Indigenous Proc - SAP User Manual
Indigenous Proc - SAP User Manual
6C at Tata Motors
SAP 4.6 C
At Tata Motors
PS Part II
Indigenous procurement
SAP User Training Manual
By Tata Technologies
1of 48
Sr
No
1
2
3
Revision details
Draft copy
Change of ordering unit
in PO process added
Subcontract process for
machine reconditioning
to outside suppliers
incorporated.
By Tata Technologies
Revision
date
08.01.2004
20.01.2004
Version
No
0
1
Prepared / corrected
By
Chandratre S M
Chandratre S M
22.02.2004
Anand Dandekar
2of 48
Goods receipt
By Tata Technologies
3of 48
Purchase group
Payment terms
In-coterms
Mandatory
Header text
8
9
Account
assignment
category
Item Category
Net price
Manual entry
Mandatory
Delivery date
Copied from PR
Plant
Copied from PR
Store location
Copied from PR
Order Qty
Copied from PR
By Tata Technologies
PO release strategy,
authorisation control, selection
of buyer's contact No in PO
printing.
Cash flow planning in ESR,
customised reports for cash
flow for standard payment
term.
Payment to supplier by FI.
PO printing
4of 48
Mandatory
Mandatory
Optional
Optional
Optional
Optional
Optional
Mandatory
Mandatory
Mandatory
Mandatory
Material
description
Defaulted from
material master.
Change manually.
Mandatory
Vendor material
No.
Optional
10
Tax code
Enter planner's
details. This filed is
used for capital proc
purpose.
Grouped together
excise, sales tax, TOT,
resale tax and
surcharge.
Mandatory
11
Pricing conditions
12
G/L account
Mandatory
for account
assigned
PO
As applicable.
Octroi and zharkhand
tax cond will be
defaulted from master
records.
Copied from PR
413500 for materials,
413501 for services
Refer
Condition
types
13
Network/activity
No
Copied from PR
Mandatory
for network
type Po
14
Item text
Free text
Optional
By Tata Technologies
5of 48
Description
Application
Status
Gross Price
Special Discount-1
Trade Discount %
Cap Discnt (Value)
P&F Charges %
P&F Charge (Qty)
P&F Charge (Value)
Rate Incl of ED
Mandatory
Optional
Optional
Optional
Optional
Optional
Optional
Optional
ZM40
Optional
FRA1
Freight %
Freight in percentage.
This will be paid separately and not the part of
vendor's capital item procurement bill. This is treated
as accruals.
Optional
FRB1
Freight (Value)
Optional
ZCP4
Insurance in Percentage.
This is applicable if insurance is born by Tata Motors
against owned policy or paid to vendor against
separate bill.
This is treated as accruals.
Optional
JOC1
ZOCM
Octroi in rupee
Octroi in %
Optional
Optional
By Tata Technologies
6of 48
Cap Zharkhand
Entry Tax
Optional
Plants
1001 PUNE AUTO
Pur Org
Pur Grp
P210
P1C
P211
P2C
C210
C1C
J210
J1C
L210
L1C
Pune Car
JSR
LKN
By Tata Technologies
7of 48
BUSINESS UNIT
Mumbai
Corporate
M210
By Tata Technologies
8of 48
M1C
By Tata Technologies
9of 48
Press enter.
Press icon Document overview on.
Press
By Tata Technologies
10of 48
By Tata Technologies
11of 48
By Tata Technologies
12of 48
By Tata Technologies
13of 48
ITEM DETAILS:
Material data:
Field vendor mat. No is free optional field to enter planners details.
By Tata Technologies
14of 48
Delivery schedule:
To split daywise del schedules. Date when material is required in your plant (incurrence date).
Caution: Do not delete the first schedule which is linked to PR.
If required, edit the date for first schedule line.
By Tata Technologies
15of 48
Note: Do not change defaulted settings like Inv. Receipt, GR-based IV.
Conditions used in pricing:
By Tata Technologies
16of 48
Account assignment:
Confirm that G/L account No is always 413500
Item text:
Always Delete item text defaulted from CPR.
17of 48
By Tata Technologies
18of 48
Overwrite relevant payment terms and in-coterms as per drop down list if required.
Header text for standard annexure:
Select option SAP script editor.
Press icon
By Tata Technologies
19of 48
You can copy and paste contains from word document in above text.
By Tata Technologies
20of 48
Communication data:
Fields for Your reference, Our reference.
Additional data:
For Vendor Quotation No and date
PO Status:
To know the status e.g. Printing, IV, released etc.
save PO.
Press Icon
By Tata Technologies
21of 48
By Tata Technologies
22of 48
Press enter.
By default system will bring the last order you have accessed.
You can enter the new line item, change the values wherever applicable.
System will give the warning or error messages as per system configuration.
Note:
1. Do not delete the first line item of delivery schedule.
2. Release strategy is applicable if any value directly or due to qty correction is changed.
By Tata Technologies
23of 48
By Tata Technologies
24of 48
Caution:
1.System will copy everything including material No, description, qty, del date, value, tax
code etc.
It is important to carefully visit all the fields including item text.
This functionality has got advantages as well as disadvantages if all the important fields
are not changed carefully.
2. The account assignment part should not be changed.
Note:
1. Split the value of entire PO into multiple line items as per supplies before goods receipt.
2. The copy functionality can be exercised even at the time of PO creation. Tcode ME21N
3. Create new PO for each CPR even if PO already exists for a vendor.
4. For the auto plants capital material can be of two types.
Cenvatable or non-cenvatable.
There are two separate generic materials created for such plants.
CAPITAL_DOM for cenvatable goods.
CAPDOM_NONCENVAT for noncenvatble goods.
Kindly change the part No accordingly for such cases in PO creation stage.
List of those plants is given below.
1001 PUNE AUTO
1002 Pune Foundry
6001 MAVAL FOUNDRY
1100 Car Auto
2001 JSR Auto Plant
2020 JSR Foundry Plant
2030 JSR Forge Plant
3001 LKO Auto and FBV
By Tata Technologies
25of 48
PO with single parent consignment item and multiple free receipt child
parts:
Use item copy function as explained above and copy the parent item already entered in PO.
1. Remove material Part No. Keep it blank.
2. Change the material short text. Total length 40 characters.
3. G/L account should be 413500 in account assignment.
4. Network and activity No should be same as parent item which got copied from CPR.
Scroll the item overview window to the right to get free item check box.
Select the check box. And save the PO.
By Tata Technologies
26of 48
By Tata Technologies
27of 48
Single click in Mat doc (GR No) will take you to the display of GR.
By Tata Technologies
28of 48
By Tata Technologies
29of 48
Printing of ESR:
By Tata Technologies
30of 48
If PO is created wrt CPR, system will get all the relevant details required in ESR from PO.
Tcode to print ESR = ZESR
You will get the screen as shown below.
Enter CPR No.
Let the Item be 10 defaulted by system.
Press execute.
31of 48
32of 48
C1
C2
S1
S2
P210
P211
P1C
P2C
CPO
CPO
CP
C3
S3
C210
C1C
CPO
CP
C4
S4
J210
J1C
CPO
CP
C5
S5
L210
L1C
CPO
CP
C6
S6
M210
M1C
CPO
CP
C7
S7
M211
M2C
CPO
CP
C8
S8
M212
M3C
CPO
By Tata Technologies
33of 48
By Tata Technologies
34of 48
35of 48
By Tata Technologies
36of 48
to view on screen.
By Tata Technologies
37of 48
Note:
To print any document from SAP, SAPLPD should be loaded in your PC.
Contact local SAP basis team for any printing related issues.
By Tata Technologies
38of 48
39of 48
The POs migrated from legacy to SAP thr cut over and if old PO No is printed on suppliers
Challan,
Use following search option to get the SAP PO No.
Legacy PO No will be linked in Req.Tracking No field.
Drill down PO No field to get the following screen.
40of 48
You will get following screen for RG23-C Part-1 Excise register entry for capital items.
This screen will appear automatically with settings of register type based on material-plant
combination.
e.g. Auto plant JSR 2001 material CAPITAL_DOM will go to Excise RG 23C register,
but material CAPDOM_NONCENVAT will show No register entry.
Similarly material CAPITAL_DOM for plants like ERC, Mumbai 4100 will be marked as
Non-cenvatable category in excise master. Therefore NO register entry will be marked.
Press enter.
By Tata Technologies
41of 48
Press- save.
See the error messages if any.
System will generate the GR Doc No and print the GR sticker.
Note: System will give error message,
1. if WBS status is not released.
2. if budget is crossed the released limit
3. if PO is created/value changed but not released.
Caution:
1. Do not create transaction MIRA for capital items.
Tcode : MIRA not applicable for capital items
2. Do not create/post excise invoice thr Tcode J1IEX for capital items.
This will be done by predefined users from excise dept in each location.
By Tata Technologies
42of 48
GR acknowledgement at store:
Use T code = MB02
Enter GR Material Doc No and year from GR sticker.
Press enter.
Press icon
By Tata Technologies
43of 48
MM03
MM60
ME53N
ME2L
ME80
ME5J
ME2M
ME5K
ME2C
ME2B
MK03
MB03
MKVZ
MB51
XK03
MBSM
MIGO
MB23
MMBE
MB5S
ME80RN
MB25
MD04
MB52
MB53
CJV3
CJ03
CJ08
CJ13
CJ2A
CJ2C
CJ93
CN03
CN13
CN23
CJ41
CJ31
CJ33
CJ74
Information reports:
S_ALR_87013558 - Budget/Actual/Commitment/Rem Plan/Assigned
S_ALR_87013537 - Commitment Detail
S_ALR_87013533 - Plan/Actual/Commitment/Rem.Plan/Assigned
ZMPSR1130
- MM Procurement Report
ZMPSR1150
- PS Incurrence and cash flow report
By Tata Technologies
44of 48
ME2N
ME2W
ME2K
MB5B
MB5T
MBLB
ME2J
45of 48
Part No is unique for this case. No need to use generic part No e.g. CAPITAL_DOM.
Go to item-> material data,
For subcontract cases, system will give this icon to add outgoing/dispatch components with
relation to incoming finished machine.
Press this icon. Add outgoing part nos, qty and plant.
By Tata Technologies
46of 48
By Tata Technologies
47of 48
By Tata Technologies
48of 48