Six operating parameters (pick-up
without rotation, slack-off without
rotation, sliding, pick with rotation,
slack-off with rotation, drilling with
rotation) are considered in the
computation [7]. Friction coefficients
between drillstring and wall of the hole
are derived from the type of mud
[8].Also; buckling tendencies
(sinusoidal and helical buckling) of
drillstring are calculated from the
following equations [9]:
5 . 0
sin
2 |
.
|
\
|
=
r
g A EI
F
s
cir
|
(9)
r
EIW
F 83 . 2
*
= (10)
Figure 2 shows the loads analysis of
inverted drillstring using drillpipe
type(S-135) and drillcollar without
rotation. While Figure 3 shows the
string loads for rotating case.
Fig. 2, Drillstring Loads without Rotation
Fig. 3, Drillstring Loads with Rotation
In both cases, a maximum surface
tension of the string was recorded in
pick-up condition. These values are
smaller than the tensile strength of
drillpipe (388000 lb), which provided
reasonable safety margin. Also,
maximum compressive load has been
achieved when using steerable bottom
hole assembly (sliding mode). This
mode of drilling could be used safely
since the sinusoidal critical buckling of
drillpipe (40000 lb) is larger than the
compressive load in the string. In
addition, a sufficient surface slack-off
load is noticed which provided
adequate string weight to offset the
axial friction effects while tripping in
the hole.
6- Hydrulic Requirements
A computer program was constructed
to calculate the pressure losses in the
circulation system for Bingham plastic
fluid (since the offset wells are drilled
with Bingham plastic mud). Also
nozzles size, jet velocity, hydraulic
power at the bit (BHHP), and impact
force of the bit (BIF) were calculated.
Table 6 provides the results of
calculations.
Conclusions
This paper is concerned with the
design of horizontal well aspects.
These included selection of bit and
casing size, setting depths and drilling
-150000
-100000
-50000
0
50000
100000
150000
200000
0 500 1000 1500 2000 2500 3000 3500 4000
Measured Depth,ft
D
r
i
l
l
s
t
r
i
n
g
T
e
n
s
i
o
n
,
l
b
Sinusoidal Buckling
Helical Bukling
Pick up W/O Rotation
Slack off W/O Rotation
Sliding
-100000
-50000
0
50000
100000
150000
0 500 1000 1500 2000 2500 3000 3500 4000
Measured Depth,ft
D
r
i
l
l
s
t
r
i
n
g
T
e
n
s
i
o
n
,
l
b
Sinusoidal Buckling
Helical Buckling
Pick up W/Rotation
Slack-off W/Rotation
Drilling W/Rotation
Design of Horizontal Well Program for Ajeel Field
62 IJCPE Vol.15 No.1 (March 2014) -Available online at: www.iasj.net
fluid densities, well profile, drillstring
loads and casing. An Iraqi oil field
which is (Ajeel field) is selected for
application this design. From the
obtained results, a vertical well could
be converted to short radius well with
64 ft vertical distance needed. Also, a
single build profile with rate of build
of about 90 deg/100ft could be
implemented without exceeding the
strength limits of the inverted
drillstring.
Nomenclature
: inclination angle at the lower end of
element, degree.
: azimuth angle at lower end of
element, degree.
: hole angle, measured from vertical,
deg
: weight per cubic inch, lb
m
.
: coefficient of friction.
T: change of axial tension over the
length of element, lb
f
.
M: change of torsion over the length
of element, ft-lb
f
.
: change of inclination angle over
the length of element, degree.
: change of azimuth angle over the
length of element, degree
A
s
: cross- sectional area of pipe,in
2
BUR:build up rate of angle ,deg/100ft
E: Young's modulus, psi
F
crit
: critical buckling force ,lbf
F
N
: the net normal force, lb
f
F
f:
sliding friction force acting on the
element, lb
f
.
F
*
: helical buckling force, lb
g: gravitational force, lb
f
.
H1: horizontal displacement of build
section, ft
I
1
, I
2
: inclination at station 1and 2,
degree
I: moment of inertia of pipe, in
4
L1: length of build section, ft
M: torsion at the lower end of element,
ft-lb
f
.
R: radius of curvature, ft
r: characteristic radius of element, ft.
T: axial tension at the lower end of the
element, lb
f
.
V1: vertical height of upper build
section, ft
W: buoyed weight of drillstring
element, lb
f
.
References
1- Economides, M.J., Watters, L.T.,
and Norman, S.D., "Petroleum Well
Construction", John Willey& Sons
Ltd, England, (1998).
2- Hassan, A., Aljawad, M., and
Aldabaj, A., "Design of Horizontal
Well Programm for an Iraqi Oil
Field"; Ph.D. dissertation,
University of Baghdad, 2010.
3- Horwell, "Horizontal Drain
Opportunities for Ajeel Field",
December, (1996).
4- Rabia, H., "Oil Well Drilling
Engineering Principles & Practice",
Graham & Trotman Limited,
London, (1985).
5- Rabia, H." Well Engineering &
Constructions", (2005).
6- Johancsik, C.A., Friesen, D.B., and
Dawson, R., "Torque and Drag in
Directional Wells-Prediction and
Measurement", JPT, (June 1984),
987-992.
7- Cobert, K.T., and Dawson, R.,
"Drillstring Design for Directional
wells", OGJ. (Apr30, 1984), 61-66.
8- Dellinger, T.B., Gravley, W., and
Tolle, S.C.," Directional
Technology Will Extended Drilling
Reach", OGJ. (Sept. 1980), 153-
169.
9- Dawson, R. and Pasaly, P.R.,
"Drillpipe Buckling in Inclined
Holes", JPT, (Oct.1984), 1734-
1738.
Mohammed S.AL-Jawad, A.A.AL-Dabaj and Hassan Abdul Hadi Abdul Hussien
-Available online at: www.iasj.net IJCPE Vol.15 No.1 (March 2014) 63
Table 1, Bit and Casing Sizes for 6 5/8 in
Production Casing
Bit Size, in Casing Size ,in
17 1/2 13 3/8
12 1/4 9 5/8
8 1/2 6 5/8
.
Table 2, Pore and Fracture Pressure Data
Depth(RTKB)
ft
Pore
pressure
psi
Fracture
pressure
psi
2261 1518 2057
2404 1572 2212
2562 1487 2383
2747 1492 2637
Table 3, Setting Depths and Drilling Mud
Densities
Setting Depth
,ft
Mud Density,
ppg
1445 8.92
2520 12.63
2975 11.77
Table 4, Casing Grads and Weights
Hole
Size
in
Casing
Size
in
Grade
Weight
Lb/ft
Length
ft
17.5 13 3/8 k-55 54.5 1445
12.25 9 5/8 K-55 36 2520
8.5 6 5/8 N-80 26 2975
Table 5, Dimensions of Horizontal Well
Profile
Radius of Curvature,
ft
63.66
Vertical Depth of
Build Section, ft
63.66
Horizontal Length of
Build Section, ft
63.66
Length of build
Section, ft
100
Kick-off
Point(KOP),ft
2934
Total Measured
depth, ft
3534
Table 6, Hydraulic Calculation of Circulation System
Dh
in
Q
gpm
Ps
psi
P
string
psi
P
annulus
psi
P
bit
psi
A
n
In
2
V
n
Ft/sec
D
n,
1/32in
BHHB
hp
BIF
Lb
f
17.5
12.25
8.5
692
510
310
50
38
22
412
403
250
42
73
94
2525
2555
2703
0.39
0.34
0.24
561
474
505
13.1
12.2
10.29
1018
758
602
1789
1577
1179