Geotechnical Engineering
Geotechnical Engineering
Geotechnical Engineering
or
Who Needs a Foundation
Engineer Anyway???
Soil
Rock
Groundwater
Soil is heterogeneous
Homogeneous
Heterogeneous
Soil is anisotropic
Anisotropic
Isotropic
Soil is nonconservative
After
Before
Conservative
Before
After
Nonconservative
Soil is nonlinear
Stress
Linear
Strain
Stress
Strain
Nonlinear
Panama Canal
Panama Canal
Culebra Cut
Panama Canal
Culebra Cut
The excavation of the cut was one of the greatest areas of
uncertainty in the creation of the canal, due to the unpredicted
large landslides.
The Americans had lowered the summit of the cut from 59
meters (193 feet) to 12 metres (40 feet) above sea level, at the
same time widening it considerably, and had excavated over 76
million cubic meters m (100 M cubic yards).
Some 23 M m (30 M cubic yards) of this material was
additional to the planned excavation, having been brought into the
cut by the landslides.
Aswan Dam
How do you keep the water out?
Aswan Dam
What about the core?
Aswan Dam
What is a grout curtain?
Tunnels
Old Way
Graduate
Students
New Way
Undergraduate
students
Professors
Ground Improvement
Dynamic Compaction
Landslides
Thistle Slide Spanish Fork Canyon
Mud Slide
Geoenvironmental Engineering
Compacted Clay Cap for Refinery Site
Earthquake Hazards
(San Andres Fault )
Fault Rupture
Fault Rupture
Liquefaction
Damage
Liquefaction
Damage