Testimony
Clarify the distinction between short and long term design
criteria Issue 20.1
Shift the first two short term recommendations on p. 17 to long
term on p. 18 Issue 20.2
11/24/2014
Proposed Zoning
R-90
R-60
Vision
11/24/2014
Option 2
NR Zoning Recommendation
Design Standards (Requirements)
any redevelopment of the properties
recommended for NR zoning must incorporate
certain mandatory design elements.
11/24/2014
NR Zoning Recommendation
Design Standards (Requirements)
Orient building uses to activate pedestrian areas. Along all
connections, provide pedestrian amenities, including wide sidewalks,
green planting strips between pedestrians and vehicular areas,
significant tree planting, street lighting, and street furnishings.
Integrate bikeway facilities recommended by the 1994 Aspen Hill
Master Plan.
NR Zoning Recommendation
Design Standards (Requirements)
All buildings must front on a street or public open space, with a preference for
concentrating new development along Connecticut Ave to establish a street
presence along this major thoroughfare and give maximum visibility to new uses.
All new buildings must comply with the following requirements:
At least 50% of the front facade of any building fronting on Connecticut Ave
or Aspen Hill Rd must be w/in 35 ft of the ROW on which the building
fronts.
At least 50% of the front facade of any other building must be within 20 ft
of the street or public open space on which the building fronts.
Any building at the corner of Connecticut Ave and Aspen Hill Rd must front
on either Connecticut Ave or Aspen Hill Rd.
On the north side of Aspen Hill Rd, non-residential buildings may not be
constructed w/in 100 ft of an adjacent lot improved with a detached house.
11/24/2014
Option 2
11/24/2014
Design: Entrances
CRT Zoning Recommendation
Design Guidelines
Locate the front entrances and primary facades of new buildings on
Connecticut Ave, Aspen Hill Rd, or the shared entrance drive from
Connecticut Ave, as appropriate. Provide at least one publicly-accessible
entrance on every building faade facing a street or public open space. If two
adjoining facades each front on a street or public open space, one entrance at
the intersection of these facades may satisfy this requirement for both
facades. To the extent that a building faade has more than one entrance, the
entrances may not be more than 100 feet apart.
NR Zoning Recommendation
Design Standards (Requirements)
Provide at least one publicly-accessible entrance on every building faade
facing a street or public open space. If two adjoining faades each front on a
street or public open space, one entrance at the intersection of these
faades may satisfy this requirement for both faades. Any publiclyaccessible entrance at a location other than a street or public open space
must be accessible via well-designed pedestrian connections to adjacent
streets and public open spaces.
NR Zoning Recommendation
Design Standards (Requirements)
Provide architectural elements to articulate faades, create visual
interest, and to enhance the communitys identity and character.
Articulation strategies may include (but are not limited to) changes
in plane, alternative materials, building transparency, incorporation
of public art, and incorporation of green elements (e.g. green
walls). Building faades may not include blank walls greater than 35
ft in length.
11/24/2014
NR Zoning Recommendation
Design Standards (Requirements)
Surface parking areas must not abut the Connecticut Ave or Aspen
Hill Rd ROWs and must be set back behind the front building lines
of buildings fronting on those ROWs. All parking areas must
incorporate significant planting areas and accessible pedestrian
walks that connect to enhanced pedestrian areas along the public
domain. Loading docks and service areas must not front on or be
directly accessible from Connecticut Ave.
NR Zoning Recommendation
Design Standards (Requirements)
Consolidate public use space allocated to meet zoning
requirements in centralized locations to create substantial urban
space for neighborhood use.
11/24/2014
NR Alternative 1
NR Alternative 2
Staff Recommendation
CRT + Design Guidelines
At all times, redevelopment should achieve
NR Alternative
NR + Design Standards (Requirements)
any redevelopment of the properties
recommended for NR zoning must incorporate
certain mandatory design elements.
11/24/2014
Community Meeting #1
Scope of Work to Planning Board
Initial Staff Recommendations
Community Meeting #2
Staff Briefing to Planning Board
Community Meeting #3
Staff Briefing to Planning Board
Staff Draft Plan to Planning Board
Planning Board Public Hearing
Planning Board Worksession #1
Planning Board Worksession #2
Planning Board Worksession #3
Planning Board Draft Plan
County Executive/Council Plan Review
County Council Public Hearing
Approved Plan
Dec 3, 2013
Jan 23, 2014
Feb - Mar 2014
April 1, 2014
April 24, 2014
May, 13, 2014
June 5, 2014
July 10, 2014
Sept 11, 2014
Oct 9, 2014
Oct 30, 2014
Nov 20, 2014
Dec 4, 2014
Dec 2014
Jan 2015
Mar 2015
Discussion