What Are Methods To Be Adopted For Volume Calculating?: Estimation and Quantity Surveying
What Are Methods To Be Adopted For Volume Calculating?: Estimation and Quantity Surveying
3. Pipe culvert
4. Box culvert
6. What are the methods of estimate?
1. Detailed estimate
2. Abstract estimate
7. What are the types of estimate?
1. Preliminary Estimate or Rough cost estimate
2. Plinth area estimate
3. Cube Rate Estimate or Cubical Content Estimate
4. Approximate Quantity Method estimate
5. Detailed Estimate or Item Rate Estimate
6. Revised Estimate
7. Supplementary Estimate and Revised Estimate
8. Annual Repair or Maintenances Estimate
9. Supplementary Estimate
8. Briefly explain about preliminary Estimate
The estimate which prepared using any rough method to get the
approximate cost construction anticipated in a project is called an
approximate or rough estimate. Since this estimate is normally prepared in
the preliminary estimate.
Cost of brickwork
Cost of plastering
Total Cost
LBH
4m 3m 0.30 m
3.6 cu.m
2 4m 3m
24 sq.m
3.6 320.00
Rs.1,152.00
24 8.50
Rs.204.00
1,152.00 + 204.00
Rs.1,356.000
entered in an abstract form. The total cost of each item of work is now
calculated by multiplying the quantities and respective rates.
12. Define quantity surveyor
Rs.4,97,000
140 m
4,96,000/140 = Rs.3,550/-
20. Write the formula for Mid ordinate rule and Prismoidal formula
Rule.
Mid sectional area method:
Q = (Bdm + sdm2) L
Where
B Formation width
S Side slopes
dm Mean depth
L Length of the section
Prismoidal formula rule
Q = L/6 (A1 + A2 + 4Am)
A1 = Bd1 + sd12
A2 = Bd2 + Sd22
Am = Bdm + sdm2
dm = (d1 + d2) / 2
21. Define estimate
An estimate is a computation or calculation of the quantities required
and expenditure likely to be incurred in the construction of a work. The
estimate is the probable cost of a work and is determined theoretically by
mathematical calculation based on the plans and drawing and current rates.
22. Write the recommendation for degree of accuracy in measurements
Dimensions of works shall be measured to an accuracy of 0.01 m.
Thickness of R.C. works shall be measured to an accuracy of 0.0005
m.
Areas of works shall be calculated to the nearest 0.01 m2.
Volumes of work shall be calculated to the nearest 0.01 m3.
Volumes of wood shall be calculated to the nearest 0.001 m3.
23. Briefly explain about revised estimate
The estimate, which is prepared
When any major change or alteration is made in the plan / structural
arrangement, with or without affecting the estimate cost, and
It is
31. Workout the quality of stone metal required for 2Km. Length for
wearing cost of a 4m wide road. The thickness of the metal road
required is 12cm, loose.
Solution
Quality of metal = 1 2 1000 4 0.12 = 960.00 cu.m.
32. An approach road 2 Km. long is to be constructed. Work out the
quantity of materials required i.e. stone metal and bricks. Data is
given below.
Length
2 Km
Metalled width
3.60 m
Soiling of bricks
10 cm
12 cm
Solution
Quantity of bricks
No of bricks
Stone metal
Bricks
3,60,000 Nos
1 Km
Width of formation
10 m
Height of embankment
60 cm
Side slope
1:2
L (Bd + Sd2)
Solution
Quantity of earth work
B = 10 cm; d = 0.60 m; S = 2
Quantity of earth work = 1000 (10 0.60) + 2 0.60 0.60 = 6720 cum.
It is made public by
100/6 = 16.67
900 16.67
Rs.15003.00
55. Find the plinth area required for the residential accommodation
for an assistant engineer in the pay scale of Rs.400.00 to 1,000 per
month.
Average pay = 400 + 1000/2 = Rs.700/month
Average month rent @ 10% of salary = 700.00/10 = Rs.70.00
Average annual rent 70.00 12 = Rs.840.00
Capital cost of the building @ 6% interest
= 840 100/6 = Rs.14,000.00
Plinth area required @ Rs.150.00 per sq.m of plinth are
= 14000/150 = 93.33 sq.m
Normally the quarters for the assistant engineer should be
constructed at the cost ofRs.14,000.00 having plinth area of 93.33 sq.m.
But due to the increase in the cost of construction, this ray be
increased by 100% and the capital cost of construction maybe fixed as
Rs.28,000.00 and the approximate plinth areas of 93.33.
Si/(l+I)n 1
Si/(l+I)n 1
27,0000.04/(l+0.04)20
1 = Rs.907.20
Si/(l+1)n 1
Where I
Sinking fund
Rs.5,00,000
Carpet area
70m2
Plinth area