Subsea Integrity: from thoughts to actions, by det norske veritas. Ss Avoid (major) accidents SS Comply with regulations and authority requirements SS Meet production targets / minimum downtime (economy) ss ensure the integrity of an asset / system throughout its whole lifecycle ensure fitness for purpose of assets with optimal use of effort whilst complying with company policies and regulatory requirements.
Subsea Integrity: from thoughts to actions, by det norske veritas. Ss Avoid (major) accidents SS Comply with regulations and authority requirements SS Meet production targets / minimum downtime (economy) ss ensure the integrity of an asset / system throughout its whole lifecycle ensure fitness for purpose of assets with optimal use of effort whilst complying with company policies and regulatory requirements.
Subsea Integrity: From thoughts to actions Subsea Europe 2009 Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 2 Subsea Assets What are we talking about? Risers Umbilicals Non class Floaters SURF Subsea equipment, Umbilical, Risers, Flowlines X-mas Trees Subsea to beach Flowlines Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 3 What is Integrity Management? Whats the difference between Whats the difference between a maintenance program a maintenance program and and integrity management integrity management?? Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 4 What is Integrity Management? IM : Integrity Management Integrity of an Asset or System: the asset/system fulfil the design requirements throughout its whole lifecycle ensure fitness for purpose of assets with optimal use of effort whilst complying with company policies and regulatory requirements a continuous process of Knowledge and Experience Management applied throughout the lifecycle to assure that the asset/system is managed cost effectively and safely and remains reliable and available, with due focus on personnel, assets, operations and environment IM activities: The activities to control and document the integrity for the whole operational life IM aims to IM aims to ensure the integrity ensure the integrityof an asset/system within a of an asset/system within a set of set of specified specifiedoperational operational limitations limitations throughout the throughout the lifecycle lifecycle Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 5 What should we focus on? Avoid (major) accidents Comply with regulations and authority requirements Comply with codes and standards, e.g. DNV Codes, API standards, Company standards, etc. (acceptance criteria, requirements, PIM system ) Protect reputation Meet production targets / minimum downtime (economy) Low maintenance costs Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 6 Integrity Management: System vs. Process Core process Core process Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 7 The Integrity Management System; in a life cycle perspective Establish integrity stage Concept, design and construction Maintain integrity stage Operation and maintenance INTEGRITY MANAGEMENT PROCESS System risk review and strategy development Inspection, monitoring and testing Integrity Assessment Mitigation, intervention and repair Abandonment
Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 8 IM in a life cycle perspective Design Fabrication Installation Operation Time scale: Establish integrity Maintain integrity Phases: Transfer Integrity Operation Transfer Integrity e.g. pipeline Ownership transfer Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 9 Repair Intervention Mitigation Integrity assessment Testing Monitoring Inspection System Risk Review & Strategy Development The Integrity Management Process: Key Elements The Deming Wheel Model: Design requirements Authority Requirements Company requirements HAZOP etc PLAN DO CHECK ACT Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 10 The Integrity Management Process Hazard evaluation and Risk assessment Implement the Integrity Management Plan Learning and Improvement Develop the Integrity Management Plan Hazard evaluation & assessment methods are the basis for planning and execution of IM activities DNV approach for Integrity Management: Risk Based Inspection & Maintenance Planning Keys steps Keys steps Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 11 Risk Based Approach IM Strategy System breakdown Assessment of individual risks The level of inspection, monitoring or maintenance should be related to the level of risk identified. 6 5 4 3 2 P r o b a b i l i t y
1 A B C D E Consequence
LOW LOW MEDIUM MEDIUM HIGH HIGH Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 12 Other tools for IM RCM: Reliability Centered Maintenance RBM: Risk Based Maintenance (RBI + RCM) SIL: Safety Integrity Level RAM: Reliability, Availability and Maintenability Fitness for Purpose Technical Assessment (fatigue, pressure containment, etc.) Flow Assurance CFD: Computational Fluid Dynamics Modeling (corrosion, flow, spills, etc.) Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 13 Market needs and challenges Integrity assessment Lifetime extension Flow assurance Failure investigation - corrosion - dents and cracks - free spans - buckles - etc. Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 14 Integrity assessment From diagnosis to solution Results from inspections Design data and operational data Acceptance criteria Integrity evaluation - Failure modes - Loads and capacity Conclusions Recommendations - Inspections and analyses - Mitigation actions - Interventions and repairs Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 15 Integrity Management Requirements and Guidelines Authority requirements Company requirements Standards e.g. ISO, NORSOK and DNV-OS-F101 - Safety philosophy - Requirements to Integrity Management System Guidelines, e.g. DNV Recommended Practices - DNV-RP-F206 (Riser system) - DNV-RP-F116 (Pipeline system) upcoming 2009 - Technical RP s - Corrosion, erosion, free span, stability, buckling Development and Implementation Integrity Management System - Technology, work processes, people and organisation - Integrity Management software and databases Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 16 DNV services following the field life cycle S e r v i c e s T e c h n i c a l
i s s u e s D N V Design and Construction Operation and Production Installation ready for production Safety and reliable performance Smooth handover from project to operational org. Prepare for operation, e.g. Work procedures, Management systems and Administrative systems Technical issues: Corrosion, Flow assurance, Sand management, Specific system solutions and theats Qualify equipment for production Complete construction and commissioning Smooth transition from design to operation Technical integrity partner Establish Asset Integrity Management systems Subsea/Pipelines & Structures Establish HSE and Emergency Preparedness system Verification, technology qualification and technical advisor Follow-up HSE and Emergency Preparedness performance Establish Production and Maintenance system Follow-up Improvement of production and maintenance performance Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 17 Operations Phase Services Development and implementation of Integrity Management system Condition assessment (fit for service) Lifetime extension and re-qualification Planning of inspections, maintenance and testing Technical assistance (in connection with repairs, mitigations, interventions, selection of inspection tools, decommissioning etc.) Failure investigation and laboratory testing Flow assurance and sand management Risk assessment (eg. HAZID and QRA) Availability and reliability evaluations Regulatory compliance services Data management and software systems Training and courses Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 18 Laboratory Services DNV capabilities: Failure investigations Small and large scale testing Qualification management and testing Purpose made testing rigs according to client specifications Flow testing Full scale bend testing of clad pipe TTRD - Wear testing with mud Tool joint wear on tubing hanger seal area Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 19 Develop a Subsea Integrity Management System Critical Issue -Handover from Norsk Hydro -Safeguard integrity of subsea system Solution -Early preparation; DNV engaged 2 years prior to handover -Develop a Subsea Integrity Management System (SIMS) defining the organisation, work processes and resources -Assist Shell in implementation and auditing of SIMS Value delivered -Extensive expertise and knowledge from DNV on the system from concept, design, fabrication and installation -Technical assistance: Pipeline condition, corrosion and erosion assessment... Shell: Ormen Lange - Subsea Integrity Management - Pipeline systems - Umbilicals - Subsea structures - Subsea control and safety system Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 20 Petrobras Subsea Integrity Management Solution: Multidisciplinary competencies, use of international networks in DNV, development of innovative solutions Key Deliverables: Best Practices reports, IM database, Risk Based IM Process, RAM analysis Value Delivered: State of the art IM System implemented, safety improvement, cost savings Develop a Risk Based Integrity Management System for subsea flow systems from Petrobras/UN-RIO nCritical Issue: Develop a new approach on Integrity management of components with complex design, including those installed in deepwaters Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 21 Greater Plutonio FPSO Solution: Cross disciplinary and cross regional cooperation to deliver the required equipment and system competence Deliverables: Integrity management program for all systems on the FPSO including hull, mooring, lifting equipment Manage the IM program during operation Value delivered: High quality integrity management program and engineering competence from one single service provider FPSO Integrity Management nCritical Issue: Develop one integrity management program for all systems at the FPSO in a unified manner
Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 22 Evaluate and document the integrity of the HP/HT flowlines Critical Issue: - Evaluate and document the integrity of the high pressure / high temperature (HP/HT) flowlines. - Propose and document effect of maintenance measures. - Kristin field (8 lines) and sgard field (26 lines). Currently extending to Mikkel and Urd fields. Solution: - Establish a risk based methodology for integrity assessment of HP/HT flowlines. - Develop effective FE analysis tools, databases and visualization tools. StatoilHydro Integrity assessment of HP/HT flowlines Shut down Normal operation Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 23 Develop a Well Risk Management System Critical Issues - Old installation has shut down wells due to leak caused by barrier degradation Solution: - Preparing a reliability analysis for each well including flow analysis and evaluation of fire and explosion potential. - Evaluating the effect of degraded compared to intact well in production with and without gas lift as well as in shut-in condition. - Prepared a method for analysis which can be updated when the operational conditions change. - Acceptance criteria based on fire and explosion risk or environmental risk. Value Delivered: - Providing risk based acceptance criteria's for evaluation of degraded well barriers. - Presenting the total leak risk from all platform wells - Extensive expertise and knowledge from DNV on the system from well design, technical safety and reliability analysis. StatoilHydro Oseberg st: Well Risk Management - Well Integrity - Operational risk analysis - Technology qualification Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 24 Critical Issue - Expected subsidence by year 2028 is as much as 12m at the centre of the Ekofisk complex giving large wave loads on risers just underneath the deck structure. - New extreme design waves. - Corrosion. Some risers are from the 1970s. ConocoPhillips Life Extension of Ekofisk Risers Scope - All critical risers are to be verified with respect to prolonged service life. Solution - Non-linear time domain FE analyses of risers. CFD analyses of wave loads. Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 25 StatoilHydro: Statfjord A Pipelines Life Extension Critical Issue: - Field developed through 70s and further installed from 1979 - Field to be extended in operation additional 20 years from present - Future operation of risers, infield pipelines including relevant components Solution: - Assess degradation mechanisms from start-up to present; and toward future - Investigate operational condition vs. design requirements - Assess condition with respect to External and Internal threats of pipeline and components. Value to be delivered: - Current condition with recommendations for enhanced condition status - Recommendations toward future operation Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 26 Integrity Management DNV References DNV Rules and RPs - OS-F101/2007 - Submarine Pipeline Systems (IM concepts for all phases of pipeline life cycle, from design to abandonment). - RP-F206 Riser Integrity Management: - RP-H101 - Risk Management Subsea - RP-F101 Corroded Pipelines - RP-F107 - Risk Assessment of Pipeline Protection - RP-G101 - RBI Offshore - RP-F116 - Submarine Pipeline Systems Integrity Management To Be Issued Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 27 Wraping up Offshore Assets: huge investments Integrity Management: cost effective compared to investments One solution doesnt fit all IMPORTANT: start during conception phase Risk Based Inspection and Management Planning: core of IM process DNV: Recommended Practices and Softwares for IM, RBI and RCM + hands on experience DNV experience with IM for offhsore assets: - Platforms (structures and topside plants) - Pipelines - Subsea installations and wells - Mooring Systems Det Norske Veritas AS. All rights reserved. Subsea Integrity: from thoughts to actions 24th November 2009 28 Contact: [email protected] Safeguarding life, property and the environment www.dnv.com
SPE - Emerging Decommissioning Trends in South East Asia - Local Interpretation and Implementation of Recently Updated Legislative Framework and Guidelines