Department of Civil and Environmental Engineering and Geodetic Science CE/GS 400 Introduction To Surveying Traversing With The Total Station Purpose
Department of Civil and Environmental Engineering and Geodetic Science CE/GS 400 Introduction To Surveying Traversing With The Total Station Purpose
The theodolite is the basic surveyors instrument, used for turning angles. It forms the
foundation, when made electronic, for the total station. The total station operates in a
similar manner to a theodolite, but also measures distances and has the potential to record
the measurements electronically, simplifying transfer to computers and surveying
software packages, while minimizing transcription errors. Because most of its operation
is automated, there is a lot less to worry about in some areas relating to error. However,
these machines are not error-free, so you may discover where some potential for errors
may lie.
Readings: Lecture and Laboratory Notes
Location
Once again the lab will take place in the Oval; after we initially meet in the regular
laboratory classroom.
Equipment
Each group will be issued with one set of the following equipment:
(1) Sokkia or Topcon total station, with accessories
(1) Tripod;
(2) Telescoping Range Poles and Prisms
Procedure
Setting up
Your crew will use the same traverse that you occupied in Laboratory Projects Two,
Three and Four. In order to minimize confusion, it is recommended that you place the
same color flagging on your range poles..
Page 1 of 9
Given the fact that each crew has a five (5) point traverse; each crew member will have
an opportunity to set the instrument up over a point; turn angles and observe distances.
Eventually your crew will have to occupy each traverse point. In some instances there
will be two (2) crews on a traverse; it is recommended that you coordinate your activities.
It is recommended that you proceed clockwise around the traverse.
On each setup make certain that the instrument is both over the mark and leveled
properly. If you are still unclear as to how to accomplish this, please feel free to ask your
instructor or teaching assistant for assistance.
Learning about the instrument
Set up and check out the instrument. Go into the settings menus and see what settings are
available and what they are set to be. There is a quick reference card in the instrument
box to help you with this.
Given the short distances we are measuring it is probably not necessary to correct for the
temperature and pressure. However, in industry you will need to read the temperature and
pressure outside, set the index correction for the EDM by keying in the measured
temperature and pressure and let the machine compute this correction, which will be in
parts per million (ppm).) You can verify the settings if you wish, and modify them if
necessary. Please note that these corrections fall under the category of systematic errors.
It is necessary to note, and if necessary, to set the prism constant (PC). Note that your
instrument has most probably retained the Prism Constant (-30mm) from the previous
Laboratory Project.
The Traverse
The traverse is the fundamental plane surveying method for location of objects. As
mentioned earlier, the field traverse consists of five (5) monuments that are located at
positions which are inter-visible.
The total station is set up at each monument, and the angle between the adjacent points is
measured. Crew members will have to hold prism poles over the center of the monument;
it is recommended that the instrument-person sight as low as possible (near the tip) on the
prism pole. Your instructor or lab assistant will demonstrate how to double your angles.
Once the angle is measured; the instrument person will measure the distance with the
EDM function. You will measure the distances forward (distance) and reverse (repeat).
This will entail a bit of walking for the rod-person. IT IS ESSENTIAL that the rodperson hold the prism pole a close to vertical (plumb) as possible.
Traverse Closure
After you have completed this figure, decide whether or not your measurements produce
an acceptable solution. It is recommended that you perform a sum of the interior angles
before leaving the field. If the sum of your angles is within 50 seconds of the theoretical
value; Interior Angles = (n-2)180o, where n = number of interior angles you can assume
Page 2 of 9
that the error is mostly random. Unless you have a data collector, it is generally not
possible to check the traverse for closure in the field. However, assuming that you
observed forward and reverse distances, blunders in distance measurement should
generally be eliminated.
Traversing Grade Schedule Field Score
Accuracy
Grade
1/10,000 to or greater
100%
1/5,000 to 1/9,999
90%
1/2500 to 1/4,999
80%
1/2499 or less
70%
728752.3960 ft
1825233.0330 ft
1.
2.
Balance traverse angles to distribute angular error throughout the traverse angles.
Compute Azimuths of each line of the traverse (AZIMUTH COMPUTATION
SHEET). You will need the data from Project Number Four Orientation to
Total Station for this Calculation. Submit these calculations with your report
3.
Use the Excel Spreadsheet entitled Lab Five Spreadsheet from the Website to
compute Latitudes and Departures, to determine the linear error (mis-closure), to
remove the error (balance the latitudes and departures) and to calculate
coordinates of the traverse points. Submit a copy of this spreadsheet with this
report.
Page 3 of 9
Note: You will have to use the known reference line (Ringle to Latitude Stone Reset) and
the coordinates of Ringle to reference your traverse to State Plane Coordinate System
(SPCS).
Office Work: Combined Report Use the calculations (Crew Report) your crew
performed to answer the questions. Use the standard report format for your combined
report. In addition to the data, make certain that the field notes contain all weather, field
conditions and crew assignments, equipment used and sketches.
Final Score: The grade for this project will be the arithmetic average of the Field Grade
fand the Office (report and field book) grade. In addition to the calculation sheets,
summarize your results by answering the following questions:
Questions
1. How well did your traverse mathematically close?
a. Angular error =
b. Linear error =
c. Error of closure =
Page 4 of 9
Page 5 of 9
Field Angle
1
2
3
4
5
SUM
Page 6 of 9
Adjustment
Adjusted Angle
From
Azimuth Back
Ringle
Azimuth Forward
Lat.
Stone
Ringle
Ringle
From
Angle: Left(-), Right(+)
Lab 4
Azimuth Back
To
Lat.
Stone
2
2
Ringle
Ringle
From
Lab 4
Azimuth Forward
Azimuth Back
Azimuth Forward
Azimuth Back
Azimuth Forward
Azimuth Back
Azimuth Forward
Azimuth Back
Azimuth Forward
Azimuth Back
Azimuth Forward
Page 7 of 9
Noted Operation
277o 50 07
CONTROL TRAVERSE
LOCATION OF PRIMARY POINTS
TRAVERSE COLOR: __________________
Point Number
Northing
US Feet
Easting
US Feet
1
2
3
4
5
* From Laboratory Project Number Three Traverse Leveling.
Page 8 of 9
Elevation*
US Feet
Page 9 of 9