Punching Shear Check For Slab

1. Punching shear check was performed for a concourse slab supported by a plunge column at the construction and permanent stages. 2. At the construction stage, shear reinforcement and structural steel sections were provided to resist the punching shear load of 6552kN, and the calculated shear stress was less than the permissible value. 3. At the permanent stage, with a higher load of 7560kN, the calculated shear stress was still less than permissible without structural steel sections, as they were neglected, and the provided shear reinforcement was sufficient to resist the load.

Uploaded by

Arnab Sur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
518 views

Punching Shear Check For Slab

1. Punching shear check was performed for a concourse slab supported by a plunge column at the construction and permanent stages. 2. At the construction stage, shear reinforcement and structural steel sections were provided to resist the punching shear load of 6552kN, and the calculated shear stress was less than the permissible value. 3. At the permanent stage, with a higher load of 7560kN, the calculated shear stress was still less than permissible without structural steel sections, as they were neglected, and the provided shear reinforcement was sufficient to resist the load.

Uploaded by

Arnab Sur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Punching Shear Check For Concourse Slab - At Construction Stage

Plunge Column
518
ISMB 300
Self Weight of concourse slab = 0.6 x 25 = 15 kN/m
2
SIDL = 6.5 kN/m
2
Live Load / Imposed Load = 10 kN/m
2
Toatl UDL = 31.5 kN/m
2
Effective area of slab being supported by column = 160 m
2
ULS load factor = 1.3
ULS load to be considered for punching shear = 160 x 31.5 x 1.3 = 6552 kN
Punching Shear Check at 'd/2' from support face:
Maximum net load on column = 6552 kN
Finished size of plunge column = 1080 mm x 480 mm
Overall thickness of concourse slab = 600 mm
Effective depth of base slab = 518 mm
Grade of concrete of base slab = 35 MPa
Provided structural steel section to increase shear capacity = ISMB 300 of grade 250 MPa
Web area of steel section (Tw * D) = 2250 mm
2
Provided numbers of steel section at critical shear plane = 4 nos.
Total area of structural steel 9000 mm
2
Shear capacity of provided structural steel = 0.6 x 250 x 9000 N
= 1350 kN
Shear force to be taken by concrete section = 5202 kN
Permissible Punching shear stress (cl. 31.6.3 IS:456) = 1.5 x 0.25 x 35
= 2.219 MPa
Perimeter for shear at 'd/2' from column face = 5192 mm
Calculated punching shear stress =V / (b x d) = 1.934 MPa < 2.219 MPa
OK
Calcul ati on for Punchi ng Shear Reinforcement:
Provided reinforcement to resist punching shear = 16 mm diameter @ 150 mm x @ 300 mm
Length of structural steel section from face of column = 259 mm ('d/2' distance)
Length of perimeter at end of steel section = 5192 mm
Capacity of provided shear reinforcement, V
us
=0.87 x f
y
x A
sv
x d / S
v
Nos. of legs of shear reinforcement at perimeter = 35 nos.
Provided area of steel, A
sv = 7037
mm
2
Spacing of reinforcement, S
v = 300 mm
Capacity of shear reinforcement, V
us = 4387 kN
Capacity of concrete, V
c
=0.5 x
c
x b x d = 1989 kN
Total shear carrying capacity of the section = 4387 +1989 = 6376 kN
> 5202 kN OK
Hence, provide 4 nos.ISMB 300 extending minimum 518mm from face of column
ISMB 300
Welded to
Steel Plunge Col.
Punching Shear Check For Concourse Slab - At Permanent Stage
Plunge Column
Permanent Column
Self Weight of concourse slab = 0.6 x 25 = 15 kN/m
2
SIDL = 6.5 kN/m
2
Live Load / Imposed Load = 10 kN/m
2
Toatl UDL = 31.5 kN/m
2
Effective area of slab being supported by column = 160 m
2
ULS load factor = 1.5
ULS load to be considered for punching shear = 160 x 31.5 x 1.5 = 7560 kN
Punching Shear Check at 'd/2' from support face:
Maximum net load on column = 7560 kN
Finished size of plunge column = 1800 mm x 1000 mm
Overall thickness of concourse slab = 600 mm
Effective depth of base slab = 518 mm
Grade of concrete of base slab = 35 MPa
Provided structural steel section to increase shear capacity = ISMB 300 of grade 250 MPa
Web area of steel section (Tw * D) = 2250 mm
2
Provided numbers of steel section at critical shear plane = 0 nos. (Neglected in permanent stage)
Total area of structural steel 0 mm
2
Shear capacity of provided structural steel = 0.6 x 250 x 0 N
= 0 kN
Shear force to be taken by concrete = 7560 kN
Permissible Punching shear stress (cl. 31.6.3 IS:456) = 1.5 x 0.25 x 35
= 2.219 MPa
Perimeter for shear at 'd/2' from column face = 7672 mm
Calculated punching shear stress =V / (b x d) = 1.902 MPa < 2.219 MPa
OK
Calcul ati on for Punchi ng Shear Reinforcement:
Provided reinforcement to resist punching shear = 16 mm diameter @ 150 mm x @ 300 mm
Length of structural steel section from face of column = 259 mm ('d/2' distance)
Length of perimeter at end of steel section = 7672 mm
Capacity of provided shear reinforcement, V
us
=0.87 x f
y
x A
sv
x d / S
v
Nos. of legs of shear reinforcement at perimeter = 51 nos.
Provided area of steel, A
sv = 10254
mm
2
Spacing of reinforcement, S
v = 300 mm
Capacity of shear reinforcement, V
us = 6392 kN
Capacity of concrete, V
c
=0.5 x
c
x b x d = 2939 kN
Total shear carrying capacity of the section = 6392 +2939 = 9331 kN
> 7560 kN OK