This document provides a test report for restricted earth fault protection on an MV consumer panel. It details the panel specifications, relay and current transformer details, and results of various tests conducted including: 1) Magnetization tests of current transformers to prove knee point voltage 2) Secondary injection tests of the relay at various current settings 3) Relay stability tests by injecting current through the phases and neutral and recording relay and CT currents 4) Relay unstable tests to check relay operation outside the stable region. The tests were conducted and signed off by the panel manufacturer, contractor and consultant to verify compliance with specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
770 views

Ref Testing - MV Panel Rev

This document provides a test report for restricted earth fault protection on an MV consumer panel. It details the panel specifications, relay and current transformer details, and results of various tests conducted including: 1) Magnetization tests of current transformers to prove knee point voltage 2) Secondary injection tests of the relay at various current settings 3) Relay stability tests by injecting current through the phases and neutral and recording relay and CT currents 4) Relay unstable tests to check relay operation outside the stable region. The tests were conducted and signed off by the panel manufacturer, contractor and consultant to verify compliance with specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 6

1

66ELECTRICITY DISTRIBUTION DEPARTMENT


MAINTENANCE SECTION
(Distribution Protection)

PRE COMMISSIONING TEST REPORT FOR


RESTRICTED EARTHFAULT
PROTECTION, MV CONSUMER PANEL
Project
Name
Name of substation: Planning Number ..

MV Panel make :..Serial no. ..


.
Panel supplier Name . Tele.
no..
Name of Contractor' Tele.
no..
Name of Consultant... Tele. no

Name of CS Engineer ............................Tele .no

Date of Testing ..
Relay Details:
Name of Relay
Relay Make:
Serial No.
Type
Current
rating
Voltage rating

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Make:
Ratio
Class
Knee point V (Vkp)
In at Vkp

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Current Transformer Details:

Serial Numbers
Red CT
Yellow CT
Blue CT
Neutral CT

-----------------------------------------------------------------------------------------

Details of Power Transformer:


Transformer No.
Capacity
Voltage
% Impedance (Z%)
Make

-----------------------------------KVA
11KV/ ---------------------- %
---------------------

(Telephone: 4845623-5622 Fax 4845707)


EDM/PR /MV-01

Vector Group
--------------------Year of Manufacture ---------------------Resistance of CT
R Phase
Y Phase
B - Phase
Neutral

----------------------------------------------------------------------------------

Lead resistance
Red
Yellow
Blue
Neutral

-------------------------------------------------------------------------------------------

Resistance of relays:
Current Setting
0.5A
1.0 A
2A

Resistance
Ohm
------------Ohm
------------Ohm

Relay current setting (Iop)


Value of Stabilizing resistance

Amp
Ohm

For Stable Operation of the REF relay the following condition should be
satisfied
I op (Rst + Rr)

>

Ifs (Rct + 2 Rl)

Where
Iop
Rst
Rr
IFs
IF
Ifs
Rl

Relay Setting Current


Value of Stabilizing Resistance
Resistance of Relay at Current Setting
Maximum Secondary Current during the fault
Maximum Fault Current
IF/ CT ratio
Resistance of CT loads

IF = TX capacity / 3 V x pu Impedance
CT knee point requirement calculation
Vkp = 2 x Iop (Rst+Rr+2RL)
Minimum VKp should be as above equation
Where Vkp
= Minimum knee joint voltage
Iop
= Relay setting current
Rst
= Stabilizing resistor
(Telephone: 4845623-5622 Fax 4845707)
EDM/PR /MV-01

Rr
2RL

= Relay resistance
= Loop resistance

1. MAGNETISATION TESTS OF CTS


R Phase
Voltag Curren
e
t
In
In Milli
volts
Amps

Y-Phase
Voltag Current
e
in Milli
in
Amps
Volts

B Phase
Voltage
Current
In volts
In Milli
Amps

Neutral
Voltag
Current
e
In Milli
In
Amps
volts

Note :-To prove the knee point, graph should be Plotted and attached
2. SECONDARY INJECTION OF THE RELAY
Setting
0.5
075
1.0
1.25
1.50
1.75
2.00

Pickup

(Telephone: 4845623-5622 Fax 4845707)


EDM/PR /MV-01

3. RELAY STABILITY TEST


Primary
current

(Refer Fig a)

Relay
Current

Red

CT Current (Clip-on Measurement)


Yellow
Blue
Neutral

Injected

R-N
Y-N
B-N

4. RELAY UNSTABLE TEST (Refer fig b)


Primary
current
Injected

Relay
Curre
nt

Red

CT Current (Clip-on Measurement)


Yellow
Blue
Neutral

R-N
Y-N
B-N

1. Confirm the S1 -S2 of CTs are connected as shown in the drawing.


2. Confirm neutral CT connected between the TX neutral Point and
earthing connection of Neutral as shown in the diagram.
R

Y
B
N

S1

S2

S1

S2

S1

S2

S1

S2

Fig (a)
Inject current through R-N ,Y-N & B-N and record the values in table 3
(Telephone: 4845623-5622 Fax 4845707)
EDM/PR /MV-01

S1

S2

S1

S2

S1

S2

S1

S2

Fig (b)
Inject current through R-N, Y-N & B-N and record the values in table 4
Battery and Battery charger Make..
Confirm the Battery charger and Battery voltage Volts

Name & Signature of Testing Engineer: .

Details of Test used for the Stability check


1. Primary Injection Test Serial Number.Rated Current..
2. Ammeter/voltmeterSerial Numbers..
3. Secondary Injection test Kit Serial Number..

We the undersigned undertake herein

1. The Reliability of MV Panel REF Protection scheme stability and test


results is in compliance with the approved specification and the test results
achieved by testing as per the KM guidelines
2. In violation of the above mentioned commitment, KM has the right to
initiate all legal proceedings liable under such violation.
3. This acknowledgment is subjected to and interrupted in accordance with
Qatari law.

Panel Manufacturer
.
CR. Number.
Name& Signature,..

Date
Stamp

(Telephone: 4845623-5622 Fax 4845707)


EDM/PR /MV-01

Contractor
CR
.Number.
Name &Signature
Date.
Stamp

Consultant..
License Number
Name &Signature
Date
Stamp

Approval from Protection


Remarks
..

.
Name & Signature of Protection Engineer