The document outlines a performance qualification protocol for validating a new heat sealer. It details the purpose, reference documents, pre-requisites, equipment list, experimental plan, sample and test plan, acceptance criteria, and signature record required for the validation. The experimental plan involves running trials under different operating conditions and measuring seal strength to ensure specifications are met.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
332 views
PQ-example Guidelis Sample
The document outlines a performance qualification protocol for validating a new heat sealer. It details the purpose, reference documents, pre-requisites, equipment list, experimental plan, sample and test plan, acceptance criteria, and signature record required for the validation. The experimental plan involves running trials under different operating conditions and measuring seal strength to ensure specifications are met.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6
Performance Qualification
Protocol #: PQP- xxx Ver 01
Gismo Heat Sealer Page 1 of 6 SeerPharma Pty Ltd Page # 1 Performance Qualification Protocol Prepared March 2008 Title Heat Sealer Validation Products Sterile Gizmos Codes 12345 through 12789 Equipment/Process to be Validated: Supplier Co., Model xyz, ABC Manufacturing Equipment Register: MER 98-1248 / Heat Sealing Process: SOP 20- 12-14 Equipment Number PPCN 98-364 Approval of the Validation Protocol Sign here after reviewing and approving the document, standards and schedules Title Name Signature Date Written By: Approved By: Validation Coordinator Laboratory Manager Technical/ Quality Assurance Manager Process Engineer Performance Qualification Protocol #: PQP-xxx Ver 01 Gismo Heat Sealer Page 2 of 6 18/12/07 Page # 2 1 Section 1: Purpose Supplier Co. has developed a new and improved heat sealer, which should improve process flow and reduce setup time. The heat sealer will be validated to assure it performs with existing barrier pouch materials and existing process procedure SOP 20-12-14. SOP 20-12-14 identifies a design requirement for a seal strength of 2 to 4 kg and a target of 3 kg. The most difficult pouches to seal are the smallest (PN 96-122) and the largest (PN 88-010). The target process capability is a Cpk of >1.33. 2 Section 2: Reference Documents 1. Heat Seal Process Procedure, SOP 20-12-14 2. Statistical Methodologies, SOP 3-8-51, SOP 3-9-12, SOP 3-13-81 3. Master Device Records, Codes 12xxx 4. Manufacturing Equipment Register, MER 98-1248 5. Supplier Co. Model xyz Heat Sealer Operating Manual 6. Process Validation Master Plan: PVP-98001 7. Lab Processes and Calibration: SOP 9-2-5 8. Production Processes and Calibration: SOP 20-1-2 9. Clean Room Procedures: SOP 1-12-77 3 Performance Qualification Pre-requisites The sealer must pass IQ and OQ phases of qualification before commencing the performance qualification phase. In addition interim or proposed manufacturing instructions should be drafted and approved, all measuring instruments should be calibrated, the sealer should pass a safety inspection and operators trained in the manufacturing instructions. Performance Qualification Protocol #: PQP-xxx Ver 01 Gismo Heat Sealer Page 3 of 6 18/12/07 Page # 3 IQ Status Installation Qualification has been successfully completed. Refer to report # IQR .. Name Signature Date OQ/PQ Status Operational/Performance Qualification has been successfully completed. Refer to report # OQR .. Name Signature Date Equipment List Measurement / Testing Equipment and Calibration: 1. Stopwatch, Process Development Lab, Calibrated per SOP 9-2-5 2. Remote IR Thermometer RST-12, Process Development Lab, Calibrated per SOP 9-2-5 3. Pressure gauge, 0 500kPa, Process Development Lab, Calibrated per SOP 9-2-5 4. VAR meter, ID 683, Process Development Lab, Calibrated per SOP 9-2-5 5. Heat Seal Pull Tester, PE 8167, Production, Calibrated per SOP 20-1-2 Performance Qualification Conditions Performance Qualification will commence after satisfactory completion of installation and operational qualification. The normal production process will be used. Production personnel will be trained on the use of the new heat sealer. Worst case combinations of time, temperature and pressure will be evaluated. Optimal settings for the heat sealer will be used and the heat seal action levels for adjustment of time, temperature and pressure will be used. Performance Qualification Protocol #: PQP-xxx Ver 01 Gismo Heat Sealer Page 4 of 6 18/12/07 Page # 4 4 Performance Qualification Experimental Plan Aim To provide documented evidence that the bag heat sealing step is capable and reliable and can consistently manufacture products that meet pre-approved specifications. Procedure Reference List Process Instructions # and Version for the steps List Products manufactured at this step # of Experimental Runs (default = 3 Run #1 Lot #: Date: Where: Run #2 Lot #: Date: Where: Run #3 Lot #: Date: Where: Process Variables (Factors) Machine (Line) speed, seal dwell time, warm up time of sealer, Pouch width, operator(s), . Process Measures: Monitor and Record Expected Operating Ranges List the process Seal Dwell Time 30.0 sec 45.0 sec parameters Sealer Temperature 200oC 250oC to be measured Sealer Pressure 1.0 bar 1.5 bar during the run Line Speed 40 / hour - 60/ hour Operator(s) Use at least 2 different operators Experimental Details Describe the experimental approach for each run: Runs will be completed as follows: 1) with the optimal settings per the Device Master Record target conditions - repeat 2 times 2) with a short dwell time (30 sec), low temperature (200oC) and low pressure (1.0bar); repeat 2 times 3) long dwell time (45sec), high temperature (250oC) and high pressure (1.5bar). repeat 2 times. Action levels for adjustment of the heat sealer will be determined as a result of this phase. Conduct each run with at least 300 bags. Sample and Test Plan Describe the sampling plans for each run (number, location, frequency etc) Sample size: 3 consecutive bags per time Sample frequency: every 15 minutes, also 10 at start and last 10 bags Test: Subject each sample to the seal integrity challenge test SOP xxx Acceptance Criteria** Statistical methods in SOP 3-x-x will be used as appropriate to analyse the data. 1. Seal strength Cpk must be greater than 1.33 across each run. 2. Al sampled bags must be within acceptance limits 2.0Kg to 4.0Kg ** If any run does not meet the accept criteria raise a validation deviation notice. Performance Qualification Protocol #: PQP-xxx Ver 01 Gismo Heat Sealer Page 5 of 6 18/12/07 Page # 5 5 Signature Record All personnel involved in this qualification must complete the table below to provide identification of all the signatures/initials used in this document. Company Title Name & Signature Initials & Date Performance Qualification Protocol #: PQP-xxx Ver 01 Gismo Heat Sealer Page 6 of 6 18/12/07 Page # 6 6 Example PQ Report