0% found this document useful (0 votes)
168 views15 pages

Analysis Report On MOS Problems in The XX Project

The document provides an analysis report on MOS problems in a XX project. It summarizes the background and current problems, and describes required actions that have been implemented to address the issues. Key findings include: the proportion of good MOS values decreased after switching; version differences between RNC and NodeB could be impacting MOS; many transmission parameters were inconsistent with baselines after switching and required checking. The report analyzes test data, compares factors affecting MOS, and provides check results and conclusions for completed and ongoing required actions.

Uploaded by

shindele
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
168 views15 pages

Analysis Report On MOS Problems in The XX Project

The document provides an analysis report on MOS problems in a XX project. It summarizes the background and current problems, and describes required actions that have been implemented to address the issues. Key findings include: the proportion of good MOS values decreased after switching; version differences between RNC and NodeB could be impacting MOS; many transmission parameters were inconsistent with baselines after switching and required checking. The report analyzes test data, compares factors affecting MOS, and provides check results and conclusions for completed and ongoing required actions.

Uploaded by

shindele
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 15

Analysis Report on MOS Problems in the XX Project PUBLIC

Analysis Report on MOS Problems in the XX


Project
XX department XX November 27, 2012
1 Overview
1.1 Background
Describe the backro!n" in#ormation o# the c!rrent project$ incl!"in the project name$ project scale$
net%orkin mo"e &IP transmission or micro%a'e transmission($ an" major e'ent in earlier staes)
Project backro!n"*
Project scale*
Problems*
Describe the c!rrent problems an" MOS taret 'al!es)
In ++ o##ice$ the ,'oice is !se" to test the MOS 'al!e on MS-PS./ be#ore an" a#ter s%appin) It pro'es
that the proportion o# MOS 'al!e reater than 0 be#ore an" a#ter s%appin is 12)34 an" 15)24$
respecti'ely$ %hich in"icates that this proportion a#ter s%appin "ecreases) .he acceptance criteria is MOS
m!st be hiher than that be#ore s%appin) .here#ore$ the MOS 'al!e a#ter s%appin "oes not meet the
criteria)
1.2 Versions and Transmission Modes
Describe 'ersions o# /6s$ s!ch as BSC an" B.S$ on the li'e net%ork) I# m!ltiple 'ersions are in'ol'e"$
speci#y all the 'ersions) I# 'ersion !pra"es are in'ol'e"$ speci#y the 'ersions be#ore an" a#ter the !pra"e$
an" the !pra"e time)
C/ Man!#act!rer* 6ricsson
R/C 'ersion* 7133R3896/:C38SP;582
/o"eB 'ersion* 0133 series)
01336 <<+++
.ransmission mo"e*
I!b* A.M
I!-CS* IP
2 Implementation of Required ctions
Pro'i"e the implementation res!lts #rom re=!ire" actions$ incl!"in necessary "eli'erables$ tro!bleshootin
res!lts$ an" c!rrent "i##ic!lties)
938>-31-81 ;!a%ei con#i"ential) /o sprea"in %itho!t permission) Pae 8 o# 15
Analysis Report on MOS Problems in the XX Project PUBLIC
Required ction
!ompletio
n "tatus
#ngineer $ame
%elivera&le and
!'eck Result
Re=!ire" action 8* Pro'i"in an MOS
"ri'e test speci#ications checklist
Complete"
Re=!ire" action 9* Checkin e=!ipment
an" 'ersion #or kno%n problems
Onoin
Re=!ire" action 0* Checkin all
enco"in?"eco"in parameters
Onoin
Re=!ire" action >* Analy@in
characteristics o# lo% MOS
Onoin
Re=!ire" action 5* Checkin
co"in?"eco"in problems base" on
typical characteristics
Onoin
Re=!ire" action 2* Checkin BL6R-
relate" co'erae base" on typical
characteristics
/ot starte"
Re=!ire" action A* Checkin BL6R-
relate" inter#erence base" on typical
characteristics
Partially
complete"

Re=!ire" action B* Checkin BL6R-
relate" transmission base" on typical
characteristics
Onoin
Re=!ire" action 1* Checkin BL6R-
relate" alorithm base" on typical
characteristics
Onoin
Re=!ire" action 83* Checkin BL6R-
relate" e=!ipment base" on typical
characteristics
/ot starte"
Re=!ire" action 83* Checkin han"o'er-
relate" problems base" on typical
characteristics
/ot starte"
938>-31-81 ;!a%ei con#i"ential) /o sprea"in %itho!t permission) Pae 9 o# 15
Analysis Report on MOS Problems in the XX Project PUBLIC
( %etailed nal)sis of Required
ctions
(.1 Required ction 1* +roviding an MO" %rive
Test "peci,cations !'ecklist
(.1.1 nal)-ing Test %ata
MOS is a "ri'e test co!nter re#lectin en"-to-en" speech =!ality b!t can be easily a##ecte") .here#ore$ to
a'oi" !ne+pecte" chanes that lea" to "ata comparison #ail!res$ ens!re that test ro!tes$ test spee"s$ an"
"e'ices are same in t%o comparison test scenarios)
.he #ollo%in MOS checklist "escribes the #actors a##ectin MOS test res!lts) Chen han"lin the MOS
problems$ #irst collect the #ollo%in in#ormation be#ore i"enti#yin an" analy@in the ca!ses)
MO" %T data c'ecklist
%T Information $ow Before #.ecute Remark
.est e=!ipment?Speech
%a'e sample
Probe narrD!kastsDB)%a'
PS./ ;!a%ei C/
.ra##ic mo"el 3)39 erl?S!b
7ehicle?.erminal Eor" SU7 ?;!a%ei 2883
.est area 8>*33-93*33$ !rban main roa"
.est spee" 03 km?h
.ool settin An B-ho!r a!tomatic test an" call
e'ery 13 secon"s

Statistic stan"ar" P6S,B29)8
Recor"e" speech %a'e
check
892F
MOS mean Score 0)25
Mos Ma+ >)38
MOS G 8 rate 94
MOS G 9 rate 04
MOS G 0 rate 24
MOS G > rate A84
MOS H > rate 8B4
MOS samples 8B3>)33
;;O n!mbers 082)33
938>-31-81 ;!a%ei con#i"ential) /o sprea"in %itho!t permission) Pae 0 o# 15
Analysis Report on MOS Problems in the XX Project PUBLIC
MO" %T data c'ecklist
%T Information $ow Before #.ecute Remark
;;O? MOS sample rate 8A)594
A'erae BL6R 3)38
BL6R &8( rate &34-
3)AB4(
B94
BL6R &9( rate &3)AB4-
8)524(
894
BL6R &0( rate &8)524-
0)894(
94
BL6R &>( rate &0)894-
2)9>4(
84
BL6R &5( rate &2)9>4-
89)>B4(
84
BL6R &2( rate &89)>B4-
8334(
94
A'eraeRSCP 25)33
A'erae 6c?Io -83)33
6c?Io G -8> "B 0)004
-8> "B I 6c?Io G -83 "B >2)034
-83 "B I 6c?Io G -2 "B >5)5B4
6c?Io H -2 "B >)AB4
AMR 'ersion an" rate AMR89)9 &8334($
CBAMR 34

AMRC rate AMR89)9 8334
Drop times 5)33
D. "e'ices an" metho" Probe$ MS-MS
D. time an" roa" 8>*33-93*33$ !rban main roa"
I!b$ I!-CS transmission I!b* A.M
I!-CS* A.M

R/C 'ersion BSC213371R389C38SPC533
DBS01337933R388C33SPC893

"elay$ jitter$ E6R?BL6R 893 ms
938>-31-81 ;!a%ei con#i"ential) /o sprea"in %itho!t permission) Pae > o# 15
Analysis Report on MOS Problems in the XX Project PUBLIC
(.1.2 !onclusion
Pro'i"e chane res!lts o# #actors a##ectin MOSs accor"in to chanes o# #actors in the t%o tests)
Accor"in to comparison res!lts$ con#irm chanes o# #actors a##ectin MOS be#ore an" a#ter s%appin$ #or
e+ample$ chanes o# AMR co"es$ chanes o# air inter#ace transmission =!ality$ an" chanes o# han"o'er
rates) In a""ition$ con#irm %hether test areas$ time$ an" spee"s are same as those in the comparison test)
(.2 Required ction 2* !'ecking #quipment
and Version for /nown +ro&lems
(.2.1 nal)-ing %i0erence &etween R$! and $odeB
Versions
Con#irm %hether there are any in#l!ences #rom the 'ersion "i##erences or the kno%n problems o# the
c!rrent 'ersion accor"in to the release" preca!tions$ anno!ncements$ an" release notes) .ake the release"
pre'enti'e meas!res to a'oi" #actors s!ch as kno%n "i##erences)
/o"eB
Lo% MOS problems an" speech =!ality problems on CBBP" boar"s can be sol'e" in
the #ollo%in 'ersions*
J R89 7933R389C33SPC>>3
J R80 7933R380C33SPC083
(.2.2 !onclusion
Dra% concl!sions base" on the 'ersion "i##erences o# the R/C an" /o"eB)
(.( Required ction (* !'ecking ll
+arameters
(.(.1 +roviding !'ecking Results of ll +arameters
Pro'i"e the check res!lts #or all parameters an" core 'oice parameters) Con#irm an" check the parameters
base" on the parameter check theme) Pro'i"e the reason #or parameter settins) I# no proper reasons are
a'ailable$ chane the 'al!es o# these parameters to the recommen"e" 'al!es) In IP transmission mo"e$
parameters m!st be set base" on the baseline 'al!e)
Li'e net%orks an" oriinal net%orks are "i##erent) .here#ore$ checkin res!lts sho% that many parameters
are not consistent %ith the baseline a#ter s%appin) .he #ollo%in table "escribes the parameter checkin
res!lts*
MM1
comman
d
+aramete
r I%
Bitmap +aramet
er $ame
Baselin
e Value
Impact
S6.
UCorrmalo
s%itch
CsS%itch CSDIUUPD7
9DSUPPOR.
DSCI.C;
.EO?.rEO 8 6nablin this s%itch %ill increase
MOS by 3)9 %itho!t neati'e
impact
CSDAMRCD
SCI.C;
AMRC 3 6nablin this s%itch %ill lea" to
silence or call "rop as a res!lt o#
938>-31-81 ;!a%ei con#i"ential) /o sprea"in %itho!t permission) Pae 5 o# 15
Analysis Report on MOS Problems in the XX Project PUBLIC
MM1
comman
d
+aramete
r I%
Bitmap +aramet
er $ame
Baselin
e Value
Impact
the U6 compatibility iss!e)
CmpS%itch CMPDUUDA
MRDDRDD;
;ODCOMPA
.DSCI.C;
DRD ;;O
CMP S%itch
8 A#ter this s%itch is enable"$ both
;;O an" DRD are s!pporte" to
a'oi" the arble noise ca!se" by
U6 compatibility iss!e)
S6.
UDPUCE:
DA.A
Amr/oiseCor
rectS%itch
A!tomatic
/oise
Correction
S%itch
&R80(
o## .he arble noise is a!tomatically
correcte")
S6.
URRC.RL
SCI.C;
Rs'"Para8K
RS7DBI.8D
BI.9>
CS Link
Reestablish
ment S%itch
3 6nablin this s%itch helps
"ecrease the call "rop rate$ b!t
%ill lea" to a 2-secon" silence$
compromisin !ser e+perience)
S6.
UERCC;L
.LP6PARA
SrbChl.ype SRB O76R
; S%itch
/one .he SRB O76R ; s%itch %ill
lea" to the %ater r!nnin so!n")
S6.
URRC.RL
SCI.C;
Rs'"Para8 RS7DBI.8D
BI.85
Silence
Detect
3 Silence is "etecte")
S6.
UCORRMP
ARA
P6RE6/;D
OLPCDBL6
RDCO6EDA
DMUS.
Dynamic
Po%er
Control
8 I# this s%itch is enable"$ a lo%
BL6R 'al!e %ill be set #or 'oice
!sers %hen cell loa" is =!ite lo%)
.his %ill impro'e speech =!ality
at the cost o# cell loa" increase$
co'erae shrinkae an" call "rop
increase on the cell bor"er) Chen
cell loa" is hih$ restorin the
BL6R 'al!e %ill not a##ect cell
!plink capacity)
S6. UU6A 6ncryptionAl
o
R/C
S!pporte"
6ncryption
Alorithm
U6A3-
8NU6A8-
8
.his alorithm m!st be consistent
%ith that !se" on the C/)
Other%ise$ call "rop may occ!r)
S6.
US.A.6.I
M6R
;oPhychRec#
.mr
;;O
Physical
Channel
Recon#i!rat
ion .imer
5333 I# this time is set to more than
83333$ the %ater r!nnin problem
may occ!r)
938>-31-81 ;!a%ei con#i"ential) /o sprea"in %itho!t permission) Pae 2 o# 15
Analysis Report on MOS Problems in the XX Project PUBLIC
MM1
comman
d
+aramete
r I%
Bitmap +aramet
er $ame
Baselin
e Value
Impact
MOD
UC6LLRLP
CR
RlMa+DlP%r Ma+im!m
"o%nlink
transmit
po%er o#
89)9 kbit?s
CS ser'ices
3 Increasin the 'al!e o#
RlMa+DlP%r helps to "ecrease
the "o%nlink BL6R an" optimi@e
MOSs) ;o%e'er$ conestion in
some cells "eteriorates an" 6c?/o
'al!es increase)
RlMinDlP%r Minim!m
"o%nlink
transmit
po%er o#
89)9 kbit?s
CS ser'ices
-853 Increasin the 'al!e o#
RlMinDlP%r helps to "ecrease the
"o%nlink BL6R an" optimi@e
MOSs) ;o%e'er$ conestion in
some cells "eteriorates an" 6c?/o
'al!es increase)
MOD
U.LPRAB
OLPC
MI/SIR.AR
:6.
Minim!m
SIR taret
'al!e
B9 A"j!stin this parameter helps to
"ecrease the BL6R an" this
a"j!stment "oes not a##ect relate"
co!nters)
BL6R,UALI
.L
BL6R taret
'al!e
-93 A"j!stin the BL6R,UALI.L
helps to "ecrease the BL6R an"
increase MOS 'al!es) .he 'al!e
o# SIRADMUS.S.6P sho!l" be
a"j!ste") ;o%e'er$ !plink an"
"o%nlink transmit po%er increase)
SIRADMUS.
S.6P
SIR
A"j!stment
Step
5 Steps are a"j!ste" base" on
BL6R)
Pro'i"e the check res!lts #or all parameters an" core 'oice parameters) Con#irm an" check the parameters
base" on the parameter check theme) Eor the parameters that a##ect the call "rop rates$ pro'i"e the reason
#or parameter settins) I# no proper reasons are a'ailable$ chane the 'al!es o# these parameters to the
recommen"e" 'al!es)
(.(.2 !onclusion
Mo"i#y incorrect parameters base" on parameter check res!lts an" "ra% concl!sions)
938>-31-81 ;!a%ei con#i"ential) /o sprea"in %itho!t permission) Pae A o# 15
Analysis Report on MOS Problems in the XX Project PUBLIC
(.2 Required ction 2* nal)-ing
!'aracteristics of 1ow MO"
(.2.1 !'ecking %istri&ution of 1ow MO"
Check lo% MOS accor"in to the MOS list an" associate lo% MOSs %ith e'ents in the correspon"in
perio" o# ratin MOS) 7eri#y %hether top cell problems or contin!o!s lo% MOS e+ist base" on the lo%
MOS "istrib!tion)
I# lo% MOS occ!rs contin!o!sly or massi'ely on one si"e "!rin a "ri'e test$ the problem !s!ally lies %ith
the MOS tester$ a!"io cable connection or test metho")
Eor e+ample$ in an o##ice$ "ri'e test "ata comes %ith contin!o!s lo% MOS on one si"e an" recor" 'oice in
the a!"io #iles so!n"s o!t o# or"er) A#ter check an" analysis$ it pro'es that one o# the )"ll #iles o# the testin
so#t%are is not !p"ate")
(.2.2 nal)-ing 1ow MO"
Analy@e the "ri'e test U6 lo to check MOSs) Use a tool to check an" #ilter o!t lo% MOSs an" check ra"io
sinals)
I# the RSCP o# the cells %ith a lo% MOS is less than 835 "Bm or their 6c?Io is smaller than -8> "B$ the
lo% MOS is ca!se" by poor =!ality o# ra"io sinals an" %eak co'erae) .here#ore$ %ireless net%ork
optimi@ation is re=!ire")
I# the R.CP o# the cells %ith a lo% MOS is larer than -13 "Bm$ the lo% MOS is ca!se" by inter#erence)
.here#ore$ inter#erence checkin an" locatin are re=!ire")
I# the sinal =!ality o# the cells %ith a lo% MOS is oo" an" their RSCP is not smaller than -15 "Bm or
their 6c?Io is not smaller than -89 "B$ the problem may lie %ith pro"!cts) .here#ore$ an in-"epth problem
locatin is re=!ire")
938>-31-81 ;!a%ei con#i"ential) /o sprea"in %itho!t permission) Pae B o# 15
Analysis Report on MOS Problems in the XX Project PUBLIC
(.2.( !onclusion
Dra% concl!sions accor"in to the analysis o# in#l!ences bro!ht by !ne+pecte" #actors)
(.3 Required ction 3* !'ecking
!oding4%ecoding +ro&lems &ased on T)pical
!'aracteristics
(.3.1 nal)-ing MO" !'aracteristics in %rive Tests
.ypical characteristics o# enco"in?"eco"in problems* .he a'erae MOS is smaller than 0)2$ an" the
ma+im!m MOS is smaller than >)3) .REO an" AMRC #!nctions are closely relate" to enco"in?"eco"in
problems)
MOS mean Score 0)>23
Mos Ma+ 0)B3
MOS G 8 rate 34
MOS G 9 rate 3)54
MOS G 0 rate 2)54
MOS G > rate 10)34
MOS H > rate 34
MOS samples 9805
938>-31-81 ;!a%ei con#i"ential) /o sprea"in %itho!t permission) Pae 1 o# 15
Analysis Report on MOS Problems in the XX Project PUBLIC
8) .REO
.REO a##ects speech enco"in?"eco"in) 6nablin .REO %ill increase MOS by 3)9) A#ter .REO is
"isable"$ the MOS baseline 'al!e "ecreases to 0)>)
S6. UCORRMAL:OSCI.C;* CsS%itch*CSDIUUPD79DSUPPOR.DSCI.C;K8O
9) AMRC
6nablin AMRC %ill a##ect the enco"in rate an" has a neati'e ain on the MOS)
S6. UCORRMAL:OSCI.C;* CSDAMRCDSCI.C;K3O
It is recommen"e" that AMRC be "isable" an" .REO be enable")
(.5 Required ction 5* !'ecking B1#R6related
!overage &ased on T)pical !'aracteristics
(.5.1 !omparing B1#R !'anges in %rive Tests
Compare the BL6R chanes in t%o "ri'e tests$ partic!larly the BL6R rate rank ranin #rom 2 to A) Check
%hether =!ality "eterioration occ!rs an" a##ects MOS 'al!es) In a""ition$ 'eri#y %hether contin!o!s lo%
MOSs occ!r in areas an" sites %ith speech =!ality "eterioration)
MO" %T data c'ecklist
%T Information $ow Before #.ecute Remark
A'erae BL6R 3)38
BL6R &8( rate &34-3)AB4( B94
BL6R &9( rate &3)AB4-8)524( 894
BL6R &0( rate &8)524-0)894( 94
BL6R &>( rate &0)894-2)9>4( 84
BL6R &5( rate &2)9>4-89)>B4( 84
BL6R &2( rate &89)>B4-8334( 94
(.5.2 !omparing B1#R !'anges in Tra7c "tatistics
Compare the BL6R chanes in t%o tra##ic statistics) I# speech =!ality "ecreases$ check %hether top cells
e+ist an" 'eri#y %hether MOS problems occ!r in these top cells by analy@in "ri'e test "ata)
T)pe !ounter !ounter %escription
BL6R 7S)ULBlerAMR .his meas!rement item takes statistics o# the UL BL6R on the "e"icate"
transport channel carryin AMR speech ser'ices in the best cell)
7S)UL)BLer)O!t)CSAMR.his meas!rement item takes statistics o# the ratio o# the time taken by the
ma+im!m UL BL6R on the DC; carryin the AMR speech ser'ice in the
best cell)
7S)ULBler)AMR)6rr.B .his co!nter pro'i"es the n!mber o# .Bs %ith UL CRCI error #or AMR
ser'ices on the DC; in the best cell)
938>-31-81 ;!a%ei con#i"ential) /o sprea"in %itho!t permission) Pae 83 o# 15
Analysis Report on MOS Problems in the XX Project PUBLIC
(.5.( !omparing R"!+ !'anges in %rive Tests
Compare the a'erae 'al!e an" "istrib!tion o# RSCP to 'eri#y %hether speech =!ality "eterioration occ!rs
an" a##ects MOS 'al!es) In a""ition$ 'eri#y %hether contin!o!s lo% MOSs occ!r in areas an" sites %ith
speech =!ality "eterioration)
MO" %T data c'ecklist
%T Information $ow Before #.ecute Remark
A'erae RSCP 25)33
A'erae 6c?Io -83)33
6c?Io G -8> "B 0)004
-8> "B I 6c?Io G -83 "B >2)034
-83 "B I 6c?Io G -2 "B >5)5B4
6c?Io H -2 "B >)AB4
(.5.2 !onclusion
Con#irm %hether speech =!ality a##ects MOSs accor"in to BL6R an" RSCP chanes be#ore an" a#ter
s%appin)
(.8 Required ction 8* !'ecking B1#R6related
Interference &ased on T)pical !'aracteristics
(.8.1 !'ecking RT9+ %i0erence
Pro'i"e R.CP check res!lt "eli'erables$ relate" "ata$ check res!lts o# cells %ith R.CP problems$ an"
tro!bleshootin res!lts) Analy@e the relationship bet%een R.CP an" top cells) Pre#erentially sol'e R.CP
problems in top cells)
7S)MeanR.CP H -13 "Bm
7S)Ma+R.CP H --A5" Bm
7S)MinR.CP I -832 "Bm
.he check res!lts sho% that many cells ha'e hih R.CP) .hese cells are i"enti#ie" as top cells an" nee"
key checkin in prece"ence)
(.8.2 !'ecking Intermodulation
Determine %hether ob'io!s !plink inter#erence e+ists accor"in to the inter#erence ban" "ata) I# !plink
inter#erence e+ists$ pro'i"e the intermo"!lation check res!lt) Determine %hether the intermo"!lation e+ists)
I# the intermo"!lation e+ists$ pro'i"e the check res!lt)
Eor "etails$ see UMTS RF Channel Fault Detection and Rectification:
Factors of Impact + Troubleshooting Methods and Tools + Deliverables
938>-31-81 ;!a%ei con#i"ential) /o sprea"in %itho!t permission) Pae 88 o# 15
Analysis Report on MOS Problems in the XX Project PUBLIC
(.8.( !'ecking Reverse !ell !onnection
Check re'erse cell connection$ an" tro!bleshoot the cells %ith the access problem base" on the check
res!lts o# relate" tools) Pro'i"e the check res!lt o# cells %ith the problem$ an" analy@e the relationship
bet%een the re'ersely connecte" cells an" the top cells) Resol'e problems o# the top cells in prece"ence)
Eor "etails$ see UMTS RF Channel Fault Detection and Rectification:
Factors of Impact + Troubleshooting Methods and Tools + Deliverables)
(.8.2 !'ecking :plink and %ownlink Balance
Pro'i"e the check res!lt o# !plink?"o%nlink balance an" the res!lt o# han"lin the cells %ith s!ch a
problem) In a""ition$ analy@e the relationship bet%een the cells %ith the !plink?"o%nlink balance problem
an" the top cells) Resol'e the !plink?"o%nlink !nbalance problem o# the top cells in prece"ence)
Eor "etails$ see UMTS RF Channel Fault Detection and Rectification:
Factors of Impact + Troubleshooting Methods and Tools + Deliverables)
(.8.3 !onclusion
Dra% concl!sions accor"in to the relate" "ata analysis o# re=!ire" action A)
R.CP #rom the tra##ic statistics "i##ers #rom that in "eli'erables) .here#ore$ it is necessary to con#irm the
"i##erence) I# R.CP is hih on the li'e net%ork$ locate the problem) I# no "eli'erable is enerate" #rom the
prece"in re=!ire" action$ recon#irm %hether the prece"in problems occ!r) .ro!bleshoot the top cells %ith
these problems in prece"ence)
Re=!irement* Pro'i"e relate" check "eli'erables an" concl!sions) Pro'i"e relate" e+planation i# the
prece"in problems "o not occ!r)
(.; Required ction ;* !'ecking B1#R6related
Transmission &ased on T)pical !'aracteristics
(.;.1 !'ecking Tra7c Measurement !ounters
Check I!b?I!-CS transmission per#ormance co!nters*
8) I# the transmission mo"e o'er the I!b?I!-CS inter#ace is A.M transmission$ then pro'i"e
the #ollo%in co!nters*
7S)AAL9PA.;)P7CLAL6R)DROPEOR;6ADC6LLS$
7S)AAL9PA.;)P7CLAL6R)DROPEORRXO76RELOCC6LLS$
7S)AAL9PA.;)P7CLAL6R)DROPEOR.XO76RELOCC6LLS
Judgment criteria: ! more than "# pac$ets are lost due to A%M pac$et header error or insu!!icient
space in A%M bu!!er area& lo' MOS problems are related to A%M lin$ !aults(
9) I# the transmission mo"e is IP transmission an" IPPM is acti'ate"$ pro'i"e the #ollo%in
in#ormation* 7S)IPPM)Eor%or")Peak)DropRates
Judgment criteria: ! the PPA%) pea$ pac$et loss rate is o*er 1+& lo' MOS problems are related to
transmission lin$ !aults(
0) I# the transmission mo"e is IP transmission an" IPPM is not acti'ate"$ pro'i"e the
#ollo%in co!nters* 7S)IPPA.;)IPLAL6R).XDROPPACF6.S$
7S)IPPA.;)IPLAL6R)RXDROPPACF6.S
938>-31-81 ;!a%ei con#i"ential) /o sprea"in %itho!t permission) Pae 89 o# 15
Analysis Report on MOS Problems in the XX Project PUBLIC
Judgment criteria: ! more than "# pac$ets are lost 'hen transmitted on the P layer& lo' MOS
problems are related to P lin$ !aults(
(.;.2 !onclusion
7eri#y %hether transmission problems occ!r by analy@in transmission co!nters in tra##ic statistics)
(.< Required ction <* !'ecking B1#R6related
lgorit'm &ased on T)pical !'aracteristics
(.<.1 !'ecking lgorit'm and +arameters
CS link reestablishment s%itch an" har" han"o'er a##ect MOSs) Check the #ollo%in parameters*
T)pe MM1
!ommand
+arameter I% Bitmap Baseline
Value
CS link
reestablishment
s%itch
S6.
URRC.RLSCI.C;
Rs'"Para8KRS7DBI.8DBI.9> 3
;ar" ;an"o'er
Physical
Channel
Recon#i!ration
.imer
S6.
US.A.6.IM6R
;oPhychRec#.mr 5333
(.1= Required ction 1=* !'ecking B1#R6
related #quipment &ased on T)pical
!'aracteristics
(.1=.1 !'ecking larms
Pro'i"e alarm in#ormation abo!t #a!lty R/Cs an" relate" han"lin res!lts) Con#irm %hether any alarms
ob'io!sly a##ect the call "rop rate) Associate alarms %ith the cells ha'in call "rop problems$ clear alarms
in these cells)
Required ction !ompleti
on "tatus
%ate #ngineer
$ame
%elivera&le and
!'eck Result
Check RE channels #or
main an" "i'ersity
channels$ cross pairs$
an" inter#erence)
Onoin per t%o %eek /o alarms
Accor"in to the "eli'erables pro'i"e" by #iel" enineers$ no alarms are enerate") Pro'i"e e+planation i#
the prece"in problems "o not occ!r)
938>-31-81 ;!a%ei con#i"ential) /o sprea"in %itho!t permission) Pae 80 o# 15
Analysis Report on MOS Problems in the XX Project PUBLIC
(.1=.2 !'ecking %evice >aults
Pro'i"e the in#ormation abo!t R/C #a!lts &ser'ice interr!ption an" o!t-o#-ser'ice( an" the relate" #a!lt
han"lin res!lts) In a""ition$ analy@e the relationship bet%een the "e'ice #a!lts an" cells %ith call "rops)
;an"le "e'ice #a!lts o# cells %ith hih call "rop rates in prece"ence)
ALM-99538 DSP CPU o'erloa" alarm
ALM-939A5 Inter#ace boar" #or%ar"in o'erloa" alarm
ALM-98059 IPPA.; e+cessi'e packet loss alarm
ALM-98998 IMA link o!t-o#-#rame alarm
ALM-98939 68?.8 o!t-o#-#rame alarm
ALM-9893B 68?.8 e+cessi'e slip #rame alarm
ALM-98990 IMA link remote recei'in #a!lt alarm
ALM-93935 System clock so!rce !na'ailable alarm
ALM-93988 DSP time synchroni@ation e+ception alarm
ALM-93931 Clock phase-lock loop #a!lt alarm
ALM-98058 6+cessi'e IP transport layer errore" #rame alarm
ALM-9893A 68?.8 e+cessi'e B6R alarm
(.1=.( !onclusion
Dra% concl!sions base" on the alarms an" check res!lts o# "e'ice #a!lts)
(.11 Required ction 11* !'ecking ?andover6
related +ro&lems &ased on T)pical
!'aracteristics
(.11.1 !omparing %rive Test %ata
Compare "ri'e test "ata be#ore an" a#ter s%appin to analy@e chanes in the n!mber o# han"o'ers$ MOSs$
an" the proportion o# the n!mber o# har" han"o'ers to the n!mber o# MOS calls) .he proportion in"icates
the impact o# han"o'er on MOSs) A smaller proportion re#lects a more serio!s MOS "eterioration) In
a""ition$ 'eri#y %hether the han"o'er proportion chanes an" impacts the MOSs)
Some "ri'e test tools can meas!re MOSs that are a##ecte" an" not a##ecte" by han"o'er) :enerally$ MOSs
a##ecte" by han"o'er are 3)2 lo%er than those not a##ecte") Analy@e %hether impacts o# han"o'er on MOSs
are %ithin the normal rane) .he #ollo%in #i!re sho%s the statistics e+porte" by the ,'oice)
938>-31-81 ;!a%ei con#i"ential) /o sprea"in %itho!t permission) Pae 8> o# 15
Analysis Report on MOS Problems in the XX Project PUBLIC
(.11.2 !omparing Tra7c "tatistics
Compare an" analy@e chanes in the n!mber o# han"o'ers per call accor"in to tra##ic statistics "ata be#ore
an" a#ter s%appin) Con#irm %hether the chane tren" in "ri'e tests an" tra##ic statistics are same)
Eor e+ample$ i# the n!mber o# han"o'ers per call an" per 6rlan increases a#ter s%appin$ impacts o#
han"o'er on speech =!ality increase)
!luster21 $um&er of ?andovers per !all
Be#ore s%appin 3)A8
A#ter s%appin 3)AA
(.11.( !onclusion
Con#irm %hether the n!mber o# han"o'ers chanes an" impacts MOSs accor"in to han"o'er "ata analysis
in "ri'e tests an" tra##ic statistics)
2 !onclusion
Dra% concl!sions accor"in to the analysis an" s!mmary o# the re=!ire" actions) Pro'i"e concl!si'e
opinions s!ch as the c!rrent possible problems$ the meas!res that can be taken$ other re=!ire"
tro!bleshootin metho"s$ an" the re=!ire" "ata s!pport)
Accor"in to the prece"in analysis$ the #ollo%in concl!sions are "ra%n*
8) .est roa"s?areas an" spee"s are basically same in comparison tests)
9) Chanes in han"o'er$ speech =!ality$ an" speech 'ersions ha'e been i"enti#ie") Impacts
o# chanes on MOSs are also clear)
0) Re=!ire" actions s!ch as checkin channels an" checkin parameters are partially
per#orme") /o problems are #o!n")
>) Contin!o!s lo% MOSs %ith 'al!es o# 1 e+ist in the !plink$ %hich is relate" to call "rops
an" release #ail!res on the P.S/ si"e) Impacts ha'e been e+cl!"e" in comparison "ata)
Re,uirements !or !eedbac$:
8) Pro'i"e "ri'e test "ata o# the s%appin %eek in a PDE #ile)
9) Pro'i"e the "eli'erables on channel tro!bleshootin an" the tro!bleshootin res!lts o#
locate" problems$ an" pro'i"e concl!si'e "escriptions on re=!ire" actions that #ail to locate any
problems)
0) Pro'i"e parameter con#i!ration #iles)
3 Monitoring Optimi-ation Measures
Monitor the application time$ application scope$ an" application e##ect o# e'ery optimi@ation meas!re) In
a""ition$ pro'i"e a comparison report on the application o# a meas!re$ incl!"in analysis o# in"icator