468/468
22/4.5/0.415
Amp
Cooling Types
12.3/60.0
ONAN, ONAF,
OFAF
Number of Phases
Vector Symbol
YNyn0yn0
Mass Untanking, kg
2420
115
6850
43
litre
2650
1200
Top Radiator
Bottom Radiator
60
T, deg C
55
50
Avr wnd. T
45
40
35
Bot wnd. T
30
0
10
11
12
13
14
15
t, min
FO12 MV top
FO13 MV middle
FO14 MV bottom
wm(i) as measured
w(i) as calculated
16
Tawr
47
T, deg C
45
43
41
39
37
35
0
10
12
t, min
FO7 HV top
FO9 HV middle
FO11 HV bottom
14
16
85
80
75
70
65
60
0:00:00
0:02:53
0:05:46
0:08:38
0:11:31
0:14:24
0:17:17
0:20:10
Twarm
FO7
FO1
FO9
0:23:02
OFAF(100 A) MV Phase B
2nd set of winding resistance measurement instrumentation was used
120
110
T, deg C
100
90
80
70
60
0:00:00
0:02:53
0:05:46
0:08:38
0:11:31
0:14:24
0:17:17
0:20:10
0:23:02
FO13
FO12
FO14
It could be seen that depending on duration of test variations in Twnd (R) is ~10 C
Phase A
Phase B
Phase C
86
84
T, degC
82
80
78
76
74
~4 hours!
72
70
7:12
8:24
9:36
10:48
12:00
13:12
FO6
FO15
14:24
FO16
15:36
16:48
18:00
19:12
Blocked Coolers: 60 A
2nd set of winding resistance measurement instrumentation was used
84
Blocked Cooling
82
Ph A
80
Ph C
78
T, degC
Ph B
76
74
72
70
68
0:00
2:24
4:48
Twarm A
7:12
Twarm fitted IEC (A)
9:36
Twarm C
12:00
Twarm fitted IEC
14:24
Twarm B
16:48
19:12
21:36
90
85
80
T, deg C
75
70
65
Winding temp by
resistance
60
55
50
45
0:00
2:24
4:48
7:12
9:36
12:00
14:24
FO7
FO9
FO11
(TV4+TV5)/2
16:48
19:12
21:36
ONAN(60A) HV phase B
2nd set of winding resistance measurement instrumentation was used
70
T, deg C
65
60
55
50
45
0:00:00
0:02:53
0:05:46
0:08:38
0:11:31
0:14:24
0:17:17
FO9
FO3
FO11
ONAN(60A) MV phase B
2nd set of winding resistance measurement instrumentation was used
75
70
T, deg C
65
60
55
50
45
40
0:00:00
0:02:53
0:05:46
0:08:38
0:11:31
0:14:24
0:17:17
FO12
FO13
FO14
85
Temperature, deg C
Phase B
80
75
Phase C
70
65
60
Cooling curves
55
8:24
9:36
10:48
12:00
FO6
13:12
Time, h:mm
14:24
15:36
FO15
16:48
FO16
18:00
Phase C
Phase A
85
80
75
70
65
60
0:00
2:24
4:48
7:12
9:36
12:00
14:24
16:48
19:12
21:36
1:45 min
85
T, deg C
80
4:00 min
75
70
65
60
0:00:00
0:02:53
0:05:46
0:08:38
0:11:31
0:14:24
0:17:17
0:20:10
0:23:02
Conclusions
Depending on winding time constant taking first
resistance measurement at 4 min may be too long wait
and could lead to significant error in determination of
winding temperature at shutdown
10 min cooling curve period could be well justified for
small and medium distribution transformers, but does not
seem to be adequate for large power transformers,
where 20 min should be considered as more appropriate
15 sec acquisition rate was found to be easily
achievable with the modern acquisition systems and is
recommended, especially for a winding with a short time
constant
Conclusions (Contd)
c.