This document is a Port State Control Inspection Report for the ship DARYA TARA. It lists 8 deficiencies found during the inspection on July 21, 2014 at Paradip, India. For each deficiency, it identifies the relevant convention or flag state requirement, and notes that the deficiencies should be rectified within 17 days. It was signed by the authorized Port State Control Officer, and provides contact information for appealing inspection results or notifying the flag state if detention is warranted.
This document is a Port State Control Inspection Report for the ship DARYA TARA. It lists 8 deficiencies found during the inspection on July 21, 2014 at Paradip, India. For each deficiency, it identifies the relevant convention or flag state requirement, and notes that the deficiencies should be rectified within 17 days. It was signed by the authorized Port State Control Officer, and provides contact information for appealing inspection results or notifying the flag state if detention is warranted.
(INDIAN OCEAN MOU) Reporting office: Principal Officer, Mercantile Marine Department Pratishtha Bhavan, M.K.Road, Mumbai 400 020. Copy to: Master Tel. 91-22-22039881/83/22064081 FAX: 91 22 2013307/4671 Head Office E-mail: [email protected],.Website: http://mmd.gov.in PSCO Head Office: PSC/FSI Cell, If ship is detained, Directorate General of Shipping, copy to: Flag State & Beta Building, Kanjurmarg East Classification Society Mumbai 400 042, India Tel: 91 22 25752040/41/42/43; FAX: 91 22 25752029/35; E-mail: [email protected], Website: www.dgshipping.gov.in 1 Name of ship............................................ 2 IMO number............................................. 3 Date of inspection .................................... 4 Place of inspection.................................. 5 Nature of deficiency Sr. No. Nature of deficiency 1
Convention 2 /Flag requirements Action Taken 3
Name...................................................... (duly authorized PSCO of reporting authority)
Signature................................................. 1 This inspection was not a full survey and deficiencies listed may not be exhaustive. In the event of a detention, it is recommended that full survey is carried out by Recognized Organization and all deficiencies are rectified before an application for re-inspection is made. 2 To be completed in the event of a detention. 3 Actions taken include, i.e.: ship detained/released, flag State informed, classification society informed, next port informed. Deficiency Action Codes PSC Inspection Action Code 10 Deficiency rectified 40 next port informed 15 Rectify deficiency at next port 45 rectify detainable deficiency at next port 16 Rectify deficiency within 14 days 50 flag state / consul informed 17 Rectify deficiency before departure 55 flag state consulted 18 Rectify deficiency within 3 months 70 recognized organization informed 30 Detainable deficiency 85 investigation of contravention of discharge 99 Other (Specify) provision (MARPOL)
Note: For ISM deficiencies only code 10, 18 and 30 can be used.
DARYA TARA 21-07-2014 9218387 PARADIP 1 LIFEBUOY(FEW) MARKING MISSING 11135 17 2 FOREPEAK DEWATERING SYSTEM NOT TAKING SUCTION SIMULTANEOUSLY FROM BOTH WELLS 03115 17 3 ANTISKID ARRANGEMENT F'CASTLE, POOP DECK, EMERGENCY FIRE PUMP ENTRANCE NOT PROVIDED. 09207 17 4 MF/HF DSC TEST - THIRD OFFICER NOT AWARE OF PROCEDURE 05118 17 5 FEW GRATINGS ON CROSS OVER DECKS, F'CASTLE DAMAGED 02117 17 6 ACCESS TO BULKHEADS IN F'PK STORE OBSTRUCTED 09206 17 7 FEW FIRE HYDRANTS FOUND LEAKING 09232 17 8 FEW HATCH COVER LIPS, CLEATS REQUIRE MAINTENANCE 02117 17 S.V.DURGAPRASAD