0% found this document useful (0 votes)
501 views1 page

Denah Power House PLTM

This document contains technical specifications and layout details for a hydropower plant, including: - Turbine specifications such as head, flow rate, and power output - Generator specifications including voltage, frequency, and power output - Foundation load details for the turbine and generator - Single line diagram showing the layout of transformers, generators, switchgear, and other equipment - Equipment list with descriptions and quantities - Layout drawing showing dimensions and elevations of the powerhouse building

Uploaded by

Wardhana Zolli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
501 views1 page

Denah Power House PLTM

This document contains technical specifications and layout details for a hydropower plant, including: - Turbine specifications such as head, flow rate, and power output - Generator specifications including voltage, frequency, and power output - Foundation load details for the turbine and generator - Single line diagram showing the layout of transformers, generators, switchgear, and other equipment - Equipment list with descriptions and quantities - Layout drawing showing dimensions and elevations of the powerhouse building

Uploaded by

Wardhana Zolli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Section A-A ( 1 : 75 )

Section B-B ( 1 : 75 )
Turbine data:
Hb = 86,5 m
Hn = 82,72 m
Q = 6670 l/sec
PT = 5012 kW
nT = 600 1/min
PG = 4877 kW
= 5737 kVA, pf=0,85
nG = 600 1/min
nd,G = 1170 1/min
(runaway speed)

U = 6300 V
F = 50 Hz
Forces on Foundation:
FT = 310 kN
MT = 100 kNm
FG = 400 kN
MG = 100 kNm
MG,short circuit = 1200 kNm
FP = 2350 kN
FB = 170 kN
FD = 70 kN
FA = 125 kN

Index
Gew.
Datum /
Date Name
from
Name
Bearb.
Gepr. TB
Gepr. EB
Drawing No
Mastab von
Scale
Ersetzt durch
Benennung:
Name:
EP_10.1
Typ Nr.
Type No.
Halbzeug
Datum / Date
Ersatz fr
nd.-Mitt. / Modification
Zulssige Toleranzangabe fr Mae ohne Toleranzangabe
Winkelmae
(Lnge der krz. Schenkel)
Werkstoff:
Material:
Zeichn.-Nr.
( ) Mae sind
Hilfsmae
Artikel Nr.:
Ident. No.: Sheet
Nennmabereich in mm
1000
-
-
30
30
120
120
400
400
1000
ber
bis
-
10
10
50
50
100
100
500
zul.
Original-
Format
DIN A
Mae werden
besonders geprft
Blatt
Projekt:
Project:
0,1 0,2 0,3 0,5 0,6 1 30' 20' 10'
FS07BAE0303BAY-P-EP001Z1
27.11.2007 papke
papke.a 24.01.2008
1 A0 1:400
FS-238-907
papke.a Drawing reworked 24.01.08 A
Transformer rail reworked 30.06.08 papke.a B

Einbauplan - Draufsicht Rev. A

EP0700434 1
Bayburt






Arrangement drawing - Top view Rev. A
A
A
B B
Part list
Designation Pcs. Pos.
WKV - Regulation unit - Generators 1 28
Draft tube pipe 3 27
WKV- turnine governor - Hydr. unit 3 26
Oil supply system - Generator 3 25
Draft tube elbow 3 24
Pressure gauger (0- (-9) mWS) - Draft tube 3 23
Pressure gauge (0-160 mWc) - Turbine 3 22
WKV - Francisturbine 3 21
Synchronous generator (5800 kVA; 3x6300 V; 50 Hz) 3 20
Dismantling joint DN1200 PN10 3 19
Reduction piece DN1400 - DN1200 PN10 3 18
WKV - Hydraulic power pack - Butterfly valve 3 17
Bypass ansd filling valve DN100 PN10 3 16
Butterfly valve DN1400 PN10 3 15
Inlet pipe DN1400 PN10 DIN2632 3 14
AC/DC Switchgear 1 13
WKV- PLC control panel 1 12
WKV - Control panel 3 11
WKV- UPS switchgear 1 10
Battery 2 9
Station service transformer 100 kVA 1 8
Medium voltage switchboard 1 7
Cooling water supply system 3 6
Transformer 6000kVA 3 5
Pressure gauge (0-160mWS) - Penstock 1 4
Neutral grounding resistor - Generator 3 3
Neutral grounding resistor - Transformer 3 2
Diesel unit 1 1
11250 11250
7000 7000 7000
4100
4100 4100
4
5
0
0
E
n
t r y
g
a
t e

4
5
0
0
h
e
i g
h
t
4
0
0
0
1
6
0
0
1
1
0
0
0
2
4
0
0
4
2
0
0
11250 11250 6400 6000 7200
42100
2500
1
7
8
0
0
Storage room
Operators and
control room
Air conditoned/
sound isolated
Civil
room
U
P
S
-
B
a
t t e
r
y

r
o
o
m
w
i t h
a
e
r a
t i o
n
a
n
d
d
e
a
e
r a
t io
n
Medium voltage room
Diesel room
Sound isolated
UNIT I UNIT II UNIT III
Transformer
Unit I
Transformer
Unit II
Transformer
Unit III
AC DC PLC UNIT I UNIT II UNIT III
In
c
o
m
i n
g
f e
e
d
e
r
1
0
0
0
m
m
M
e
te
r i n
g
p
a
n
e
l
7
5
0
m
m
G
e
n
e
ra
to
r I
1
0
0
0
m
m
G
e
n
e
ra
t o
r II
1
0
0
0
m
m
G
e
n
e
r a
t o
r II I
1
0
0
0
m
m
S
t a
ti o
n
s
e
r v
i c
e
tr a
n
s
f o
r m
e
r
7
5
0
m
m
2000
2500 height
2000
2500 height
2
0
0
0
2
5
0
0
h
e
i g
h
t
2
0
0
0
E
n
t r y
d
o
o
r
2
5
0
0
h
e
ig
h
t
2000
2500 height
LOADING
AREA
1420 x 14,2
outer diameter x thickness
7
3
0
0
2
0
0
0
3800
15
17
14
16
19
18
21
20
23
22
25
24
5 1 7
8
9 10 13 12 11
Approved by the client:
Place, Date: Signature:
26
27
6 4
To national
grid
AIR IN AIR IN AIR IN
Note:
Drain pipe DN100
to central pump sump
Note:
Drain pipe DN100
to central pump sump
Note:
Drain pipe DN100
to central pump sump
9
0
0
Note:
Hand rail removable
Note:
All stairs, protection fences
and hand rails are local supply
+1588,00
+1582,32
+1582,32
+1588,00
Note:
Provide manhole dia 600
to clean the penstock
Note:
Provide valves DN250 PN16
to flusch and drain the penstock
(Drain to tailrace channel)
Note:
Provide drain pipe to
cnetral pimp sump
+1582,32
+1581
2
1
0
0
3000 5590 4570 4570 4570 9000 7000
Protection fence
removable
Emergency
exit
A
I R
I N
AIR OUT
2 3
Note:
Central pump sump with
two redundant pumps and
alarm and drain to tailrace channel.
Capacity: 2x6000 l/h
Drain to tailrace channel over
max. flood level
(Local supply)
Note:
Hand rail
Reinforcements and dimensions of building
(construction) components as well as stress analysis
(static) are not part of WKV`s responsibility and to be
provided by the customer.
This drawing is only valid regarding the dimensions
pertaining to the generating set.
Pr. Bayburt
28
RU

You might also like