07-Dec-2009
Sr. Name of Scheme /Adm Status of Approved Exp. upto Funds Exp. during Exp. During Cumulative Exp.
No Approval Date Scheme Amount 31/03/ 2009 During November the Year Upto
09- 10 2009 09- 10 November 2009
(1) (2) (3) (4) (5) (6) (7) (4+7)
39 Tankri, Aug W/s Scheme[16/12/2004] In Progress 7.50 5.71 0.00 0.00 0.33 6.04
40 Uncha, Aug W/s Scheme[16/12/2004] In Progress 12.50 9.35 0.00 0.00 0.25 9.60
41 Usmapur, Aug W/s Scheme[16/12/2004] In Progress 80.70 76.26 0.00 0.00 3.37 79.63
Div. Total 1,479.62 1,328.48 0.00 0.00 33.84 1,362.32
Prg. Total 1479.62 1328.48 0.00 0.00 33.84 1362.32
Rural Nab. RIDF XII
Rewari PHED
42 Bamber, Pro W/s Scheme[30/03/2007] In Progress 90.01 97.03 0.00 0.00 0.09 97.12
43 Gurawara, Pro W/s Scheme[13/03/2007] In Progress 167.64 188.78 0.00 0.00 15.36 204.14
44 Jant Sariawas, Pro W/s In Progress 174.05 143.28 0.00 0.00 1.24 144.52
Scheme[30/03/2005]
45 Jatusana, Pro W/s Scheme[13/03/2007] In Progress 163.51 82.34 0.00 0.00 0.00 82.34
46 Jiwra, Pro W/s Scheme[13/03/2007] In Progress 117.08 100.78 0.00 0.00 30.58 131.36
47 Khijuri, Pro W/s Scheme[13/03/2007] In Progress 183.79 200.43 0.00 0.00 1.69 202.12
48 Khushpura, Pro W/s In Progress 164.92 77.10 0.00 0.00 32.90 110.00
Scheme[13/03/2007]
49 Makharia, Pro W/s Scheme[13/03/2007] In Progress 97.03 65.75 0.00 0.00 24.01 89.76
50 Mundra, Pro W/s Scheme[13/03/2007] In Progress 189.71 194.39 0.00 0.00 3.09 197.48
51 Phadni, Pro W/s Scheme[30/03/2007] In Progress 131.36 110.44 0.00 0.00 23.94 134.38
52 Shadipur, Pro W/s Scheme[30/03/2005] In Progress 52.98 10.59 0.00 0.00 0.00 10.59
Div. Total 1,532.08 1,270.91 0.00 0.00 132.90 1,403.81
Prg. Total 1532.08 1270.91 0.00 0.00 132.90 1403.81
Rural Nab. RIDF X
Rewari PHED
53 Jharodha Aug W/s Scheme[27/01/2004] In Progress 300.21 265.65 0.00 0.00 1.57 267.22
Div. Total 300.21 265.65 0.00 0.00 1.57 267.22
Prg. Total 300.21 265.65 0.00 0.00 1.57 267.22
Rural Ind. Fed.
Rewari PHED
54 Bhatera, Providing Independent In Progress 12.50 0.00 0.00 0.00 0.00 0.00
Feeder[30/11/2006]
55 Chandanwas, Providing Independent In Progress 17.50 0.00 0.00 0.00 0.00 0.00
Feeder[30/11/2006]
56 Gokal Garh, Providing Independent In Progress 32.35 13.42 0.00 0.00 0.00 13.42
Feeder[30/11/2006]
57 Kanwali, Providing Independent In Progress 24.72 0.00 0.00 0.00 0.00 0.00
Feeder[30/11/2008]
58 Kharagwas, Providing Independent In Progress 15.00 0.00 0.00 0.00 0.00 0.00
Feeder[30/11/2006]
59 Khera Murar, Providing Independent In Progress 10.00 0.00 0.00 0.00 0.00 0.00
Feeder[30/11/2006]
60 Ladhuwas, Providing Independent In Progress 15.00 0.00 0.00 0.00 0.00 0.00
Feeder[30/11/2006]
61 Mastapur, Providing Independent In Progress 10.00 0.00 0.00 0.00 0.00 0.00
Feeder[30/11/2006]
Div. Total 137.07 13.42 0.00 0.00 0.00 13.42
Prg. Total 137.07 13.42 0.00 0.00 0.00 13.42
Rural IGDWS
Rewari PHED
62 Indra Gandhi Drinking water supply In Progress 386.00 393.70 0.00 0.00 0.00 393.70
(2007-08) Distt - Rewari[31/03/2007]
63 Indra Gandhi Drinking water supply In Progress 431.85 434.88 0.00 0.00 0.00 434.88
(2008-09) Distt - Rewari[31/03/2008]
64 Infrastructure for SC households under In Progress 450.00 69.07 174.00 0.00 370.88 439.95
WSD Rewari[04/06/2008]
Div. Total 1,267.85 897.65 174.00 0.00 370.88 1,268.53
Prg. Total 1267.85 897.65 174.00 0.00 370.88 1268.53
Rural DDP
Rewari PHED
65 Bawa- Updating water In Progress 13.70 0.00 6.75 0.00 0.50 0.50
supply[04/06/2008]
66 Berli Kalan- Boosting In Progress 14.05 0.00 7.00 0.00 4.75 4.75
station[04/06/2008]
Page 2 of 6
07-Dec-2009
Sr. Name of Scheme /Adm Status of Approved Exp. upto Funds Exp. during Exp. During Cumulative Exp.
No Approval Date Scheme Amount 31/03/ 2009 During November the Year Upto
09- 10 2009 09- 10 November 2009
(1) (2) (3) (4) (5) (6) (7) (4+7)
67 Boria Kamalpur, Providing Water Supply In Progress 239.25 0.00 32.87 0.00 0.19 0.19
Scheme[01/01/1900]
68 Dehlawas Aug W/s Scheme[09/07/1999] In Progress 81.50 86.39 0.00 0.00 3.38 89.77
69 Dharoli, Construction of Water In Progress 154.00 13.19 20.00 0.00 71.23 84.42
Works[20/12/1999]
70 Gamri- Updating water In Progress 2.60 0.00 2.60 0.00 0.00 0.00
supply[04/06/2008]
71 Gogudh- Updating W/S In Progress 4.30 0.00 4.30 0.00 0.17 0.17
scheme[04/06/2008]
72 Gudiani- W/S to Model In Progress 96.40 51.08 16.75 0.00 24.25 75.33
village[07/10/2008]
73 Kapriwas, Aug W/s Sch Group of 3 Nos In Progress 28.50 23.66 0.00 0.00 0.86 24.52
of villages[20/12/1999]
74 Khurshid Nagar- Updating water In Progress 7.90 0.17 7.73 0.00 0.00 0.17
supply[04/06/2008]
75 Kolana, Pro Ind Water In Progress 11.80 3.12 8.68 0.00 0.00 3.12
Works[20/12/1999]
76 Lisan - prov. 2 no. t/w and laying of In Progress 28.80 0.00 10.40 0.00 0.00 0.00
pipe[10/02/2009]
77 Meerpur- W/S to Model In Progress 85.60 53.01 12.30 0.00 11.73 64.74
village[07/10/2008]
78 Palhawas W/S Scheme[20/12/1999] In Progress 100.50 95.42 0.00 0.00 0.00 95.42
79 Revised estimate for Ind. W/S Bishowa In Progress 183.60 56.19 25.00 0.00 76.94 133.13
gr. (Original cost 152.50 lacs)
[04/06/2008]
80 Revised estimate for providing B/S and In Progress 191.00 71.28 25.00 0.00 47.34 118.62
pipeline in Model village Nahar (Org.
[04/06/2008]
81 Rewari - Horizontal layer of filter media In Progress 17.45 0.00 8.75 0.00 0.00 0.00
upto 27 depth in existing
filter[10/02/2009]
82 Sekhpur Sikarpur, Aug W/s Sch Group of In Progress 81.50 68.14 6.75 0.00 8.83 76.97
11 No. of Villages[20/12/1999]
Div. Total 1,342.45 521.65 194.88 0.00 250.17 771.82
Prg. Total 1342.45 521.65 194.88 0.00 250.17 771.82
Rural Aug.
Rewari PHED
83 Alamgirpur Aug. W/S In Progress 2.55 1.53 1.02 0.00 0.12 1.65
Scheme[17/05/2006]
84 Aulant, Tubewell[18/03/2006] In Progress 64.00 61.92 2.08 0.00 9.08 71.00
85 Bass Aug. W/S Scheme[17/05/2006] In Progress 6.35 7.37 0.00 0.00 0.00 7.37
86 Bhatsana, Aug. W/S In Progress 15.30 10.98 0.00 0.00 0.29 11.27
Scheme[18/03/2006]
87 Bhurthal Jat Tubewell[18/03/2006] In Progress 18.40 17.48 0.92 0.00 3.10 20.58
88 Bhusla, Tubewell[18/03/2006] In Progress 27.40 2.40 25.00 0.00 0.00 2.40
89 Budhpur, Aug W/s Sch[17/05/2006] In Progress 12.75 13.57 0.00 0.00 0.92 14.49
90 Construction of SE Residence for SE, In Progress 24.30 0.00 10.00 0.00 0.00 0.00
PHE Circle, Rewari[09/06/2009]
91 Dharuhera, Independent Water SUpply In Progress 53.00 41.89 11.11 0.00 5.74 47.63
Scheme[28/11/2006]
92 Fatehpuri Tappa Dahina Aug. W/S In Progress 4.15 5.98 0.00 0.00 0.16 6.14
Scheme[17/05/2006]
93 Jant, Tubewell[18/03/2006] In Progress 11.85 7.08 4.77 0.00 0.24 7.32
94 Jarthal Ki Dhani, Improvement W/s In Progress 20.50 15.59 4.91 0.00 2.18 17.77
Scheme[18/03/2005]
95 Jeetpura, Water SUpply In Progress 16.55 10.05 6.50 0.00 0.92 10.97
Scheme[18/03/2006]
96 Jonawas, Pipeline[17/05/2006] In Progress 5.40 0.07 5.33 0.00 0.00 0.07
97 Kakoria, Independent Water In Progress 9.15 10.92 0.00 0.00 0.45 11.37
Works[18/03/2006]
98 Kasoli, Water Supply In Progress 11.15 6.92 4.23 0.00 0.00 6.92
Scheme[18/03/2006]
99 Kishangarh, Pipeline[17/05/2006] In Progress 4.30 0.24 4.06 0.00 1.13 1.37
100 Maliawas, Aug W/s Sch[17/05/2006] In Progress 10.60 0.85 9.75 0.00 0.11 0.96
Page 3 of 6
07-Dec-2009
Sr. Name of Scheme /Adm Status of Approved Exp. upto Funds Exp. during Exp. During Cumulative Exp.
No Approval Date Scheme Amount 31/03/ 2009 During November the Year Upto
09- 10 2009 09- 10 November 2009
(1) (2) (3) (4) (5) (6) (7) (4+7)
101 Nangal Pathani, Aug W/s In Progress 13.50 10.41 3.09 0.00 0.00 10.41
Sch[18/03/2006]
102 Pithrawas, Aug W/s Sch[17/05/2006] In Progress 12.45 0.00 12.45 0.00 0.00 0.00
103 Pragpura, Aug W/s Sch[17/05/2006] In Progress 11.70 0.06 11.64 0.00 0.00 0.06
104 Raliawas, Boosting Station[18/03/2006] In Progress 25.00 11.64 13.36 0.00 2.93 14.57
105 Ramgarh Aug. W/S Scheme[17/05/2006] In Progress 4.10 5.14 0.00 0.00 0.00 5.14
106 Rojhka[18/03/2006] In Progress 11.90 4.70 7.20 0.00 0.42 5.12
107 Tatarpur Istmarar, Pipeline[17/05/2006] In Progress 2.85 0.46 2.39 0.00 0.27 0.73
Div. Total 399.20 247.25 139.81 0.00 28.06 275.31
Prg. Total 399.20 247.25 139.81 0.00 28.06 275.31
Rural ARWSP
Rewari PHED
108 Aulant, Aug W/s Sch Group of 6 In Progress 125.00 104.80 0.00 0.00 0.00 104.80
Villages[25/07/2000]
109 Bass Duda, Providing In Progress 10.25 1.89 8.36 0.00 0.17 2.06
Tubewell[03/07/2007]
110 Beriawas (Kathuwas), Aug W/s In Progress 24.00 10.68 6.60 0.00 1.44 12.12
Sch[20/12/1999]
111 Bhandor, Tubewell[03/07/2007] In Progress 10.25 2.76 7.49 0.00 1.31 4.07
112 Bidawas, additional T/w[30/06/2000] In Progress 6.70 3.76 0.00 0.00 0.00 3.76
113 Bolni, Tubewell[17/05/2006] In Progress 6.50 8.80 0.00 0.00 0.90 9.70
114 Chandawas Aug. W/S In Progress 4.60 1.63 2.97 0.00 0.18 1.81
Scheme[17/05/2006]
115 Chhawa, Tubewell[17/05/2006] In Progress 10.40 7.93 2.47 0.00 0.20 8.13
116 Chita DUngra, Pro 1 No. In Progress 7.05 3.73 0.00 0.00 5.94 9.67
Tubewell[09/08/2002]
117 Chita DUngra, Pro Tubewell[03/07/2007] In Progress 7.95 0.00 0.00 0.00 5.20 5.20
118 Churiawas, Tubewell[17/05/2006] In Progress 10.40 4.23 6.17 0.00 0.23 4.46
119 Dahina, Boosting Station[17/05/2006] In Progress 12.55 10.06 2.49 0.00 6.62 16.68
120 Dhanies Mundra Aug. W/S In Progress 3.40 3.22 0.18 0.00 0.00 3.22
Scheme[17/05/2006]
121 Gumina, Tubewell[17/05/2006] In Progress 13.20 5.69 7.51 0.00 2.71 8.40
122 Gurawara Aug W/S Scheme[17/05/2006] In Progress 45.20 1.50 11.75 0.00 0.00 1.50
123 Jahidpur Tappa Kosli, In Progress 16.60 13.60 3.00 0.00 1.49 15.09
Tubewell[17/05/2006]
124 Jakhala, Providing Tubewell[03/07/2007] In Progress 15.00 0.34 7.50 0.00 0.84 1.18
125 Jarthal Churiawas, Aug W/s In Progress 229.85 183.83 0.00 0.00 25.73 209.56
Sch[06/06/1995]
126 Jholry Aug. W/S Scheme[17/05/2006] In Progress 17.00 21.28 0.00 0.00 0.93 22.21
127 Jiwra Aug W/S Scheme[17/05/2006] In Progress 6.60 1.49 5.11 0.00 0.00 1.49
128 Joniawas, Tubewell[17/05/2006] In Progress 12.50 5.47 7.03 0.00 0.00 5.47
129 Kanharwas, Tubewell[17/05/2006] In Progress 10.60 15.10 0.00 0.00 0.29 15.39
130 Kanwali Aug. W/S Scheme[17/05/2006] In Progress 23.10 26.31 0.00 0.00 0.46 26.77
131 Karan Kunj (Gujar Ghata) Aug. W/S In Progress 14.10 14.84 0.00 0.00 0.47 15.31
Scheme[17/05/2006]
132 Khandora Aug. W/S In Progress 13.00 7.36 5.64 0.00 0.00 7.36
Scheme[17/05/2006]
133 Kharkhara, Tubewell[17/05/2006] In Progress 12.80 4.71 8.09 0.00 3.95 8.66
134 Khera Murar Aug W/S In Progress 97.75 94.86 2.89 0.00 0.00 94.86
Scheme[30/06/2000]
135 Khera Murar, Internal and Distribution In Progress 65.00 21.04 11.00 0.00 0.66 21.70
System[12/05/2004]
136 Khol Aug. W/S Scheme[17/05/2006] In Progress 6.00 4.16 1.84 0.00 0.00 4.16
137 Khol Aug. Water Supply In Progress 5.85 3.13 2.72 0.00 0.12 3.25
Scheme[17/05/2006]
138 Khori, Additional Tubewell[14/05/2000] In Progress 13.75 6.16 7.59 0.00 0.81 6.97
139 Kundal, 1 NO Tubewell[19/05/2007] In Progress 6.30 5.34 0.96 0.00 0.62 5.96
140 Kundal, Providing Tubewell[03/07/2007] In Progress 7.95 0.74 7.21 0.00 0.30 1.04
141 Lohana, Pro Additional In Progress 10.00 5.41 4.59 0.00 0.61 6.02
Tubewell[19/05/2007]
142 Lukhi, Aug W/s Sch[12/05/2004] In Progress 145.00 118.61 10.25 0.00 13.73 132.34
Page 4 of 6
07-Dec-2009
Sr. Name of Scheme /Adm Status of Approved Exp. upto Funds Exp. during Exp. During Cumulative Exp.
No Approval Date Scheme Amount 31/03/ 2009 During November the Year Upto
09- 10 2009 09- 10 November 2009
(1) (2) (3) (4) (5) (6) (7) (4+7)
143 Majra Mustal Bhakli, In Progress 8.40 5.02 3.38 0.00 6.16 11.18
Tubewell[03/07/2007]
144 Majra Sheoraj, Boosting In Progress 11.55 9.73 1.82 0.00 0.00 9.73
Station[17/05/2006]
145 Mamria Asampur, Aug W/s In Progress 9.15 0.18 8.97 0.00 0.00 0.18
Sch[31/03/2006]
146 Manethi, Tubewell[03/07/2007] In Progress 10.25 4.91 5.34 0.00 0.00 4.91
147 Massani, Boosting Station[17/05/2006] In Progress 11.90 9.64 2.26 0.00 1.62 11.26
148 Mastpur Aug W/S Scheme[19/03/2006] In Progress 104.25 111.56 0.00 0.00 0.09 111.65
149 Mohniawas, Aug W/s Sch[31/03/2006] In Progress 15.70 1.69 7.00 0.00 5.42 7.11
150 Narain VIhar Aug W/S In Progress 33.60 3.53 10.00 0.00 0.25 3.78
Scheme[17/05/2006]
151 Nimoth, Tubewell[03/07/2007] In Progress 17.00 1.73 7.75 0.00 0.47 2.20
152 Padaniawas Aug. W/S In Progress 11.60 11.09 0.51 0.00 0.77 11.86
Scheme[17/05/2006]
153 Palhawas, Aug W/s Sch[27/06/1997] In Progress 151.35 52.92 0.00 0.00 15.94 68.86
154 Phadani Aug. W/S Scheme[17/05/2006] In Progress 0.75 0.00 0.75 0.00 0.00 0.00
155 Phideri Aug. W/S Scheme[06/06/1995] In Progress 99.90 95.64 0.00 0.00 4.50 100.14
156 Pithrawas Aug W/S Scheme[17/05/2006] In Progress 12.04 10.70 1.34 0.00 0.00 10.70
157 Pithrawas, Tubewell[03/07/2007] In Progress 10.25 2.53 7.72 0.00 1.45 3.98
158 Radha ki Dhani, Pro Addl In Progress 7.60 3.69 0.00 0.00 0.00 3.69
Tubewell[20/12/1999]
159 Ram Garh, Providing In Progress 10.75 0.00 6.50 0.00 0.36 0.36
Tubewell[03/07/2007]
160 Rasgan Aug. W/S Scheme[17/05/2006] In Progress 12.40 11.37 0.00 0.00 0.96 12.33
161 Rasiawas, Pro Additional T/w Group of In Progress 10.65 6.86 0.00 0.00 0.00 6.86
villages[20/12/1999]
162 Rojhuwas, Pro Independent Water In Progress 144.00 132.70 0.00 0.00 5.22 137.92
Works[01/03/2000]
163 School Connection Aug. In Progress 22.50 18.20 4.30 0.00 1.31 19.51
W/S[17/05/2006]
164 School Connection to various villages of In Progress 30.00 32.39 0.00 0.00 2.84 35.23
District Rewari[31/03/2006]
165 Sehbajpur, Aug W/s Sch[06/06/1995] In Progress 43.00 51.36 0.00 0.00 1.24 52.60
166 Sekhu Sikarpur, Aug W/s In Progress 120.46 109.90 0.00 0.00 2.97 112.87
SCh[06/06/1995]
167 Shayam Nagar Aug. W/S In Progress 11.35 7.65 3.70 0.00 3.02 10.67
Scheme[17/05/2006]
168 Subhaseri - II, Tubewell[17/05/2006] In Progress 15.90 14.88 1.02 0.00 1.36 16.24
169 Sudhrana, Aug W/s Sch Group of 4 In Progress 50.00 39.35 10.65 0.00 7.89 47.24
Villages[26/08/2000]
170 Sunaria, Additional In Progress 10.60 1.68 8.92 0.00 1.68 3.36
Tubewell[17/05/2006]
171 Tatarpur Khalsa, Tubewell[17/05/2006] In Progress 11.80 5.58 0.00 0.00 0.00 5.58
172 WSD Rewari, Replacement of Filter In Progress 10.00 0.00 0.00 0.00 0.00 0.00
Media 3 No Canal base
Scheme[03/07/2007]
Div. Total 2,044.90 1,480.94 233.34 0.00 141.43 1,622.37
Prg. Total 2044.90 1480.94 233.34 0.00 141.43 1622.37
Rural ACA
Rewari PHED
173 Baliar Khurd, Providing Independent In Progress 12.25 0.19 0.00 0.00 0.48 0.67
Tubewell[02/08/2004]
174 Balwari, Providing Additional In Progress 20.20 3.47 16.73 0.00 0.00 3.47
Tubewell[02/08/2004]
175 Bhanwari, Pro Independent Water In Progress 13.40 8.52 4.88 0.00 3.63 12.15
SUpply[02/08/2004]
176 Bishanpur Aug. W/S In Progress 10.60 14.35 0.00 0.00 0.41 14.76
Scheme[04/06/2008]
177 Dhamalka, Providing Independent W/s In Progress 12.50 5.73 6.77 0.00 0.28 6.01
Sch[02/08/2004]
178 Dungarwas Aug. W/S In Progress 1.20 0.00 1.20 0.00 0.00 0.00
Scheme[17/05/2006]
Page 5 of 6
07-Dec-2009
Sr. Name of Scheme /Adm Status of Approved Exp. upto Funds Exp. during Exp. During Cumulative Exp.
No Approval Date Scheme Amount 31/03/ 2009 During November the Year Upto
09- 10 2009 09- 10 November 2009
(1) (2) (3) (4) (5) (6) (7) (4+7)
179 Gokalpur Aug. W/S Scheme[17/05/2006] In Progress 7.40 7.54 0.00 0.00 0.00 7.54
180 Jiwra, Kanhora, Gurawara, Construction In Progress 25.00 26.92 0.00 0.00 0.19 27.11
of Boosting Station[02/08/2004]
181 Kahari Aug. W/S Scheme[17/05/2006] In Progress 10.40 16.52 0.00 0.00 0.00 16.52
182 Khijuri Bhadoj, Providing Additional In Progress 6.15 1.93 4.22 0.00 0.00 1.93
Tubewell[16/12/2004]
183 Kumbhawas, Providing Additional In Progress 14.80 0.90 13.90 0.00 0.06 0.96
Tubewell[02/08/2004]
184 Maheshwari, Tubewell[25/01/2001] In Progress 12.85 5.68 7.17 0.00 0.42 6.10
185 Malahera Aug. W/S Scheme[17/05/2006] In Progress 10.70 6.27 4.43 0.00 0.00 6.27
186 Masit, Providing Independent W/s In Progress 18.00 11.25 6.75 0.00 3.02 14.27
Sch[02/08/2004]
187 Meerpura Aug. W/S Scheme[17/05/2006] In Progress 15.65 16.49 0.00 0.00 0.00 16.49
188 murlipur Aug W/s Scheme[09/06/1998] In Progress 120.90 142.04 0.00 0.00 0.22 142.26
189 Nandha (Balwari), Aug W/s In Progress 20.20 3.47 16.73 0.00 0.00 3.47
Sch[31/03/2005]
190 Nangal Jamalpur, Providing In Progress 14.50 12.36 2.14 0.00 1.40 13.76
Independent W/s Sch[02/08/2004]
191 Panwar, Providing Independent W/s In Progress 11.20 2.56 8.64 0.00 0.00 2.56
Sch[02/08/2004]
192 Sulkha Aug. W/S Scheme[04/06/2008] In Progress 6.00 10.65 0.00 0.00 0.00 10.65
Div. Total 363.90 296.84 93.56 0.00 10.11 306.95
Prg. Total 363.90 296.84 93.56 0.00 10.11 306.95
Deposit [(Original/Special Repair) Rural]
Rewari PHED
193 Pro.water supply arrangement to 28 In Progress 64.60 0.00 0.00 0.00 0.00 0.00
battalion of ITBP police at
Jatusana[16/01/2008]
194 Revise Estimate for shifting of water In Progress 26.70 0.00 0.00 0.00 0.00 0.00
supply and sewerage
pileline[20/11/2007]
Div. Total 91.30 0.00 0.00 0.00 0.00 0.00
Prg. Total 91.30 0.00 0.00 0.00 0.00 0.00
G.Total 8958.58 6322.79 835.59 0.00 968.96 7291.75