P052 Modelling Your Maturity PDF
P052 Modelling Your Maturity PDF
CMMI is registered in the U.S. Patent and Trademark Office by Carnegie Mellon University
OPM3 and PMBOK are marks of Project Management Institute, Inc
P3M3 is a mark of Office of Government Commerce UK (OGC)
PMOZ Conference
28-31 August 2007
www.mosaicprojects.com.au
Carnegie Mellon University: data provided by Angela Tuffley, Software Quality Institute
3
PMOZ Conference
28-31 August 2007
Todays Focus
Three Maturity models will be compared
on the basis of:
Maturity Criteria
Functional Criteria
www.mosaicprojects.com.au
Lynda Bourne
OPM3 and PMBOK
Disclaimer
The following comparisons between
CMMI and OPM3 are based on the
results of this work
BUT
The information presented here is
based on a different approach and
different evaluation methodology
PMOZ Conference
28-31 August 2007
www.mosaicprojects.com.au
Representations of Maturity
CMMI
Staged (Levels 1 -5)
Continuum
OPM3
Continuum
P3M3
Staged (Levels 1 -5)
CMMI
The Capability Maturity Model
Integration (CMMI)
Developed by the Software Engineering
Institute (SEI)
Assist organisations to improve processes
for developing and maintaining the
products and services of the organisation
Focus on disciplines:
Software and systems engineering
Integrated product and process
development
PMOZ Conference
28-31 August 2007
www.mosaicprojects.com.au
CMMI Representations
PMOZ Conference
28-31 August 2007
OPM3
The Organizational Project
Management Maturity Model (OPM3)
Developed by the Project Management
Institute (PMI)
Assists organisations improve capabilities
for managing projects, programs and
portfolios, leading to business
improvement.
Developed from PMIs standards:
PMBOK, and the standards for Program
Portfolio Management
PMOZ Conference
28-31 August 2007
10
www.mosaicprojects.com.au
OPM3 reports
PMOZ Conference
28-31 August 2007
11
P3M3
Portfolio, Programme and Project
Management Maturity Model (P3M3)
Developed by UK Governments Office
of Government Commence (OGC)
Portfolio, programme and project
management are nested within the
P3M3 model, building on:
PRINCE2 (for projects)
Managing Successful Programmes (MSP)
PMOZ Conference
28-31 August 2007
12
www.mosaicprojects.com.au
P3M3 overview
PMOZ Conference
28-31 August 2007
13
CMMI
OPM3
P3M3
Background
Exists
Exists
Exists
Explanation of Model
Architecture
Exists
Exists
Exists
Explanatory Text
Exists
Exists
Exists
Assessment
Partially Exists
Exists
Exists
Improvement
Exists
Exists
Exists
Multiple Representations
Exists
Exists
Exists
Compatibility
References
Exists
Exists
Exists
Exists
Content Amplification
Exists
Comparison model in this and succeeding slide provided by Angela Tuffley, Software Quality Institute
PMOZ Conference
28-31 August 2007
14
www.mosaicprojects.com.au
CMM I
E x is ts
P ro g ram M an a g e m en t
P a r tia ll y
e x is ts
P a r tia ll y
e x is ts
E x is ts
P r o je c t v . P r o g r a m
M a n a g e R e la t e d P r o je c ts
P r o g r a m M a n a g e m e n t P ro c e s s e s
R o le o f P r o g r a m M a n a g e r
P o r tf o lio M a n a g e m e n t
P r o je c t S e le c tio n
R e v ie w P r o je c ts a g a in s t C o n tin u e o r
T e r m in a te C r ite ria
P o r tf o lio M a n a g e m e n t P r o c e s s e s
R o le o f P o r tf o lio M a n a g e r
R o le o f P r o je c t M a n a g e r
P r o je c t M a n a g e m e n t in C o n te x t o f
G en eral M an ag em en t
O r g a n iz a tio n a l P r o je c t M a n a g e m e n t
P ro cesses
PMOZ Conference
28-31 August 2007
E x is ts
D oes not
e x is t
D oes not
e x is t
D oes not
e x is t
D oes not
e x is t
D oes not
e x is t
D oes not
e x is t
E x is ts
P a r tia ll y
e x is ts
E x is ts
O PM 3
P a rtia lly
e x is ts
E x is ts
E x is ts
P3M 3
E x is ts
E x is ts
E x is ts
P a rtia lly
e x is ts
E x is ts
P a rtia lly
e x is ts
E x is ts
E x is ts
P a rtia lly
e x is ts
E x is ts
E x is ts
E x is ts
P a rtia lly
e x is ts
E x is ts
E x is ts
E x is ts
E x is ts
E x is ts
E x is ts
D oes not
e x is t
P a rtia lly
e x is ts
D oes not
e x is t
E x is ts
P a rtia lly
e x is ts
E x is ts
15
Conclusions
CMMI offers two approaches to maturity
assessment:
Staged and continuous
16
www.mosaicprojects.com.au
Conclusions
CMMI (and predecessors) has been used
by organisations for many years
Statistical proof of effectiveness
17
Contact Details
CMMI: Angela Tuffley
Software Quality Institute
Griffith University, Nathan Campus
Queensland Australia
Ph: +617 3875 5022
[email protected]
OPM3: Lynda Bourne
Mosaic Project Services, Melbourne, Australia
Ph: +613 9686 1424
[email protected]
PMOZ Conference
28-31 August 2007
18
www.mosaicprojects.com.au
Questions Please
Useful links:
PMI OPM3: http://opm3online.pmi.org/
CMMI: http://www.sei.cmu.edu/cmmi/
OGC (UK) Portfolio, Programme & Project Management
Maturity Model (P3M3) http://www.ogc.gov.uk/documents/p3m3.pdf
19
10
www.mosaicprojects.com.au