CPWD Web Based Project Monitoring System
CPWD Web Based Project Monitoring System
June 2011
Web Based
Project Monitoring system
CPWD
Project Team
Er M K Singh
Executive Engineer
Computer Cell,
CDO, CPWD, New
Delhi.
Page 1
Kishore-09958001055(Delhi)
09282232157(Chennai)
2. Software Engineer
Kishore
Old.No.148/8, New No.28, I Floor,
Habibullah Road, T.Nagar,
Chennai 600017
Email: [email protected]
09282232157 (Chennai and Roaming)
Kishore
Software Engineer
No.92B/5, Room No.20, III Floor,
Munirkha Village,
New Delhi 110067
Email: [email protected]
09958001055 (Delhi)
Page 2
1.2
Purpose :- following four main purpose are :1. Preparation of Online Monthly Progress report of all projects.
2. Online Monitoring of progress of all projects including their
packages and all Agreements drawn for a project, in
planning as well as in execution stage online by different
level of officers.
3. Generation of Online Mandatory letters at important stage of
work. This is required for automatic updating of data related
to project required in MPR.
4. Monthly Progress Report can be viewed by all officers and client as
well.
1.3
Online WBPMS
:- To be maintained on
desktop computer of each division where expenditure figures are to be
updated.
Page 3
- Agreement (called
Page 4
Civil
Div
work
Civil
Div
work
Agreement 1 ( or Subwork 1)
C/O School Building for JNV
at Pune (Civil Works)
Agreement 2
C/O Water Tank for School
Building for JNV at Pune
(Civil Works)
Elect Agreement 3
Div
C/O Street lighting for road
work outside School Building for
JNV at Pune (Electrical
Works)
Hort Agreement 4
div
Horticulture works for School
work building for JNV at Pune
( Horticulture work)
Package
2
Staff
Residences
Civil Agreement 1
div
C/O Staff Residences for
work JNV at Pune (Civil Works)
Civil Agreement 2
div
C/O Road work for Staff
work Residence for JNV at Pune
(Civil Works)
Elect Agreement 3
div
Electrical works for Staff
work Residence for JNV at Pune
(Electrical Works)
600 Lakhs
586Lakhs
50 Lakhs
57 Lakhs
30 Lakhs
32 Lakhs
20 Lakhs
23 Lakhs
500 lakhs
400 Lakhs
412 Lakhs
50 Lakhs
42 Lakhs
30 Lakhs
33 Lakhs
Page 5
1.5
Activities
Registration of Project on
receipt of requisition
letter from client.
Preparation and sending
of
Preliminary
Architectural Drawing to
client
Approval of Architectural
Drawing from Client.
Project Owner
Architect office
Get format letter No. 2
Senior
Architect/
Architect
Client Department / Get format letter No. 3
Senior Architect
after
getting
approval
of
architectural drawing and send to
all offices concerned.
Preparation
of
and Planning
head Get format letter No. 4 from
sending of Preliminary attached with Project WBPMS ( forwarding letter of
Estimate
to
client Owner
Preliminary Estimate)
department
SE(P)/ EE(P)/ AE(P)
7a
Decision of Sub-works is to be
done by project owner.
Subwork /Agreement registration
shall be made within a project by
project owner and all activities of
subwork can now be monitored by
different offices.
New agreement can be added at
later stage also by project owner
adding with some package.
Page 6
2. Planning
Agreements
stage
activities
for
Activities
Issue
of
Detailed Architect office
Get format letter No. 6 of WBPMS
Working
Architectural
Drawings.
Issue
of
Structural Structural
design Get format letter No. 7 of WBMS
Drawings
unit.
(SE(P)/EE(P)/ AE(P)
unit
11
12
13
14
15
16
17
18
Preparation of Detailed
Estimate and Issue of
Technical Sanction
Issue NIT for call of
tender of each Subwork.
Planning
head Get format letter No. 8 of WBPMS
attached with Project
Owner
Planning
head Get format letter No. 9 of WBPMS
attached with Project
Owner
Call of Tender and Executive Engineer Get format letter No. 10 of WBPMS
sending to Press and of Field unit.
Internet media for wide
publicity
as
per
requirement.
Sale of tender papers Executive Engineer No Action required in WBPMS.
and Receipt of Tenders.
of Field unit.
Scrutiny of Tender and Executive Engineer Get format letter No. 11/12/13
sending to competent of Field unit.
authority for approval of
( letter No. 11 for EE to SE)
tender.
( letter No. 12 for SE to CE)
(letter No. 13 for CE to higher
office)
Acceptance of Tender by Competent authority No action.
Competent Authority.
As
per
CPWD Tender approval has to be
Manual
conveyed only in hard copy.
Issue
of
Letter
of Executive Engineer Get format letter No. 14 of WBPMS
acceptance
to of Field unit.
Construction agency for
submitting
the
Performance guarantee.
Final Award of work after Executive Engineer Get format letter No. 15 of WBPMS
submitting
the of Field unit.
performance guarantee.
Page 7
19
20
21
Action
required by
Authority in
CPWD
Timely Issue of Remaining Architect
Architectural and Structural Unit
and
drawings, if all drawings are not Structural
issued before start of work.
Design unit
Action
WBPMS
Updating
the
Expenditure
Figure every month by linking
with
Divisional
accounting
Package
To be done once in a
month after updating the
Expenditure figure of
Divisional
accounting
package.
Activities
ALL
Field
unit
(Division
offices
maintaining
account )
Updating the percent progress / EE field unit
Target date of completion and
Remarks of each agreements in
Execution stage
Updating the remarks by higher
officers
23
Monitoring of Milestones
different agreements
24
26
28
in
To be done once in a
month after updating the
Expenditure figure of
Divisional
accounting
package.
SE/ CE
To be done online after
updating
data
by
Executive
Engineer
office.
EE
Field Not yet included in
unit
WBPMS ( Shall be taken
up in 2nd Stage)
Executive
Not yet included in
Engineer
WBPMS( Shall be taken
Field unit
up in 2nd Stage)
22
of
required
Not
yet
included
in
WBPMS( Shall be taken
up in 2nd Stage)
Not
yet
included
in
WBPMS( Shall be taken
up in 2nd Stage)
Page 8
2.0 Activities required in Project Monitoring System :1. Registration of Project and Generation of Project ID:All Projects for which requisition is received, need to be registered
in Project Monitoring System using the Project Registration Window. A
unique project code shall be generated for each project registered which
can be used for all future reference of the particular project.
Project is a work for which Requisition has been received from a
client department or sanction has been issued by the client department for
execution against a capital budgetary head, deposit, etc for which a
separate A/A & E/S has been accorded.
Project Code is the WBPMS generated unique number for the
registered project giving the project identification linked to Client, state of
its location and the calendar year in which requisition received.
Page 9
Page 10
Hort work
Elect work
Civil Work
Civil Work
Name of Project
:C/O
Javahar
Navodaya
Vidyalay at Pune.
Package 1 School
Building
Agreement 1 ( or
Subwork 1)
C/O
School
Building for JNV at
Pune (Civil Work)
Agreement 2
C/O Water Tank
for School Building
for JNV at Pune
(Civil Work)
Agreement 3
C/O Street lighting
for road outside
School Building for
JNV at Pune (Elect
Work)
Agreement 4
Horticulture works
for School building
for JNV at Pune
( Horticulture work)
Elect work
Civil work
Civil work
Package 2 Staff
Residences
Agreement 1
C/O
Staff
Residences
for
JNV at Pune (Civil
Work)
Agreement 2
C/O Road work for
Staff Residence for
JNV at Pune (Civil
Work)
Agreement 3
Electrical works for
Staff Residence for
JNV
at
Pune
(Electrical Work)
AA and
ES
amount
Agreement
amount
Date of
Start
St date
of
Comple
tion
Target
date of
Comple
tion
Upto
date
Expen
diture
Percent
progres
s
Rs 1200
Lakhs
Total
of
all agrmnt
under
packages
4/2009
10/2014
10/2014
Sum
of all
packa
ge
Wght
aver
percnt
700 lakhs
Total
of
all agr
4/2009
8/2012
3/2013
Wt aver
percent
4/2009
4/2010
5/2010
Sum
of all
agr
100
600
Lakhs
586 Lakhs
5/2010
12/2010
3/2011
30
10%
50 Lakhs
57 Lakhs
6/2010
4/2011
9/2011
20
0%
30 Lakhs
32 Lakhs
4/2011
8/2012
3/2013
10
55%
20 Lakhs
23 Lakhs
500 lakhs
Total
5/2010
10/2014
10/2014
Sum
of all
agr
Wt av
percent
400
Lakhs
412 Lakhs
5/2010
10/2014
10/2014
212
45%
50 Lakhs
42 Lakhs
6/2010
10/2012
9/2012
32
60%
30 Lakhs
33 Lakhs
7/2010
12/2012
11/2012
13
30%
30 %
Page 11
Page 12
4. Linkage of Project with Divisional Accounting Package :For getting started in WBPMS on project(s) by the project
stakeholders, field units are required to perform one time operation for
a project involving registration of that project/ package and subworks
and its mapping or linking with NIJ Divisional Accounting package.
Whereas the WBPMS based mandatory operations by field and
planning units including its monthly update results in status update of
projects. The sequence of these operations is described as under:1. Projects are to be registered by field units and Project Code
generated, by project owners, with the data as per Annexure A.
2. Packages and Subworks/ Agreements to be identified by field
units (by project owners) with data as per Annexure B. This is to
be done only after the Project Code is generated.
3. Mapping for each Agreements to be done in WBPMS by the
respective Divisional Unit using 8 digit code taken from Nirman
Info-Jyothi (NIJ) generated for each Agreements(TS Wise) and
entered against the each Agreeement under Project Code
obtained as above at Sl. 1 above on registration in WBPMS.
4. Only agreements need to be mapped with divisional accounting
package. Details of Package and Projects are automatically
collected by programme in respect of a project from different
divisions for getting the accumulated figure.
5. Activities for Award of Work for different Sub Work :Activities like Sending of Working Architectural Drawing by
Senior Architect for Execution of work and Sending of Structural
Drawing for Execution of work shall also be sent using Web based
generated letters and details shall be get updated automatically.
Technical Sanction and NIT shall be issued by competent
authority for each Sub Work decided for different packages shall be
issued using online letter generation by Web Based Project Monitoring
System.
Tender shall be called for each Sub Work using Web Based
PMS and letter for sending the Notice Inviting tender to Press Media
and Internet Media Like www.tenderhome.com shall be sent through
PMS generated letter. These activities and important data like
Estimated cost date of T/S, NIT date of call of tender, date of opening
of tender will be automatically updated in the system.
Tender forwarding Note shall also be generated using PMS and
comments by higher authorities can also be sent using the system.
Info Jyothi Software Consultancy, Chennai
Page 13
Page 14
3.0 Reports that can be generated using the System :Following Reports can be generated using Project Monitoring
System :1. Monthly Progress Report of CPO and NON CPO Works of
following stages :Sr Mothly Progress Reports
No.
CPO WORKS
1
Requisition from client received-Unsanctioned Work
2
PE sent to Client Unsanctioned Work
3
Sanctioned but not yet started
4
Sanctioned and Work is in Progress
5
Work Completed
NON- CPO WORKS
1
Requisition from client received-Unsanctioned Work
2
PE sent to Client Unsanctioned Work
3
Sanctioned but not yet started
4
Sanctioned and Work is in Progress
5
Work Completed
Report No.
14
13
12
11
10
18
17
16
15
20
2. Expenditure Card
3. Expenditure Return
4. Details of Works as per following
a. State Wise
b. Client Wise
c. Cost of Work wise
d. CPO/ NON CPO Works
Page 15
ANNEXURE A
:
:
Sr No.
Budgetary
Letter of Authorisation
Deposit
Others
Tick appropriately
2
3
6.
Status of Project
Sr No.
Tick appropriately
Work Completed
: No. .
:
Page 16
c. PE Amount
: Rs.
9. A/A&E/S details (Mandatory for Status Id 3, 4 & 5)
a. Amount of A/A & E/S
b. Sanctioning Authority
c. Letter/ Sanction No.
d. Date
e. Head of Account
f. Start Date
g. Finish date
h. Stipulated date of Completion
10. Date of Actual Completion of Project
(Mandatory for Status Id 5)
: Rs
: ..
: No.
: .
:
:.......
: .
: ..
: .
11. Specify field units related to project execution (In case of more than one division
is involved for the same discipline, all such divisions are to be indicated):
DISCIPLINE
ZONE
DIVISION
CIVIL Related
ELECTRICAL Related
HORTICULTURE Related
12. Specify Planning Units related to project planning (In case of more than one unit
is involved for the same discipline, all such units are to be indicated):
NATURE OF PLANNING ACTIVITY
Civil Planning Unit
(Prel Estt, Det Estt, Tech Sanction, NIT
Electrical Planning Unit
(Prel Estt, Det Estt, Tech Sanction, NIT
Horticulture Planning
(Prel Estt, Det Estt, Tech Sanction, NIT
Architectural Unit
(Prel Drgs, Detailed Working Drgs, Local Body
Approval)
Structural Design Unit
(Analysis and design of structural members)
EE(P)
EE(P)
SE(P)
EE/ SE/ E
Page 17
ANNEXURE B
2. Name of Project
:
.
Start Date
Finish Date
2.
.
1.
2.
.
AE(P)
EE(P)
SE(P)
Page 18
Annexure C.
List of letters which are mandatory to be generated using
PMS:Letter
No.
Letter
Authority
Project Owner
2.
3.
Forwarding
Letter
to
Client
Department. Copy of letter to be sent
to all offices concerned.
4.
4.
5.
6.
Sending
of
Working Senior Architect.
Architectural Drawing by
Senior Architect
for
Execution of work
7.
Sending
of
Structural Structural
Page 19
8.
9.
10.
EE/ AE
EE/ AE
11
Forwarding
Letter
for
Tender
Forwarding Memo to higher office for
different sub works.
12.
Comment of SE to CE SE TO CE
Office for tender of CE
Level and above.
13.
Comment of CE to higher
Office for tender of ADG
Level and above.
14.
15.
CE to ADG or
DG or Works
board
Page 20
Online
Web Based Project
Monitoring System
Note: The screens shown in this help may differ from actual screens. Due
to Improvements in the website..
The Following are the Steps for Divisional Users for Updating Web Based
Project Monitoring System:
1) Open internet explorer (with Internet Connection)
2) Please enter the above Address in the address bar
Address: http://www.cpwd.gov.in and then click Project Monitoring
System or http://www.cpwdpms.gov.in
Page 21
Page 22
Page 23
Page 24
7) Click each Project Code link (link means Project Code with
underline)
For Example when you click the Project Code CE/GO/2009/19
You get the following screen. Click on NEW and then select the Pkg
Code - Description from the screen as shown below.
Page 25
Page 26
Page 27
Page 28
b) Select Master Details > Project Menu > Refer > Name of
the Client
Page 29
d) List of Projects will be displayed. Note the 8-digit code for the
Name of work and Subwork/T.S./Agreement
e) If Name of work and Agreement does not exist in the list then
take the help of Accounts Branch people to register the work.
For New Project Registration Please follow the steps given
below
Click on Add -> New Project
Page 30
Then Save the Project and Note the Number (The First Agreement
will have 0001 along with the Project Code i.e., 13280001 for the
above Agreement)
If there are more number of Agreements in the same project then
follow the procedure as shown below:
Click Add-> New Tech.Sanc.for Existing Project -> Search By ->
Project
Page 31
Select the Project Under which you want to add another Agreement
Page 32
Or
Open Form 64 For Budgetory/Authorisation/CSS Heads of
Account and Form 65 TS Wise for Deposit Works
Eg: 10010001, 10010002
Page 33
Page 34
Page 35
c) Click on Browse
Page 36
Page 37
Page 38
Page 39
Page 40
Note: In Project Wise Progress Reports you will find only the remarks
given by the Project Owner only.
Page 41
INSTALLATION GUIDE
FOR NIJ DIVISIONAL ACCOUNTING SYSTEM
New Nirman Info Jyothi 2010
1)
2)
3)
4)
Read Throughly and Follow the following instructions to install the New
Nirman Info Jyothi 2010 (Compulsory)
Before installation you should have the following
The screen resolution should be 800 x 600 pixels
Create a directory (folder) " Avkr " in the " C:\ "
Operating System should be Windows based (Windows 98 and
Above)
1)
Page 42
Export System
Page 43
Page 44
Kishore
Software Engineer
Kishore
Software Engineer
Page 45