5. Power Transformer.
5.1
Type :
The transformer shall be of the double wound core type, three phase, oil
immersed, natural oil circulation type suitable for outdoor installation and
operation under the climatic conditions referred to in the specification Clause
No.1.4.
All transformers shall be provided with the required accessories as specified in the
The transformers shall strictly comply with the British Standard Spec. No.171,
unless otherwise stated in this specification.
5.2
5.3
Method of Cooling:
The cooling of the transformers shall be by natural oil circulation in external
banks of cooling radiators. The external cooling medium shall be natural air or
specified.
5.4
Voltage Ratio:
The voltage ratio of the transformers on nominal tappings and an non-load shall
The high voltage windings shall have tapings, arranged to give variations of
5.5
58
5.6
a)
Electrical Connections :
The transformers shall be in accordance with BSS.171 as follows:300/132 KV transformers :
H.V. winding - Star
L.V. winding - Star
Vector Group - YNyno (with tertiary compensation winding )
b)
c)
132/11.5 KV Transformers:
H.V. winding - Delta
L.V. winding - Zig-Zag
Vector Group - DZ10
d)
5.7
5.8
Parallel Operation :
The transformers of each type shall be designed for operating in parallel. In
addition, the transformers shall be designed to operate in parallel with additional
similar transformers that may be installed in the future.
5.9
Insulation Level:
All transformers insulation level shall be standard 1 to BSS 171 for the system
highest voltages corresponding to the operating voltage ratings 275 KV, 132 KV,
33 KV and 11 KV.
5.10
Harmonic Voltage:
The design of the transformers shall be such as to suppress voltage harmonics
(particularly third and fifth ) to a minimum, to eliminate wave distortion and high
frequency disturbances.
5.11
59
The Tenderer shall submit the details of the tests and method adopted to measure
the noise level in the factory. This test is to be carried out in presence of the
Inspector/Engineer appointed by MEW. Cladding of transformer room walls with
special material to obtain the required limit of noise level may be adopted.
However, The cost of such be included in the tender price. It shall be noted that
above mentioned limit of noise level shall be when the transformer is fully loaded
and all the blowers are running.
5.12
Windings :
The designed maximum current density in the windings of the transformers shall
not exceed 2.6 amperes per sq.mm. at continuous maximum rating of the
transformer with normal voltage and frequency. In the case of air blast cooled
transformers, this current density may be increased to a maximum of 3.4
Amps/sq.mm.
The conductors shall be make from high conductivity electrolytic copper of best
quality. All windings shall be fully insulated as defined in BSS. All neutral
points shall be insulated for full line voltage, expect for the 300/132 kV
transformer stated elsewhere in the specification. Tenderers shall submit drawings
with their offers showing types of windings, methods of bracing and clamping,
details of oil cooling ducts with dimensions and state what precautions are taken
to prevent shrinkage of insulating material in service, particular attention must be
given to the bracing of the winding and terminals to withstand shocks which may
occur during handling and transport having regard to the rough handling to be
expected during unloading in Kuwait. Foil spiral type winding is not acceptable.
5.13
Core :
The core shall be constructed of the best quality low loss, cold rolled, grain
oriented electrical steel laminations.
The flux density in any part of the core shall not exceed 17500 lines per net
square centimeter at normal voltage and frequency.
The core shall be provided with an ample number of cooling channels in order to
ensure its proper circulation of oil and efficient cooling.
All core plates shall be insulated from one another to reduce the core loss to a
minimum and the core shall be held together by bolts and clamping plates to keep
the magnetic noise at a minimum level. All bolts and clamps shall be adequately
insulated. The completed core shall be provided with lifting eyes to facilitate its
removal from transformers. All steel sections used for supporting the core are to
be thoroughly sand blasted after cutting, drilling and welding. Design of
supporting frame shall take into consideration complete emptying of tank through
a drain-valve, the avoidance of movement of the core relative to the tank during
transport, installation and operation.
Details of earthing of the inactive part and screening of the core if applied to be
submitted with the offer.
60
5.14
Insulation :
2757, ( except where another class is specified ). The winding shall be insulated
with best quality paper and treated to prevent the formation of acid in the
insulating oil. The transformers will be connected to a system which is earthed as
follows :300 KV System Solidly earthed
132 KV System Solidly earthed
33 KV System
Earthed through resistors of 39 ohms and 24 ohms
for 45 and 75 MVA transformers respectively.
11 KV System
Earthed through resistors of 8 ohms and 10.5 ohms
for 132/11 KV and 33/11 KV transformers respectively.
Over voltage can occur due to exposure of the system to lightning and switching
surges. The neutral shall be insulated for system line toline voltage, except for
300/132 KV transformers where the neutral shall be insulated for phase-to-earth
voltage.
5.15
61
62
10. In the event of the transformers forming a group and operating in parallel
getting out of step due to faulty tap change operation, a device shall be
connected in the control system to make inoperative the automatic "Tap
Change". This device shall set off an alarm to indicate the condition
electrically at a remote point. The device shall be of the hand reset type.
The device should also be provided with additional clean set of auxiliary
contacts (potential free) and wired to suitable terminal blocks in the control
panel or tap change control desk for use as an alarm to the "Remote
system.
11. Out of-step relays of tap changes should have an adjustable time-lag of 0.20
seconds.
12. Step-by-step description of operating sequence should be given for all
automatic tap
change control with the aid of a comprehensive
schematic drawing.
13. A warning lamp should be connected to the control system to indicate that
tap-changing is in progress.
14. TapThis applies
when transformer is set on manual
and either set on individual or master
in case of parallel with other transformers. Details
shall be subject to the
brought to a suitable terminal block in the control panel.
15. The tap-changing driving mechanism shall be fully rated for the worst
temperature conditions in Kuwait. The summer sun temperature causes
heating of surfaces exposed to the direct sunshine as follows:Assume a cube with surfaces on the Top, North, South, East and West sides
:Top side maximum average temperature
West side maximum average temperature
South side maximum average temperature
East side maximum average temperature
North side maximum average temperature
:
:
:
:
:
70 oC
63 oC
60 oC
55 oC
52 oC
63
The tap change shall be effected on the high voltage windings of the transformers.
The range of the tap change and the number of steps and the size of each step
5.17
Main Tank:
The main tank shall be designed to house the transformer core and windings and
arranged to prevent any movement of the core structure inside the tank. Provision
shall be made to enable the core to be lifted out with case for maintenance
inspection.
The tank shall be of mild steel plate construction of adequate dimensions braced
and reinforced where necessary to prevent any distortion due to transportation,
lifting, internal pressure, and temperature variations.
The top of tank shall have provision to give access to terminations of windings,
Each transformer tank shall be fitted with suitable skids for mounting on preprepared concrete foundations provided. Where transformers with wheels are
provided, necessary rails and fixing clamps shall be provided at no extra cost.
The whole of the tank and fittings shall be sand blasted inside and outside to
remove all scale and rust before painting. The inside of the tank shall be painted
with an approved oil resisting varnish. The tank shall be provided with hauling
lugs of adequate strength for withdrawal of the transformer in an out of the
transformer bay.
One set of the necessary steel ropes, slings, tackles, jacks required for erection
shall be provided.
5.18
Jacking Lugs:
Each transformer shall be provided with at least four jacking lugs located near the
four corners of the transformer tank. The lugs shall be approximately 50cms
above the ground level.
5.19
Conservator:
A conservator tank shall be located conveniently on the top of the tank. Suitable
oil gauges shall be provided at each end which can be easily read from the ground
open is 6 o C to 84 o C.
The conservator tank shall be of two sections (one for main tank and the second
for the tap-changer). Each is provided with filling cap, drain and oil sampling
valve device.
The pipe connections from the conservator to the main tank and tap change
selector switch chamber shall be designed to have smooth run without sharp
bends.
All pipes connected to the conservator tank shall protrude at least five cms above
the bottom of the tank.
The oil level gauges shall be of the magnetic type with contacts for local and
remote supervisory low oil level alarm indications.
64
5.20
Cooling Radiators:
The banks of cooling radiators of the transformers shall be designed and arranged
so that they are detachable from the main tank for purposes of transport. Valves
shall be provided to shut off the oil leaving the main tank in to the cooling tanks.
Air vent holes and drain plugs shall be provided on the banks to facilitate filling
and draining of the banks on site. The tube bank shall be connected to the main
tank by bolted flange joints.
5.21
a)
b)
c)
d)
e)
5.22
Valves:
Drain valves shall be provided to completely drain the main tank, the conservator
tank, the tap change apparatus chambers, cooling tube banks and disconnecting
link chambers.
Set valves with clearly marked position indicators and padlocking facilities shall
be provided between:
The main tank and conservator.
The conservator and tap selection switch chamber.
The conservator and each cable disconnecting link chambers.
Between main tank and cooling tube banks.
Oil sampling valve device shall be provided at suitable points on the main tank,
the tube banks and tap change selection switch chamber, and the conservator tank.
Aluminum values are not acceptable.
Explosion Vent:
An explosion vent shall be provided on the main tank and arrangements shall be
provided to prevent ingress of rain water and sand when the relief diaphragm is
ruptured. When metallic diaphragms are used, then every protective measure
must be taken to have them not in contact with polluted atmospheric conditions.
Alternatively, pressure relief device can be used with auxiliary contacts wired for
local and remote alarm indication.
5.23
Breather:
Each portion of the conservator vessel shall be fitted with Silica Gel Breather with
replaceable elements. The breather shall be arranged at such a height that it may
be readily accessible from ground level and suitable observation window to be
provided in the breather.
5.24
Earthing Terminals:
Suitable earthing terminals for earthing the tank structure shall be fitted close to
each of the four corners of the tank so that connections to the earth terminals can
be made to suit local conditions.
5.25
65
5.27
66
5.28
Cable Boxes:
of the oil filled type shall be provided on the transformer for high voltage side.
For low voltage side the cable end boxes shall be either liquid compound type or
unfilled type (air type) depending upon the type of cables used. The design and
arrangement of the boxes shall meet the requirements of the cable manufacturer.
The boxes shall have suitable filling caps, air vents, expansion domes, brass
wiping glands and cable bedding clamps. Compound draining plugs of ample
dimensions shall be provided. Fully detailed drawings shall be submitted for
approval of the Purchaser.
The design shall be such as to facilitate any jointing with particular attention to
the minimum bending of cores and fitting of cable clamps or lugs. The
transformer external terminals shall be fitted with flexible links and solid cast
brass lugs or clamps to receive the specified sizes or copper conductors. Cable
supports and clamps shall be fitted below the boxes. The cable shall be arranged
for vertical entry of cables from bottom. The brass wiping glands shall be fully
insulated when single core cables are used Plastic oil compound level gauges are
not acceptable since it suffers from discoloring and cracking due to high
temperature.
Note: The LV cable box must be provided with good quality gasket with proper
thickness. Rubber gaskets with minimum 5mm thickness are more suitable.
5.29 132 kV Outdoor Bushing:
5.30
67
5.31
Buchholz Protection:
Double float buchholz protection device shall be provided for the main tank and a
gas relay for the tap change switch compartment. The buchholz and gas relays
shall be electrically connected to trip and alarm relays located on the switchgear
remote control panel. In case of segregated tap change switching chambers for
the three phases, three gas relays will be provided.
The buchholz device shall be inserted in the pile work and provided with suitable
valves on both sides of the devices to facilitate easy service.
Unless otherwise approved, by-pass with control valves shall be provided to
enable oil to by-pass the buchholz device during oil filtration.
The buchholz device incorporate a test cock for testing purpose.
Each substation shall be provided with a suitable foot operated air pump together
with terminal adaptors for testing of the Buchholz as well as other gas relays used
on the transformers. The cost of such shall be included in the tender price.
5.32 Forced Air Cooling Fans:
These shall be operated by electric motors. The motors shall be continuously
rated for Kuwait worst temperature conditions and shall be vermin, water and dust
proof.
The transformers shall be capable of operating continuously at full load under
worst temperature conditions encountered in Kuwait and without the temperature
rise exceeding those stated in clause 5.2 with only of the number of blowers in
operation, to allow for the maintenance of the blowers without reduction of load.
415/240 volts, 50Hz supply shall be used for the above.
The above blowers shall be automatically switched on when the transformers
temperature exceeds a pre-determined value and switch off automatically when
the temperature falls below a pre-determined value. Clean contacts (potential
on at the
Supervisory and Control Centre. Further, blowers supply voltage failure and fan
trouble alarm should be provided for local and remote supervisory indication.
All motors shall be of the totally enclosed, squirrel cage, fan cooled, direct
starting type. The motors, control gear and auxiliary apparatus shall be or robust
construction insulated with
F
having degree of protection of IP65
and in accordance with BSS.2613 including dimensional standard where stated,
unless otherwise specified herein. Arrangement of the control gear for auto and
manual starting, selection of fans for operation will be entirely to the satisfaction
of the purchaser.
5.33
Marshalling Kiosk:
Each transformer shall be provided with a marshalling kiosk located adjacent to
the transformers. The kiosk shall be of the outdoor type of sheet steel
construction fitted with two access doors and one after the other. Alternatively,
the kiosk may be mounted on the transformer. The kiosk must be dust, damp, rain
and vermin proof and shall be designed for the temperature conditions in Kuwait.
The front access doors shall be fitted with wire reinforced glass inspection panels.
Locks and handles linked with bolts shall be fitted to doors. If the tenderer
prefers to provide the marshalling kiosk with one door, the sealing of such door
should provide a degree of protection of IP65 in accordance with IEC:144.
The kiosk shall accommodate all the following:
68
1.
2.
3.
4.
5.
6.
7.
8.
9.
5.34 Instruments:
a)
b)
69
If the acceptance tests of the transformers show that the actual losses exceed the
values stated in the schedule of particulars and Guarantees, the excess total losses
(c)" will be capitalized according to the above assumptions and the sum thus
obtained deducted from the money due to the contractor as a penalty. For this
purpose no tolerance will be allowed on the figures stated in the schedule of
particulars and Guarantees. At any rate, the actual losses should not exceed the
figures stated in the schedule of particulars and Guarantees by more than the
tolerances given in BSS.171.
NOTE: The losses to be stated in the schedule of particulars and Guarantees shall
be given without tolerance.
5.36 Transformer Fire Protection:
The power transformer shall be provided with a water firefighting system. This
water system shall be of the high pressure type, consisting mainly of water
reservoir of steel with suitable lining and adequate capacity sufficient for putting
out fire on at least one of the biggest size of transformers. However, in case the
blast walls are not specified between transformers and will not be provided, the
capacity of the reservoir shall be sufficient for putting out the fire of at least two
transformers. The reservoir shall be fitted with the necessary water level and
pressure gauges and wired to alarm relays located in the control room, for local
and remote alarm indication at the Supervisory Centre.
For water supply to this reservoir two water pumps, one stand-by to the other shall
be provided, both pumps shall be suitable for automatic starting in case the one in
service is out of order. For maintaining air pressure over the water in the reservoir,
two air compressors (one standby to the other) shall be provided and shall be
suitable for automatic starting. The firefighting system shall also cover the supply,
70
erection, test and commissioning of the necessary piping (which will be of the ring
system), valves of all kinds as needs, nozzles, fire detectors and any other fittings
necessary for putting out fire on or within the transformer enclosure. Means of
periodical checking and maintenance have to be provided. Piping connection with
valves to be made suitable for either water city network or by water tanker for
supply of water to the water
reservoir, these connections have to be
located on the boundary wall at the main gate. Full details of the proposed
arrangement shall be subject to the approval of the Purchaser.
The material selection for the firefighting equipment, i.e. pumps, pipes, tanks,
valves, ..etc should be compatible with the water quality available which is highly
corrosive in nature. A typical water analysis is as shown in the following table:
CHEMICAL ANALYSIS OF POTABLE WATER
Parameters
Conductivity
ohms cm
PH
T.D.S
CO3
HCO3
T.Alkalinity (CaCo3)
SO4
Cl
Ca
Mg
Na
K
Concentration mg/L
1
466
7.6
246
0
12
10
79
63
24
9
39
1.2
The internal surfaces of steel tanks must be prepared by blasting prior to coating in
Standard S.S.P.C. Grade SP10 (Swedish Standards Sa 2) Internal surfaces of
tanks shall then receive three coats of coal tar epoxy (Hempel 1513 or equivalent
or better), amounting to a total dry thickness of 375 microns. The minimum total
dry thickness should not be less than 300 microns.
All pipes used for firefighting system including connections from water tanker and
KFB (Kuwait Fire Brigade) shall be of the ductile iron type with restrain joints of
the Kubolock T type of M/s. Kubota of Japan or similar.
However, the following shall be noted:
1) The capacity of main water reservoir (tank) shall be based on a discharge rate
of not less than 15 litr/min/sq.m. of projected area of a rectangular prism
envelope for the transformer including radiators and conservator and water
spray shall be sufficient for putting out the fire and cooling the transformers
so that no re-ignition will occur. In addition to the main tank a reserve
outdoor water tank for firefighting shall also be provided. This tank shall be
of the same water capacity of the main tank and shall be suitable for
connection to city water main water tanker and Kuwait Fire Brigade inlet
pipe. The details shall be subject to MEW approval. One common water
supply connection for fire brigade inlet for direct spraying over transformer
on fire to be provided.
71
2)
3)
4)
5)
6)
7)
8)
9)
N.B: 1.
2.
3.
4.
72
sheet steel enclosure with all tap change terminals properly insulated. The
thickness of the housing shall not be less than 3mm.
The enclosure shall be provided with skids and its has to be dust protected and
vermin proof with degree of protection IP3 in accordance with IEC
recommendation 144-1. However, measures for ventilation have to be provided.
Regarding the L.T. cable box, this shall be tar epoxy resin filled otherwise as
approved by the Purchaser. However, bare connections are not accepted.
5.38 Transformer Tests:
a)
Routine Test1s:
The following routine tests shall be applied to all transformers in accordance with BSS 171:
1.
2.
3.
4.
5.
6.
7.
8.
um
b)
Mechanical Tests:
The following tests shall be applied as routine tests on all transforms:
1) Bushings:
Each transformer bushing insulator shall be hydraulically tested using
transformer oil to BSS 148 as the testing medium. The temperature of the oil
shall not be less than 90oC initially and the pressure maintained at
0.7Kg/sq.cm for continuous period of 24 hours
with no trace of oil leakage.
2)
Cable Boxes:
All cable boxes and disconnecting chambers shall also be tested as (1) above.
3)
.
All tanks and oil filled compartments shall be tested for oil tightness by being
completely filled with oil viscosity for greater than that of BSS 148
insulating oil at a temperature of 15oC and subjected for at least 12 hours to a
pressure of 0.35Kg/Sq.cm. above normal pressure. No leakage of oil shall
occur during the application of excess pressure.
73
c)
Type Tests:
The contractor shall carry out the following type tests on one transformer of each
size:
i)
ii)
iii)
d)