Ak Fabtech - Complete Profile
Ak Fabtech - Complete Profile
Abdul Rehman Shaikh, Over the past Decade, A K Group, has consistently build its
infrastructure and system for a Steel Fabrication and Erection. Additionally, A K Group Periodically Upgrade Project Team, who are well
equipped to handle Steel Project.
Our clients trust us because.
We work with a strong sense of transparency with all our employees and clients. To maintain transparency of operations with our clients
we regularly update them with a project report and achieved Project Milestone.
A K Group Sustain in an Industry because.
Because, Steel Fabrication is our Core business and we offer the industry's most comprehensive and flexible service delivery modelon a
large scalein today's business scenario.
In-depth knowledge of Steel Fabrication Process to provided better solution to the client in order to complete project on time with quality
work.
At A K Group, Our Project Team has a skilled & experience to sort out the Procurement, Fabrication, delivery & Erection process, apart
from this our management team constantly monitor the project milestone.
Our biggest asset is our Skilled Rigger. Welders, fitters, and operators, and it all comes from the long way journey of Steel Fabrication &
Erection and we constantly upgrade them with latest technical process.
FOUNDER
SHAIKH ABDUL REHMAN
MANAGER PURCHASE
ZAKIR SAYYED
SURESH DESAI
MANAGER - TECHNICAL
AZEEZULLAH SHAIKH
SAYED MUDASSAR
B.E. CIVIL
B.E. MECHANICAL
SITE IN CHARGE
SITE IN CHARGE
SITE SUPERVISOR
SITE SUPERVISOR
SITE SUPERVISOR
SITE SUPERVISOR
BALNE VENKTASH
RAMASRAY
MOIN SARFDANI
SITE SUPERVISOR
SITE SUPERVISOR
SAMIR SHAIKH
REHMAT SHAIKH
SKILLED WELDER
SKILLED FITTER
UN SKILLED WORKER
15 NOS.
15 NOS.
25 NOS.
i.
ii.
industrial cranes - 1
iii.
Portable Crane 2
iv.
v.
vi.
vii.
viii.
ix.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
A.
As an Fabrication and Erection company, A K FABTECH, is totally committed to the safety of its employees and labours , as well
as to prevent loss of human life, to protect against injury and to prevent damage / destruction to project, property, equipment
and materials at its work sites.
B.
To achieve this we has established and implemented an effective Safety and Fire Prevention Program to create a safe working
environment at site. Within the frame work of this Safety and Fire Prevention Program, we are committed strategy of creating
Safety Awareness at all level of work.
i.
All individual working in our firm are above 18 years of age & well aware of the risk of working at the construction site.
ii.
The firm provides identity cards to all workers for each project
iii.
The firm provides Uniform, safety shoes, safety glasses for welding purpose, safety belts, hand gloves, and we ensure they
are used at the site
iv.
v.
All the equipments like rectifier welding machines, gas cutting machines, portable cranes are well maintained and checked
before providing at the site
vi.
All safety precautions measures are taken if the worker is working on high rise towers
vii.
The hierarchy of controls for working at height, working at ground level, using scaffolds, platforms and ladders and safety
netting.
Steel
SALE
400
3.49 Cr
350
300
2.83 Cr
250
200
1.95 Cr
SALE
150
100
50
0
2010-11
2011-12
2012-13
Nos.
Year
Client
Project
Current Projects
2010-2012
KAPSTONE
CONSTRUCTION
RUSTOMJEE
THANE
2012 - 2012
KALPATARU LTD
2011-12
URBANIA
Scope of Work
Cost
350 lacs
SYNERGY II
FABRICATION
90 Lacs
RNA CORP
RNA METROPOLIS
FABRICATION Work
27 lacs
2010 2012
Bombay Dyeing
FABRICATION WORK
35 lacs
2011 - 12
LODHA GROUP
LODHA LUXURIA
GLASS RAILING
65 Lacs
2012 - 2012
RAHEJA UNIVERSAL
RAHEJA EXCELSIOR
Fabrication Work
52 Lacs
2010-2012
MARTHON REALTY
MARATHON FUTURE X
FABRICATION Work
54 lacs
Projects Completed
2010 2011
ONE AVIGHNA
FABRICATION WORK
10 Lacs
2009-2011
RAHEJA UNIVERSAL
RAHEJA ATLANTIS
FABRICATION Work
148 Lacs
2010-2011
RAHEJA UNIVERSAL
Compound Wall
166 lacs
2006-2010
RAHEJA UNIVERSAL
RAHEJA EXOTICA
FABRICATION Work
196 lacs
2009-2010
KANAKIA GROUP
KANAKIA METRO
FABRICATION Work
35 lacs
2009-2010
KANAKIA GROUP
KANAKIA BOOMERANG
FABRICATION Work
19 lacs
2009-2010
KANAKIA GROUP
KANAKIA Marriot
FABRICATION Work
22 lacs
2009-2010
RAHEJA UNIVERSAL
RAHEJA LEGEND
FABRICATION Work
90 lacs
2008-2009
RAHEJA UNIVERSAL
RAHEJA EXOTICA
FABRICATION Work
40 lacs
10
2008-2009
RAHEJA UNIVERSAL
RAHEJA WILLOWS
FABRICATION Work
48 Lacs
11
2008-2009
RAHEJA UNIVERSAL
RAHEJA TITANIUM
FABRICATION Work
62 lacs
12
2008-2009
RAHEJA UNIVERSAL
RAHEJA TIPCO
FABRICATION Work
58 lacs
Projects
Project
Work Nature
Specification
Structural
Consultant
MAHIMTURA Consultancy
Project
RAHEJA
MUMBAI
ATLANTIS,
SOUTH
Work Nature
Structural Consultant
MAHIMTURA Consultancy
Specification
Project
Work Nature
Structural Roofing
Structural Consultant
PB-SYSTRA
Project
KANAKIA SPACE
Work Nature
Pergola Work
Specification
Steel
Structure
of
Pergola at Terrace
level
Structural
Consultant
Spectrum
Project
RAHEJA EXCELSIOR
Work Nature
Spiral Staircase
ACP Work
and
Project
RAHEJA TITANIUM
Work Nature
Structural
Consultant
MAHIMTURA
Consultancy
Project
Work Nature
Specification
Structural
Consultant
Project
Work Nature
M S Railing
Project
RAHEJA
KANDIVALI
Work Nature
M S Railing
REFLECTION,
Project
RAHEJA
Govandi
ACROPOLIIS,
Work Nature
Architectural
Railing,
Dome Structure, Gate