Unit = cum
Taking output = 10 cum
(a) Labour
day
Mate
day
Mazdoor (Unskilled)
(b) Machinery
hour
Plate compactor
(c) Materials
cum
Compensation for earth Taken from private land
d&e) Overheads & Contractors Profit
Cost for 10 cum = a+b+c+d
Rate per cum = a+b+c+d/10
B Mechanical Means including conveyance of earth from
1000 M load
Unit = cum
Taking output = 50 cum
(a) Labour
day
Mate
day
Mazdoor (Unskilled)
(b) Machinery
hour
Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum/h
RBR-MTRD-2
OR
hour
Hydraulic Excavator 1 cum bucket capacity @ 60 cum/h
hour
Tipper 5.5 cum, 10 t capacity
hour
Plate compactor 3.5 cum / hour capacity
(c) Materials
cum
Compensation for earth Taken from private land
d&e) Overheads & Contractors Profit
Cost for 50 cum = a+b+c+d+e
Rate per cum a+b+c+d+e/50
Note : Only 75% of fresh material has been provided as 25% can be
retrieved from site from earth i.e. flown down the slop in the form of
slurry and deposited at the foot of rain cuts.
Maintenance of Earthen shoulder (filling with fresh
selected soil)
(I) Making up loss of material/irregularities on shoulders to the
design level by adding fresh approved selected soil and
compacting it with appropriate equipment at OMC upto a
lead of 1000 m as per technical specification Clause 1903
MORD / 3003 MORTH
Unit = sqm
Taking output = 100 sqm
Assuming average thickness of filling to be 150 mm
Quality of fresh material = 15 cum
(a) Labour
day
Mate
day
Mazdoor (Unskilled)
6.240
3.000
7.500
10.400
0.830
0.650
2.270
15.000
37.500
4.680
621
RBR-MTRD
Index-code
S. No
Description
Unit
Quantity
Rate
Rs.
hour
0.250
hour
hour
0.680
4.000
cum
15.000
day
day
2.600
hour
4.000
(b) Machinery
Hydraulic Excavator 0.9 cum / 1.00 cum bucket capacity @
60 cum/h
Tipper 5.5 cum
Plate compactor @ 25 sqm per hour
(c) Materials
Compensation of earth
d&e) Overheads & Contractors Profit
Cost for 100 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/100
(II) Maintenance of Earthen shoulder (stripping of excess
soil)
Stripping excess soil from the shoulder surface to achieve
the approved level and compacting with plate compactor at
OMC as per drawings and Technical Specification Clause
1903 MORD / 3003 MORTH
Unit = sqm
Taking output = 100 sqm
Assuming height of stripping as 75 mm
Quantity of earth cutting involved = 7.5 cum
(a) Labour
Mate
Mazdoor (Unskilled)
(b) Machinery
Plate compactor @ 25 sqm per hour
c&d) Overheads & Contractors Profit
Cost for 100 sqm = a+b+c+d
Rate per sqm = a+b+c+d/100
RBR-MTRD-3
Amount
Rs.
Remarks
Unit = cum
Taking output = 187.5x0.075 = 14.06 cum = (30.94 Tonne)
(5% area of one km)
(a) Labour
day
Mate
day
Mazdoor (Unskilled)
(b) Machinery
hour
Jack hammer 25 kg with tractor
hour
Compressor 210 cfm with tractor
hour
Emulsion pressure distributor
hour
Mixall 6/10 t capacity
hour
Three wheeled 80-100 kN Static Roller
(c) Materials
Primer with bitumen emulsion @ 9 kg/10 sqm 187.5x9 = Tonne
168.75 kg.
Tack coat with bitumen emulsion @ 3.0 kg/ 10 sqm
Bottom = 187.5
Tonne
Sides = 28.27
Total = 215.77
Bitumen for BM @ 3.5% by weight of mix = 30.94 x 3.5 / 100 = 1.082
20.800
4.000
2.000
4.000
4.000
4.000
0.168
0.064
Tonne
1.082
cum
cum
cum
cum
2.985
8.955
4.975
2.985
622
RBR-MTRD
Index-code
S. No
Description
Unit
Quantity
Rate
Rs.
day
day
16.640
hour
hour
hour
2.000
2.000
4.000
tonne
0.292
tonne
0.040
tonne
0.136
cum
5.400
cum
1.200
day
day
20.800
hour
hour
hour
hour
2.000
2.000
2.000
4.000
0.064
0.292
t
Bitumen for pre-mix carpet @ 14.60 kg per 10 sqm = 200 x
14.6 / 10 = 292 kg
t
Bitumen for seal coat @ 6.8 kg per 10 sqm
= 200 x 6.8 / 10 = 136 kg
Crushed stone aggregate 13.2 mm to 5.6 mm @ 0.27 cum cum
per 10 sqm= 200x0.27/10=5.4cum
Crushed sand passing 2.36 mm sieve and retained on 180 cum
micron sieve @ 0.06 cum per 10 sqm
200 x 0.06 / 10 = 1.20 cum
d&e) Overheads & Contractors Profit
Cost for 200 sqm = a+b+c+d+e
Rate per sqm = a+b+c+d+e/200
Amount
Rs.
Remarks
0.136
5.400
1.200
day
day
16.640
hour
hour
hour
hour
2.500
2.000
2.000
4.000
tonne
0.060
tonn
0.430
tonn
0.200
cum
5.400
623
RBR-MTRD
Index-code
S. No
1
Description
Unit
Quantity
4
1.200
RBR-MTRD-5
Rate
Rs.
Amount
Rs.
Remarks
Day
Day
Day
90.000
7.760
hour
hour
hour
hour
6.000
6.000
45.000
12.000
cum
cum
tonne
184.500
92.250
14.970
tonne
2.460
Day
Day
Day
70.000
5.920
hour
hour
hour
hour
6.000
6.000
45.000
12.000
tonne
22.500
tonne
1.180
cum
cum
cum
99.750
65.550
114.000
cum
cum
cum
tonne
85.500
71.250
122.550
9.000
Unit = Sqm
Taking out put = 4900 sqm (196 cum)(450 Tonnes)
a) Labour
Mate
Mazdoor (Unskilled)
Mazdoor skilled
b)
Machinery
Air compressor 250 cfm
HMP 100-110 TPH Capacity
Tipper 10 tonnes capacity
Smooth wheeled roller 8-10 tonnes
c)
Material
I) Bitumen
ii) Bitumen emulsion for tack coat .
iii) Aggregates
Grading I - 19mm(Nominal size)
20-10mm 35 per cent
10-5 mm 23 per cent
5mm and below40 per cent
Add 5 per cent for wastage
or
Grading-II 13mm (Nominal size)
13.2-10 mm 30 per cent
10-5 mm 25 per cent
5 mm and Below43 per cent
Filler 2 per cent (Cement)
Add 5 per cent for wastage
Any one of the above alternatives of aggregate i.e. 19mm or 13mm
nominal size may be adopted as per approved design.
(i)
624
RBR-MTRD
Index-code
S. No
Description
Unit
Quantity
Rate
Rs.
Amount
Rs.
Remarks
RBR-MTRD-6
RBR-MTRD-7
RBR-MTRD-8
A
B
(C)
(D)
RBR-MTRD-9
1.040
33.000
0.020
day
day
2.080
cum
6.250
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
sqm
0.540
0.500
2.500
10.000
0.050
625
RBR-MTRD
Index-code
S. No
1
Description
Unit
Quantity
Rate
Rs.
Amount
Rs.
Remarks
RBR-MTRD-11
10
11
RBR-MTRD-12
12
0.540
0.250
1.000
0.050
day
day
1.080
day
day
1.040
hour
1.670
Note : Land Slide clearance involves pushing of loose earth slided on the road surface from hill face on the
valley side. Since no cutting of original ground is involved, the output of dozer has been taken as 60 cum
per hour for soil, ordinary rock and blasted hard rock. However, if there are objection to disposing of earth
on valley side, additional resources for its disposal shall be considered as per site conditions.
RBR-MTRD-13
13
day
day
day
1.590
0.750
626
RBR-MTRD
Index-code
S. No
1
RBR-MTRD-14
RBR-MTRD-15
14
15
Description
Unit
Quantity
4
0.070
day
Blaster
b)
Machinery
hour
Dozer D 80 A-12,180 HP @ 60 cum per hour
hour
Air compressor 250 cfm with two jack hammer
c)
Materials
kg
Gelatine 80 per cent @ 35 kg per 100 cum
Electric Detonators @ 1 Detonator for 2 Gelatine sticks of each
125 gms each
c&d) Overheads & Contractors Profit
Cost for 100 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/100
Note : Credit for the rock if found acceptable as construction
material shall be afforded
Maintenance of Gravel Road
Maintenance of gravel road including making up the loss of
profile, rectifying corrugated surface, filling up of
depressions, pot holes and erosion gullies by adding fresh
material and compacting it with appropriate equipment or to
strip excess of material from the road surface as per
drawings and technical specification Clause 1905 MORD
Rate
Rs.
Amount
Rs.
Remarks
1.670
2.500
17.500
70.000
28.120
50%
RBR-MTRD-16
16
627
RBR-MTRD
Index-code
S. No
Description
Unit
Quantity
Rate
Rs.
day
day
day
1.100
1.400
L.S
LS
day
day
day
4.200
1.000
L.S
LS
day
day
day
2.400
4.000
LS
LS
day
day
day
2.090
0.125
LS
LS
RBR-MTRD-17
17
Amount
Rs.
Remarks
Maintenance of Culverts
(I) Maintenance of Hume pipe Culvert by way of Clearing, Cleaning,
Erosion repair, repairs to cracks, parapet wall and protection work as
per drawing and technical specification Clause 1908 MORD.
RBR-MTRD-18
18
RBR-MTRD-19
19
Unit = 1 km
All types of signs in one Km
a) Labour
Mate
Mazdoor (Unskilled)
Painter 1st Class
b) Material
Synthetic Enamel Paint, Engineering grade tape, welding
machine etc. (LS Rs.300)
c&d) Overheads & Contractors Profit
Cost for one Km = a+b+c+d
Rate per km = a+b+c+d
628
RBR-MTRD
Index-code
RBR-MTRD-20
RBR-MTRD-21
S. No
Description
Unit
Quantity
Rate
Rs.
20
21
Amount
Rs.
Remarks
0.324
0.100
0.200
0.039
0.001
LS
0.212
0.100
0.100
0.013
Unit = 1 km
Assuming 1 km stone, 4 nos 200 metre stone and 1/5th 5km
stone
Painting two coats with synthetic enamel paint
200 m stone 4 nos = 0.760 sqm.
One km stone = 0.815 sqm.
5th km stone 1x1/5 = 0.320 sqm.
Total = 1.895 sqm.
sqm
As per item No. 10.5 of chapter 10
1.895
per cm
220.000
629
RBR-MTRD
Index-code
S. No
1
RBR-MTRD-22
Description
Unit
Quantity
Rate
Rs.
day
day
day
0.524
0.100
LS
LS
day
day
day
1.120
2.000
day
day
2.080
day
day
10.400
day
day
day
0.153
0.143
quintal
kg
kg
0.045
0.100
0.013
a) Labour
Mate
Mazdoor (Unskilled)
Mason 1st Class
b)
Material
Cement, sand, aggregates etc.
(LS = Rs.100.00)
c&d) Overheads & Contractors Profit
Rate per/km = (i+ii+a+b+c+d)
Cutting of branches of trees shrubs and trimming of
grass and weeds
22
i
23
Remarks
RBR-MTRD-23
Amount
Rs.
Unit = sqm
Taking output = 1500 sqm
a) Labour
Mate
Mazdoor (Unskilled)
b&c) Overheads & Contractors Profit
Cost for 1500 sqm = a+b+c
Rate per sqm = a+b+c/1500
White washing of parapet walls of CD work and tree
truncks
White washing two coats on parapet walls and tree trunks including
preparation of surface by cleaning scraping etc. as per technical
specifications Clause 1915 MORD
RBR-MTRD-24
24
Unit = sqm
Taking output = 9 sqm
a) Labour
Mate
Mazdoor (Unskilled)
White washer
b)
Material
Lime
Fevicol adhesive
Indigo
c&d) Overheads & Contractors Profit
Cost for 9 sqm = a+b+c+d
Rate per sqm = a+b+c+d/9
Periodical Renewal to existing bituminous surface
I Open graded Premix carpet 20 mm thick
Unit = sqm
(i) Tack coat
With bituminous Emulsion (RS-1)
Rates as in Chapter 5
sqm
Rates as in Chapter 5
as relevant
Or
(iii) Premix carpet using bitumen Emulsion
Rates as in Chapter 5
sqm
sqm
630
RBR-MTRD
Index-code
S. No
Description
Unit
Quantity
Rate
Rs.
Amount
Rs.
Remarks
sqm
General Note :
The provisions towards Mate is included in the provision towards unskilled Mazdoor.
631