0% found this document useful (0 votes)
37 views

Simops Test Leak / Hold Test For SCSSV / SSV North East Cluster

This document summarizes leak/hold tests performed on several wells' Subsurface Control Safety Shut-off Valves (SCSSV) and Surface Safety Valves (SSV). Tests were conducted on wells D120P, D121P, and D122P in the North East Cluster on February 3, 2006. The upstream pressures were 79 barg, 79 barg, and 101 barg respectively. For each well, pressures were recorded at 5 minute intervals over 30 minutes for both valves when open and closed. No leaks were observed on any SCSSV or SSV as they all held the pressures indicated.

Uploaded by

Hossein
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views

Simops Test Leak / Hold Test For SCSSV / SSV North East Cluster

This document summarizes leak/hold tests performed on several wells' Subsurface Control Safety Shut-off Valves (SCSSV) and Surface Safety Valves (SSV). Tests were conducted on wells D120P, D121P, and D122P in the North East Cluster on February 3, 2006. The upstream pressures were 79 barg, 79 barg, and 101 barg respectively. For each well, pressures were recorded at 5 minute intervals over 30 minutes for both valves when open and closed. No leaks were observed on any SCSSV or SSV as they all held the pressures indicated.

Uploaded by

Hossein
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

DATE:

WELL No.
Time
interval
W/H Pressure (
barg)
05 Min. 26 05 Min. 45
10 Min. 26 10 Min. 45
15 Min. 26 15 Min. 45
20 Min. 26 20 Min. 45
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
(barg)
05 Min. 26 05 Min. 55
10 Min. 26 10 Min. 55
15 Min. 26 15 Min. 55
20 Min. 26 20 Min. 55
25 Min. 25 Min.
30 Min. 30 Min.
Remarks
No leak on the SCSSV and SSV as bothare holding
Rashid S.A J Louis
Vincent
SCSSV LEAK / HOLD TEST
Up stream Pressure
Well Shut in Pressure
(barg)
79
W/H pressure
after
depresuriseing
(barg)
RSES
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
45
78.5 55
Observations
During test (barg)
Field Supervisor
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
03/02/2006
D120P
Obervations
Obervations
SSV LEAK TEST / HOLD TEST
Performer
Majid/Karnik
Status
Flow line pressure
During test (barg)
Production Supdt.
W/H pressure
after
depresuriseing
(barg)
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)

DATE:
WELL No.
Time
interval
W/H Pressure
(barg)
05 Min. 24.5 05 Min. 50
10 Min. 24.5 10 Min. 50
15 Min. 24.5 15 Min. 50
20 Min. 24.5 20 Min. 50
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
(barg)
05 Min. 24.5 05 Min. 52
10 Min. 24.5 10 Min. 52
15 Min. 24.5 15 Min. 52
20 Min. 24.5 20 Min. 52
25 Min. 25 Min.
30 Min. 30 Min.
Remarks
Rashid S.A J.Louis
Vincent
Production Supdt.
W/H pressure
after
depresuriseing
(barg)
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)
During test (barg)
Field Supervisor
52
Performer
Obervations
W/H pressure
after
depresuriseing
(barg)
Up stream Pressure
Status
Flow line pressure
During test (barg)
Well Shut in Pressure
(barg)
79
Majid/Karnik
Observations
No leak on SCSSV and SSV as both are holding
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
2/3/2006
D - 121 P
Obervations
79
SSV LEAK TEST / HOLD TEST
SCSSV LEAK / HOLD TEST
RSES
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
50

DATE:
WELL No.
Time
interval
W/H Pressure
(barg)
05 Min. 24 05 Min. 60
10 Min. 24 10 Min. 60
15 Min. 24 15 Min. 60
20 Min. 24 20 Min. 60
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
(barg)
05 Min. 24 05 Min. 62
10 Min. 24 10 Min. 62
15 Min. 24 15 Min. 62
62 24 20 Min. 62
25 Min. 25 Min.
30 Min. 30 Min.
Remarks
Rashid S.A J. Louis
Vincent
Production Supdt.
W/H pressure
after
depressurising
(barg)
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)
During test (barg)
Field Supervisor
62
Performer
Obervations
W/H pressure
after
depresuriseing
(barg)
Up stream Pressure
Status
Flow line pressure
During test (barg)
Well Shut in Pressure
(barg)
101
Majid/Karnik
Observations
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
2/3/2006
D - 122P
Obervations
101
SSV LEAK TEST / HOLD TEST
SCSSV LEAK / HOLD TEST ( NO SCSSV ONLY SLEEVE)
RSES
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
60