Lecture 12: Exercise On Mineral Processing: F C C F
Lecture 12: Exercise On Mineral Processing: F C C F
Contents
Problems1to7
Afloatationplanttreatsfeedwhosegradeis0.8% Cu.Theplantproducesconcentrateandtailings.The
coppergradeofconcentrateis26%andthatoftailingsis0.16%.Calculate:
a) Curecoveryinconcentrate
b) Fractionoffeedinconcentrate
c) Enrichmentratio
LetMF mass of feed, MC mass of concentrate andMT ismassoftailing,f,candtareCugradein
feed,concentrateandtailingrespectively.
Materialbalance
MF
MC
MF
MT (1)
MC
MT (2)
By1and2weget
MF
MC
(3)
plant recovery
MC
MF
100(4)
By3and4weget.
MF
MC
100(5)
Plantrecoveryiscopperrecoveryandbyequation5itis82.73%Ans.
Fractionoffeedinconcentrate
Enrichment ratio
MC
MF
0.0286Ans
28.9
Problem2
Inthecircuitshownbelow,thedrysolidsofdensity300Kg/m arefedattherateof25 tonshr.The
feedtothecyclonecontains36%solidsbyweight.Itisfoundthat250 msizeintherodmilldischarge,
ballmilldischargeandcyclonefeedis27%, 5%,and14%respectively.Determinethevolumetricflow
rateoffeed(solid+water)tothecyclone.
Figure12.1:Flowsheetshowingflowofmaterials
Solution:materialbalance
Ball mill feed B
cyclone feed CF
CF
25(1)
Performingbalanceon250 msize
CF
14
5B
25
27(2)
61.1 tons/hr.
Solvingequation1and2wegetCF
Volumetricflowrateoffeed(dry)tocyclone
Volumetricflowrateofwater
108.6
20.36
Ans
Ans
Note isdilutionratio.Densityofwater1ton/m
Problem3
Ahydrocycloneproducestwoproductsi.e.underflowandoverflowfromthefeed.Theoverflowis
treatedfurtherforconcentrationofvaluablemineral;whereasunderflowisrecirculated.Inahydro
cycloneaslurryofdensity1140 Kgm isfedforseparation.Itproducesunderflowofslurrydensity
1290 Kgm andoverflowofslurrydensity1030 Kgm .Determinemassflowrateoffeedtocyclone,
when3litersampleofunderflowtakes4s.Densityofdrysolidis3000 Kgm .Calculate%solidsin
feed,underflowandoverflowbythefollowingequation
Solution
% solids
equation6oflecture11
% solids in feed
18.42%
% solids in underflow
% solids in overflow
33.72%
4.37%
Dilutionratiooffeed,underflowandoverflowcanbecalculatedbyequation10oflecture11.These
dilutionratiosarc4.42,1.97and21.97respectively.
Mass flow rate of underflow
%solidinUF
m hr.
Whereisvolumetricflow rate
Massflowrateofunderflow
1172 kghr.
WaterbalanceonthecyclonegivesMF
1336 kghrAns.
Problem4:
Analyzethefollowingcircuitanddetermineunknowns
Figure12.2Flowsheetformaterialsflow
Solution:
Applymaterialbalanceandgettheanswer
Flowrateofconcentrate123 thrandtailing877 thr.
Problem5:Doyourself
Inahydrocycloneaslurrycontaining30%solidisfedforseparationofcourseandfines.Theunderflow
has50%solidsandtheoverflowhas15%solids.Ifthefeedentersat20 tonshrinthehydrocyclone,
calculatethetonnageofsolidhrinunderflow.Answer .
Problem6:Doyourself
Aplanttreats210tonnesofmaterialinashiftofmetalgrade40%andtailinghasmetalgrade0.2%.
Calculatemassofconcentrateandtailing.Answer
Problem7
AfloatationcircuitconsistsofroughercleanercircuittoconcentratePbS
ThegradeofPbS infeedis15%andisdeliveredqt1200t/h.Thegradeofcleanertailingis20%.The
cleanertailingsarerecycledtorougherandcirculatingloadis0.25(recycle/freshfeed).Therecovery
andgradeintheconcentrateis 98%and89%respectively.Calculatetheflowratesandgradeofthe
respectivestreams.
Solution
Figure12.3:Floatationcircuittoshowarrangementofrougherandcleaneralongwithinputsand
outputs.
Solution:
Materialbalanceatsteadystateofrougher
1200
300
mT
mC
Cleanertotalmassbalance
R (1)
mC
mC
300(2)
mT R ismassofroughertailinginthr, mC
concentrate.
R ismassofrougherconcentrate,
RougherPbSbalance
1200
0.15
300
0.2
mT
R tR
mC
R CR (3)
t R andCR is PbSgradeinroughertailingandcleanerconcentraterespectively.
CleanerPbSbalance
mC
R cR
mC C CC
300
0.2(4)
CC isPbSgradeincleanerconcentrate
P S
Recovery
.
C C
mC
100
P S
100
198.6 Tonshr.
mC
498.6 Tonshr.
mT
1001.4 Tonshr.
Byequations3and4wecandetermine
.
. %
%
mC C massofcleaner