Liquid/Liquid and Gas/Liquid/Liquid Separators - Type Selection and Design Rules
The copyright of this document is vested in this company. Calculation example an existing horizontal open two-phase settler has to be checked to establish whether it can separate oil and water properly under given process conditions. If required, its separation performance has to be upgraded by the installation of internals.
Liquid/Liquid and Gas/Liquid/Liquid Separators - Type Selection and Design Rules
The copyright of this document is vested in this company. Calculation example an existing horizontal open two-phase settler has to be checked to establish whether it can separate oil and water properly under given process conditions. If required, its separation performance has to be upgraded by the installation of internals.
DEP 31.22.05.12-Gen. January 2008 DESIGN AND ENGINEERING PRACTICE USED BY COMPANIES OF THE ROYAL DUTCH/SHELL GROUP
This document is restricted. Neither the whole nor any part of this document may be disclosed to any third party without the prior written consent of Shell Global Solutions International B.V., The Netherlands. The copyright of this document is vested in this company. All rights reserved. Neither the whole nor any part of this document may be reproduced, stored in any retrieval system or transmitted in any form or by any means (electronic, mechanical , reprographic, recording or otherwise) without the prior written consent of the copyright owner. DEP 31.22.05.12-Gen. January 2008 Page 74 IV.1.3 Calculation example An existing horizontal open two-phase settler has to be checked to establish whether it can separate oil and water properly under given process conditions. If required, its separation performance has to be upgraded by the installation of internals. Flow conditions are: Oil: mass flow rate of 500 t/d with a density of 750 kg/m 3 and a dynamic viscosity of 0.5 mPa.s. Water: mass flow rate of 320 t/d with a density of 990 kg/m 3 and a dynamic viscosity of 0.9 mPa.s. Design margin is 1.2 No dispersion band expected in the oil/water interface Level control (based on water flow rate): 3 minutes between high and low level (pre-alarms) 1 minute between pre-alarm and trip Further information: Vessel: diameter 1.5 m and T/T of 5 m (heads semi-elliptical with a ratio of 2:1) Nozzles: feed inlet is a top inlet located 0.25 m from the "left" vessel tangent line; distance of oil and water outlets from "right" vessel tangent line is 0.4 m; diameters of feed inlet, oil outlet and water outlet are 0.15, 0.15 and 0.10 m respectively Internals: only vortex breakers on the oil and water outlet are present Check To optimise the settling conditions, it is proposed to convert the vessel layout to the layout shown in the top part of Figure 3.1. It is proposed to fit the feed nozzle with an elbowed pipe directed to the nearest vessel head and to install a double calming baffle (30 % NFA and 50 % NFA respectively), the second baffle to be located at 0.75 m (0.45 vessel diameter) from the left tangent line with a distance of 0.3 m (0.2 D ves diameter) between the baffles. The distance from the vertical TL to the first baffle is taken slightly larger than the minimum (0.25 vessel diameter) to accommodate the inlet nozzle with sufficient clearance from left tangent line and baffle. This distance is 150+ ID nozzle + max(150, 0.5xID nozzle ) = 0.45 m. This will result in an effective settling length to the nozzles of 5 - 0.4 - 0.75 = 3.85 m. The distance between pre-alarm and trip level in each set is at least 0.1 m (no allowance for dispersion band necessary) and the distance between high and low IL is minimal 0.35 m. This results in a total control band of minimal 0.55 m. As a starting point it is assumed that the control band has this minimum width of 0.55 m. It should be located in the vessel so that in both the oil and the water layer proper bulk separation takes place i.e. all droplets larger than 150 m diameter shall be removed. Initially three locations of this control band in the vessel have been considered: Position I: At the lowest location (LZA(LL) int = 0.2 * D ves = 0.3 m) Position II: In the centre (A l = A h ) Position III: At the highest location (LZA(HH) int = 0.8 * D ves = 1.2 m) For these three positions the various quantities (e.g. cross-sectional areas, velocities, cut- off diameters, control time and maximum allowable axial velocities) have been calculated according to the calculation scheme presented in Appendix IV.3. DEP 31.22.05.12-Gen. January 2008 Page 75 They are listed in the following table. Nozzle velocities (including design margin!) have also been calculated and listed. In this table it has been indicated (by bold italic and border) where the various requirements for this type of separator are not satisfied (see Appendix IV.1.2).
location of control band position I (low) position II (medium) position III (high) position IV
limits of LZA(LL) int (m) 0.300 0.475 0.650 0.380 control band LZA(HH) int (m) 0.850 1.025 1.200 0.930 step 1 A l (m 2 ) 0.734 0.480 0.252 0.616
A h (m 2 ) 0.252 0.480 0.734 0.352 v l,ax (mm/s) 12.6 19.3 36.8 15.0 v h,ax (mm/s) 17.8 9.3 6.1 12.8 step 2 L set (m) 3.85 3.85 3.85 3.85 step 3 v dh,set (mm/s) 2.1 2.4 2.9 2.2 v dl,set (mm/s) 1.4 1.2 1.1 1.3 d h (m) 103 113 134 107 d l (m) 125 106 96 114 step 4 A con (m 2 ) 0.505 0.520 0.505 0.516
V hd (m 3 ) 0.143 0.152 0.143 0.149
V con (m 3 ) 2.813 2.905 2.813 2.878 t con,H_L (sec) 627 647 627 641 t con,HH_H (sec) 186 177 155 184 t con,L_LL (sec) 155 177 186 167 nozzle feed: v N1 (m/s) 0.74 0.74 0.74 0.74 velocities oil out: v N3 (m/s) 0.50 0.50 0.50 0.50 water out: v N4 (m/s) 0.55 0.55 0.55 0.55
The check of the settler leads to the following conclusions: The calculations show that for the low, medium and high control band position, adequate bulk separation takes place for both liquid phases (cut-off diameter smaller than 150 m). However, the axial velocity in the light phase exceeds the upper limit of 0.015 m/s when the control band is in the medium or high position. The axial velocity in the heavy phase exceeds the limit of 0.015 m/s when the control band is in the low position. Therefore, for optimum settler performance, a control band position between the low and medium position should be selected. The table shows that if LZA(LL) int is at 0.38 m (position IV; 0.08 m above the low position) the velocity requirement for both phases has been satisfied. The available time for the various control bands is in all cases much more than the minimum requirements, so the selected width of the control band of 0.55 m is more than sufficient. The nozzle inlet and outlet velocities are well below the maximum of 1 m/s. As i m trying to size settler as per this shell DEP, i m unable to understand how vdh and vdl for all positions are calculated ? Please help me in this regard i will be very thankful to you. You immediate response is highly appreciated.
CIGRE-158 An Efficient Production Tool To Maximize BC Hydro Peace System Transfer Limits While Factoring in Dynamically Armed Generation Shedding RAS Requirements PDF