Project IRR
(real/year50)
Equity IRR
(real/year50)
ADSCR
(min)
LLCR
(min)
PV (VAT +
Tax-Subsidies)
19.6% 20 6.0% 4 4.0% 30.0% 5.0% 3.7 30% 30% 50 170,000 1,000 20.6
Concession
life
Construct.
cost
Operation
Cost
Initial Daily
Traffic
Traffic
Growth
Corporate
tax rate
Debt maturity
Equity VAT
rate
Interest
Rate
Grace
Period
Inflation
rate
446,027 13.02% 23.12% 4.66 2.79
Toll rate
VAT incl.
Investment
Subsidies
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
Principal
Interests
ADSCR
LLCR
Limit
All figures in kUSD
COMMENTS:
Project IRR
(real/year50)
Equity IRR
(real/year50)
ADSCR
(min)
LLCR
(min)
PV (VAT +
Tax-Subsidies)
30.0% 19.6% 20 6.0% 4 4.0% 5.0% 3.7 30% 30% 50 170,000 1,000 20.6
446,027 13.02% 23.12% 4.66 2.79
Traffic
Growth
Toll rate
VAT incl.
Investment
Subsidies
Inflation
rate
Equity
Debt maturity
Interest
Rate
Grace
Period
Concession
life
Construct.
cost
Operation
Cost
Initial Daily
Traffic
VAT
rate
Corporate
tax rate
-40%
-30%
-20%
-10%
0%
10%
20%
30%
-40000
-20000
0
20000
40000
60000
80000
Dividends
Equity
project IRR (real)
equity IRR (real)
All figures in kUSD
COMMENTS:
Summary of Assumptions and Results
GENERAL TOLL AND TRAFFIC
Concession life 50 years Toll, VAT included 3.7 USD per vehicle
Construction Period 4 years Initial traffic 20,600 vehicles / day
Construction costs 170,000 kUSD Traffic growth 5.0%
Amortization 46 years
FINANCIAL STRUCTURE OPERATING COSTS
Subsidy 30% of the construction costs Fixed part 1,000 kUSD per year
Equity 30% of the construction costs Variable part 0.1 USD per vehicle
Debt
Maturity 20 years OTHER KEY PARAMETERS
Interest rate 6.0% Inflation rate 4.0%
Grace period 4 years Corporate tax 30.0%
Repayment of loan P+I constant VAT rate 19.6%
FINANCING PLAN
Uses (in kUSD) 197,297 Sources (in kUSD) 197,297
Construction costs (nominal terms) 188,696 Investment subsidy 56,609
Capitalised Interests 8,601 Equity 56,609
Debt 84,079
FINANCIAL RATIOS SHAREHOLDERS' RETURN
Minimum ADSCR (Annual Debt Service Coverage Ratio) 2.79 Project IRR after tax (real terms) 13.02%
Minimum LLCR (Loan Life Coverage Ratio) 4.66 Project IRR after tax (nominal terms) 17.54%
Minimum PLCR (Project Life Coverage Ratio) 21.34 Equity IRR (real terms) 23.12%
Equity IRR (nominal terms) 28.05%
PUBLIC AUTHORITIES' FINANCIAL FLOWS
PV on Subsidy (kUSD) -45,984
PV on the VAT (kUSD) 215,519
PV on the Coporate Taxes (kUSD) 276,492
PV on the State revenues (kUSD) 446,027
SUMMARY OF THE MAIN ASSUMPTIONS
SUMMARY OF THE RESULTS