PMCD Framework
PMCD Framework
Project Manager
Competency
Development (PMCD)
Framework
Second Edition
A : 97682$CHFM
08-13-07 09:35:41
Layout: 97682 : 901
A : 97682$CHFM
08-13-07 09:35:41
Layout: 97682 : 902
Notice
The Project Management Institute, Inc. (PMI) standards and guideline publications, of which the
document contained herein is one, are developed through a voluntary consensus standards development process. This process brings together volunteers and/or seeks out the views of persons who
have an interest in the topic covered by this publication. While PMI administers the process and
establishes rules to promote fairness in the development of consensus, it does not write the document
and it does not independently test, evaluate, or verify the accuracy or completeness of any information
or the soundness of any judgments contained in its standards and guideline publications.
PMI disclaims liability for any personal injury, property or other damages of any nature whatsoever,
whether special, indirect, consequential or compensatory, directly or indirectly resulting from the
publication, use of application, or reliance on this document. PMI disclaims and makes no guaranty
or warranty, expressed or implied, as to the accuracy or completeness of any information published
herein, and disclaims and makes no warranty that the information in this document will fulfill any
of your particular purposes or needs. PMI does not undertake to guarantee the performance of any
individual manufacturer or sellers products or services by virtue of this standard or guide.
In publishing and making this document available, PMI is not undertaking to render professional
or other services for or on behalf of any person or entity, nor is PMI undertaking to perform any
duty owed by any person or entity to someone else. Anyone using this document should rely on his
or her own independent judgment or, as appropriate, seek the advice of a competent professional
in determining the exercise of reasonable care in any given circumstances. Information and other
standards on the topic covered by this publication may be available from other sources, which the
user may wish to consult for additional views or information not covered by this publication.
PMI has no power, nor does it undertake to police or enforce compliance with the contents of
this document. PMI does not certify, test, or inspect products, designs, or installations for safety or
health purposes. Any certification or other statement of compliance with any health or safety-related
information in this document shall not be attributable to PMI and is solely the responsibility of the
certifier or maker of the statement.
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$CHFM
08-13-07 09:35:41
Layout: 97682 : 903
iii
A : 97682$CHFM
08-13-07 09:35:41
Layout: 97682 : 902
Contents
Preface to the Second Edition. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix
Chapter 1Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1 Purpose of the PMCD Framework . . . . . . . . . . . . . . . . . .
1.2 Target Audience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.3 What is Project Manager Competence? . . . . . . . . . . . . . .
1.3.1 Competencies Addressed by the PMCD Framework
1.3.2 Other Competence. . . . . . . . . . . . . . . . . . . . . . .
1.3.3 Complementing the PMCD Framework . . . . . . . . .
1.4 Alignment of the PMCD Framework with PMI Standards . . .
1.5 Design of the PMCD Framework . . . . . . . . . . . . . . . . . . .
1.6 Structure of the PMCD Framework . . . . . . . . . . . . . . . . .
1.7 Application of the PMCD Framework . . . . . . . . . . . . . . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .9
. .9
.10
.10
.12
.12
.12
.12
.12
.13
.13
.14
.14
.14
.14
.15
.15
.15
.16
.16
.17
.17
.18
.18
.18
.18
.19
.19
.20
.20
.20
.20
.21
.21
.21
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$CHFM
08-13-07 09:35:41
Layout: 97682 : 903
Page v (5)
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.1
.1
.2
.2
.2
.3
.3
.4
.5
.5
.6
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.22
.22
.22
.22
.22
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.23
.23
.23
.24
.26
.26
.26
.26
.27
.27
.28
.28
.28
.29
.29
.29
.30
.30
.31
.31
.32
.32
.32
.33
.33
.34
.34
.34
.35
.35
.36
.36
.36
.37
.37
.38
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.39
.40
.41
.42
.42
.42
.45
.46
.46
.46
.47
.47
.47
.48
vi
A : 97682$CHFM
08-13-07 09:35:41
Layout: 97682 : 904
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page vi (6)
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$CHFM
08-13-07 09:35:41
Layout: 97682 : 903
vii
A : 97682$CHFM
08-13-07 09:35:41
Layout: 97682 : 902
Chris Cartwright
Project Manager
PMCD Framework Project Team
Michael Yinger
Deputy Project Manager
PMCD Framework Project Team
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$CHFM
08-21-07 04:37:29
Layout: 97682 : 903
Page ix (9)
ix
A : 97682$CHFM
08-13-07 09:35:41
Layout: 97682 : 902
Chapter 1
Introduction
A : 97682$$CH1
08-13-07 05:35:57
Layout: 97682 : Start Odd
Page 1
Chapter 1Introduction
Has demonstrated the required project management knowledge, skills and experience,
Has passed an accredited project management examination or certification (the Project Management Professional (PMP) or an equivalent from a recognized institute), and
Is able to provide evidence of Performance and Personal Competencies as identified in Chapters
2 and 3 of the PMCD Framework.
A : 97682$$CH1
08-13-07 05:35:57
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 2
Chapter 1Introduction
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH1
08-21-07 04:38:24
Layout: 97682 : Odd
Page 3
Chapter 1Introduction
of the time. As depicted in Figure 1.2, the competencies described in Chapters 2 and 3 of the PMCD
Framework should be used as a foundation for developing an assessment model.
The assessment model is then complemented by organizational and industry-specific performance
requirements. The actual level of achievement of those competencies defines the project managers
competence. Figure 1-2, complementing the PMCD Framework, is a comprehensive representation
of the competencies that a project manager would be expected to be assessed against.
A : 97682$$CH1
08-13-07 05:35:57
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 4
Chapter 1Introduction
The PMCD FrameworkSecond Edition is also aligned with other PMI publications and standards
as illustrated in Figure 1-3. Details on the points of alignment are found in Table 1-1. To find all
PMI publications, refer to www.pmi.org.
A : 97682$$CH1
08-14-07 04:38:16
Layout: 97682 : Odd
Page 5
Chapter 1Introduction
a major function or activity. At the next tier are Elements of Competence, which are the basic building
blocks of each unit. They describe, in output terms, actions or outcomes that are demonstrable or
accessible. Each element is provided with a set of performance criteria which are the list of aspects
of performance that are regarded as displaying competent performance of an Element of Competence.
Each performance criteria includes a listing of the types of evidence or specific documented proof
that the action within the performance criteria has been satisfied. In addition, Chapters 2 and 3 of
the PMCD Framework use the following focus for their structure:
A : 97682$$CH1
08-13-07 05:35:57
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 6
Chapter 1Introduction
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH1
08-13-07 05:35:57
Layout: 97682 : Odd
Page 7
A : 97682$$CH1
08-13-07 05:35:57
Layout: 97682 : 2002
Page 8 no folio
Chapter 2
Performance Competencies
Performance Competence is what the project manager is able to do or accomplish by applying their
project management knowledge.
Individuals will demonstrate their Performance Competence by applying their knowledge and
skills to a project and delivering the planned outcomes. Each individual skill that reflects project
management good practice needs to be assessed. To assess Performance Competence, endorsed
standards or baselines are required for each skill against which:
Individuals are able to measure and plan their progress towards competence. Organizations are
able to design performance measurement instruments, design job specifications, employment specifications. and individual development programs.
Performance Competencies in the PMCD FrameworkSecond Edition are aligned with five of the
six Performance Domains from the PMP Examination Specification. The sixth domain, Professional
Responsibility, is included in Chapter 3 on Personal Competencies.
Units cover the skills that need to be addressed in order to demonstrate specific competencies.
Performance Competence can be measured by assessing individuals against each Unit of Competence and element using the performance criteria and types of evidence specified in this chapter.
The Performance Criteria given in this document need to be tailored to the individual organization
in accordance with the organizational project management processes and the project management
policies, in accordance with their applicability.
This chapter covers the following topics
2.1
2.2
2.3
2.4
A : 97682$$CH2
08-27-07 14:26:54
Layout: 97682 : Start Odd
Page 9
A : 97682$$CH2
08-27-07 14:26:54
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 10
A : 97682$$CH2
08-27-07 14:26:54
Layout: 97682 : Odd
Page 11
11
Types of Evidence
Element 1.2 Preliminary scope statement reflects stakeholder needs and expectations
Performance Criteria
Types of Evidence
Types of Evidence
12
A : 97682$$CH2
08-27-07 14:26:54
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 12
Types of Evidence
Types of Evidence
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH2
08-27-07 14:26:54
Layout: 97682 : Odd
Page 13
13
Types of Evidence
WBS
List of project alternatives
Types of Evidence
Types of Evidence
14
A : 97682$$CH2
08-27-07 14:26:54
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 14
Element 2.4 Project team identified with roles and responsibilities agreed
Performance Criteria
Types of Evidence
Types of Evidence
Templates to support plan e.g. status report, issue log, lessons learned
or other organizational process assets
Types of Evidence
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH2
08-27-07 14:26:54
Layout: 97682 : Odd
Page 15
15
Types of Evidence
Types of Evidence
16
A : 97682$$CH2
08-27-07 14:26:54
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 16
Types of Evidence
Types of Evidence
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH2
08-27-07 14:26:54
Layout: 97682 : Odd
Page 17
17
Types of Evidence
Types of Evidence
Types of Evidence
Staffing lists
Labor contracts
Statements of work (SOW) for procured labor
18
A : 97682$$CH2
08-27-07 14:26:54
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 18
Types of Evidence
Quality audits
Documented process improvement recommendations
Documented updates to planning documents based on variance from
plan
Types of Evidence
Contracts, SOWs
Purchase orders
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH2
08-27-07 14:26:54
Layout: 97682 : Odd
Page 19
19
Types of Evidence
.2 Communicates status to
stakeholders
Types of Evidence
Types of Evidence
.5 Facilitates audits
Audit reports
Documented suggestions for improvement
20
A : 97682$$CH2
08-27-07 14:26:54
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 20
Types of Evidence
.6 Facilitates audits
Audit reports
Documented suggestions for improvement
Types of Evidence
Types of Evidence
.4 Facilitates audits
Audit reports
Documented suggestions for improvement
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH2
08-27-07 14:26:54
Layout: 97682 : Odd
Page 21
21
Types of Evidence
Types of Evidence
Types of Evidence
Documented analysis
Types of Evidence
22
A : 97682$$CH2
08-27-07 14:26:54
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 22
Chapter 3
Personal Competencies
Personal Competencies are those behaviors, attitudes, and core personality characteristics that
contribute to a persons ability to manage projects.
The Personal Competencies presented in this chapter combine with the knowledge competencies
described in the PMBOK GuideThird Edition, and with the Performance Competencies described
in Chapter 2 of this document. As described in Chapter 1, there are certain overlaps between
Knowledge, Performance and Personal Competencies. For example, this chapter may describe the
behavior supporting specific actions of performance competence. Taken together, the three dimensions of competence are required by a project manager to deliver most projects most of the time.
This chapter covers the following topics
3.1
3.2
3.3
3.4
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH3
08-13-07 06:36:56
Layout: 97682 : Start Odd
Page 23
23
24
A : 97682$$CH3
08-13-07 06:36:56
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 24
A : 97682$$CH3
08-14-07 04:41:21
Layout: 97682 : Odd
Page 25
25
Types of Evidence
.1 Actively listens
Types of Evidence
26
A : 97682$$CH3
08-13-07 06:36:56
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 26
Types of Evidence
Types of Evidence
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH3
08-13-07 06:36:56
Layout: 97682 : Odd
Page 27
27
Types of Evidence
Types of Evidence
Examples of:
Acting with integrity in all situations
Keeping commitments
Providing consistent messages in all situations
Supporting team members when confronted with unjustified criticism
Maintaining composure
Demonstrating fair treatment of partners and sellers
28
A : 97682$$CH3
08-13-07 06:36:56
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 28
Types of Evidence
Types of Evidence
Types of Evidence
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH3
08-13-07 06:36:56
Layout: 97682 : Odd
Page 29
29
Types of Evidence
30
A : 97682$$CH3
08-13-07 06:36:56
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 30
Element 8.2 Plans and manages for project success in an organized manner
Performance Criteria
Types of Evidence
Types of Evidence
.2 Recognizes conflict
.3 Resolves conflicts
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH3
08-13-07 06:36:56
Layout: 97682 : Odd
Page 31
31
Types of Evidence
Stakeholder analysis
Communication plan aligned with stakeholders needs
Stakeholders needs and objectives documented in project charter and
project plan
Types of Evidence
32
A : 97682$$CH3
08-13-07 06:36:56
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 32
Types of Evidence
Types of Evidence
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH3
08-13-07 06:36:56
Layout: 97682 : Odd
Page 33
33
Types of Evidence
Types of Evidence
Communication plan
Updates to stakeholder analysis
Documented feedback from stakeholders stating that they felt
motivated
34
A : 97682$$CH3
08-13-07 06:36:56
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 34
Types of Evidence
.4 Enables a change-friendly
environment by fostering continuous
learning
Types of Evidence
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH3
08-13-07 06:36:56
Layout: 97682 : Odd
Page 35
35
Types of Evidence
Types of Evidence
36
A : 97682$$CH3
08-13-07 06:36:56
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 36
Types of Evidence
Types of Evidence
.4 Creates an environment of
confidence and respect for individual
differences
Documented feedback from team showing that they had confidence that
the PM respected individual differences
Examples where the PM created the conditions that motivated and
enabled others to contribute their best
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH3
08-13-07 06:36:56
Layout: 97682 : Odd
Page 37
37
Types of Evidence
38
A : 97682$$CH3
08-13-07 06:36:56
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 38
Chapter 4
Developing Competence as a
Project Manager
The purpose of this chapter is to show how the Performance and Personal Competencies defined
in Chapters 2 and 3 can be used to facilitate the development of project management competence.
The process recommended is for the continuous development of project management competence,
as shown in Figure 4-1.
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH4
08-13-07 06:47:15
Layout: 97682 : Start Odd
Page 39
39
In Step 3, the developmental activities planned in Step 2 are executed. These activities will need
to take into account both the priorities and needs of the organization and of the project(s) underway.
These development activities should be monitored and tracked against the competence development plan.
The entire process is then repeated as the overall competence of the project manager is further
developed.
The competence development process allows development activities and the methods of assessment to be adapted to develop training or performance assessment requirements. The entry and
exit points of this process will depend on the objectives of the project manager or organization the
project manager is working for.
This chapter covers the following topics:
4.1
4.2
4.3
4.4
4.5
Assessment Rigor
Step 1: Assess Performance
Step 2: Plan Competence Development
Step 3: Implement Project Manager Competence Development Plan
In Summary
A : 97682$$CH4
08-13-07 06:47:15
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 40
resulting in a lower rating of competence. This can be compensated for by performing a selfassessment and having the assessment reviewed by a peer or manager.
An example of low rigor is when project managers may assess their competence as a personal
exercise or prior to an assessment by a third party. The individuals may apply the process with less
rigor and the collection of evidence may be done over an extended period. The individuals will
compare their performance against the performance criteria specified in Chapters 2 and 3. This selfassessment may lead to a request for assistance to address a development need or an organizational
assessment.
Medium rigor is less casual and adds an appropriate selection of the following elements to the
assessment process:
Review of the suggested types of evidence for each Performance and Personal Competence.
360 feedback, where feedback is provided from all around the subject.
Interviewing the project manager and evaluating the evidence to gain an understanding of the
effort and contribution.
Specific recommendation of action items to work on.
Reassessment after implementation of the development plan.
Medium rigor requires the person performing the assessment to have attained the necessary range
of competencies to enable them to make an assessment of the performance. The assessor will require
competence in the assessment process and an in- depth understanding of project management
competence. In addition, medium rigor takes more time; as much as two to four times the amount
of time as the low-rigor approach described above. Furthermore, the results are more repeatable
and useful.
A high-rigor approach to assessment should be documented so that it will be repeatable and
consistent when conducting other assessments and adds the following, where appropriate:
Assessment by qualified, independent assessors, to allow better observation of the Personal Competencies of the person being assessed. This also allows specific recommendations of the action items
to be documented.
Preparation and assessor review of project documentation, where the person being assessed
describes how he or she demonstrated each of the performance criteria in a recent project.
Workshops or simulations may be used to distinguish between ability to convince and ability
to perform.
Careful recordkeeping of each assessment judgment and reconciliation of assessor differences in
independent scoring. This is essential for legal reasons, as well as for assessor evaluation.
High rigor increases the assessment effort and the consistency of the results.
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH4
08-13-07 06:47:15
Layout: 97682 : Odd
Page 41
41
Wherever there is a gap, it is necessary to describe the extent of the gap and to define the
development required. If at any time during the assessment process there appears to be a gap in
competence that is putting the project currently being managed at risk, the assessor may need to
immediately initiate actions to address the gap.
The gaps can be viewed at dimension, unit, or element levels, or as detailed as the performance
criteria level. Not all gaps have to be examined at the same level of detail. The gaps can be viewed
holistically to give a multi-dimensional picture (as depicted in Figure 1-3), or gaps can be viewed
individually to address specific development opportunities.
Upon completion of the assessment, a plan should be created to guide the individual and organization toward the agreed-upon goals and objectives. Organizations may want to strive to address the
key areas that will provide them with maximum improvement benefits, rather than by attempting
to focus on all of the possible issues at once.
When there are sufficient performance criteria gaps within an element or unit, the development
activity may require a more comprehensive approach to address the gaps. The assessor needs to be
aware that when using a holistic approach, strength in one area could obscure one or more gaps in
other areas. Hence the need to recognize when to use a holistic versus detailed approach.
42
A : 97682$$CH4
08-13-07 06:47:15
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 42
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH4
08-13-07 06:47:15
Layout: 97682 : Odd
Page 43
43
44
A : 97682$$CH4
08-14-07 04:44:05
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 44
By focusing on the high priority items, which are indicated as requiring additional development,
a more effective plan can be implemented. Just as the work breakdown structure is an effective means
of decomposing a large project into more manageable deliverables, the competence assessment helps
to segregate the elements.
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH4
08-13-07 06:47:15
Layout: 97682 : Odd
Page 45
45
A : 97682$$CH4
08-13-07 06:47:15
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 46
While an organization may be involved in the development and support of a project managers
competence development plan, it remains the responsibility of the individual to ensure that the plan
put in place is followed and the benefits are realized. The outcomes of the plan will allow the
individual to improve their performance and reap the benefits in their career.
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH4
08-13-07 06:47:16
Layout: 97682 : Odd
Page 47
47
4.5 In summary
The previous chapters of PMCD Framework defined the performance and personal competencies
that, together with the Knowledge Competencies defined in the PMBOK GuideThird Edition, are
considered required for a competent project manager. It was also indicated that each organization
might customize the framework to its particularities, potentially using a subset of the competencies
defined in this document and adding other competency dimensions important in their particular
environment.
This chapter recommended an iterative process to develop competence as a project manager,
where we assess the competence of project managers, plan competence development for the project
managers, execute the competence development plan and then repeat the process.
Each iteration of the competence development plan should be treated as a project in itself. The
project manager owns the plan and is accountable for delivering the outcomes. The project manager
needs to execute the plan just as any other project plan would be executed. Successful completion
of the competence development plan depends on the motivation of the project manager and the
support given to the project manager by the senior project managers and peers.
The PMCD FrameworkSecond Edition has been developed to provide both individuals and
organizations with guidance on how to assess, plan and manage the professional development of a
project manager. Use of the framework will provide a structured approach to the continuing journey
of competence development for individuals as well as organizations.
48
A : 97682$$CH4
08-13-07 06:47:16
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 48
Appendix A
The purpose of this appendix is to give a detailed explanation of the changes made to the Project
Manager Competency Development Framework that was released in 2002 to create the Project Manager
Competency Development FrameworkSecond Edition.
Structural Changes
The project team for the PMCD FrameworkSecond Edition was asked to update the document,
taking into account the following:
Research conducted by PMI through the Role Delineation Study culminating in the PMP Examination Specification
Alignment with existing PMI Standards, in particular A Guide to the Project Management Body of
Knowledge (PMBOK Guide)Third Edition
Feedback from the marketplace on the 2002 document
Possible submission to ANSI-for approval as Ameican National Standard
This resulted in the following structural changes (see Table A-1) and name changes (see Table A-2).:
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH5
08-27-07 14:30:15
Layout: 97682 : Start Odd
Page 49
49
Section 2
Performance Competencies
Project Integration Management
Project Scope Management
Project Time Management
Project Cost Management
Project Quality Management
Project Human Resources Management
Project Communications Management
Project Risk Management
Project Procurement Management
Chapter 2
Performance Competencies
Initiating a Project
Planning a Project
Executing a Project
Initiating and Controlling a Project
Closing a Project
Section 3
Personal Competencies
Achievement and Action
Helping and Human Service
Impact and Influence
Managerial
Cognitive
Personal Effectiveness
Chapter 3
Personal Competencies
Communicating
Leading
Managing
Cognitive Ability
Effectiveness
Professionalism
Writing Styles
A style guide was used in order to guide the project team in using a standard, best practice approach.
The style guide served as a detailed guideline for the team to use in the document development,
review, and edit process and resulted in a consistent tone, structure, and vocabulary in the final
document.
The team employed a five-step process in reviewing the document that included grammar and
punctuation, content analysis, nomenclature, overall look and feel (including formatting and
usability), and consistency of voice.
Chapter 1
Chapter 1 of the PMCD FrameworkSecond Edition provides an introduction to the concepts
conveyed in the remaining chapters and has been modified to align with changes made to these
chapters in the second edition.
In addition, a number of other changes were made to the chapter. The project team considered
it important to clearly identify the target audience for the PMCD FrameworkSecond Edition within
Chapter 1 and to provide an indication of who would be most likely to benefit from the standard.
A significant difference between the First and Second Editions of the PMCD Framework is the lack
of detailed definition of knowledge competencies. This chapter provides an explanation for this
deficit and a simpler view of the dimensions of competence.
The project team felt that the term project success has a number of connotations and that it is
not necessarily always a product of project manager competence. It was therefore decided to remove
the section on project success from Chapter 1.
The 2002 edition of the PMCD Framework references sources of information used for the edition.
The second edition provides a more detailed overview of the alignment of the PMCD Framework
with other PMI standards and publications.
The second edition simplifies and rationalizes the structure of the document. This is reflected in
Chapter 1 with one figure being used to illustrate the structure of both chapters two and three. The
50
A : 97682$$CH5
08-27-07 14:30:15
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 50
numbering system used within these chapters is significantly simpler than the previous edition and
does not, therefore, require detailed explanation.
PMCD Framework - 2002 Edition
Chapter 2
Chapter 2 has been completely restructured as a result of the role delineation study findings documented in the PMP Examination Specification. The results show the membership view of project
management from a process group perspective and not from a knowledge area perspective. This
information resulted in the reduction of Performance Competence Units descriptions to five. This
also aligns with what is seen as good practice in defining competencies. The five Performance
Competence Units are based on five of the six Performance Domains defined in the PMP Examination
Specification. The sixth Performance Domain specified in the PMP Examination Specification
Professional and Social Responsibilityis not included as a performance competence but is included
in Chapter 3 as a Personal Competence. The PMP Examination Specification was also used to define
the elements of each unit. The wording however was changed so that each element was described
as an outcome to be achieved rather than a process to follow. Each element is further broken down
in performance criteria developed by the team using the PMCD Framework2002 Edition, the PMP
Examination Specification and existing PMI standards. The achievement of each of the performance
criteria ensures that the outcome specified in the element will be delivered. In order to establish
achievement of the performance criteria, the project team defined the types of evidence that could
demonstrate achievement of each criteria. In Chapter 2, a one for one approach was taken between
performance criteria and types of evidence but this should be seen as an example only, there may
be other types of evidence that can demonstrate compliance.
A : 97682$$CH5
08-27-07 14:30:15
Layout: 97682 : Odd
Page 51
51
Chapter 3
Chapter 3 also evolved from the previous edition, moving further from the initially used Competency
Dictionary (known as the Spencer Model) developed by Lyle and Signe Spencer (1993). The new
competency units are the result of a deeper understanding of the specific Personal Competencies
required for project management. The most visible evolution in the definition of Personal Competencies for a project manager is the new Competence Unit titled Professionalism, supporting PMIs
Code of Ethics and Professional Conduct as well as the Professional and Social Responsibility section
from the PMP Examination Specification.
The Second Edition includes six Personal Competence Units, as did the 2002 Edition. The units
names have been shortened and their content area better separated, aligning with best practices in
defining competency frameworks. However, due to the subjective nature of personal competencies,
there might be elements that have characteristics of more than a single unit. In such cases, a judgment
call was made regarding most appropriate placement of such element, acknowledging its other
characteristics as well.
Most competency elements were preserved from the 2002 Edition (in some instances consolidated
for clarity), some were added and a few were deleted. They were regrouped into the new Competency
Units based on their usage and relationships specific to project management. Each element is further
broken down in performance criteria representing behaviors showing the presence of the competence
element. The achievement of each of the performance criteria is established through the existence
of one or more of the types of evidence listed. The types of evidence are for exemplification only as
each organization might use other similar documents or facts to demonstrate the accomplishment
of a performance criterion.
No types of evidence
52
A : 97682$$CH5
08-27-07 14:30:15
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 52
Chapter 4
Chapter 4 has been completely rewritten coincident with the restructure of the rest of the document.
The objective of this chapter, unlike the 2002 editions focus on the attempt to achieve a certain
level of competence, was to use the PMCD Framework to assess the level of competence demonstrated
in the project managers performance. The purpose of this is to promote continuous improvement
rather than trying to reach some arbitrary level of competence.
PMCD Framework2002 Edition
Five-stage approach:
Stage 1: Determine applicable elements and
performance criteria
Stage 2: Determine desired levels of proficiency
Stage 3: Assessment
Stage 4: Addressing gaps in competency
Stage 5: Progress toward competence
Three-step approach:
Step 1: Assess performance
Step 2: Prepare competence development plan
Step 3: Implement PM competence development
plan
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH5
08-27-07 14:30:15
Layout: 97682 : Odd
Page 53
53
A : 97682$$CH5
08-27-07 14:30:15
Layout: 97682 : 2002
Page 54 no folio
Appendix B
The PMI Standards Committee sponsored the Project Management Competency (PMC) project in
1998 to work on a competency framework for project managers. The purpose of the project was to
develop a project manager competency development framework that described the competencies
likely to lead to effective project manager performance across contexts. The competency framework
was to be used for the professional development of project managers rather than in selection or
performance evaluation.
The Standards Committee recognizes that professionalism in project management is greatly
facilitated by a project management competency framework that:
is generally accepted throughout the profession.
provides guidance to both individuals and organizations regarding how to manage the professional growth of a project manager.
addresses a full range of project types from small and simple to large and complex.
Consequently, in late 1998, the PMI Standards Committee asked for volunteers to develop a standard
outlining a project manager competency development framework and sponsored the Project Manager
Competency (PMC) project team. The PMCD Framework was to identify and define some of the key
dimensions of effective performance, the competencies that likely impact performance, and the
contingencies likely to influence the extent to which a particular competency had an impact on
project manager performance. A volunteer team was assembled and, during the course of the next
year, worked on refining the projects scope, reviewing the literature, and starting to develop the
basic framework and definitions outlining project manager competency.
In the fall of 2000, PMIs certification department published the Project Management Professional
(PMP) Role Delineation Study and the Project Management Experience and Knowledge Self-Assessment
Manual. The PMC core team reviewed this work in comparison to the elements and criteria contained
in the draft PMCD Framework. A decision was made to revise the elements of competence and
performance criteria contained within the PMCD Framework to align with the works published by
PMI certification. The PMC core team, with support from the PMI Project Management Standards
Program, conducted an open working session at PMI 2000. Additional input was solicited from those
attending the session regarding the completeness and usefulness of the draft PMCD Framework.
Input indicated that the draft PMCD Framework would serve as a useful resource for those working
to develop the competence of project managers within their organizations.
The draft of the PMCD Framework was submitted to the PMI Project Management Standards
Program Team in March 2001 for consideration as an Exposure Draft to be circulated among PMI
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH6
08-27-07 15:26:40
Layout: 97682 : Start Odd
Page 55
55
membership and other affected parties. Following approval by the Standards Program Team, the
proposed exposure draft was submitted for formal review to six other knowledge experts. The PMCD
Framework project team evaluated the comments from these six reviewers and the Standards Program
Team. A final draft was submitted to the Standards Program Team and approved for this exposure draft.
The Exposure Draft was submitted for public review on 1 October 2001, with an exposure closure
on 3 December 2001. During this period 154 comments were received. Each idea proposed during
the review was evaluated and decisions made as to whether to incorporate the recommendation
into this version of the PMCD Framework. All comments that the project team accepted for the
current version have been incorporated.
A : 97682$$CH6
08-27-07 15:26:40
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 56
David Garbitt
Larry Goldsmith, PMP
William C. Grigg, PE, PMP
Brad King
Alan Kristynik, PMP
Rose Mary Lewis, PMP
Lawrence Mack, PE, PMP
Barbara Marino, MPM, PMP
Dave Maynard, MBA, PMP
Vrinda Menon, PMP
Richard Ray
Paul Rust, PMP
Philip Sharpe, PMP
Gregory Skulmoski
Cyndi Stackpole, PMP
Ken Stevenson, MS
Dick Waltz, PMP
Greg Willits, PMP
Peter Wynne
Frank Yanagimachi
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH6
08-27-07 15:26:40
Layout: 97682 : Odd
Page 57
57
that were linked to project management competence. During the life of the project, the team grew
to over 380 volunteers.
The standard was restructured along the lines of the PMP Exam Specification, based on project
charter direction from PMI. The team also took the opportunity to expand the document to cover
three levels of project managers. A first draft of the standard was created by late 2005. This consisted
of a framework to assess and develop project coordinators, project managers, and senior project
managers. While this expanded the scope of the charter, the team believed that the standard would
have a greater value to the profession.
In early 2006, PMI directed the team to focus solely on the project manager, leaving the other
levels of competency development to future projects. The charter for the PMCD Framework was
strengthened and a new core team was developed with the addition of a deputy project manager to
drive adherence to the charter. The core team consisted of:
Lyn WindsorIntroduction and Chapter 1;
George JucanChapter 3, covering Personal Competencies
Paul OsmanChapter 4 on developing competence.
This left the project manager, Chris Cartwright, as the chapter lead for Chapter 2 on Performance
Competence. The core team also included team members with responsibility for specific functions
necessary to complete the second edition:
Jen Skrabak took responsibility for the edit team;
Mike Reid headed up the integration team;
Neelesh Ajmani assumed the role of volunteer administration and general HR.
The team welcomed Mike Yinger to the role of deputy PM, who brought a great deal of experience
and drive to the engine room of the project.
The team established regular teleconferences and set up groups of volunteers to support the work
of developing the four chapters. Some of the chapter team members went far beyond what is normally
expected of volunteers and they are recognized as significant contributors in Appendix C.
Over a number of months, the various teams developed their chapters using regular teleconferences.
The decision was made to bring the core team together to review the chapters at a face-to-face
meeting. The core team consisted of five members from North America and three members from
Australia. The first face-to-face meeting was held in May 2006.
While the use of modern technology allows us to work in virtual teams, there is still no better way
to develop teamwork than to meet in person and get to know the faces associated with the names.
One lesson learned from the first face-to-face meeting was to have this type of meeting early in the
project to build the team focus and bond the team. The results of the meeting were taken back to
the chapter teams and each chapter was revised using input from the meeting. The integration and
edit teams provided input as to style and coverage and this was also included in the chapter edits.
The draft was now ready for a complete team review. Each team member was asked if they wished
to participate and a formal review team was established. In the formal PMI Standards Department
process for this stage of the project, there can be up to four different types of reviews to manage
the quality of the final document. There will be an internal review, there may be a subject matter
expert (SME) review, there will be a Members Advisory Group (MAG) review, and finally there will
be the exposure draft (ED) review, which is open to the world-at-large. When the revision was ready
for the project team review, it was forwarded to PMI Standards for the internal edit, where the
decision was made that the document was comparatively ready for Exposure Draft and, consequently,
the decision was made by PMI Standards to administer three of the reviews in parallel. The core
team agreed and ran the internal team review, the SME review and the MAG review at the same time.
The reviewers made a substantial contribution to the document, providing over 2700 suggestions
for improvements to the document. As this stage of the process was the first opportunity many of
the review team had to see the complete document; the internal project team review was especially
helpful. The chapter teams then incorporated the suggestions where necessary and the core team
had a second face-to-face meeting to review the complete document. This was a particularly arduous
and intensive meeting, with much discussion and debate. The revised draft of the standard was then
58
A : 97682$$CH6
08-27-07 15:26:40
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 58
forwarded to PMI Standards Department for the Exposure Draft (public) review. The normal ED
process was followed and this provided approximately 285 comments from the membership. While
this number is low compared to other standards, the team believes it reflects the quality of the work
done by all previous reviewers. More than 80% of the ED comments were included in the final draft
of the document.
While the final draft of the PMCD FrameworkSecond Edition meets its charters stated goal (to
provide necessary information to the project manager who is at the PMP level, the team believes
there is a need to expand the framework in future editions to include those levels which are outside
of the PMP level, both above and below. This and future frameworks may be used by organizations
as a development path for project staff.
Several steps were taken in the HR processes of the team to coordinate the large number of
volunteers. The core team put in place a process for induction and polled each new arrival for
their interests in allocating them to a suitable task. A regular newsletter was also implemented to
communicate to all team members regarding progress and achievements. It is gratifying to this
project team that its efforts to maintain the energy and enthusiasm of so many volunteers have been
recognized by the PMI Standards Department as an appropriate template for changes to the overall
Standards project team creation and maintenance process.
The core team of the PMCD Framework project would like to acknowledge the support provided
by the team at PMI Standards, from the Standards Manager and from a number of Standard Project
Specialists. This support was greatly appreciated and helped us all deliver the best standard that
we could.
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH6
08-27-07 15:26:40
Layout: 97682 : Odd
Page 59
59
A : 97682$$CH6
08-27-07 15:26:40
Layout: 97682 : 2002
Page 60 no folio
Appendix C
This appendix lists, alphabetically within groupings, those individuals who have contributed to the
development and production of the Project Manager Competency Development FrameworkSecond
Edition. No simple list or even multiple lists can adequately portray all the contributions of those
who have volunteered to develop the Project Manager Competency Development FrameworkSecond
Edition. Appendix B describes specific contributions of many of the individuals listed below and
should be consulted for further information about individual contributions to the project.
The Project Management Institute is grateful to all of these individuals for their support and
acknowledges their contributions to the project management profession.
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH7
08-27-07 14:34:44
Layout: 97682 : Start Odd
Page 61
61
Appendix CContributors and Reviewers of the Project Manager Competency Development FrameworkSecond Edition
A : 97682$$CH7
08-27-07 14:34:44
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 62
Appendix CContributors and Reviewers of the Project Manager Competency Development FrameworkSecond Edition
A : 97682$$CH7
08-27-07 14:34:44
Layout: 97682 : Odd
Page 63
63
Appendix CContributors and Reviewers of the Project Manager Competency Development FrameworkSecond Edition
A : 97682$$CH7
08-27-07 14:34:44
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 64
Appendix CContributors and Reviewers of the Project Manager Competency Development FrameworkSecond Edition
A : 97682$$CH7
08-27-07 14:34:44
Layout: 97682 : Odd
Page 65
65
Appendix CContributors and Reviewers of the Project Manager Competency Development FrameworkSecond Edition
A : 97682$$CH7
08-27-07 14:34:44
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 66
Appendix CContributors and Reviewers of the Project Manager Competency Development FrameworkSecond Edition
A : 97682$$CH7
08-27-07 14:34:44
Layout: 97682 : Odd
Page 67
67
Appendix CContributors and Reviewers of the Project Manager Competency Development FrameworkSecond Edition
A : 97682$$CH7
08-27-07 14:34:44
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 68
Appendix CContributors and Reviewers of the Project Manager Competency Development FrameworkSecond Edition
A : 97682$$CH7
08-27-07 14:34:44
Layout: 97682 : Odd
Page 69
69
Appendix CContributors and Reviewers of the Project Manager Competency Development FrameworkSecond Edition
70
A : 97682$$CH7
08-27-07 14:34:44
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 70
References
Crawford, L.H. 1997. A global approach to project management competence. Proceedings of the 1997 AIPM
National Conference, Gold Coast, Brisbane: AIPM, 220228.
Project Management Institute. 2005. Project Manager Professional (PMP) Examination Spec. Newtown
Square, PA: Project Management Institute.
Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK Guide)
Third Edition. Newtown Square, PA: Project Management Institute.
Roecker, J.T. 2005. PMIs Career Framework: The case for a project manager path. Newtown Square, PA:
Project Management Institute.
Additional References
Aguinis, H. and Kraiger, K.T. April 1997. Practicing what we preach: Competency-based assessment of
industrial/organizational psychology graduate students. The Industrial-Organizational Psychologist, 3439.
Association for Project Management. The 40 key competencies. http://www.apmgroup.co.uk/apmbok.htm.
Australian Institute of Project Management (AIPM). 1996. National Competency Standards for Project
Management. Split Junction, NSW.
Anastasi, A. 1988. Psychological Testing, 6th ed. New York: Macmillan.
Bacharach, S.B. 1989. Organizational theories: Some criteria for evaluation. Academy of Management
Review, 14(4), 496515.
Belout, A. 1997. Effects of human resource management on project effectiveness and success: toward a
new conceptual framework. International Journal of Project Management, 16(1). 2126.
Boyatzis, R.E. 1982. The competent manager: A model for effective performance. New York: John Wiley &
Sons.
Cascio, W.F. 1992. Managing human resources: Productivity, quality of work life, profits, 3rd Ed. New York:
McGraw-Hill.
Crawford, L.H. 1998. Project management competence for strategy realisation. Proceedings of the 14th
World Congress on Project Management. Ljubljana, Slovenia, 1, 1021.
Project Management Institute. 1999. Assessing and developing project management competence.
Proceedings of the 30th Annual Project Management Institute 1999 Seminars & Symposium. Newtown Square,
PA: Project Management Institute.
Dale, M. and Iles, P. 1992. Assessing management skills: A guide to competencies and evaluation techniques.
London: Kogan.
Finn, R. 1993. A synthesis of current research on management competencies. Henly Working Paper
HWP9310. Henley-on-Thames, Henley Management College.
Gadeken, O.C. (January-February 1997) Project Managers as Leaders: Competencies of Top Performers,
Army RD&A Magazine, 27.
Gonczi, A., Hager, P.and Athanasou, J. 1993. The development of competency-based assessment strategies for
the professions. Canberra: Australian Government Publishing Service.
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH8
08-21-07 04:48:19
Layout: 97682 : Start Odd
Page 71
71
References
Hellriegel, D. Slocum J.W., Jr., and Woodman, R.W. 1992. Organizational Behavior, 6th Ed. St. Paul: West.
Heneman, H.G., III, and Heneman, R.L. 1994. Staffing Organizations. Middleton: Mendota House.
Heywood, L., Gonczi, A. and Hager, P. 1992. A Guide to Development of Competency Standards for
Professionals. Canberra: Australian Government Publishing Service.
Kleinmuntz, B. 1985. Personality and Psychological Assessment. Malabar: Robert E. Krieger.
McLagan, P.A. May 1997 Competencies: The next generation, Training & Development, 51, 4047.
McClelland, D.C. January 1973). Testing for competence rather than for intelligence, American
Psychologist 114.
McVeigh, B.J. January-February 1995. The right stuff revisited: A competency perspective of army program
managers, Program Manager, 3034
Mealiea, L.W. and Latham, G.P. 1996. Skills for managerial success: Theory, experience, and practice.
Chicago, IL: Irwin
Messick, S. November 1980. Test validity and the ethics of assessment. American Psychologist, 35(11)
10121027.
Mirabile, R.J. August 1997. Everything you wanted to know about competency modeling. Training &
Development, 51(8) 7377.
Morris, P.W.G. 1999. Body Building. Paper presented on project management forum (www.pmforum.org/
digest/newapr99.htm).
NASA. Academy of Program/Project Leadership (formally called NASAs Program/Project Management
Initiative). http://www.msfc.nasa.gov/training/PPMI/HOME.html.
Parry, S.B. 1998. Just What Is a Competency? (And Why Should You Care?) Training, (June), 5864.
Pinto, J.K., and Slevin, D.P. February 1988. Project success: Definitions and measurement techniques,
Journal of Project Management, 19 (1), 6772.
Posner, B.Z. 1987). What it takes to be a good project manager. Project Management Journal, March 1987.
Newtown Square, PA: Project Management Institute.
Project Management Institute. 2000. Project Management Professional (PMP) Role Delineation Study.
Newtown Square, PA: Project Management Institute.
Project Management Institute. 2000. Project management experience and knowledge self-assessment
manual. Newtown Square, PA: Project Management Institute.
Skulmoski, G. June 1999. New locks and keys: Is cost engineering ready to contribute? Presented at 43rd
Annual Meeting of AACE International.
Spencer, L.M., Jr., and Signe, M.S. 1993. Competence at work: Models for superior performance. New York:
John Wiley & Sons.
Struckenbruck, L.C. 1986. Who determine project success? PMI Seminar/Symposium Proceedings, 8593.
Thamhain, H.J., and Wilemon, D.L. 1982. Developing project/program managers. PMI Seminar/
Symposium Proceedings, II-B.1II-B.10.
Toney, F. July 1998. The quest to find the superior project manager: The Fortune 500 project management
benchmarking forum defines competencies. PM Network. Newtown Square, PA.: Project Management
Instutute.
Treasury Board of Canada Secretariat. An enhanced framework for the management of information
technology projectsProject management core competencies. http://www.tbs-sct.gc.ca/cio-dpi/default.asp.
Ulrich, D., Brockbank, W., Yeung, A. K., & Lake, D. G. (Winter 1995). Human resource competencies: An
empirical assessment. Human Resource Management, 34(4), 473495.
U.S. Department of Defense. Project performance measurement standards. http://www.acq.osd.mil/pm/.
Waller, R. 1997. A Project Manager Competency Model. Proceedings of the 28th Annual Project Management
Institute 1997 Seminars & Symposium. Newtown Square, PA: Project Management Institute.
72
A : 97682$$CH8
08-13-07 08:16:36
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 72
Glossary
This glossary includes terms that are used in the PMCD Framework. These terms are not unique to project manager
competence, but may be used differently or with a narrower meaning than that of general everyday usage.
Ability. The quality of being able to do something; the physical, mental, financial, or legal power to perform; a natural
or acquired skill or talent.
Accept. The act of formally receiving or acknowledging something and regarding it as being true, sound, suitable,
or complete.
Acceptance. See accept
Activity. A component of work performed during the course of a project.
Assumptions. Assumptions are factors that, for planning purposes, are considered to be true, real, or certain without
proof or demonstration. Assumptions affect all aspects of project planning, and are part of the progressive
elaboration of the project. Project teams frequently identify, document, and validate assumptions as part of
their planning process. Assumptions generally involve a degree of risk.
Attitudes. Relatively lasting feelings, beliefs, and behavior tendencies directed toward specific persons, groups,
ideas, issues, or objects. They are often described in terms of three components: (a) an affective component,or
the feelings, sentiments, moods, and emotions about some person, idea, event, or object; (b) a cognitive
component or the beliefs, opinions, knowledge, or information held by the individual; and (c) a behavioral
component or the intention and predisposition to act.
Baseline. The approved time phased plan (for a project, a work breakdown structure component, a work package,
or a schedule activity), plus or minus approved project scope, cost, schedule, and technical changes. Generally
refers to the current baseline, but may refer to the original or some other baseline. Usually used with a modifier
(e.g., cost baseline, schedule baseline, performance measurement baseline, technical baseline).
Behavior. The manner in which an individual acts or conducts oneself under specified circumstances.
Capability. A specific organization project management maturity (OPM3) competency that must exist in order for
an organization to execute project management processes and deliver project management services and
products. Capabilities are incremental steps leading up to one or more Best Practices.
Change Control. Identifying, documenting, approving or rejecting, and controlling changes to the project baseline.
Change Control Board (CCB). A formally constituted group of stakeholders responsible for reviewing, evaluating,
approving, delaying, or rejecting changes to the project, with all decisions and recommendations being recorded.
Change Request. Requests to expand or reduce the project scope, modify policies, processes, plans, or procedures,
modify costs or budgets, or revise schedules. Requests for a change can be direct or indirect, externally or
internally initiated, and legally or contractually mandated or optional. Only formally documented requested
changes are processed and only approved change requests are implemented.
Communication. A process through which information is exchanged among persons using a common system of
symbols, signs, or behaviors.
Communication Management Plan [Output/Input]. The document that describes: the communications needs and
expectations for the project; how and in what format information will be communicated; when and where each
communication will be made; and who is responsible for providing each type of communication. A communication
management plan can be formal or informal, highly detailed or broadly framed, based on the requirements of
the project stakeholders. The communication management plan is contained in, or is a subsidiary plan of, the
project management plan.
Competence. A cluster of related knowledge, attitudes, skills, and other personal characteristics that affects a major
part of ones job (i.e., one or more key roles or responsibilities), correlates with performance on the job, can
be measured against well-accepted standards, and can be improved by means of training and development.
Major components of competencies include:
Abilities
Attitudes
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH9
08-27-07 14:37:54
Layout: 97682 : Start Odd
Page 73
73
Glossary
Behavior
Knowledge
Personality
Skills
Major dimensions of competency include Knowledge Competence, Personal Competence, and Performance
Competence.
See also Knowledge Competence, Personal Competence, and Performance Competence
Competence Baseline. An initial assessment of the individual compared to the personal Knowledge, Performance,
and Personal Competencies as described in the PMCD Framework.
Competence Development Plan. A plan that prescribes activities to be undertaken by the project manager that are
necessary to achieve the learning required after an assessment is performed to determine the competence gap.
Competence Dimensions. A multidimensional framework that breaks competency into dimensions of Knowledge,
Performance and Personal Competencies.
Competence Gap. The difference between the desired level of competence within a given dimension and the level
of competence assessed for an individual. It is the gaps in ones competence that an individual aims to
improve through individual development.
Competency. See Competence
Cost Management Plan [Output/Input]. The document that sets out the format and establishes the activities and
criteria for planning, structuring, and controlling the project costs. A cost management plan can be formal or
informal, highly detailed or broadly framed, based on the requirements of the project stakeholders. The cost
management plan is contained in, or is a subsidiary plan, of the project management plan.
Document. A medium and the information recorded thereon, that generally has permanence and can be read by
a person or a machine. Examples include project management plans, specifications, procedures, studies,
and manuals.
Effective Performance. An intended or expected accomplishment.
Elements of Competence. The basic building blocks of a Unit of Competence. They describe, in output terms, actions
or outcomes, which are demonstrable and assessable.
Emotional Intelligence. Describes an ability, capacity, or skill to perceive, assess, and manage the emotions of
ones self, of others, and of groups.
Feedback. A reaction or response to a particular process or activity.
Integrated Change Control [Process]. The process of reviewing all change requests, approving changes and controlling
changes to deliverables and organizational process assets.
Knowledge. Knowing something with the familiarity gained through experience, education, observation, or investigation,
it is understanding a process, practice, or technique, or how to use a tool.
Knowledge Competence. The knowledge and understanding that a project manager brings to a project. This can include
qualifications and experience, both direct and related. These are the knowledge components of competence.
Lessons Learned [Output/Input]. The learning gained from the process of performing the project. Lessons learned
may be identified at any point. Also considered a project record, to be included in the lessons learned
knowledge base.
Organizational Process Assets [Output/Input]. Any or all process related assets, from any or all of the organizations
involved in the project that are or can be used to influence the projects success. These process assets
include formal and informal plans, policies, procedures, and guidelines. The process assets also include the
organizations knowledge bases such as lessons learned and historical information.
Outcome. The tangible or intangible result of applying a capability.
Performance Criteria. An integrated list of aspects of performance that would be regarded as displaying competent
performance during a project in an element of competence.
Performance Competence. What the project manager is able to do or accomplish by applying project management
knowledge. This competency dimension looks at the demonstrable performance of the individual in carrying
out project management tasks, and focuses on the project outcomes grouped in five units: Initiating, Planning,
Executing, Monitoring and Controlling, and Closing a Project.
Personality. A unique organization of a relatively stable set of characteristics, tendencies, and temperaments that
define an individual and determine that persons interaction with the environment.
Personal Competence. The core personality characteristics underlying a persons capability to do a project. These
are the behavior, motives, traits, attitudes, and self-concepts that enable a person to successfully manage
a project, grouped into six units: communicating, leading, managing, cognitive ability, effectiveness, and
professionalism.
74
A : 97682$$CH9
08-27-07 14:37:54
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 74
Glossary
Procurement Management Plan. The document that describes how procurement processes from developing procurement documentation through contract closure will be managed.
Project Charter [Output/Input]. A document issued by the project initiator or sponsor that formally authorizes the
existence of a project, and provides the project manager with the authority to apply organizational resources
to project activities.
Project Management (PM). The application of knowledge, skills, tools, and techniques to project activities to meet
the project requirements.
Project Performance. A measure of the extent to which the project is carried out as planned in terms of objectives,
time and financial constraints, and organizational policies and procedures.
Project Schedule [Output/Input]. The planned dates for performing schedule activities and the planned dates for
meeting schedule milestones.
Project Success. A collective assessment by project stakeholders (e.g., client/customer, sponsor) of the degree to
which the project has achieved each of its objectives.
Quality Management Plan [Output/Input]. The quality management plan describes how the project management
team will implement the performing organizations quality policy. The quality management plan is a component
or a subsidiary plan of the project management plan. The quality management plan may be formal or informal,
highly detailed, or broadly framed, based on the requirements of the project.
Responsibility Assignment Matrix (RAM) [Tool]. A structure that relates the project organizational breakdown structure
to the work breakdown structure to help ensure that each component of the projects scope of work is assigned
to a responsible person/team
Risk Management Plan [Output/Input]. The document describing how project risk management will be structured
and performed on the project. It is contained in or is a subsidiary plan of the project management plan. The
risk management plan can be informal and broadly framed, or formal and highly detailed, based on the needs
of the project. Information in the risk management plan varies by application area and project size. The risk
management plan is different from the risk register that contains the list of project risks, the results of risk
analysis, and the risk responses.
Risk Mitigation [Technique]. A risk response planning technique associated with threats that seeks to reduce the
probability of occurrence or impact of a risk to below an acceptable threshold.
Risk Register [Output/Input]. The document containing the results of the qualitative risk analysis, quantitative risk
analysis, and risk response planning. The risk register details all identified risks, including description, category,
cause, probability of occurring, impact(s) on objectives, proposed responses, owners, and current status. The
risk register is a component of the project management plan.
Risk Response Planning [Process]. The process of developing options and actions to enhance opportunities and to
reduce threats to project objectives.
Seller. A provider or supplier of products, services, or results to an organization.
Skill. Ability to use knowledge, a developed aptitude, and/or a capability to effectively and readily execute or perform
an activity.
Staffing Management Plan [Output/Input]. The document that describes when and how human resource requirements
will be met. It is contained in, or is a subsidiary plan of, the project management plan. The staffing management
plan can be informal and broadly framed, or formal and highly detailed, based on the needs of the project.
Information in the staffing management plan varies by application area and project size.
Stakeholder. Person or organization (e.g., customer, sponsor, performing organization or the public) that is actively
involved in the project, or whose interests may be positively or negatively affected by execution or completion
of the project. A stakeholder may also exert influence over the project and its deliverables.
Style. A set of skills, attributes, or characteristics of a person; the concept refers to a frequent pattern of what is
said, done, expressed, or performed by a person demonstrating ones values. It encompasses the modes or
patterns of behavior that people exhibit in approaching their work and interacting with others.
Subject Matter Expert (SME). A person, usually an accomplished performer, who knows the knowledge, performance,
and personal competence required for a given Unit of Competence.
360 Feedback. The type of feedback in which project team members, project sponsors, and other stakeholders are
surveyed anonymously in regard to the project managers performance. This can be used to assess baseline
competence in order to complete a competence gap analysis and create a development or training plan.
Types of Evidence. Specific documented proof that Performance Criteria are achieved or expected action has been
completed; these form the basis upon which competence can be assessed.
Unit of Competence. A major segment of overall competency, typically representing a major function.
Work Breakdown Structure (WBS) [Output/Input]. A deliverable-oriented hierarchical decomposition of the work to
be executed by the project team to accomplish the project objectives and create the required deliverables. It
organizes and defines the total scope of the project. Each descending level represents an increasingly detailed
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$$CH9
08-27-07 14:37:54
Layout: 97682 : Odd
Page 75
75
Glossary
definition of the project work. The WBS is decomposed into work packages. The deliverable orientation of the
hierarchy includes both internal and external deliverables.
Work Breakdown Structure Dictionary [Output/Input]. A document that describes each component in the work
breakdown structure (WBS). For each WBS component, the WBS dictionary includes a brief definition of the
scope or statement of work, defined deliverable(s), a list of associated activities, and a list of milestones.
Other information may include: responsible organization, start and end dates, resources required, an estimate
of cost, charge number, contract information, quality requirements, and technical references to facilitate
performance of the work.
76
A : 97682$$CH9
08-27-07 14:37:54
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 76
Index
A
ability ...................................................................................................................... 2, 23, 28-29, 32, 41, 73-75
accept...........................................................................................................................................................73
acceptance documentation .............................................................................................................................18
accountability ................................................................................................................................................29
activity ........................................ 2, 6, 10, 14-15, 17, 19, 21-22, 24, 29-30, 34-36, 39-40, 42, 45-47, 62, 73-76
advisor .........................................................................................................................................................6-7
alignment .................................................................................................................... 1, 4-5, 12, 36, 45, 49-51
application..............................................................................................................................1-2, 6, 32, 40, 75
appropriate............................................................................. 3, 5, 10, 20, 23-24, 26-35, 38, 40-42, 45, 52, 59
approved ....................................................................................................................13-17, 20, 31, 47, 56, 73
assessment ....................................................................... 1-5, 7, 9-10, 38-42, 45-46, 51, 53, 55, 71-72, 74-75
assessor ......................................................................................................................................24, 40-42, 46
assumptions............................................................................................................................................12, 73
attitudes ..................................................................................................................................2, 23, 32, 73-74
audience .................................................................................................................................................27, 40
audits ......................................................................................................................................................19-21
B
baseline ...................................................................................................................3, 7, 15, 20, 39-41, 73, 75
behavior ..............................................................................................1-3, 6-7, 23-24, 32, 36-37, 45, 52, 72-75
best practices....................................................................................................................................34, 52, 73
budget ...............................................................................................................................................13-14, 73
business case ...............................................................................................................................................13
C
capability............................................................................................................................7, 24, 40, 45, 73-75
CCB See change control board
change control ...................................................................................................................................16, 33, 73
change control board (CCB) ......................................................................................................................16, 73
change request.................................................................................................................. 19-20, 26, 35, 73-74
charter See project charter
closing a project ...............................................................................................................10, 22, 26-27, 50, 74
closure..............................................................................................................................................22, 56, 75
coaching........................................................................................................................................................45
cognitive ability .................................................................................................................24, 32-33, 50, 52, 74
communicating .................................................................................................................22-23, 26, 50, 52, 74
communication ............................................................................................................ 13, 15, 26-27, 32-34, 73
communications management plan .................................................................................................................13
competence................................................................. 1-7, 9, 24-25, 39-42, 45-46, 48-50, 52-53, 55, 58, 71-75
competence baseline .................................................................................................................................7, 74
competence development................................................................................................................3, 39-40, 48
competence development plan ................................................................................. 7, 39-40, 42, 46-48, 53, 74
competence gap .................................................................................................................................18, 74-75
competency ..............................................................................1, 6, 41, 46, 48-49, 51-53, 55, 58, 61-63, 69-75
competent ......................................................................................................2-3, 6, 10, 39, 41, 45, 48, 71, 74
complex ............................................................................................................................................32, 45, 55
compliance ..................................................................................................................................10, 19, 31, 51
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$CIN1
08-27-07 14:52:22
Layout: 97682 : Start Odd
Page 77
77
Index
D
dependencies ................................................................................................................................................14
design...............................................................................................................................................1, 5, 9, 34
developing competence ............................................................................................................1, 39, 41, 49, 58
dimensions of competence........................................................................................................... 1-3, 23, 50-51
document ....................................................4, 9-10, 13, 16, 19, 22-24, 27, 29, 32, 35, 37, 48-53, 58-59, 73-76
documentation............................................................................13-18, 20-22, 26-28, 30, 32, 34-36, 38, 41, 75
E
effective performance.........................................................................................................................55, 71, 74
effectiveness ..............................................................................................................24, 34-35, 50, 52, 71, 74
effort............................................................................................................................................13, 16, 40-41
elements of competence ..................................................................................................................3, 6, 55, 74
emotional intelligence ..............................................................................................................................32, 74
environment ...............................................................................................2, 24, 27-28, 32, 35, 37, 45, 48, 74
estimate.......................................................................................................................................13-14, 16, 76
ethical................................................................................................................................................24, 36-37
ethical standards ........................................................ 1-5, 9-10, 15, 19, 28, 31, 36-37, 49-51, 55-59, 70-73, 76
evidence............................................................................................................................2, 10, 24, 28, 41, 47
executing a project........................................................................................................................10, 18-19, 50
expectation................................................................................................ 12, 18, 26, 28, 30-31, 34, 41-42, 73
expert .............................................................................................................................27, 29, 31, 34, 56, 62
F
feedback ...............................................................................10, 13-18, 20-22, 26-32, 34-38, 41, 47, 49, 74-75
final acceptance ............................................................................................................................................22
formal ........................................................................................... 10, 15, 18, 26-28, 32, 42, 47, 56, 58, 73-75
framework ................................................................... 1-7, 9-10, 12, 26, 33, 38-42, 46-53, 55-59, 61-63, 69-74
G
gaps .............................................................................................................................7, 9, 18, 42, 46, 53, 74
goals............................................................................................................................................28-29, 36, 42
governance..............................................................................................................................................13, 18
group training ................................................................................................................................................45
H
holistic ....................................................................................................................................................32, 42
human resources (HR)..................................................................................................................18, 42, 50, 71
I
in-house training ............................................................................................................................................45
individual training...........................................................................................................................................45
informal................................................................................................................. 10, 26-28, 32, 40, 47, 73-75
78
A : 97682$CIN1
08-27-07 14:52:22
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 78
Index
K
knowledge .............................................................................2-4, 9, 23, 29, 31-32, 34, 48-51, 55-56, 62, 70-75
Knowledge Competence .........................................................................................................................2, 5, 74
L
leading .................................................................................................................... 1, 23, 28-29, 50, 52, 73-74
lessons learned .....................................................................................................................15, 22, 32, 37, 74
M
managing .........................................................................................................7, 23, 30-31, 35, 50, 52, 71, 74
material.................................................................................................................................17, 19, 23, 30, 45
mentoring ..........................................................................................................................................29, 45, 47
metrics...................................................................................................................................15, 20-21, 31, 46
milestone ................................................................................................................................................18, 47
monitoring and controlling a project......................................................................................................10, 20-21
N
network ...................................................................................................................................................14, 72
networking...............................................................................................................................................29, 47
O
objectives...........................................................................................10, 12-13, 18, 23, 28, 32, 36, 40, 42, 75
on-the-job training ..........................................................................................................................................45
openness ......................................................................................................................................................28
opportunity ...................................................................................................................................33-35, 42, 75
organization chart ..........................................................................................................................................18
organizational process asset ........................................................................................................15, 17, 22, 74
outcome..........................................................................................................................10, 22, 33, 47, 51, 74
P
Performance Competence................................................................................................3, 9-23, 49, 51, 58, 74
performance criteria .................................................................................6-7, 9-22, 24, 26-42, 51-53, 55, 74-75
Performance Domain...................................................................................................................6, 9-10, 49, 51
performance measurement .........................................................................................................................9, 72
performance measurement baseline See baseline
performance report ........................................................................................................................................20
Personal Competence ...............................................................................2-3, 5, 7, 23-38, 41, 49, 51-52, 74-75
personality.....................................................................................................................................2, 23, 72, 74
planning a project .........................................................................................................................10, 14-17, 50
PMP examination specification.................................................................................................... 9-10, 49, 51-52
prescriptive....................................................................................................................................................24
processes ............................................................................................... 2-3, 15-16, 19, 22, 31, 47, 59, 73, 75
procurement ......................................................................................................................................17, 19, 75
procurement management plan.................................................................................................................17, 75
procurement plan...........................................................................................................................................17
professionalism ..........................................................................................................24, 36-38, 50, 52, 55, 74
project baseline .......................................................................................................................................17, 20
project charter ........................................................................................................................13, 32, 58-59, 75
project closure...............................................................................................................................................22
Project Management Professional .........................................................................................................2, 55, 72
project manager performance ..............................................................................................................1-2, 7, 55
project performance .......................................................................................................................................75
project plan ........................................................................................................... 12, 17-18, 20, 31-32, 46, 48
project procurement management .............................................................................................................17, 50
project quality management......................................................................................................................15, 50
project risk management ....................................................................................................................16, 50, 75
project schedule ..........................................................................................................................14, 32, 35, 75
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$CIN1
08-27-07 14:52:22
Layout: 97682 : Odd
Page 79
79
Index
Q
quality ..............................................................................................15, 19-20, 27-28, 58-59, 62, 71, 73, 75-76
quality assurance (QA) ...................................................................................................................................19
quality management plan ...............................................................................................................................75
R
responsibilities ............................................................................................................................15, 28, 30, 73
responsibility assignment matrix (RAM) .....................................................................................................38, 75
rigor .........................................................................................................................................................40-42
risk ...............................................................................................................12, 16, 21, 29, 35, 40, 42, 73, 75
risk management plan........................................................................................................................16, 18, 75
risk mitigation....................................................................................................................................21, 35, 75
risk register ...........................................................................................................................12, 16, 21, 33, 75
risk response plan ...................................................................................................................................16, 21
risk response planning ...................................................................................................................................75
risk response strategies.................................................................................................................................21
S
self assessment ............................................................................................................................................42
seller ................................................................................................................................................19, 21, 75
SOW See statement of work (SOW)
sponsor.................................................................................................................... 2, 12-14, 17-18, 46-47, 75
staffing management plan ..............................................................................................................................75
stakeholder See project stakeholder
standards See ethical standards
statement of work (SOW)................................................................................................................................76
status ..................................................................................................................15, 18, 20, 31, 34-35, 38, 75
strategy.................................................................................................................................13, 16, 29, 36, 71
strengths.......................................................................................................................................7, 39, 42, 46
stress ...........................................................................................................................................................37
structure ........................................................................................................1, 5-7, 9-10, 23-25, 32, 50-51, 75
style..................................................................................................................................................50, 58, 75
subject matter expert (SME) .....................................................................................................................58, 75
success .................................................................................................................................29, 47, 71-72, 74
T
target audience............................................................................................................................ 1-2, 40, 50-51
task ...................................................................................................................... 14, 18-19, 30-31, 38, 59, 74
team See project team
team development .........................................................................................................................................15
team satisfaction ...........................................................................................................................................21
360 feedback.........................................................................................................................................41, 75
transitions ...............................................................................................................................................18, 22
trends ...............................................................................................................................................10, 20, 32
trust........................................................................................................................................................28, 37
types of evidence.................................................................................................. 6, 9-24, 26-38, 41, 51-52, 75
U
Unit of Competence ................................................... 6, 9-10, 12, 14, 18, 20, 22, 26, 28, 30, 32, 34, 36, 74-75
V
vision ............................................................................................................................................................29
80
A : 97682$CIN1
08-27-07 14:52:22
Layout: 97682 : Even
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
Page 80
Index
W
WBS See work breakdown structure (WBS)
work breakdown structure (WBS)..............................................................................................14, 45, 73, 75-76
work breakdown structure dictionary................................................................................................................76
workaround....................................................................................................................................................21
2007 Project Management Institute, Four Campus Boulevard, Newtown Square, PA 19073-3299 USA
A : 97682$CIN1
08-27-07 14:52:22
Layout: 97682 : Odd
Page 81
81