Overview of MEA Power Distribution System-2013 PDF
Overview of MEA Power Distribution System-2013 PDF
Presentation Outline
14/01/58
EGAT
PEA
MEA
Area (km2)
513,115
509,923
3,192
Population
64,456,695
56,421,160
8,035,535
16,599,507
3,194,167
22,460
28,060
8,121
26,121.1
16,748.8
8,383
Customer
Employee
Demand (MW)
14/01/58
PEA
MEA
Description
Line1)
Sub2)
TR3)
500kV
3,721.95
10 15,850
230kV
13,393.05
68 44,560
132kV
8.71
133
115kV
13,279.73
130 14,574
69kV
Line
Sub
TR
Line
Sub
49.54
9,214*
463
2,400
18.8
870.23
MV(11, 12, 22
, 24, 33kV)
296,245
16,058.68
LV
457,959
25,509.97
300kV (HVDC)
TR
22.99
16,980
388
5
Total 30,639.75
1) cct-km
2) No. of substation
3) MVA
236 40,276
Description
Total assets
EGAT
2011
2012
15,777
PEA
2011
2012
MEA
2011
2012
16,956
9,645
9,814
4,401
4,700
Total liabilities
6,183
6,613
6,277
6,246
2,409
2,544
Equity
9,594
10,343
3,368
3,567
1,992
2,157
Total revenues
13,284
16,285
10,310
12,323
4,745
5,664
Total expenses
11,634
14,460
9,915
11,848
4,569
5,365
1,087
1,339
395
475
176
299
Net profit
14/01/58
8
Source: EGAT 2011
14/01/58
9
Source: EGAT 2011
10
14/01/58
Bang Buathong
Nonta Buri
Min Buri
Bang Khen
Bang Yai
Samsen
Thon Buri
Bang
Khunthian
Wat
Liab
KlongToei
Yan Nawa
Lat
Phrao
Lat Krabang
Bang
Kapi
Prawet
Rat Burana
Bang Plee
Samut Prakarn
11
Unit
Population (Thailand)
2011
2012
2013
64,076,033
64,456695
64,785,909
Population (MEA)
8,000,693
8,035,535
8,084,133
Customers
3,115,695
3,194,167
3,281,574
Employees
7,926
8,121
393
393
Customer/employee
Energy Purchase
GWh
45,774
49,997
49,627
Energy Sale
GWh
44,197
48,244
47,951
Maximum Power
MW
7,858
8,383
8,590
Energy Loss
3.44
3.51
3.31
12
Load Factor
66.47
68.92
64.27
14/01/58
Description
2011
Total assets
2012
2013
138,641
148,060
165,127
Total liabilities
75,898
80,126
92,228
Equity
62,744
67,935
72,899
Total revenues
149,471
178,412
192,152
Total expenses
143,934
169,005
180,921
5,537
9,408
11,234
Net profit
13
Unit in Million THB
Power Plant
230/500 kV
69/115 kV Customer
69/115 kV
Substation
12/24 kV
220/380 V
220/380 V
Customer
12/24 kV Customer
14
14/01/58
230 kV
69
69//115 kV
Secondary
Substation
Subtransmission
Line
Terminal Station
Transmission Line
13.
13.8 kV
Distribution Line
MEA
EGAT
12
12//24 kV
220
220//380 V
GENERATOR
69/115 kV
12/24 kV
CUSTOMER
CUSTOMER
220/380 V 15
CUSTOMER
Klong Rangsit
Sainoi
Sainoi
Jangwattana
MEA 69 kV T/S
MEA 115 kV T/S
MEA 69 & 115 kV T/S
Bangkoknoi
Nongjok
Nongjok
Lardprao
North Bangkok
Vibhavadi
Chidlom
Ratchadapisek
Bangkapi
Thanontok
Teparak
South Thonburi
South Bangkok
On-nuj
Bangplee
Klongdan
(Future)
16
14/01/58
No
Capacity
(MVA)
17
18,306
131
17,690
Switching Station
80
105.88
84
3,285
Terminal Station
Substation
17,350
17
746.14
900.93
17,478.15
27,656.33
18
14/01/58
4.5
4.19
3.96
3.82
3.6
3.5
3.25
3.46
3.23
3.39
3.44
3.51
3.41
3.14
2.5
2
1.5
1
0.5
0
1998
2000
2002
2004
2006
2008
2010
2012
2014
19
Year
1958
1963
1968
1973
1978
1983
1988
1993
1998
2003
20
(1977- 1988)
4.3 Conversion from 12 kV Primary to 24 kV primary (1977-present)
4.4 Conversion from 69 kV Primary to 115 kV primary (1990-present)
10
14/01/58
21
SAIFI
(times/cust/year)
SAIDI
(minutes/cust/year)
City/Business
2.46
54.86
Industrial
2.63
54.23
Suburb
4.32
100.37
Overall MEA
2.79
62.07
22
11
14/01/58
MEA SAIFI
3
2.388
2.5
2.019
2.299
1.931
1.837
1.865
1.869
1.831
1.699
1.715
1.5
0.5
0
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
23
MEA SAIDI
70
58.798
59.652
60
50.645
47.055
50
42.174
42.136
49.448
46.919
40
37.101
30
20
10
0
2003
24
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
12
14/01/58
Sub--transmission Lines
Sub
Activities
construct of additional subtransmission line
conversion of overhead line to underground
cable
Design
Maintenance
Tree Pruning/Cutting
Line patrol with Thermo-scan or binocular
Clean live line insulation by pressurized water
spray
provide outage restoration crews on standby
for 24 hour service
25
Substations
Activities
Build new substations
Replace metal-clad air insulated switchgears with SF6 gas insulated ones
Install fibre optic network which is far more reliable and accurate than radio
signal for SCADA
Design
Design double bus for 69 KV& 115 KV GIS and single bus tie for 12 KV & 24 KV
GIS
OLTC with oil filter
partition power transformer bank and install fire extinguish system
Maintenance
26
13
14/01/58
Activities
Replace bare conductor or partial insulated cable with aerial
spaced cable.
Distribution Lines
Planning
Design
Maintenance
27
42.17442.136
46.919
40
20
2.388 2.299
2.019 1.931
1.869
1.699
2
1.5
49.448
37.101
30
2.5
58.798
59.652
50.645
47.055
1.865
1.837
10
1.831
1.715
0
2002
2004
2006
2008
2010
2012
2014
1
0.5
28
0
2002
2004
2006
2008
2010
2012
2014
14
14/01/58
4.3
4.19
3.96 3.82
3.6
3.25 3.23
3.41
1998
2000
2002
2004
2006
2008
2010
2012
2014
29
R =9.12 m
Angle = 15 Deg.
6
63.5 M.
50.8 M.
R =18.24 m
Angle = 15 Deg.
30
2
15
14/01/58
31
Transmission network
EHV customer
SubSub-transmission network
HV customer
Primary
distribution
system
MV customer
or MV / LV transformer
EMS
DMS
32
16
14/01/58
34
17
14/01/58
35
36
18
14/01/58
Thank