0% found this document useful (0 votes)
1K views23 pages

Brent Spence Fracture Critical 2012 Inspection Report

The document summarizes the findings of an inspection of the Brent Spence Bridge over the Ohio River. Key findings include: 1. The bridge deck is in satisfactory condition with minor cracking and spalling, especially around expansion joints. Drainage systems are clogged and in poor condition. 2. The superstructure is also in satisfactory condition, with some cracking observed in floor beam connections and secondary diaphragms. 3. The main truss members are satisfactory overall but show signs of pack rust, section loss, and reactivated corrosion at connections.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views23 pages

Brent Spence Fracture Critical 2012 Inspection Report

The document summarizes the findings of an inspection of the Brent Spence Bridge over the Ohio River. Key findings include: 1. The bridge deck is in satisfactory condition with minor cracking and spalling, especially around expansion joints. Drainage systems are clogged and in poor condition. 2. The superstructure is also in satisfactory condition, with some cracking observed in floor beam connections and secondary diaphragms. 3. The main truss members are satisfactory overall but show signs of pack rust, section loss, and reactivated corrosion at connections.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 23

January30,2013

JoshRogers,PE,LSIT Re: NBIandFractureCriticalBridgeInspection


ProjectManager BrentSpenceBridgeovertheOhioRiver
DivisionofMaintenance (I75andI71)
KentuckyTransportationCabinet Bridge059B00046N
200MeroStreet
Frankfort,KY40622

DearMr.Rogers,

Michael Baker, Jr. (Baker) has completed the NBI and Fracture Critical inspection of the Brent Spence Bridge (I75
and I71) over the Ohio River in Kenton County, KY. The inspection included the 3 spans of the double deck
cantilevered through truss (453 830.5 453). Inspection activities began on November 5, 2012 and were
completedonNovember10,2012utilizing7bridgeinspectors.Bakercompletedthefieldinspectioninaccordance
withtheScopeofWorkforthereferencedproject.

DESCRIPTIONOFFIELDINSPECTION
Thetypeofinspectionforthisprojectwasafracturecritical,NBI,andelementlevelinspectionincluding:
Arms length inspection of all Fracture Critical members and Fatigue sensitive details including category E,
EandFdetailsinthegirdersandfloorbeams.
Armslengthinspectionofsignificantproblemsdiscoveredduringpriorinspections,
Armslengthinspectionoffloorbeamsupportconnections,
Floorsystemelementsunderdeckcontrolandexpansionjointswereobservedfromeachend.Ifevidence
of deterioration, abnormal sounding or misalignment of members was observed, and arms length
inspectionofthoseelementswasperformed.
Awalkoverinspectionofthedeck,
Armslengthinspectionofbearingassemblies
Armslengthinspectionofinteriorandexteriorofsteelpiercaps.
NDE including Magnetic Particle or Dye Penetrant testing was performed where new cracks were visually
foundorsuspectedand wherecracksweresuspectedtohavegrowntoverifythecrackanddetermineits
limits.Crackterminiweremarkedinthefieldwithdate.
Inspection of all other elements at a distance deemed practical, without requiring climbing or specialized
equipment,
DatagatheringandconditionreportingforbothNBIandPontiselementlevelinspectionreporting.

INSPECTIONINTRODUCTION
The floorbeams supporting the upper roadway were inspected using (2) bucket trucks. The remaining truss
elements were inspected utilizing rope access methods. Traffic was maintained in accordance with the Kentucky
Department of Highways(KDOH) Standard Drawing TTC115, Lane Closure MultiLane Highway Case I. The bridge
was inspected utilizing single lane closures. Lane closures were allowed between 10pm to 6am. Two (2) law
enforcement officers were utilized with interstate lane closures. Traffic control and inspection equipment were
providedbyPittsburghRigging.Amannedsafetyboatwasusedwheneverinspectorswereworkingoverwater.

Michael Baker Jr., Inc.


A Unit of Michael Baker Corporation

9750 Ormsby Station Road
Suite 210
Louisville, KY 40223

(502) 339-3557
(502) 339-4486 Fax
2012 NBI and Fracture Critical Inspection
Brent Spence Bridge over the Ohio River
SUMMARYOFFINDINGS

DECKOverallconditionrating=Satisfactory(6)
NBI58.1StructuralConditionand58.2WearingSurface
1. Thedeckwasnotedinoverallsatisfactoryconditionandappearstobestructurallysound.Thebottom
ofthelowerdeckhasspallingwithexposedrebaradjacentatthemajorityofthedeckjoints.Thebottom
oftheupperdeckexhibitedcrackingwithefflorescenceadjacenttothedeckjointsatafewlocations.The
wearingsurfaceoftheupperandlowerdecksareinfairconditionwithminorspallingtypicallyadjacentto
theexpansionjointsalongwithtransverseandlongitudinalcrackingthroughout.Groovinginthewearing
surfaceisshowingwearinthewheelpath.



Typicaltransversecrackingwithlightefflorescence onlowerroadwaydeck.
Typicaltransverseandlongitudinalcracksonupperroadwaysurface.
2012 NBI and Fracture Critical Inspection
Brent Spence Bridge over the Ohio River

Span3atFB3Typicalspallonbottomoflowerdeck, adjacenttojoint.
Span1atFB6Crackingwithefflorescenceonbottomofupperdeck, adjacenttojoint.
2012 NBI and Fracture Critical Inspection
Brent Spence Bridge over the Ohio River


























Span3atFB0Crackingwithefflorescenceonbottomofupperdeck, adjacenttofinger
joint.
Span2atFB23Undersideviewoftypicaljointrepaironupperdeck joint.
2012 NBI and Fracture Critical Inspection
Brent Spence Bridge over the Ohio River
NBI58.3Joints,58.4Drainsand58.5ExpansionDevices
2. The upper deck joints have been repaired since the previous inspection and are in overall satisfactory
condition.Lowerdeckjointsareinoverallpoorcondition.Primarydeficienciestolowerdeckjointsoccur
on bottom of the deck (see 58.1) and leakage. Drains are in poor condition. The majority of the deck
drain inlets are full of debris and downspouts exhibit corrosion and varying levels of section loss. Finger
expansionjoints,withtroughs,arefullofdebris.Fingerjointsappeartobestructurallysound.





Span1,PP0Fingerexpansionjointupto5/8
verticaloffsetbetweenfingerswasnoted.
Typicalminorspalladjacenttodeckjoint.
Span1,PP0drainpipesectionwhichisheavilycorroded. Typicalcloggeddrain.
2012 NBI and Fracture Critical Inspection
Brent Spence Bridge over the Ohio River
NBI58.7Railings
3. Theconcreterailisinoverallsatisfactorycondition.Theconcretebarriershaveverticalcracksatregular
intervals.Atisolatedlocations,concretehasspalledoffthefaceortopofbarrier,exposingreinforcement.
Severalutility/lightingjunctionboxcoveredwereeitherdamagedormissing.



Span2:TypicalParapetCracking Span2, betweenPP19 20Spallwithexposed
reinforcementontopofparapet
SpalledconcretefromapparentimpactdamageatPP0,
upperdeck,downstreamside.
Typicalcrackedjunctionboxplateonlowerdeck.
2012 NBI and Fracture Critical Inspection
Brent Spence Bridge over the Ohio River
NBI58.8Lighting
4. Roadwaylightingisinoverallsatisfactorycondition.Navigationlightingwasobservedworking.






SUPERSTRUCTUREOverallConditionRating=Satisfactory(6)
NBI59.1Stringers,Girders,Beams
5. Thestringersaregenerallyinsatisfactorycondition.Lightcorrosionwasnotedatthestringerendsunder
thedeckjointsandfingerjointlocations.

CracksinthetopflangefilletweldofthesecondarydiaphragmsatUD0wereobservedat(1)Str2,WFat
4.125,(2)Str2,EFat6.75,(3)Str3,WFat6,(4)Str5,EFat7,(5)Str5,WFat8,(6)Str6,EFat3.25,
(7)Str7,EFat5.5and(8)Str7,WFat4.5.

Brokengreenlensfornavigationlighting,DSside.Lightbulb
wasworking.
UD0,Str.7,E.Side5crackinT/flngfilletweld. UD0,Str.2,E.Side 6crackinT/flngfilletweld.
2012 NBI and Fracture Critical Inspection
Brent Spence Bridge over the Ohio River
NBI59.2FloorBeams
6. Thefloorbeamswereobservedinoverallfaircondition.Theprimarydeficienciesnotedwerecracksatthe
floorbeamconnectiontothetruss.Ofthefourteentotallocations,twolocationswereobservedattheend
ofthefloorbeamtopflangeangleattheconnectiontothetruss,elevenlocationswerenotedattheendof
thefloorbeamintheTconnectionattheconnectiontothetrussandone5/8crackoriginatingatrivet
holetoedgeoffillplateofFB16,UD,DS(seeAppendixfortable).
Thefloorbeamsalsoexhibitminorsectionlossandsurfacerustthroughoutthebridge.Underthe
expansionjoints,thereismoderatecorrosionanddebrisontopofthefloorbeams.Thebuiltupbox
girderfloorbeamsatUD17andUD17exhibitminortomoderatecorrosionwithsectionlossofthetop
flangeandrivetheads.



TypicalTconnectionatfloorbeamconnectiontotruss. TypicalcrackinTconnectioncloseup
Typicalcrackinfloorbeamatconnectiontotruss closeup. FB16,UD,DS 5/8crackinfillplate
2012 NBI and Fracture Critical Inspection
Brent Spence Bridge over the Ohio River

NBI59.3TrussMainMembers
7. Overall,themaintrussmembersareinsatisfactorycondition.Thefollowingdeficiencieswereobserved
a. Thereispackrustoccurringatthelowerchord,particularlyonthespliceplates,fillerplates,andcover
plates.Thereisalsopackrustalongtheedgesofthelowerchord.Thispackrustiscausingtheedgeofthe
platetocurlup.Minortomoderatesectionlossisoccurringontheundersideofthelowerchord,
particularlyintheareaofthecoverplatesandspliceplates.
b. Corrosionisbeginningtoreactivate,primarilyatthepanelpoints.
c. Theupperchordmembersareinoverallgoodcondition.Theminordeficienciesobservedincludes(1)
surfacerustandminorpackrustalongtheedgesofgussetplates,(2)minordebrisandsurfacerustinsideof
thetopchordaroundtheconnectionboltsforthetopchordsplices,(3)minorpackrustalongtheedgesof
thetopchordmember,and(4)lightsurfacecorrosioniswidespreadalongthetopsurfacesofthetruss
members.
d. Thetopguideplatesontheupperchordpinsarefractured.ThesearelocatedatL17DSandUS,andL17
DS.Thereisfrettingcorrosionatthepinandsurfacerust.
e. Theinboardandoutboardgussetplatesaregenerallyinsatisfactorytogoodcondition.Thereissurfacerust
andflakingpaintonthegussetplates,andpackrustaroundtheedgesoftheplates.Thereissectionloss,
upto1/8,atsomelocations.SeeAppendixforGussetPlateEvaluationTable.

UD17and17BoxGrdrFloorBeamTypical
insideviewlookingtowardsmidspanoffloor
beam.
UD17and17BoxGirderFloor Beam Lookingupatinsideviewoft/flange
endattrussnotelighttomoderatecorrosiononbottomsideoftop
flange.
2012 NBI and Fracture Critical Inspection
Brent Spence Bridge over the Ohio River

Typicalpackrustalongedgesoffillerplatesatgussets. Typicalpackrustalongedgeoflowerchord.
Typicalinsideviewatpanelpoint.Notetheminor
activecorrosion.
Typicalinsideviewoflowerchordlookingtowardsmidpanel.
PP4,USTruss,InboardGussetSectionlossat1/8max.wasobserved(seeredarrow)ongusset.Seeappendixfortable.
2012 NBI and Fracture Critical Inspection
Brent Spence Bridge over the Ohio River

NBI59.3aTrussBracing,Portals
1. Thebracingandportalmembersaregenerallyinsatisfactorycondition.Lightsurfacerustwasnoted
throughoutthebridge.Thereare(2)looseboltsatthebottomofthelateralbracingconnectingU22,DS.


NBI59.3bTrussInspectionWalk
2. Theinspectionwalkisinoverallsatisfactorycondition.Themaindeficiencynotedwasapairoffractured
connectionanglesatFB16forFB17FB16.Theendoftheinspectionwalkissittingonlowerlateralgusset
plate.


U17U18nearPP17,USTruss,InboardSide Fracturedguideplate(seeredarrow). DSTrussissimilar.
FB17FB16Fracturedconnectionangles(seeredarrow).Inspectionwalkwayendissittingonlowerlateralgussetplate.
2012 NBI and Fracture Critical Inspection
Brent Spence Bridge over the Ohio River
NBI59.4BearingDevices
3. Themaintrussbearingdevicesaregenerallyinsatisfactorycondition.Thestringerbearingsbelowjoints
inboththeupperandlowerdecksaregenerallyinfairconditionwithlighttomoderatepackrustand
minortomoderatesectionloss.

Typicalstringerbearingatupperfingerjoint. Typicalstringerbearingatupperdeckjoint.
Typicaltrussexpansionbearing. TypicalstringerbearingatFB17.
2012 NBI and Fracture Critical Inspection
Brent Spence Bridge over the Ohio River
PAINTCONDITIONOverallConditionRating=Fair(5)

4. Thepaintconditionisinoverallfaircondition.
a. Corrosionisactiveinlocationsexposedtodeckrunoff.
b. Lightsurfacerustwasobservedonthetopsofseveraltrussmembers.
c. Thefloorbeamsandstringerssupportingtheupperroadwayareinfairtopoorconditiondueto
apparentenvironmentalexposurefromvehicleexhaustfumes.














Typicalpoorpaintconditiononupperroadwayfloorbeams. Typicallightsurfacerustonlowerchord.

Typicallightsurfacerustontopoftrussmembers. Typicalwidespread surfacerustontrussmembersinSpan2.
2012 NBI and Fracture Critical Inspection
Brent Spence Bridge over the Ohio River
SUBSTRUCTUREOverallConditionRating=Satisfactory(6)

NBI60.2Piers
12. Overall,thepiersareinsatisfactorycondition.MinorcrackswithminorspallswereobservedforPiersI,
II,andIII.PierIVexhibitsheavymapcrackinganddelaminationalongbottomofpiercapandthefull
heightoftheupstreamcolumn,westface.


























PierII,USFaceoverallview.

RiverPierIII,DSFace.

2012 NBI and Fracture Critical Inspection


Brent Spence Bridge over the Ohio River


























Typicalelevationviewofriverpiernosignificantproblemsnoted.
PierIVHeavymapcrackinganddelaminationalongbottomofpiercapandthefull
heightoftheUScolumn,WF.
2012 NBI and Fracture Critical Inspection
Brent Spence Bridge over the Ohio River
RECOMMENDATIONS
Based on evaluation of the inspection findings we recommend the following repairs and maintenance activities in
order to maintain the useful life of the bridge:
1. Replace deck joints with spalled concrete sections and exposed rebar.
2. Repair the broken connection angles for the inspection sidewalk at FB 16.
3. Monitor the cracked concrete on the bottom side of the upper deck adjacent to the finger joints. Repair as
necessary.
4. Monitor cracks on the floor beams. Repair as necessary.
5. Repair the broken and missing guide plates of the sliding pins in upper chord of Span 2.
6. Monitor bearings that are experiencing pack rust. Repair as necessary.
7. Clean and repair all deck drain inlets.
8. Clean troughs under finger expansion device.
9. Repair spalls in the barrier, deck and Pier IV.
10. Replace broken/missing electrical junction box covers.
11. Monitor all pack rust and section loss throughout the truss. Repair as necessary.
12. Monitor paint condition of the upper deck floor beams and areas under the expansion joints. Clean and paint
as necessary.
Refer to the attached Bridge Inspection Report TC 71118 for the condition rating of the various components.

Please feel free to contact us if you have any questions or require additional information.


Sincerely,

Michael Baker, Jr.
Michael Baron, PE
Project Manager

Transportation Cabinet TC 71-118
Division of Operations Rev. 9/11

BRIDGE INSPECTION REPORT
RECOMMENDED LOAD CAPACITIES (tons) I: II: III: IV: Gross: .
FIELD POSTINGS N/E No S/W No I: II: III: IV: Gross: .
Underwater Data:
Reviewed By:
Review Date:


Two Yr
Y
Substd
N UnderWater N
In-Depth
N
Fracture Critical
Y

Project No: 059B00046N NBI-Location: Brent Spence Bridge over the Ohio River .

Local-ID: I-75/I-71 Brent Spence Bridge over the Ohio River at Covington, KY.

Structure Description:

Milepoint: 191.53 Inspectors Initials: MJ B Inspection Date: 11. 10 2012

Inspectors Signature Michael Baker J r., Inc.


58 Deck
6
1 Structural Condition 6
2 Wearing Surface 5
3 Joints 4
4 Drains 4
5 Expansion Devices 5
6 Curbs, Sidewalks, Medians N
7 Railings 6
8 Lighting or Utilities 6

59 Superstructure
6
1 Stringers, Girders, Beams 6
2 Floor Beams 5
3 Trusses Main Members 6
3a Trusses Bracing, Portals 6
3b Trusses Inspection Walk 6
4 Bearing Devices 5
5 Alignment/ Structural Members 7
6 Deflection/ Vibration under Load 7
7 Debris on Members 5


59A Paint Condition
5
Color Gray Date Painted 5 1991


60 Substructure
6
1 Abutments, Wingwalls N
2 Piers/ or Bents 6
3 Alignment/ or Settling 8
4 Scour, Erosions 8
5 Debris on Seats, Caps 7
6 Protection Systems 7
7 Abutments, Wingwalls (S.Z.D.) N
8 Piers/ or Bents (S.Z.D.) N
9 Alignment or Settling Due to Scour 8
61 Channel/Channel Protection
8
1 Channel Scour 8
2 Embankment Erosion 8
3 Drift 8
4 Channel Alignment 8
5 Vegetation 8
6 Erosion Control System N
7 Rip-Rap 8

62 Culvert-Retaining Walls
N
1 Barrel N
2 Wingwalls, Headwall N
3 Debris N
4 Scour Under Footings (Underwater) N
5 Erosion at Wingwalls (Underwater) N
6 Drainage Adequacy (Underwater) N

10 Inventory Route Vertical Clearances

Over: 00.00 FT 00 IN 36 Traffic Safety
Under: 16 FT 7 IN 1 1 1 1 .

71 Waterway Adequacy
9
72 Approach Roadway Alignment
7

113 Scour Critical Bridge Rating
N

108 Wearing Surface/Protective System

Type: 4 Membrane: 0 Protection: 0

OVERLAY
No:
Yes: X Date: 1-1995
TYPE Latex: X PCC: Asphalt:
Depth:

3 Spans Double Deck Cantilevered Through Truss (453 830.5 453)
Fracture Critical Member Plan
1. Truss members, includes gussets (shown in red above).
2. Floorbeams, upper deck and lower deck.
2012 NBI and Fracture Critical Inspection
Brent Spence Bridge over the Ohio River















APPENDIX





North 23/4",15/8",1/8"
South 25/8",11/4",1/2",1/8"
0 US South CracksinWeb 11/2"
1 US North CracksinTconnection 11/2"
14' DS South CrackinTconnection 11/4"
North 11/4"
South 1"
North 1"
South 17/8"
North 13/16"
South 15/8"
North 13/4"
South 15/8"
South 5/8"
North 1/4"
South 13/16"
North 1"
CrackinTconnection 11/2"
CracksinWeb 13/8"
South CrackinTconnection 23/8",7/8"
North 2"
South 2"
1' DS South CracksinTconnection 1"
Brent Spence Bridge (I-71) over the Ohio River
059B00046N: Summary of Floorbeam Cracks - Lower Roadway
Span
Panel
Point
Truss
Side
Flrbm.
Face
LocationDescription 2012Length
0 DS CracksinTconnection
CrackinTconnection
1
2
17 DS
16 US
16 DS
16' US
3
CrackinTconnection
16' DS CrackinTconnection
CrackinTconnection
CrackinTconnection
17 US CrackinTconnection
0' US CrackinTconnection
0' DS
North
InboardPlate OutboardPlate CS InboardPlate OutboardPlate CS
L0 5/8",1/2" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L1 1/2" Trad.Tools Trad.Tools 3 UT UT 4
L2 5/8" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L3 1/2" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L4 5/8" Trad.Tools Trad.Tools 4 UT UT 4
L5 1/2" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 3
L6 11/16" Trad.Tools Trad.Tools 4 UT UT 4
L7 1/2" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L8 5/8",11/16" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L9 1/2" Trad.Tools Trad.Tools 3 Trad.Tools Trad.Tools 4
L10 3/4" Trad.Tools Trad.Tools 4 UT Trad.Tools 4
L11 1/2" Trad.Tools Trad.Tools 3 Trad.Tools Trad.Tools 3
L12 3/4",3/4",5/8" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L13 1/2" Trad.Tools Trad.Tools 3 Trad.Tools Trad.Tools 4
L14 5/8" Trad.Tools Trad.Tools 4 UT UT 4
L15 1/2" Trad.Tools Trad.Tools 3 Trad.Tools Trad.Tools 4
L16 5/8" Trad.Tools Trad.Tools 4 UT UT 4
L17 3/4" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L18 1/2" Trad.Tools Trad.Tools 4 UT UT 4
L19 3/4" Trad.Tools Trad.Tools 4 UT Trad.Tools 4
L20 1/2" Trad.Tools Trad.Tools 4 Trad.Tools UT 4
L21 5/8" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L22 1/2" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L23 5/8" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L22' 1/2" Trad.Tools Trad.Tools 4 Trad.Tools UT 4
L21' 5/8" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L20' 1/2" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L19' 3/4" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L18' 1/2" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L17' 3/4" Trad.Tools Trad.Tools 4 UT UT 4
L16' 5/8",11/16" Trad.Tools Trad.Tools 4 UT UT 4
L15' 1/2" Trad.Tools Trad.Tools 3 Trad.Tools Trad.Tools 4
L14' 5/8" Trad.Tools Trad.Tools 4 Trad.Tools UT 4
L13' 1/2" Trad.Tools Trad.Tools 3 Trad.Tools Trad.Tools 4
L12' 5/8",3/4" Trad.Tools Trad.Tools 4 UT Trad.Tools 4
L11' 1/2" Trad.Tools Trad.Tools 3 Trad.Tools Trad.Tools 3
L10' 3/4" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 3
L9' 1/2" Trad.Tools Trad.Tools 3 Trad.Tools Trad.Tools 4
L8' 11/16" Trad.Tools Trad.Tools 4 UT Trad.Tools 4
L7' 1/2" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L6' 11/16" Trad.Tools Trad.Tools 4 UT Trad.Tools 4
L5' 1/2" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L4' 5/8" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L3' 1/2" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L2' 5/8" UT Trad.Tools 4 Trad.Tools Trad.Tools 4
L1' 1/2" Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools 4
L0' 5/8",1/2"
Trad.Tools Trad.Tools 4 Trad.Tools Trad.Tools
4
Note:ConditionState(CS)ratingsbasedonAASHTOCoReElementdescriptions
Panel
Point
Nominal
Thickness
DownstreamTruss UpstreamTruss
Brent Spence Bridge (I-71) over the Ohio River
059B00046N: Gusset Plate Evaluation - Lower Gussets
InboardPlate OutboardPlate CS InboardPlate OutboardPlate CS
U1 5/8",1/2" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U2 5/8" Trad.Tools Trad.Tools 3 UT UT 2
U3 5/8" Trad.Tools Trad.Tools 3 Trad.Tools Trad.Tools 3
U4 5/8" Trad.Tools Trad.Tools 1 Trad.Tools Trad.Tools 2
U5 5/8" Trad.Tools Trad.Tools 2 UT UT 2
U6 5/8" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U7 3/4" Trad.Tools Trad.Tools 2 UT UT 2
U8 3/4" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 3
U9 7/16" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 1
U10 3/4" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U11 3/4" Trad.Tools Trad.Tools 2 UT Trad.Tools 2
U12 3/4",3/4" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U13 3/4" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U14 3/4" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U15 7/16" Trad.Tools Trad.Tools 2 UT UT 2
U16 5/8" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 3
U17 3/4" Trad.Tools Trad.Tools 2 UT UT 3
U18 5/8" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U19 9/16" Trad.Tools Trad.Tools 2 UT UT 2
U20 5/8" Trad.Tools Trad.Tools 2 UT Trad.Tools 2
U21 5/8" Trad.Tools Trad.Tools 2 Trad.Tools UT 2
U22 11/16" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U23 5/8" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U22' 11/16" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U21' 5/8" Trad.Tools Trad.Tools 2 Trad.Tools UT 2
U20' 5/8" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U19' 9/16" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U18' 5/8" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U17' 3/4" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U16' 5/8" Trad.Tools Trad.Tools 2 UT UT 2
U15' 7/16" Trad.Tools Trad.Tools 2 UT UT 2
U14' 3/4" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U13' 3/4" Trad.Tools Trad.Tools 2 Trad.Tools UT 2
U12' 3/4",3/4" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U11' 3/4" Trad.Tools Trad.Tools 2 UT Trad.Tools 2
U10' 3/4" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U9' 7/16" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U8' 3/4" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U7' 3/4" Trad.Tools Trad.Tools 2 UT Trad.Tools 2
U6' 5/8" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U5' 5/8" Trad.Tools Trad.Tools 2 UT Trad.Tools 2
U4' 5/8" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U3' 1/2" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U2' 5/8" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
U1' 1/2",5/8"
UT Trad.Tools 2 Trad.Tools Trad.Tools
2
Note:ConditionState(CS)ratingsbasedonAASHTOCoReElementdescriptions
Brent Spence Bridge (I-71) over the Ohio River
059B00046N: Gusset Plate Evaluation - Upper Gussets
Panel
Point
Nominal
Thickness
DownstreamTruss UpstreamTruss
InboardPlate OutboardPlate CS InboardPlate OutboardPlate CS
M9 5/8" Trad.Tools Trad.Tools 3 Trad.Tools Trad.Tools 3
M11 5/8" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 3
M12 3/4" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
M13 5/8" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 4
M15 5/8" Trad.Tools Trad.Tools 3 Trad.Tools Trad.Tools 4
M15' 5/8" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 3
M13' 5/8" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 3
M12' 3/4" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
M11' 5/8" Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools 2
M9' 5/8"
Trad.Tools Trad.Tools 2 Trad.Tools Trad.Tools
2
Note:ConditionState(CS)ratingsbasedonAASHTOCoReElementdescriptions
Brent Spence Bridge (I-71) over the Ohio River
059B00046N: Gusset Plate Evaluation - Upper Gussets
Panel
Point
Nominal
Thickness
DownstreamTruss UpstreamTruss