0% found this document useful (0 votes)
44 views

Development

Uploaded by

Oscar Wong Chong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views

Development

Uploaded by

Oscar Wong Chong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 23

J 7evel c .

p
m
ent
-441-411-
222

CHAPTER6

Devel opment of Rei nf orcement
L 1 =AB. I f u, i s the f ai l ure s tres s agai ns t s l i ppage acti ng over the nomi nal s ur-
f ace area - rrd, , L, , then
or
Onthe other hand, i f ub i s the f ai l ure
s tres s agai ns t s pl i tti ng and Ab,
i s
the aver-
agebeari ng area per
uni t l ength, then
or
L =f '
db
(6 . 2. 2)
Ahr 4
Thes ames i tuati on
exi s ts i nf reebodyBCas s howni nFi g.
6. 2
. 1 (c) . Thus the
maxi mumtens i l ef orce at
Bhas todevel opbyembedment i nbothdi recti ons f rom
B; that i s ,
both
the ABand BCdi s tances . Wheres pace l i mi tati ons prevent pro
vi di ng the proper amount of s trai ght embedment, s uch bars maybetermi nated
bys tandard hooks (as def i ned i n ACI - 7. 1 ) . As tandard hook i s permi tted to be
cons i dered as contri buti ng to an equi val ent devel opment l ength bymechani cal
acti on (ACI - 1 2. 5) , thus reduci ng the total embedment di mens i on requi red . Sec-
ti on 6. 1 1 provi des treatment of
devel opment l ength
wi ths tandard hooks
.
Adequatedevel opment l ength
mus t
beprovi ded f or a rei nf orci ng bar
i ncom-
pres s i onas wel l as i n
tens i on.
r' LLL_
z
u, 7r dbL, =
fy,
7r
db
ubAb, Ll =
T
- _
7rdb
4

f
r
T
L
2
=
f v
d, ,

(6. 2. 1 )
4u,
L,
7
A

B

B

C
(b)

(c)
Fi gure 6. 2. 1

Devel opment of rei nf orcement .
224

CHAPTER6

Devel opment of
Rei nf orcement
6. 4 Fai l ure
Modes
The
term" _bondfai l ure" hasbeengi vento
themechani smbywhi chf ai l ureoccurs
wheni nadequate devel opment
l engthi s provi ded. Years ago, whenpl ai n bars
( rel ati vel ysmooth bars wi thout l ug
def ormati ons) were used, sl i p resi stance
( " bond" ) wasthought of as adhesi on
betweenconcrete paste andthe surf ace of
the bar. Yet evenwi thl owtensi l e
stress i nthe rei nf orcement, therewassuf f i ci ent
sl i p i mmedi atel y adj acent to a
f l exural crack i n the concrete to break the adhe-
si on, l eavi ng onl yf ri cti ontoresi st
bar movement rel ati ve tothesurroundi ng con-
crete over thesl i p l ength.
Shri nkage can al so cause
f ri cti onal drag agai nst the bars. Typi cal l y, a
hot-
rol l edpl ai nbar may
pul l l oose byl ongi tudi nal spl i tti ng whenthe
adhesi onand
f ri cti on resi stances are
hi gh, or j ust pul l out l eavi ng a cyl i ndri cal hol e
whenadhe-
si on andf ri cti on
resi stances are l ow.
Def ormed_bars
were createdto change t he
behavi
or
pattern so that there
woul d
_be
l ess_rel i anceonf ri cti on andadhesi on
( thoughtheyst i l l exi st) and. more
rel i ance
on_the beari ngof the l ugsagai nst
the concrete. Thebeari ngf orces act at
an angl e to the axi s of the bar, causi ng
radi al outwardcomponents agai nst the
concrete, as showni n Fi g. 6. 4. 1 .
When i nadequate devel opment l engthi s pro-
vi ded, def ormedbars i n
normal -wei ght concrete gi ve ri se to a spl i tti ng_modeof
f ai l ure ( i . e. , " bondf ai l ure" ) [ 6
. 1, 6
. 5,
6
. 71 .
Aspl i tti ng f ai l ure occurs when
the
wedgi ng acti on of the
steel l ugs on a def ormedbar causes cracks i n the
sur-
roundi ng concreteparal l el
tothebar . Thesecracksoccur betweenthebar
andthe
nearest concrete
f ace, as showni n Fi g. 6. 4. 2( a, b), or over the short
di stance
betweenbars
whenbars are cl osel y spaced, as
i n Fi g.
6. 4
. 2( c) .
Whensmal l si ze bars are usedwi th
l arge
cover,
the l ugs maycrushthe con-
crete bybeari ngandresul t i n a pul l out
f ai l urewi thout spl i tti ng the concrete. Thi s
nonspl i tti ng f ai l ure hasal sobeen
reportedf or l arger barsi nstructural l i ghtwei ght
concrete [ 6. 11 .
Al thoughspl i tti ng i s the
usual f ai l ure mode, ani ni ti al spl i tti ng crack on one
f aceof a beami s not
consi deredf ai l ure. Thedi stress si gni ndi cati ng f ai l ure
i s pro-
gressi vespl i tti ng.
Conf i nement of tensi on steel bysti rrups, ti es, or spi ral s
usual l y
wi l l del aycol l apse
( commonl ydef i nedasani ncrease i nl oadi ng
that resul ts i nno
i ncrease i n resi stance)
unti l several spl i tti ng cracks havef ormed.
Ori gi nal l y, devel opment l engthrequi rements
werebasedonpul l out tests [ 6. 81
of pl ai n bars, f ol l owedbypul l out tests [ 6. 9-6. 151
of def ormedbars, i ncl udi ng the
rel atedl oad-sl i pdata. Si nce
conf i nement exi sts i npul l out tests, theearl yworkdi d
not gi ve suf f i ci ent emphasi s to the
spl i tti ng modeof f ai l ure. Spl i tti ng has been
emphasi zedi n the more
recent studi es byOrangun, J i rsa, andBreen [ 6. 3,
6. 41,
( a) Onbar
( b)
On
concrete

( c) Components
Fi gure 6. 4
. 1

Forces
betweenbar andsurroundi ng concrete.
Fi nal spl i t t i ng f ai l ur e
Cb >Cs,
- . - C
=CS
( a
Fi r st spl i t t i ng
' /
( b)

( c )
Fi gur e 6. 4 . 2

Spl i t t i ng c r ac ks and
ul t i mat e spl i t t i ng f ai l ur e modes ( f r om
ACI
Commi t t ee 408
[ 6- 11) .
Unt r auer
and War r en [ 6. 16] , Kemp
and Wi l hel m [ 6. 171,
Mor i t a and Kaku
[ 6
. 18] ,
J i menez,
Whi t e, and Ger gel y [ 6. 191,
Kemp
[ 6. 71,
Mi r za [ 6. 20] ,
Moehl e, Wal l ac e, and
Hwang [ 6. 21] , Dar wi n, Mc Cabe,
I dun, Sc hoenekase
[ 6. 221, Lut z, Mi r za, andGosai n
[ 6
. 23] , and Hwang, Leu, and
Hwang [ 6. 241 .
The st udi es of Or angun,
J i r sa, and Br een [ 6. 31
andUnt r auer and War r en [ 6. 161
have hypot hesi zed t hat
t he ac t i on of spl i t t i ng
ar i ses f r oma st r ess c ondi t i on
anal -
ogous t o a c onc r et e
c yl i nder sur r oundi ng
a r ei nf or c i ng bar and ac t ed upon by
t he
out war d r adi al c omponent s
[ Fi g . 6. 4. 1( c ) ]
of t he bear i ng f or c es f r omt he
bar . The
c yl i nder woul d
have an i nner di amet er
equal t o t he bar di amet er c l h
and a t hi c k-
ness Cequal t o
t he smal l er of CF, , t he
c l ear bot t omc over , or C,
hal f of t he c l ear
spac i ng t o
t he next adj ac ent bar ( see
Fi g . 6. 4 . 3) . The t ensi l e
st r engt h of t hi s c on-
c r et e c yl i nder
det er mi nes t he
r esi st anc e agai nst spl i t t i ng.
I f
CS
<Cb, a si de- spl i t
t ype
of f ai l ur e oc c ur s [ Fi g. 6. 4
. 2( c ) ] . When C>
Ch,
l ongi t udi nal c r ac ks t hr ough
t he
bot t omc over f or mf i r st
[ f i r st spl i t t i ng c r ac ks
i n Fi g . 6. 4 . 2( a) , ( b) ] . I f Ci s
onl y
nomi nal l y gr eat er t han
C, , , t he sec ondar y spl i t t i ng
wi l l be si de spl i t t i ng al ong
t he
pl ane of t he bar s . I f CS i s
si gni f i c ant l y gr eat er
t han
Cb,
t he sec ondar y
spl i t t i ng wi l l
al so be t hr ough t he
bot t omc over t o c r eat e a
V- not c h f ai l ur e [ Fi g. 6. 4. 2( b) ] .
The pr oposal Hf
ACI Commi t t ee 408 [ 6. 5,
6
. 251
r ec ogni zes
t he c yl i nder
hypot hesi s
f or spl i t t i ng f ai l ur e . The
por t i on of t he pr oposal r el at i ng
t o hooks ( see
Sec t i on 6. 11)
was adopt ed f or t he 1983
ACI Code, and t he
por t i on r el at i ng t o
st r ai ght bar devel opment l engt h
f or med t he basi s f or
t he r el at i vel y c ompl ex
6. 4 Fai l ur e Modes

225
Whol e l ayer suddenl y
spl i t s
af t er
i ni t i al
hor i zont al spl i t s at si des
Cyl i nder of c onc r et e
t r i bu
t ar y t o bar
Fi gur e 6. 4. 3

Conc r et e
c yl i nder hypot hesi s
f or spl i t t i ng f ai l ur e ( f r om
Or angun,
J i r sa, and Br een [ 6. 3] ) .
6 6

1, 1cment Capaci t y Dagrarn-Bar Bends and Cut of f s

227
Thus, t he l ocal i zed si t uat i on, rel at i ng t o rat e of change i n moment , does not
di rect l y correl at e wi t h t he devel opment -l engt h-rel at ed st rengt h of t he member.
When t he bars are properl y anchored, t hat i s, t hey have adequat e devel opment
l engt h provi ded and cont i nue t o carry- t hei r requi red t ensi l e f orce, t he l ocal i zed
st ress condi t i on i s not of concern.

'
6. 6 Moment Capaci t y
Di agram-Bar Bends
and Cut of f s
As st at ed i n Sect i on 6. 2, t he moment capaci t y of a beamat any sect i on al ong i t s
l engt h i s a f unct i on of i t s cr oss-sect i on and t he act ual embedment l engt h of _ i t s
_ rei nf orcement . The concept of a di agramshowi ng t hi s t hree-di mensi onal rel a-
t i onshi p can be a val uabl e ai d i n det ermi ni ng cut of f or bendpoi nt s of l ongi t udi -
nal rei nf orcement . I t may be recal l ed f romChapt er 3 t hat i n t erms of t he cross
sect i on, t he moment capaci t y ( i . e . , st rengt h) f or a
si ngl y
rei nf orced rect angul ar
may be expressed
NI =A, f , ( d - a/ 2)

[ 3. 8. 11
Equat i on ( 3 . 8 . 1) assumes t hat t he st eel rei nf orcement compri si ng A, i s ade-
quat el y embedded i n each di rect i on by t he requi red devel opment l engt h Ldf rom
t he sect i on where 1111 i s comput ed such t hat t he st ress f , , i s reached.
" EXAMPLE 6. 6. 1 Comput e anddrawt he moment capaci t y di agramqual i t at i ve-
l y f or t he beamof Fi g. 6. 6. 1 .
Sol ut i on:

The procedure
i s
basi cal l y t he same whet her st rengt h ( M, or OMn) or
worki ng st ress moment capaci t y i s desi red.
The maxi mumcapaci t y i n each regi on i s represent ed by t he hori zont al por-
t i ons of t he di agrami n Fi g. 6. 6. 1 . I n t hi s exampl e, t here are f i ve bars of one si ze
i n sect i on C-C; t hus t he maxi mummoment capaci t y represent ed by each
bar i s
i n t hi s case approxi mat el y one-f i f t h of t he t ot al capaci t y
. Act ual l y, t he
sect i ons
wi t h f our and t wo bars wi l l have a
l i t t l e more t han f our-f i f t hs and t wo-f i f t hs,
respect i vel y, of t he t ot al capaci t y of
t he sect i on cont ai ni ng f i ve bars, due t o
t he sl i ght
i ncrease
i n moment armwhen t he number of bars i n t he sect i on
decreases.
At poi nt a, t he l ocat i on where t he f i f t h bar t ermi nat es, t hi s bar has zero
embedment l engt h t o t he l ef t andt hus has zero capaci t y. Proceedi ng t o t he ri ght
f rompoi nt a, t he bar may be count ed on t o
carry
a t ensi l e f orce proport i onal
t o
i t s embedment f rompoi nt a up t o t he devel opment
l engt h L, l .
Thus,
i n
Fi g. 6. 6
. 1,
poi nt brepresent s t he poi nt where t he
f i f t h bar i s f ul l y devel opedt hrough t he di s-
t ance L< < and can t heref ore
carry i t s
f ul l
t ensi l e capaci t y. The ot her cut of f poi nt s
are
t reat ed
i n t he
same
way.
" EXAMPLE 6. 6. 2 Demonst rat e
qual i t at i vel y t he pract i cal
use
of t he moment
capaci t y OM, di agramf or veri f i cat i on of
t he l ocat i ons of cut of f
or bend
poi nt s i n
a desi gn.
Assume t hat t he mai n
cross-sect i on wi t h f i ve equal -si zed bars provi des
exact l y t he requi red st rengt h at mi dspan f or t hi s si mpl y support edbeamwi t h uni -
f orml oad, as shown i n Fi g. 6. 6. 2.
228

CHAPTER6

Devel opment
of Rei nf orcement
Fi gure
6. 6. 1

Moment capaci ty
di agram.
2bars

,4bars

Poi nt a,

,5bars
L . ' 3
L _C
Note: Showi ngthe ti p of a
bar bent upi s a schemeusedthroughout
thi s text to
showthe bar termi nati on. Thebars are actual l y
strai ght and l i e i n a
commonpl ane.
Secti onA-A

Secti onB-B

Secti on C: -C
i
( ~ of span
Sol uti on:

( a) Compute
the actual OAI
f or eachpotenti al
bar groupi ngthat may
be
used; i nthe present
case, f or f i ve
bars, f our bars, and
twobars.
( b) Deci de whi chbars
must extend
enti rel y across the span
and i nto the
support
. ACI -12. 11 . 1 states
that " At l east
one-thi rd the posi ti ve
moment rei n-
f orcement i n si mpl e
members . . . shal l
extendal ong the same
f ace of member
i nto the support . " I n
beams, the
rei nf orcement must
extendi nto the support
at
l east 6 i n. I n thi s
case, twobars
shoul dextendi nto the
support .
( c) Deci de onthe order
of cutti ng or
bendi ng the
remai ni ng bars. The
l east
amount of l ongi tudi nal
rei nf orcement
wi l l be obtai ned
when the resul ti ng
moment capaci ty
O/ 1, di agrami s
cl osest to the f actored
moment M
di agram.
Wi ththat thought
i nmi nd, and
proceedi ngf rom
maxi mummoment regi on
tothe
support, cut of f
onebar as soonas
permi ssi bl e.
~-
At endof bar :

no capaci ty; devel ops
f ul l strength
by "bond" i n
l ength Ld
6. 6

Moment Capaci ty Di agram, -Bar
Bends and Cutof f s

229
M
i s zero at centerl i ne of si mpl e support
dor 12di am

Theoreti cal
cut-of f poi nt
Actual f actored moment di agram,
M
( desi gn moment)
Fi gure
6. 6. 2

Veri f i cati on of bar cutof f s wi th the moment capaci ty di agram.
( d) Cutof f restri cti ons. Poi nt Aof Fi g. 6. 6. 2i s thetheoreti cal l ocati onto thel ef t
of whi ch thecapaci ty representedby the
remai ni ng f our
bars
i s adequate. Topro-
vi de f or a saf ety f actor agai nst shi f ti ng of the moment
I I , , di agram( especi al l y i n
conti nuous spans) andto provi de
parti al l y f or thecompl exi ty ari si ng f roma poten-
ti al di agonal crack, theACI Codeprovi des
that_ there_ must beanextensi onbeyond
the poi nt wherea bar theoreti cal l y maybetermi nated, or i t maybebent i nto the
compressi on
f ace.
I n
ACI
12. 10
. 3 _
i s the statement, "Rei nf orcement shal l extend
beyondthe poi nt at whi ch i t i s no l onger requi red to resi st f l exure f or
a
di stance
equal _ to the ef f ecti ve depth-of - the member_ or 12bar, di ameters, whi chever i s
greater, except at supports of si mpl espans andat f reeendof canti l evers . "
( e)
Oncecutof f or bend
poi nts are l ocated, a check i s madeby drawi ng the
moment capaci ty 0 M, , di agramto ensure no encroachment on the
f actored
moment M, di agram.
( f ) Other restri cti ons
.
Si ncepoi nts BandCof Fi g. 6. 6. 2arebar termi nati ons
i n a tensi on zone,
the
stress concentrati ons descri bed i n Secti on 6
. 5
are present,
r~
ti ~
230

CHAPTER6

Devel opment
of
Rei nf orcement
ef f ecti vel y reduci ng the
shear strength of the beam[ 6. 26,
6. 27] .
Thus, one
of
the
three
speci al
condi ti ons of ACI - 12. 10
. 5
must besati sf i ed f or cutof f s to beaccept-
abl e.
However,
i f these
bars were bent up and anchored i n the compressi on
zone, no
f urther i nvesti gati on woul d benecessary.
6. 7 Devel opment Length f or Tensi onRei nf orcement
- ACI Code
The term"devel opment l ength" has been
def i ned i n Sec.
6. 2 as
the l ength of
embedment needed todevel opthe
yi el d
stress
i ntherei nf orcement
. As
descri bed
i nSecti on 6. 4 , the devel opment
l ength requi rement i s pri mari l y a f uncti on of the
spl i tti ng resi stance of the
concrete surroundi ng the bars rather than a f ri cti onal -
adhesi onal
pul l out resi stance
. The spl i tti ng resi stance i s roughl y proporti onal to
the
bar area,
i ndi cated by
Eq. ( 6. 2. 2) ; whereas the pul l out resi stance i s roughl y
proporti onal tothe bar di ameter, i ndi cated by Eq. ( 6. 2. 1) .
I n the 1989 ACI Code, compl etel y newbar devel opment provi si ons were
adopted ( ACI - 12. 2) , recogni zi ng the ef f ects of ( a) l ateral spaci ng of bars bei ng
devel oped, ( b) cl ear cover over bars bei ng devel oped, and ( c) conf i nement, i f
any, by sti rrups, ti es, or spi ral s aroundthebars bei ng devel oped. Those
provi si ons
are descri bed i n detai l i n the 5th edi ti on of thi s text, and are not repeated
here.
Because of the seemi ng
compl exi ty of the 1989 provi si ons f or bar devel op-
ment, and i n response to strong
encouragement f romthe prof essi on, ACI Com-
mi ttee 318 revi sed the
requi rements f or the 1995 ACI Code.
The 1995 Code provi si ons
are based on the same basi c rel ati onshi p devel -
oped by Orangun, J i rsa, and Breen[ 6. 3, 6. 4 ] that f ormed the basi s f or the 1989
Codeprovi si ons. The 1995 provi si ons areal so i nf l uenced by a morerecent study
Sozenand Moehl e[ 6. 281.
The general equati on, af ter some tamperi ng wi th the Orangun, J i rsa, and
Breen[ 6. 3, 6. 4 ] f ormat, i s gi ven i n
ACI - 12. 2. 3
as
ACI Formul a ( 12- 1) ,
where
L~l
=
~n =
C=
devel opment l ength
L, t -
_3
f , ,

4 YA
d
n
4 0~

C
+
Ktr~
nomi nal di ameter of bar or wi re
cover or spaci ng di mensi on
the smal l er of ( 1) di stance f rom
center of ba_r bei ng devel oped to the
nearest concrete surf ace,
and ( 2)
one- hal f
the center- to- center spaci ng
of bars bei ng
devel oped

-
For SI , wi th
A,
and J ' , ' i n MPa,
L< < _
15 _J w

aPyA
db

16N/ f ~'
l G+K, rl
( 6. 7. 1) *
where
Thet ransverse
rei nf orcement t erm
K,
i s def i ned as f ol l ows :
At ,
=t ot al cross- sect i onal
area of al l t ransverserei nf orcement whi chi s
wi t hi n t hespaci ng s and whi chcrosses t he pot ent i al pl ane of
spl i t t i ng
t hrought he
rei nf orcement bei ng devel oped
fyt =speci f i ed yi el d st rengt hof t ransverse
rei nf orcement , psi
s =maxi mumcent er- t o- cent er
spaci ng of t ransverse rei nf orcement wi t hi n
devel opment l engt h
L d
n =
number of
bars bei ng devel oped al ong t he pl ane of
spl i t t i ng
I n t he use of Eq. ( 6 . 7 . 1) , t he
cover and t ransverse rei nf orcement t ermcannot be
t aken great er t han 2
. 5 ;
t hus,
Thesymbol s a, ( 3 , y and
A i n Eq. ( 6
. 7
. 1) represent t hef ol l owi ng modi f i cat i on
f act ors :
a =modi f i cat i on f act or
f or rei nf orcement l ocat i on
=
1 . 3
f or
t op
bars t
=1 . 0 f or ot her bars
modi f i cat i on f act or f or epoxy- coat ed
rei nf orcement
=1
. 5
when cover
<3 d, , or cl ear spaci ng
<
6d, ,
=1 . 2
ot her
epoxy- coat ed rei nf orcement
=1 . 0 non- epoxy- coat ed rei nf orcement
a( 3 =need not exceed 1 . 7
y =modi f i cat i on f act or f or bar si ze
=0 . 8 f or #6 and
smal l er
bars
and def ormed wi re
=1
. 0
f or
#7
and l arger bars
A =
modi f i cat i on
f act or f or l i ght wei ght aggregat e concret e
1 . 3 f or l i ght wei ght aggregat e concret e
' For SI , wi t h
f r
i n MPa,
6. 7

Devel opment Lengt h f or Tensi on Rei nf orcement - ACI Code

23 1
( or 6. 7~/
,
f ,
>_
l . p
when f t i s speci f i ed)
1 . 0 f or
normal - wei ght concret e
Kt ,
1500s' n
,

( 6
. 7
. 2) "
c
+
Kt >-
d

<_
2
. 5
n
( 6. 7
. 3 )
Kt ,
=At rf
t

( 6. 7 . 2)
260sn
' Top bars are def i ned i n ACI - 12
. 2 . 4 as "Hori zont al rei nf orcement so pl aced t hat more
t han 12 i n. of
f resh concret e i s cast i n t he member bel ow
t hedevel opment l engt h or spl i ce. "
232

CHAPTER6

Devel opment of
Rei nf orcement
Si mpl i f i ed Equati ons of
ACI - 12. 2. 2.

Theuse of Eq. ( 6. 7 . 1) i s
cl earl y a com-
pl i cated way of determi ni ng
devel opment l ength L d . For most
practi cal si tuati ons
the
si mpl i f i ed expressi on of
ACI - 12. 2. 2 can be used. The
si mpl i f i ed equati ons
di vi de i nto twocategori es, as
f ol l ows :
Category A.

Ei ther one
of the f ol l owi ng two
condi ti ons wi l l sati sf y thi s most
f avorabl e si tuati on:
r
1. ( a) Cl ear l ateral
spaci ng betweenbars atl eas
db,
ands

`i
( b) Cl ear cover
at l east db, and - . - '
( c) mi ni mum
sti rrups or ti es al ong the
devel opment l ength ( as per
ACI - 7 . 10 . 5
f or ti es, or ACI - 11. 5 . 4
combi ned wi th ACI - 11. 5 . 5
. 3
f or
sti rrups)
or 2. ( a) cl ear l ateral
spaci ng between
bars at l east 2d, , , and
( b)
cl ear cover not l ess than d
o
The Ld/db si mpl i f i cati on
of Eq. ( 6. 7 . 1) af ter
substi tuti ng ( c +K, , ) /db =1. 5
becomes :
For #6and smal l er bars:
For #7 and
l arger bars:
Category B.

Anythi ng
not i nCategory Ai s
i n Category B. TheLd/ d
b
si mpl i f i ca-
ti on of Eq. ( 6. 7
. 1) af ter substi tuti ng ( c
+
Kt) l dh
=1. 0

becomes
For #6and smal l er bars:
For #7 and l arger bars :
d
b
50
' For SI , wi th
f ,
and f f i i n
MPa, f or #20M( see Tabl e 1
. 12. 2) and smal l er :
tFor
SI , wi th
f ,
and f '
c
i n MPa, f or #25M( see
Tabl e 1. 12. 2) and l arger:
For SI , wi th
f ,
and
J
.
.
. i n
MPa, f or #20Mand smal l er :
Ld
=

f V ,

a, l 3' l

( 6. 7
. 4) *
d
o
25
d, =20 f ~~
a
J 3
. L

( 6
. 7- 5) '
Ld
=

3f , ,

a/3, l

( 6
. 7
. 6)
$
Ld
=

f l
apA

( 6. 7 . 4)
d, , 2
La
-

Sf ' '
aPA

( 6
. 7. 5)
do
8
L~J =
3f
aj 3A

( 6. 7. 6)
dh 4
Usef ul Tabl es .

Devel opment l ength f or common
val ues of
f ,
and f ar e
showni n Tabl es 6
. 7 . 1
to 6
. 7 . 4
f or al l bar si zes . Nbte the descr i pti ve headi ng on
the top
of
these tabl es, especi al l y the r ef er ence to apA.
Tabl e 6. 7 . 1

Devel opment Length f or Categor y
A* ,
Eqs . ( 6 . 7 . 4) and ( 6 . 7 . 5) wi th a8A=1 . 0
INCH-POUNDBARSWITH
6. 7

Devel opment Length f or Tensi on Rei nf or cement-ACI
Code

233
Ld ININCHES
CANADIANMETRIC BARSWITHL, i INCENTIMETERS
* ( a)
Cl ear spaci ng andcl ear cover
L` t
=

3f ,

a0A

( 6
. 7 . 7) '
d, , 40
( b)
cl ear spaci ng
>_
2dh
and cl ear
cover
~d, ,
d, ,
and mi ni mumsti r r ups, or
Conti nued Use of 1 989ACI Code Pr ocedur e.

Because the 1 995 Code pr o-
cedur e i s basedonthe same r esear ch backgr oundas f or the 1 989Code pr ocedur e,
the ACI Commentar y ( ACI-R1 2. 2) states "Thus, desi gnai ds andcomputer pr ogr ams
t For SI, wi th
f
v
and f '
c
i n MPa, f or #25Mand l ar ger :
=
40, 000
f "
( psi )
psi
f
Y
=60, 000
f '
( psi )
psi
BAR 3000 4000 5000 3000 4000 5000
#3
1 2. 0 1 2. 0 1 2. 0 1 6 . 4 1 4
. 2
1 2. 7
#4 1 4 . 6 1 2. 6 1 2. 0 21 . 9 1 9. 0
1 7 . 0
#5
1 8. 3
1 5 . 8
1 4 . 1 27 . 4 23. 7 21 . 2
#6 21 . 9 1 9. 0 1 7 . 0
32. 9
28. 5
25
. 5
#7
32. 0
27 . 7
24
. 7
47 . 9 41
. 5 37 . 1
#8
36 . 5 31 . 6
28
. 3
54 . 8 47 . 4 42. 4
#9
41 . 2
35
. 7
31 . 9
61 . 8 53. 5 47 . 9
t
#1 0 46 . 4 40. 2 35 . 9
69. 6 6o. 2 53. 9
#1 1
51 . 5
44 . 6 39. 9 77 . 2 66. 9
59. 8
#1 4 61 . 8
53. 5
47 . 9
92
. 7 80. 3 71 . 8
#1 8
82
. 4
71
. 4
63. 8
1 24 1 07
95 . 8
f ; . =300
MPa f , =
400
MPa
f , ' QvIPa)
f ~
( MPa)
BAR
25 30 35 25
30
35
#1 0M
33. 9
30. 9 30. 0 45 . 2 41 . 3
38
. 2
#1 5M 48. 0 43. 8 40. 6 64 . 0
58. 4 54 . 1
#20M 58
. 5 53. 4
49. 4
78
. 0 71 . 2
65 . 9
#25M 94
. 5
86. 3 79. 9 1 26 1 1 5 1 06
#30M 1 1 2
1 02 94 . 8
1 50 1 36 1 26
#35M
1 34 1 22 1 1 3 1 79 1 63 1 51
#45M 1 64 1 50 1 38 21 9 1 99 1 85
#55M
21 2
1 93 1 79
282 257 238
234

CHAPTER6

Devel opment of
Rei nf orcement
Tabl e
6. 7 . 2 Devel opment Length f or Category B* ,
Eqs. ( 6 . 7 . 6) and ( 6. 7 . 7) wi th aPA=1 . 0
I NCH-POUNDBARS
WI THLd I NI NCHES
CANADI ANMETRI CBARSWI TH
L, t
I NCENTI METERS
* Everythi ng not i n Category A.
basedonSecti on1 2. 2of
ACT
31 8-89
canbeusedf or compl yi ngwi th the1 995ACT
Bui l di ng
Code. " Theauthors of
thi s text havenot i ncl uded those
1 989
provi si ons
( they are i n
the
5th edi ti on) bel i evi ng that theabovesi mpl i f i ed equati ons, al ong
wi th anopti onal more" exact" equati on, wi l l bestrongl y pref erredby most users.
I nbri ef , the 1 989 Code( ACI -1 2. 2) requi redcomputati onof a basi c devel op-
ment l ength basedonspl i tti ng strength. Thebasi c devel opment was modi f i ed by
mul ti pl yi ng by 1 . 0, 1 . 4, or 2. 0; thel arger val uef or themost unf avorabl ebar spac
i ng andcover condi ti on. That modi f i ed basi c l ength coul d not be l ess thanthe
mi ni mumdevel opment l ength based on
pul l out,
0. 03dbfy/N1 f _, ' .
That gave the
" f i rst-l evel
L~i " ; i t was then
mul ti pl i ed
by
" second-l evel " modi f i cati ons ( 1 ) af or top
bars, ( 2) j 9 f or epoxy-coated bars, ( 3) Af or l i ghtwei ght aggregate concrete, and
( 4) a, XS f or excess rei nf orcement. Fi nal resul t coul d not bel ess than1 2i n.
The maxi mumval ue on the cover and transverse rei nf orcement term,
( c
+
Ktr) l db,
of 2
. 5
i n the 1 995 ACT Code i s i ntended to mai ntai n the same
mi ni mumdevel opment l ength as prescri bed i n the 1 989 ACTCodebased on
a
pul l out f ai l ure mode.
=
40, 000
psi f , =60, 000 psi
f ,
( psi )
. f
( psi )
BAR 3000 4000 5000
3000 4000 5000
#3 1 6. 4
1 4. 2 1 2
. 7
24. 6 21 . 3 1 9. 1
#4 21 . 9 1 9. 0 1 7. 0
32
. 9 28. 5 25. 5
#5
27. 4 23. 7 21
. 2 41 . 1
35. 6
31 . 8
#6
32
. 9 28. 5 25. 5
49. 3 42
. 7 38
. 2
#7 47. 9
41
. 5 37
. 1 71 . 9 62. 3 55. 7
#8
54
. 8 47. 4 42
. 4 82. 2
71
. 2 63. 6
#9
61 . 8
53. 5
47
. 9 92
. 7
80
. 3
71 . 8
#1 0 69. 6
60
. 2
53. 9
1 04 90 . 4 80. 8
#1 1 77. 2 66. 9 59. 8 1 1 6 1 00 89. 7
#1 4 92
. 7 80
. 3
71
. 8 1 39 1 20 1 08
#1 8 1 24 1 07
95. 8
1 85 1 61 1 44
#1 0M
50
. 9 46. 4 43. 0 67. 8 61 . 9 57 . 3
#1 5M 72. 0 65. 7 60 . 9 96. 0 87. 6 81
. 1
#20M 87
. 8 80
. 1
74. 2
1 1 7 1 07
98
. 9
-25M 1 42 1 29 1 20 1 89 1 73 1 60
#30M 1 35 1 54 1 42 224 205 1 90
#35M
1 61
1 83
1 70 268 244 226
#45M 1 97 224 208 328 299 277
#55M 254 . : , 290 268
423
386 358
Tabl e 6. 7. 3

Devel opment Length f or Categor y
A*,
Eqs. ( 6. 7 . 4) and ( 6. 7 . 5)
wi th a/ 6A =1 . 0
1996
ASTMMETRI CBARSWI THLd
I NCENTI METERS
*( a) Cl ear spaci ngand
cl ear cover ?do andmi ni mum
sti r r ups, or
( b) cl ear spaci ng
?
2d, ,
andcl ear cover ?d, ,
6. 7

Devel opment Length
f or Tensi onRei nf or cement- ACI Code

235
Tabl e6. 7. 4

Devel opment
Length f or Categor y
B*, Eqs.
( 6. 7 . 6) and( 6
. 7 . 7) wi th aPA =1 . 0
1996ASTMMETRI C
BARSWI THLdI NC
ENTI METERS
*Ever ythi ng not i nCategor yA.
Pr acti cal
Appl i cati on of ACI - 12. 2 Devel opment
Length Rul es.

The
pr acti -
cal i ty f or
appl yi ng the r ul es i n or di nar y
r ei nf or ced concr ete constr ucti on
i s that
most
beams wi l l contai nat l east
ACI Code- speci f i ed mi ni mumsti r r ups
( ther eby
sati sf yi ng Categor y A, i teml c) ,
cl ear spaci ng must sati sf y
the l ar ger of the bar
di ameter dbor 1 i n. ( ACI - 7. 6. 1) ,
andcover must sati sf y the
mi ni mumspeci f i edi n
ACI - 7
. 7
. 1 i n any case. Usi ng
the mi ni mum1 . 5 i n.
of cover onbeams wi l l
com-
monl y pr ovi de the Categor y
A mi ni mumof db.
For sl ab- l i ke el ements
wi thout
shear r ei nf or cement,
cl ear spaci ng wi l l
usual l y sati sf y the Categor y
A, i tem2a,
f ,
=3
00 MPa
f
( NI Pa)
f , =420 MPa
f , '
( MPa)
BAR 1
25 30
35
25 30 35
#I OM
42
. 8 39. 0 36. 1
59. 9 54
. 6
50
. 6
#13M
57
. 2
52
. 2 48 . 3
80 . 0
73. 0
67. 6
#16M 71 . 6 65 . 3
60
. 5
100 91 . 4
84
. 7
#19M 86
. 0 78
. 5
72 . 6
120 110 102
#22M 125 114 106
175 160
148
#25M 143
130
121 200 183
169
#29M 161 147 136
226 206 191
#32M 182 166
154 254 232
215
#36M 201
184 170 282 257
238
#43M
242 221 204 339
309 286
#57M 322 294
272 451 412
381
BAR
f v
25
=300 MPa
f ,
( Nl Pa)
30
35
f
v
25
=420 MPa
f ,
( MPa)
30 35
#10M
30
. 0 30 . 0
30 . 0
39. 9
36. 4 33. 7
#13M 38 . 1
34. 8
32
. 2 53. 3
48 . 7
45
. 1
#16M 47
. 7
43
. 5
40
. 3
66. 8 61 . 0 56. 4
#19M 57
. 3
52. 3 48 . 4
80 . 2
73
. 2 67. 8
#22M
83. 3
76
. 0 70 . 4 117
1o6 98
. 5
#25M
95 . 3
87. 0 80 . 5 133
122 113
#29M 108 98 . 2 91
. 0 151 138
127
#32M
121 111 102 170
155 143
#36M 134 123 113
188 172 159
#43M 161 147 136
226 206
191
#57M 215
196 182 301 275
254
"EXAMPLE6. 8. 1
Det ermi ne t he devel opment
l engt h Ld requi red f or t he
*9
epoxy- coat ed
bars Aon t he t op of a 15- i n. sl ab,
as shown i n Fi g. 6. 8. 1 . Use
f , .
=60, 000
psi , and
f '
=4000 psi wi t h l i ght wei ght
aggregat e concret e.
Sol ut i on: ( a) Det ermi ne
t he devel opment l engt h Ld
usi ng t he si mpl i f i ed equa-
t i ons . Si nce cover
of 1. . 5 i n. exceeds d
o
of 1 . 128
i n. , and t he 8 i n. bar spaci ng
exceeds cl ear
spaci ng of 2dn ( i . e. , 2
. 3
i n. ) , t he
si t uat i on i s Cat egory A, i t em2, and
f or
*9
bars
Eq. ( 6. 7 . 5) appl i es,
Not e t hat
53 . 5
i n. agrees wi t h t he val ue
i n Tabl e 6. 7 . 1 .
Ref erri ng t o Fi g. 6. 8. 1, whenchecki ng t he
bar spaci ng, bars A
are devel oped
over di st ance 1- 2, whi l e bars Bare
devel opedover t he di st ance
2- 3 .
Thespaci ng
60, 000
=

a~A=
47 . 4af l A
204000
L, , =47 . 4db ai GA=47 . 4( 1 . 128) aj 8A
=
53- 50A
238

CHAPTER6

Devel opment of Rei nf orcement
Pl anvi ew

J _ L "
Cl ear

#
9@
8, l ong (bars B)
'

15"
Fi gure 6.8.1

Topbars f or Exampl e
6.8
.1 .
(e)
Fi nal devel opment l ength Ld.
#
9@8, short (bars A)
al ternatewi th
#
9@8, l ong (bars B)
f
111,
2
_Ld
- _ _ 3

.fy

apy k
db

40

C
+
Kt,
db
cl ear
tobeusedf or bars
Ai s thespaci ngof the
cl osest bars that termi nateat
the
same
poi nt. I n other words,
the spaci ng f or both
bars Aand B i s 8i n
.
(b) Modi f i cati on
af or top bars. Si nce the
negati ve moment regi on bars
are
cast wi th morethan
12i n. of f resh concretebel ow
them, they
are
topbars
accord-
i ng to ACI - 12
.2.4 ; thus a =1.3.
(c) Modi f i cati on ) 3
f or epoxy - coated bars.
Checkcl ear cover,
Cl ear cover =
d5
=
1
1.5
128
-
1
.341,
<
3db
b
Si nce cl ear cover i s l ess than3dh,

8
=1
.5.
Themaxi mumval ueof a(3=1
.7 .
(d)
Modi f i cati onJ 1 f or l i ghtwei ght aggregateconcrete. Thel i ghtwei ght aggre-
gate concrete mul ti pl i er J t =1
.3.
L ' , =
53
.5aBA=
53.50.7) 1
.3=
118i n
.
(f ) Computedevel opment l ength L d. Usi ngthe general equati on, Eq. (6.7 .1) .
Cover =1.5 +1.128/ 2=2.06 i n.
(Center- to- center spaci ng) / 2=8/ 2=4 i n.
Thereare nosti rrups; thus Kt , =0. Theval ueof c f or Eq. (6
.7
.1) i s the smal l er of
the cover (i .e., the di stance f romthe center of the bar to the nearest concrete
f ace) or one- hal f the center- to- center spaci ng of the bars bei ngdevel oped. I nthi s
case,
Thus,
L d
- 3

f ,

ap
y
A
db -
40Vf c
~C+K
t r )
6. 9

Devel opment Lengt h f or
Cor ncr essl on Rei nf or cement

239
f c+Kt , _2. 06+0
I
\
db

1
. 128
=1 . 83
db
<
7 . 7
_3 60, 000 0. 7) ( 1
. 01 . 3

( 1
. 7) ( 1
. 0) 1 . 3
=
40

4000

1 . 83

=
71 . 1

1 . 83

85. 9
I n t he ab ove cal cul at i on, a/ 3 =1 . 7, t he
upper
l i mi t of t hat pr oduct , whi ch
exceeds t he act ual a/ 3 =1 . 3( 1 . 5) =1 . 95. The b ar si ze f act or A =1 . 0 f or #7 b ar s
and l ar ger . Thus,
L, , =85. 9db =85. 9( 1
. 128) =
96. 9 i n
.
The si mpl i f i ed met hod
gave L, , =118 i n. That f or mul a used
( c
+
Kt , ) / db
=1 . 5,
wher eas
Eq.
( 6. 7 . 3)
gave 1 . 83, t hus gi vi ng t he mor e accur at e L, , as 82%of t he
val ue f r omt he
si mpl i f i ed equat i on.
6. 9 Devel opment Lengt h
f or Compr essi on
Rei nf or cement
[ 6. 7
. 3]
Rel at i vel yl ess i s
knownab out t he devel opment l engt h f or compr essi on b ar s t han
f or
t ensi on b ar s, except t hat t he weakeni ng ef f ect of f l exur al t ensi on cr acks i s not
pr esent and t her e i s b enef i ci al ef f ect of t he end b ear i ng of t he b ar s on t he con-
cr et e. ACI -12. 3 gi ves as t he b asi c devel opment l engt h L, , b ,
t , .
L, a,
=0. 02611, 1
( 6. 9
. 1) *
whi ch i s b asi cal l y t wo-t hi r ds
of t he mi ni mumdevel opment l engt h f or t ensi on
r ei nf or cement t o pr event
a "pul l out " mode of f ai l ur e. ACI -12. 3 al so st at es t hat L, ,
must not b e l ess t han
L, , b
=-~! : 0-0003d
1, f ,

( 6. 9 . 2) *
whi ch means t hat onl y
f ' up
t o
ab out 4400psi may
b e count ed
upon. Thus t he
b asi c devel opment l engt h
L, , b
i s
t o b e t akenas t he l ar ger
of
Eqs.
( 6. 9
. 1) and ( 6. 9 . 2) .
Whenexcess b ar
ar eai s pr ovi ded such t hat pr ovi ded A, exceeds r equi r ed A, ,
Eqs . ( 6. 9 . 1) or ( 6. 9
. 2) , whi chever cont r ol s, mayb e r educed b yappl yi ng t he mul -
t i pl i er ( r equi r ed A, / pr ovi ded A) .
Reduct i on
i n devel opment l engt h i s per mi t t ed when r ei nf or cement i s
encl osed b yspi r al s or cl osel y spaced t i es ( t ypi cal l y i n col umns ; see Chapt er 13)
whi ch ar e not l ess t han 4-i n. di amet er f or
spi r al s
( ACI -7 . 10
. 4) ,
or #4b ar s
f or
t i es
( ACI -7 . 10
. 5) ,
and havi ng a pi t ch
( f or spi r al s)
or cent er -t o-cent er spaci ng
( f or t i es)
not exceedi ng 4i n. Under t hese
conf i nement condi t i ons, L, , b
mayb e
r educed 25%.
' For SI ,
ACI 318--95M,
f or L, , n and d, , i n mm, and J ~. ' and f y i n MPa, gi ves
L,
1,
=
2461, ,
f ,

( 6. 9 . 1)
L , =0. 044 cl , , f ,

( 6. 9
. 2)
240

CHAPTER6

Devel opment
of Rei nf orcement
Af ter
a l l modi f i ca ti ons, the
devel opment l ength Ld i s not permi tted tobel ess tha n
8 i n. ( 200 mm). Thus,
i n genera l ,
f or compressi onrei nf orcement .
_

Eqs
. ( 6. 9
. 1)

requi red A

F 0
. 75
f or encl osure
L 1

~ >8 i n.

( 6. 9
. 3)
or ( 6. 9 . 2)

11
Provi ded A
s
[by spi ra l s or ti es
"EXAMPLE6. 14. 1 F or the ca nti l ever bea mshown
i n F i g. 6. 14. 2 determi ne the
di sta nce L1 f romthesupport to the poi nt where2- #8 ba rs
ma y becut of f . Assume
the #4 sti rrups shown ( sol i d, not the da shed ones)
ha ve been prel i mi na ri l y
desi gned. Assumetherewi l l bea t l ea st L, , embedment of
theba rs i ntothesupport
.
Dra wthe resul ti ng moment ca pa ci ty OM, di a gra mf or the
enti re bea m. Use
3000psi a nd fy =60, 000psi .
Sol uti on:

( a ) Computethe ma xi mummoment ca pa ci ty
- ONI ,
z
of the secti on
.
0. 75p, , ( Ta bl e 3. 6. 1) =0. 0160
_ 3( 1 . 27) +
2( 0. 79)
p

16( 28)

=
00120 <0
. 75pb
OK
C=0. 85( 3)16a =40
. 8a
T=
13( 1 . 27) +
2( 0. 79)160 =( 3 . 81 +1
. 58)60 =323 ki ps
a =323 =7
. 92 i n.
40. 8
NT
E
+
00
E~
ti
CL,J
Y
CD
+
~>o
0' -
U
I I
r
Revi sed sti r r up spaci ng
to
sati sf y cutof f i n
tensi on zone
Ll =4' - 0"
590' k
~,- - -
L =3 . 6'
~
147. 5k

d
L
81
. 1 k
6 . 14

Bar Cutof f s i n Uni f or ml y
Loaded Canti l ever Beams

251
8'
-
0"
73. 2k
Fi gur e 6 . 14. 2

Beam
of Exampl e 6 . 14. 1 .
Cut 2- #8 bar s
7@4"
#4sti r r ups
Gi ven
spa
ci ng
3 @14"

#
4
4@5"

3 @8"

mar "

.
1
Usti r r ups
2"
I
CO
L
8 CC'
Factor ed moment M.
"

-

capaci ty di agr am, OM,,
Extensi on
to pr ovi de adequate
capaci ty
at suppor t
Ldn =
2. 32'
Extensi on
to
sati sf y ACI - 12. 10. 5. 1
( i ncr eased sl i ghtl y f r om
r equi r ed to use L~=4f t)
7
M,1 =
323[28
- 0. 5( 7. 92) ] 12
=
647 f t- ki ps
C=
40. 8a
T=3 . 81( 60) =
229 ki ps
a =
229
40. 8
=5. 61
i n.
( ~Mn =0. 90( 229) [28 -
0
. 5( 5
. 61) 1
;2 =
433
f t- ki ps
I mpr obabl e that
hook devel ops
capaci ty i n a
l i near manner
Devel opment l ength
f or #10hooked bar
( Ldn
=
27. 8")
~r ,t
=0. 90( 647)
=
582f t- ki ps - ==M,{ =
590
f t- ki ps

OK
( b) Deter mi ne the theor eti cal cutof f poi nt f or 2- #8 bar s. The moment capac-
i ty OM,, r emai ni ng wi th 3- #10bar s i s
252

CHAPTER6

Devel opment of Rei nf orcement
Pl ot on the
f actored moment M, , di agramand l ocate the theoreti cal cutof f poi nt
A. Extend to
the ri ght 12 bar di ameters ( of the=8 bars that are to becut) or the
ef f ecti ve
depth
of
the member, whi chever i s greater, to arri ve at poi nt B.
d =28 i n. ( 2. 33
f t) >[ 12db =
12( 1 . 0) =12 i n. ]
( c) Use
the si mpl i f i ed equati ons to determi nethe devel opment l ength Ld f or
#8
bars .
CanCategory A, the moref avorabl e one, beused? Check the cl ear spac-
i ng
of bars
. Assumi ngthe bars, though unequal i n si z e, areuni f orml y spaced, the
cl ear spaci ng betweenthemi s
16 - 2( 1. 5) -
2( 0
. 5) - 3( 1. 27) - 2( 1. 0)
cl ear spaci ng =

4

=
1
. 55
i n
Si nce
onl y the 2- #8 bars are bei ng devel oped, and the
3- #10
arepresumed to
conti nue
beyond the#8 cutof f l ocati on, i t i s the spaci ng betweenthetwo#8 that
determi nes the Category. Thef ai l ure modewoul d havespl i tti ng f roma #8 bar to
the
si de
or topf aceof themember, or betweenthetwo#8 bars . TheACI Coderul es
consi der a bar ( or bars) as essenti al l y i nert wheni t i s not bei ng devel oped wi thi n
the devel opment regi on of other bars. Thus, whenthe#10 bars of thi s exampl e
have a devel opment l ength
f romthei r
termi nati on near the f ree end of the can-
ti l ever that i s l ess thanthedi stance
to
the#8 bar cut, the#10 bars areconsi dered to
havenoi nf l uenceon
L. , f or the#8 bars . I t i s a matter of opi ni onwhether or not the
#10 i tsel f shoul d betreated
as concrete. That i s, i nthi s
case
whether to usethef ul l
spaci ng between
the#8 bars, 2( 1
. 55)
+1 . 27 di am. of #10 =4. 37 i n. Theauthors
bel i eve i t
appropri ate i n thi s case toconsi der the spaci ng of the #8 tobe4 . 37 i n.
f or the purpose of sati sf yi ng a Category Arequi rement, assumi ng L, , J or the=- 10
does
not overl aptheL, , f or the#8b( rs.
Even i f the concrete wi dth between #8 bars were taken as 2( 1
. 55) =3
. 10
i n. , i t sti l l exceeds the 2db f or the#8 bar to sati sf y Category A, i tem2( a) , gi ven i n
Secti on 6. 7 ( ACI - 12. 2. 2) , as
wel l as i tem
2( b) , becausecover tothe
top
f aceof the
beami s 2 i n. , whi ch
exceeds db needed f or that i tem
.
Thus, Category A
appl i es! Usi ng si mpl i f i ed Eq. ( 6
. 7 . 5) f or #7
and l arger bars
L, 1
=

f y
db 20~
a

[ 6
. 7. 5)
For the modi f i cati on f actors a) 3A, onl y the top bar f actor a =1 . 3 appl i es . The
epoxy- coated bar f actor
j G
and the l i ghtwei ght aggregate concrete f actor Aare
both 1 . 0 becausethose f actors donot appl y. Thus, Eq. ( 6. 7
. 5)
gi ves
d
bf
y
1. 0( 60, 000)
Ld =

a, 8A =

a, 8A
20~20 00
=54 . 8a, 8A =
54
. 8( 1. 3) ( 1 . 0) 1
. 0 =71
. 2 i n.
The54. 8
i n. canbeveri f i ed f romTabl e 6
. 7
. 1 . Thus,
L, , ( f or
#8) =71
. 2 i n.
( 5. 9 f t)
Thi s
devel opment l ength i s 58%l onger than the L, , of
3. 75
f t obtai ned under the
1989 ACI Code, wherethe most f avorabl econdi ti ons appl i ed.
( d)
Use t he gener al equat i on, Eq. ( 6 . 7 . 1) ,
t o det er mi ne t he
devel opment
l engt h Ld f or
=8 bar s. That equat i on i s
Eval uat i ng
Eq. ( 6 . 7
. 3) ,
Thus,
( c
+
K
t
, ) / d, , =2
. 5 .
Eval uat e Eq. ( 6 . 7 . 1) ,
_ _3 dnf , a, 3yl
L` '
40
c +Kt ,
6 . 14

Bar Cut of f s i n Uni f or ml y
Loaded Cant i l ever
Beams

253
_Ld _
_
3_

. f v

ag
yA
do 40

c +
Kr ,
d
o
The
cover or spaci ng di mensi on c i s t he smal l er
of ( 1) di st ance f r om
cent er
of bar bei ng devel oped
t o near est concr et e sur f ace,
and ( 2) one- hal f cent er - t o-
cent er spaci ng
( cl ear spaci ng comput ed as 1 . 55 i n. i n
par t a) of bar s bei ng
devel -
oped. The di st ance c i s t he smal l er
of t he f ol l owi ng t wo
val ues:
t op and si de cover =1
. 5( i . e. , cl ear )
+
0. 50. e. , st i r r up) +
0
. 5( i
. e. , bar
r adi us) =2 . 5 i n.
one- hal f
cent er - t o- cent er spaci ng =1
. 55 +
0
. 5( i . e. , bar r adi us) =2
. 05
i n.
Thus, c =2 . 05 i n.
For t he st i r r ups i n t he devel opment r egi on,
uset he 8 i n . spaci ng
f or compu-
t at i on
. Use Eq. ( 6. 7 . 2) ,
K
_ At r f ' t
` r
1500sn
The number n of bar s bei ng
devel oped i s 2, and At , i s t he
t ot al ar ea of st i r r ups
sur r oundi ng t he bar s bei ng
devel oped, i n t hi s case, f or
#4 st i r r ups i t i s 2( 0. 2)
t i mes
8 st i r r ups. Thus, eval uat i on of Eq.
( 6 . 7 . 2) gi ves
_
At , 4, _ 8( 2) ( 0
. 20) 60, 000 _
K` r
1500sn
1500( 8) 2
8
-
C
c
+
Kt r
-
2. o6 +8. o
10. 1 >2. 5 max
3 ( l . 0) 6o, ooo a, 8yA

1 . 3( 1
. 0) ( 1 . 0) 1 . 0
40

=82. 2

2
. 5

=42 . 7 i n. ( 3 . 6 f t )
3000 2 . 5
[ 6. 7
. 2)
The 42. 7 i n. compar es f avor abl ywi t h
t he 1989 ACI Codeval ue
of 45 . 0 i n. , and
si gni f i cant l y l ower t han t he
71
. 2 i n.
f r omt he 1995 si mpl i f i ed
equat i on
.
Use
Ld =
42 . 7 i n. f or t he moment capaci t y di agr am
i n Fi g. 6 . 14. 2 .
Si nce poi nt B, t he pr oposed cut of f poi nt ,
l i es onl yabout 3 . 5 f t f r omt he sup-
por t , t he
#8 bar s woul d not have f ul l capaci t y at
t he suppor t . Ther ef or e, ext end
t he
pr oposed cut of f t o poi nt C whi ch i s l ocat ed
at L, , ( f or #8) =3 . 6 f t f r omt he
suppor t .
i s
254

CHAPTER6

Devel opment of
Rei nf orcement
(e)
Check ACI - 12. 10. 5 f or cutti ng bars at poi nt Ci n the tensi on zone. The
shear strength, i ncl udi ng contri buti onof sti rrups, i s f i rst computed. Usi ng thesi m-
pl i f i ed method of constant V,
V, =2~b, , d =2V-3000
(16)(28)
i ooo
=49
. 1
ki ps
For the 14- i n. spaced
#4sti rrups i n the vi ci ni ty of the potenti al cut poi nt C
Theshear strength OV, at poi nt Ci s
V
-
A, 4, d
-
2(0
. 20)(60)28
=
48. 0 ki ps
s
s . 14
OV =O(Vc
+
V, . ) =0 . 85(49. 1
+
48. 0) =82
. 5
ki ps
percent stressed i nshear =

Vn
=
81. 1
=98%>
75%

NG
Even whenonl y 50%of the
moment strength OM
i s used by Mt
the percent
stressed i nshear cannot exceed75%
(seeCondi ti on
3,
Eqs .
6. 12
. 3 and
6
. 12. 4) . Try
usi ng onemore8- i n
. sti rrup spaci ng to cover thepotenti al cut at poi nt Candsee
whether or not Condi ti on
1, Eq. (6. 12. 1), i s sati sf i ed .
V, =
48. 0
g
)
=
84. 0 ki ps
81. 1
percent stressed i n shear
=

=
71%
0
. 85(49. 1
+84)
Thi s i s
borderl i ne to sati sf y the two- thi rds l i mi t of ACI - 12. 10
. 5. 1
(Eq. 6. 12. 1) .
Extend the #8 bars to poi nt C'
4
f t
f rom
f aceof support .
(f ) Checkwhether theconti nui ng #10 bars haveadequatedevel opment l ength
to the ri ght of poi nt C. Thecl ear spaci ng betweenthe conti nui ng three
#10 bars i s
16- 2(1
. 5) -
2(0
. 5) - 3(1. 27)
cl ear spaci ng -

2

=4. 1 i n.
whi chexceeds the 2d, , of
2
. 54 i n
.
requi red f or Category A, i tem
2(a). Topcover
of 2. 64 i n. [ i . e. , 1. 5 +0. 5 +
1. 27/ 2) =2
. 64 i n. ] to the center of
the #10 bars
exceeds the
dh requi rement of Category A, i tem2(b) . Thus, the si mpl i f i ed equa-
ti on, Eq
.
(6. 7. 5)
f or
#7
and l arger bars,
1. 27(60, 000)
01
L, , (f or #10) =
20

a(3A
=

20

3000
apA
=69. 6aPA=69. 6(1. 3)(1 . 0)1. 0 =90
. 5
i n.
(7. 5
f t)
For the modi f i cati on f actors a/ 3A, onl y the top bar f actor a =1. 3 appl i es .
Cal cul atethedevel opment
l ength Ld
based
onthe
general
equati on, Eq. (6. 7. 1) .
Thedi stance c i s the
smal l er of the f ol l owi ng
two
val ues
:
top and si de
cover =1
. 5(i
. e. , cl ear)
+0
. 5(i
. e. , sti rrup) +
0. 635(i . e. ,
bar radi us) =2. 6 i n.
one- hal f center- to- center
spaci ng =4. 12 +0
. 635(i . e
. , bar radi us) =2. 7 i n.
Thus c =2. 6 i n.
Eval uat i ng
Eq. ( 6 . 7 . 3) ,
614

Bar Cut of f s i n Uni f orml y LoadedCant i l ever Beams

255
For
t he st i rrups i n t he devel opment regi on, use t he gi ven
14i n. spaci ng
near t he f ree endof t he cant i l ever f or comput at i on. Thenumber n
of bars
bei ng
devel oped
i s 3,
and
At ,
i s t he t ot al area of st i rrups surroundi ng t he bars bei ng
devel oped,
i n t hi s case, f or #4 st i rrups i t i s 2( 0 . 2) t i mes 3 st i rrups
. Use
Eq. ( 6
. 7
. 2) ,
Thus, ( c +
K) ; dn
=2
. 5.
Eval uat e
Eq. ( 6 . 7
. 1) ,
3
dbf ,

a, 6 yA
Lei
=
-
40~(
c +Kt , )~
_ At , Ar _
3( 2) ( 0 . 20) 60, 000
K' r

1500sn

150004) 3

-
1
1
c
+
Kt ,
-2. 6 +1. 0
db 1. 27
2. 8 >2
. 5
max
_ 3 ( 1. 27) 60, 000
a( 8 yA

1. 30
. 0) ( 1. 01. 0
-
40

3000

2. 5

-
104. 3

2. 5

=54. 2 i n. ( 4. 5 f t )
Thi s embedment of 4. 5 f t
measuredf romt he end
of
st rai ght
#10 bars woul d
over-
l ap t he devel opment
l engt h regi on of t he
#8
bars, possi bl y requi ri ng l onger
devel opment l engt h L, ,
f or t he #8 bars becauset he cent er-t o-cent er spaci ng t hen
woul dbet he
reducedval ue basedon f i ve bars i n t he 16 i n. wi dt h. However, i n
t hi s case becauseK, r i s 8 . 0 ( see part ( d) ] t he val ue of ( c +
K, , ) / d,
remai ns at 2
. 5
and
t he L, ,
of #8 bars st ands at 3 . 6 f t i n part ( d) . The#10 bars woul dsat i sf y l i t er-
al l y t he st at ement of ACI -12. 10 . 4, whi ch requi res "Cont i nui ng rei nf orcement shal l
havean embedment l engt h not l ess t han t he devel opment l engt h L, , beyondt he
poi nt wherebent or t ermi nat ed t ensi on rei nf orcement i s no l onger requi red t o
resi st f l exure. " I n ot her words, t he di st ance f rompoi nt A t o t he f ree endof t he
cant i l ever must beat l east
L, , ( f or #10) . Theaut hors bel i eve
i n a somewhat more
conservat i ve approach, requi ri ng t he
moment
capaci t y
Oyu
di agramt o havean
of f set f romt hef act ored
moment Mt , di agram, except at or near a si mpl esupport
or t hef reeendof
a cant i l ever, equal t o 12 bar di amet ers of t he ef f ect i ve l engt h d,
whi chever
i s
great er.
I n
t hi s case,
t ry st andard90 hooks ( seeFi g. 6 . 11. 1) on t heends of t he#10 bars .
Si nce t he beamhas t he usual 1. 5-i n. cl ear cover and#4st i rrups, t he cover t o t he
hookedbars i s 2i n. , whi ch i s l ess t han t he2
a
i n. requi redby ACI -12
. 5
. 4; t hus, t he
speci al provi si ons of t hat Codesect i on
must
be
sat i sf i ed
.
Thedevel opment l engt h
L, , f or t he#10 hookedbar
i s t hebasi c val ue
Lhb
( i
. e. ,
no modi f i cat i on t o
Lhb appl i es) gi ven by Eq. ( 6 . 11. 1) andTabl e 6 . 11. 2. Thus, f or
#10 hookedbar,
1200db _ 12000. 27)
L, 1h =Lhn =

-

=
27 . 8 i n.
256

CHAPTER6

Devel opment of Rei nforcement
whi chexceeds themi ni mum8dh or 6i n. , whi chever i s greater ( ACI - 12. 5. 1) . The
Ldh
of
27. 8
i n. i s di mensi oned fromtheoutsi defaceof thetai l of thehook, as shown
i nFi g.
6. 14
. 2.
Of
course, heresti rrups spaced at not more
than 3 d6
( 4. 23 i n. ) must
be provi ded
al ong the
27. 8
i n. of devel opment di stance, i n accordance wi th
ACI - 12. 5. 4 .
( g) Moment
capaci ty 0011, , di agram. Theful l strength OM, for thebeamwi th
3 - #10
hooked bars
wi l l beavai l abl eat 27. 8 i n. fromtheoutsi deof thehook onthe
endof thebeam. Assumi ng
1
. 5
i n. cover, ful l capaci ty
i s avai l abl eat
29. 3 i n. ( 2. 44
ft) fromendof beam
( poi nt D) . Thedashedl i nei nFi g.
6
. 14. 2 has
been
drawnfrom
zerostrength at theend of the
hook
toful l strength OM, =
43 3
ft- ki ps at
2. 44 ft
fromend of beam; however,
i t i s not i ntended
toi mpl y that thehooked
bar devel -
ops i ts strength l i nearl y si nce
that i s hi ghl y
i mprobabl e.
( h)
Fi nal
deci si on. Cut 2- #8 bars at 4 ft- 0 i n. fromthesupport; use90 stan-
dardhooks onthe3 - #10
bars; use8- #4 Usti rrups as confi nement over theL, , hdi s-
tance, as shown
i nFi g. 6. 14. 2 by thedashed sti rrups.
Theuseof
#10
bars
i nthi s canti l ever beami s not
a
practi cal
desi gn
but serves
toi l l ustratetheneed
for extendi ng thecut l ocati onfromBtoCand thenC' , and
the
need for and
treatment of hooked bars .