Specification For The Construction of A Residence FOR Mr. Khader

This document outlines the specifications for constructing a residence for Mr. Khader. It details the existing foundation and ground floor structure. It then specifies the materials and work for new construction elements like wall partitions, doors, windows, electrical work, flooring, painting, and water tank. It estimates the total construction area and cost, accounting for work already completed. It proposes installment payments in six amounts over the construction timeline.

Uploaded by

aniljacob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views

Specification For The Construction of A Residence FOR Mr. Khader

This document outlines the specifications for constructing a residence for Mr. Khader. It details the existing foundation and ground floor structure. It then specifies the materials and work for new construction elements like wall partitions, doors, windows, electrical work, flooring, painting, and water tank. It estimates the total construction area and cost, accounting for work already completed. It proposes installment payments in six amounts over the construction timeline.

Uploaded by

aniljacob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Specification for the Construction of a residence

FOR Mr. Khader


1. Foundation & Basement Existing

2. Ground floor structure( wall & roof slab) Exising
New construction Specification
3. Wall partition - brick masonry in CM 1!
4. Wood Wor! "#W $% & '(ac )ood*+n,ili
Front "oor--11" x #1" cm ornamental finis$ %rame si&e -. / 3. !0ea )ood&
%ront door 1 1'#( t$ick uniform section)-*inges-+rass
Other "oors and )indo)s
Frames1+n,ili# Windo) shutter10ea )ood#"oor shutter1 ,ac )ood
frame si&e ,( x #)-(
.indow s$utter -/(x 1)#-(- %ront face +uskey window
0oor s$utter -,(x 1)-( frame & 1( 1anel
.indow Grill 1rotection (2wner3s c$oice)) / nos) 3. Stainless hin2es#
3.)indo) sta4# 3. hoos $ e4es# 4mm 2lass.
0oor 4wo 1aneled5 , nos) ,( $inges5 6( alloy tower bolt5
-. RCC Wor115254 mi/
%loor slab-1" cm t$ick 5! mm steel -( x !( c'c
7oof slab-1" cm t$ick 5! mm steel 6( x !( c'c
6. 7lasterin2 - .all CM 1- Ceiling 1/ %loor 1,
8. 9lectrification -89C Conduit5 Cable %inolex5 +oxes metal'.ooden
:witc$es Crabtree5 E;C+5MC+-<:<'*awals
2rdinary fancy lig$t 5 :ocket5 %an(crom1ton) one in eac$ rooms 5 49 and
4ele1$one socket on beds & $all)(exce1t kitc$en & toilet)
:. Staircase Rails 10ea )ood
3. 0oilet Furnishin2
63 $eig$t ceramic tile(=o$nson)wall finis$5 floor ceramic tiles(=o$nson)5 one
closet(Cera' 1arry' *indware)5 one basin5 one ta15s$ower5one mirror5 $ot water
arrangement5 soa1 tray5 towel rod etc>in all bat$ rooms)
1;. Floorin2 !o<er 1; cm thic pcc floorin2&1
Selection =4 o)ner
>round floor $First floor1 %itrified tile 1-; Rs* sft
7orch1 ultra tile
11. Kitchen furnishin2
?itc$en slab granite slab (black) finis$5 side wall #3 $eig$t granite tile abo@e
granite slab
12. 7aintin2
2ut side A1ex 1aint5 inside 1utty emulsion5 =oineries-:tained finis$#
13. .ater tank- 1oly ca1ital-B-";5
14. %<44<CG: A+29E A9E7AGE MA4E7<A; A9A<;A+;E <C 4*E MA7?E4
(42 +E :E;EC4E0 +D 4*E C;<EC4)
0?M9 OF COM7@90?OA14 MOA0BS
7RO(9C0 COS0
Construction area
>round$ first floor131;; sC ft
Rate*Sft1 13;; Rs.
0otal +mount Rs. 4;#3;#;;;*1
LESS COST OF WORk ALREADY DONE- 550 Rs sft ! "#00 $Rs %&%0&000
9/tra for Front modelin2 $ tile roofin21 2#;;;;; Rs
+mount of )or DRs 32#;;;;; ! 0hirt4 t)o @ahs onl4&
<nstallment 8ayment 4ime Amount Gross Amount
1
st
0uring Agreement 1"5""""" 1"5"""""
#
nd
0uring roof slab work /5""""" 1/5"""""
/
rd
0uring 8lastering ,5""""" 1B5"""""
,t$
0uring %ixing of 0oor & window s$utters ,5""""" #15"""""
-
t$
0uring flooring5 sanitary5Electrical 1urc$ase 65""""" #B5"""""
6
t$
0uring 1ainting & 2t$er %inis$ing work ,"""" /15"""""
B
t$
4ime of *anding o@er +alance amount