0% found this document useful (0 votes)
99 views

ILSAS Training Schedule 2014-Distribution

This document provides a schedule for distribution training courses offered by ILSAS for fiscal years 2013/2014. It lists 62 courses related to substations, overhead lines, cables, and metering. The courses are targeted at different participant grades and ranges from 1 to 20 days in duration. Multiple sessions are scheduled for each course throughout the year. The schedule provides the dates each session will take place.

Uploaded by

conchunchun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
99 views

ILSAS Training Schedule 2014-Distribution

This document provides a schedule for distribution training courses offered by ILSAS for fiscal years 2013/2014. It lists 62 courses related to substations, overhead lines, cables, and metering. The courses are targeted at different participant grades and ranges from 1 to 20 days in duration. Multiple sessions are scheduled for each course throughout the year. The schedule provides the dates each session will take place.

Uploaded by

conchunchun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

DISTRIBUTION TRAINING

ILSAS PROGRAM SCHEDULE FY 2013/2014


DISTRIBUTION TRAINING
No

Course Title

Target
Participant
(Grade)

Duration
(days)

Nos. of
Session

Sept 13

Oct 13

Nov 13

Dec 13

Jan 14

Feb 14

Mac 14

Apr 14

11-22

3-14

3-14

18-29

17-28

14-25

3-7

7-11

May 14

Jun 14

Jul 14

Aug 14

Substation & Operation System


SUBSTATION

Substation Fitter 1 (Maintenance)


Asas Jurugegas Pencawang 1 (Senggaraan)

TT05/06

10

Substation Fitter 2 (Construction)


Asas Jurugegas Pencawang 2 (Pembinaan)

TT05/06

10

21-1/11

Transformer Operation & Maintenance up to


33kV & PPVR (Malim Nawar)
Kendalian & Penyelenggaraan Alatubah
setakat 33kV & PPVR (Malim Nawar)

TT07/08

7-11

Earthing Installation of Distribution Substation


Pemasangan Pembumian Pencawang
Pembahagian

TT07/08

16-17

Senggaraan Pencawang (Malim Nawar)


Substation Maintenance

TT07/08

Sistem Pembumian
Earthing System

TT09/10

Transformer Construction & Maintenance up to


33kV (Malim Nawar)
Pembinaan & Penyelenggaraan Alatubah
Setakat 33kV (Malim Nawar)

TT09/10

Switchgear Installation and Maintenance up to


33kV
Pemasangan dan Penyelenggaraan Alatsuis
setakat 33kV

TT09/10

Introduction to LV Capacitor Bank

TT09/10

10

Pengenalan Pencawang Pembahagian Untuk


Anggota Kerja Perjangkaan
Introduction of Distribution Substation for
Metering Staff

TT09/14

17-19

11

Construction and Maintenance of Distribution


Substation

Executive

23-27

12

Transformer & OLTC Maintenance up to 33kV for


Executive

Executive

2-13

21-25

6-10,

23-24

28-29

27-28

6-10
20-24

11-15

6-7

19-30

9-10

16-20

23-27

14-15

20-24

31-4/4

13-14

14-18

6-10

3-5

7-9

12-14

27-29

11-15

16-20

20-24

14-16

31-4/4
17-20

21-25
19-22

2-5

DISTRIBUTION TRAINING

DISTRIBUTION TRAINING
No

Course Title

Target
Participant
(Grade)

Duration
(days)

Nos. of
Session

Sept 13

Oct 13

Nov 13

Dec 13

Jan 14

2-5

27-30

Feb 14

Mac 14

Apr 14

May 14

Jun 14

Jul 14

Aug 14

OPERATION SYSTEM 11kV


13

Switching Operation up to 1kV Kendalian Sistem


- setakat 1kV

Non Exec
TNBD

17-20

14

11kV Switching Operation (Refresher)


Kendalian Pencawang 11kV (Ulangkaji)

TT09-TT14

30-1/10

TT07-TT14

23-27

25-29

19-20

6-7

15
16

Cable Fault Location


Mencari Kerosakan Kabel
Sheath Fault Location
Mencari Kerosakan Kabel 'Sheath'

TT07-TT14

17

Substation Switching Operation up to 11kV


(Malim Nawar)
Kendalian Pencawang - Setakat 11kV (Malim
Nawar)

TT09-TT14

18

11kV Switching Operation (Malim Nawar)


Kendalian Pencawang 11kV (Malim Nawar)

E07-E13

30-4/10

19

Cable Fault Location


Mencari Kerosakan Kabel

E07-E15

9-13

20

Sheath Fault Location


Mencari Kerosakan Kabel 'Sheath'

E07-E15

2-3

18-22
25-29

10-13
31-3/4

21-25

16-20
2-3
2-6
9-13
16-20

11-15

2-6

6-10

18-22

10-14

14-18

6-10
12-13
30-31

17-18
OPERATION SYSTEM 33kV

21

Switching Operation up to 33kV


(Module 1 - Introduction to 33kV System)
Kendalian Pencawang - Setakat 33kV
(Modul 1 - Pengenalan Sistem 33kV)

TT09/14

22

Switching Operation up to 33kV


(Module 2 - System Operation 33kV)
Kendalian Pencawang - Setakat 33kV
(Modul 2 - Kendalian Sistem 33KV)

TT09/14

23

Switching Operation up to 33kV


(Module 3 - Fault Diagnosis)
Kendalian Pencawang - Setakat 33kV
(Modul 3 - Mendiagnosis Kerosakan)

TT09/14

24

Switching Operation up to 33kV


(Module 1 - Introduction to 33kV System)
Kendalian Pencawang - Setakat 33kV
(Modul 1 - Pengenalan Sistem 33KV)

E07-E15

25

Switching Operation up to 33kV


(Module 2 - System Operation 33kV)
Kendalian Pencawang - Setakat 33kV
(Modul 2 - Kendalian Sistem 33KV)

E07-E15

26

Switching Operation up to 33kV


(Module 3 - Fault Diagnosis)
Kendalian Pencawang - Setakat 33kV
(Modul 3 - Mendiagnosis Kerosakan)

E07-E15

6-8

6-8

2-6

24 - 26

10 - 12

10 - 14

31 - 4/4

14 - 16

21 - 25

28 - 30

17 - 19

16 - 18

25 - 29

17 - 19

20 - 24

3-5

17 - 21

25 - 29

4-6

5-7

14 - 18

2-6

23 - 25

18 - 20

DISTRIBUTION TRAINING

DISTRIBUTION TRAINING
No

Course Title

Target
Participant
(Grade)

Duration
(days)

Nos. of
Session

Sept 13

Oct 13

Nov 13

Dec 13

Jan 14

Feb 14

Mac 14

Apr 14

May 14

Jun 14

3-14

17-28

14-25

19-30

9-20

Jul 14

Aug 14

OVERHEAD LINES & CABLE


OVERHEAD LINES

27

28

Fault Finder Competency


Kompetensi Pembaik Kerosakan / Asas
Pembaik Kerosakan

Low Voltage Live Line Work


Kerja Talian Hidup Voltan Rendah

TT05

TT05 - TT08

23-4/10

6-8
25-27

30-2/10
(MNawar)

1-3

7-9
(Bangi)
20-22

(MNawar)

(MNawar)

(MNawar)

27-29

28-30
(Bangi)

28-30

(MNawar)

29

Construction and Maintenance of Overhead


Line Bare Conductor
Pemasangan dan Penyelenggaraan Talian
Atas Voltan Sederhana Tidak Bertebat

TT07/08

30

Refresher For Fault Finder


Ulangkaji Pembaik Kerosakan

TT07/08

31

Low Voltage Live Line Work for


Executives/Supervisors
Kerja Talian Hidup Voltan Rendah
Eksekutif/Penyelia

TT09-E12

32

Low Voltage Overhead Line for Executives


Talian Atas Voltan Rendah Utk. Eksekutif

E07-E13

33

Refresher Course for 33kV Overhead Line for


Executives
Ulangkaji Talian Atas 33kV Utk. Eksekutif

E07-E13

9-10

7-8

34

Refresher for Low Voltage Live Line


Ulangkaji Kerja Talian Hidup Voltan Rendah

TT05 - 08

12-13
30-31

15-16,

35

Pembinaan dan Senggaraan Talian Atas Voltan


Rendah

TT09/12

36

High Voltage Overhead Line for Linesman


(Malim Nawar)
Asas Pemasang Talian Voltan Tinggi (Malim
Nawar)

TT05/07

20

37

Low Voltage Live Line Work (Malim Nawar)


Kerja Talian Hidup Voltan Rendah (Malim
Nawar)

TT05/06

38

Low Voltage Overhead Line for Linesman


Module 1 (Malim Nawar)
Kompetensi Pemasang Talian VR Modul
1(Malim Nawar)

TT05/06

10

39

Low Voltage Overhead Line for Linesman


Module 2
Kompetensi Pemasang Talian VR Modul 2

TT05/06

10

16-20

2-5

14-16

26-30

25-29

16-19

10-13

2-5

11-14
25-28

2-6

10-14
24-28

2-6

18-22

7
26

9-13

2-6

14-15

25-26

3-7

19-20

31/3-4/4

19-23

16-20

OVERHEAD LINES (MALIM NAWAR)

24-21/3

20-22
27-29

30-2/10

21-1/11

2-13

11-22

2-13

1-3
28-30

19-30

9-20

4-15
18-29

DISTRIBUTION TRAINING

DISTRIBUTION TRAINING
No

Course Title

Target
Participant
(Grade)

Duration
(days)

Nos. of
Session

E07-E14

40

MV ABC for Executive (Malim Nawar)

41

Construction and Maintenance of MV ABC


Cable (Malim Nawar)
Pemasangan dan Penyelenggaraan Kabel MV
ABC (Malim Nawar)

Executive

42

Pengendalian & Penyelenggaraan Kren - Auger


(Malim Nawar)
Operation & Maintenance of Crane - Auger
(Malim Nawar)

TD05

43

Vegetation Management (Malim Nawar)

Open

44

Refresher for Low Voltage Live Line (Malim


Nawar)
Ulangkaji Kerja Talian Hidup Voltan Rendah

Open

Sept 13

Oct 13

Nov 13

Dec 13

Jan 14

Feb 14

Mac 14

18-19

Apr 14

May 14

3-4

14-15

Jul 14

Aug 14
13-14
27-28

2-6
23-27

7-11

23-27
(TNBD)

Jun 14

24-28
(TNBD)

25-29

3-4
17-18

7-8

16-17

22-23

19-20

23-24

2-10

22-30

3-11

15-24

20-28

11-12
25-26

31-1/4

CABLE

45

LV Jointing Practices
Amalan Pencantuman Kabel Voltan Rendah

46

TT05/06

11kV Jointing Practices


Amalan Pencantuman Kabel hingga 11 kV

TT05/06/07

47

33kV Jointing Practices


Amalan Pencantuman Kabel hingga 33 kV

TT07/08

9-13

48

Cable Laying Practices up to 33kV (Supervisor)


Amalan Rentang Kabel hingga 33kV (Penyelia
TNB)

TT05-10

26-27

49

Cable Fault Post Mortem (Exec & NonExec)

TT09 -14
E07-E14

50

Cable Laying & Jointing up to 33kV (Malim


Nawar)

TT09-14

51

Condition Based Maintenance - Cable CPD

E07/08 - E14

52

U/G Distribution Cables CPD

E07/08- E14
ET & Engineer

53

22kV Jointing Practices


Amalan Pencantuman Kabel hingga 22 kV

TT05/06/07

54

11kV Jointing Practices (Refresher)


Amalan Percantuman Kabel 11kV (Refresher)

TT05-08

55

Cable Laying Practices up to 33kV (Contractor)


Amalan Rentang Kabel Hingga 33kV
(Kontraktor)

Contractor

56

Trench Back Filling

Pegawai &
Kakitangan
TNB

7-15
18-26
7-11

9-17

6-10

25-26

20-21

27-28

24-25

29-30

14-15

17-19

24-26

21-23

26-28

11-13

16-17

2-4

6-8

27-29

12-14

3-5

10-12

UPON REQUEST

12-13

13-14

20-21

UPON REQUEST

2-3
30-1/10

28-29

25-26

DISTRIBUTION TRAINING

DISTRIBUTION TRAINING
No

Course Title

Target
Participant
(Grade)

Duration
(days)

Nos. of
Session

Sept 13

Oct 13

Nov 13

Dec 13

Jan 14

Feb 14

Mac 14

Apr 14

May 14

Jun 14

Jul 14

Aug 14

METERING (ENGINEERING SERVICES TRAINING)

57

Installation and Testing of OPC Meters


Pemasangan dan Pengujian Jangka OPC

TT05/06

7-9

16-18

17-19

58

Installation and Testing of LPC LV Meters


Pemasangan dan Pengujian Jangka LPC LV

TT05/06

10-11

19-20

20-21

59

Inspection of OPC/LPC Meters


Pemeriksaan Jangka OPC/LPC

TT07/08

28/10 1/11

60

Installation and Testing of OPC and LPC Meters


Pemasangan dan Pengujian Jangka OPC &
LPC

TT09/10

61

Inspection and Detection of LPC Metering


Irregularities
Pemeriksaan dan Mengesan Kejanggalan
Jangka LPC

TT09/10

62

Metering Wiring and Inspection

E07/08/12/13
(Only for
Metering
Engineers)

63

Introduction to Metering & Supply Application

E12/13 (Post
PEP)

64

High Voltage Metering

E07/ 08/ 12/


13

65

Handling of Portable Meter Test Set

TT05/06 TT09/10

20-24

24-27

7-11

10-13

3-6

14-17

4-7

12-14

6-9

18-20

22-25

7-10

10-13
24-28

23-27

Upon Request
PLANNING (ENGINEERING SERVICES TRAINING)

66

LV Planning Guidelines for Non-executive (to


be conducted together with MV Planning
Guidelines for Non-exec)

TT09/10

2-4

14-16

67

MV Planning Guidelines for Non-executive (to


be conducted together with LV Planning
Guidelines for Non-exec)

TT09/10

5-6

17-18

68

Basic PSS-Adept for Non-executive

TT11/12

69

Introduction to Power Quality for Executive

E07-12

70

Introduction to LV Planning (to be conducted


together with Introduction to MV Planning)

E12

10-12

19-21

71

Introduction to MV Planning (to be conducted


together with Introduction to LV Planning)

E12

13-14

22-23

72

Basic PSS-Adept for Executive

E12-13

19-21

21-23
12-13

14-16

24-25

17-19

DISTRIBUTION TRAINING

DISTRIBUTION TRAINING
No

Course Title

Target
Participant
(Grade)

Duration
(days)

Nos. of
Session

Sept 13

Oct 13

Nov 13

Dec 13

Jan 14

Feb 14

Mac 14

Apr 14

May 14

Jun 14

Jul 14

Aug 14

AM MODULE
TECHNICAL

73

Planning
- Planning (1 day)
- Power Quality (1 day)

E14/E15
E12/E13
E07/E08

26
(Planning)
27 (PQ)

PLANNING
EXEC
74

Distribution Planning Module 1 - LV Planning for


Exec

E07-E15

9-11

75

Distribution Planning Module 2 - MV Planning for


Exec

E07-E15

30-3/10

76

Distribution Planning Module 3 - Project


Planning Process

E07-E15

13-14

77

PQ for O&M Exec

E07-E15

25-27

78

Failure Analysis Methodology for MV VCBs

E07-E15

79

Transient Fault Reduction for MV Overhead


Lines

E07-E15

80

Application of ESAH

E07-E15

81

DNMP for Area Planner

E07-E15

8-9

6-7

82

DNAPnet for State Planner

E07-E15

21-25

18-22

83

Intro to MS IEC 60364

E07-E15

84

Integration of Distributed Generation into


Distribution Network

E07-E15

28-30
20-23
17-18

10-11
17-18

7-'9

16-18

28-30

23-25

26-27

19-20

6-7

17-18

20-21
24-26

8-10

26-28

28-29
2-4

NON-EXEC
85

Accident Recall & Diagnostic

86

System Power Quality (Non-exec)

AP & CP (Mix)

TT09-TT14

24-25
31-1/4
16-18

24-25
2-4

11-13

PROTECTION
87

Distribution Network Power System Protection


33/11KkV

E12 - 13
(Post-PEP)

88

Earth Fault Indication (EFI) Installation Operation


& Maintenance

E07 - 15

89

Earth Fault Indication (EFI) Installation Operation


& Maintenance

TT09-TT14

2-4
11-12
26-27

9-10

4-6
27-28

4-6

1-3

5-7

11-12
25-26

7-8
21-22

14-15
27-28

11-12

DISTRIBUTION TRAINING

DISTRIBUTION TRAINING
No

Course Title

Target
Participant
(Grade)

Duration
(days)

Nos. of
Session

Sept 13

Oct 13

Nov 13

3-5

1-3

6-8
25-27

90

Distribution System Protection 33/11kV (Basic)


Perlindungan Sistem Pembahagian 33/11kV
(Asas)

TT05-TT06

91

Distribution System Protection 33/11kV


(Intermediate)
Perlindungan Sistem Pembahagian 33/11kV
(Pertengahan)

TT07-TT08

92

Distribution System Protection 33/11kV


(Advance)
Perlindungan Sistem Pembahagian 33/11kV
(Lanjutan)

TT09-TT14

93

Protection
Advanced Power System Protection (Analysis &
Engineer/Man
Protection of Power System - APPS)
ager

10

94

Practical Power System Protection & Control


(MATRIX Power)

Executive

Dec 13

Jan 14

Feb 14

Mac 14

Apr 14

May 14

Jun 14

Jul 14

Aug 14

18-20

11-13
24-26

25-27

4-6

28-30

12-14

Upon Request
5

18-22

20-24

17-21

19-23

2-6
23-27

PEMBAHAGIAN (SCADA)
95

SCADA System (M1) - Distribution @ Sistem


SCADA (Modul 1)

TT09 (TNBD
Only)

96

SCADA System(M3) - Distribution @ Sistem


SCADA (Modul 3)

TT09 - E14
(TNBD Only)

97

RTU-Foxboro

TT09-TT14
(TNBD Only)

98

RTU- Dongfang

TT09-TT14
(TNBD Only)

99

RTU-Viscon Dua

TT09-TT14
(TNBD Only)

TT09-TT14
(TNBD Only)

E12-E15 (TNBD
Only)

100 Master Station Module 1 (Non Exec)


101 Master Station Module 1 (Exec)

10-12
6-8
12-15
3-6

4-7
21-23
18-19
8-9

CERTIFIED TECHNICAL PROGRAMME (For TNBD)


Akta Bekalan Elektrik
102 TNB Dist : 8-10 & 22-24/9/2014, 13-15 & 10/2014,
10-12/11/2014)

TNBD Only

ST Cable Jointing Level 1 (LV)


103 Percantuman Kabel Tahap 1 (Voltan Rendah) TNBD / Open

TT05/06

12

ST Cable Jointing Level 2 (11kV)


104 Percantuman Kabel Tahap 2 (11kV) - TNBD /
Open

TT05/06/07

10

ST Cable Jointing Level 3 (33kV)


105 Percantuman Kabel Tahap 3 (33kV) - TNBD +
Open

TT05/06/07

10

9-11
23-25

7-9
21-23
28-30

18-20

6-8
20-22

10-12
24-26

10-12
24-26

7-9
21-23

5-7
19-21

2-4
16-18

11-13
25-27

3-18
31-15/3
16-27

2-16

DISTRIBUTION TRAINING

DISTRIBUTION TRAINING
No

Course Title

Target
Participant
(Grade)

Duration
(days)

Nos. of
Session

Sept 13

Oct 13

Nov 13

Dec 13

Jan 14

Feb 14

Mac 14

Apr 14

May 14

Jun 14

28-30

23-25

Jul 14

Aug 14

OTHER COURSES
106 Failure Analysis Methodology for MV VCBs

E07-E15

E07-E15

E07-E15

109 Vendor Training - SS Maint

Kont

Upon Request

110 Speed Program - LVDB

Mix

Upon Request

107

Transient Fault Reduction for MV Overhead


Lines

108 Intro to MS IEC 60364

111

Construction and Maintenance of Distribution


Substation

TNBD Only

112

Construction and Maintenance of Distribution


Substation

Outsider

Outsider

113 TX maintenance (Malim Nawar)

10-11

6-7
20-21

23-27
(TNBD)

11-15
(TNBD)
25-29

16-20
(TNBD)

20-24
(TNBD)

30-4/4
(TNBD)

28-29

21-25
(TNBD)

10-14
24-28

28-1/11

You might also like