This Specification covers the requirements for the protection of ferrous metal and galvanized ferrous metal surfaces from corrosion by use of paint coatings and includes requirements for both initial and maintenance painting.

Uploaded by

rahman196011
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
271 views17 pages

Coating Specification

This Specification covers the requirements for the protection of ferrous metal and galvanized ferrous metal surfaces from corrosion by use of paint coatings and includes requirements for both initial and maintenance painting.

Uploaded by

rahman196011
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

PROJECT TITLE :

Qom Regional Water Authority


Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 1 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 1 OF 4





















APPROVED BY VERIFIED BY CHECKED BY PREPARED BY ISSUED FOR ISSUE DATE REV. NO.
H.T M.F F.E M.H FR 1391/11/14 00




Coating specs.

PROJECT TITLE :

Qom Regional Water Authority
Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 2 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 2 OF 4
REVISION DETAILS
REVISION JUSTIFICATION :




REVISION INDEX
REV. NO.
SH. NO.
REV. NO.
SH. NO.
REV. NO.
SH. NO.
06 05 04 03 02 01 06 05 04 03 02 01 06 05 04 03 02 01
61 31 1
62 32 2
63 33 3
64 34 4
65 35 5
66 36 6
67 37 7
68 38 8
69 39 9
70 40 10
71 41 11
72 42 12
73 43 13
74 44 14
75 45 15
76 46 16
77 47 17
78 48 18
79 49 19
80 50 20
81 51 21
82 52 22
83 53 23
84 54 24
85 55 25
86 56 26
87 57 27
88 58 28
89 59 29
90 60 30

PROJECT TITLE :

Qom Regional Water Authority
Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 3 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 4 OF 4


TABLE OF CONTENT
SCOPE. ................................................................................................................. 4
REFERENCE STANDARDS. ............................................................................. 4
GENERAL. ........................................................................................................... 4
MATERIAL. ......................................................................................................... 5
SURFACE PREPARATION. .............................................................................. 6
PAINT APPLICATION. ..................................................................................... 8
FIELD TOUCH-UP AND MAINTENANCE PAINTING. ........................... 10
GALVANIZING. ................................................................................................ 11
PAINT SYSTEMS. ............................................................................................. 12
COLOUR CODE. ............................................................................................... 14
INSPECTION. .................................................................................................... 14
SAFETY. ............................................................................................................. 15
PAINTING REPORT TABLE. ......................................................................... 16


PROJECT TITLE :

Qom Regional Water Authority
Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 4 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 4 OF 4

U1. SCOPE
1.1 This Specification covers the requirements for the protection of ferrous metal and galvanized ferrous metal
surfaces from corrosion by use of paint coatings and includes requirements for both initial and maintenance
painting.
1.2 The following materials do not require shop or field painting:
- nickel, aluminum, and other metals not subject to corrosion, concrete and masonry surfaces, and
underground pipes.
- stainless steel and galvanized surfaces will not be painted except Specified otherwise.
1.3 Precautions will be taken to prevent paint from being applied to nameplates, couplings shafts, valve stems,
bearings, control valves, instrument glasses, moving parts and other machined surfaces.

U2. REFERENCE Standards
2.1 Swedish Pictorial Standard SIS 055900 1967.
2.2 Steel Structures Painting Council SSPC
Manual Vol.1 Good Painting Practice
Manual Vol.2 Systems and Specifications
As qualified and excepted by this specification.
2.3 British Standard B.S. 331 C Colors for Specific Purposes.
2.4 Painting manufacturers data sheets.
2.5 B.S 7079 Preparation of steel substrates before application of paint.
2.6 ASTM D 3359- CODE FOR ADHESION METHOD.
2.7 CLIENT Final finish color shades standards.

U3. GENERAL
3.1 Performance of the work
3.1.1 All work will be performed in strict accordance with these specifications and the coating manufacturers
current application instructions.
3.1.2 All work will be carried out in strict compliance with any safety regulation made by the company for the
site.


PROJECT TITLE :

Qom Regional Water Authority
Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 5 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 4 OF 4

U4. MATERIAL
4.1. Paints
All paints shall be supplied in strict accordance with this specification.
4.1.1 All coatings material shall be delivered to the job-site with following markings:
- Manufacturers Name and date of manufacture
- Product Name, Certificate of Quality from manufacturer.
4.1.2 All containers shall be the original containers and unopened.
4.1.3 All paint products, delivered at site, shall be accomplished with Products Data sheets and Application
instruction. Information include shelf-life, storage instructions, thinning instructions including maximum
amount of thinners allowed, mixing instructions, pot life, method of application, drying time as applied to
site conditions, minimum and maximum application time of overcoat, application temperature for the
material, steel surface, as well as minimum and maximum ambient temperature and relative humidity, dry
film thickness per coat, and any special precautions.
Surface preparation shall be specified.

4.2. Blasting Materials
Blasting materials shall be selected to obtain the correct blast profile in addition to the required of surface
preparation.
All abrasives shall be supplied fresh, unused, dry and free of dust, organic matter, and totally free of salt
contamination.
4.2.1 Sand shall be supplied per the general guidelines as laid down on page 21 of SSPC Painting Manual
Selection of abrasives.
4.2.2 Expendable grit (from copper slag only) 16-80 Mesh, B.S. sieve series. Grits shall not be recycled.
4.2.3 Shot is not acceptable, except as a standardized production shop process.
4.2.4 Sand shall be recycled free of any type of contaminate.





PROJECT TITLE :

Qom Regional Water Authority
Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 6 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 4 OF 4

U5. SURFACE PREPARATION
5.1. Safety Precautions
5.1.1 All pertinent safety regulations shall be adhered to rigidly. In addition, all safety precautions noted on the
manufacturers product data sheet and application instructions shall be observed.
5.1.2 Blasting equipment shall be of an approved design and manufacturers instructions shall be adhered to. In
particular the following shall be observed.
- Remote operation by operator.
- Deadmans device on nozzle.
- External hose couplings. Internal connections are forbidden.
- Adequate safety clothing.
- Coded vessel.
- Weekly hose inspection (bore is softer if internal braid has been exposed).
5.1.3 Operators shall wear air fed helmets at all times during sand blasting.
5.1.4 Access
Scaffolding guard rails and painters trolleys or cages shall be mandatory and safe stable and adequate in
extent for proper surface preparation painting and inspection.
5.2. General
5.2.1 Compressed Air
Compressed air for blasting and spraying shall be available in sufficient quantity at an adequate pressure or
as per paint manufacturers recommendation. It shall be free from water and oil.
Filters and traps used to collect water and oil shall be emptied and cleaned regularly.
5.2.2 Blasting machines shall have 1 minimum piping, an air dryer, auto filling valve, conical base, blow through
feature, correctly sized nozzle with correct fan angle for blasting job, and a hypodermic pressure gage for
checking the nozzle pressure.

5.3. Surface Preparation- General
5.3.1 Refer to clauses 4.1.3, 4.2 for general requirements.
5.3.2 Blast cleaning : according to the condition of steel as found on site (A, B or C as referred to SIS 055900-
1967) surfaces shall be blasted to a degree as specified in the paint schedule in Section 9. For hand / power
tool cleaning surfaces shall be cleaned to ST-3.

PROJECT TITLE :

Qom Regional Water Authority
Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 7 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 4 OF 4

5.3.3 Surface irregularities including weld spatter, rough capping, undercuts and slag together with sharp or rough
edges and burrs, surface laminations and laps shall be removed or rounded smooth prior to commencement
of surface preparation.
Such irregularities which become apparent after surface preparation by blast cleaning or hot acid pickling
shall be similarly treated.
5.3.4 Grease or oil contamination shall be removed initially by either wiping or scrubbing the surface with rags or
brushes wetted with spirit and then finally wiping down with clean dry cloths.
5.3.5 Blast cleaning operations shall not be conducted on surfaces that will be wet after blasting and before
coating, when the surfaces are less than C

3 above the dew point, when the relative humidity of the air is
greater than 80%, or when the ambient temperature is below C

3 , or outside daylight hours.


5.3.6 No coating will be permitted to the applied over scale, rust oil, grit, or other foreign material .
Abrasives shall be removed by brush, air blast, or vacuum type cleaner prior to applying primer.
The prepared blast cleaned surface should be primed within four hours and completely primed the same day
as blasted, and before any visible rusting or deterioration of the surface overnight before coating .If such
surfaces are not primed in accordance with the above they shall be reblasted .
5.3.7 Care should be taken not to contaminate blast cleaned surfaces prior to painting.
5.3.8 Blasting operations shall never be allowed in the vicinity of painting work or near to a wet paint surface, or
anywhere that blast abrasive, grit or fall-out shall impinge on a freshly painted surface, or on any uncovered
primed surface.
5.3.9 Residual grit and dust shall be completely removed after blasting, preferably vacuum cleaning but otherwise
by oil and water free air blast or fiber brush.
5.3.10 All abrasives shall be free from dust, moisture and salt. Blasting shall be continued till a uniform metal
surface is achieved.
5.3.11 If manual cleaning is specified it shall carried out with the aid of impact cleaning tools, abrasive wheels,
chipping hammers, scrapers, wire brushes, etc.
Cleaning with mechanically operated tools is preferable to hand cleaning especially when surfaces are
covered with heavy rust, scale or other firmly adherent deposits. Special attention shall be paid to all rivets,
welds, angles, joints, corners and openings.
The use of chisels is not allowed.



PROJECT TITLE :

Qom Regional Water Authority
Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 8 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 4 OF 4

After cleaning, dust and other loose matter shall be removed by brushing with clean hair or fiber brushes, or
by blowing off with compressed air free from moisture and oil, or by vacuum cleaning. Any oil or grease
remaining shall be removed by swabbing with a volatile solvent. This type of mechanically cleaned surface
shall receive primer in the same day.
5.3.12 Surface preparation shall result clean Surface Compatible to at least SA
2
1
2 as per Swedish Standard 05
5900, unless otherwise Specified.

U6. PAINT APPLICATION
6.1 All painting shall be carried out in full conformity with the paint manufactures recommendations and with this
Specification. Particular attention shall be paid to instructions on storage, mixing, thinning, pot life, application
conditions, application technique and recommended time intervals between coats.
Coatings shall not be applied to wet or damp surfaces.
Painting shall only be done in the open when the weather is fine and dry and likely to remain so until the paint is
dry.
6.2 Painting shall not take place at temperatures below C

5 , when the relative humidity is greater than 80% or


when the metal surface temperature is less than C

3 above the ambient dew point, or above the manufacturers


limit, particularly in the case of inorganic zinc primers.
Painting shall not take place outside daylight hours on exterior locations.
6.3 Hand mixing of paints shall only be permitted for containers up to 5 liters.
All larger containers shall be mixed by mechanical agitators and brought to a uniform consistency.
Where pigment separation readily occurs provision shall be made for continuous mixing during application.
6.4 Coatings shall be applied by conventional and/ or airless spray in exact accordance with the manufacturers
instructions and applicators approved procedure. In no circumstance shall roller application be permitted.
Brush primers shall be used in areas where brush application is permitted.
6.5 Two pack paints shall be carefully mixed in strict accordance with manufacturers instructions. The pot life of
such paints, shall be carefully noted and any mixed paint which has exceeded its pot life must be discarded
irrespective of its apparent conditions.
6.6 The application shall leave no sags, runs, marks or other defects.

PROJECT TITLE :

Qom Regional Water Authority
Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 9 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 4 OF 4

6.7 Drying and application time between coats shall adhere to the coating manufacturers recommendations with
temperature and humidity conditions taken into account, and shall generally be kept to the minimum in order to
prevent contamination between coats.
Where contamination occurs between coats this must be completely removed, generally be washing per
manufacturers recommendation or otherwise with 1% By-Proxy detergent solution or equivalent and rinsing
with clean water.
The paint surface shall be dry before over-coating application.
6.8 The greatest precaution shall be taken in the spraying of inorganic zinc primers to ensure that at all times a
wet spray is maintained to ensure proper cohesion and adhesion of zinc.
Brush painting shall be minimized and where permitted care shall be taken not to exceed the maximum film
thickness.
6.9 It is imperative that all edges be coated to the same film thickness as the adjacent steel work to prevent
premature breakdown from this area.
Corers, crevices, bots heads, welds and rivet heads require similar attention.
All such areas shall receive a brush stripe coat of the same primer to ensure that the specified dry film thickness
has been reached.
6.10 Any and all holes and surface imperfections shall be cleaned and filled in an approved manner before painting.
6.11 Dry film thickness per coat and for the total system shall follow the coating manufacturers recommendation and
this specification.
Maximum dry film thicknesses shall not exceed those laid down by the paint manufacturer and this
specification.
6.12 Except where otherwise specified, thinning shall be done only if necessary for the workability of coating, and
then only in accordance with manufacturers instruction, particularly as regards maximum amount permitted.
6.13 Each coat shall be applied in a different color or shade from the preceding coat to aid in determining the
uniformity and coverage of the coating.
The finish color will be selected by CLIENT Spec.
6.14 All points of damage to paintwork incurred at any stage of the work including site welding operations, shall be
re-prepared by blast cleaning to the original standard and recoating with the specified priming coat and finish
coat to restore the film thickness.
In all such instances preparation shall extend 25mm into the sound paintwork and a further 25mm of sound
paintwork shall be lightly blasted to etch the surface.

PROJECT TITLE :

Qom Regional Water Authority
Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 10 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 4 OF 4

Repainting shall then cover the prepared surface and the etched paintwork .
6.15 Machinery base plates to be grouted with epoxy resin should be sandblasted prior to installation, or have been
pre-coated with the compatible epoxy.
6.16 On completion of the works the Contractor shall without delay clear away and remove all surplus material,
scaffolding plant and equipment to the satisfaction of ARPC.

U7. FIELD TOUCH-UP AND MAINTENANCE PAINTING
7.1 Field Touch-up
7.1.1 All steel surfaces which have been shop primed and brought to the field for touchup top coating shall receive the
following additional preparation prior to topcoating :
All areas of grease and oil shall be thoroughly solvent wiped with toluo1 or cleaner recommended by
manufacturer using rags thoroughly soaked in the solvent and replaced regularly in order to insure that the rags
and solvent are clean and that contamination is removed and not redistributed.
7.1.2 All shop primed or shop top coated steel shall be made good in the field prior to final riled top coating.
These shall include any damaged or masked areas.
All such areas shall be adequately prepared, by sandblasting to SIS SA
2
1
2
7.1.3 All shop primed items which have deteriorated as a result of transshipment to the extent that either
crumbling or white staining of the coating is evident shall receive :
1) In severe cases, a superficial sweep blast cleaning sufficient to remove the degradation and to reprepare
exposed degraded metal substrate and dust.
2) In mild cases, scrubbing with a 2% detergent wash using bristle rushes, followed by copious rinsing
down with clean fresh water.

7.2. Maintenance Painting
7.2.1 Surface preparation for maintenance work shall be as specified in Section 5.3 except as amended below.
7.2.2 Prior to commencement of any surface preparation of previously painted surfaces, the existing paintwork
shall be thoroughly examined and all areas of loosened paint and rust formation carefully noted so that work
can be concentrated on such areas.
If such areas cannot exactly be defined then overall preparation shall be carried out.

PROJECT TITLE :

Qom Regional Water Authority
Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 11 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 4 OF 4

7.2.3 The preparation of the surface shall ensure that all loosened paintwork is removed to a firm edge and that all
other surface irregularities and contaminants are also removed as specified in Section 5.3.
7.2.4 Loosened paintwork and rust formation shall be removed by blast cleaning as specified in Section 5.3.
Surface preparation of previously painted surfaces by chipping, scraping and steel wire brushing using power
driven tools may be accepted as an alternative to blast cleaning in less severe environments, or in areas
where sandblasting is prohibited due to process or hazard limitation.
7.2.5 Surface preparation or areas of existing sound paintwork prior to further coating shall comprise removing
any oil or grease contamination followed by washing down with a 1% By-Proxy (or equal) detergent
solution and rinsing with clean water.
7.2.6 Galvanized steel surfaces having loosened paint and areas of corrosion shall be prepared by hand scraping to
a firm edge and then steel wire brushed to remove all corrosion products and surface contaminants.
The surface shall then be cleaned by wiping with rags or brushes wetted with white spirits and finally wiped
down with clean dry cloths, then refer, to Section 8.
7.2.7 Maintenance painting shall be carried out in conformity with the requirements of Section 6 except as
modified below.
7.2.8 All prepared surfaces shall be primed before any deterioration of the preparation occurs or within 4 hours
whichever is the sooner. Where patch priming is being carried out this shall extend 50mm (2) on to the
adjacent sound paintwork.
7.2.9 The paint systems shall be as specified in the Schedules which are shown as the minimum dry film thickness
of the individual coatings and as the total dry film thickness of the complete paint system.
U8. GALVANIZING
8.1 Surface preparation, materials, application, and inspection shall be in accordance with the following ASTM
Standards:
UItems to be Galvanized UApplicable ASTM Standards
Hot dip galvanizing A123, A153
Bolts, Washers, Nuts B 695
8.2 Particular care shall be taken to remove any materials from surfaces to be galvanized which could be
conductive to a premature failure of the zinc coating.
8.3 If site painting or repair over galvanized items is required the surface shall be degreased with white spirit and in
the case of new surfaces chemically etched either by using an approved mordant solution per manufacturers
instructions or in the case of complete over painting on etch primer. In the case of weathered galvanizing the

PROJECT TITLE :

Qom Regional Water Authority
Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 12 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 4 OF 4

surface shall be wire brushed to remove all corrosion products and followed by degreasing with white spirits.
Over painting repairs shall be made with zinc rich epoxy paint.
U9. PAINT SYSTEMS
Following primers and intermediate or finish coats are used in the tables.
Primer:
- P1 : Inorganic zinc silicate.
- P2 : Zinc pros plate etch primer. (wash primer)
- P3 : Organic zinc rich epoxy.
- P4 : Vinyl chloride co- polymer.
b) Intermediate finish coats.
- F1 : Epoxy polyamide-MIO.
- F2 : High build epoxy polyamide.
- F3 : Coal- tar epoxy.
- F4 : Vinyl chloride co-polymer.
- F5: Silicone resin or modified aluminum.
- F6 : Aliphatic polyurethane.
- F7 : Solvent free epoxy.












PROJECT TITLE :

Qom Regional Water Authority
Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 13 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 4 OF 4

UTABLE-9A
USTRUCTURAL STEEL, PIPING AND EQUIPMENT

EXTERIOR SURFACE
PAINT SYSTEM
DFT (DRY FILM THICKNESS
IN MICRONS)
SSPC SURFACE
PREP N.O
PRIMER
COAT
INTER
COAT
FINISH
COAT
PC IC FC TOTAL
STEEL
(NOTE-1)
Indoor
10 P3 F1 F2 70 100 120 290
10 P1 F5 F5 70 30 30 130
Outdoor 10 P3 F1 F6 70 2*75 50 270
STEEL TO BE
INSULATED (NOTE-1)
10 P1 _ _ 75 _ _ 75
10 P1 _ _ 75 _ _ 75
GALVANIZED STEEL
(NOTE-2)
UPPERLADDERS.
HORIZONTAL POLES,
TOP RAILS, MID RAILS.
SAFETY PLATFORM,
SAFETY CAGES
1 P2 (NOTE-3) F6 10 _ 70 80
SUPFACE PROOFED
FRIE PROOFED
10 P1 75 75
NOTES:
1) STAINLESS STEELS DO NOT REQUIRE PAINTING.
2) SHALL BE PAINTED AT THE DISCRETION OF CLIENT.
3) ETCH PRIMER FOR-TREATMENT.




PROJECT TITLE :

Qom Regional Water Authority
Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 14 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 4 OF 4


U10. COLOUR CODE
Colour code will be according to CLIENT final finish colour shades standard.

U11. INSPECTION
After surface preparation and before applying the paint roughness shall be checked as per
blasting procedure.
Finished paint work shall have the correct shade, degree of gloss and evenness and be free
from tackiness after drying / curing and cracks, and cracks, holidays, runs, sags, wrinkles,
patchy ness, brush marks or other defects that may be detected in a coated area.
The quality control procedure shall be in the form of an inspection and test plan which
reference all test procedures, witness paints, acceptance and rejection criteria, and frequency
of testing and how control of quality is measured and maintained.
All dry film thicknesses given in this specification shall be strictly adhered to and shall be
measured in accordance with SSPC-PA2 with particular reference to requirements laid down
in clause 3.1 concerning the minimum thicknesses permitted for a given number of
measurements tanks over a stated area. The maximum tolerance on dry film thickness for each
coat shall be in accordance with recommendations of the paint manufacturer, which once
established shall not be exceeded. The film thickness shall be checked with calibrated film
thickness gauges, using the magnetic resistance or eddy currents principle, such as Elcometer,
Microtest, Tinselly, etc. and following the procedures conferred in SSPC-PA 2. The
equipment shall be calibrated at least twice daily in accordance with the manufacturers
recommendation.
In order to achieve the specified dry film thickness frequent check of wet film thickness shall
be carried out during the application with film thickness gauges such as the elcometer wheel

PROJECT TITLE :

Qom Regional Water Authority
Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 15 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 4 OF 4

or comb type.
In the event of the thickness not meeting the specified requirements, additional coat(s) of the
paint concerned shall be applied in compliance with the specified requirements.
The degree of curing of epoxy resin paint systems shall be the determination of the resistance
of the coating to methyl ethyl ketone (MEK). After rubbing the coating for one minute with a
rag soaked in MEK, the coating shall not be softened and shall resist scraping with a
fingernail.
The adhesion of the primer to the steel substrate and the intercoat adhesion of the subsequent
coat(s) and primer after curing shall be determined by alternative methods at the discretion of
owner. Adhesion to the steel substrate may be determined in accordance with X-cut taps test
described in ASTMD3359, method A for specified film thicknesses in excess of 125 microns
and method B for specified film thickness up to 125 microns.
The criteria for acceptance of adhesion tests as mentioned above shall, unless otherwise
agreed, be a scale of 4A for ASTMD3359, method A, and a scale of 4B for ASTMD3359,
method B.
For the painting material, the following checking shall be done:
1) shelf-life and pot-life
2) the paint up to data certificate of chemical/ physical specification from as approved laboratory.
3) Continuity of paint
4) Viscosity
U12. SAFETY
As paint, has been manufactured from some toxic and flammable elements then working with this item shall be done
with most care. For storage and its handling flash point and manufacturer data sheet recommendation must be taken
in to consideration. All the mixing and applying shall be done in an open area or with a ventilator. Operator shall wear
eye protection when applying paint. Avoid cleaning hand with paint solvent which will cause serious chronic skin
complaints. During handling the paint appropriate gloves and clothing shall be used.


PROJECT TITLE :

Qom Regional Water Authority
Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 16 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 4 OF 4

U13. PAINTING REPORT

Order No : Project No:
Serial No : Ref. Standard:
Client: Part / Ass. Name:
Grit / Sand / Shot Blasting Method :
Metal Surface Temperature: C


Surface preparation standard: grade of blasted surface
Painting process Reference standard:
Ambient Conditions
Dew point : C

temperature: C

Relative Humidity: %
Duration Between Surface prep. & painting Hour (s)
Paint Application Method :
First coating Second coating
Paint Type: shelf life/pot life: Paint Type: shelf life/pot life:
Addition : Addition :
Mix : Mix :
Thinner : Thinner :
Allowable time for next coating : Allowable time for next coating :
Third Coating Final Coating
Paint Type: shelf life/pot life: Paint Type: shelf life/pot life:
Addition : Addition :
Mix : Mix :
Thinner : Thinner :
Allowable time for next coating : Allowable time for next coating :
First Coating : Dry Film Thickness
Second Coating : Dry Film Thickness
Third Coating : Dry Film Thickness
Final Coating : Dry Film Thickness
Total Dry Film Thickness :
Result : (Adhesion/continuity/visual) Acceptable Not Acceptable
Corrective Action (s) Requirement :



PROJECT TITLE :

Qom Regional Water Authority
Qom Water Treatment Plant
DOCUMENT TITLE :
Coating specs.
DOC. PRODUCER CODE :
DOCUMENT CODE
CORRESPONDING DOC. CODE
REV. NO SR.NO DOC. TYPE DISC. UNIT STAGE PROJECT
SH. 17 of 17 00 002 SPC ME 00 B QWTP

FORMAT CODE : QWTP-A4PW-01 REV.NO.00 SH. 4 OF 4