Rate Analysis
Rate Analysis
BRICK WORK
DESCRIPTION OF ITEM:
Item No. 1
Detail
MATERIAL
1 Bricks 9" x 4" x 3"
1350.00 Nos.
2 Good earth or stiff clay for mud master
35.00 Cft
Total
Contractor's Profit & Ov
Total
20
Nos.
% Cft
Percent
Mason
Coolies unskilled
Bahishti
1.50 Nos.
2.00 Nos.
0.13 No
per day
per day
per day
0.67 No.
0.33 No
per day
per day
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum
Page 1
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 1
In ground floor.
Detail
MATERIAL
1 Bricks 9" x 4" x 3"
1350.00 Nos.
2 Good earth or stiff clay for mud master
35.00 Cft
Total
Contractor's Profit & Ov
Total
20
Nos.
% Cft
Percent
Mason
Coolies unskilled
Bahishti
2.00 Nos.
3.00 Nos.
0.13 No.
per day
per day
per day
0.67 No.
0.33 No
per day
per day
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 2
DESCRIPTION OF ITEM:
Item No. 2
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.25 No.
1.00 No.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Say
Labour rate per Cum
Say
LABOUR for 125 Cft
Second Floor
1
2
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.75 No.
2.00 Nos.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Say
Labour rate per Cum
Say
Page 3
Detail
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.25 Nos.
3.00 Nos.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Say
Labour rate per Cum
Say
LABOUR for 125 Cft
4th & Subsequent Floor
1
2
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
2.25 Nos.
4.50 Nos.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Labour rate per cum
Rs.
Rs.
Page 4
Say
Say
DESCRIPTION OF ITEM:
Item No. 3
Detail
MATERIAL
1 Bricks 9" x 4" x 3"
2 Good earth or stiff clay
Total
Contractor's Profit & Ov
Total
1350.00 Nos.
35.00 Cft
20
Nos.
% Cft
Percent
Mason
Coolies unskilled
2.00 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.33 No
per day
per day
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 5
DESCRIPTION OF ITEM:
Item No. 3
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.25 No.
1.00 No
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 6
Say
Say
DESCRIPTION OF ITEM:
Item No. 4 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
8.00 bags
20.00 Cft
Nos.
per bag
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 7
DESCRIPTION OF ITEM:
Item No. 4 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
6.00 bags
22.50 Cft
Nos.
per bags
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 8
DESCRIPTION OF ITEM:
Item No. 4 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
4.80 bags
24.00 Cft
Nos.
per bag
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 9
DESCRIPTION OF ITEM:
Item No. 4 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
4.00 bags
25.00 Cft
Nos.
per bag
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 10
DESCRIPTION OF ITEM:
Item No. 4 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
3.40 bags
25.70 Cft
Nos.
per bag
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 11
DESCRIPTION OF ITEM:
Item No. 4 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
3.00 bags
26.50 Cft
Nos.
per bag
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 12
DESCRIPTION OF ITEM:
Item No. 4 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
2.66 bags
26.67 Cft
Nos.
per bag
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 13
DESCRIPTION OF ITEM:
Item No. 4 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
3.20
59.72
24.00
20
Nos.
bags
kg
Cft
Nos.
per bag
per kg
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Rs.
Rs.
Say
Say
Page 14
DESCRIPTION OF ITEM:
Item No. 4 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
2.85
53.00
24.78
20
Nos.
bags
kg
Cft
Nos.
per bag
per kg
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 15
DESCRIPTION OF ITEM:
Item No. 4 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
2.56
47.78
25.60
20
Nos.
bags
kg
Cft
Nos.
per bag
per kg
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 16
DESCRIPTION OF ITEM:
Item No. 4 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
2.32
43.30
26.20
20
Nos.
bags
kg
Cft
Nos.
per bag
per kg
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Rs.
Rs.
Say
Say
Page 17
DESCRIPTION OF ITEM:
Item No. 4 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
2.14
39.94
26.66
20
Nos.
bags
kg
Cft
Nos.
per bag
per kg
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 18
DESCRIPTION OF ITEM:
Item No. 4 (iii)
Detail
MATERIAL
1
Pacca brick 9" x 4" x 3"
2
Lime Slaked
3
Sand
Total
Contractor's Profit & Ov
Total
20
1350.00 Nos.
174.30 Kg.
23.33 Cft
Nos.
Per Kg.
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum
Page 19
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 5 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
8.00 bags
20.00 Cft
Nos.
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 20
DESCRIPTION OF ITEM:
Item No. 5 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
6.00 bags
22.50 Cft
Nos.
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 21
DESCRIPTION OF ITEM:
Item No. 5 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
4.80 bags
24.00 Cft
Nos.
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 22
DESCRIPTION OF ITEM:
Item No. 5 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
4.00 bags
25.00 Cft
Nos.
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 23
DESCRIPTION OF ITEM:
Item No. 5 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
3.40 bags
25.70 Cft
Nos.
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 24
DESCRIPTION OF ITEM:
Item No. 5 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
3.00 bags
26.50 Cft
Nos.
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 25
DESCRIPTION OF ITEM:
Item No. 5 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
2.66 bags
26.57 Cft
Nos.
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 26
DESCRIPTION OF ITEM:
Item No. 5 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
59.72
3.20
24.00
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 27
DESCRIPTION OF ITEM:
Item No. 5 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
53.37
2.85
24.78
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 28
DESCRIPTION OF ITEM:
Item No. 5 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
47.78
2.56
25.60
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 29
DESCRIPTION OF ITEM:
Item No. 5 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
43.30
2.32
26.20
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 30
DESCRIPTION OF ITEM:
Item No. 5 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
40.00
2.14
26.66
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 31
DESCRIPTION OF ITEM:
Item No. 5 (iii)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
174.30 kg
23.33 Cft
Nos.
per kg
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 32
DESCRIPTION OF ITEM:
Item No. 6
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.25 No.
1.00 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
per day
per day
Rs.
Say
Rs.
Say
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.75 No.
2.00 Nos.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
per day
per day
Rs.
Say
Rs.
Say
Page 33
Detail
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.25 Nos.
3.00 Nos.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Say
Labour rate per Cum
Say
LABOUR for 125 Cft
4th & Subsequent Floor
1
2
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
2.25 Nos.
4.50 Nos.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Labour rate per cum
Rs.
Rs.
Page 34
Say
Say
DESCRIPTION OF ITEM:
Item No. 7 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
8.00 bags
20.00 Cft
Nos.
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 35
Item No. 7
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
6.00 bags
22.50 Cft
Nos.
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 36
DESCRIPTION OF ITEM:
Item No. 7 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
4.80 bags
24.00 Cft
Nos.
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 37
DESCRIPTION OF ITEM:
Item No. 7 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
4.00 bags
25.00 Cft
Nos.
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 38
DESCRIPTION OF ITEM:
Item No. 7 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
3.40 bags
25.70 Cft
Nos.
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 39
DESCRIPTION OF ITEM:
Item No. 7 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
3.00 bags
26.50 Cft
Nos.
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 40
DESCRIPTION OF ITEM:
Item No. 7 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
2.66 bags
26.67 Cft
Nos.
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 41
DESCRIPTION OF ITEM:
Item No. 7 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
59.72
3.20
24.00
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 42
DESCRIPTION OF ITEM:
Item No. 7 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
53.00
2.85
24.78
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 43
DESCRIPTION OF ITEM:
Item No. 7 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
47.78
2.56
25.60
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 44
DESCRIPTION OF ITEM:
Item No. 7 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
43.29
2.32
26.20
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 45
DESCRIPTION OF ITEM:
Item No. 7 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
39.94
2.14
26.66
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 46
DESCRIPTION OF ITEM:
Item No. 7 (iii)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
174.30 kg
23.33 Cft
Nos.
per kg
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 47
DESCRIPTION OF ITEM:
Item No. 8
Detail
Masons
Cooly
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.25 No.
1.00 No.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate Per 100 Cft.
Labour Rate Per Cum.
Rs.
Rs.
Page 48
Say
Say
DESCRIPTION OF ITEM:
Item No. 9
Detail
Masons
Cooly
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.50 No.
0.50 No.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate Per 100 Cft.
Labour Rate Per Cum.
Rs.
Rs.
Page 49
Say
Say
DESCRIPTION OF ITEM:
Item No. 10
Detail
MATERIAL
1
Pacca bricks
Total
Contractor's Profit & Ov
Total
82.00 No.
20
% Cft
Percent
Mason
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.25 No.
10
Percent
20
Percent
per day
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 50
DESCRIPTION OF ITEM:
Item No. 11
Detail
Mason
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.43 No.
10
Percent
20
Percent
per day
ITEM RATES
Labour rate per 100 Cft
Composit rate per Cum
Rs.
Rs.
Page 51
Say
Say
DESCRIPTION OF ITEM:
Item No. 12
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.12 No.
0.50 No.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Composit rate per Cum
Rs.
Rs.
Page 52
Say
Say
DESCRIPTION OF ITEM:
Item No. 12
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.25 No.
1.00 No.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Composit rate per Cum
Rs.
Rs.
Page 53
Say
Say
DESCRIPTION OF ITEM:
Item No. 13
Extra for face work (half brick thick) using special brick
of Ist class bricks.
Detail
MATERIAL
1
2
270.00
513.00
Total
Add 5% wastage
Total
783.00
39.15
822.15
Extra cost
= 0
20
%0 Nos.
Percent
Rs.
Rs.
Page 54
Say
Say
DESCRIPTION OF ITEM:
Item No. 14
Detail
MATERIAL
1
2
3
4
Pacca bricks
Cement
Sand
Kikar wood for centring & shuttering
(10 x 1.60 x 0.2) Can be use 20 times
Total
Contractor's Profit & Ov
Total
20
10.00 No.
0.11 bag
0.41 Cft
Nos.
per bag
% Cft
0.002 Cft
Cft
0.067 No.
0.11 No.
0.023 No.
per day
per day
per day
Percent
Mason
Cooly unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 55
DESCRIPTION OF ITEM:
Item No. 15 (a)
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
3.00 No.
0.34 No.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 No.
Rs.
Page 56
Say
DESCRIPTION OF ITEM:
Item No. 15 (b)
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.50 No.
0.17 No.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 No.
Rs.
Page 57
Say
DESCRIPTION OF ITEM:
Item No. 16
(i)
Detail
MATERIAL
1
2
20
338.00 No.
8.75 Cft
Nos.
% Cft
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00 No.
1.83 Nos.
0.23 No.
10
Percent
20
Percent
per day
per day
per day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 58
DESCRIPTION OF ITEM:
Item No. 16 (ii)
Detail
MATERIAL
1
2
3
20
338.00 No.
2.00 bags
5.00 Cft
Nos.
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 59
DESCRIPTION OF ITEM:
Item No. 16 (ii)
Detail
MATERIAL
1
2
3
20
338.00 No.
1.50 bags
5.60 Cft
Nos.
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 60
DESCRIPTION OF ITEM:
Item No. 16 (ii)
Detail
MATERIAL
1
2
3
20
338.00 No.
1.20 bags
6.00 Cft
Nos.
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 61
DESCRIPTION OF ITEM:
Item No. 16 (ii)
Detail
MATERIAL
1
2
3
20
338.00 No.
1.00 bags
6.25 Cft
Nos.
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 62
DESCRIPTION OF ITEM:
Item No. 16 (ii)
Detail
MATERIAL
1
2
3
20
338.00 No.
0.86 bags
6.40 Cft
Nos.
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 63
DESCRIPTION OF ITEM:
Item No. 16 (ii)
Detail
MATERIAL
1
2
3
20
338.00 No.
0.75 bags
6.58 Cft
Nos.
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 64
DESCRIPTION OF ITEM:
Item No. 16 (ii)
Detail
MATERIAL
1
2
3
20
338.00 No.
0.67 bags
6.67 Cft
Nos.
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 65
DESCRIPTION OF ITEM:
Item No. 16 (iii)
Detail
MATERIAL
1
2
3
4
20
338.00
14.93
0.80
6.00
No.
kg
bags
Cft
Nos.
kg
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 66
DESCRIPTION OF ITEM:
Item No. 16 (iii)
Detail
MATERIAL
1
2
3
4
20
338.00
13.44
0.71
6.13
No.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 67
DESCRIPTION OF ITEM:
Item No. 16 (iii)
Detail
MATERIAL
1
2
3
4
20
338.00
12.32
0.64
6.40
No.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 68
DESCRIPTION OF ITEM:
Item No. 16 (iii)
Detail
MATERIAL
1
2
3
4
20
338.00
10.82
0.58
6.50
No.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 69
DESCRIPTION OF ITEM:
Item No. 16 (iii)
Detail
MATERIAL
1
2
3
4
20
338.00
10.08
0.54
6.70
No.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 70
DESCRIPTION OF ITEM:
Item No. 16 (iv)
Detail
MATERIAL
1
2
3
20
338.00 Nos.
43.67 kg
5.58 Cft
Nos.
per kg
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 71
DESCRIPTION OF ITEM:
Item No. 17
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.13 No.
0.50 No.
10
Percent
20
Percent
ITEM RATES
Labour rate for 100 Sft
per day
per day
Rs.
Say
Rs.
Say
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.37 No.
1.00 No.
10
Percent
20
Percent
ITEM RATES
Labour rate for 100 Sft
per day
per day
Rs.
Say
Rs.
Say
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.63 No.
1.50 Nos.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate for 100 Sft
Say
Labour rate per Sqm
Say
Page 72
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.12 Nos.
2.12 Nos.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate for 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 73
Say
Say
DESCRIPTION OF ITEM:
Item No. 18 (i)
Detail
MUD MORTAR
1
2
20
675.00 Nos.
17.50 Cft
Nos.
% Cft
1.25 Nos.
2.75 Nos.
0.35 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 74
DESCRIPTION OF ITEM:
Item No. 18 (ii)
Detail
MATERIAL
1
2
3
Total
Contractor's Profit & Ov
Total
20
675.00 Nos.
4.00 bags
10.00 Cft
Nos.
bags
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 75
DESCRIPTION OF ITEM:
Item No. 18 (ii)
Detail
MATERIAL
1
2
3
Total
Contractor's Profit & Ov
Total
20
675.00 Nos.
3.00 bags
11.25 Cft
Nos.
bags
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 76
DESCRIPTION OF ITEM:
Item No. 18 (ii)
Detail
MATERIAL
1
2
3
Total
Contractor's Profit & Ov
Total
20
675.00 Nos.
2.40 bags
12.00 Cft
Nos.
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 77
DESCRIPTION OF ITEM:
Item No. 18 (ii)
Detail
MATERIAL
1
2
3
Total
Contractor's Profit & Ov
Total
20
675.00 Nos.
2.00 bags
12.50 Cft
Nos.
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 78
DESCRIPTION OF ITEM:
Item No. 18 (ii)
Detail
MATERIAL
1
2
3
Total
Contractor's Profit & Ov
Total
20
675.00 Nos.
1.72 bags
12.80 Cft
Nos.
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 79
DESCRIPTION OF ITEM:
Item No. 18 (ii)
Detail
MATERIAL
1
2
3
Total
Contractor's Profit & Ov
Total
20
675.00 Nos.
1.50 bags
13.13 Cft
Nos.
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 80
DESCRIPTION OF ITEM:
Item No. 18 (ii)
Detail
MATERIAL
1
2
3
Total
Contractor's Profit & Ov
Total
20
675.00 Nos.
1.33 bags
13.34 Cft
Nos.
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 81
DESCRIPTION OF ITEM:
Item No. 18 (iii)
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
675.00
29.86
1.60
12.00
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 82
DESCRIPTION OF ITEM:
Item No. 18 (iii)
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
675.00
26.50
1.42
12.39
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 83
DESCRIPTION OF ITEM:
Item No. 18 (iii)
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
675.00
23.90
1.28
12.80
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 84
DESCRIPTION OF ITEM:
Item No. 18 (iii)
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
675.00
21.65
1.16
13.10
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 85
DESCRIPTION OF ITEM:
Item No. 18 (iii)
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
675.00
20.16
1.07
13.33
Nos.
kg
bags
Cft
Nos.
per kg
per kg
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 86
DESCRIPTION OF ITEM:
Item No. 18 (iv)
Detail
MATERIAL
1
2
3
Total
Contractor's Profit & Ov
Total
20
675.00 Nos.
86.97 kg
11.67 Cft
Nos.
per kg
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 87
DESCRIPTION OF ITEM:
Item No. 19
Detail
LABOUR
First Floor
0.75
0.75
Say
Say
LABOUR
Second Floor
0.75
0.75
Say
Say
LABOUR
Third Floor
0.75
0.75
Say
Say
LABOUR
Fourth & Subsequent Floor
0.75
0.75
Say
Say
Page 88
DESCRIPTION OF ITEM:
Item No. 20
Upto 20 ft.
Detail
Total
Contractor's Profit & Ov
Total
20
1350.00 No.
8.80 bags
22.00 Cft
Each
per bag
per Cft
3.00 Nos.
3.00 Nos.
0.25 No.
per day
per day
per day
1.00 No.
0.25 No
per day
per day
Percent
Mason
Coolies
Bahishti
for mortar
1
2
Cooly
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 89
DESCRIPTION OF ITEM:
Item No. 20
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.25 No.
1.00 No
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 90
Say
Say
DESCRIPTION OF ITEM:
Item No. 21
4" (114 mm) thick walling with hoop iron bouding 6"
(150 mm) apart.
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
525.00
2.40
9.00
45.00
20.41
Nos.
bags
Cft
lbs
Kg.
Nos.
per bag
% Cft
Per Kg.
1.00
1.25
0.25
0.15
No.
Nos.
No.
No.
per
per
per
per
Percent
LABOUR
1
2
3
4
Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 91
DESCRIPTION OF ITEM:
Item No. 21
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
525.00
2.40
9.00
22.50
10.20
Nos.
bags
Cft
lbs
kg.
Nos.
per bag
% Cft
Per Kg.
No.
No.
No.
No.
per
per
per
per
Percent
LABOUR
1
2
3
4
Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00
1.00
0.25
0.10
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 92
DESCRIPTION OF ITEM:
Item No. 21
3" (75 mm) thick walling with hoop iron bouding 6"
(150 mm) apart.
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
350.00
1.80
6.50
45.00
20.41
Nos.
bags
Cft
lbs
Kg.
Nos.
per bag
% Cft
Per Kg.
No.
No.
No.
No.
per
per
per
per
Percent
Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.75
1.00
0.20
0.15
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 93
DESCRIPTION OF ITEM:
Item No. 21
3" (75 mm) thick walling with hoop iron bouding 12"
(300 mm) apart.
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
350.00
1.80
6.50
20.00
9.070
Nos.
bags
Cft
lbs
Kg.
Nos.
per bag
% Cft
Per Kg.
No.
No.
No.
No.
per
per
per
per
Percent
Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.75
1.00
0.20
0.15
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 94
DESCRIPTION OF ITEM:
Item No. 22
Detail
MATERIAL
1
2
x
x
Total
LABOUR for 125 Cft
1
2
3
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
2.00 Nos.
3.67 Nos.
0.50 No.
10
Percent
20
Percent
per day
per day
per day
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 95
DESCRIPTION OF ITEM:
Item No. 23
Detail
MATERIAL
1
Total
Contractor's Profit & Ov
Total
20
1350.00 Nos.
Nos.
1.00 No.
2.00 Nos.
per day
per day
Percent
LABOUR
1
2
Mason
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 96
DESCRIPTION OF ITEM:
Item No. 24
Detail
MATERIAL
1
2
Total
Contractor's Profit & Ov
Total
1350.00 Nos.
35.00 Cft
20
Nos.
% Cft
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.50 Nos.
3.50 Nos.
0.25 No.
10
Percent
20
Percent
per day
per day
per day
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 97
DESCRIPTION OF ITEM:
Item No. 25
Detail
Coolies skilled
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00 No.
1.50 Nos.
0.50 No.
10
Percent
20
Percent
per day
per day
per day
ITEM RATES
Labour rate per 100 Cft
Composite rate per Cum
Rs.
Rs.
Page 98
Say
Say
DESCRIPTION OF ITEM:
Item No. 26
Detail
Moulded brick
Cement for laying and plastering
Sand
Deduct cost of ordinary bricks
Total
Contractor's Profit & Ov
Total
20
280.00
1.50
5.00
140
Nos.
bag
Cft
Nos.
Nos.
per bag
% Cft
Nos.
1.75 Nos.
1.75 Nos.
0.25 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 99
DESCRIPTION OF ITEM:
Item No. 26
Detail
20
420.00
1.75
6.00
210.00
Nos.
bag
Cft
Nos.
Nos.
per bag
% Cft
Nos.
2.00 Nos.
2.00 Nos.
0.25 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 100
Rft
DESCRIPTION OF ITEM:
Item No. 26
Detail
Total
Contractor's Profit & Ov
Total
20
465.00
465.00
1.20
5.00
Nos.
Nos.
bag
Cft
Nos.
Nos.
per bag
% Cft
1.00 No.
2.00 Nos.
per day
per day
Percent
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 101
DESCRIPTION OF ITEM:
Item No. 27
One brick.
Detail
2
3
Total
Contractor's Profit & Ov
Total
20
Nos.
per bag
% Cft
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
2.00 Nos.
2.00 Nos.
0.25 No.
10
Percent
20
Percent
per day
per day
per day
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 102
Rft
DESCRIPTION OF ITEM:
Item No. 27
Two brick.
Detail
Pacca bricks
Cement for laying & plastering
Sand for laying & plastering
Total
Contractor's Profit & Ov
Total
20
175.00 Nos.
5.00 bags
18.00 Cft
Nos.
per bag
% Cft
3.00 Nos.
3.00 Nos.
0.25 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 103
DESCRIPTION OF ITEM:
Item No. 27
Three bricks.
Detail
Pacca bricks
Cement for laying & plastering
Sand for laying & plastering
Total
Contractor's Profit & Ov
Total
20
270.00 Nos.
8.00 bags
60.00 Cft
Nos.
per bag
% Cft
4.00 Nos.
4.00 Nos.
0.34 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 104
DESCRIPTION OF ITEM:
Item No. 27
Four brick.
Detail
Pacca bricks
Cement for laying & plastering
Sand for laying & plastering
Total
Contractor's Profit & Ov
Total
20
580.00 Nos.
10.00 bags
37.00 Cft
Nos.
per bag
% Cft
5.00 Nos.
5.00 Nos.
0.50 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 105
DESCRIPTION OF ITEM:
Item No. 28
Detail
Cooly unskilled
1.75 Nos.
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
per day
ITEM RATES
Labour rat per 1000 No.
Rs.
Say
DESCRIPTION OF ITEM:
Item No. 29
Detail
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
3.30 Nos.
10
Percent
20
Percent
per day
ITEM RATES
Labour rat per 1000 No.
Rs.
Page 106
Say
DESCRIPTION OF ITEM:
Item No. 30
Detail
MATERIAL
1
Sand
Total
Contractor's Profit & Ov
Total
20
100.00 Nos.
% Nos.
0.50 Nos.
per day
Percent
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft.
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 107
DESCRIPTION OF ITEM:
Item No. 31
Providing and laying 2" (50 mm) thick projected tile bank
(1: 2) cement sand mortar with hoop iron 1" (25 mm) wide 1
SWG flat iron sheet 9" (225 mm) apart.
Detail
Total
Contractor's Profit & Ov
Total
20
43.00
0.09
0.20
3.00
Nos.
bag
Cft
Kg.
Nos.
per bag
% Cft
Per Kg.
Percent
LABOUR
1
2
Mason
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.50 No.
0.50 No.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 108
DESCRIPTION OF ITEM:
Item No. 32
Ist class brick tiles (9" 4" x 1") 225 x 114 x 40 mm cla
76 mm thick laid in cement sand mortar recifered with hoop
strips placed at 2 ft. (600 mm) apart vertically.
(i)
Ratio (1 : 3).
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
810.00
2.40
9.00
4.54
No.
bags
Cft
Kg.
Nos.
per bag
% Cft
per Kg.
No.
No.
No.
No.
per
per
per
per
Percent
LABOUR
1
2
3
4
Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00
1.00
0.25
0.10
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 109
DESCRIPTION OF ITEM:
Item No. 32
Ist class brick tiles (9" 4" x 1") 225 x 114 x 40 mm cla
76 mm thick laid in cement sand mortar recifered with hoop
strips placed at 2 ft. (600 mm) apart vertically.
(ii)
Ratio (1 : 4).
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
810.00
1.92
9.60
4.54
No.
bags
Cft
Kg.
Nos.
per bag
% Cft
per Kg.
No.
No.
No.
No.
per
per
per
per
Percent
LABOUR
1
2
3
4
Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00
1.00
0.25
0.10
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft.
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 110
DESCRIPTION OF ITEM:
Item No. 33
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00 No.
1.00 No.
10
Percent
20
Percent
Rs.
Rs.
Page 111
per day
per day
Say
Say
DESCRIPTION OF ITEM:
Item No. 34
Detail
Assume 60 Bricks
MATERIAL
1
2
3
Bricks
Cement
Sand
Total
Contractor's Profit & Ov
Total
20
50.00 Nos.
0.005 Bag
0.026 Cft
Nos.
Bag
% Cft.
2.00 No.
1.00 No.
per day
per day
Percent
LABOUR
1
2
Mason
Cooly
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Brick
Composit rate per Brick
Rs.
Rs.
Page 112
Say
Say
DESCRIPTION OF ITEM:
Item No. 35
Detail
MATERIAL
1
2
3
20
10.00 No.
0.08 bags
0.25 Cft
Nos.
per bag
% Cft
0.25 No.
0.25 No.
per day
per day
Percent
Mason
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Each No.
Composite rate per Each No.
Rs.
Rs.
Page 113
Say
Say
DESCRIPTION OF ITEM:
Item No. 36
Detail
Mason
1.00 No.
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
Rs.
Rs.
per day
Say
Say
DESCRIPTION OF ITEM:
Item No. 37
Maroo corners.
Detail
Mason
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.20 No.
10
Percent
20
Percent
Rs.
Page 114
per day
Say
CHAPTER NO. 11
SURFACE RENDERING
DESCRIPTION OF ITEM:
Item No. 1
Mud plaster on walls (excluding Gobri leeping) upto 20' (6.10 metre) height.
(a)
Detail
Amount (Rs.)
MATERIAL
1
2
Clay
Bhoosa
6.00 Cft
7.50 kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahisthi
0.17 No.
0.50 No.
0.05 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 1
DESCRIPTION OF ITEM:
Item No. 1
Detail
Amount (Rs.)
MATERIAL
1
2
Clay
Bhoosa
12.00 Cft
15.00 kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.20 No.
0.75 No.
0.07 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 2
DESCRIPTION OF ITEM:
Item No. 2
Detail
Amount (Rs.)
MATERIAL
1
2
Clay
Bhoosa
6.00 Cft
7.50 kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.15 No.
0.45 No.
0.05 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 3
DESCRIPTION OF ITEM:
Item No. 2
Detail
Amount (Rs.)
MATERIAL
1
2
Clay
Bhoosa
12.00 Cft
15.00 kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.15 No.
0.45 No.
0.05 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 4
DESCRIPTION OF ITEM:
Item No. 3
Detail
Amount (Rs.)
MATERIAL
1
2
3
Cement
Lime Slaked (ground)
Sand
0.10 bag
12.70 kg
1.40 Cft
0.00
0.00
0.00
bags
kg
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
1.00 No.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
-0.01
0.00
Say
Say
Rs.
Rs.
-0.01
0.00
Say
Say
Page 5
DESCRIPTION OF ITEM:
Item No. 3
Detail
Amount (Rs.)
MATERIAL
1
2
3
Cement
Lime Slaked (ground)
Sand
0.20 bag
25.38 kg
2.80 Cft
0.00
0.00
0.00
bags
kg
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
1.00 No.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.01
0.00
Say
Say
Page 6
DESCRIPTION OF ITEM:
Item No. 4
Cement neru plaster 1 : 2 (cement and sand) upto 20 ft. (6.10 metre).
(a)
Detail
Amount (Rs.)
MATERIAL
1
2
3
Cement
Sand
Chopped jute
0.60 bag
1.54 Cft
1.41 kg
0.00
0.00
0.00
bags
Cft
kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
1.00 No.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 7
DESCRIPTION OF ITEM:
Item No. 4
Cement neru plaster 1 : 2 (cement and sand) upto 20 ft. (6.10 metre).
(b)
Detail
Amount (Rs.)
MATERIAL
1
2
3
Cement
Sand
Chopped jute
0.92 bag
3.08 Cft
2.72 kg
0.00
0.00
0.00
bags
Cft
kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
1.00 No.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 8
DESCRIPTION OF ITEM:
Item No. 5
Stucco cement plaster 2" (50 mm) thick 1 : 2 : 4 (cement sand and shingle,
upto 20 ft (6.0 m) height.
Detail
Amount (Rs.)
MATERIAL
1
2
3
Shingle
Sand
Cement
15.00 Cft
7.40 Cft
3.70 bags
-200.00
0.00
0.00
% Cft
Cft
bags
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
1.00 No.
4.00 Nos.
0.30 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 9
DESCRIPTION OF ITEM:
Item No. 6
Providing and laying machine sprayed plaster " (12 mm) thick, using
cement and chips zero gauge over the existing plastered and roughened
surface, upto 20 ft height (6 metre).
(i)
Ratio 1 : 1.
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Chips
1.80 bag
2.30 Cft
157.00 kg
0.00
0.00
bags
kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
Spray machine
1.00 No.
0.50 Nos.
0.13 No.
L.S
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 10
DESCRIPTION OF ITEM:
Item No. 6
Providing and laying machine sprayed plaster "12 mm thick, using cement
and chips zero gauge over the existing plastered and roughened surface,
upto 20 ft height.
(ii)
Ratio 1 : 1.
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Chips
1.45 bag
2.75 Cft
187.00 kg
0.00
0.00
bags
kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
Spray machine
1.00 No.
0.50 Nos.
0.13 No.
L.S
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 11
DESCRIPTION OF ITEM:
Item No. 6
Providing and laying machine sprayed plaster "12 mm thick, using cement
and chips zero gauge over the existing plastered and roughened surface,
upto 20 ft height.
(iii)
Ratio 1 : 2.
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Chips
1.25 bag
3.00 Cft
204.00 kg
0.00
0.00
bags
kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
Spray machine
1.00 No.
0.50 Nos.
0.13 No.
L.S
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 12
DESCRIPTION OF ITEM:
Item No. 7
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.96 bag
2.50 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.01
0.00
Say
Say
Page 13
DESCRIPTION OF ITEM:
Item No. 7
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
1.25 bag
3.00 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 14
DESCRIPTION OF ITEM:
Item No. 7
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
1.92 bag
5.00 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
1.00 No.
1.25 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 15
DESCRIPTION OF ITEM:
Item No. 8
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.66 bag
2.55 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 16
DESCRIPTION OF ITEM:
Item No. 8
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.88 bag
3.40 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
-0.01
0.00
Say
Say
Rs.
Rs.
-0.01
0.00
Say
Say
Page 17
DESCRIPTION OF ITEM:
Item No. 8
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
1.32 bag
5.10 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
1.00 No.
1.25 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 18
DESCRIPTION OF ITEM:
Item No. 9
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.57 bag
3.00 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 19
DESCRIPTION OF ITEM:
Item No. 9
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.73 bag
3.60 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 20
DESCRIPTION OF ITEM:
Item No. 9
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
1.14 bag
5.50 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
1.00 No.
1.25 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 21
DESCRIPTION OF ITEM:
Item No. 10
Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. roof slab only, upto
20 ft. (6.10 meter) height.
(a)
Ratio ( 1 : 2 ).
Detail
Amount (Rs.)
MATERIAL
1
2
1.16 bag
2.55 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
1.00 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 22
DESCRIPTION OF ITEM:
Item No. 10
Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. roof slab only, upto
20 ft. (6.10 meter) height.
(b)
Ratio ( 1 : 3 ).
Detail
Amount (Rs.)
MATERIAL
1
2
0.86 bag
2.55 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
1.00 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 23
DESCRIPTION OF ITEM:
Item No. 10
Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. roof slab only, upto
20 ft. (6.10 meter) height.
(c)
Ratio ( 1 : 4 ).
Detail
Amount (Rs.)
MATERIAL
1
2
0.77 bag
3.00 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
1.00 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 24
DESCRIPTION OF ITEM:
Item No. 11
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.50 bag
3.00 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 25
DESCRIPTION OF ITEM:
Item No. 11
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.60 bag
4.00 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 26
DESCRIPTION OF ITEM:
Item No. 11
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
1.00 bag
6.00 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
1.00 No.
1.25 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 27
DESCRIPTION OF ITEM:
Item No. 12
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.40 bag
3.00 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 28
DESCRIPTION OF ITEM:
Item No. 12
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.53 bag
4.00 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 29
DESCRIPTION OF ITEM:
Item No. 12
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.80 bag
6.00 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
1.00 No.
1.25 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 30
DESCRIPTION OF ITEM:
Item No. 13
Detail
Amount (Rs.)
MATERIAL
1
Cement
0.40 bag
0.00
bags
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
0.25 Nos.
0.10 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 31
DESCRIPTION OF ITEM:
Item No. 14
Lime pointing flush upto 20 ft (6.10 mm) height including raking joints.
Ratio (1 : 2) lime sand mortar.
Detail
Amount (Rs.)
MATERIAL
1
2
13.44 kg
1.80 Cft
0.00
0.00
kg
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.50 No.
0.75 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 32
DESCRIPTION OF ITEM:
Item No. 15
Lime pointing struck joints on walls, upto 20 ft. (6.10 metre) height
including raking joints Ratio (1 : 2) lime sand mortar.
Detail
Amount (Rs.)
MATERIAL
1
2
13.44 kg
1.80 Cft
0.00
0.00
kg
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
1.00 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 33
DESCRIPTION OF ITEM:
Item No. 16
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.72 bag
1.80 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 34
DESCRIPTION OF ITEM:
Item No. 16
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.54 bag
2.00 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.75 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 35
DESCRIPTION OF ITEM:
Item No. 17
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.72 bag
1.80 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
0.50 No.
0.75 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 36
DESCRIPTION OF ITEM:
Item No. 18
Cement pointing struck joints on walls upto 20 ft. (6.10 metre) height.
(a)
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.72 bag
1.80 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
1.00 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 37
DESCRIPTION OF ITEM:
Item No. 18
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.54 bag
2.00 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
1.00 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 38
DESCRIPTION OF ITEM:
Item No. 19
Detail
Amount (Rs.)
MATERIAL
1
2
18.66 kg
2.00 Cft
0.00
0.00
kg
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
1.00 No.
0.50 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 39
DESCRIPTION OF ITEM:
Item No. 19
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.54 bag
2.00 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
1.00 No.
0.50 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 40
DESCRIPTION OF ITEM:
Item No. 19
(i)
Detail
Amount (Rs.)
MATERIAL
1
2
Slaked lime
Sand
0.54 bag
18.66 kg
2.00 Cft
0.00
0.00
kg
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
2.00 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 41
DESCRIPTION OF ITEM:
Item No. 19
(ii)
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.54 bag
2.00 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
2.00 No.
1.00 Nos.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 42
DESCRIPTION OF ITEM:
Item No. 20
Detail
Amount (Rs.)
Cooly (Skilled)
1.00 No.
0.00
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
DESCRIPTION OF ITEM:
Item No. 21
Detail
Amount (Rs.)
Cooly (Skilled)
0.50 No.
0.00
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 43
0.00
0.00
Say
Say
DESCRIPTION OF ITEM:
Item No. 22
Detail
Amount (Rs.)
MATERIAL
1
Chalk
0.91 kg
0.00
kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
0.10 No.
0.10 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.01
0.00
Say
Say
Page 44
DESCRIPTION OF ITEM:
Item No. 23
Distempering.
(a)
New surface.
(i)
One coat.
Detail
Amount (Rs.)
MATERIAL
1
2
3
Distemper
Burshes (Large)
Sand Paper
0.15
1.50
0.04
0.014
gln
lbs
No.
No.
0.00
0.00
0.00
per gln
Each
Doz
Total
Contractor's Profit & Ove 20.00 Percent
Total
Painter
Cooly un-skilled
0.17 No.
0.08 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 45
DESCRIPTION OF ITEM:
Item No. 23
Distempering.
(a)
New surface.
(ii)
Two coats.
Detail
Amount (Rs.)
MATERIAL
1
2
3
Distemper
Burshes (Large)
Sand Paper
0.20
2.00
0.04
0.014
gln
lbs
No.
No.
0.00
0.00
0.00
per gln
Each
Doz
Total
Contractor's Profit & Ove 20.00 Percent
Total
Painter
Cooly un-skilled
0.25 No.
0.12 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 46
DESCRIPTION OF ITEM:
Item No. 23
Distempering.
(a)
New surface.
(iii)
Three coats.
Detail
Amount (Rs.)
MATERIAL
1
2
3
Distemper
Burshes (Large)
Sand Paper
0.25
2.50
0.04
0.014
gln
lbs
No.
No.
0.00
0.00
0.00
per gln
Each
Doz
Total
Contractor's Profit & Ove 20.00 Percent
Total
Painter
Cooly un-skilled
0.33 No.
0.16 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 47
DESCRIPTION OF ITEM:
Item No. 23
Distempering.
(b)
Old surface.
(i)
One coat.
Detail
Amount (Rs.)
MATERIAL
1
2
3
Distemper
Burshes (Large)
Sand Paper
0.10
1.00
0.04
0.014
gln
lbs
No.
No.
0.00
0.00
0.00
per gln
Each
Doz
Total
Contractor's Profit & Ove 20.00 Percent
Total
Painter
Cooly un-skilled
0.15 No.
0.08 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 48
DESCRIPTION OF ITEM:
Item No. 23
Distempering.
(b)
Old surface.
(ii)
Two coats.
Detail
Amount (Rs.)
MATERIAL
1
2
3
Distemper
Burshes (Large)
Sand Paper
0.10
1.00
0.04
0.014
gln
lbs
No.
No.
0.00
0.00
0.00
per gln
Each
Doz
Total
Contractor's Profit & Ove 20.00 Percent
Total
Painter
Cooly un-skilled
0.25 No.
0.12 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 49
DESCRIPTION OF ITEM:
Item No. 24
Colour washing.
(a)
New surface.
(i)
One coat.
Detail
Amount (Rs.)
MATERIAL
1
2
3
White lime
Rice
Colouring material
1.87
0.117
0.17
0.077
kg
kg
lbs
kg
0.00
0.00
0.00
per kg
per kg
per kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Colly skilled
Cooly un-skilled
0.12 No.
0.06 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 50
DESCRIPTION OF ITEM:
Item No. 24
Colour washing.
(a)
New surface.
(ii)
Two coat.
Detail
Amount (Rs.)
MATERIAL
1
2
3
White lime
Rice
Colouring material
2.80
0.175
0.22
0.10
kg
kg
lbs
kg
0.00
0.00
0.00
per kg
per kg
per kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Colly skilled
Cooly un-skilled
0.18 No.
0.09 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 51
DESCRIPTION OF ITEM:
Item No. 24
Colour washing.
(b)
Old surface.
(i)
One coat.
Detail
Amount (Rs.)
MATERIAL
1
2
3
White lime
Rice
Colouring material
1.40
0.044
0.10
0.045
kg
kg
lbs
kg
0.00
0.00
0.00
per kg
per kg
per kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Colly skilled
Cooly un-skilled
0.12 No.
0.06 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 52
DESCRIPTION OF ITEM:
Item No. 24
Colour washing.
(b)
Old surface.
(ii)
Two coats.
Detail
Amount (Rs.)
MATERIAL
1
2
3
White lime
Rice
Colouring material
2.33
0.073
0.15
0.068
kg
kg
lbs
kg
0.00
0.00
0.00
per kg
per kg
per kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
6.99
6.99
1.40
8.39
Colly skilled
Cooly un-skilled
0.18 No.
0.09 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
8.39
0.90
Say
Say
Page 53
8.40
0.90
DESCRIPTION OF ITEM:
Item No. 25
White washing.
(a)
New surface.
(i)
One coat.
Detail
Amount (Rs.)
MATERIAL
1
2
White lime
Rice
1.87 kg
0.117 kg
0.00
0.00
per kg
per kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Colly skilled
Cooly un-skilled
0.12 No.
0.06 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 54
DESCRIPTION OF ITEM:
Item No. 25
White washing.
(a)
New surface.
(ii)
Two coats.
Detail
Amount (Rs.)
MATERIAL
1
2
White lime
Rice
2.80 kg
0.175 kg
0.00
0.00
per kg
per kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Colly skilled
Cooly un-skilled
0.18 No.
0.09 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 55
DESCRIPTION OF ITEM:
Item No. 25
White washing.
(a)
New surface.
(iii)
Three coats.
Detail
Amount (Rs.)
MATERIAL
1
2
White lime
Rice
3.73 kg
0.233 kg
0.00
0.00
per kg
per kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Colly skilled
Cooly un-skilled
0.23 No.
0.12 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 56
DESCRIPTION OF ITEM:
Item No. 25
White washing.
(b)
Old surface.
(i)
One coat.
Detail
Amount (Rs.)
MATERIAL
1
2
White lime
Rice
1.40 kg
0.088 kg
0.00
0.00
per kg
per kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Colly skilled
Cooly un-skilled
0.12 No.
0.06 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 57
DESCRIPTION OF ITEM:
Item No. 25
White washing.
(b)
Old surface.
(ii)
Two coats.
Detail
Amount (Rs.)
MATERIAL
1
2
White lime
Rice
2.33 kg
0.146 kg
0.00
0.00
per kg
per kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Colly skilled
Cooly un-skilled
0.18 No.
0.09 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 58
DESCRIPTION OF ITEM:
Item No. 26 (a)
Detail
Amount (Rs.)
MATERIAL
1
2
0.25 Cft
4.00 kg
0.00
0.00
per kg
per kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Bahishti
0.15 No.
0.06 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 59
DESCRIPTION OF ITEM:
Item No. 26 (b)
Detail
Amount (Rs.)
MATERIAL
1
2
0.25 Cft
4.00 kg
0.00
0.00
per kg
per kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Bahishti
0.12 No.
0.06 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 60
DESCRIPTION OF ITEM:
Item No. 27
Detail
Mason
0.25 No.
0.00
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
DESCRIPTION OF ITEM:
Item No. 28
Extra for lime Mud or cement plaster and pointing from 20' and above (for
each Addl: 10' height).
Detail
Mason
Cooly un-skilled
0.12 No.
0.25 No.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 61
0.00
0.00
Say
Say
DESCRIPTION OF ITEM:
Item No. 29
Detail
Amount (Rs.)
MATERIAL
1
2
3
Coaltar (Bitumen)
Sand
Fuel
4.00 kg
4.00 Cft
2.18 Kg.
0.00
0.00
0.00
per kg
per Cft
per kg.
Total
Contractor's Profit & Ove 20.00 Percent
Total
Cooly skilled
Cooly un-skilled
0.50 No.
0.50 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 62
DESCRIPTION OF ITEM:
Item No. 30
Detail
Amount (Rs.)
MATERIAL
1
2
Mud
Chopped Straw
4.00 Cft
1.50 kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Cooly skilled
Cooly un-skilled
0.50 No.
0.50 Nos.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 63
DESCRIPTION OF ITEM:
Item No. 31
Extra cost of labour and material for red oxide pigment in cement pointing
to match with the colour of bricks.
Detail
Amount (Rs.)
MATERIAL
1
2.50 lbs
0.25 gln
Total
Contractor's Profit & Ove 20.00 Percent
Total
LABOUR
0.25 Nos.
0.00
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 64
DESCRIPTION OF ITEM:
Item No. 32 (i)
Providing grooved cement plaster 3/8" (10 mm) thick ratio (1 : 3) over
existing plastered and rough surface upto 20' height.
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.66 bag
2.55 Cft
0.00
0.00
bags
Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
1.00 No.
1.00 No.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.01
0.00
Say
Say
Page 65
DESCRIPTION OF ITEM:
Item No. 32 (ii)
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.88 bag
3.40 Cft
0.00
0.00
per bag
per Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Mason
Cooly un-skilled
Bahishti
1.00 No.
1.00 No.
0.25 No.
0.00
0.00
0.00
per day
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 66
DESCRIPTION OF ITEM:
Item No. 33
Providing & fitting expanded metal edge bead for corner's with nail on
both sides of edges.
Detail
Amount (Rs.)
MATERIAL
1
Nails
1.00 Rft.
0.012 Kg.
0.00
Per Kg.
Total
Contractor's Profit & Ove 20.00 Percent
Total
Skilled Cooly
1.00 No.
0.00
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total rate for 84 Rft
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 67
DESCRIPTION OF ITEM:
Item No. 34
Single
Detail
Amount (Rs.)
MATERIAL
1
Cement
Sand
0.076 Bag
0.38 Cft.
0.00
0.00
Bag
% Cft.
Total
Contractor's Profit & Ove 20.00 Percent
Total
(0.01)
LABOUR
1
2
Mason
Cooly un-skilled
0.14 No.
0.14 No.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate for each
Composit rate for each
Rs.
Rs.
Page 68
0.00
Say
Say
DESCRIPTION OF ITEM:
Item No. 34
Double
Detail
Amount (Rs.)
MATERIAL
Cost of cement and sand
As per item 34 (
LABOUR
-
ITEM RATES
Labour rate for each
Composit rate for each
Rs.
Rs.
Page 69
0.00
0.00
Say
Say
DESCRIPTION OF ITEM:
Item No. 35
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.200 Bag
1.15 Cft.
0.00
0.00
Bag
% Cft.
Total
Contractor's Profit & Ove 20.00 Percent
Total
LABOUR
1
2
Mason
Cooly un-skilled
0.25 No.
0.34 No.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate for Each
Composit rate for Each
Rs.
Rs.
Page 70
0.00
0.00
Say
Say
DESCRIPTION OF ITEM:
Item No. 36
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.100 Bag
0.57 Cft.
0.00
0.00
Bag
% Cft.
Total
Contractor's Profit & Ove 20.00 Percent
Total
LABOUR
1
2
Mason
Cooly un-skilled
0.125 No.
0.17 No.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate for Each
Composit rate for Each
Rs.
Rs.
Page 71
0.00
0.00
Say
Say
DESCRIPTION OF ITEM:
Item No. 37
Detail
Amount (Rs.)
MATERIAL
1
2
Cement
Sand
0.16 Bag
0.91 Cft.
0.00
0.00
Bag
% Cft.
Total
Contractor's Profit & Ove 20.00 Percent
Total
LABOUR
1
2
Mason
Cooly un-skilled
0.25 No.
0.34 No.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate for Each
Composit rate for Each
Rs.
Rs.
Page 72
0.00
0.00
Say
Say
DESCRIPTION OF ITEM:
Item No. 38
Extra labour for white washing colour washing, priming coat and
distempering etc from 20 ft. (6 metre) height and above, requiring
scaffolding for every additional 10 ft. (3 metre) height, or part thereof.
Detail
Amount (Rs.)
Cooly skilled
Cooly un-skilled
0.02 No.
0.01 No.
0.00
0.00
per day
per day
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 73
0.00
0.00
Say
Say
CHAPTER NO. 7
BRICK WORK
DESCRIPTION OF ITEM:
Item No. 1
Detail
MATERIAL
1 Bricks 9" x 4" x 3"
1350.00 Nos.
2 Good earth or stiff clay for mud master
35.00 Cft
Total
Contractor's Profit & Ov
Total
20
Nos.
% Cft
Percent
Mason
Coolies unskilled
Bahishti
1.50 Nos.
2.00 Nos.
0.13 No
per day
per day
per day
0.67 No.
0.33 No
per day
per day
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum
Page 1
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 1
In ground floor.
Detail
MATERIAL
1 Bricks 9" x 4" x 3"
1350.00 Nos.
2 Good earth or stiff clay for mud master
35.00 Cft
Total
Contractor's Profit & Ov
Total
20
Nos.
% Cft
Percent
Mason
Coolies unskilled
Bahishti
2.00 Nos.
3.00 Nos.
0.13 No.
per day
per day
per day
0.67 No.
0.33 No
per day
per day
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 2
DESCRIPTION OF ITEM:
Item No. 2
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.25 No.
1.00 No.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Say
Labour rate per Cum
Say
LABOUR for 125 Cft
Second Floor
1
2
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.75 No.
2.00 Nos.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Say
Labour rate per Cum
Say
Page 3
Detail
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.25 Nos.
3.00 Nos.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Say
Labour rate per Cum
Say
LABOUR for 125 Cft
4th & Subsequent Floor
1
2
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
2.25 Nos.
4.50 Nos.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Labour rate per cum
Rs.
Rs.
Page 4
Say
Say
DESCRIPTION OF ITEM:
Item No. 3
Detail
MATERIAL
1 Bricks 9" x 4" x 3"
2 Good earth or stiff clay
Total
Contractor's Profit & Ov
Total
1350.00 Nos.
35.00 Cft
20
Nos.
% Cft
Percent
Mason
Coolies unskilled
2.00 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.33 No
per day
per day
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 5
DESCRIPTION OF ITEM:
Item No. 3
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.25 No.
1.00 No
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 6
Say
Say
DESCRIPTION OF ITEM:
Item No. 4 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
8.00 bags
20.00 Cft
Nos.
per bag
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 7
DESCRIPTION OF ITEM:
Item No. 4 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
6.00 bags
22.50 Cft
Nos.
per bags
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 8
DESCRIPTION OF ITEM:
Item No. 4 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
4.80 bags
24.00 Cft
Nos.
per bag
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 9
DESCRIPTION OF ITEM:
Item No. 4 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
4.00 bags
25.00 Cft
Nos.
per bag
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 10
DESCRIPTION OF ITEM:
Item No. 4 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
3.40 bags
25.70 Cft
Nos.
per bag
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 11
DESCRIPTION OF ITEM:
Item No. 4 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
3.00 bags
26.50 Cft
Nos.
per bag
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 12
DESCRIPTION OF ITEM:
Item No. 4 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
2.66 bags
26.67 Cft
Nos.
per bag
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 13
DESCRIPTION OF ITEM:
Item No. 4 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
3.20
59.72
24.00
20
Nos.
bags
kg
Cft
Nos.
per bag
per kg
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Rs.
Rs.
Say
Say
Page 14
DESCRIPTION OF ITEM:
Item No. 4 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
2.85
53.00
24.78
20
Nos.
bags
kg
Cft
Nos.
per bag
per kg
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 15
DESCRIPTION OF ITEM:
Item No. 4 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
2.56
47.78
25.60
20
Nos.
bags
kg
Cft
Nos.
per bag
per kg
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 16
DESCRIPTION OF ITEM:
Item No. 4 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
2.32
43.30
26.20
20
Nos.
bags
kg
Cft
Nos.
per bag
per kg
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Rs.
Rs.
Say
Say
Page 17
DESCRIPTION OF ITEM:
Item No. 4 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
2.14
39.94
26.66
20
Nos.
bags
kg
Cft
Nos.
per bag
per kg
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 18
DESCRIPTION OF ITEM:
Item No. 4 (iii)
Detail
MATERIAL
1
Pacca brick 9" x 4" x 3"
2
Lime Slaked
3
Sand
Total
Contractor's Profit & Ov
Total
20
1350.00 Nos.
174.30 Kg.
23.33 Cft
Nos.
Per Kg.
% Cft
2.00 Nos.
2.50 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum
Page 19
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 5 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
8.00 bags
20.00 Cft
Nos.
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 20
DESCRIPTION OF ITEM:
Item No. 5 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
6.00 bags
22.50 Cft
Nos.
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 21
DESCRIPTION OF ITEM:
Item No. 5 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
4.80 bags
24.00 Cft
Nos.
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 22
DESCRIPTION OF ITEM:
Item No. 5 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
4.00 bags
25.00 Cft
Nos.
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 23
DESCRIPTION OF ITEM:
Item No. 5 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
3.40 bags
25.70 Cft
Nos.
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 24
DESCRIPTION OF ITEM:
Item No. 5 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
3.00 bags
26.50 Cft
Nos.
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 25
DESCRIPTION OF ITEM:
Item No. 5 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
2.66 bags
26.57 Cft
Nos.
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 26
DESCRIPTION OF ITEM:
Item No. 5 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
59.72
3.20
24.00
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 27
DESCRIPTION OF ITEM:
Item No. 5 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
53.37
2.85
24.78
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 28
DESCRIPTION OF ITEM:
Item No. 5 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
47.78
2.56
25.60
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 29
DESCRIPTION OF ITEM:
Item No. 5 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
43.30
2.32
26.20
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 30
DESCRIPTION OF ITEM:
Item No. 5 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
40.00
2.14
26.66
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 31
DESCRIPTION OF ITEM:
Item No. 5 (iii)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
174.30 kg
23.33 Cft
Nos.
per kg
% Cft
2.50 Nos.
4.00 Nos.
0.25 No.
per day
per day
per day
0.83 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 32
DESCRIPTION OF ITEM:
Item No. 6
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.25 No.
1.00 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
per day
per day
Rs.
Say
Rs.
Say
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.75 No.
2.00 Nos.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
per day
per day
Rs.
Say
Rs.
Say
Page 33
Detail
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.25 Nos.
3.00 Nos.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Say
Labour rate per Cum
Say
LABOUR for 125 Cft
4th & Subsequent Floor
1
2
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
2.25 Nos.
4.50 Nos.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Labour rate per cum
Rs.
Rs.
Page 34
Say
Say
DESCRIPTION OF ITEM:
Item No. 7 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
8.00 bags
20.00 Cft
Nos.
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 35
Item No. 7
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
6.00 bags
22.50 Cft
Nos.
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 36
DESCRIPTION OF ITEM:
Item No. 7 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
4.80 bags
24.00 Cft
Nos.
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 37
DESCRIPTION OF ITEM:
Item No. 7 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
4.00 bags
25.00 Cft
Nos.
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 38
DESCRIPTION OF ITEM:
Item No. 7 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
3.40 bags
25.70 Cft
Nos.
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 39
DESCRIPTION OF ITEM:
Item No. 7 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
3.00 bags
26.50 Cft
Nos.
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 40
DESCRIPTION OF ITEM:
Item No. 7 (i)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
2.66 bags
26.67 Cft
Nos.
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 41
DESCRIPTION OF ITEM:
Item No. 7 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
59.72
3.20
24.00
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 42
DESCRIPTION OF ITEM:
Item No. 7 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
53.00
2.85
24.78
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 43
DESCRIPTION OF ITEM:
Item No. 7 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
47.78
2.56
25.60
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 44
DESCRIPTION OF ITEM:
Item No. 7 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
43.29
2.32
26.20
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 45
DESCRIPTION OF ITEM:
Item No. 7 (ii)
Detail
MATERIAL
1
2
3
4
1350.00
39.94
2.14
26.66
20
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 46
DESCRIPTION OF ITEM:
Item No. 7 (iii)
Detail
MATERIAL
1
2
3
20
1350.00 Nos.
174.30 kg
23.33 Cft
Nos.
per kg
% Cft
2.50 Nos.
3.00 Nos.
per day
per day
1.00 No.
0.50 No
per day
per day
Percent
Mason
Coolies unskilled
Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 47
DESCRIPTION OF ITEM:
Item No. 8
Detail
Masons
Cooly
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.25 No.
1.00 No.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate Per 100 Cft.
Labour Rate Per Cum.
Rs.
Rs.
Page 48
Say
Say
DESCRIPTION OF ITEM:
Item No. 9
Detail
Masons
Cooly
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.50 No.
0.50 No.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate Per 100 Cft.
Labour Rate Per Cum.
Rs.
Rs.
Page 49
Say
Say
DESCRIPTION OF ITEM:
Item No. 10
Detail
MATERIAL
1
Pacca bricks
Total
Contractor's Profit & Ov
Total
82.00 No.
20
% Cft
Percent
Mason
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.25 No.
10
Percent
20
Percent
per day
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 50
DESCRIPTION OF ITEM:
Item No. 11
Detail
Mason
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.43 No.
10
Percent
20
Percent
per day
ITEM RATES
Labour rate per 100 Cft
Composit rate per Cum
Rs.
Rs.
Page 51
Say
Say
DESCRIPTION OF ITEM:
Item No. 12
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.12 No.
0.50 No.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Composit rate per Cum
Rs.
Rs.
Page 52
Say
Say
DESCRIPTION OF ITEM:
Item No. 12
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.25 No.
1.00 No.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Composit rate per Cum
Rs.
Rs.
Page 53
Say
Say
DESCRIPTION OF ITEM:
Item No. 13
Extra for face work (half brick thick) using special brick
of Ist class bricks.
Detail
MATERIAL
1
2
270.00
513.00
Total
Add 5% wastage
Total
783.00
39.15
822.15
Extra cost
= 0
20
%0 Nos.
Percent
Rs.
Rs.
Page 54
Say
Say
DESCRIPTION OF ITEM:
Item No. 14
Detail
MATERIAL
1
2
3
4
Pacca bricks
Cement
Sand
Kikar wood for centring & shuttering
(10 x 1.60 x 0.2) Can be use 20 times
Total
Contractor's Profit & Ov
Total
20
10.00 No.
0.11 bag
0.41 Cft
Nos.
per bag
% Cft
0.002 Cft
Cft
0.067 No.
0.11 No.
0.023 No.
per day
per day
per day
Percent
Mason
Cooly unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 55
DESCRIPTION OF ITEM:
Item No. 15 (a)
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
3.00 No.
0.34 No.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 No.
Rs.
Page 56
Say
DESCRIPTION OF ITEM:
Item No. 15 (b)
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.50 No.
0.17 No.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 No.
Rs.
Page 57
Say
DESCRIPTION OF ITEM:
Item No. 16
(i)
Detail
MATERIAL
1
2
20
338.00 No.
8.75 Cft
Nos.
% Cft
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00 No.
1.83 Nos.
0.23 No.
10
Percent
20
Percent
per day
per day
per day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 58
DESCRIPTION OF ITEM:
Item No. 16 (ii)
Detail
MATERIAL
1
2
3
20
338.00 No.
2.00 bags
5.00 Cft
Nos.
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 59
DESCRIPTION OF ITEM:
Item No. 16 (ii)
Detail
MATERIAL
1
2
3
20
338.00 No.
1.50 bags
5.60 Cft
Nos.
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 60
DESCRIPTION OF ITEM:
Item No. 16 (ii)
Detail
MATERIAL
1
2
3
20
338.00 No.
1.20 bags
6.00 Cft
Nos.
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 61
DESCRIPTION OF ITEM:
Item No. 16 (ii)
Detail
MATERIAL
1
2
3
20
338.00 No.
1.00 bags
6.25 Cft
Nos.
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 62
DESCRIPTION OF ITEM:
Item No. 16 (ii)
Detail
MATERIAL
1
2
3
20
338.00 No.
0.86 bags
6.40 Cft
Nos.
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 63
DESCRIPTION OF ITEM:
Item No. 16 (ii)
Detail
MATERIAL
1
2
3
20
338.00 No.
0.75 bags
6.58 Cft
Nos.
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 64
DESCRIPTION OF ITEM:
Item No. 16 (ii)
Detail
MATERIAL
1
2
3
20
338.00 No.
0.67 bags
6.67 Cft
Nos.
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 65
DESCRIPTION OF ITEM:
Item No. 16 (iii)
Detail
MATERIAL
1
2
3
4
20
338.00
14.93
0.80
6.00
No.
kg
bags
Cft
Nos.
kg
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 66
DESCRIPTION OF ITEM:
Item No. 16 (iii)
Detail
MATERIAL
1
2
3
4
20
338.00
13.44
0.71
6.13
No.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 67
DESCRIPTION OF ITEM:
Item No. 16 (iii)
Detail
MATERIAL
1
2
3
4
20
338.00
12.32
0.64
6.40
No.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 68
DESCRIPTION OF ITEM:
Item No. 16 (iii)
Detail
MATERIAL
1
2
3
4
20
338.00
10.82
0.58
6.50
No.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 69
DESCRIPTION OF ITEM:
Item No. 16 (iii)
Detail
MATERIAL
1
2
3
4
20
338.00
10.08
0.54
6.70
No.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 70
DESCRIPTION OF ITEM:
Item No. 16 (iv)
Detail
MATERIAL
1
2
3
20
338.00 Nos.
43.67 kg
5.58 Cft
Nos.
per kg
% Cft
1.25 Nos.
2.42 Nos.
0.38 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 71
DESCRIPTION OF ITEM:
Item No. 17
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.13 No.
0.50 No.
10
Percent
20
Percent
ITEM RATES
Labour rate for 100 Sft
per day
per day
Rs.
Say
Rs.
Say
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.37 No.
1.00 No.
10
Percent
20
Percent
ITEM RATES
Labour rate for 100 Sft
per day
per day
Rs.
Say
Rs.
Say
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.63 No.
1.50 Nos.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate for 100 Sft
Say
Labour rate per Sqm
Say
Page 72
Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.12 Nos.
2.12 Nos.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate for 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 73
Say
Say
DESCRIPTION OF ITEM:
Item No. 18 (i)
Detail
MUD MORTAR
1
2
20
675.00 Nos.
17.50 Cft
Nos.
% Cft
1.25 Nos.
2.75 Nos.
0.35 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 74
DESCRIPTION OF ITEM:
Item No. 18 (ii)
Detail
MATERIAL
1
2
3
Total
Contractor's Profit & Ov
Total
20
675.00 Nos.
4.00 bags
10.00 Cft
Nos.
bags
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 75
DESCRIPTION OF ITEM:
Item No. 18 (ii)
Detail
MATERIAL
1
2
3
Total
Contractor's Profit & Ov
Total
20
675.00 Nos.
3.00 bags
11.25 Cft
Nos.
bags
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 76
DESCRIPTION OF ITEM:
Item No. 18 (ii)
Detail
MATERIAL
1
2
3
Total
Contractor's Profit & Ov
Total
20
675.00 Nos.
2.40 bags
12.00 Cft
Nos.
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 77
DESCRIPTION OF ITEM:
Item No. 18 (ii)
Detail
MATERIAL
1
2
3
Total
Contractor's Profit & Ov
Total
20
675.00 Nos.
2.00 bags
12.50 Cft
Nos.
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 78
DESCRIPTION OF ITEM:
Item No. 18 (ii)
Detail
MATERIAL
1
2
3
Total
Contractor's Profit & Ov
Total
20
675.00 Nos.
1.72 bags
12.80 Cft
Nos.
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 79
DESCRIPTION OF ITEM:
Item No. 18 (ii)
Detail
MATERIAL
1
2
3
Total
Contractor's Profit & Ov
Total
20
675.00 Nos.
1.50 bags
13.13 Cft
Nos.
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 80
DESCRIPTION OF ITEM:
Item No. 18 (ii)
Detail
MATERIAL
1
2
3
Total
Contractor's Profit & Ov
Total
20
675.00 Nos.
1.33 bags
13.34 Cft
Nos.
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 81
DESCRIPTION OF ITEM:
Item No. 18 (iii)
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
675.00
29.86
1.60
12.00
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 82
DESCRIPTION OF ITEM:
Item No. 18 (iii)
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
675.00
26.50
1.42
12.39
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 83
DESCRIPTION OF ITEM:
Item No. 18 (iii)
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
675.00
23.90
1.28
12.80
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 84
DESCRIPTION OF ITEM:
Item No. 18 (iii)
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
675.00
21.65
1.16
13.10
Nos.
kg
bags
Cft
Nos.
per kg
per bag
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 85
DESCRIPTION OF ITEM:
Item No. 18 (iii)
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
675.00
20.16
1.07
13.33
Nos.
kg
bags
Cft
Nos.
per kg
per kg
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 86
DESCRIPTION OF ITEM:
Item No. 18 (iv)
Detail
MATERIAL
1
2
3
Total
Contractor's Profit & Ov
Total
20
675.00 Nos.
86.97 kg
11.67 Cft
Nos.
per kg
% Cft
1.90 Nos.
3.63 Nos.
0.55 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 87
DESCRIPTION OF ITEM:
Item No. 19
Detail
LABOUR
First Floor
0.75
0.75
Say
Say
LABOUR
Second Floor
0.75
0.75
Say
Say
LABOUR
Third Floor
0.75
0.75
Say
Say
LABOUR
Fourth & Subsequent Floor
0.75
0.75
Say
Say
Page 88
DESCRIPTION OF ITEM:
Item No. 20
Upto 20 ft.
Detail
Total
Contractor's Profit & Ov
Total
20
1350.00 No.
8.80 bags
22.00 Cft
Each
per bag
per Cft
3.00 Nos.
3.00 Nos.
0.25 No.
per day
per day
per day
1.00 No.
0.25 No
per day
per day
Percent
Mason
Coolies
Bahishti
for mortar
1
2
Cooly
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 89
DESCRIPTION OF ITEM:
Item No. 20
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.25 No.
1.00 No
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 90
Say
Say
DESCRIPTION OF ITEM:
Item No. 21
4" (114 mm) thick walling with hoop iron bouding 6"
(150 mm) apart.
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
525.00
2.40
9.00
45.00
20.41
Nos.
bags
Cft
lbs
Kg.
Nos.
per bag
% Cft
Per Kg.
1.00
1.25
0.25
0.15
No.
Nos.
No.
No.
per
per
per
per
Percent
LABOUR
1
2
3
4
Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 91
DESCRIPTION OF ITEM:
Item No. 21
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
525.00
2.40
9.00
22.50
10.20
Nos.
bags
Cft
lbs
kg.
Nos.
per bag
% Cft
Per Kg.
No.
No.
No.
No.
per
per
per
per
Percent
LABOUR
1
2
3
4
Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00
1.00
0.25
0.10
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 92
DESCRIPTION OF ITEM:
Item No. 21
3" (75 mm) thick walling with hoop iron bouding 6"
(150 mm) apart.
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
350.00
1.80
6.50
45.00
20.41
Nos.
bags
Cft
lbs
Kg.
Nos.
per bag
% Cft
Per Kg.
No.
No.
No.
No.
per
per
per
per
Percent
Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.75
1.00
0.20
0.15
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 93
DESCRIPTION OF ITEM:
Item No. 21
3" (75 mm) thick walling with hoop iron bouding 12"
(300 mm) apart.
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
350.00
1.80
6.50
20.00
9.070
Nos.
bags
Cft
lbs
Kg.
Nos.
per bag
% Cft
Per Kg.
No.
No.
No.
No.
per
per
per
per
Percent
Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.75
1.00
0.20
0.15
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 94
DESCRIPTION OF ITEM:
Item No. 22
Detail
MATERIAL
1
2
x
x
Total
LABOUR for 125 Cft
1
2
3
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
2.00 Nos.
3.67 Nos.
0.50 No.
10
Percent
20
Percent
per day
per day
per day
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 95
DESCRIPTION OF ITEM:
Item No. 23
Detail
MATERIAL
1
Total
Contractor's Profit & Ov
Total
20
1350.00 Nos.
Nos.
1.00 No.
2.00 Nos.
per day
per day
Percent
LABOUR
1
2
Mason
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 96
DESCRIPTION OF ITEM:
Item No. 24
Detail
MATERIAL
1
2
Total
Contractor's Profit & Ov
Total
1350.00 Nos.
35.00 Cft
20
Nos.
% Cft
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.50 Nos.
3.50 Nos.
0.25 No.
10
Percent
20
Percent
per day
per day
per day
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 97
DESCRIPTION OF ITEM:
Item No. 25
Detail
Coolies skilled
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00 No.
1.50 Nos.
0.50 No.
10
Percent
20
Percent
per day
per day
per day
ITEM RATES
Labour rate per 100 Cft
Composite rate per Cum
Rs.
Rs.
Page 98
Say
Say
DESCRIPTION OF ITEM:
Item No. 26
Detail
Moulded brick
Cement for laying and plastering
Sand
Deduct cost of ordinary bricks
Total
Contractor's Profit & Ov
Total
20
280.00
1.50
5.00
140
Nos.
bag
Cft
Nos.
Nos.
per bag
% Cft
Nos.
1.75 Nos.
1.75 Nos.
0.25 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 99
DESCRIPTION OF ITEM:
Item No. 26
Detail
20
420.00
1.75
6.00
210.00
Nos.
bag
Cft
Nos.
Nos.
per bag
% Cft
Nos.
2.00 Nos.
2.00 Nos.
0.25 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 100
Rft
DESCRIPTION OF ITEM:
Item No. 26
Detail
Total
Contractor's Profit & Ov
Total
20
465.00
465.00
1.20
5.00
Nos.
Nos.
bag
Cft
Nos.
Nos.
per bag
% Cft
1.00 No.
2.00 Nos.
per day
per day
Percent
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 101
DESCRIPTION OF ITEM:
Item No. 27
One brick.
Detail
2
3
Total
Contractor's Profit & Ov
Total
20
Nos.
per bag
% Cft
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
2.00 Nos.
2.00 Nos.
0.25 No.
10
Percent
20
Percent
per day
per day
per day
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 102
Rft
DESCRIPTION OF ITEM:
Item No. 27
Two brick.
Detail
Pacca bricks
Cement for laying & plastering
Sand for laying & plastering
Total
Contractor's Profit & Ov
Total
20
175.00 Nos.
5.00 bags
18.00 Cft
Nos.
per bag
% Cft
3.00 Nos.
3.00 Nos.
0.25 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 103
DESCRIPTION OF ITEM:
Item No. 27
Three bricks.
Detail
Pacca bricks
Cement for laying & plastering
Sand for laying & plastering
Total
Contractor's Profit & Ov
Total
20
270.00 Nos.
8.00 bags
60.00 Cft
Nos.
per bag
% Cft
4.00 Nos.
4.00 Nos.
0.34 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 104
DESCRIPTION OF ITEM:
Item No. 27
Four brick.
Detail
Pacca bricks
Cement for laying & plastering
Sand for laying & plastering
Total
Contractor's Profit & Ov
Total
20
580.00 Nos.
10.00 bags
37.00 Cft
Nos.
per bag
% Cft
5.00 Nos.
5.00 Nos.
0.50 No.
per day
per day
per day
Percent
Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 105
DESCRIPTION OF ITEM:
Item No. 28
Detail
Cooly unskilled
1.75 Nos.
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
per day
ITEM RATES
Labour rat per 1000 No.
Rs.
Say
DESCRIPTION OF ITEM:
Item No. 29
Detail
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
3.30 Nos.
10
Percent
20
Percent
per day
ITEM RATES
Labour rat per 1000 No.
Rs.
Page 106
Say
DESCRIPTION OF ITEM:
Item No. 30
Detail
MATERIAL
1
Sand
Total
Contractor's Profit & Ov
Total
20
100.00 Nos.
% Nos.
0.50 Nos.
per day
Percent
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft.
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 107
DESCRIPTION OF ITEM:
Item No. 31
Providing and laying 2" (50 mm) thick projected tile bank
(1: 2) cement sand mortar with hoop iron 1" (25 mm) wide 1
SWG flat iron sheet 9" (225 mm) apart.
Detail
Total
Contractor's Profit & Ov
Total
20
43.00
0.09
0.20
3.00
Nos.
bag
Cft
Kg.
Nos.
per bag
% Cft
Per Kg.
Percent
LABOUR
1
2
Mason
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.50 No.
0.50 No.
10
Percent
20
Percent
per day
per day
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 108
DESCRIPTION OF ITEM:
Item No. 32
Ist class brick tiles (9" 4" x 1") 225 x 114 x 40 mm cla
76 mm thick laid in cement sand mortar recifered with hoop
strips placed at 2 ft. (600 mm) apart vertically.
(i)
Ratio (1 : 3).
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
810.00
2.40
9.00
4.54
No.
bags
Cft
Kg.
Nos.
per bag
% Cft
per Kg.
No.
No.
No.
No.
per
per
per
per
Percent
LABOUR
1
2
3
4
Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00
1.00
0.25
0.10
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 109
DESCRIPTION OF ITEM:
Item No. 32
Ist class brick tiles (9" 4" x 1") 225 x 114 x 40 mm cla
76 mm thick laid in cement sand mortar recifered with hoop
strips placed at 2 ft. (600 mm) apart vertically.
(ii)
Ratio (1 : 4).
Detail
MATERIAL
1
2
3
4
Total
Contractor's Profit & Ov
Total
20
810.00
1.92
9.60
4.54
No.
bags
Cft
Kg.
Nos.
per bag
% Cft
per Kg.
No.
No.
No.
No.
per
per
per
per
Percent
LABOUR
1
2
3
4
Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00
1.00
0.25
0.10
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft.
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 110
DESCRIPTION OF ITEM:
Item No. 33
Detail
Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00 No.
1.00 No.
10
Percent
20
Percent
Rs.
Rs.
Page 111
per day
per day
Say
Say
DESCRIPTION OF ITEM:
Item No. 34
Detail
Assume 60 Bricks
MATERIAL
1
2
3
Bricks
Cement
Sand
Total
Contractor's Profit & Ov
Total
20
50.00 Nos.
0.005 Bag
0.026 Cft
Nos.
Bag
% Cft.
2.00 No.
1.00 No.
per day
per day
Percent
LABOUR
1
2
Mason
Cooly
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Brick
Composit rate per Brick
Rs.
Rs.
Page 112
Say
Say
DESCRIPTION OF ITEM:
Item No. 35
Detail
MATERIAL
1
2
3
20
10.00 No.
0.08 bags
0.25 Cft
Nos.
per bag
% Cft
0.25 No.
0.25 No.
per day
per day
Percent
Mason
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Each No.
Composite rate per Each No.
Rs.
Rs.
Page 113
Say
Say
DESCRIPTION OF ITEM:
Item No. 36
Detail
Mason
1.00 No.
Total
Sundries
Total
Contractor's Profit & Ov
Total
10
Percent
20
Percent
Rs.
Rs.
per day
Say
Say
DESCRIPTION OF ITEM:
Item No. 37
Maroo corners.
Detail
Mason
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.20 No.
10
Percent
20
Percent
Rs.
Page 114
per day
Say
CHAPTER NO. 6
CONCRETE
DESCRIPTION OF ITEM:
Item No. 1
Detail
Rate
Per Unit
MATERIAL
1
2
Brick/Stone Ballast
Earth
Total
Contractor's Profit & Overhea
Total
100.00 Cft
50.00 Cft
20
% Cft
% Cft
per day
per day
per day
Percent
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
0.13 No.
4.00 Nos.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 1
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 2
Detail
Rate
Per Unit
MATERIAL
1
Brick/Stone Ballast
Total
Contractor's Profit & Overhea
Total
110.00 Cft
20
% Cft
per day
Percent
LABOUR
1
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
3.00 Nos.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 2
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 3
Cement concrete brick or stone ballast 1" to 2" (40 to 50 mm) gaug
foundation and plinth.
(a)
Ratio (1 : 3 : 6)
Detail
Rate
Per Unit
MATERIAL
1
2
3
Cement
Sand
Brick/Stone ballast
Total
Contractor's Profit & Overhea
Total
20
13.00 Bags
46.00 Cft
92.00 Cft
per bag
% Cft
% Cft
0.25 No.
5.00 Nos.
0.50 No.
per day
per day
per day
Percent
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 3
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 3
Cement concrete brick or stone ballast 1" to 2" (40 to 50 mm) gaug
foundation and plinth.
(b)
Ratio (1 : 4 : 8)
Detail
Rate
Per Unit
MATERIAL
1
2
3
Cement
Sand
Brick/Stone ballast
Total
Contractor's Profit & Overhea
Total
20
9.60 bags
48.00 Cft
96.00 Cft
per bag
% Cft
% Cft
0.25 No.
5.00 Nos.
0.50 No.
per day
per day
per day
Percent
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 4
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 3
Cement concrete brick or stone ballast 1" to 2" (40 to 50 mm) gaug
foundation and plinth.
(c)
Ratio (1 : 5 : 10)
Detail
Rate
Per Unit
MATERIAL
1
2
3
Cement
Sand
Bricks/stone ballast
Total
Contractor's Profit & Overhea
Total
20
7.80 bags
49.00 Cft
98.00 Cft
per bag
% Cft
% Cft
0.25 No.
5.00 Nos.
0.50 No.
per day
per day
per day
Percent
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 5
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 3
Cement concrete brick or stone ballast 1" to 2" (40 to 50 mm) gaug
foundation and plinth.
(d)
Ratio (1 : 6 : 12)
Detail
Rate
Per Unit
MATERIAL
1
2
3
Cement
Sand
Bricks/stone ballast
Total
Contractor's Profit & Overhea
Total
20
6.50 bags
49.00 Cft
98.00 Cft
per bag
% Cft
% Cft
0.25 No.
5.00 Nos.
0.50 No.
per day
per day
per day
Say
Say
Percent
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Rs.
Rs.
Page 6
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 3
Cement concrete brick or stone ballast 1" to 2" (40 to 50 mm) gaug
foundation and plinth.
(e)
Ratio (1 : 6 : 18)
Detail
Rate
Per Unit
MATERIAL
1
2
3
Cement
Sand
Bricks/stone ballast
Total
Contractor's Profit & Overhea
Total
20
5.00 bags
37.00 Cft
112.00 Cft
per bag
% Cft
% Cft
0.25 No.
5.00 Nos.
0.50 No.
per day
per day
per day
Percent
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 7
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 3
Cement concrete brick or stone ballast 1" to 2" (40 to 50 mm) gaug
foundation and plinth.
(f)
Ratio (1 : 7 : 20)
Detail
Rate
Per Unit
MATERIAL
1
2
3
Cement
Sand
Bricks/stone ballast
Total
Contractor's Profit & Overhea
Total
20
4.40 bags
38.50 Cft
110.00 Cft
per bag
% Cft
% Cft
0.25 No.
5.00 Nos.
0.50 No.
per day
per day
per day
Percent
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 8
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 4
in bed.
Detail
Rate
Per Unit
Amount (Rs.)
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
0.60 No.
1.00 Nos.
0.10 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
per day
per day
per day
Say
Say
DESCRIPTION OF ITEM:
Item No. 4
on slope.
Detail
Rate
Per Unit
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
1.00 No.
1.40 Nos.
0.10 No.
10
Percent
20
Percent
per day
per day
per day
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 9
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 5
Ratio (1 : 1 : 2)
Detail
Rate
Per Unit
MATERIAL
1
2
3
Cement
Sand
Aggregate (Stone)
Total
Contractor's Profit & Overhea
Total
20
31.50 bags
39.00 Cft
78.00 Cft
per bag
% Cft
% Cft
1.00 No.
6.00 Nos.
0.60 No.
per day
per day
per day
Percent
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 10
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 5
Ratio (1 : 1 : 1)
Detail
Rate
Per Unit
MATERIAL
1
2
3
Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total
20
31.50 bags
58.00 Cft
58.00 Cft
per bag
% Cft
% Cft
1.00 No.
6.00 Nos.
0.60 No.
per day
per day
per day
Percent
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 11
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 5
Ratio (1 : 1 : 3)
Detail
Rate
Per Unit
MATERIAL
1
2
3
Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total
20
22.50 bags
42.00 Cft
84.00 Cft
per bag
% Cft
% Cft
1.00 No.
6.00 Nos.
0.60 No.
per day
per day
per day
Percent
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 12
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 5
Ratio (1 : 2 : 3)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total
20
21.00 bags
52.00 Cft
78.00 Cft
per bag
% Cft
% Cft
1.00 No.
6.00 Nos.
0.60 No.
per day
per day
per day
Percent
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
0.00
0.00
Rs.
Rs.
Say
Say
0.00
0.00
Page 13
DESCRIPTION OF ITEM:
Item No. 5
Ratio (1 : 3 : 3)
Detail
Rate
Per Unit
MATERIAL
1
2
3
Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total
20
17.60 bags
66.00 Cft
66.00 Cft
per bag
% Cft
% Cft
1.00 No.
6.00 Nos.
0.60 No.
per day
per day
per day
Percent
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 14
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 5
Ratio (1 : 2 : 4)
Detail
Rate
Per Unit
MATERIAL
1
2
3
Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total
20
17.60 bags
44.00 Cft
88.00 Cft
per bag
% Cft
% Cft
1.00 No.
6.00 Nos.
0.60 No.
per day
per day
per day
Percent
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 15
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 5
Ratio (1 : 2 : 6)
Detail
Rate
Per Unit
MATERIAL
1
2
3
Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total
20
13.70 bags
34.00 Cft
102.00 Cft
per bag
% Cft
% Cft
1.00 No.
6.00 Nos.
0.60 No.
per day
per day
per day
Percent
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 16
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 5
Ratio (1 : 3 : 6)
Detail
Rate
Per Unit
MATERIAL
1
2
3
Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total
20
13.00 bags
46.00 Cft
92.00 Cft
per bag
% Cft
% Cft
1.00 No.
6.00 Nos.
0.60 No.
per day
per day
per day
Percent
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 17
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 5
Ratio (1 : 4 : 8)
Detail
Rate
Per Unit
MATERIAL
1
2
3
Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total
20
9.60 bags
48.00 Cft
96.00 Cft
per bag
% Cft
% Cft
1.00 No.
6.00 Nos.
0.60 No.
per day
per day
per day
Percent
LABOUR
1
2
3
Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 18
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 6
1-
Detail
Rate
Per Unit
Shuttering
Assumed size for concrete slab
14' x 20' x 5"
=
1" thick plank seperate slab 280x1/12 =
Joint (studs) for supporting planks
5 x 0.3' x 0.3' x 14' =
Props Mix. 20 x 3" x 3" x 14' =
Total
For 100 Cft 45.5 x 100 117 =
This material can be uses 24 times
For one operation 38.89 24 =
1.62 Cft @ 350.0 Cft (kail wood)
Bolts and nuts, nails
Greasing and oiling for surfacing
and shuttering
Total
Contractor's Profit & Overhea
Total
20
31.50 bags
39.00 Cft
78.00 Cft
per bag
% Cft
% Cft
1.62 Cft
3.5 Kg.
per Cft
Per Kg.
2.67 Kg.
Per Kg.
per
per
per
per
per
per
117 Cft
23.34 Cft
4.38 Cft
17.50 Cft
0.28 Cft
45.5 Cft
38.89
1.62 Cft
Percent
LABOUR
1
2
3
4
5
6
Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 100 Cft
Rate/Cft
ITEM RATES
1.00
1.50
10.00
2.00
1.00
2.00
10
Percent
20
Percent
Nos.
Nos.
No.
No.
Nos.
Nos.
day
day
day
day
day
day
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 19
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 6
2-
Detail
3).
Rate
Per Unit
Cement
Sand (Harro)
Bajri
Shuttering
Wood for shuttering detail as per
item 5-(a) (i)-1
Bolts and nuts, nails
Greasing and oiling for surfacing
and shuttering
Total
Contractor's Profit & Overhea
Total
20
22.50 bags
42.00 Cft
84.00 Cft
per bag
% Cft
% Cft
1.62 Cft
3.5 Kg.
per Cft
Per Kg.
2.432 Kg.
Per Kg.
1.00
1.50
10.00
2.00
1.00
2.00
per
per
per
per
per
per
Percent
LABOUR
1
2
3
4
5
6
Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 100 Cft
Rate per Cft
ITEM RATES
Labour rate per Cft
Labour rate per Cum
10
Percent
20
Percent
Page 20
Nos.
Nos.
No.
No.
Nos.
Nos.
day
day
day
day
day
day
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 6
3-
Detail
Rate
Per Unit
Cement
Sand (Harro)
Bajri
Shuttering
Kail Wood for shuttering detail as per
item 5-(a) (i)-1
Bolts and nuts, nails
Greasing and oiling for surfacing
and shuttering
Total
Contractor's Profit & Overhea
Total
20
17.60 bags
44.00 Cft
88.00 Cft
bags
% Cft
% Cft
1.62 Cft
3.5 Kg.
per Cft
Per Kg.
2.272 Kg.
Per Kg.
1.00
1.50
10.00
2.00
1.00
2.00
per
per
per
per
per
per
Percent
LABOUR
1
2
3
4
5
6
Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 100 Cft
Rate per Cft
ITEM RATES
Labour rate per Cft
Labour rate per Cum
10
Percent
20
Percent
Page 21
Nos.
Nos.
No.
No.
Nos.
Nos.
day
day
day
day
day
day
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 6
1-
Detail
Rate
Per Unit
Cement
Sand (Harro)
Bajri
Kail Wood for shuttering
Bolts, nuts & nails
Oiling, greasing, surface of shuttering
Total
Contractor's Profit & Overhea
Total
20
31.50
39.00
78.00
0.19
3.5
0.480
bags
Cft
Cft
Cft.
Kg.
Kg.
per bag
% Cft
% Cft
P. Cft
Per Kg.
Per Kg.
1.00
1.00
5.00
1.00
1.00
1.00
Nos.
Nos.
No.
No.
Nos.
Nos.
per
per
per
per
per
per
Percent
LABOUR
1
2
3
4
5
6
Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 100 Cft
Rate per Cft
10
Percent
20
Percent
day
day
day
day
day
day
ITEM RATES
Labour rate per Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 22
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 6
2-
Detail
Rate
Per Unit
Cement
Sand (Harro)
Bajri
Kail Wood for shuttering
Bolts, nuts & nails
Oiling, greasing, surface of shuttering
Total
Contractor's Profit & Overhea
Total
20
22.50
42.00
84.00
0.17
0.5
0.560
bags
Cft
Cft
Cft.
Kg.
Kg.
per bag
% Cft
% Cft
P. Cft
Per Kg.
Per Kg.
1.00
1.00
5.00
1.00
1.00
1.00
Nos.
Nos.
No.
No.
Nos.
Nos.
per
per
per
per
per
per
Percent
LABOUR
1
2
3
4
5
6
Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft
10
Percent
20
Percent
day
day
day
day
day
day
ITEM RATES
Labour rate per Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 23
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 6
3-
Detail
Rate
Per Unit
Cement
Sand (Harro)
Bajri
Kail Wood for shuttering
Bolts, nuts & nails
Oiling, greasing, surface of shuttering
Total
Contractor's Profit & Overhea
Total
20
17.60
44.00
88.00
0.16
0.5
0.560
bags
Cft
Cft
Cft.
Kg.
Kg.
per bag
% Cft
% Cft
P. Cft
Per Kg.
Per Kg.
1.00
1.00
5.00
1.00
1.00
1.00
Nos.
Nos.
No.
No.
Nos.
Nos.
per
per
per
per
per
per
Percent
LABOUR
1
2
3
4
5
6
Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft
10
Percent
20
Percent
day
day
day
day
day
day
ITEM RATES
Labour rate per Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 24
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 6
(b)
1-
Detail
Rate
Per Unit
Shuttering
Assume beam of 12' x 12" x 6" =
Wood
Planks = 2 x 12 1/6 x 13/12 x 2 1/12 =
1 x 12 1/6 x 1/12 x =
2 x 1/12 x 12/12 x 6/12 =
Studs = 2 x 5 x 1/6 x 1/12 =
Total
For 100 Cft 2.93 6 x 100 =
Can be used in 40 operation
One operation 48.73 40.0Cft
=
Nails, nuts & bolts etc.
Greasing and oiling for shuttering surface
Total
Contractor's Profit & Overhe
Total
20
31.50 bags
39.00 Cft
78.00 Cft
per bag
% Cft
% Cft
1.22 Cft
4.00 No.
2.11 Kg.
Per Cft
Each
Per Kg.
1.00
1.00
2.00
1.00
8.00
per
per
per
per
per
6 Cft
2.2 Cft
0.51 Cft
0.08 Cft
0.04 Cft
2.93 Cft
48.73 Cft
1.22 Cf
Percent
LABOUR
1
2
3
4
5
Mason
Carpanter
Coolies skilled
Bahisthi
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft
10
Percent
20
Percent
ITEM RATES
Labour rate per Cft
Labour rate per Cum
Composite rate per Cft
Composite rate per Cum
Page 25
Nos.
Nos.
No.
No.
Nos.
day
day
day
day
day
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 6
Detail
Rate
Per Unit
Cement
Sand (Harro)
Bajri
Shuttering
Kail Woood for shuttering as per item 5 (b) (1)
Nails, nuts & bolts etc.
Greasing and oiling etc.
Total
Contractor's Profit & Overhea
Total
20
22.40 bags
42.00 Cft
84.00 Cft
per bag
% Cft
% Cft
1.22 Cft
4.00 No.
2.11 Kg.
Cft
Each
Per Kg.
1.00
1.00
2.00
1.00
8.00
per
per
per
per
per
Percent
LABOUR
1
2
3
4
5
Mason
Carpanter
Coolies skilled
Bahisthi
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft
10
Percent
20
Percent
Nos.
Nos.
No.
No.
Nos.
day
day
day
day
day
ITEM RATES
Labour rate per Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 26
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 6
3-
Detail
Rate
Per Unit
Cement
Sand (Harro)
Bajri
Shuttering
Kail Woood for shuttering as per item 5 (b) (1)
Nails, nuts & bolts etc.
Greasing and oiling etc.
Total
Contractor's Profit & Overhea
Total
20
17.60 bags
44.00 Cft
88.00 Cft
per bag
% Cft
% Cft
1.22 Cft
4.00 No.
1.71 Kg.
Cft
Each
Per Kg.
1.00
1.00
2.00
1.00
8.00
per
per
per
per
per
Percent
LABOUR
1
2
3
4
5
Mason
Carpanter
Coolies skilled
Bahisthi
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft
10
Percent
20
Percent
Nos.
Nos.
No.
No.
Nos.
day
day
day
day
day
ITEM RATES
Labour rate per Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 27
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 6
Detail
Rate
Per Unit
Sand
Bitumen
Total
Contractor's Profit & Overhea
Total
1.00 Cft
12.73 kg
0.25 Cwt
20
% Cft
kg
per day
per day
Percent
LABOUR
1
2
Mason
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft
1.00 Nos.
5.00 Nos.
10
Percent
20
Percent
ITEM RATES
Labour rate per Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 28
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 6
Add extra labour for R.C. concrete in 2nd and subsequent stories.
Detail
Rate
Per Unit
LABOUR
1
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
0.03 Nos.
10
Percent
20
Percent
per day
ITEM RATES
Labour rate per Cft
Labour rate per Cum
Rs.
Rs.
Page 29
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 7
Detail
MATERIAL
Rate
Per Unit
Amount (Rs.)
Concrete
2
3
4
5
6
Cement
Sand (Harro)
Bajri
Extra cement (10%)
Cost of casing pipe
100' @
Can be used 100 times
0 100
x 100
=176.78 Cft
12 x 4
22
bags
Cft
Cft
bags
per bag
% Cft
% Cft
per bag
5.10
5.30
22.00
1.00
2.00
Nos.
Nos.
Nos.
Nos.
Nos.
per
per
per
per
per
100.00 Rft
2.50 hrs.
L.S
Rs. 0.00
Total
Contractor's Profit & Overhea
Total
31.10
77.76
155.52
3.11
Rs. 0.00
20
Percent
LABOUR
1
2
3
4
5
6
7
8
9
Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Fitter
Total
Boring hole 18" dia (24" dia)
Working of rig during casting
Construction of Temporary Island
Carriage of material to site of work
(Boring Material)
Total
Sundries
Total
Contractor's Profit & Overhea
on Rs. 4725.45 + 472.55
=
Total for 100 Rft
10
Percent o0.00
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per L.M
Composite rate per Rft
Composite rate per L.M
Page 30
day
day
day
day
day
per foot
per hour
L.S
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 7
Detail
Rate
Per Unit
Amount (Rs.)
Concrete
2
3
4
5
6
Cement
Sand (Harro)
Bajri
Extra cement (10%)
Cost of casing pipe
100 @
Can be used 100 times
0 100
x 100
12x4
38.40
96.00
192.00
3.84
bags
Cft
Cft
bags
per bag
% Cft
% Cft
per bag
7.00
7.00
35.00
1.00
3.00
Nos.
Nos.
No.
No.
Nos.
per
per
per
per
per
100.00 Rft
2.50 hrs.
L.S
Rs. 0.00
Total
Contractor's Profit & Overhea
Total
=218.17 Cft
Rs. 0.00
20
Percent
LABOUR
1
2
3
4
5
6
7
8
9
Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Fitter
Total
Boring hole 20" dia (500 mm) dia
Working of rig during casting
Constructin of Temparary Island
Carriage of material at site of work
(Boring Material)
Total
Sundries
10 Percent o
Total
Contractor's Profit & Overhea
20 Percent
on Rs.
0.00 + =
Total for 100 Rft
ITEM RATES
Labour rate per Rft
Labour rate per L.M
Composite rate per Rft
Composite rate per L.M
Page 31
day
day
day
day
day
per foot
per hour
L.S
0.00
0.00
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 7
Detail
Rate
Per Unit
Amount (Rs.)
Concrete
2
3
4
5
Cement
Sand (Harro)
Bajri
Extra cement (10%)
Cost of casing pipe
100'.0 @
Can be used 100 times
0 100
x 100
12x4
46.46
116.15
192.00
4.60
bags
Cft
Cft
bags
per bag
% Cft
% Cft
per bag
7.00
7.00
70.00
1.00
3.75
Nos.
Nos.
Nos.
Nos.
Nos.
per
per
per
per
per
100.00 Rft
2.50 hrs.
L.S
Rs. 0.00
Total
Contractor's Profit & Overhea
Total
=264.98 Cft
Rs. 0.00
20
Percent
LABOUR
1
2
3
4
5
6
7
8
9
Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Fitter
Total
Boring hole 22" dia (550 mm) dia
Working of rig during casting
Constructin of Tempary Island
Carriage of material as site of work
(Boring Material)
Total
Sundries
Total
Contractor's Profit & Overhea
on Rs. 11245.00 + 1124.50 =
Total for 100 Rft
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per L.M
Composite rate per Rft
Composite rate per L.M
Page 32
day
day
day
day
day
per foot
per hour
L.S
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 7
Detail
MATERIAL
1
2
3
4
5
Rate
Per Unit
Amount (Rs.)
x 100
12x4
55.29
138.23
276.46
5.53
bags
Cft
Cft
bags
per bag
% Cft
% Cft
per bag
8.00
8.00
95.00
1.00
4.75
Nos.
Nos.
No.
No.
Nos.
per
per
per
per
per
100.00 Rft
2.50 hrs.
L.S
Rs. 0.00
Total
Contractor's Profit & Overhea
Total
=314.16 Cft
Rs. 0.00
20
Percent
LABOUR
1
2
3
4
5
6
7
8
9
Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Fitter
Total
Boring hole 24" dia (550 mm) dia
Working of rig during casting
Constructin of Temparary Island
Carriage of material to site of work
(Boaring Material)
Total
Sundries
Total
Contractor's Profit & Overhea
on Rs. 13528.75 + 1352.88 =
Total for 100 Rft
Percent o
0.00
20
Percent
Rs.
0.00
Page 33
per foot
per hour
L.S
10
ITEM RATES
Labour rate per Rft
Labour rate per L.M
day
day
day
day
day
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 8
Plain bars.
Detail
Rate
Per Unit
Amount (Rs.)
Fabrication of steel
Welding electrode
Hire charges of plant
Working of rig during lowering of cage
Total
Contractor's Profit & Overhea
Total
Material cost per Cwt
20
2.443
(48.00
1.00
L.S
3.00
Ton
Cwt)
bundle
per ton
er bundle
hrs.
per hour
1.00 Nos.
3.00 Nos.
per day
per day
Percent
Welder
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Cwt
Labour rate per 100 Kg
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 34
DESCRIPTION OF ITEM:
Item No. 8
Deformed bars.
Detail
Rate
Per Unit
Amount (Rs.)
Fabrication of steel
Welding electrode
Hire charges of plant
Working of rig during lowering of cage
Total
Contractor's Profit & Overhea
Total
Material cost per Cwt
20
2.443
(48.00
1.00
L.S
3.00
Ton
Cwt)
bundle
per ton
er bundle
hrs.
per hour
1.00 Nos.
3.00 Nos.
per day
per day
Percent
Welder
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Cwt
Labour rate per 100 Kg
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 35
DESCRIPTION OF ITEM:
Item No. 9
Plain bars.
Detail
Rate
Per Unit
Amount (Rs.)
55
(1.08
(0.25
0.114
Total
Contractor's Profit & Overhea
Total
20
kg
Cwt)
lbs)
kg
per tonne
kg
0.25 Nos.
0.25 Nos.
per day
per day
Percent
LABOUR
1
2
Black Smith
Collies unskilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Cwt
Labour rate per 100 Kg
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 36
Cwt
DESCRIPTION OF ITEM:
Item No. 9
Deformed bars.
Detail
Rate
Per Unit
Amount (Rs.)
55.00
(1.08
(0.25
0.114
Total
Contractor's Profit & Overhea
Total
20
kg
Cwt)
lbs)
kg
per tonne
per kg
0.25 Nos.
0.25 Nos.
per day
per day
Percent
LABOUR
1
2
Black Smith
Collies unskilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Cwt
Labour rate per 100 Kg
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 37
DESCRIPTION OF ITEM:
Item No. 10
Detail
Rate
Per Unit
Cement
Sand
Shingle
Kail Woden planks or steel plates for moulds
Total
Contractor's Profit & Overhea
Total
20
17.60
44.00
88.00
0.40
bags
Cft
Cft
Cft
per bag
% Cft
% Cft
P. Cft.
2.00
3.00
0.50
1.00
Nos.
Nos.
No.
No.
per
per
per
per
Percent
LABOUR
1
2
3
4
Mason
Collies unskilled
Carpenter
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 100 Cft
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 38
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 11
Detail
Rate
Per Unit
Cement
Sand
Shingle
Kail Wood for templates
Total
Contractor's Profit & Overhea
Total
20
11.20
28.00
56.00
0.40
bags
Cft
Cft
Cft
per bag
% Cft
% Cft
P. Cft.
4.50
8.00
1.50
0.50
Nos.
Nos.
No.
No.
per
per
per
per
Percent
LABOUR
1
2
3
4
Mason
Collies unskilled
Bahishti
Carpenter for template
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 39
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 12
Providing and fixing ornamental concrete cement Jali 2" (50 mm) thi
(1 : 2 : 4) without steel.
Detail
Rate
Per Unit
Cement
Sand
Shingle
Form work (Kail Wood)
Total
Contractor's Profit & Overhea
Total
0.30
0.75
1.00
0.01
20
bags
Cft
Cft
Cft
per bag
% Cft
% Cft
P. Cft.
per day
per day
Percent
LABOUR
1
2
Mason
Collies unskilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
0.20 No.
0.20 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 40
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 13
Detail
Rate
Per Unit
Amount (Rs.)
Collies unskilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate for 100 Cft
4.00 Nos.
10
Percent
20
Percent
363.00 x 10
125
per day
Say
Say
0.00
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
DESCRIPTION OF ITEM:
Item No. 13
Detail
Rate
Per Unit
Collies unskilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate for 100 Cft
2.50 Nos.
10
Percent
20
Percent
226.88 x 10
125
per day
Say
Say
0.00
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 41
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 14
Extra labour work of weir, rail or road bridges syphons and concret
super-structure.
Detail
Rate
Per Unit
Amount (Rs.)
Collies unskilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate for 100 Cft
1.00 Nos.
10
Percent
20
Percent
per day
Say
Say
0.00
125
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
DESCRIPTION OF ITEM:
Item No. 15
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
Cement
Sand
Bajri
Steel
Wood (Kail Wood)
Total
Contractor's Profit & Overhea
Total
0.09
0.22
0.88
0.70
0.007
20
Bag
Cft
Cft
Kg.
Cft
P. Bag
% Cft.
% Cft.
P. Kg.
P. Cft
0.25 No.
0.25 No.
per day
per day
Say
Say
Percent
LABOUR
1
2
Mason
Collies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Spout
Composit rate per Spout
Rs.
Rs.
Page 42
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 16
Making hole upto 3" (75 mm) dia 18" (450 mm) deep in cement concret
stone masonry walls and repairing.
Detail
Rate
Per Unit
Amount (Rs.)
LABOUR
1
2
Mason
Collies unskilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
0.60 No.
0.60 No.
10
Percent
20
Percent
per day
per day
Say
ITEM RATES
Labour rate per hole
Rs.
DESCRIPTION OF ITEM:
Item No. 17
Detail
Rate
Per Unit
Well sinker/diver
Collies unskilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate per 100 Cft
1.00 No.
6.00 Nos.
10
Percent
20
Percent
750.20 x 10
150
per day
per day
Say
Say
0.00
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 43
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 18
Detail
Rate
Per Unit
Amount (Rs.)
Mason
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate per 100 Sft
0.50 No.
10
Percent
20
Percent
per day
Say
Say
x 100
125
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
DESCRIPTION OF ITEM:
Item No. 18
Detail
Rate
Per Unit
Mason
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate per 100 Sft
0.165 No.
10
Percent
20
Percent
per day
Say
Say
x 100
125
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 44
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 19
Horizontal floor.
Detail
Rate
Per Unit
Amount (Rs.)
Mason
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate per 100 Sft
0.28 No.
0.25 No.
10
Percent
20
Percent
per day
per day
Say
Say
x 100
125
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
DESCRIPTION OF ITEM:
Item No. 19
Detail
Rate
Per Unit
Mason
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate per 100 Sft
0.50 No.
0.25 No.
10
Percent
20
Percent
per day
per day
Say
Say
x 100
125
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 45
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 19
Inverted filters.
Detail
Rate
Per Unit
Mason
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate per 100 Sft
0.125 No.
0.125 No.
10
Percent
20
Percent
per day
per day
Say
Say
x 100
125
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 46
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 20
complete in
respects.
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
(a)
(b)
(c)
(d)
(e)
(f)
188.87 lbs
15.11
203.98
7.5 ft.
92.54 kg
per ton
2.00 sets
per set
75.00 ft
22.86 metre
per metre
7.50 ft
2.29 metre
per metre
0.27 Bag
0.34 Cft.
0.68 Cft.
P. Bag
% Cft.
% Cft.
per bag
% Cft
% Cft
0.38 bags
0.07 bags
0.45 ba
0.45 bag
0.97 Cf
0.97 Cft
0.194 C
0.194 Cft
Page 47
Foreman/Supervisor
Black Smith
Coolies skilled
Coolies un-skilled
Total
Hire charges of assembling bunch
cable wire cutter stressing, jack
Hydraulic pump, conce, fixer grout
injecting pump reliveable observation
and supply of recorded data of
stresses.
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 4 Nos.
Rate for one cable (85.65 Kg)
Rate for 100 Kg
2.00
6.00
4.00
8.00
No.
Nos.
Nos.
Nos.
per
per
per
per
day
day
day
day
L.S
10
Percent o
20
Percent
0
0.00
=
x 100
85.65
ITEM RATES
Labour rate per 100 Kg
Composite rate per 100 Kg
Rs.
Rs.
Say
Page 48
DESCRIPTION OF ITEM:
Item No. 21
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
(a)
(b)
Anchorage cone
one female for
i) 5 mm dia = 4x2
ii) 4 mm dia = 3x2
4
5
5 Nos.
256.25 lbs
3 Nos.
=
99.900 lbs
356.15 lbs
161.55 kg
12.92 kg
174.47
174.47 kg
Using 4 times
=
4
Making good recesses with type 'A'
nominal mix 1:1:2 concrete
including curing 500 15 = 33+1
= 34 x 2 =
Repair of plate for the down struts
spacers
M.S bar used for spacer reinforcement
161.55 x 20 100
=
Wastage 1%
20
per ton
each end
per ton
kg
per
per
per
per
0.00
Rs.
0.00
Rs.
Rs. 0.00
=Rs.
0.00
68 ends
68.00 ends
L.S
32.31 kg
0.32 kg
32.63 k
32.63 kg
0.114 kg
Percent
0.00
LABOUR
1
2
3
4
5
Foreman
Black Smith
Coolies skilled
Coolies un-skilled
Total
Hire charges of wire cutter
stressing, Jack, Hydraulic pump
relievable cone, observation and
supply of recorded data of stress.
Total
Sundries (10on labour
Total
Contractor's Profit & Overhea
Total
20
0.25
1.00
1.00
1.00
No.
Nos.
Nos.
Nos.
L.S
Percent
ITEM RATES
Labour rate per 100 Kg
Composite rate per 100 Kg
Rs.
Rs.
Page 49
day
day
day
day
DESCRIPTION OF ITEM:
Item No. 22
Detail
Rate
Per Unit
(a)
LABOUR
1
2
3
4
Page 50
No.
Nos.
Rft
Nos.
Rft
each
each
Rft
each
Rft
400.00 Rft
6.00 Nos.
Rft
each
375 Cft
200 beams
75000 Cft
0.00
0.00
Supervisor/foreman
Colies skilled
Crane operator
Coolies un-skilled
Total
Sundries
10 Percent
Total
20 Percent
Contractor's Profit & Overhea
Total for 2 beams of 375 Cft each
Rate for 100 Cft
x
10.00
2 x 375
ITEM RATES
Labour rate per 100 Cft
Labour rater per Cum
1.00
3.00
450.00
3.00
60.00
1.00
3.00
1.00
8.00
No.
Nos.
No.
Nos.
per
per
per
per
day
day
day
day
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 22
Detail
Rate
Per Unit
Amount (Rs.)
EQUIPMENT
As per item 22(i)
(a)
Beam 75 x 2 x 3.75 =
The equipment used to lift/
transport and fixing in postion
during one year
=
Cft = 80 x 562.5 =
Amount per beam
-
562.5 Cft
80 beams
45000 Cft
x
562
45000
0.00
LABOUR
Full shift of Labour is required for
one day as per item 22(i)
Total
ITEM RATES
Machinary + Labour required to operate the
machinary
Rate per 100 Cft
Rs.
Rs.
Rs.
Page 51
x
562.50
100
DESCRIPTION OF ITEM:
Item No. 22
Detail
Rate
Per Unit
Amount (Rs.)
EQUIPMENT
As per item 22(i)
(a)
750 Cft
60 beams
45000 Cft
x
750
45000
0.00
LABOUR
Full shift of Labour is required for
two days as per item 22(i)
2.00
Total
ITEM RATES
Machinary + Labour required to operate the
machinary
Rate per 100 Cft
Rate per Cum
Rs.
Rs.
Rs.
Page 52
750.00
100
Say
DESCRIPTION OF ITEM:
Item No. 22
Beam above 100 ft. upto 150 ft (23 metre to 30 metre) length.
Detail
Rate
Per Unit
EQUIPMENT
As per item 22(i)
(a)
1125 Cft
34 beams
38250 Cft
x
1125
38250
0.00
LABOUR
Full shift of Labour is required for
four days as per item 22(i)
4.00
Total
ITEM RATES
Machinary + Labour required to operate the
machinary
Rate per 100 Cft
Rs.
Rs.
Rs.
0.00
x 100
1,125.00
Say
Say
Page 53
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 22
Beam above 150 ft. upto 175 ft (46 metre to 53 metre) length.
Detail
Rate
Per Unit
EQUIPMENT
As per item 22(i)
(a)
1312.5 Cft
28 beams
36750 Cft
x
1312
36750
0.00
LABOUR
Full shift of Labour is required for
six days as per item 22(i)
6.00
Total
ITEM RATES
Machinary + Labour required to operate the
machinary
Rate per 100 Cft
Rs.
Rs.
Rs.
Say
Say
Page 54
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 23
Providing and laying foam concrete 3" (75 mm) thick, using cement s
the ratio of 1 : 2 and aluminum powder at the rate of 0.2% of the c
mix.
Detail
Rate
Per Unit
Cement
Sand
Aluminum powder 0.2% od cement sand
mix
Total
Contractor's Profit & Overhea
Total
20
1.00
2.50
0.66
0.30
bag
Cft
lbs
kg
per bag
% Cft
per kg
per day
per day
per day
Percent
LABOUR
1
2
3
Mason
Collies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total
0.20 Nos.
0.50 Nos.
0.10 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 55
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 24
Providing and fixing 6" (150 mm) wide curved sheet of required shap
on face of the construction joint with G.I. Screw, 1.5" (40 mm) lon
construction joints vertically.
(i)
Detail
Rate
Per Unit
2
3
Total
Contractor's Profit & Overhea
Total
20
2.34 kg
16.00 Nos.
17.00 Nos.
per kg
each
Doz
0.125 No.
0.094 No.
per day
per day
Percent
LABOUR
Mason
For making special slope
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per L.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 56
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 24
Providing and fixing 6" (150 mm) wide curved sheet of required shap
on face of the construction joint with G.I. Screw, 1.5" (40 mm) lon
construction joints vertically.
(ii)
Detail
Rate
Per Unit
Total
Contractor's Profit & Overhea
Total
20
6 Sft
5.77 kg
per kg
6.00 Nos.
each
6.00 Sft
6.00 Nos.
0.13 No.
Sft
each
per day
Percent
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per L.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 57
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 25
Providing and fixing 1/8" (3 mm) thick 3" (75 mm) wide aluminum str
horizontal and vertical expansion joints in walls, columns, ceiling
etc., including cost of clips/screws etc., complete in all respect
(a)
Detail
Rate
Per Unit
Total
Contractor's Profit & Overhea
Total
20
2.34 kg
16.00 Nos.
17.00 Nos.
0.13 Nos.
0.13 Nos.
per kg
each
Dozen
Percent
Mason
Moulder/Fitter
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per L.M.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 58
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 25
Providing and fixing 1/8" (3 mm) thick 3" (75 mm) wide aluminum str
horizontal and vertical expansion joints in walls, columns, ceiling
etc., including cost of clips/screws etc., complete in all respect
(b)
Detail
Rate
Per Unit
Amount (Rs.)
Total
Contractor's Profit & Overhea
Total
Cost of Material/Rft
20
2.34
16.00
17.00
12.00
kg
Nos.
Nos.
Rft
0.13 Nos.
0.13 Nos.
per kg
each
P. Dozen
per Rft
Percent
Mason
Moulder/Fitter
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per L.M.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 59
DESCRIPTION OF ITEM:
Item No. 26
Providing and fixing 1/16" (1.6 mm) thick copper flashing on expans
complete in all respects.
Detail
Rate
Per Unit
Total
Contractor's Profit & Overhea
Total
20
105.00 Sft
0.50 Kg.
Per Sft
Per Kg.
Percent
LABOUR
1
2
Carpenter/Black Smith
Helper
Total
Sundries
Total
Contractor's Profit & Overhea
Total
1.00 Nos.
1.00 Nos.
10
Percent
20
Percent
ITEM RATES
Labour rate per Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 60
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 27
Providing and fixing 6" (150 mm) wide G.I. sheet 18 SWG stopper to
joint.
Detail
Rate
Per Unit
Total
Contractor's Profit & Overhea
Total
20
4.83 kg
per kg
Percent
LABOUR
1
2
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
0.012 Nos.
0.05 Nos.
ITEM RATES
Labour rate per Rft
Labour rate per L.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 61
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 28
Providing and embedding 10" (250 mm) wide 1/4" thick (6 mm) thick r
water stopper in expansion joints of R.C.C roof slab complete in al
Detail
Rate
Per Unit
Total
Contractor's Profit & Overhea
Total
20
10.00 Rft
Rft
0.25 No.
per day
Percent
LABOUR
1
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Rft
Labour rate per metre
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 62
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 29
Detail
Qty
Rate
Per Unit
5.5 Cft
1.1 Cft
2
3
4
Sand
5.5 x 2 5 =
Sawdust
5.5 x 2 5 =
Wood for heating 4 seers
=
2.2 Cft
2.2 Cft
1.82 kg
Total
Contractor's Profit & Overhea
Total
20
32.39
2.20
2.20
1.82
kg
Cft
Cft
kg
per kg
% Cft
per Cft
per kg
1.00 No.
per day
Percent
LABOUR
1
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per inch/per foot
Labour rate per 25 mm/per metre
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 63
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 30
Detail
Rate
Per Unit
Amount (Rs.)
Coolies skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
0.65 No.
10
Percent
20
Percent
per day
Say
Say
0.00
ITEM RATES
Labour rate per Rft
Labour rater per metre
Rs.
Rs.
DESCRIPTION OF ITEM:
Item No. 31
Detail
Rate
Per Unit
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
0.70 No.
10
Percent
20
Percent
per day
Say
Say
ITEM RATES
Labour rate per Rft
Labour rater per metre
Rs.
Rs.
Page 64
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 32
Detail
Rate
Per Unit
Total
Contractor's Profit & Overhea
Total
20
9.76 Sqm
0.40 No.
0.40 No.
per day
per day
Percent
LABOUR
1
2
Mason
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 65
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 32
Detail
Rate
Per Unit
Total
Contractor's Profit & Overhea
Total
20
9.76 Sqm
0.40 No.
0.40 No.
per day
per day
Percent
LABOUR
1
2
Mason
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
ITEM RATES
Labour rate per Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 66
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 33
With one coat of bitumen and one coat polythene sheet 500 gauge.
(i)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel
Brush
7
8
Bitumen
Polythine 105 Sft @ 1.13 kg % Sft
Total
Contractor's Profit & Overhea
Total
20
2.25
5.50
11.00
0.103
5.82
0.20
(20.00
8.88
1.18
bags
Cft
Cft
Cft
Kg.
No.
lbs)
kg
kg
per bag
% Cft
% Cft
Per Cft
Per Cft
Each
per kg
per kg
0.15
0.50
2.00
0.25
No.
No.
Nos.
No.
per
per
per
per
Percent
Carpenter
Mason
Coolies un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 150 Sft
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 67
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 33
With one coat of bitumen and one coat polythene sheet 500 gauge.
2" (50 mm) thick.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel
Brush
7
8
Bitumen
Polythine with 5% wastage
Total
Contractor's Profit & Overhea
Total
20
2.93
7.50
15.00
0.103
5.82
0.20
(20.00
8.88
1.18
bags
Cft
Cft
Cft
Kg.
No.
lbs)
kg
kg
per bag
% Cft
% Cft
Per Cft
Per Cft
Each
per kg
per kg
0.15
0.50
2.00
0.25
No.
No.
Nos.
No.
per
per
per
per
Percent
Carpenter
Mason
Coolies un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 150 Sft
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 68
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 33
With one coat of bitumen and one coat polythene sheet 500 gauge.
3" (75 mm) thick.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel
Brush
7
8
Bitumen
Polythine with 5% wastage
Total
Contractor's Profit & Overhea
Total
20
4.50
11.00
22.00
0.103
5.82
0.20
(20.00
8.88
1.18
bags
Cft
Cft
Cft
Kg.
No.
lbs)
kg
kg
per bag
% Cft
% Cft
Per Cft
Per Cft
Each
per kg
per kg
0.25
0.50
2.00
0.25
No.
No.
Nos.
No.
per
per
per
per
Percent
Carpenter
Mason
Coolies un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 150 Sft
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 69
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 33
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel
Brush
Total
Contractor's Profit & Overhea
Total
20
2.25
5.50
11.00
0.103
5.82
0.20
(34.00
15.08
bags
Cft
Cft
Cft
Kg.
No.
lbs)
kg
per bag
% Cft
% Cft
Per Cft
Per Cft
Each
per kg
0.15
0.50
2.00
0.25
No.
No.
Nos.
No.
per
per
per
per
Percent
Carpenter
Mason
Coolies un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 150 Sft
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 70
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 33
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel
Brush
Total
Contractor's Profit & Overhea
Total
20
2.93
7.50
15.00
0.103
5.82
0.20
(34.00
15.08
bags
Cft
Cft
Cft
Kg.
No.
lbs)
kg
per bag
% Cft
% Cft
Per Cft
Per Cft
Each
per kg
0.15
0.50
2.00
0.25
No.
No.
Nos.
No.
per
per
per
per
Percent
Carpenter
Mason
Coolies un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total for 150 Sft
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 71
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 33
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel
Brush
20
4.50
11.00
22.00
0.103
5.82
0.20
(34.00
15.08
bags
Cft
Cft
Cft
Kg.
No.
lbs)
kg
per bag
% Cft
% Cft
Per Cft
Per Cft
Each
per kg
0.50
2.00
0.25
0.25
No.
Nos.
No.
No.
per
per
per
per
Percent
Mason
Coolies un-skilled
Carpenter
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 72
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 34
Provding and laying damp proof course with cement sand plaster and
coating.
(a)
(i)
(a)
With one coat of bitumen and one coat polythen sheet 500 gauge.
Ratio 1 : 4.
" (12 mm) thick.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage
Total
Contractor's Profit & Overhea
Total
0.73
3.60
5.82
0.20
8.86
1.18
20
bags
Cft
Kg.
No.
kg
kg
per bag
% Cft
Per Cft
Each
per kg
per kg
0.50 No.
2.00 Nos.
0.25 No.
per day
per day
per day
Percent
Mason
Coolies un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 73
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 34
Provding and laying damp proof course with cement sand plaster and
coating.
(a)
(i)
(b)
With one coat of bitumen and one coat polythen sheet 500 gauge.
Ratio 1 : 4.
" (20 mm) thick.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage
Total
Contractor's Profit & Overhea
Total
1.14
5.50
5.82
0.20
8.86
1.18
20
bags
Cft
Kg.
No.
kg
kg
per bag
% Cft
Per Cft
Each
kg
kg
per day
per day
per day
Percent
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 74
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 34
Provding and laying damp proof course with cement sand plaster and
coating.
(a)
(ii)
(a)
With one coat of bitumen and one coat polythen sheet 500 gauge.
Ratio 1 : 3.
" (12 mm) thick.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage
Total
Contractor's Profit & Overhea
Total
0.88
3.40
5.82
0.20
8.86
1.18
20
bags
Cft
Kg.
No.
kg
kg
per bag
% Cft
Per Cft
Each
kg
per kg
per day
per day
per day
Percent
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate fore 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 75
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 34
Provding and laying damp proof course with cement sand plaster and
coating.
(a)
(ii)
(b)
With one coat of bitumen and one coat polythen sheet 500 gauge.
Ratio 1 : 3.
" (20 mm) thick.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage
Total
Contractor's Profit & Overhea
Total
1.32
5.10
5.82
0.20
8.86
1.18
20
bags
Cft
Kg.
No.
kg
kg
per bag
% Cft
Per Cft
Each
kg
per kg
per day
per day
per day
Percent
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 76
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 34
Provding and laying damp proof course with cement sand plaster and
coating.
(a)
(iii)
(a)
With one coat of bitumen and one coat polythen sheet 500 gauge.
Ratio 1 : 2.
" (12 mm) thick.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage
1.25
3.00
3.63
0.20
9.72
1.18
Total
Contractor's Profit & Overhea
20
i.e. on Rs.
Total
Percent
bags
Cft
Kg.
No.
kg
kg
per bag
% Cft
Per Cft
Each
per kg
per kg
per day
per day
per day
Mason
Coolies un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 Nos.
0.250 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 77
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 34
Provding and laying damp proof course with cement sand plaster and
coating.
(a)
(iii)
(b)
With one coat of bitumen and one coat polythen sheet 500 gauge.
Ratio 1 : 2.
" (20 mm) thick.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage
1.92
3.00
3.63
0.20
9.72
1.18
Total
Contractor's Profit & Overhea
20
i.e. on Rs.
Total
bags
Cft
Kg.
No.
kg
kg
per bag
% Cft
Per Cft
Each
per kg
per kg
per day
per day
per day
Mason
Coolies un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 Nos.
0.250 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 78
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 34
Provding and laying damp proof course with cement sand plaster and
coating.
(b)
(i)
(a)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
Cement
Sand
Fuel
Brush
Bitumen
0.73
3.60
3.65
0.20
16.50
Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total
bags
Cft
Kg.
No.
kg
per bag
% Cft
Per Cft
Each
per kg
per day
per day
per day
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 79
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 34
Provding and laying damp proof course with cement sand plaster and
coating.
(b)
(i)
(b)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
Cement
Sand
Fuel
Brush
Bitumen
1.14
5.50
3.63
0.20
16.50
Total
Contractor's Profit & Overhea
20
i.e. on Rs.
Total
Percent
bags
Cft
Kg.
No.
kg
per bag
% Cft
Per Cft
Each
per kg
per day
per day
per day
on item 1, 2, 3 & 4
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 80
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 34
Provding and laying damp proof course with cement sand plaster and
coating.
(b)
(ii)
(a)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
Cement
Sand
Fuel
Brush
Bitumen
0.88
3.40
3.73
0.20
16.50
Total
Contractor's Profit & Overhea
20
i.e. on
Rs
Total
bags
Cft
Kg.
No.
kg
per bag
% Cft
Per Cft
Each
per kg
per day
per day
per day
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 81
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 34
Provding and laying damp proof course with cement sand plaster and
coating.
(b)
(ii)
(b)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
Cement
Sand
Fuel
Brush
Bitumen
1.32
5.10
3.73
0.20
16.50
Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total
bags
Cft
Kg.
No.
kg
per bag
% Cft
Per Cft
Each
per kg
per day
per day
per day
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 82
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 34
Provding and laying damp proof course with cement sand plaster and
coating.
(b)
(iii)
(a)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
Cement
Sand
Fuel
Brush
Bitumen
1.25
3.00
3.73
0.20
16.50
Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total
bags
Cft
Kg.
No.
kg
per bag
% Cft
Per Cft
Each
per kg
per day
per day
per day
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 83
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 34
Provding and laying damp proof course with cement sand plaster and
coating.
(b)
(iii)
(b)
Detail
Rate
Per Unit
MATERIAL
1
2
4
5
5
Cement
Sand
Fuel
Brush
Bitumen
1.92
5.00
3.73
0.20
16.50
Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total
bags
Cft
Kg.
No.
kg
per bag
% Cft
Per Cft
Each
per kg
per day
per day
per day
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 84
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 35
Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(a)
(i)
(a)
With one coat of bitumen & one layer of polythene sheet 500 gauge.
Ratio 1 : 4.
" (12 mm) thick.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage
0.73
3.60
3.62
0.20
9.72
1.18
Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total
bags
Cft
Kg.
No.
kg
kg
per bag
% Cft
Per Cft
Each
per kg
per kg
per day
per day
per day
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.250 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 85
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 35
Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(a)
(i)
(b)
With one coat of bitumen & one layer of polythene sheet 500 gauge.
Ratio 1 : 4.
" (20 mm) thick.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage
1.14
5.50
3.63
0.20
9.72
1.18
Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total
bags
Cft
Kg.
No.
kg
kg
per bag
% Cft
Per Cft
Each
per kg
per kg
per day
per day
per day
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.250 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 86
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 35
Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(a)
(ii)
(a)
With one coat of bitumen & one layer of polythene sheet 500 gauge.
Ratio 1 : 3.
" (12 mm) thick.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage
0.88
3.40
3.63
0.20
9.72
1.18
Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total
bags
Cft
Kg.
No.
kg
kg
per bag
% Cft
Per Cft
Each
per kg
per kg
per day
per day
per day
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 87
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 35
Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(a)
(ii)
(b)
With one coat of bitumen & one layer of polythene sheet 500 gauge.
Ratio 1 : 3.
" (20 mm) thick.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Bitumen
Polythene with 5% wastage
Fuel
Brush
1.32
5.10
9.72
1.18
3.63
0.20
Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total
Percent on item 1, 2,
bags
Cft
kg
kg
Kg.
No.
per bag
% Cft
per kg
per kg
Per Cft
Each
per day
per day
per day
4, 5 & 6
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 88
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 35
Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(a)
(iii)
(a)
With one coat of bitumen & one layer of polythene sheet 500 gauge.
Ratio 1 : 2.
" (12 mm) thick.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage
1.25
3.00
3.63
0.20
9.72
1.18
Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total
Percent
bags
Cft
Kg.
No.
kg
kg
per bag
% Cft
Per Cft
Each
per kg
per kg
per day
per day
per day
on item 1, 2, 3, 4 & 6
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 89
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 35
Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(a)
(iii)
(b)
With one coat of bitumen & one layer of polythene sheet 500 gauge.
Ratio 1 : 2.
" (20 mm) thick.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage
1.92
5.00
3.63
0.20
9.72
1.18
Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total
Percent
bags
Cft
Kg.
No.
kg
kg
per bag
% Cft
Per Cft
Each
per kg
per kg
per day
per day
per day
on item 1, 2, 3, 4 & 6
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 90
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 35
Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(b)
(i)
(a)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
Cement
Sand
Fuel
Brush
Bitumen
0.73
3.60
3.63
0.20
16.50
Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total
Percent
bags
Cft
Kg.
No.
kg
per bag
% Cft
Per Cft
Each
per kg
per day
per day
per day
on item 1, 2, 3 & 4
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.250 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 91
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 35
Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(b)
(i)
(b)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
Cement
Sand
Fuel
Brush
Bitumen
1.14
5.50
3.63
0.20
16.50
Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total
bags
Cft
Kg.
No.
kg
per bag
% Cft
Per Cft
Each
per kg
per day
per day
per day
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 92
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 35
Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(b)
(ii)
(a)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
Cement
Sand
Fuel
Brush
Bitumen
0.88
3.40
3.63
0.20
16.50
Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total
bags
Cft
Kg.
No.
kg
per bag
% Cft
Per Cft
Each
per kg
per day
per day
per day
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 93
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 35
Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(b)
(ii)
(b)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
Cement
Sand
Fuel
Brush
Bitumen
1.32
5.10
3.63
0.20
16.50
Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total
bags
Cft
Kg.
No.
kg
per bag
% Cft
Per Cft
Each
per kg
per day
per day
per day
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 94
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 35
Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(b)
(iii)
(a)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
Cement
Sand
Fuel
Brush
Bitumen
1.25
3.02
3.63
0.20
16.50
Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total
bags
Cft
Kg.
No.
kg
per bag
% Cft
Per Cft
Each
per kg
per day
per day
per day
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 95
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 35
Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(b)
(iii)
(b)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
Cement
Sand
Fuel
Brush
Bitumen
1.92
5.00
3.63
0.20
16.50
Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total
bags
Cft
Kg.
No.
kg
per bag
% Cft
Per Cft
Each
per kg
per day
per day
per day
Mason
Cooly un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft
0.50 No.
2.00 No.
0.25 No.
10
Percent
20
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 96
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 36
Detail
Rate
Per Unit
Amount (Rs.)
LABOUR
1
2
3
4
Mason
Carpenter
Coolies un-skilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Overhea
Total
2.00
0.50
5.00
1.00
10
Percent
20
Percent
Nos.
No.
Nos.
No.
per
per
per
per
day
day
day
day
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 37
Detail
Rate
Per Unit
LABOUR
1
Mason
Total
Sundries
Total
Contractor's Profit & Overhea
Total
0.22 Nos.
10
Percent
20
Percent
per day
Say
Say
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 97
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 38
Detail
Rate
Per Unit
Amount (Rs.)
LABOUR
1
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
3.25 Nos.
10
Percent
20
Percent
per day
Say
Say
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
DESCRIPTION OF ITEM:
Item No. 39
Detail
Rate
Per Unit
Mason
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
1.00 No.
2.00 Nos.
10
Percent
20
Percent
per day
per day
Say
ITEM RATES
Labour rate per No.
Rs.
Page 98
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 40
Detail
Rate
Per Unit
Amount (Rs.)
LABOUR
1
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
2.50 Nos.
10
Percent
20
Percent
per day
Say
Say
ITEM RATES
Labour rate per 100 Cft
Composite rate per Cum
Rs.
Rs.
DESCRIPTION OF ITEM:
Item No. 40
Detail
Rate
Per Unit
LABOUR
1
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
2.80 Nos.
10
Percent
20
Percent
per day
Say
Say
ITEM RATES
Labour rate per 100 Cft
Composite rate per Cum
Rs.
Rs.
Page 99
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 40
Detail
Rate
Per Unit
Amount (Rs.)
LABOUR
1
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
3.25 Nos.
10
Percent
20
Percent
per day
Say
Say
ITEM RATES
Labour rate per 100 Cft
Composite rate per Cum
Rs.
Rs.
DESCRIPTION OF ITEM:
Item No. 40
Detail
Rate
Per Unit
LABOUR
1
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
3.75 Nos.
10
Percent
20
Percent
per day
Say
Say
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 100
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 41
Detail
Rate
Per Unit
Cement
Sand
Stone agregate
Broken glass
Total
Contractor's Profit & Overhea
Total
20
43.00 Cft
0.107 Cft
53.7 Cft
4.40
16.00
32.00
2.00
74.39
bags
Cft
Cft
mds
kg
per bag
% Cft
per Cft
% kg
0.50
2.00
0.15
5.00
No.
Nos.
No.
Nos.
per
per
per
per
Percent
LABOUR
1
2
3
4
Mason
Coolies un-skilled
Bahishti for fixing glass
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
10
Percent
20
Percent
day
day
day
day
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 101
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 42
Detail
Rate
Per Unit
Amount (Rs.)
LABOUR
1
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
2.50 Nos.
10
Percent
20
Percent
per day
Say
Say
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
DESCRIPTION OF ITEM:
Item No. 43
Detail
Rate
Per Unit
LABOUR
1
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
2.80 Nos.
10
Percent
20
Percent
per day
Say
Say
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 102
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 43
Detail
Rate
Per Unit
Amount (Rs.)
LABOUR
1
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
3.25 Nos.
10
Percent
20
Percent
per day
Say
Say
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
DESCRIPTION OF ITEM:
Item No. 43
Detail
Rate
Per Unit
LABOUR
1
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
3.75 Nos.
10
Percent
20
Percent
per day
Say
Say
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 103
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 43
Detail
Rate
Per Unit
Amount (Rs.)
LABOUR
1
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
5.00 Nos.
10
Percent
20
Percent
per day
Say
Say
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
DESCRIPTION OF ITEM:
Item No. 43
Detail
Rate
Per Unit
LABOUR
1
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
8.50 Nos.
10
Percent
20
Percent
per day
Say
Say
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 104
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 44
Detail
Rate
Per Unit
Amount (Rs.)
LABOUR
1
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
0.80 No.
10
Percent
20
Percent
per day
Say
Say
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
DESCRIPTION OF ITEM:
Item No. 45
Detail
Rate
Per Unit
LABOUR
1
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
0.80 No.
10
Percent
20
Percent
per day
Say
Say
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 105
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 46
Erecting and carting sun shades of precast R.C concrete upto 5' x 2
(1.50 x 0.760 metre).
Detail
Rate
Per Unit
Assume 5 Nos.
LABOUR
1
2
Mason
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
0.50 No.
1.60 Nos.
10
Percent
20
Percent
per day
per day
Say
ITEM RATES
Labour rate per No.
Rs.
Page 106
Amount (Rs.)
CHAPTER NO.4
DISMANTLING
DESCRIPTION OF ITEM:
Item No. 1
Detail
Cooly un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.85 No.
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 1
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 2
Detail
mortar.
Cooly un-skilled
1.25 Nos.
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 3
Detail
Cooly un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
3.00 Nos.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 2
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 4 (a)
Detail
Coolies un-skilled
1.50 Nos.
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 4 (b)
Detail
Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
1.90 Nos.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 3
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 5
Detail
Coolies un-skilled
2.50 Nos.
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 6
Detail
Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
4.00 Nos.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 4
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 7
Wooden Crates
Detail
LABOUR
1
Coolies un-skilled
2.00 Nos.
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 7
Wire crates
Detail
LABOUR
1
Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
2.50 Nos.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 5
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 8
Detail
Coolies un-skilled
1.40 Nos.
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 9
Detail
Cooly un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.50 No.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 6
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 10
Detail
Coolies un-skilled
1.25 Nos.
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 11
Detail
Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.85 No.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 7
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 12
Detail
Coolies un-skilled
1.75 Nos.
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 13
Detail
Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
4.25 Nos.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 8
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 14
Detail
Coolies un-skilled
3.75 Nos.
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 15
Detail
Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
1.00 No.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 9
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 16
Detail
Coolies un-skilled
2.00 Nos.
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 17
Detail
Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
2.75 Nos.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 10
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 18
Detail
Coolies un-skilled
10.50 Nos.
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 19 (a)
Detail
Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
5.50 Nos.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 11
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 19 (b)
Detail
Coolies un-skilled
9.00 Nos.
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 19 (c)
Detail
Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
11.00 Nos.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 12
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 19 (d)
Detail
Coolies un-skilled
3.00 Nos.
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 19 (e)
Detail
LABOUR
1
Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
1.50 Nos.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 13
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 20
Detail
Coolies un-skilled
18.00 Nos.
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 21
Detail
Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.60 No.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 14
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 22 (a)
Detail
Coolies un-skilled
1.50 Nos.
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 22 (b)
Detail
Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
1.25 Nos.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 15
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 23
Detail
LABOUR
1
2
Fitter
Coolies un-skilled
0.25 No.
0.50 No.
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
0.00per day
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 24 (a)
Detail
Carpenter
Cooly un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.20 No.
0.40 No.
0.00per day
0.00per day
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 16
0.00
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 24 (b)
Detail
LABOUR
1
2
Carpenter
Cooly un-skilled
0.60 No.
1.80 Nos.
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
0.00per day
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 25
Detail
LABOUR
1
Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
2.00 Nos.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 17
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 26
Detail
Coolies un-skilled
2.50 Nos.
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 27 (a)
Detail
LABOUR
1
Coolies unskilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
1.25 Nos.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 18
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 27 (b)
Detail
LABOUR
1
2
Fitter
Cooly unskilled
0.12 No.
1.00 No.
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
0.00per day
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 27 (c)
Detail
LABOUR
1
2
Blacksmith
Cooly unskilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
1.00 No.
0.25 No.
0.00per day
0.00per day
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 19
0.00
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 28
Detail
LABOUR
1
Coolies un-skilled
2.00 Nos.
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 29
Detail
Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.85 No.
0.00per day
Percent
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 20
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 30
Detail
Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
1.25 Nos.
0.00per day
Percent
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 21
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 31
Detail
Mason
Cooly un-skilled
1.00 No.
1.00 No.
0.00per day
0.00per day
0.00
0.00
1.00 No.
0.00per day
0.00
Cooly un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per Rft
Labour rate per R.M
NOTE:
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
1)
2)
The rate does not include the cost of excavation and refi
Page 22
DESCRIPTION OF ITEM:
Item No. 31
(b)
Above 12
inches
to 24 inches Dia-metre.
Detail
Mason
Cooly un-skilled
1.00 No.
1.00 No.
0.00per day
0.00per day
0.00
0.00
3.00 Nos.
0.00per day
0.00
Cooly un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Page 23
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 31 (c)
Above 24
inches
to 36 inches Dia-metre.
Detail
Mason
Cooly un-skilled
1.50 Nos.
1.50 Nos.
0.00per day
0.00per day
0.00
0.00
4.00 Nos.
0.00per day
0.00
Cooly un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Page 24
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 31 (d)
Above 36
inches
Dia-metre.
Detail
Mason
Cooly un-skilled
2.00 Nos.
2.00 Nos.
0.00per day
0.00per day
0.00
0.00
6.00 Nos.
0.00per day
0.00
Cooly un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per Rft
Labour rate per R.M
Rs.
Rs.
Page 25
0.00
Say
Say
0.00
DESCRIPTION OF ITEM:
Item No. 32 (a)
Detail
LABOUR
1
2
3
Cooly un-skilled
Mason
Carpenter
0.15 No.
0.10 No.
0.05 No.
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
0.00per day
0.00per day
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATE
Labour rate per No.
0.00
0.00
0.00
Rs.
0.00
Say
0.00
DESCRIPTION OF ITEM:
Item No. 32 (b)
Detail
LABOUR
1
2
3
Cooly un-skilled
Mason
Carpenter
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.10 No.
0.08 No.
0.05 No.
0.00per day
0.00per day
0.00per day
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATE
Labour rate per No.
Rs.
Page 26
0.00
0.00
0.00
0.00
Say
DESCRIPTION OF ITEM:
Item No. 33
Detail
LABOUR
1
2
3
Cooly un-skilled
Mason
Carpenter
0.05 No.
0.05 No.
0.02 No.
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
0.00per day
0.00per day
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATE
Labour rate per No.
0.00
0.00
0.00
Rs.
0.00
Say
DESCRIPTION OF ITEM:
Item No. 34 (a)
Detail
LABOUR
1
Cooly un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.25 No.
0.00per day
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATE
Labour rate per No.
Rs.
Page 27
0.00
0.00
Say
0.00
DESCRIPTION OF ITEM:
Item No. 34 (b)
Detail
LABOUR
1
Cooly un-skilled
0.40 No.
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATE
Labour rate per No.
0.00
Rs.
0.00
Say
0.00
DESCRIPTION OF ITEM:
Item No. 35 (a)
Detail
Carpenter
Coolies un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
1.00 No.
2.00 Nos.
0.00per day
0.00per day
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 28
0.00
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 35 (b)
Detail
Carpenter
Coolies un-skilled
0.25 No.
4.00 Nos.
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
Labour rate per Cwt
ITEM RATES
0.00per day
0.00per day
0.00
0.00
0.00
0.00
0.00
0.00
Percent
Percent
0.00
0.00
Rs.
Say
0.00
DESCRIPTION OF ITEM:
Item No. 36
Dismantling wooden
Detail
pelisade fencing.
Carpenter
Coolies un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
1.00 No.
1.00 No.
0.00per day
0.00per day
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per Rft
Labour rate per Metre
Rs.
Rs.
Page 29
0.00
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 37
Detail
Carpenter
Coolies un-skilled
1.00 No.
3.00 Nos.
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
Labour rate per Cwt
ITEM RATES
0.00per day
0.00per day
0.00
0.00
0.00
0.00
0.00
0.00
Percent
Percent
0.00
0.00
Rs.
Say
0.00
DESCRIPTION OF ITEM:
Item No. 38
Detail
Coolies un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
Labour rate per Cwt
ITEM RATES
5.00 Nos.
0.00per day
0.00
0.00
0.00
0.00
0.00
0.00
Percent
Percent
Rs.
Page 30
0.00
0.00
Say
0.00
DESCRIPTION OF ITEM:
Item No. 39
Detail
Qty
LABOUR
1
2
Fitters
Cooly un-skilled
0.40 No.
1.00 No.
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
0.00per day
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATE
Labour rate per unit of two seats
0.00
0.00
Rs.
0.00
Say
0.00
DESCRIPTION OF ITEM:
Item No. 40
Detail
Fitters
Coolies un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
Labour rate for 1 No. 12" bore
1.00 No.
1.00 No.
0.00per day
0.00per day
0.00
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate for each per 1" (25mm) bore
Labour rate for each per cm bore
Page 31
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 41 (a)
Detail
LABOUR
1
2
3
Mason
Black-smith
Coolies un-skilled
0.75 No.
0.75 No.
8.00 Nos.
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
0.00per day
0.00per day
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate for Each
0.00
0.00
0.00
Rs.
0.00
Say
0.00
DESCRIPTION OF ITEM:
Item No. 41 (b)
Detail
LABOUR
1
2
3
Mason
Black-smith
Coolies un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.50 No.
0.75 No.
5.00 Nos.
0.00per day
0.00per day
0.00per day
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate for Each
Rs.
Page 32
0.00
0.00
0.00
Say
0.00
DESCRIPTION OF ITEM:
Item No. 42
Detail
Coolies un-skilled
1.70 Nos.
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
0.00
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per 100 Rft
Labour rate per R.M
Rs.
Rs.
0.00
Say
Say
0.00
DESCRIPTION OF ITEM:
Item No. 43
Detail
Coolies un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.40 No.
0.00per day
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 33
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 44
Detail
Coolies un-skilled
0.75 No.
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 45
Detail
Coolies un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
2.00 Nos.
0.00per day
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Page 34
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 46
Detail
Coolies un-skilled
2.67 Nos.
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.00per day
0.00
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 47
Detail
Cooly un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
1.00 No.
0.00per day
0.00
0.00
0.00
0.00
0.00
Percent
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 35
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 48
Detail
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total
1.00 No.
10.00
Percent
20.00
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
0.00per day
0.00
0.00
0.00
0.00
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 49 (a)
Detail
LABOUR
1
Coolies un-skilled
Total
Sundries
Total
Contractor Profit
Total
0.20 No.
10.00
Percent
20.00
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
0.00
0.00
0.00
0.00
0.00
0.00
Rs.
Rs.
Page 36
0.00per day
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 49 (b)
Detail
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total
0.75 No.
10.00
Percent
20.00
Percent
0.00per day
0.00
0.00
0.00
0.00
0.00
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 50
Detail
LABOUR
1
2
Mason
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total
1.00 No.
1.00 No.
10.00
Percent
20.00
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs.
Rs.
Page 37
0.00per day
0.00per day
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 51
Scraping boulders.
Detail
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total
3.50 Nos.
10.00
Percent
20.00
Percent
0.00per day
0.00
0.00
0.00
0.00
0.00
0.00
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 52
Detail
LABOUR
1
Coolies un-skilled
Total
Sundries
Total
Contractor Profit
Total
1.75 Nos.
10.00
Percent
20.00
Percent
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
0.00
0.00
0.00
0.00
0.00
0.00
Rs.
Rs.
Page 38
0.00per day
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 53
Detail
Cement
Sand
Total
Contractor Profit
Total
20.00
0.02 Bag
0.11 Cft
Each B
% Cft,
0.00
0.00
0.00
0.00
0.00
1.00 No.
0.50 No.
0.00per day
0.00per day
0.00
0.00
Percent
LABOUR
1
2
Electrician
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total
10.00
Percent
20.00
Percent
0.00
0.00
0.00
0.00
0.00
ITEM RATES
Labour rate per point
Composite rate for each point
Rs.
Rs.
Page 39
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 54
Detail
Cement
Sand
Total
Contractor Profit
Total
20.00
0.02 Bag
0.11 Cft
Each B
% Cft,
0.00
0.00
0.00
0.00
0.00
1.00 No.
0.50 No.
0.00per day
0.00per day
0.00
0.00
Percent
LABOUR
1
2
Electrician
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total
10.00
Percent
20.00
Percent
0.00
0.00
0.00
0.00
0.00
ITEM RATES
Labour rate for each point
Composite rate for each point
Rs.
Rs.
Page 40
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 55
On surface.
Detail
Cement
Sand
Total
Contractor Profit
Total
20.00
0.02 Bag
0.11 Cft
Each B
% Cft,
0.00
0.00
0.00
0.00
0.00
1.00 No.
0.50 No.
0.00per day
0.00per day
0.00
0.00
Percent
LABOUR
1
2
Electrician
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total
10.00
Percent
20.00
Percent
0.00
0.00
0.00
0.00
0.00
ITEM RATES
Labour rate per Foot
Composite rate per Foot
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
Say
Say
0.00
Page 41
DESCRIPTION OF ITEM:
Item No. 55
Recessed in wall.
Detail
Cement
Sand
Total
Contractor Profit
Total
20.00
0.02 Bag
0.11 Cft
Each B
% Cft,
0.00
0.00
0.00
0.00
0.00
1.00 No.
1.00 No.
0.00per day
0.00per day
0.00
0.00
Percent
LABOUR
1
2
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total
10.00
Percent
20.00
Percent
0.00
0.00
0.00
0.00
0.00
ITEM RATES
Labour rate per Foot
Composite rate per Foot
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 42
CHAPTER NO.3
EARTH WORK
(EXCAVATION & EMBANKMENT)
DESCRIPTION OF ITEM:
Item No. 1
Detail
Amount (Rs.)
3.75 No.
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 1
Say
Say
DESCRIPTION OF ITEM:
Item No. 1
In ordinary soil.
Detail
Amount (Rs.)
4.50 No.
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 2
Amount (Rs.)
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 2
Say
Say
DESCRIPTION OF ITEM:
Item No. 3
Detail
Amount (Rs.)
4.00 Nos.
3.00 Nos.
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 3
Detail
Amount (Rs.)
4.00 Nos.
3.00 Nos.
0.55 No.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 3
Say
Say
DESCRIPTION OF ITEM:
Item No. 4
Ordinary Soil.
Detail
Amount (Rs.)
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
4.00 Nos.
3.00 Nos.
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 4
Hard Soil.
Detail
Amount (Rs.)
5.60 Nos.
3.00 Nos.
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 4
Say
Say
DESCRIPTION OF ITEM:
Item No. 5
Earthwork in ordinary soil for embankments lead upto 100 ft. (30 metre)
including ploughing and mixing with blade grade or disc harrow or
other suitable equipment and compaction by mechanical means at
optimum moisture content and dressing to designed section, complete
in all respects:
(i)
Detail
Amount (Rs.)
4.00
3.00
0.125
0.142
Nos.
Nos.
No.
No.
per
per
per
per
day
day
day
day
Percent
Percent
0.25 HR
0.25 HR
per hrs.
per hrs.
Total
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 5
DESCRIPTION OF ITEM:
Item No. 5
Earthwork in ordinary soil for embankments lead upto 100 ft. (30 metre)
including ploughing and mixing with blade grade or disc harrow or
other suitable equipment and compaction by mechanical means at
optimum moisture content and dressing to designed section, complete
in all respects:
(ii)
Detail
Amount (Rs.)
4.00
3.00
0.125
0.142
Nos.
Nos.
No.
No.
per
per
per
per
day
day
day
day
Percent
Percent
0.25 HR
0.20 HR
per hrs.
per hrs.
Total
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 6
DESCRIPTION OF ITEM:
Item No. 5
Earthwork in ordinary soil for embankments lead upto 100 ft. (30 metre)
including ploughing and mixing with blade grade or disc harrow or
other suitable equipment and compaction by mechanical means at
optimum moisture content and dressing to designed section, complete
in all respects:
(iii)
Detail
Amount (Rs.)
4.00
3.00
0.125
0.142
Nos.
Nos.
No.
No.
per
per
per
per
day
day
day
day
Percent
Percent
0.25 HR
0.15 HR
per hrs.
per hrs.
Total
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 7
DESCRIPTION OF ITEM:
Item No. 6
Detail
Amount (Rs.)
4.50 Nos.
0.50 No.
0.12 No.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 8
Say
Say
DESCRIPTION OF ITEM:
Item No. 7
Earthwork excavation in open cutting upto 5 ft (1500 mm) depth for storm
water channels, drains, sullage drains in open areas, roads, streets, lane
including under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed level and
dimensions, trimming, removal of suface water from trenches, back filling
surplus excavated material disposed of and dressed within 50 ft (15 metre)
lead.
i)
Ordinary
Detail
Amount (Rs.)
0.046 Cft.
P. Cft.
Percent
LABOUR
1
2
3
4
5
6
7
Coolies unskilled
Coolies unskilled
Coolies unskilled
Coolies unskilled
Cooly un-skilled
Dresser
Skilled cooly for
under pinning
for
for
for
for
4.00
1.50
0.50
0.50
1.00
1.00
Nos.
Nos.
No.
No.
No.
No.
per
per
per
per
per
per
day
day
day
day
day
day
per day
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
0.20 No.
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 9
DESCRIPTION OF ITEM:
Item No. 7
Earthwork excavation in open cutting upto 5 ft (1500 mm) depth for storm
water channels, drains, sullage drains in open areas, roads, streets, lane
including under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed level and
dimensions, trimming, removal of suface water from trenches, back filling
surplus excavated material disposed of and dressed within 50 ft (15 metre)
lead.
ii)
Hard
Detail
Amount (Rs.)
0.046 Cft.
P. Cft.
Percent
LABOUR
1
2
3
4
5
6
7
Coolies unskilled
Coolies unskilled
Coolies unskilled
Coolies unskilled
Cooly un-skilled
Dresser
Skilled cooly for
under pinning
for
for
for
for
5.60
1.50
0.50
0.50
1.00
1.00
Nos.
Nos.
No.
No.
No.
No.
per
per
per
per
per
per
day
day
day
day
day
day
per day
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
0.20 No.
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 10
DESCRIPTION OF ITEM:
Item No. 7
Earthwork excavation in open cutting upto 5 ft (1500 mm) depth for storm
water channels, drains, sullage drains in open areas, roads, streets, lane
including under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed level and
dimensions, trimming, removal of suface water from trenches, back filling
surplus excavated material disposed of and dressed within 50 ft (15 metre)
lead.
iii)
Very Hard
Detail
Amount (Rs.)
0.046 Cft.
0.00 P. Cft.
Percent
LABOUR
1
2
3
4
5
6
7
Coolies unskilled
Coolies unskilled
Coolies unskilled
Coolies unskilled
Cooly un-skilled
Dresser
Skilled cooly for
under pinning
for
for
for
for
7.30
1.50
0.50
0.50
1.00
1.00
Nos.
Nos.
No.
No.
No.
No.
per
per
per
per
per
per
day
day
day
day
day
day
per day
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
0.20 No.
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 11
DESCRIPTION OF ITEM:
Item No. 7
Earthwork excavation in open cutting upto 5 ft (1500 mm) depth for storm
water channels, drains, sullage drains in open areas, roads, streets, lane
including under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed level and
dimensions, trimming, removal of suface water from trenches, back filling
surplus excavated material disposed of and dressed within 50 ft (15 metre)
lead.
Gravel and Shingle.
iv)
Detail
Amount (Rs.)
0.046 Cft.
P. Cft.
Percent
LABOUR
1
2
3
4
5
6
7
Coolies unskilled
Coolies unskilled
Coolies unskilled
Coolies unskilled
Cooly un-skilled
Dresser
Skilled cooly for
under pinning
for
for
for
for
10.00
4.50
2.00
1.00
0.50
2.00
Nos.
No.
No.
No.
No.
No.
per
per
per
per
per
per
day
day
day
day
day
day
per day
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
0.20 No.
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 12
DESCRIPTION OF ITEM:
Item No. 8
Earth work excavation in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm
depth for storm water channels, drains sullage drains in open areas, roads
streets, lanes including under pinning of walls and shoring to protect
existing works, shuttering and timbering the trenches, dressed to disigned
level and dimensions, trimming, removal of surface water from trenches,
back filling and surplus excavated material disposal of and dressed within
100 ft. (30 metre) lead.
i)
Ordinary soil
Detail
0.092 Cft.
P. Cft.
Percent
LABOUR
1
2
3
4
4.00 Nos.
4.00 Nos.
0.50 No.
per day
per day
per day
1.00 No.
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 13
DESCRIPTION OF ITEM:
Item No. 8
Earth work excavation in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm
depth for storm water channels, drains sullage drains in open areas, roads
streets, lanes including under pinning of walls and shoring to protect
existing works, shuttering and timbering the trenches, dressed to disigned
level and dimensions, trimming, removal of surface water from trenches,
back filling and surplus excavated material disposal of and dressed within
100 ft. (30 metre) lead.
ii)
Hard Soil
Detail
Amount (Rs.)
0.092 Cft.
P. Cft.
Percent
LABOUR
1
2
3
4
5.60 Nos.
4.00 Nos.
0.50 No.
per day
per day
per day
1.00 No.
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 14
DESCRIPTION OF ITEM:
Item No. 8
Earth work excavation in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm
depth for storm water channels, drains sullage drains in open areas, roads
streets, lanes including under pinning of walls and shoring to protect
existing works, shuttering and timbering the trenches, dressed to disigned
level and dimensions, trimming, removal of surface water from trenches,
back filling and surplus excavated material disposal of and dressed within
100 ft. (30 metre) lead.
iii)
Very Hard
Detail
Amount (Rs.)
0.092 Cft.
P. Cft.
Percent
LABOUR
1
2
3
4
7.30 Nos.
4.00 Nos.
0.50 No.
per day
per day
per day
1.00 No.
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 15
DESCRIPTION OF ITEM:
Item No. 8
Earth work excavation in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm
depth for storm water channels, drains sullage drains in open areas, roads
streets, lanes including under pinning of walls and shoring to protect
existing works, shuttering and timbering the trenches, dressed to disigned
level and dimensions, trimming, removal of surface water from trenches,
back filling and surplus excavated material disposal of and dressed within
100 ft. (30 metre) lead.
iv)
Detail
Amount (Rs.)
0.092 Cft.
P. Cft.
Percent
LABOUR
1
2
3
4
5
9.00
6.00
4.00
1.00
2.00
Nos.
Nos.
Nos.
No.
Nos.
per
per
per
per
per
day
day
day
day
day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 16
DESCRIPTION OF ITEM:
Item No. 9
Dry
Detail
Amount (Rs.)
9.00 Nos.
4.00 Nos.
6.00 Nos.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 9
Wet
Detail
10.00 Nos.
5.00 Nos.
7.00 Nos.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 17
Say
Say
DESCRIPTION OF ITEM:
Item No. 9
In flowing water
Detail
14.00 Nos.
6.50 Nos.
7.50 Nos.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 10
Ordinary soil
Detail
Amount (Rs.)
Coolies
filling
Coolies
Dresser
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
4.00 Nos.
3.00 Nos.
1.00 No.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 18
Say
Say
DESCRIPTION OF ITEM:
Item No. 10
Hard soil
Detail
Amount (Rs.)
Coolies
filling
Coolies
Dresser
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
5.60 Nos.
3.00 Nos.
1.00 No.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 10
Detail
Amount (Rs.)
Coolies
filling
Coolies
Dresser
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
7.30 Nos.
3.00 Nos.
1.00 No.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 19
Say
Say
DESCRIPTION OF ITEM:
Item No. 10
Detail
Amount (Rs.)
Coolies
filling
Coolies
Coolies
Dresser
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
8.00
4.00
6.00
2.00
Nos.
Nos.
Nos.
Nos.
per
per
per
per
day
day
day
day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 11
Soft rock, Slate, Shale, Schist or laterite works, with pick & crowbar.
Detail
Amount (Rs.)
14.00 Nos.
4.00 Nos.
1.00 No.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 20
Say
Say
DESCRIPTION OF ITEM:
Item No. 11
Detail
Amount (Rs.)
3.00 Nos.
each
6.34
14.00
20.34
Percent
LABOUR
1
2
3
4
5
6
7
8
9
per
per
per
per
per
per
per
per
per
day
day
day
day
day
day
day
day
day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 21
DESCRIPTION OF ITEM:
Item No. 12 (a)
Grade-I
Detail
Amount (Rs.)
3.00 No.
each
Percent
LABOUR
1
2
3
4
5
6
7
3.00 Nos.
per day
7.00 Nos.
1.00 No.
0.50 No.
per day
per day
per day
6.00 Nos.
0.25 No.
0.25 No.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 22
DESCRIPTION OF ITEM:
Item No. 12 (a)
Grade-II
Detail
Amount (Rs.)
5.00 No.
each
Percent
LABOUR
1
2
3
4
5
6
7
4.00 Nos.
per day
7.00
1.00
0.50
0.50
0.50
per
per
per
per
per
day
day
day
day
day
per day
Nos.
No.
No.
Nos.
No.
6.00 No.
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 23
DESCRIPTION OF ITEM:
Item No. 12 (a)
Grade-III
Detail
Amount (Rs.)
6.00 No.
each
Percent
LABOUR
1
2
3
4
5
6
7
5.00 Nos.
per day
8.50
1.50
0.75
0.75
0.75
per
per
per
per
per
day
day
day
day
day
per day
Nos.
No
No.
No.
No.
6.00 Nos.
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 24
DESCRIPTION OF ITEM:
Item No. 11 (a)
Grade-IV
Detail
7.00 No.
each
Percent
LABOUR
1
2
3
4
5
6
7
6.00 Nos.
per day
9.00
2.00
0.75
1.00
1.00
per
per
per
per
per
day
day
day
day
day
per day
Nos.
No
No.
No.
No.
6.00 Nos.
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 25
DESCRIPTION OF ITEM:
Item No. 12
Grade-V
Detail
8.00 No.
each
Percent
LABOUR
1
2
3
4
5
6
7
7.00 Nos.
10.00
2.50
1.00
1.00
1.00
Nos.
No
No.
No.
No.
6.00 Nos.
per day
per
per
per
per
per
day
day
day
day
day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 26
DESCRIPTION OF ITEM:
Item No. 12
Grade-VI
Detail
Amount (Rs.)
9.00 No.
each
Percent
LABOUR
1
2
3
4
5
6
7
8.00 Nos.
10.00
3.00
1.00
1.25
1.25
Nos.
No
No.
No.
No.
6.00 Nos.
per day
per
per
per
per
per
day
day
day
day
day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 27
DESCRIPTION OF ITEM:
Item No. 12 (b)
Grade-I
Detail
Amount (Rs.)
LABOUR
(0.01)
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 12 (b)
Grade-II
Detail
Amount (Rs.)
LABOUR
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 28
DESCRIPTION OF ITEM:
Item No. 12 (b)
Grade-III
Detail
Amount (Rs.)
LABOUR
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 12 (b)
Grade-IV
Detail
Amount (Rs.)
LABOUR
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 29
DESCRIPTION OF ITEM:
Item No. 12 (b)
Grade-V
Detail
Amount (Rs.)
LABOUR
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 12 (b)
Grade-VI
Detail
Amount (Rs.)
LABOUR
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 30
DESCRIPTION OF ITEM:
Item No. 13
Detail
Amount (Rs.)
Coolies un-skilled
2.50 No.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 13
Upto a lead of
Detail
Amount (Rs.)
1.50 No.
2.00 No.
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 31
Say
Say
DESCRIPTION OF ITEM:
Item No. 14
Rehandling of gravel work or excavated rock, lead upto 50 ft. (15 metre).
Detail
Amount (Rs.)
4.00 Nos.
6.00 Nos.
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 15
Detail
Amount (Rs.)
1.50
2.00
1.00
0.50
Nos.
Nos.
No.
No.
per
per
per
per
day
day
day
day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 32
Say
Say
DESCRIPTION OF ITEM:
Item No. 15
With new earth excavated from outside, lead upto one chain (30 metre).
Detail
Amount (Rs.)
Diggers
Carrier
Dresser
Rammer Cooly un-skilled
Bahishti
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
4.00
2.58
1.00
1.50
0.50
Nos.
Nos.
No.
Nos.
No.
per
per
per
per
per
day
day
day
day
day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 33
Say
Say
DESCRIPTION OF ITEM:
Item No. 16
Extra for every 50 ft. (15 metre) additional lead or part thereof.
i)
Detail
Amount (Rs.)
1.00
8.00
4.00
10.00
2.00
2.00
1.00
No.
Nos.
Nos.
Nos.
Nos.
Nos.
No.
per
per
per
per
per
per
per
month
month
month
month
month
month
month
Total
Exenditure per day
(b)
(c)
i)
0
0.00
30
Jamadari commission for supplying labour on Rs.
0.00 @ 6%
Food etc as under
One seer Atta per man daily for 28 men
28.00 seer
26.12 kg
per kg
ii)
L.S.
Total: = a + b + c =
0.00
II - i)Donkeys
28 Nos. Donkeys worker 500 ft. lead in belcha
7 No. Donkey in each belcha
Average working life of one donkey
6 years
Average cost price of one donkey
=
0.00
After depriceation cost of one donkey =
0.00
Amount per day
28 x 0
0.00
=
6 x 365 Say
ii) Food etc as under for 28 donkeys
Phak, 5 seers (4.67 kg) per day per donkey
= 28 x 5
=
3.50 mds
40
Grams, 2 seers (0.933 x 2) = 1.866 kg per donkey
Per day
28 x 2 =
1.40 mds
40
Total-II
iii) Material
The following articles are required:
a) 4 No. pick axes and 8 Nos. belchas
cost of repairs and replacement
b) Sharpening expenses for pick axes
and belchas 12 No.
c) Palana with namda complete for one donckey
Rs.300 average life 4 months. Hence cost per
day
28 x 0
=
4 x 30
d) 2 sacks daily consumption repairs and
Page 34
L.S.
L.S.
3.50 mds
per Md
1.40 mds
per Md
0.00
each
replacement etc.
e) Sutli consumption
2.00 Nos.
0.6 Kg.
each
P. Kg.
Total - III
0.00
0.00
III
Total - V
+
IV
per day
Percent
0.00
0.00
4
i) Progress per belcha in ashes sand, soft soil or
silt = 1650 Cft and lead 500 ft.
Rate for 1000 Cft
0.00 x 1000
0.00
1650
Rate for 1000 Cft lead 50 ft. (as per item No.2)
of this Chapter
0.00
Difference for 450 =
0.00 - 0.00
Rate for 50 ft. lead
0.00
0.00
9
ii) Progress per belcha in ordinary soil =
1260 Cft
Rate for 1000 Cft lead 500 ft.
0.00 x 1000
0.00
1260
Rate for 1000 Cft lead 50' as per item No. (10-i) SR
of this Chapter
0.00
Difference for lead 450ft
0.00 - 0.00
0.00
Rate for 50 ft. lead
0.00
0.00
9
Rate for every 50 ft. add lead or a part thereof
iii) Progress per belcha in hard soil 1150 Cft
Rate for 1000 Cft lead 500 ft.
0.00 x 1000
0.00
=
1150
Rate for 1000 Cft lead 50 ft.
(as per item No.10-ii of the Chapter
Difference for lead 450ft
0.00 - 0.00
Rate for 50 ft. lead
0.00
9
=
=
0.00
0.00
0.00
0.00
0.00
9
Rate for eveyr 50 ft. Add. lead or part thereof
i)
= 0.00
Stat
0.00 x 20
100.00
0.00
0.00 + 0.00
0.00
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 36
0.00
DESCRIPTION OF ITEM:
Item No. 17
Transportation of earth all types when the total distance, including the l
covered in the item of work, is more than 1000 ft.
(a)
Upto mile
Detail
Amount (Rs.)
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
0.00
Say
Say
DESCRIPTION OF ITEM:
Item No. 17 (b)
For every 330 ft. additional lead or part-thereof, beyond mile upto one m
Detail
Amount (Rs.)
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 37
Say
Say
DESCRIPTION OF ITEM:
Item No. 17 (c)
For every mile additional lead or part thereof, beyond one mile upto 5 m
Detail
Amount (Rs.)
=
=
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 17 (d)
Detail
Amount (Rs.)
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 38
Say
Say
DESCRIPTION OF ITEM:
Item No. 18
Detail
Amount (Rs.)
Dresser
Cooly un-skilled
0.20 No.
0.12 No.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 18
Detail
Amount (Rs.)
Dresser
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
0.50 No.
0.12 No.
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 39
Say
Say
DESCRIPTION OF ITEM:
Item No. 18
Detail
Amount (Rs.)
1.00 No.
0.50 No.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 19
Dowel dressing.
Detail
Amount (Rs.)
Dresser
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 150 Rft
Rate per 100 Rft
0.25 No.
0.10 No.
per day
per day
Percent
Percent
ITEM RATES
Labour rate per Chain
Labour rate per R.M
Rs.
Rs.
Page 40
Say
Say
DESCRIPTION OF ITEM:
Item No. 20 (a)
Detail
Amount (Rs.)
Dresser
Cooly un-skilled
1.00 No.
0.30 No.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Sft
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 20 (b)
Detail
Amount (Rs.)
Dresser
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1600 Sft
1.00 No.
2.00 Nos.
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 41
Say
Say
DESCRIPTION OF ITEM:
Item No. 21
Detail
Amount (Rs.)
5.00 Nos.
3.00 Nos.
1.00 No.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 21
In ordinary soil.
Detail
Amount (Rs.)
6.00 Nos.
3.00 Nos.
1.50 No.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 42
Say
Say
DESCRIPTION OF ITEM:
Item No. 21
c)
Detail
Qty
Amount (Rs.)
7.00 Nos.
per day
3.00 Nos.
per day
Dresser
1.75 No.
per day
Total
Sundries
#####
Percent
Total
Contractor's Profit & Ove #####
Percent
ITEM RATES
Rs.
Say
Rs.
Say
Page 43
DESCRIPTION OF ITEM:
Item No. 22
Cutting hard rock such as granite, ballast hard line, stone or sand stone
with chisels and lammers for small foundations.
Detail
Steel
Charcoal
Total
Contractor's Profit & Ove #####
Total
50
22.69
500
#####
Lbs
kg
Lbs
kg
kg
kg
Percent
LABOUR
1
2
3
4
28.00
28.00
7.00
7.00
No.
No.
No.
No.
per
per
per
per
day
day
day
day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 44
DESCRIPTION OF ITEM:
Item No. 23
Detail
Amount (Rs.)
54.00
Total
Contractor's Profit & Ove #####
Total
0.154 Cft.
P. Cft.
Percent
LABOUR
1
2
Cooly un-skilled
Carpenter
1.00 No.
0.25 No.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 24
Detail
Amount (Rs.)
Cooly un-skilled
Bahishti
Dresser earth
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
0.12 No.
0.30 No.
0.75 No.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 45
Say
Say
DESCRIPTION OF ITEM:
Item No. 24
Detail
Amount (Rs.)
Bullockman
Cooly un-skilled
1.00 No.
0.50 No.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 24
Detail
Amount (Rs.)
Bullockman
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
1.25 No.
0.50 No.
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 46
Say
Say
DESCRIPTION OF ITEM:
Item No. 24
Detail
Amount (Rs.)
Bullockman
Cooly un-skilled
1.25 No.
0.75 No.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 24
Detail
Amount (Rs.)
Bullockman
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
1.50 No.
0.75 No.
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 47
Say
Say
DESCRIPTION OF ITEM:
Item No. 24
Detail
Amount (Rs.)
Coolies un-skilled
1.50 No.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 24
Detail
Amount (Rs.)
2.00 No.
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 48
Say
Say
DESCRIPTION OF ITEM:
Item No. 25
Detail
Amount (Rs.)
0.00
1000 Cft
Cft
ITEM RATES
Composite rate per 1000 Cft
Composite rate per Cum
Rs.
Rs.
DESCRIPTION OF ITEM:
Item No. 25
Detail
Amount (Rs.)
0.00
1000 Cft
Cft
ITEM RATES
Composite rate per 1000 Cft
Composite rate per Cum
Rs.
Rs.
Page 49
DESCRIPTION OF ITEM:
Item No. 25
Detail
Amount (Rs.)
0.00
1000 Cft
Cft
ITEM RATES
Composite rate per 1000 Cft
Composite rate per Cum
Rs.
Rs.
DESCRIPTION OF ITEM:
Item No. 26
Detail
Amount (Rs.)
3.50 No.
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 50
Say
Say
DESCRIPTION OF ITEM:
Item No. 27
Detail
Amount (Rs.)
8.00 No.
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 28
Detail
Amount (Rs.)
Bahishti
Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
1.50
4.75 No.
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 51
Say
Say
DESCRIPTION OF ITEM:
Item No. 29
Earthwork on small rain water drains along canal banks roads and
plantion drains dressed etc., complete.
Detail
Amount (Rs.)
Coolies un-skilled
0.95 No.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate fore 125 Rft
per day
Percent
Percent
ITEM RATES
Labour rate per 100 Rft
Labour rate per metre
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 30
Filling and compacting soil earth and boulders behind retaining walls
(including excavation of soil and lead upto 50 ft. (15 metre).
Detail
Amount (Rs.)
7.00 Nos.
2.00 Nos.
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 52
Say
Say
DESCRIPTION OF ITEM:
Item No. 31
Detail
Amount (Rs.)
Dresser
1.40 Nos.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total
per day
Percent
Percent
ITEM RATES
Labour rate for 1 Mile
Labour rate for 1 Kilometre
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 32
Detail
Amount (Rs.)
0.50
1.00
1.00
1.50
No.
No.
No.
No.
per
per
per
per
day
day
day
day
Percent
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 53
Say
Say
DESCRIPTION OF ITEM:
Item No. 33
Berm cutting
a)
Detail
Amount (Rs.)
4.50 No.
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 33
Berm cutting
b)
Detail
Amount (Rs.)
4.00 Nos.
3.00 Nos.
1.00 No.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 54
Say
Say
DESCRIPTION OF ITEM:
Item No. 34
Detail
Amount (Rs.)
2.00 Nos.
12.00 Nos.
per day
per day
Percent
Percent
ITEM RATES
Labour rate for 1 Mile
Labour rate for 1 Kilometre
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 34
Detail
Amount (Rs.)
3.00 Nos.
15.50 Nos.
1.00 No.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate for 1 Mile
Labour rate for 1 Kilometre
Rs.
Rs.
Page 55
Say
Say
DESCRIPTION OF ITEM:
Item No. 34
Detail
Amount (Rs.)
4.00 Nos.
25.50 Nos.
1.00 No.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate for 1 Mile
Labour rate for 1 Kilometre
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 35
Detail
Amount (Rs.)
LABOUR
1
2
60.00
1.00 No.
1.00 No.
per day
per day
Percent
Percent
ITEM RATES
Labour rate per Acre
Labour rate per Hectare
Rs.
Rs.
Page 56
Say
Say
DESCRIPTION OF ITEM:
Item No. 35
Detail
Amount (Rs.)
LABOUR
1
0.00
508.20
Acre
ITEM RATES
Labour rate per Acre
Labour rate per Hectare
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 36
In unploughed land.
a) From 10 ft (3 metre) to 20 ft (6 metre) wide.
Detail
Amount (Rs.)
0.50 No.
1.00 Nos.
per day
per day
Percent
Percent
ITEM RATES
Labour rate per Chain
Labour rate per Running Metre
Rs.
Rs.
Page 57
Say
Say
DESCRIPTION OF ITEM:
Item No. 36
In unploughed land.
b) From 20 ft (6 metre) to 40 ft (12 metre) wide.
Detail
Amount (Rs.)
1.00 No.
1.00 Nos.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1.5 Chains
per day
per day
Percent
Percent
ITEM RATES
Labour rate per Chain
Labour rate per Running Metre
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 36
In ploughed land.
a) From 10 ft. (3 metre) to 20 ft. (6 metre) wide.
Detail
Amount (Rs.)
LABOUR
1
2
0.00 1.5
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total
0.00
0.032 Acre
P.Acre
Percent
Percent
ITEM RATES
Labour rate per Chain
Labour rate per Running Metre
Rs.
Rs.
Page 58
Say
Say
DESCRIPTION OF ITEM:
Item No. 36
In unploughed land.
b) From 20.1 ft. (6.1 metre) to 40 ft. (12 metre) wide.
Detail
Amount (Rs.)
LABOUR
1
2
0.00 1.5
0.00
L.S
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total
Percent
Percent
ITEM RATES
Labour rate per Chain
Labour rate per Running Metre
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 37
Digging and loading into boats upto 50 ft. (15 metre) lead.
Detail
Amount (Rs.)
4.00 No.
per day
3.50 No.
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 59
Say
Say
DESCRIPTION OF ITEM:
Item No. 37
Detail
Amount (Rs.)
0.07 No.
per day
0.53 No.
per day
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate for 1 trip (200 Cft
Rate for 5 trips (100 Cft)
Percent
Percent
58.27 x 5
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 37
Extra for every additional one chain (30 metre) or part thereof beyond
10 chain (300 metre).
Detail
Amount (Rs.)
0.20 No.
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 60
Say
Say
DESCRIPTION OF ITEM:
Item No. 37
Detail
Amount (Rs.)
Coolies un-skilled
3.50 No.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 38
Unloading earth from B.G. Tracks and clearing 5 ft. (1.5 metre) from rail.
Detail
Amount (Rs.)
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft
3.00 No.
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 61
Say
Say
DESCRIPTION OF ITEM:
Item No. 39
Earthwork by train way, digging and loading in truck, upto 50 ft. (15 metr
lead.
Detail
Amount (Rs.)
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate for 1250 Cft
7.00 No.
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 40
Unloading earth from B.G. trucks and spreading upto 15 ft. (4.5 metre) from
rail.
Detail
Amount (Rs.)
LABOUR
1
2
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total
2.50 Nos.
2.00 Nos.
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Page 62
Say
Say
DESCRIPTION OF ITEM:
Item No. 41
Supplying clean and screened river or pit sand within 5 chain (150 metre).
Detail
Amount (Rs.)
MATERIAL
1
Royalty
100 Cft.
% Cft.
Percent
LABOUR
1
Sundries
#####
Total
Contractor's Profit & Ove #####
Total
0.424 No.
per day
Percent
Percent
TOTAL
CARRIAGE
Ist
2nd
3rd
4th
Chain
Chain
Chain
Chain
=
=
=
=
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 63
DESCRIPTION OF ITEM:
Item No. 42
Earth work excavation inopen cutting for sewers and manholes as shown in
drawing including shuttering and timbering, dressing to correct section an
dimension according to templates and levels and removing surface water, in
all types of soil except, shingle gravel and rock.
(i)
Detail
Amount (Rs.)
10.83 Cft
0.14 Cft
STRUTS
Wood 26 x 4.75' x 6" x 3"
Can be used 100 times
for one time 15.44 100
Total
Wastage 5%
15.44 Cft
Total
Contractor's Profit & Ove #####
i.e on Rs.
0.00
Total rate for 1750 Cft
Total rate for 1000 Cft
1
2
(b)
1
1
2
3.10 Sft
Sft
Per Kg.
3.1 Sft
6.50 Nos.
1.00 No.
per day
per day
Percent
Percent
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate per 1250 Cft
Labour rate per 1000 Cft
(c)
Cft
0.083 Kg.
0.154 Cft
0.294 Cft
0.0147 Cft
0.31 Cft
0.31 Cft
0.25 Nos.
per day
Percent
Percent
0.10 No.
0.40 No.
Page 64
per day
per day
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate for 1750 Cft
Total rate for 1000 Cft
Percent
Percent
ITEM RATES
Labour rate for 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 65
DESCRIPTION OF ITEM:
Item No. 42
Earth work excavation in open cutting for sewers and manholes as shown in
drawing including shuttering and timbering, dressing to correct section an
dimension according to templates and levels and removing surface water, in
all types of soil except shingle, gravel and rock.
(ii)
Detail
Amount (Rs.)
Vertical planks
26 Nos.
26 x 8' x 10" x 1"
=
Can be use 80 times
21.67 80
=
STRUTS 39 Nos.
Kail wood 39 x 4.75 x 6" x 3"
Can be used 100 times
Wood for one time 23.16 100
Total 1 + 2 = 0.27 +
Wastage 5% =
0.23
23.16 Cft
=
0.23 Cft
0.50 Cft
0.03 Cft
0.53 Cft
5.3 Sft
Total
Contractor's Profit & Ove #####
(except on sawing charges)
Total
Cost per 1000 Cft 212.69 2
Percent
0.53 Cft
5.30 Sft
0.083 Kg.
Cft
Sft
Per Kg.
0.00
0.00
0.20 No.
0.80 No.
Percent
Percent
Page 66
per day
per day
(b)
1
2
(c)
12.00 Nos.
1.00 No.
per day
per day
Percent
Percent
0.12 No.
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 67
DESCRIPTION OF ITEM:
Item No. 42
Earth work excavation in open cutting for sewers and manholes as shown in
drawing including shuttering and timbering, dressing to correct section an
dimension according to templates and levels and removing surface water, in
all types of soil except shingle gravel and rock.
(iii)
Above 15 ft.
Detail
Amount (Rs.)
STRUTS
2
21.67 Cft
0.27 Cft
39 Nos.
Kail wood 39 x 4.75 x 6" x 3" =
Can be used 100 times
Kail wood for one time 23.16 100
Total ( 1 + 2 ) = 0.27 + 0.23
Wastage (5%)
Total
Sawing charges 0.53 x 10
Bolt, nuts & nails
23.16 Cft
=
0.23 Cft
0.50 Cft
0.03 Cft
0.53 Cft
Total
Contractor's Profit & Ove #####
Total rate for 2000 Cft
Cost per 1000 Cft 212.69 2
5.30 Sft
0.53 Cft
5.30 Sft
0.083 Kg.
Cft
Sft
Per Kg.
0.00
LABOUR
(For Shutterng)
Carpenter
Cooly
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate for 2000 Cft
Total rate for 1000 Cft
0.20 No.
0.80 No.
Percent
Percent
Page 68
per day
per day
(b)
1
2
(c)
1
16.00 No.
1.00 No.
Percent
Percent
0.12 No.
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 69
DESCRIPTION OF ITEM:
Item No. 43
Earth work excavation of trenches in open cutting for Sewers and manhole
chambers etc. below sub soil water level to correct section and dimension
according to templates and levels, including shoring, timbering and
shuttering of M.S. Sheets on both sides of the trenches.
(i)
Detail
Amount (Rs.)
MATERIAL
(i)
10 Nos.
2 Nos.
12 Nos.
1920 lbs
9.60 lbs
960 lbs
0.64 lbs
10.24 lbs 10.24 lbs
4.64 kg
2.00 Nos.
(iii) Jhambs
life = 100 time
One opertion = 2 100 =
0.02 No.
0.02
(iv) Charakharies complete
2.00
(v) Kail wood first class planks
=
10 Nos.
10 x 10' x 10" x 1" =
10.41 Cft
Life 20 times
One operation 10.41 20
=
0.520 Cft
(vi) Ballies
16.00 Nos.
16 x 10 x 8" x 4"
=
35.55 Cft
Life 200 time
One operation = 35.55 200
=
0.18 Cft
(vii) Struts =
16.00 Nos.
16 x 6.25' x 8" x 4" =
22.22 Cft
Life = 100 times
One operation = 22.22 100 =
0.22 Cft
Kail wood first class total 0.52 + 0.18 + 0.22 0.92 Cft
Wastage (5%) = 0.92 + 0.05 =
0.97 Cft
0.97
Sawing charges 0.97 Cft x 10 =
9.7 Sft
9.70
Bolts and nuts
0.083
(viii) Manila Rope 1" 100' long
Life 25 times
One operation = 100 25
=
4.00 Rft
4.00
Total
Contractor's Profit & Ove ##### % Except sawing
Total
Page 70
0.00
No.
Nos.
Cft
Sft
Kg.
Rft
kg
each
each
Cft
Sft
Per Kg.
Rft
Diver sinker
Charakhar-man
Cooly for pully out
Coolies for removing earth
Skilled coolies for hammering M.S sheet to
drive and takout
Cooly for making platform
Carpenter for making shuttering and removing
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate per 1500 Cft
Total rate per 1000 Cft
2.00
4.00
2.00
2.00
2.00
No.
No.
No.
No.
No.
0.50 No.
0.25 No.
per
per
per
per
per
day
day
day
day
day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 71
DESCRIPTION OF ITEM:
Item No. 43
Earth work excavation of trenches in open cutting for Sewers and manhole
chambers etc. below sub soil water level to correct section and dimension
according to templates and levels, including shoring, timbering and
shuttering of M.S. Sheets on both sides of the trenches.
(ii)
Detail
Amount (Rs.)
MATERIAL
(I)
20 Nos.
4 Nos.
24 Nos.
3840 lbs
19.20 lbs
960 lbs
0.64 lbs
19.84 lbs 19.84 lbs
9.00 kg
2.00 Nos.
(iii) Jhambs
=
Life = 100 times
One operation 2 100 =
0.02 No.
0.02
(iv) Charakharies complete =
2.00 Nos. 2.00
(v) Wooden planks =
10.00 Nos.
Kail wood first class 10 x 10' x 10" x 1" = 10.41 Cft
Life 20 times
One operation = 10.41 20
=
0.52 Cft
(vi) Ballies
=
16.00 Nos.
16 x 10' x 8" x 4" =
35.55 Cft
Life 200 time
One operation
35.55 200
=
0.18 Cft
(vii) Struts
16.00 Nos.
16 x 6.25' x 8" x 4" =
22.22 Cft
Life = 100 times
One operation 22.22 100
=
0.22 Cft
Kail wood Ist class total 0.52 + 0.18 + 0.22 = 0.92 Cft
0.97
Add 5% wastage
0.05 Cft
0.97 Sft
Sawing charges 0.97 x 10
=
9.7 Sft
9.70
Bolts and nuts
0.083
(viii) Manila Rope 1" x 100' long
Life 25 times
One operation 100 25
=
4.00 Rft
4.00
Total
Contractor's Profit & Ove #####
Total
Percent
Page 72
kg
No.
Nos.
each
each
Cft
Cft
Sft
Kg.
Rft
Sft
Per Kg.
Rft
Diver sinker
Charakhar-man
Cooly un-skilled for pully out
Coolies un-skilled ramming
Skilled coolies for hammering M.S sheet to
drive and takout
Cooly for making platform
Carpenter for making shuttering and removing
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate per 1500 Cft
Total rate per 1000 Cft
2.50
5.00
2.50
2.50
2.50
No.
No.
No.
No.
No.
0.63 No.
0.31 No.
per
per
per
per
per
day
day
day
day
day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 73
DESCRIPTION OF ITEM:
Item No. 43
Earth work excavation of trenches in open cutting for Sewers and manhole
chambers etc. below sub soil water level to correct section and dimension
according to templates and levels, including shoring, timbering and
shuttering of M.S. Sheets on both sides of the trenches.
(iii)
Detail
Amount (Rs.)
MATERIAL
(i)
26 Nos.
4 Nos.
30 Nos.
4800 lbs
160 lbs
24.80 lbs
960 lbs
0.64 lbs 25.44 lbs
25.44 lbs 11.54 kg
2.00 Nos.
0.02 No.
0.02 No.
2.00 Nos. 2.00 Nos.
10.00 Nos.
10.41 Cft
kg
each
each
Cft
Sft
Per Kg.
Per Rft.
0.52 Cft
16.00 Nos.
35.55 Cft
0.18 Cft
16.00 Nos.
22.22 Cft
0.22
0.92
0.05
0.97
9.70
Cft
Cft
Cft
Cft
Sft
4.00 Rft
Percent
Page 74
0.97 Cft
9.70 Sft
0.083 Kg.
4.00 Rft
0.00
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 75
DESCRIPTION OF ITEM:
Item No. 44
Excavation of trenches in all kind of soil except cutting rock, for water
pipe lines upto to 5 ft. (1.5 metre) depth from ground level including trim
dressing sides, leveling the beds of trenches to correct grade and cutting
pits for joints etc. complete in all respects.
Detail
Amount (Rs.)
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate per 1250 Cft
Total rate per 1000 Cft
6.50 No.
0.50 No.
0.50 No.
per day
per day
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 45
Cutting and removing trees within a distance of 100 ft. (30 metre).
a)
Detail
Amount (Rs.)
LABOUR
1
2
Carpenter
Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total
0.15 No.
1.00 No.
per day
per day
Percent
Percent
ITEM RATES
Labour rate for each
Rs.
Page 76
Say
DESCRIPTION OF ITEM:
Item No. 45
Cutting and removing trees within a distance of 100 ft. (30 metre).
(b)
Detail
Amount (Rs.)
LABOUR
1
2
Coolies un-skilled
Carpenter
2.00 Nos.
0.25 No.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total
per day
per day
Percent
Percent
ITEM RATES
Labour rate for each
Rs.
Say
DESCRIPTION OF ITEM:
Item No. 46
Uprooting stump and removing with in 100 ft. (30 metre) from 2" to 6 ft.
(0.61 metre to 1.83 metre) grith.
Detail
Amount (Rs.)
LABOUR
1
Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total
1.50 Nos.
per day
Percent
Percent
ITEM RATES
Labour rate for each
Rs.
Page 77
Say
DESCRIPTION OF ITEM:
Item No. 47
Light
Detail
Amount (Rs.)
Coolies un-skilled
0.25 No.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total for 1250 Sft
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 47
Thick
Detail
Amount (Rs.)
Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total for 1250 Sft
0.50 No.
per day
Percent
Percent
ITEM RATES
Labour rate per 1000 Sft
Labour rate per Sqm
Rs.
Rs.
Page 78
Say
Say
DESCRIPTION OF ITEM:
Item No. 48
Up rooting sarkanda growth and disposal within 100 ft. (30 metre).
Detail
Amount (Rs.)
Coolies un-skilled
0.12 No.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total for 125 Sft
per day
Percent
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 49
Ploughing 3 times
Detail
Amount (Rs.)
Bullock-man
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total
3.25 Nos.
per day
Percent
Percent
ITEM RATES
Labour rate per Acre
Labour rate per Hectar
Rs.
Rs.
Page 79
Say
Say
DESCRIPTION OF ITEM:
Item No. 50
Detail
Amount (Rs.)
Coolies un-skilled
0.60 No.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total for 150 Sft
per day
Percent
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Item No. 51
Detail
Amount (Rs.)
Mali
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total for 150 Sft
0.50 No.
per day
Percent
Percent
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
Page 80
Say
Say
CHAPTER NO. 24
ELECTRIC INSTALLATION
DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
boxes, inspection boxes, bends, tees, etc., complete with all spec
Item No. 1
(a)
(i)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
10.00
1.00
20.00
1.50
1.00
0.021
0.08
metre
Nos.
No.
Nos.
Dozen
No.
Cft.
Cft.
per mtr.
each
each
dozen
dozen
each
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft
Rs.
Rs.
Rs.
Rs.
Page 1
Say
Say
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.
Item No. 1
(a)
(ii)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
10.00
20.00
1.50
1.00
0.021
0.08
metre
No.
Nos.
Nos.
Dozen
No.
Cft.
Cft.
per mtr.
each
each
dozen
dozen
each
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 2
DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.
Item No. 1
(a)
(iii)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
10.00
20.00
1.50
1.00
0.021
0.08
metre
No.
Nos.
Nos.
Dozen
No.
Cft.
Cft.
per mtr.
each
each
dozen
dozen
each
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 3
DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.
Item No. 1
(a)
(iv)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
10.00
1.00
1.00
20.00
1.50
0.021
0.08
metre
Nos.
No.
No.
Nos.
Dozen
Cft.
Cft.
per mtr.
each
each
each
dozen
dozen
P. Bag
Per % Cft.
0.00
2.00 Nos.
3.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 4
DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.
Item No. 1
(a)
(v)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
1.00
10.00
20.00
1.50
0.021
0.08
metre
Nos.
No.
Nos.
Nos.
Dozen
Cft.
Cft.
per mtr.
each
each
each
dozen
dozen
P. Bag
Per % Cft.
0.00
2.00 No.
3.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 5
DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.
Item No. 1
(a)
(vi)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
1.00
10.00
20.00
1.50
0.021
0.08
metre
No.
No.
Nos.
Nos.
Dozen
Cft.
Cft.
per mtr.
each
each
each
dozen
dozen
P. Bag
Per % Cft.
0.00
2.00 No.
3.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 6
DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.
Item No. 1
(a)
(vii)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
10.00
1.00
1.00
20.00
1.50
0.021
0.08
metre
Nos.
No.
No.
Nos.
Dozen
Cft.
Cft.
per mtr.
each
each
each
dozen
dozen
P. Bag
Per % Cft.
0.00
2.00 No.
3.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 7
DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.
Item No. 1
(b)
(i)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
8.00
1.00
0.021
0.08
metre
Nos.
No.
Nos.
Cft.
Cft.
per mtr.
each
each
each
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 8
DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.
Item No. 1
(b)
(ii)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
7.00
1.00
0.021
0.18
metre
Nos.
No.
Nos.
Cft.
Cft.
per mtr.
each
each
each
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 9
DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.
Item No. 1
(b)
(iii)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
8.00
1.00
0.052
0.18
metre
Nos.
No.
Nos.
Cft.
Cft.
per mtr.
each
each
each
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 10
DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.
Item No. 1
(b)
(iv)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
8.00
1.00
0.063
0.18
metre
Nos.
No.
Nos.
Cft.
Cft.
per mtr.
each
each
each
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 11
DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.
Item No. 1
(b)
(v)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
1.00
8.00
0.074
0.20
metre
Nos.
No.
Nos.
Cft.
Cft.
per mtr.
each
each
each
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 12
DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.
Item No. 1
(b)
(vi)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
1.00
8.00
0.084
0.24
metre
Nos.
No.
Nos.
Cft.
Cft.
per mtr.
each
each
each
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 13
DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.
Item No. 1
(b)
(vii)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
1.00
8.00
1.00
0.08
0.24
metre
No.
No.
Nos.
No.
Cft.
Cft.
per mtr.
each
each
each
each
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 14
DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.
Item No. 2
(a)
(i)
Detail
Rate
Per Unit
7.00
1.00
1.00
10.00
1.20
1.00
metre
No.
No.
Nos.
Dozen
Dozen
per mtr.
each
dozen
each
dozen
dozen
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 15
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.
Item No. 2
(a)
(ii)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
1.00
10.00
1.20
1.00
0.02
0.06
metre
No.
No.
Nos.
Dozen
Dozen
Cft.
Cft.
per mtr.
each
per doz.
each
dozen
dozen
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 16
DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.
Item No. 2
(a)
(iii)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
1.00
10.00
1.20
1.00
0.042
0.12
metre
No.
No.
Nos.
Dozen
Dozen
Cft.
Cft.
per mtr.
each
per doz.
each
dozen
dozen
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 17
DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.
Item No. 2
(a)
(iv)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
1.00
10.00
1.20
1.00
0.042
0.12
metre
No.
No.
Nos.
Dozen
Dozen
Cft.
Cft.
per mtr.
each
per doz.
each
dozen
dozen
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 18
DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.
Item No. 2
(a)
(v)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
1.00
10.00
1.20
1.00
0.042
0.12
metre
No.
No.
Nos.
Dozen
Dozen
Cft.
Cft.
per mtr.
each
per doz.
each
dozen
dozen
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 19
DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.
Item No. 2
(a)
(vi)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
1.00
10.00
1.20
1.00
0.042
0.12
metre
No.
No.
Nos.
Dozen
Dozen
Cft.
Cft.
per mtr.
each
per doz.
each
dozen
dozen
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 20
DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.
Item No. 2
(b)
(i)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
1.00
10.00
0.021
0.08
metre
No.
No.
Nos.
Cft.
Cft.
per mtr.
each
per doz.
each
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 21
DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.
Item No. 2
(b)
(ii)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
1.00
10.00
0.042
0.12
metre
No.
No.
Nos.
Cft.
Cft.
per mtr.
each
per doz.
each
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 22
DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.
Item No. 2
(b)
(iii)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
1.00
10.00
0.052
0.18
metre
No.
No.
Nos.
Cft.
Cft.
per mtr.
each
per doz.
each
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 23
DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.
Item No. 2
(b)
(iv)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
1.00
10.00
0.063
0.18
metre
No.
No.
Nos.
Cft.
Cft.
per mtr.
each
per doz.
each
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 24
DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.
Item No. 2
(b)
(v)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
1.00
10.00
0.074
0.20
metre
No.
No.
Nos.
Cft.
Cft.
per mtr.
each
per doz.
each
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 25
DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.
Item No. 2
(b)
(vi)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
1.00
1.00
10.00
0.084
0.24
metre
No.
No.
Nos.
Cft.
Cft.
per mtr.
each
per doz.
each
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 26
DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring purposes recessed in
including inspection boxes, pull boxes, hooks, cutting, jharriers
repairing surface etc., complete with all specials.
Item No. 3
(i)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
10.00
2.00
0.042
0.12
metre
No.
No.
Nos.
Cft.
Cft.
per mtr.
each
each
per doz.
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 27
DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring purposes recessed in
including inspection boxes, pull boxes, hooks, cutting, jharriers
repairing surface etc., complete with all specials.
Item No. 3
(ii)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
10.00
2.00
0.052
0.18
metre
No.
No.
Nos.
Cft.
Cft.
per mtr.
each
each
per doz.
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 28
DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring purposes recessed in
including inspection boxes, pull boxes, hooks, cutting, jharriers
repairing surface etc., complete with all specials.
Item No. 3
(iii)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
10.00
2.00
0.063
0.18
metre
No.
No.
Nos.
Cft.
Cft.
per mtr.
each
each
per doz.
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 29
DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring purposes recessed in
including inspection boxes, pull boxes, hooks, cutting, jharriers
repairing surface etc., complete with all specials.
Item No. 3
(iv)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
10.00
2.00
0.065
0.37
metre
No.
No.
Nos.
Cft.
Cft.
per mtr.
each
each
per doz.
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 30
DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring purposes recessed in
including inspection boxes, pull boxes, hooks, cutting, jharriers
repairing surface etc., complete with all specials.
Item No. 3
(v)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
10.00
2.00
0.070
0.40
metre
No.
No.
Nos.
Cft.
Cft.
per mtr.
each
each
per doz.
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 31
DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring purposes recessed in
including inspection boxes, pull boxes, hooks, cutting, jharriers
repairing surface etc., complete with all specials.
Item No. 3
(vi)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
10.00
0.084
0.24
metre
No.
No.
Cft.
Cft.
per mtr.
each
each
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 32
DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring on surface including
inspection boxes, pull boxes bends, tees repairing surface etc.,
with all specials.
Item No. 4
(i)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
20.00
20.00
20.00
2.00
0.021
0.06
metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.
per mtr.
each
each
each
per doz.
per doz.
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 33
DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring on surface including
inspection boxes, pull boxes bends, tees repairing surface etc.,
with all specials.
Item No. 4
(ii)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
10.00
20.00
2.00
0.021
0.06
metre
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.
per mtr.
each
each
per doz.
per doz.
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 34
DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring on surface including
inspection boxes, pull boxes bends, tees repairing surface etc.,
with all specials.
Item No. 4
(iii)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
20.00
20.00
20.00
2.00
0.021
0.06
metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.
per mtr.
each
each
per doz.
per doz.
per doz.
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 35
DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring on surface including
inspection boxes, pull boxes bends, tees repairing surface etc.,
with all specials.
Item No. 4
(iv)
Detail
Rate
Per Unit
10.00
2.00
20.00
20.00
20.00
2.00
metre
Nos.
Nos.
Nos.
Nos.
Nos.
per mtr.
each
each
per doz.
per doz.
per doz.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 36
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring on surface including
inspection boxes, pull boxes bends, tees repairing surface etc.,
with all specials.
Item No. 4
(v)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
20.00
20.00
20.00
2.00
0.021
0.06
metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.
per mtr.
each
each
per doz.
per doz.
per doz.
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 37
DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring on surface including
inspection boxes, pull boxes bends, tees repairing surface etc.,
with all specials.
Item No. 4
(vi)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
20.00
20.00
20.00
2.00
0.021
0.06
metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.
per mtr.
each
each
per doz.
per doz.
per doz.
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 38
DESCRIPTION OF ITEM:
Supply and erection of G.I Flexible pipe for wiring including weld
sockets, nipples and check nuts etc complete.
Item No. 5
(i)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
1.00
2.00
2.00
2.00
L.S
metre
Nos.
Nos.
Nos.
per mtr.
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 32 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges
1.00 No.
1.00 No.
2.00 joints
per day
per day
per joints
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 39
DESCRIPTION OF ITEM:
Supply and erection of G.I Flexible pipe for wiring including weld
sockets, nipples and check nuts etc complete.
Item No. 5
(ii)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
1.00
2.00
2.00
2.00
L.S
metre
Nos.
Nos.
Nos.
per mtr.
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 30 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges
1.00 No.
1.00 No.
2.00 joints
per day
per day
per joint
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 40
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of G.I Flexible pipe for wiring including weld
sockets, nipples and check nuts etc complete.
Item No. 5
(iii)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
1.00
2.00
2.00
2.00
L.S
metre
Nos.
Nos.
Nos.
per mtr.
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 29 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges
1.00 No.
1.00 No.
2.00 joints
per day
per day
per joints
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 41
DESCRIPTION OF ITEM:
Supply and erection of G.I Flexible pipe for wiring including weld
sockets, nipples and check nuts etc complete.
Item No. 5
(iv)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
1.00
2.00
2.00
2.00
L.S
metre
Nos.
Nos.
Nos.
per mtr.
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 24 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges
1.00 No.
1.00 No.
2.00 joints
per day
per day
per joints
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 42
DESCRIPTION OF ITEM:
Supply and erection of G.I Flexible pipe for wiring including weld
sockets, nipples and check nuts etc complete.
Item No. 5
(v)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
1.00
2.00
2.00
2.00
L.S
metre
Nos.
Nos.
Nos.
per mtr.
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 22 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges
1.00 No.
1.00 No.
2.00 joints
per day
per day
per joints
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 43
DESCRIPTION OF ITEM:
Supply and erection of G.I Flexible pipe for wiring including weld
sockets, nipples and check nuts etc complete.
Item No. 5
(vi)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
1.00
2.00
2.00
2.00
L.S
metre
Nos.
Nos.
Nos.
per mtr.
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 20 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges
1.00 No.
1.00 No.
2.00 joints
per day
per day
per joints
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 44
DESCRIPTION OF ITEM:
Supply and erection of G.I Flexible pipe for wiring including weld
sockets, nipples and check nuts etc complete.
Item No. 5
(vii)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
1.00
2.00
2.00
2.00
L.S
metre
Nos.
Nos.
Nos.
per mtr.
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 15 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges
1.00 No.
1.00 No.
2.00 joints
per day
per day
per joints
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 45
DESCRIPTION OF ITEM:
Supply and erection of PVC pipe for recessed wiring (main and subpurposes including bends special etc., in floor, wall or trenches
Item No. 6
(i)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
10.00
2.00
0.084
0.24
metre
Nos.
Nos.
Nos.
Cft.
Cft.
per mtr.
each
each
per doz.
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 46
DESCRIPTION OF ITEM:
Supply and erection of PVC pipe for recessed wiring (main and subpurposes including bends special etc., in floor, wall or trenches
Item No. 6
(ii)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
2.00
0.106
0.25
metre
Nos.
Nos.
Cft.
Cft.
per mtr.
each
per doz.
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 47
DESCRIPTION OF ITEM:
Supply and erection of PVC pipe for recessed wiring (main and subpurposes including bends special etc., in floor, wall or trenches
Item No. 6
(iii)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
2.00
0.106
0.25
metre
Nos.
Nos.
Cft.
Cft.
per mtr.
each
per doz.
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 48
DESCRIPTION OF ITEM:
Supply and erection of PVC pipe for on surface wiring (main and su
including clamps bends etc., complete with all specials.
Item No. 7
(i)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
20.00
2.00
20.00
0.021
0.06
metre
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.
per mtr.
each
each
per doz.
per doz.
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 49
DESCRIPTION OF ITEM:
Supply and erection of PVC pipe for on surface wiring (main and su
including clamps bends etc., complete with all specials.
Item No. 7
(ii)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
20.00
2.00
40.00
40.00
0.042
0.12
metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.
per mtr.
each
each
per doz.
per doz.
per doz.
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 50
DESCRIPTION OF ITEM:
Supply and erection of PVC pipe for on surface wiring (main and su
including clamps bends etc., complete with all specials.
Item No. 7
(iii)
Detail
Rate
Per Unit
Amount (Rs.)
10.00
2.00
20.00
40.00
40.00
2.00
0.084
0.24
metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.
per mtr.
each
each
per doz.
per doz.
per doz.
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 51
DESCRIPTION OF ITEM:
Item No. 8
Supply and erection of wooden strip batten for wiring purposes inc
insulation cleats etc.
Detail
Rate
Per Unit
Amount (Rs.)
Strip casing
Gutties
Clamp & nails
Screw
Insulated cleats
Total
Contractor's Profit & O ## Percent
Total
Material per metre
491.70 1
100.00
10.00
300.00
7.25
100.00
metre
Nos.
Nos.
Dozen
Nos.
% per mtr.
per doz.
% No.
Dozen
each
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 52
DESCRIPTION OF ITEM:
Item No. 9
Supply and erection of sahl wood casing and capping for wiring pur
including insulation cleats, screws etc., complete.
Detail
Rate
Per Unit
Casing Sahlwood
Screw
Gutties
Insulated cleats
Screw for cover
Total
Contractor's Profit & O ## Percent
Total
Material per metre
2662.00
100.00
20.00
20.00
20.00
0.60
metre
Nos.
Nos.
Nos.
Dozen
per mtr.
P. Doz.
per doz.
each
Dozen
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 53
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).
Item No. 10
(a)
(i)
3/0.74 mm (3/0.029")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
439.49 9
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 54
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).
Item No. 10
(a)
(ii)
3/0.91 mm (3.036")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
636.29 9
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 55
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).
Item No. 10
(a)
(iii)
7/0.74 mm (7/0.029")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
908.55 9
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 56
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).
Item No. 10
(a)
(iv)
7/0.91 mm (7/0.036")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
1150.22
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 57
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).
Item No. 10
(a)
(v)
7/1.12 mm (7/0.044")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
1640.70
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 58
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).
Item No. 10
(a)
(vi)
7/1.63 mm (7/0.064")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
4371.45
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 59
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).
Item No. 10
(a)
(vii)
19/1.32 mm (19/0.052")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
5759.90
90.00 metre
per mtr.
2.00 Nos.
3.00 Nos.
per day
per day
0.00
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 60
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).
Item No. 10
(a)
(viii)
19/1.63 mm (19/0.064")
Detail
Rate
Per Unit
Amount (Rs.)
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
13464.0
90.00 metre
per 90 mtr.
2.00 Nos.
3.00 Nos.
per day
per day
0.00
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 61
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).
Item No. 10
(b)
(i)
3/0.74 mm (3/0.029")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
509.85 9
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 62
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).
Item No. 10
(b)
(ii)
3/0.91 mm (3/0.036")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
611.82 9
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 63
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).
Item No. 10
(b)
(iii)
7/0.74 mm (7/0.029")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
815.76 9
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 64
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).
Item No. 10
(b)
(iv)
7/0.91 mm (7/0.036")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
968.72 9
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 65
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).
Item No. 10
(b)
(v)
7/1.12 mm (7/0.044")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
1529.55
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 66
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).
Item No. 10
(b)
(vi)
7/1.63 mm (7/0.064")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
4078.80
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 67
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection at single core PVC insulated PVC sheathed copp
conductor, 250/440 volts grade cable. (BSS-2004) in prelaid PVC pi
conduit/G.I pipe/wooden strip batten/wooden casing and
capping/trenches etc., (rate for cable only).
Item No. 11
(i)
3/0.74 mm (3/0.029")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
505.77 9
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 68
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection at single core PVC insulated PVC sheathed copp
conductor, 250/440 volts grade cable. (BSS-2004) in prelaid PVC pi
conduit/G.I pipe/wooden strip batten/wooden casing and
capping/trenches etc., (rate for cable only).
Item No. 11
(ii)
3/0.91 mm (3/0.036")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
740.30 9
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 69
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection at single core PVC insulated PVC sheathed copp
conductor, 250/440 volts grade cable. (BSS-2004) in prelaid PVC pi
conduit/G.I pipe/wooden strip batten/wooden casing and
capping/trenches etc., (rate for cable only).
Item No. 11
(iii)
7/0.74 mm (7/0.029")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
1008.48
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 70
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection at single core PVC insulated PVC sheathed copp
conductor, 250/440 volts grade cable. (BSS-2004) in prelaid PVC pi
conduit/G.I pipe/wooden strip batten/wooden casing and
capping/trenches etc., (rate for cable only).
Item No. 11
(iv)
7/0.91 mm (7/0.036")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
1517.31
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 71
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection at single core PVC insulated PVC sheathed copp
conductor, 250/440 volts grade cable. (BSS-2004) in prelaid PVC pi
conduit/G.I pipe/wooden strip batten/wooden casing and
capping/trenches etc., (rate for cable only).
Item No. 11
(v)
7/1.12 mm (7/0.044")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
2143.41
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 72
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection at single core PVC insulated PVC sheathed copp
conductor, 250/440 volts grade cable. (BSS-2004) in prelaid PVC pi
conduit/G.I pipe/wooden strip batten/wooden casing and
capping/trenches etc., (rate for cable only).
Item No. 11
(vi)
7/1.63 mm (7/0.064")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
4443.85
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 73
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated, PVC sheathed cop
conductor, 660/1100 volts grade cable, in prelaid G.I pipe/M.S con
pipe/G.I wire/trenches etc., (rate per cable only).
Item No. 12
(i)
7/1.63 mm (7/0.064")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
4329.01
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 74
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated, PVC sheathed cop
conductor, 660/1100 volts grade cable, in prelaid G.I pipe/M.S con
pipe/G.I wire/trenches etc., (rate per cable only).
Item No. 12
(ii)
19/0.32 mm (19/0.052")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
5759.90
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 75
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated, PVC sheathed cop
conductor, 660/1100 volts grade cable, in prelaid G.I pipe/M.S con
pipe/G.I wire/trenches etc., (rate per cable only).
Item No. 12
(iii)
19/0.63 mm (19/0.064")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
7847.16
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 76
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated, PVC sheathed cop
conductor, 660/1100 volts grade cable, in prelaid G.I pipe/M.S con
pipe/G.I wire/trenches etc., (rate per cable only).
Item No. 12
(iv)
19/2.11 mm (19/0.083")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
12207.59
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 77
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated, PVC sheathed cop
conductor, 660/1100 volts grade cable, in prelaid G.I pipe/M.S con
pipe/G.I wire/trenches etc., (rate per cable only).
Item No. 12
(v)
37/1.83 mm (37/0.072")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
21264.40
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 78
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated, PVC sheathed cop
conductor, 660/1100 volts grade cable, in prelaid G.I pipe/M.S con
pipe/G.I wire/trenches etc., (rate per cable only).
Item No. 12
(vi)
37/2.11 mm (37/0.083")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
26390.11
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 79
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated, PVC sheathed cop
conductor, 660/1100 volts grade cable, in prelaid G.I pipe/M.S con
pipe/G.I wire/trenches etc., (rate per cable only).
Item No. 12
(vii)
37/2.62 mm (37/0.103")
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
40719.18
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 80
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(a)
(i)
3/0.74 mm (3/0.029")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 90 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 81
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(a)
(ii)
3/0.91 mm (3/0.036")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 90 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 82
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(a)
(iii)
7/0.74 mm (7/0.029")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 90 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 83
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(a)
(iv)
7/0.91 mm (7/0.036")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 85 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 84
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(a)
(v)
7/1.12 mm (7/0.044")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 76 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 85
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(a)
(vi)
7/1.63 mm (7/0.064")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 66 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 86
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(b)
(i)
3/0.74 mm (3/0.029")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 85 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 87
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(b)
(ii)
3/0.91 mm (3/0.036")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 85 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 88
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(b)
(iii)
3/0.74 mm (7/0.029")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 85 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 89
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(b)
(iv)
7/0.91 mm (7/0.036")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 76 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 90
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(b)
(v)
7/1.12 mm (7/0.044")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 72 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 91
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(b)
(vi)
7/1.13 mm (7/0.064")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 63 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 92
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(c)
(i)
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 80 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 93
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(c)
(ii)
3/0.91 mm (3/0.036")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 80 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 94
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(c)
(iii)
7/0.74 mm (7/0.029")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 76 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 95
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(c)
(iv)
7/0.91 mm (7/0.036")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 76 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 96
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(c)
(v)
7/1.12 mm (7/0.044")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 72 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 97
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(c)
(vi)
7/1.63 mm (7/0.064")
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 63 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 98
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(c)
19/1.32 mm (19/0.052")
(vii)
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 45 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 99
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(d)
19/1.32 mm (19/0.052")
(i)
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
11164.35
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 100
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(d)
19/1.63 mm (19/0.064")
(ii)
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 42 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 101
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(d)
19/1.83 mm (19/0.072")
(iii)
Detail
Rate
Per Unit
1 coil
Total
Contractor's Profit & O ## Percent
Total
Material per metre
21288.60
90.00 metre
per mtr.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 102
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(d)
19/2.11 mm (19/0.083")
(iv)
Detail
Rate
Per Unit
1 coil
90.00
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 37 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 103
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(d)
37/1.83 mm (37/0.072")
(v)
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 36 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 104
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(d)
37/2.11 mm (37/0.083")
(vi)
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 30 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 105
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(d)
37/2.36 mm (37/0.093")
(vii)
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 25 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 106
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).
Item No. 13
(d)
37/2.62 mm (37/0.103")
(viii)
Detail
Rate
Per Unit
1 coil
90.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 20 Metre)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 107
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of M.S sheet box of 16 SWG, 10 cm 4" (100 mm)
4.75 mm thick 3/16" (6 mm) bakelite sheet top, for recessed wiring
making holes for regulators, switches, plugs, etc.
Item No. 14
(i)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1 M.S Box 4" x 4" (100 x 100 mm)
2 Cement
3 Sand
1.00 No.
0.021 Cft.
0.08 Cft.
each
P. Bag
Per % Cft.
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 20 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 108
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of M.S sheet box of 16 SWG, 10 cm 4" (100 mm)
4.75 mm thick 3/16" (6 mm) bakelite sheet top, for recessed wiring
making holes for regulators, switches, plugs, etc.
Item No. 14
(ii)
17.5 x 10 cm
(7" x
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1 M.S Box 7" x 4" (175 x 100 mm)
2 Cement
3 Sand
1.00 No.
0.026 Cft.
0.09 Cft.
each
P. Bag
Per % Cft.
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 16 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 109
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of M.S sheet box of 16 SWG, 10 cm 4" (100 mm)
4.75 mm thick 3/16" (6 mm) bakelite sheet top, for recessed wiring
making holes for regulators, switches, plugs, etc.
Item No. 14
(iii)
22.5 x 10 cm
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1 M.S Box 9" x 4" (225 x 100 mm)
2 Cement
3 Sand
1.00 No.
0.032 Cft.
0.08 Cft.
each
P. Bag
Per % Cft.
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 12 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 110
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of M.S sheet box of 16 SWG, 10 cm 4" (100 mm)
4.75 mm thick 3/16" (6 mm) bakelite sheet top, for recessed wiring
making holes for regulators, switches, plugs, etc.
Item No. 14
(iv)
20 x 25 cm
(8" x 10")
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1 M.S Box 8" x 10" (200 x 250 mm)
2 Cement
3 Sand
1.00 No.
0.036 Cft.
0.150 Cft.
each
P. Bag
Per % Cft.
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 10 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Page 111
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of M.S sheet box of 16 SWG, 10 cm 4" (100 mm)
4.75 mm thick 3/16" (6 mm) bakelite sheet top, for recessed wiring
making holes for regulators, switches, plugs, etc.
Item No. 14
(v)
25 x 30 cm
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1 M.S Box 10" x 12" (250 x 300 mm)
2 Cement
3 Sand
1.00 No.
0.047 Cft.
0.155 Cft.
each
P. Bag
Per % Cft.
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 8 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 112
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of M.S sheet box of 16 SWG, 10 cm 4" (100 mm)
4.75 mm thick 3/16" (6 mm) bakelite sheet top, for recessed wiring
making holes for regulators, switches, plugs, etc.
Item No. 14
(vi)
30 x 35 cm
(12" x 14")
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1 M.S Box 12" x 14" (300 x 350 mm)
2 Cement
3 Sand
1.00 No.
0.052 Cft.
0.180 Cft.
each
P. Bag
Per % Cft.
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 113
Say
Say
DESCRIPTION OF ITEM:
Item No. 15
Detail
Rate
Per Unit
MATERIAL
1 Round block
2 W. Gutti 1" x 1" (40 x 25 mm)
3 Screw
0.544 No.
1.00 No.
1.00 Dozen
each
per doz.
per doz.
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 70 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 114
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of teak wood board, 4.5 cm 1" (45 mm) thick.
Item No. 16
(i)
17.5 x 10 cm
(7" x 4")
Detail
Rate
Per Unit
MATERIAL
1 Teak Wood Board 7" x 4" (175 x 100 mm)
2 W. Gutti
3 Screw
1.00 No.
2.00 Nos.
2.00 Nos.
each
per dozen
per dozen
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 115
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of teak wood board, 4.5 cm 1" (45 mm) thick.
Item No. 16
(ii)
22.5 x 10 cm
(9" x 4")
Detail
Rate
Per Unit
MATERIAL
1 Teak Wood Board 9" x 4" (225 x 100 mm)
2 W. Gutti
3 Screw
1.00 No.
2.00 Nos.
2.00 Nos.
each
per dozen
per dozen
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 116
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of teak wood board, 4.5 cm 1" (45 mm) thick.
Item No. 16
(iii)
20 x 25 cm
Detail
Rate
Per Unit
MATERIAL
1 Teak Wood Board 8" x 10" (200 x 250 mm)
2 W. Gutti
3 Screw
1.00 No.
2.00 Nos.
2.00 Nos.
each
per dozen
per dozen
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 45 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 117
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of teak wood board, 4.5 cm 1" (45 mm) thick.
Item No. 16
(iv)
25 x 30 cm
(10" x 12")
Detail
Rate
Per Unit
MATERIAL
1 Teak Wood Wooden Board 10" x 12" (250 x 300 mm)
2 W. Gutti
3 Screw
1.00 No.
4.00 Nos.
4.00 Nos.
each
per dozen
per dozen
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 40 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 118
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of teak wood board, 4.5 cm 1" (45 mm) thick.
Item No. 16
(v)
30 x 35 cm
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1 Teak Wood Board 12" x 14" (300 x 350 mm)
2 W. Gutti
3 Screw
1.00 No.
4.00 Nos.
4.00 Nos.
each
per dozen
per dozen
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 35 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 119
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Supply and erection of Sahl wood board 4.5 cm 1" (45 mm) thick.
Item No. 17
(i)
17.5 x 10 cm
(7" x 4")
Detail
Rate
Per Unit
MATERIAL
1 Sahl Wood Board 7" x 4" (175 x 100 mm)
2 W. Gutti
3 Screw
1.00 No.
2.00 Nos.
2.00 Nos.
each
per dozen
per dozen
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 120
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of Sahl wood board 4.5 cm 1" (45 mm) thick.
Item No. 17
(ii)
22.5 x 10 cm
(9" x 4")
Detail
Rate
Per Unit
MATERIAL
1 Sahl Wood Board 9" x 4" (225 x 100 mm)
2 W. Gutti
3 Screw
1.00 No.
2.00 Nos.
2.00 Nos.
each
per dozen
per dozen
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 121
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of Sahl wood board 4.5 cm 1" (45 mm) thick.
Item No. 17
(iii)
20 x 25 cm
(8" x 10")
Detail
Rate
Per Unit
MATERIAL
1 Sahl Wood Board 8" x 10" (200 x 250 mm)
2 W. Gutti
3 Screw
1.00 No.
2.00 Nos.
2.00 Nos.
each
per dozen
per dozen
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 45 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 122
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of Sahl wood board 4.5 cm 1" (45 mm) thick.
Item No. 17
(iv)
25 x 30 cm
(10" x 12")
Detail
Rate
Per Unit
MATERIAL
1 Sahl Wood Board 10" x 12" (250 x 300 mm)
2 W. Gutti
3 Screw
1.00 No.
2.00 Nos.
2.00 Nos.
each
per dozen
per dozen
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 40 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 123
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of Sahl wood board 4.5 cm 1" (45 mm) thick.
Item No. 17
(v)
30 x 35 cm
(12" x 14")
Detail
Rate
Per Unit
MATERIAL
1 Sahl Wood Board 12" x 14" (300 x 350 mm)
2 W. Gutti
3 Screw
1.00 No.
2.00 Nos.
2.00 Nos.
each
per dozen
per dozen
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 35 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 124
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.
Item No. 18
Double pole:
(a)
(i)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
7
8
9
10
1.00
0.50
1.00
4.00
2.00
3.00
1.00
8.00
0.032
0.08
No.
metre
No.
Nos.
Nos.
Nos.
No.
Nos.
Cft.
Cft.
each
per mtr.
each
% No.
each
each
each
each
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 125
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.
Item No. 18
Double pole:
(a)
(ii)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
7
8
9
10
1.00
0.50
1.00
4.00
2.00
3.00
1.00
8.00
0.032
0.08
No.
metre
No.
Nos.
Nos.
Nos.
No.
Nos.
Cft.
Cft.
each
per mtr.
each
% No.
each
each
each
each
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 126
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.
Item No. 18
Double pole:
(a)
(iii)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
7
8
9
1.00
0.50
1.00
2.00
2.00
2.00
4.00
0.032
0.08
No.
metre
No.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.
each
per mtr.
each
each
each
each
% No.
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 127
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.
Item No. 18
Double pole:
(a)
(iv)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
7
8
9
1.00
0.50
1.00
2.00
2.00
2.00
4.00
0.032
0.08
No.
metre
No.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.
each
per mtr.
each
each
each
each
% No.
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 128
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.
Item No. 18
Triple pole:
(b)
(i)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
7
8
9
1.00
0.50
1.00
2.00
2.00
2.00
4.00
0.032
0.08
No.
metre
No.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.
each
per mtr.
each
each
each
each
% No.
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 129
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.
Item No. 18
Triple pole:
(b)
(ii)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
7
8
9
10
1.00
1.00
0.50
4.00
2.00
2.00
2.00
8.00
0.032
0.08
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.
each
each
per mtr.
% No.
each
each
each
each
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 130
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.
Item No. 18
(c)
(i)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
7
8
9
10
1.00
1.00
0.50
4.00
2.00
2.00
2.00
8.00
0.032
0.08
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.
each
each
per mtr.
% No.
each
each
each
each
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 131
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.
Item No. 18
(c)
(ii)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
7
8
9
1.00
1.00
0.50
4.00
2.00
2.00
2.00
0.052
0.18
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.
each
each
per mtr.
% No.
each
each
each
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 132
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.
Item No. 18
(c)
(iii)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
7
8
9
1.00
1.00
0.50
2.00
2.00
4.00
0.052
0.18
No.
No.
metre
Nos.
Nos.
Nos.
Cft.
Cft.
each
each
per mtr.
each
each
each
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled
1.00 No.
1.62 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 133
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, 500 volts main switche
pole and neutral link and HRC fuses, on angle iron board with 3 mm
thick M.S sheet covering, including bonding to earth with necessar
pipe and thimbles.
Item No. 19
(i)
60/65 Amp.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
8
1.00
0.50
1.00
2.00
2.00
4.00
2.00
4.00
No.
metre
No.
Nos.
Nos.
Nos.
Nos.
Nos.
each
per mtr.
each
each
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 134
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, 500 volts main switche
pole and neutral link and HRC fuses, on angle iron board with 3 mm
thick M.S sheet covering, including bonding to earth with necessar
pipe and thimbles.
Item No. 19
(ii)
100 Amp.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
8
1.00
0.50
1.00
2.00
2.00
4.00
2.00
4.00
No.
metre
No.
Nos.
Nos.
Nos.
Nos.
Nos.
each
per mtr.
each
each
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled
1.00 No.
1.62 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 135
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, 500 volts main switche
pole and neutral link and HRC fuses, on angle iron board with 3 mm
thick M.S sheet covering, including bonding to earth with necessar
pipe and thimbles.
Item No. 19
(iii)
150 Amp.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
2.00
2.00
4.00
4.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled
1.00 No.
1.62 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 136
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, 500 volts main switche
pole and neutral link and HRC fuses, on angle iron board with 3 mm
thick M.S sheet covering, including bonding to earth with necessar
pipe and thimbles.
Item No. 19
(iv)
200 Amp.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
8
1.00
1.00
0.50
2.00
2.00
2.00
4.00
4.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 1 No.)
1 Electrician
2 Coolies skilled
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 137
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, 500 volts main switche
pole and neutral link and HRC fuses, on angle iron board with 3 mm
thick M.S sheet covering, including bonding to earth with necessar
pipe and thimbles.
Item No. 19
(v)
300 Amp.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
8
1.00
0.50
1.00
2.00
2.00
2.00
4.00
4.00
No.
metre
No.
Nos.
Nos.
Nos.
Nos.
Nos.
each
per mtr.
each
each
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 1 No.)
1 Electrician
2 Coolies skilled
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 138
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, 500 volts main switche
pole and neutral link and HRC fuses, on angle iron board with 3 mm
thick M.S sheet covering, including bonding to earth with necessar
pipe and thimbles.
Item No. 19
(vi)
400 Amp.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
8
1.00
1.00
0.50
2.00
2.00
2.00
4.00
4.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 1 No.)
1 Electrician
2 Coolies skilled
1.25 No.
3.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 139
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, 500 volts main switche
pole and neutral link and HRC fuses, on angle iron board with 3 mm
thick M.S sheet covering, including bonding to earth with necessar
pipe and thimbles.
Item No. 19
(vii)
500 Amp.
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
7
8
8
9
1.00
1.00
0.50
2.00
2.00
2.00
4.00
4.00
0.203
0.99
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.
each
each
per mtr.
each
each
each
each
each
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 1 No.)
1 Electrician
2 Coolies skilled
1.50 Nos.
3.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 140
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(i)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 141
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(ii)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 142
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(iii)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 143
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(iv)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 144
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(v)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 145
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(vi)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 146
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(vii)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 147
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(viii)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 148
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(ix)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 149
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(x)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 150
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(xi)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 151
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(xii)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 152
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(xiii)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 153
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(xiv)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 154
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(xv)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 155
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(xvi)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 156
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(xvii)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 157
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 20
(xviii)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 158
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(xix)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 159
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
Item No. 20
(xx)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
0.50
4.00
4.00
2.00
8.00
No.
No.
metre
Nos.
Nos.
Nos.
Nos.
each
each
per mtr.
each
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 160
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of bus bars, for 500 volts 3 phase A.C supply
copper bars, including glazed porcelain bridges, on angle iron boa
with rag bolts and M.S sheet box 1.5 mm thick, etc., complete:
Item No. 21
(i)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
7
Porcelain (Imported)
Copper strip 1" x 1/8" x 14" (40 x 3 x 350 mm)
Box 1.5 mm thick
L-Iron board 18" x 12" x 1" (450 x 300 x 40 mm)
Reg bolts 9 x 5/8 (225 x 16 mm)
Cement
Sand
8.00
4.00
1.00
1.00
4.00
0.063
0.18
Nos.
Nos.
No.
No.
Nos.
Cft.
Cft.
each
each
each
each
each
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)
1.50 Nos.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 161
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of bus bars, for 500 volts 3 phase A.C supply
copper bars, including glazed porcelain bridges, on angle iron boa
with rag bolts and M.S sheet box 1.5 mm thick, etc., complete:
Item No. 21
(ii)
100 Amp. with 4 copper bars size 1" x 1/8" (40 x 3 mm)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
7
Porcelain (Imported)
Copper strip 14" x 1" x 1/8" (350 x 40 x 3 mm)
Box 1.5 mm thick
L-Iron board 18" x 12" x 1" (450 x 300 x 40 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Cement
Sand
8.00
4.00
1.00
1.00
4.00
0.063
0.18
Nos.
Nos.
No.
No.
Nos.
Cft.
Cft.
each
each
each
each
each
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)
1.50 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 162
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of bus bars, for 500 volts 3 phase A.C supply
copper bars, including glazed porcelain bridges, on angle iron boa
with rag bolts and M.S sheet box 1.5 mm thick, etc., complete:
Item No. 21
(iii)
200 Amp. with 4 copper bars size 2" x 1/8" (50 x 3 mm)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
7
Porcelain (Imported)
Copper strip 14" x 2" x 1/8" (350 x 50 x 3 mm)
Box 1/16 (2 mm) thick
L-Iron board 18" x 12" x 1" (450 x 300 x 40 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Cement
Sand
8.00
4.00
1.00
1.00
4.00
0.063
0.18
Nos.
Nos.
No.
No.
Nos.
Cft.
Cft.
each
each
each
each
each
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Coolies (helper)
2.00 Nos.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 163
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of bus bars, for 500 volts 3 phase A.C supply
copper bars, including glazed porcelain bridges, on angle iron boa
with rag bolts and M.S sheet box 1.5 mm thick, etc., complete:
Item No. 21
(iv)
300 Amp. with 4 copper bars size 2" x 3/16" (50 x 4 mm)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
7
Porcelain (Imported)
Copper strip 2" x 3/16" x 14" (50 x 4 x 350 mm)
Box 1/16" (2 mm) thick
L-Iron board 18" x 12" x 1" (450 x 300 x 40 mm)
Reg bolts 2 "x 5/8" (50 x 16 mm)
Cement
Sand
8.00
4.00
1.00
1.00
4.00
0.063
0.18
Nos.
Nos.
No.
No.
Nos.
Cft.
Cft.
each
each
each
each
each
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Coolies skilled
2.50 Nos.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 164
Say
Say
DESCRIPTION OF ITEM:
Supply and erection of bus bars, for 500 volts 3 phase A.C supply
copper bars, including glazed porcelain bridges, on angle iron boa
with rag bolts and M.S sheet box 1.5 mm thick, etc., complete:
Item No. 21
(v)
500 Amp. with 4 copper bars size 2" x " (50 x 6 mm)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
7
Porcelain (Imported)
Copper strip 14" x 2" x " (350 x 50 x 6 mm)
Box 1/16" (2 mm) thick
L-Iron board 18" x 12" x 1" (450 x 300 x 40 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Cement
Sand
8.00
4.00
1.00
1.00
4.00
0.084
0.24
Nos.
Nos.
No.
No.
Nos.
Cft.
Cft.
each
each
each
each
each
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)
2.00 Nos.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 165
Say
Say
DESCRIPTION OF ITEM:
Item No. 22 (i)
Detail
Rate
Per Unit
MATERIAL
1 Pendent lamp holder bakelite
2 Flexible twin wire 23/0.0076 (23/0.195 mm)
1.00 No.
2.00 metre
each
per mtr.
0.50 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 24 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 166
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 22 (ii)
Detail
Rate
Per Unit
MATERIAL
2 Flexible twin wire 23/0.0076 (23/0.195 mm)
1.00 metre
per mtr.
Total
Contractor's Profit & O ## Percent
Total
ITEM RATE
Composite rate per Metre
Composite rate per ft.
Rs.
Rs.
Page 167
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 23
Detail
Rate
Per Unit
MATERIAL
1 Flexible twin wire 23/0.0076 (23/0.195 mm)
2 Bakelite lamp holder
3 Counter weight with accessories
3.00 metre
1.00 No.
1.00 No.
per mtr.
each
each
0.50 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 12 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 168
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 24
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
2.00
1.00
1.00
2.00
metre
job
No.
metre
per mtr.
per job
each
per mtr.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 30 Nos.)
1 Electrician
2 Cooly (helper)
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 169
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 25
Supply and erection of 22.5 cm (9") long swan neck plain brass/ste
oxidised bracket lamp holder, complete.
Detail
Rate
Per Unit
MATERIAL
1 Brass bracket
2 Brass lamp holder
3 VIR/PVC Cable 3/0.029
1.00 No.
1.00 No.
0.50 metre
each
each
per mtr.
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 29 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 170
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 26
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
1.00
1.00
1.00
1.00
1.00
metre
No.
No.
No.
metre
per mtr.
each
each
each
per mtr.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 21 Nos.)
1 Electrician
2 Cooly (helper)
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 171
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 27
Detail
Rate
Per Unit
MATERIAL
1 Button Switch holder
2 Bakelite screwed cover
1.00 No.
1.84 Dozen
each
P. Doz
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 100 Nos.)
1 Electrician
2 Cooly (helper)
1.00 No.
0.50 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 172
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 28
Supply and erection of call bell 220/250 volts, fixed on teak wood
17.5 x 10 cm (7" x 4").
Detail
Rate
Per Unit
MATERIAL
1 Call bell
2 Board 7" x 4" (175 x 100 mm)
3 Screw
1.00 No.
1.00 No.
1.85 Dozen
each
each
P. Doz
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 30 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 173
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 29
Supply and erection of bell push or bed switch, with 5 metre twin
wire 23/0.0076"
Detail
Rate
Per Unit
MATERIAL
1 Bed switch/bell push
2 Flexible wire 23/0.0076" (23/0.195 mm)
1.00 No.
5.00 metre
each
per mtr.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 80 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 174
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 30
Detail
Rate
Per Unit
MATERIAL
1 Ceiling rose
2 Iron screw
1.00 No.
1.50 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 48 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 175
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of switches 5 Amp.
Item No. 31
(i)
Open type.
Detail
Rate
Per Unit
MATERIAL
1 Switch 5 Amp
2 Screw
1.00 No.
1.50 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 176
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of switches 5 Amp.
Item No. 31
(ii)
Piano type.
Detail
Rate
Per Unit
MATERIAL
1 Switch 5 Amp piano type
2 Screw
1.00 No.
1.50 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 177
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of switches 5 Amp.
Item No. 31
(iii)
Detail
Rate
Per Unit
MATERIAL
1 Switch ring type
1.00 No.
each
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 178
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of switches 5 Amp.
Item No. 31
(iv)
Detail
Rate
Per Unit
MATERIAL
1 Switch plate type
2 Screw
1.00 No.
1.50 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 179
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of switches 5 Amp.
Item No. 31
(v)
Detail
Rate
Per Unit
MATERIAL
1 Double control switch
2 Screw
1.00 No.
2.00 Nos.
each
P. Doz.
1.00 No.
0.25 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 44 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 180
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of switches 5 Amp.
Item No. 31
(vi)
Detail
Rate
Per Unit
MATERIAL
1 Double control switch recessed type
2 Screw
1.00 No.
2.00 Nos.
each
P. Doz.
1.00 No.
0.25 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 44 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 181
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of switches 5 Amp.
Item No. 31
(vii)
Detail
Rate
Per Unit
MATERIAL
1 Double control piano type
2 Screw
1.00 No.
2.00 Nos.
each
P. Doz.
1.00 No.
0.25 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 44 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 182
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of switches 10/15 Amp.
Item No. 32
(i)
Open type.
Detail
Rate
Per Unit
MATERIAL
1 Switch 10/15 Amp
2 Screw
1.00 No.
2.00 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 183
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of switches 10/15 Amp.
Item No. 32
(ii)
Detail
Rate
Per Unit
MATERIAL
1 Switch 10/15 Amp. recessed
2 Mechine Screw
1.00 No.
2.00 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 184
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 33
Detail
Rate
Per Unit
MATERIAL
1 3 pin 5 Amp wall socket
2 Shoe
3 Screw
1.00 No.
1.00 No.
2.00 Nos.
each
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 185
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 34
Detail
Rate
Per Unit
MATERIAL
1 Wall socket 3 pin 5 Amp.
2 Screw
1.00 No.
2.00 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 186
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of 3 pin 10/15 Amp. wall socket.
Item No. 35
(i)
Open type.
Detail
Rate
Per Unit
MATERIAL
1 Wall socket 10/15 Amp.
2 Screw
1.00 No.
2.00 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 187
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of 3 pin 10/15 Amp. wall socket.
Item No. 35
(ii)
Detail
Rate
Per Unit
MATERIAL
1 Wall socket 10/15 Amp. recessed
2 Machine Screw
1.00 No.
2.00 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 188
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of 3 pin switch and plug combined, recessed ty
Item No. 36
(i)
5 Amp.
Detail
Rate
Per Unit
MATERIAL
1 Plugs 3 pin and switch (combine) 5 Amp.
2 Machine Screw
1.00 No.
4.00 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 189
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of 3 pin switch and plug combined, recessed ty
Item No. 36
(ii)
10/15 Amp.
Detail
Rate
Per Unit
MATERIAL
1 Plugs 3 pin and switch (combine) 10/15 Amp.
2 Machine Screw
1.00 No.
5.00 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 190
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 37
Supply and erection of 3 pin 10/15 Amp. wall socket with shoe open
Detail
Rate
Per Unit
MATERIAL
1 Wall socket 3 pin 10/15 Amp.
2 Shoe 3 pin
3 Screw
1.00 No.
1.00 No.
2.00 Nos.
each
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 191
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of cut out, bakelite:
Item No. 38
(i)
Open type.
Detail
Rate
Per Unit
MATERIAL
1 Cut out bakelite
2 Screw
1.00 No.
2.00 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 90 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 192
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of cut out, bakelite:
Item No. 38
(ii)
Detail
Rate
Per Unit
MATERIAL
1 Cut out
2 Machine Screw
1.00 No.
2.00 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 90 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 193
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of button holder:
Item No. 39
(i)
Detail
Rate
Per Unit
MATERIAL
1 Button holder large
2 Screw
1.00 No.
2.00 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 80 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 194
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of button holder:
Item No. 39
(ii)
Detail
Rate
Per Unit
MATERIAL
1 Button holder
2 Screws
1.00 No.
2.00 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 80 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 195
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 40
Detail
Rate
Per Unit
MATERIAL
1 Brass bracket with holder
2 Screw
1.00 No.
2.00 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 60 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 196
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 41
Detail
Rate
Per Unit
MATERIAL
1 Bell push
2 Screw
1.00 No.
2.00 Nos.
each
P. Doz.
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 90 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 197
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of kit kat, 500 volt:
Item No. 42
(i)
15/20 Amp.
Detail
Rate
Per Unit
MATERIAL
1 Kit kat 15/20 Amp.
2 Screw
1.00 No.
1.00 Nos.
each
P. Doz.
1.00 No.
0.25 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 60 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 198
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of kit kat, 500 volt:
Item No. 42
(ii)
30/35 Amp.
Detail
Rate
Per Unit
MATERIAL
1 Kit kat 30/35 Amp.
2 Screw
1.00 No.
1.00 Nos.
each
P. Doz.
1.00 No.
0.25 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 55 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 199
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of kit kat, 500 volt:
Item No. 42
(iii)
60/65 Amp.
Detail
Rate
Per Unit
MATERIAL
1 Kit kat 60/65 Amp.
2 Screw
1.00 No.
1.00 Nos.
each
P. Doz.
1.00 No.
0.25 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 36 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 200
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of kit kat, 500 volt:
Item No. 42
(iv)
100 Amp.
Detail
Rate
Per Unit
MATERIAL
1 Kit kat 100 Amp.
2 Screw
1.00 No.
1.00 Nos.
each
P. Doz.
1.00 No.
0.25 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 32 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 201
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of kit kat, 500 volt:
Item No. 42
(v)
200 Amp.
Detail
Rate
Per Unit
MATERIAL
1 Kit kat 200 Amp.
2 Screw
1.00 No.
1.00 Nos.
each
P. Doz.
1.00 No.
0.25 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 28 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 202
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of kit kat, 500 volt:
Item No. 42
(vi)
300 Amp.
Detail
Rate
Per Unit
MATERIAL
1 Kit kat 300 Amp.
2 Screw
1.00 No.
1.00 Nos.
each
P. Doz.
1.00 No.
0.25 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 28 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 203
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of kit kat, 500 volt:
Item No. 42
(vii)
400 Amp.
Detail
Rate
Per Unit
MATERIAL
1 Kit kat 400 Amp.
2 Screw
1.00 No.
1.00 Nos.
each
P. Doz.
1.00 No.
0.50 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 25 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 204
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of kit kat, 500 volt:
Item No. 42
(viii)
500 Amp.
Detail
Rate
Per Unit
MATERIAL
1 Kit kat 500 Amp.
2 Screw
1.00 No.
2.00 No.
each
each
1.00 No.
0.50 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 25 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 205
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of tube light, including rod, choke, starter w
flexible wire, including connection from ceiling rose, etc., compl
Item No. 43
(i)
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
Tube rod
Chokes
Starters
Frame with holder
Flexible wire
Hooks, Chain
2.00
2.00
2.00
1.00
2.00
L.S
Nos.
Nos.
Nos.
job
metre
each
each
each
per job
per mtr.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Sets)
1 Electrician
2 Cooly (helper)
1.00 No.
0.50 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for each Set
Composite rate for each Set
Rs.
Rs.
Page 206
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of tube light, including rod, choke, starter w
flexible wire, including connection from ceiling rose, etc., compl
Item No. 43
(ii)
Single rod (40 watts) with one choke and one starter.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
Tube rod
Choke
Starter
Frame set
Flexible wire
Hooks, Chain
1.00
1.00
1.00
1.00
2.00
L.S
No.
No.
No.
No.
metre
each
each
each
each
per mtr.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 5 Sets)
1 Electrician
2 Cooly (helper)
1.00 No.
0.50 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for each Set
Composite rate for each Set
Rs.
Rs.
Page 207
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of tube light, including rod, choke, starter w
flexible wire, including connection from ceiling rose, etc., compl
Item No. 43
(iii)
Single round tube, 32 watts, with one choke and one starter, witho
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
1.00
1.00
1.00
2.00
1.00
2.00
1.00
No.
No.
No.
Nos.
No.
metre
No.
each
each
each
each
each
per mtr.
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 5 Sets)
1 Electrician
2 Cooly (helper)
1.00 No.
0.50 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 208
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of tube light, including rod, choke, starter w
flexible wire, including connection from ceiling rose, etc., compl
Item No. 43
(iv)
Round tube, 32 watts, with one choke and one starter, with cover.
Detail
Rate
Per Unit
MATERIAL
1
2
3
4
5
6
7
8
1.00
1.00
1.00
2.00
1.00
1.00
2.00
1.00
No.
No.
No.
Nos.
No.
No.
metre
No.
each
each
each
each
each
each
per mtr.
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Cooly (helper)
1.00 No.
0.50 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 209
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Providing and fixing M.S iron box for housing main switches, made
(1/16") thick M.S sheet, with locking arrangement, including paint
Item No. 44
(i)
Detail
MATERIAL
1 M.S sheet 1.5 mm thick
Base side 1 x 24/12 x 14/12 (1 x 600 x 350 mm)
Long side 2 x 24/12 x 7 12 (2x600x190mm)
Short side 2 x 14/12 x 7 12 (2x350x190mm)
Top 1 x 24 x 12 x 14 (600 x 350 x 150 mm)
1.04 Sqm @ 12.20 Kg/Sqm
2 Angle Iron 25 x 25 x 3 mm/Sqm
2 x 24" =
48" (2 x 600 mm)
2 x 14" =
28" (2 x 350 mm)
4 x 7.12 =
30" (4 x 190 mm)
=
0.82 Sqm @ 6.08 Kg/Sqm
1.70 kg
3 Handle chromium plated
4 Painting
5 Hinges
6 Locking arrangement
Rate
Per Unit
12.68 kg
per kg
1.70
1.00
0.178
3.00
L.S
kg
No.
Gallon
Nos.
each
each
Gallon
each
1.00
1.00
0.125
1.00
No.
No.
No.
No.
per
per
per
per
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1
2
3
4
Black Smith
Cooly (helper)
Painter
Electrician
day
day
day
day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 210
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Providing and fixing M.S iron box for housing main switches, made
(1/16") thick M.S sheet, with locking arrangement, including paint
Item No. 44
(ii)
Detail
MATERIAL
1 M.S sheet 38"x16"x 8" thick (1965x406x200mm)
Base side 1x38/12x16/12 (965x406mm) =
0.39 Sqm
Long side 2x38/12x8/12 (2x965x200mm)
= 0.39 Sqm
Short side 2x16/12x8/12 (2x406x200mm)
0.17 Sqm
Top 1x38/12x16/12 (1x965x406mm)
=
0.39 Sqm
1.34 Sqm
1.34 Sqm @ 12.45 Kg/Sqm
2 Angle Iron 1" x 1" x 1/8" (25 x 25 x 3mm)
2 x 965 mm = 1.93 R/m
2 x 406 mm = 0.82 R/m
4 x 200 mm = 0.80 R/m
3.55 R/m
3.55 R/m @ 0.632 Kg/R/m
3 Handle chromium plated
4 Paint
5 Hinges
6 Locking arrangement
Rate
Per Unit
16.70 kg
per kg
2.25
1.00
0.045
3.00
L.S
kg
No.
Gallon
Nos.
per kg
each
Gallon
each
1.25
1.00
0.125
1.00
Nos.
No.
No.
No.
per
per
per
per
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1
2
3
4
Black Smith
Cooly (helper)
Painter
Electrician
day
day
day
day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 211
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Providing and fixing M.S iron box for housing main switches, made
(1/16") thick M.S sheet, with locking arrangement, including paint
Item No. 44
(iii)
Detail
MATERIAL
1 M.S sheet 42" x 21" x 9" thick (1067 x 534 x 225mm)
Base side 1 x 42/12 x 21/12 (1076x534mm)
Long side 2 x 42/12 x 9/12
(2x1067x225mm)
Short side 2 x 21/12 x 9/12
(2x534x225mm)
Top
1 x
42 (1x1067x534mm)
12
12
1.872 Sqm
1872 Sqm @ 27.44 Per Sqm
(51.36 lbs) 23.30
2 Angle Iron 1" x 1" x 1/8 (25x25x3mm)
2 x 42" =
84" (2x1076)
2 x 21" =
42" (2x534)
4 x 9"
=
36" (4x225mm)
162" or 13.5 ft. (4.12 R/m)
412 ft. 1.394 lbs/PRM
5.74 lbs
2.60
3 P/F chromium plated
1.00
4 P/F Hinges
3.00
Paint
0.054
Locking arrangement
L.S
Rate
Per Unit
kg
per kg
kg
No.
Nos.
Gallon
per kg
each
each
Gallon
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1
2
3
4
Black Smith
Colly (helper)
Painter
Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
1.25
1.00
0.17
1.00
Nos.
No.
No.
No.
per
per
per
per
day
day
day
day
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 212
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Providing and fixing M.S iron box for housing main switches, made
(1/16") thick M.S sheet, with locking arrangement, including paint
Item No. 44
(iv)
Detail
MATERIAL
1 M.S sheet (54" x 28" 11") thick (1372x710x280mm)
Base side 1 x 54/12 x 28/12 (1372x710mm)
Long side 2 x 54/12 x 11/12
(2x1372x280mm)
Short side 2 x 28/12 x 11/12
(2x710x280mm)
Top 1 x 54/12 x 28/12
(1x1372x710mm)
3.12 Sqm
3.12 Sqm @ 27.44 lbs/Per Sqm
(85.50 lbs)
2 Angle Iron 1" x 1" x 1/8" (25x25x3mm)
1x2 x 54"=
108" (2x1372mm)
2 x 28" =
56" (2x710mm)
4 x 11" =
44 (4x280mm)
5.28 R/M
5.28 R/M @ 1.39 lbs/Per R/M
7.36 lbs
(7.36 lbs)
3 Handle chromium plated
4 Hinges with screws
5 Locking arrangement
38.78 kg
3.34 kg
1.00 No.
4.00 Nos.
Rate
Per Unit
per kg
per kg
each
each
L.S
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1
2
3
4
Black Smith
Cooly (helper)
Painter
Electrician
1.50
1.00
0.25
1.00
No.
No.
No.
No.
per
per
per
per
day
day
day
day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 213
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 45
Detail
Rate
Per Unit
MATERIAL
1 Girder clamp hock 5/8" (16 mm) with
M.S plate 1" x " (25 x 6 mm)
2 Nut & bolts " (12 mm) 1" (40 mm) long
1.00 No.
2.00 Nos.
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 30 Nos.)
1 Electrician
2 Cooly (helper)
1.00 No.
0.50 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 214
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 46
Detail
Rate
Per Unit
MATERIAL
5.00
(11.00
1.00
3.00
1.00
kg
lbs)
kg
No.
No.
per kg
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 30 Nos.)
1 Electrician
2 Cooly (helper)
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 215
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 47
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1 Steel channel 75 x 40 x 3 mm
1.5 R/m @ 6.90 Kg/R/m
2 Hook 5/8" (16 mm) with nut & bolts
3 Clamp
4 Cement
5 Sand
10.35 kg
10.35
1.00
1.00
0.042
0.12
kg
No.
No.
Cft.
Cft.
per kg
each
each
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 28 Nos.)
1 Electrician
2 Cooly (helper)
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 216
Say
Say
DESCRIPTION OF ITEM:
Item No. 48
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1 Iron plate 3"x1"x" (0.862x40x12mm)
6.96 lbs
3.16 kg
3.16
1.00
0.063
0.18
kg
No.
Cft.
Cft.
per kg
each
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 21 Nos.)
1 Electrician
2 Cooly (helper)
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 217
Say
Say
DESCRIPTION OF ITEM:
Item No. 49
Supply and erection of 3/8" (10 mm) dia M.S bar fan hook placed at
casting of slab.
Detail
Rate
Per Unit
MATERIAL
1 M.S bar hook 3/8" (!0 mm) dia
1.00 No.
each
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 39 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 218
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 50
Detail
Rate
Per Unit
MATERIAL
1 Cement concrete 1:3:6 (1.22x.300x1.0) 0.3714 Cum
0.3714 Cum
Per Cum
0.3714 Cum
0.3714 Cum
Cum
Cum
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Cement concrete 1 : 3 : 6
2 Excavation of foundatin
3 Erection of pole in position
Plumber
Helper
4 Extra labour for shuttering
0.50 No.
2.00 Nos.
L.S
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 219
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of bracket of M.S channel 75 x 40 x 6 mm (3"x1
section:
Item No. 51
(i)
Detail
Rate
Per Unit
MATERIAL
1 Steel channel (25 x 13 x 6 mm)
0.600 @ 5.22 Kg
Steel plate (75 x 20 x 20 mm)
3.18 Kg
0.79 Kg
3.97 Kg
3.97 Kg
2.00 Nos.
per kg
each
1.00 No.
0.25 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 7 Nos.)
1 Black Smith
2 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 220
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of bracket of M.S channel 75 x 40 x 6 mm (3"x1
section:
Item No. 51
(ii)
Detail
Rate
Per Unit
MATERIAL
1 Steel channel 75 x 13 x 6 mm
1.322 m @ 5.22 Kg/Rm
Iron plate 75 x 20 x 6 mm
6.35 Kg
0.80 Kg
7.15 Kg
7.15 Kg
2.00 Nos.
1 job
per kg
each
per job
1.00 No.
0.25 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Black Smith
2 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 221
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 52
Supply and erection of anchor rod Henley type for pole, including
clamps and 7/12" stay wire, straining screws, etc., erected in cem
1 : 3 : 6 and collar of cement concrete.
Detail
Rate
Per Unit
Amount (Rs.)
10.00
1.00
1.00
1.00
0.064
0.16
0.322
Total
Contractor's Profit & O ## Percent
Total
Material per metre
235.40 1
metre
No.
No.
No.
Cft.
Cft.
per mtr.
each
each
each
P. Bag
Per % Cft.
P. Cft.
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 222
DESCRIPTION OF ITEM:
Item No. 53
Supply and erection of stay for house service pipe, erected with s
screws and 7/14" stay wire, complete.
Detail
Rate
Per Unit
Amount (Rs.)
5.00
1.00
1.00
1.00
1.00
0.064
0.16
0.322
Total
Contractor's Profit & O ## Percent
Total
Material per metre
129.80 5
metre
No.
No.
No.
No.
Cft.
Cft.
per mtr.
each
each
each
each
P. Bag
Per % Cft.
P. Cft.
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 223
DESCRIPTION OF ITEM:
Item No. 54
Supply and erection of house service pipe Henley (G.I pipe water q
pole, type, 50 mm (2" dia) erected to install insulated overhead l
shackle insulator for holding insulated wire and straining devices
wire and other accessories, etc., complete.
Detail
Rate
Per Unit
Amount (Rs.)
4.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
0.064
0.16
0.322
metre
No.
No.
No.
No.
Nos.
No.
No.
Cft.
Cft.
per mtr.
each
each
each
each
each
each
each
P. Bag
Per % Cft.
P. Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 224
DESCRIPTION OF ITEM:
Item No. 55
Supply and erection of house service pipe 50 mm (2" dia) G.I pipe
pole type, for bare copper wire overhead line, including shackle i
straining devices and other accessories, etc.
Detail
Rate
Per Unit
Amount (Rs.)
4.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
0.042
0.12
metre
No.
No.
No.
No.
Nos.
No.
No.
Cft.
Cft.
per mtr.
each
each
each
each
each
each
each
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 225
DESCRIPTION OF ITEM:
Item No. 56
Detail
Rate
Per Unit
MATERIAL
1 Lightening arrestor
1.00 No.
each
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 5 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 226
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 57
Detail
Rate
Per Unit
MATERIAL
1 Shackle insulator (medium size)
1.00 No.
each
0.33 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 7 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 227
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 58
Detail
Rate
Per Unit
MATERIAL
1 Pin insulator green (medium size)
1.00 No.
each
0.33 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 7 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 228
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 59
Detail
Rate
Per Unit
MATERIAL
13.61
(30.00
1.00
0.454
kg
lbs)
lbs
kg
per kg
per kg
0.00
1.00 No.
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Kg
Composite rate per Kg
Rs.
Rs.
Page 229
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of G.I wire of all sizes, including binding wi
for support of rubber wire or earthing wire, pole to pole, etc.
Item No. 60
Detail
Rate
Per Unit
MATERIAL
13.61
(30.00
(1.00
0.454
Total
Contractor's Profit & O ## Percent
Total
Material cost per Kg
418.20 1
LABOUR (For 90 Lbs)
kg
lbs)
lbs)
kg
per kg
per kg
0.00
40.83 Kg
1 Electrician
1.00 No.
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Kg
Composite rate per Kg
Rs.
Rs.
Page 230
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Wiring overhead line in 2 single core, PVC/weather proof cable, on
No.8 SWG bearer wire and in house service pipe, including connecti
through joint box:
Item No. 61
(i)
3/0.74 mm (3/0.029")
Detail
Rate
Per Unit
47.00
25.00
1.81
(4.00
2.00
metre
Nos.
kg
lbs)
Nos.
per mtr.
each
kg
each
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 231
Amount (Rs.)
DESCRIPTION OF ITEM:
Wiring overhead line in 2 single core, PVC/weather proof cable, on
No.8 SWG bearer wire and in house service pipe, including connecti
through joint box:
Item No. 61
(ii)
7/0.74 mm (7/0.029")
Detail
Rate
Per Unit
47.00
1.81
(4.00
2.00
2.00
1.00
25.00
metre
kg
lbs)
Nos.
Nos.
No.
Nos.
per mtr.
kg
each
each
each
each
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 232
Amount (Rs.)
DESCRIPTION OF ITEM:
Wiring overhead line in 2 single core, PVC/weather proof cable, on
No.8 SWG bearer wire and in house service pipe, including connecti
through joint box:
Item No. 61
(iii)
7/0.91 mm (7/0.036")
Detail
Rate
Per Unit
47.00
1.81
(4.00
2.00
2.00
1.00
25.00
metre
kg
lbs)
Nos.
Nos.
No.
Nos.
per mtr.
kg
each
each
each
each
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 233
Amount (Rs.)
DESCRIPTION OF ITEM:
Wiring overhead line in 2 single core, PVC/weather proof cable, on
No.8 SWG bearer wire and in house service pipe, including connecti
through joint box:
Item No. 61
(iv)
7/1.12 mm (7/0.044")
Detail
Rate
Per Unit
47.00
1.81
(4.00
2.00
2.00
1.00
25.00
metre
kg
lbs)
Nos.
Nos.
No.
Nos.
per mtr.
kg
each
each
each
each
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 234
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 62
Supply and erection of all aluminium stranded hard drawn bare cond
size 7/3.099 mm (7/0.122").
Detail
Rate
Per Unit
MATERIAL
1 Aluminium stranded hard drawn bare
conductor 7/3.099 mm (7/0.122")
1.00 No.
each
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 26 Metre)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 235
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 63
Detail
Rate
Per Unit
MATERIAL
1 G.I. Pipe 1" dia (32 mm) 7 ft. (2.13 metre)
2 Cost of clamp
2.13 metre
2.00 Nos.
per mtr.
each
1.00 No.
1.00 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Metre)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 236
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of pole mounted street light, holders, shade a
etc., for fitting 125/250 watts mercury vapour lamp (excluding cos
Item No. 64
(i)
G.E.C design
Detail
Rate
Per Unit
MATERIAL
1 Pole street with holder shade and glass
for mercury vapour lamp 125/250 complete
2 Bracket
3 Clamps with bolts & nuts etc.
1.00 No.
1.00 No.
2.00 Nos.
each
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly (helper)
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 237
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of pole mounted street light, holders, shade a
etc., for fitting 125/250 watts mercury vapour lamp (excluding cos
Item No. 64
(ii)
Phillips design
Detail
Rate
Per Unit
MATERIAL
1 Cost of fitting complete with holder
shade and glass
2 Cost of bracket 1" (32 mm) G.I pipe
7 ft. long half round
3 Cost of pole clamp with bolt & nuts
1.00 No.
each
1.00 No.
2.00 Nos.
each
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly (helper)
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 238
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and fitting of mercury vapour lamp, complete with choke set
Item No. 65
(i)
Detail
Rate
Per Unit
MATERIAL
1 Vapour mercury lamp 125 watt
with choke set 649 + 330
979.00
1.00 Nos.
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Cooly (helper)
1.00 No.
0.50 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 239
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and fitting of mercury vapour lamp, complete with choke set
Item No. 65
(ii)
Detail
Rate
Per Unit
MATERIAL
1 Vapour mercury lamp 250 watt
with choke set 2558 + 100
3658
1.00 Nos.
each
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 5 Nos.)
1 Electrician
2 Cooly (helper)
1.00 No.
0.50 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 240
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 66
Detail
Rate
Per Unit
MATERIAL
1 Angle iron 1"x1"x3/16" (32x32x4 mm)
Legs 4x10923 mm = 43692mm = 143.35 ft.
210.72 lbs
57.54 lbs
12.13 lbs
280.39 lbs
Page 241
127.22 kg
per kg
8.26 kg
per kg
10.25 kg
0.25 gallon
per kg
per gln.
15.06 Cft.
per Cft
0.07 Cft.
per Cft
Amount (Rs.)
Detail
Rate
Per Unit
LABOUR
1 Black Smith
Cooly (helper)
2 Welding charges
No. of weld 2(72+12+16) = 200 Nos.
3 Drilling hole
Painter
4 Excavation 500x500x1576 mm = 394000000
or 13.91 Cft (Item 4b Chap. 3)
5 Concrete 1:2:4
Foundation 500x500x1728 mm = 432000000
15.06 Cft (Item 5f Chap. 6)
6 Pre cast cement concrete 1:2:4
2x100x100x100 = 2000000 mm or 0.07 Cft
(Item 10 Chap. 6)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
1.50 Nos.
3.00 Nos.
per day
per day
200.00 Nos.
20.00 Nos.
0.25 No.
each
each
per day
13.91 Cum
per Cft
15.06 Cum
per Cft
0.07 Cum
per Cft
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 242
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 67
Detail
Rate
Per Unit
MATERIAL
1 Angle iron 50x50x4mm (lattice steel)
Legs 4x30 ft.
=
120 ft.
Studs 4x7 = 28 = 148 ft. 1.96 lbs/Rft290.08 lbs
131.62 kg
131.62 kg
2 Angle Iron 1 3/8 x 1 3/8 3 x 1/8
Braces 4x16x2.75 = 176 ft.
@ 1.55 lbs/ft. = 272.8 lbs =
123.77 kg
123.77 kg
3 M.S plate 5/32" thick
13"x13"x5/32"
= 0.017 Cft
@ 493 lbs/Cft = 8.38 lbs
3.80 kg
3.80 kg
4 Silver paint 0.25 gallon
5 Cement concrete 1:3:6
(3.5 x 3.5 x 0.5)
(1 x 3.5 x 6.5)
(1 x 1.5 x 6.5)
0.25 gallon
=
=
=
6.13 Cft
22.75 Cft
9.75 Cft
38.63 Cft
Total
Contractor's Profit & O ## Percent
Total
Page 243
38.63 Cum
per kg
per kg
per kg
per gln.
per Cum
Amount (Rs.)
Detail
Rate
Per Unit
LABOUR
1 Black Smith
2 Cooly (helper)
3 Welding charges (No. of weld)
Bacing 64 x 2 =
T/plate 1 x 4
=
1.50 Nos.
3.00 Nos.
per day
per day
128 Nos.
4 Nos.
132 Nos.
132.00 Nos.
8.00 Nos.
0.25 No.
per weld
per hole
per day
91.88 Cft
per Cft
38.630 Cft
per Cft
14.630 Cft
per Cft
(Item 3a Chap. 6)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 244
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Earthing of iron clad/aluminium switches, etc., with G.I wire No.8
pipe 15 mm (" dia) recessed or on surface of wall and floor, comp
1.5 metre long G.I pipe, 50 mm (2" dia) with reducing socket 4 to
below ground level, and 2 metre away from building plinth.
Item No. 68
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1 Boring
2 G.I pipe " (12 mm) (medium quality)
3
4
5
6
7
8
(2 lbs)
(medium quality)
size 2 x " (50 x 13 mm)
10.00
8.00
0.907
(2.00
1.50
1.00
4.00
0.063
0.18
metre
metre
kg
lbs)
metre
No.
No.
Cft.
Cft.
per mtr.
per mtr.
kg
per mtr.
each
each
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 245
Say
Say
DESCRIPTION OF ITEM:
Earthing of Metallic cases, etc., with G.I wire No.8 SWG, in 15 mm
pipe, best quality:
Item No. 69
(i)
Detail
Rate
Per Unit
7.00
0.454
(1.00
6.00
1.00
10.00
10.00
1.00
metre
kg
lbs)
Nos.
No.
Nos.
Nos.
No.
per mtr.
per kg
each
each
per doz.
each
each
0.00
1.00 No.
1.00 No.
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 246
Amount (Rs.)
DESCRIPTION OF ITEM:
Earthing of Metallic cases, etc., with G.I wire No.8 SWG, in 15 mm
pipe, best quality:
Item No. 69
(ii)
Detail
Rate
Per Unit
Amount (Rs.)
7.00
0.454
(1.00
1.00
6.00
1.00
0.063
0.18
metre
kg
lbs)
No.
Nos.
Nos.
Cft.
Cft.
per mtr.
kg
each
each
each
P. Bag
Per % Cft.
0.00
1.00 No.
2.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 247
DESCRIPTION OF ITEM:
Bonding to earth with wire on surface, including cost of wire,
clamps, thimbles, etc.
Item No. 70
G.I wire:
(a)
(i)
8 SWG
Detail
Rate
Per Unit
Amount (Rs.)
0.68
(1.50
1.00
1.00
1.00
0.042
0.12
kg
lbs)
No.
No.
No.
Cft.
Cft.
per kg
each
each
each
P. Bag
Per % Cft.
0.00
1.00 No.
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 248
DESCRIPTION OF ITEM:
Bonding to earth with wire on surface, including cost of wire,
clamps, thimbles, etc.
Item No. 70
G.I wire:
(a)
(ii)
16 SWG
Detail
Rate
Per Unit
Amount (Rs.)
(40 x 6 mm)
0.112
1.00
1.00
0.011
0.03
kg
No.
No.
Cft.
Cft.
per kg
each
each
P. Bag
Per % Cft.
Total
Contractor's Profit & O ## Percent
Total
Material per Metre
LABOUR (For 50 Metre)
1 Electrician
1.00 No.
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 249
DESCRIPTION OF ITEM:
Bonding to earth with wire on surface, including cost of wire,
clamps, thimbles, etc.
Item No. 70
Copper wire:
(b)
(i)
16 SWG
Detail
Rate
Per Unit
Amount (Rs.)
0.133
1.00
1.00
0.011
0.03
(40 x 6 mm)
Total
Contractor's Profit & O ## Percent
Total
Material per Metre
28.56
kg
No.
No.
Cft.
Cft.
per kg
each
each
P. Bag
Per % Cft.
0.00
1.00 No.
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 250
DESCRIPTION OF ITEM:
Bonding to earth with wire on surface, including cost of wire,
clamps, thimbles, etc.
Item No. 70
Copper wire:
(b)
(ii)
20 SWG
Detail
Rate
Per Unit
Amount (Rs.)
0.035
1.00
1.00
0.011
0.03
kg
Nos.
Nos.
Cft.
Cft.
per kg
each
each
P. Bag
Per % Cft.
0.00
1.00 No.
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 251
DESCRIPTION OF ITEM:
Item No. 71
Detail
Rate
Per Unit
Amount (Rs.)
Gutties
Copper nail
Copper stapple
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per Metre
44.00
8.00
8.00
4.00
0.021
0.06
Nos.
Nos.
Nos.
Cft.
Cft.
per doz.
each
each
P. Bag
Per % Cft.
0.00
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 252
DESCRIPTION OF ITEM:
Item No. 72
Detail
Rate
Per Unit
MATERIAL
9.98
(22.00
36.30
(80.00
18.15
(40.00
2 Char coal
3 Salt
kg
lbs)
kg
lbs)
kg
lbs)
per kg
per kg
per kg
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Metre)
1 Electrician
2 Cooly (helper)
1.00 No.
2.00 Nos.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 253
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper tape, including copper staple copper
cement, sand, etc.
Item No. 73
(i)
Detail
Rate
Per Unit
MATERIAL
1 Copper tap 1"x1/8"
= 1 metre
1 metre = 0.004 Cft @ 550 lbs/Cft
2 Gutties
3 Copper nail
4 Copper staple
2.2 lbs
1.00
(2.20
1.00
1.00
1.00
kg
lbs)
No.
No.
No.
per kg
per doz.
each
each
1.00 No.
2.00 Nos.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 25 Metre)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 254
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of copper tape, including copper staple copper
cement, sand, etc.
Item No. 73
(ii)
Detail
Rate
Per Unit
MATERIAL
1 Copper tap 2"x1/8"
= 1 metre
1 metre = 0.005 Cft @ 550 lbs/Cft
2 Copper nail
3 Copper staple
4 Gutties
2.7 lbs
1.22
(2.27
1.00
1.00
1.00
kg
lbs)
No.
No.
No.
per kg
each
each
per doz.
1.00 No.
2.00 Nos.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 25 Metre)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Rft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 255
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 74
Detail
Rate
Per Unit
MATERIAL
Copper
with 5
1 Weight
2 weight
3 weight
(13.90 lbs)
6.30 kg
per kg
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly (helper)
1.00 No.
1.00 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each Job
Composite rate for Each Job
Rs.
Rs.
Page 256
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of electric energy metre, including metre test
Item No. 75
Single phase:
(a)
(i)
Detail
Rate
Per Unit
MATERIAL
1 Energy metre 10 Amp. Single phase 250 Volts
2 Testing Fee
1.00 No.
L.S
each
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 257
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of electric energy metre, including metre test
Item No. 75
Single phase:
(a)
(ii)
Detail
Rate
Per Unit
MATERIAL
1 Energy metre 30 Amp. Single phase 250 Volts
2 Testing Fee
1.00 No.
L.S
each
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 258
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of electric energy metre, including metre test
Item No. 75
(b)
(i)
Detail
Rate
Per Unit
MATERIAL
1 Energy metre 3 x 15 Amp. Three phase 400 Volts
2 Testing Fee
1.00 No.
L.S
each
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 259
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of electric energy metre, including metre test
Item No. 75
(b)
(ii)
Detail
Rate
Per Unit
MATERIAL
1 Energy metre 3 x 50 Amp. Three phase 400 Volts
2 Testing Fee
1.00 No.
L.S
each
1.00 No.
0.50 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 260
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Supply and erection of electric energy metre, including metre test
Item No. 75
(b)
(iii)
Detail
Rate
Per Unit
MATERIAL
1 Energy metre 3 x 80 Amp. Three phase 400 Volts
2 Testing Fee
1.00 No.
L.S
each
1.00 No.
0.50 No.
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 261
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Rewinding of A.C ceiling fan, capacitor type, including cost of wi
paper cotton tape, soldering, etc.
Item No. 76
(i)
Detail
Rate
Per Unit
MATERIAL
1 Leatheride paper
L.S
1.02
2 Copper wire No.32 SWG - 26 SWG
(2.25
3 Soldring and vanishing hoop wire No.3
Job
4 Deduction cost of 2 lbs (1.02 kg) copper wire ol 2.25
1.02
kg
lbs)
lbs
kg
per kg
per kg
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Cooly (helper)
1.50 No.
0.50 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 262
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Rewinding of A.C ceiling fan, capacitor type, including cost of
wire, leatheride paper cotton tape, soldering, etc.
Item No. 76
(ii)
Detail
Rate
Per Unit
MATERIAL
1 Leatheride paper and cotten tape
2
3
4
5
Job
1.13
(2.50
1.00
4.00
2.50
1.13
kg
lbs)
No.
ft.
lbs
kg
per kg
each
per Rft
per kg
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Cooly (helper)
1.50 No.
0.75 No.
per day
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 263
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Rewinding of A.C exhaust fan, including cost of wire,
leatheride paper, cotton tape, soldering, etc.
Item No. 77
(i)
Detail
Rate
Per Unit
MATERIAL
1 Leatheride paper and cotten tape
Job
0.68
(1.50
Job
1.50
0.68
kg
lbs)
lbs
kg
per kg
per kg
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
1.00 No.
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 264
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Rewinding of A.C exhaust fan, including cost of wire,
leatheride paper, cotton tape, soldering, etc.
Item No. 77
(ii)
Detail
Rate
Per Unit
MATERIAL
1 Leatheride paper and cotten tape
2
3
4
5
Job
0.79
(1.75
Job
4.00
1.75
0.79
kg
lbs)
per kg
ft.
lbs
kg
per ft.
per kg
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 265
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 78
Detail
Rate
Per Unit
MATERIAL
1 Leatheride paper and cotten tape
Job
0.91
(2.00
Job
(2.00
0.91
kg
lbs)
lbs)
kg
per kg
per lbs
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 5 Nos.)
1 Electrician
2.00 No.
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 266
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 79
Detail
Rate
Per Unit
MATERIAL
1 Knob with shaff and plate
1.00 No.
each
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 16 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 267
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 80
Detail
Rate
Per Unit
MATERIAL
1 Capacitor 2.2 uf
1.00 No.
each
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 20 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 268
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 81
Supply and fitting of ball bearing of size 6201, 6202 or 6203, for
Detail
Rate
Per Unit
MATERIAL
1 Ball bearing size (6201, 6202 or 6203)
1.00 No.
each
1.00 No.
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 16 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 269
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 82
Detail
Rate
Per Unit
MATERIAL
1 Enamel copper wire No.26 SWG to 32 SWG
2 Leathoride paper, cotten tape and vinishing
3 Deduct cost of old material
0.18
(0.403
L.S
(0.403
0.18
kg
lbs)
lbs)
kg
kg
per kg
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 8 Nos.)
1 Electrician
1.00 No.
per day
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 270
Say
Say
Amount (Rs.)
DESCRIPTION OF ITEM:
Item No. 83
Detail
Rate
Per Unit
MATERIAL
1 PVC wire 3/0.029"
2.00 metre
per mtr.
L.S
8.00 Nos.
1.00 No.
1.00 No.
each
per day
per day
Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 10 Nos.)
1
2
3
4
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 271
Say
Say
Amount (Rs.)
LIST EQUIPMENT
S. No.
EQ-01
EQ-02
EQ-03
EQ-04
EQ-05
EQ-06
EQ-07
EQ-08
EQ-09
EQ-10
EQ-11
EQ-12
EQ-13
EQ-14
EQ-15
EQ-16
EQ-17
EQ-18
EQ-19
EQ-20
EQ-21
EQ-22
EQ-23
EQ-24
EQ-25
EQ-26
EQ-27
EQ-28
EQ-29
EQ-30
EQ-31
EQ-32
EQ-33
EQ-34
EQ-35
EQ-36
EQ-37
EQ-38
EQ-39
EQ-40
EQ-41
EQ-42
EQ-43
EQ-44
EQ-45
EQ-46
EQ-47
EQ-48
EQ-49
EQ-50
EQ-51
EQ-52
EQ-53
EQ-54
NAME OF MACHINERY
Bull Dozer D-6 (16 Ton)
Motor Grader
Wheel Loader (15 Ton)
Rental Charges of equipment for desilting
3 Wheel Roller (10-15 Ton)
Pneumatic Tyre Roller (8-13 Ton)
Tandum/Road Roller (8-12 Ton)
Vibratory Roller (8 Ton)
Asphalt Plant (45-46 Ton)
Asphalt Finishers (Paver)
Electric Power Plant (Generator) (100 KW)
Truck 2-Axle (Local) (10 Ton)
Truck 3-Axle (Local) (15 Ton)
Truck 3-Axle (Imported) (15-18 Ton)
Dumper Truck (Imported) (15 Ton)
Water Lorry (Local)
Donkey
Wheel Tractor with Plough
Wheel Tractor with Trolley
Wheel Tractor with Sheep foot Roller
Wheel Tractor with Water Tank
Wheel Tractor with Blade
Concrete Mixer
Concrete Mixer
Concrete Vibrator
Plate Compactor
Tar Boiler
Cost of lifting machinery including carriage
Cost of trollies
Road Roller
Hire charges for a cart having a capacity of about 20 Cft/one ton
Hire charges of Rig
Hire charges of truck (5 ton - 10 tons) excluding POL but including crew
Hire Charges of testing apparatus
Reg Pump
Cost of pump set 6"x5" with 15 HP Diesel Engine
Generator set light
Pumping for out water 0-1' to 0-8'
Pumping for out water 0-9' to 0-12'
Pumping Machinery Boring 0-1' to 0-8'
Pumping Machinery Boring 0-9' to 0-12'
Pump charges for pumping out water from 0-1' to 0-8' depth
Pump charages for pumping out water from 0-9' to 0-12' depth
Hire Charges of Assembling Machine for A.C. Pipe 3" to 6"
Hire Charges of Assembling Machine for A.C. Pipe 8" to 10"
Hire Charges of Assembling Machine for A.C. Pipe 12" to 18"
Hire Charges of Assembling Machine for A.C. Pipe 20" to 24"
Disposal of Pumped Out Water upto 100' distance for 1' depth
Disposal of Pumped Out Water upto 100' distance upto 3' depth
Disposal of Pumped Out Water upto 100' distance upto 5' depth
Disposal of Pumped Out Water upto 100' distance upto 6' depth
Disposal of Pumped Out Water upto 100' distance upto 7' to 12' depth
Cost of Bulldozer-D6
Cost of Motor Grader
Page 1
CAPACITY
Per Hour
Per Hour
Per Hour
Per Day
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Each
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
2 Bag
1 Bag
Per Hour
Per Hour
Per Hour
Each
Each
Per Day
Per Day
Per Hour
Per Day
Per Day
Per Hour
Each
Per Hour
Per Hour
Per Hour
Per Day
Per Day
Per Hour
Per Hour
---------140 HP
135 HP
COST
LIST EQUIPMENT
S. No.
EQ-55
EQ-56
EQ-57
EQ-58
EQ-59
EQ-60
EQ-61
EQ-62
EQ-63
EQ-64
EQ-65
EQ-66
EQ-67
EQ-68
EQ-69
EQ-70
EQ-71
EQ-72
EQ-73
EQ-74
EQ-75
EQ-76
EQ-77
NAME OF MACHINERY
Cost Wheel Loader
Cost of 3 wheel-Static Roller (local)
Cost of Pneumatic Roller
Cost of Tandem Roller
Cost of Vibratory Roller
Cost of Asphalt Plant
Cost of Asphalt Paver
Cost of Electric power Generator
Cost of Truck-2axle (local)
Cost of Truck-3axle (local)
Cost of Truck-3axle (imported)
Cost of Dump truck
Cost of Water lorry (local)
Cost of Wheel Tractor with Plough
Cost of Wheel Tractor with Trolley
Cost of Wheel Tractor with Sheep foot roller
Cost of Wheel Tractor with Water Tank
Cost of Wheel Tractor with Blade
Cost of Concrete Mixer
Cost of Concrete Mixer
Cost of Concrete vibrator
Cost of Plate Compactor
Cost of Tar Boiler
Page 2
CAPACITY
100 HP
10-12 Ton
8-13 Ton
8-12 Ton
8-Ton
45-46 Ton.
145 HP
100 KW
10 Ton
15-18 Ton
18 Ton
18.0 Ton
------2 bags
1 bag
--1000Ltr.
COST
CHAPTER NO. 10
FLOORING
i)
ii)
Rates for all finished works include the removal of surplus debris, unused
material and by products.
For handling of all types of material for short lead including carriage upto
3 chains (90m) nothing is to be paid as extra. Where handling and carriage
involves an extra lead beyond 3 chains, (90m) carriage for whole of the distance
should be paid
DESCRIPTION OF ITEM
Laying Muram flooring consisting of 1" (25m) layer of fine powdery or flakey variety of M
laid over 6" (150mm) good hard layer of Muram spreaded over 9" (225mm) thick sub base
comprising of hand packed rubble or broken bricks properly watered and rammed provided
over well rammed earth
Detail
Qty
MATERIAL
1
2
3
80.00
55.00
9.00
Cft
Cft
Cft.
0.50
3.00
0.5
No.
Nos.
No.
0.00
0.00
0.00
per day
per day
Per day
0.00
-
Say
Say
Say
Say
0.00
0.00
0.00
0.00
LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 1
DESCRIPTION OF ITEM
2
Detail
Qty
MATERIAL
Earth (Loose measured)
Contractor's Profit & Ove ## Percent
Total
50.00
Cft
0.125
1.00
0.25
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Coolly
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
Per day
Per day
Pay day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 2
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
3
Providing, laying, watering and ramming brick ballast 1" - 2" gauge mixed with
25% sand, for floor foundation, complete in all respects.
Detail
Qty
MATERIAL
1
2
Brick Ballast
Sand
Total
Contractor's Profit & Ove ## Percent
Total
100.00
25.00
Cft
Cft
3.10
0.10
No.
No.
0.00
0.00
0.00
0.00
LABOUR
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
per day
Per day
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate per 100 Cft.
Composite Rate per Cum.
Rs.
Rs.
Rs.
Rs.
Page 3
Say
Say
Say
Say
0.00
0.00
0.00
0.00
Mud Flooring
DESCRIPTION OF ITEM
Mud flooring consisting of 6" thick consolidated layer of moistured earth and
finished off with 1" mud plaster and gobri leeping.
Detail
Qty
MATERIAL
1
2
3
4
5
0.00Per
0.00Per
0.00
0.00Per
0.00Per
100
100
Kg.
100
100
Cft
Cft
Cft
Kg.
LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
0.25
2.00
0.25
No.
No.
No.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 4
Say
Say
Say
Say
0.00
0.00
0.00
0.00
Brick Flooring
DESCRIPTION OF ITEM
Dry brick paving laid flat, sand grouted including preparation of bed by watering, rammin
bringing the same to proper camber by " mud plaster
Detail
Qty
MATERIAL
1
2
3
Brick 9"
Sand
" Mud Plaster (Good earth)
Total
Contractor's Profit & Ove ## Percent
Total
350
5
6
Nos.
Cft.
Cft.
0.00Per 1000 No
0.00Per 100 Cft
0.00Per 100 Cft
No.
No.
No.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
Say
Say
Say
Say
0.00
0.00
0.00
0.00
0.50
1.00
0.05
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 5
DESCRIPTION OF ITEM
6
Dry brick on edge paving sand grouted including preparation of bed by watering,
ramming and bringing the same to proper camber by thick mud plaster
Detail
Qty
MATERIAL
1
2
2
525
6
6
Nos.
Cft.
Cft.
No.
No.
No.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
Say
Say
Say
Say
0.00
0.00
0.00
0.00
LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
0.67
1.50
0.08
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 6
DESCRIPTION OF ITEM
7
Grouting 4"
Detail
Qty
MATERIAL
1
2
Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total
0.70
4.50
Bag
Cft.
0.50
0.50
0.50
No.
No.
No.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
Say
Say
Say
Say
0.00
0.00
0.00
0.00
Rs.
Rs.
Rs.
Rs.
Page 7
DESCRIPTION OF ITEM
8
Flat brick flooring laid in 1:6 cement mortar over a bed of /4" thick cement mortar 1:6
Detail
Qty
MATERIAL
1
2
3
4
5
350
0.50
0.80
4.00
6.00
Nos.
Bag
Bag
Cft.
Cft.
0.00Per 1000 No
0.00 Per Bag
0.00 Per Bag
0.00Per 100 Cft
0.00Per 100 Cft
0.75
1.50
0.50
No.
No.
No.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
Say
Say
Say
Say
0.00
0.00
0.00
0.00
Rs.
Rs.
Rs.
Rs.
Page 8
DESCRIPTION OF ITEM
9
Brick on edge flooring laid in 1:6 cement mortar over a bed of 3/4" thick cement mortar (
Detail
Qty
MATERIAL
1
2
3
4
5
525
0.85
0.88
7.00
6.00
Nos.
Bag
Bag
Cft.
Cft.
0.00Per 1000 No
0.00 Per Bag
0.00 Per Bag
0.00Per 100 Cft
0.00Per 100 Cft
1.00
2.00
0.50
No.
No.
No.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
Say
Say
Say
Say
0.00
0.00
0.00
0.00
Rs.
Rs.
Rs.
Rs.
Page 9
DESCRIPTION OF ITEM
10
Brick tiles (12"x6"x2") laid in (1:6) cement mortar, over a bed of 3/4" thick cement mort
Detail
Qty
MATERIAL
1
2
4
Tiles 12"x6"x2"
Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total
210
1.10
8.00
Nos.
Bag
Cft.
0.00Per 1000 No
0.00
Bag
0.00Per 100 Cft
0.75
1.50
0.50
No.
No.
No.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
Say
Say
Say
Say
0.00
0.00
0.00
0.00
LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 10
DESCRIPTION OF ITEM
11
Brick tiles (9" x 4" x 1") laid flat in 1:3 cement mortar over a bed of 3/4" thick ceme
Detail
Qty
MATERIAL
1
2
4
Tiles 9"x4"x1"
Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total
350
1.40
12.00
Nos.
Bag
Cft.
0.00Per 1000 No
0.00
Bag
0.00Per 100 Cft
No.
No.
No.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
Say
Say
Say
Say
0.00
0.00
0.00
0.00
LABOUR
Mason
Coolies (Unskilled)
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
1.00
1.50
0.50
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 11
DESCRIPTION OF ITEM
12
Cement tiles (8"x8"x") laid fiat in 1:2 cement mortar over 3/4" thick bed of cement mort
Detail
Qty
MATERIAL
1
2
4
240
1.87
4.70
Nos.
Bags
Cft.
1.25
2.00
0.34
No.
No.
No.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
Say
Say
Say
Say
0.00
0.00
0.00
0.00
Rs.
Rs.
Rs.
Rs.
Page 12
DESCRIPTION OF ITEM
13
Cement concrete tiles laid in 1:2 cement mortar over 3/4" thick bed of cement mortar 1:2
a)
Detail
Qty
MATERIAL
1
2
4
105
1.85
4.67
Nos
Bags
Cft.
0.00
Each
0.00 Per Bag
0.00Per 100 Cft
1.25
2.00
0.34
No.
No.
No.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
Say
Say
Say
Say
0.00
0.00
0.00
0.00
Rs.
Rs.
Rs.
Rs.
Page 13
b)
Detail
Qty
MATERIAL
1
2
4
186
1.86
4.67
Nos
Bags
Cft.
0.00
Each
0.00 Per Bag
0.00Per 100 Cft
1.25
2.00
0.34
No.
No.
No.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
Say
Say
Say
Say
0.00
0.00
0.00
0.00
Rs.
Rs.
Rs.
Rs.
Page 14
c)
Detail
Qty
MATERIAL
1
2
4
420
1.90
4.74
Nos
Bags
Cft.
0.00
Each
0.00 Per Bag
0.00Per 100 Cft
1.25
2.00
0.34
No.
No.
No.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
Say
Say
Say
Say
0.00
0.00
0.00
0.00
Rs.
Rs.
Rs.
Rs.
Page 15
DESCRIPTION OF ITEM
14
Coloured cement tiles (8"x8"3/4") of approved dark shade laid flat in 1:2 cement
mortar over 3/4" bedding mortar of 1:2
Detail
Qty
MATERIAL
1
2
3
4
Tiles
240
Each
Cement
1.87
Bag
Sand
4.70
Cft.
Pigment
0.67 Lbs (0.30 Kg
Total
Contractor's Profit & Ove ## Percent
Total
0.00
Each
0.00 Per Bag
0.00Per 100 Cft
0.00 Per Kg.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
Say
Say
Say
Say
0.00
0.00
0.00
0.00
1.25
2.00
0.34
No.
No.
No.
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 16
DESCRIPTION OF ITEM
15
Detail
Qty
MATERIAL
1
2
3
4
Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total
1.50
3.70
7.40
0.034
Bags
Cft.
Cft.
Cft.
1.00
0.50
0.10
0.25
No.
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Coolies
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
Per
Per
Per
Per
day
day
day
day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 17
Say
Say
Say
Say
0.00
0.00
0.00
0.00
b)
Detail
Qty
MATERIAL
1
2
3
4
Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total
1.85
4.60
9.20
0.034
Bags
Cft.
Cft.
Cft.
1.00
0.50
0.10
0.25
No.
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Coolies
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
Per
Per
Per
Per
day
day
day
day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 18
Say
Say
Say
Say
0.00
0.00
0.00
0.00
c)
Detail
Qty
MATERIAL
1
2
3
4
Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total
2.20
5.50
11.00
0.034
Bags
Cft.
Cft.
Cft.
1.00
1.00
0.15
0.25
No.
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Cooly (Unskilled)
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
Per
Per
Per
Per
day
day
day
day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 19
Say
Say
Say
Say
0.00
0.00
0.00
0.00
d)
Detail
Qty
MATERIAL
1
2
3
4
Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total
2.55
6.50
12.80
0.040
Bags
Cft.
Cft.
Cft.
1.00
1.00
0.15
0.25
No.
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
Per
Per
Per
Per
day
day
day
day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 20
Say
Say
Say
Say
0.00
0.00
0.00
0.00
e)
Detail
Qty
MATERIAL
1
2
3
4
Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total
3.00
7.40
14.70
0.040
Bags
Cft.
Cft.
Cft.
1.00
1.50
0.20
0.25
No.
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
Per
Per
Per
Per
day
day
day
day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 21
Say
Say
Say
Say
0.00
0.00
0.00
0.00
f)
Detail
Qty
MATERIAL
1
2
3
4
Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total
3.30
8.40
16.50
0.046
Bags
Cft.
Cft.
Cft.
1.00
1.60
0.20
0.25
No.
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
Per
Per
Per
Per
day
day
day
day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 22
Say
Say
Say
Say
0.00
0.00
0.00
0.00
g)
Detail
Qty
MATERIAL
1
2
3
4
Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total
3.65
2.20
18.35
0.051
Bags
Cft.
Cft.
Cft.
1.00
2.00
0.25
0.25
No.
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
Per
Per
Per
Per
day
day
day
day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 23
Say
Say
Say
Say
0.00
0.00
0.00
0.00
h)
Detail
Qty
MATERIAL
1
2
3
4
Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total
4.00
10.00
20.20
0.051
Bags
Cft.
Cft.
Cft.
No.
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
1.00
2.00
0.25
0.25
Per
Per
Per
Per
day
day
day
day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 24
Say
Say
Say
Say
0.00
0.00
0.00
0.00
i)
Detail
Qty
MATERIAL
1
2
3
4
Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total
4.40
11.00
22.00
0.057
Bags
Cft.
Cft.
Cft.
No.
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
-
LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
1.00
2.00
0.25
0.25
Per
Per
Per
Per
day
day
day
day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 25
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
16
Providing and laying conglomerate flooring (two coat work) with top layer of " thick
wearing surface, consisting of one part of cement and two parts of stone chips passing
3/16" sieave, over bottom layer of cement concrete 1:3:6 including surface finishing and
dividing in panels:a)
Detail
Qty
MATERIAL
i)
1
2
Cement
Sand
ii)
1.25
3.00
Bags
Cft.
1.08
3.83
7.67
Bags
Cft.
Cft.
0.50
0.25
0.05
0.25
No.
No.
No.
No.
0.00
0.00
0.00
0.00
Per
Per
Per
Per
day
day
day
day
0.80
0.50
0.15
0.25
No.
No.
No.
No.
0.00
0.00
0.00
0.00
Per
Per
Per
Per
day
day
day
day
0.00
0.00
LABOUR
i)
ii)
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 26
Say
Say
Say
Say
0.00
0.00
0.00
0.00
b)
Detail
Qty
MATERIAL
i)
1
2
Cement
Sand
ii)
1.25
3.00
Bags
Cft.
1.35
4.06
8.12
Bags
Cft.
Cft.
0.50
0.25
0.05
0.25
No.
No.
No.
No.
0.00
0.00
0.00
0.00
Per
Per
Per
Per
day
day
day
day
0.80
0.50
0.15
0.25
No.
No.
No.
No.
0.00
0.00
0.00
0.00
Per
Per
Per
Per
day
day
day
day
0.00
0.00
LABOUR
i)
ii)
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 27
Say
Say
Say
Say
0.00
0.00
0.00
0.00
c)
Detail
Qty
MATERIAL
i)
1
2
Cement
Sand
ii)
1.25
3.00
Bags
Cft.
1.63
5.75
11.50
Bags
Cft.
Cft.
0.50
0.25
0.05
0.25
No.
No.
No.
No.
0.00
0.00
0.00
0.00
Per
Per
Per
Per
day
day
day
day
1.00
1.00
0.20
0.30
No.
No.
No.
No.
0.00
0.00
0.00
0.00
Per
Per
Per
Per
day
day
day
day
0.00
0.00
LABOUR
i)
ii)
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 28
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
17
Add extra in cement concrete floor topping, if finished with pigment and polishing
Detail
Qty
MATERIAL
1
Grey Cement for Finishing 1/16" Thick
0.40
Bags
2
Pigment
4.5 Lbs (2.04 Kg
3
Polish
0.5 Lbs (0.23 Kg.
Total
Contractor's Profit & Ove ## Percent
Total
0.00
0.00
0.00
Per Bag
Per Kg.
Per Kg.
0.00
0.00
Per day
Per day
0.00
0.00
0.50
0.50
No.
No.
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 29
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
18
Extra labour for each storey above ground floor for moasic, conglomerate, tiles
stone and wooden floor
Detail
Qty
LABOUR FOR 125 SFT.
Cooly for carriage of material
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
0.75
No.
0.00
Per day
ITEM RATE
Labour Rate per 100 Sft.
Labour Rate per Sqm.
Rs.
Rs.
0.00
-
Say
Say
0.00
0.00
DESCRIPTION OF ITEM
19
Flag stone flooring laid in lime mortar 1:2 over 3/4" bedding mortar in plat forms
and floors etc.
a)
Detail
Qty
MATERIAL
1
2
3
4
5
0.00
Each
0.00 Per Kg.
0.00Per 100 Cft
0.00 Per Kg.
0.00 Per Kg.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Coolies
Bahishti
Blacksmith
Bollow Man
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
2.50
3.00
0.12
0.10
0.10
No.
No.
No.
No.
No.
Per
Per
Per
Per
Per
day
day
day
day
day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 30
Say
Say
Say
Say
0.00
0.00
0.00
0.00
b)
Detail
Qty
MATERIAL
1
2
3
4
5
25.00
Nos.
1.42 Mds (53 Kg.)
5.00
Cft.
0.75
Kg.
1.81
Kg.
0.00
Each
0.00 Per Kg.
0.00Per 100 Cft
0.00 Per Kg.
0.00 Per Kg.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Cooly
Bahishti
Blacksmith
Bollow Man
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
2.50
3.00
0.12
0.10
0.10
No.
No.
No.
No.
No.
Per
Per
Per
Per
Per
day
day
day
day
day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 31
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
20
Asphalt flooring including preparation of proper base, remelting, setting out and
finishing complete
a)
Detail
Qty
MATERIAL
1
2
3
4
Asphalt
2.36 Cwt (119.90 Kg
Steam Coal
0.5 Md (18.66 Kg.
Fine Aggregate
9.00
Cft.
Form Work (Kail Wood)
0.034
Cft.
Total
Contractor's Profit & Ove ## Percent
Total
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason for Setting out and laying
Coolies
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
0.25
2.00
0.25
No.
No.
No.
Per day
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 32
Say
Say
Say
Say
0.00
0.00
0.00
0.00
b)
Detail
Qty
MATERIAL
1
2
3
4
Asphalt
1.20 Cwt (60.960 Kg
Steam Coal
0.25 Md (9.33 Kg.
Fine Aggregate
4.51
Cft.
Form Work (Kail Wood)
0.034
Cft.
Total
Contractor's Profit & Ove ## Percent
Total
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Coolies
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
0.20
1.50
0.25
No.
No.
No.
Per day
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 33
Say
Say
Say
Say
0.00
0.00
0.00
0.00
c)
Detail
Qty
MATERIAL
1
2
3
4
Asphalt
0.60 Cwt (30.48 Kg
Steam Coal
0.25 Md (8.58 Kg.
Fine Grit
2.51
Cft.
Form Work (Kail Wood)
0.034
Cft.
Total
Contractor's Profit & Ove ## Percent
Total
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Cooly
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
0.17
1.00
0.25
No.
No.
No.
Per day
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 34
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
21
1 3/8" thick mosaic flooring consisting of 3/8" mosaic topping of one part of
cement and marble powder in the ratio 3:1 and two parts of marble chips laid
over 1" thick flooring of 1:2:4 cement concrete including rubbing and polishing
complete.
a)
Using
Grey Cement
Detail
Qty
Cement
Sand
Shingle
Form Work
Total
Contractor's Profit & Ove ## Percent
Total
Total Material
1.50
3.70
7.40
0.034
Bags
Cft.
Cft.
Cft.
1.50
1.25
5.00
0.75
No.
No.
Nos.
No.
0.00
0.00
0.00
0.00
0.00
0.00
Per
Per
Per
Per
day
day
day
day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 35
Say
Say
Say
Say
0.00
0.00
0.00
0.00
b)
Detail
Qty
Cement (White)
0.94
Bag
Marble Poweder
0.31 Cwt (15.75 Kg
Marble Chips
3.00 Cwt (152.40 Kg
Carborandom Stone
3.00
Nos.
Wax Polish
0.50 Lbs (0.23 Kg
Linen Cotton etc.
0.40
Kg.
Tar Taric Acid
0.34 Lbs (0.15 Kg
Total
Contractor's Profit & Ove ## Percent
Total
0.01
LABOUR
Mason for Laying
Coolies
Coolies (skilled for rubbing)
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
1.50
1.25
5.00
0.75
No.
No.
Nos.
No.
0.00
0.00
0.00
0.00
Per
Per
Per
Per
day
day
day
day
0.00
0.00
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 36
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
22
1" thick mosaic flooring consisting of " mosaic topping of one part of
cement and marble powder in the ratio of 3:1 and two parts of marble chips laid
over 1" thick flooring of 1:2:4 cement concrete including rubbing and polishing
complete.
a)
Detail
Qty
MATERIAL
1
2
3
4
5
6
7
1.50
1.25
5.00
0.75
No.
No.
Nos.
No.
0.00
0.00
0.00
0.00
Per
Per
Per
Per
day
day
day
day
0.00
0.00
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 37
Say
Say
Say
Say
0.00
0.00
0.00
0.00
b)
Detail
Qty
MATERIAL
1
2
3
4
5
6
7
Cement White
1.27
Bag
Marble Powder
0.42 Cwt (21.34 Kg
Marble Chips
4.16 Cwt (211.33 Kg
Carborandom Stone
3.00
Nos.
Wax Polish
0.50 Lbs (0.23 Kg
Linen Cotton etc.
0.72
Kg.
Tar Taric Acid
0.34 Lbs (0.15 Kg
Total
Contractor's Profit & Ove ## Percent
Total
1.50
1.25
5.00
0.75
No.
No.
Nos.
No.
0.00
0.00
0.00
0.00
Per
Per
Per
Per
day
day
day
day
0.00
0.00
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 38
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
23
Providing and laying floor of mosaic marble chips tiles 1" thick of approved quality and
laid in white cement and pigment over 3/4" bedding of cement sand mortar 1:2, incluidng
finishing and polishing complete.
Detail
Qty
MATERIAL
1
2
3
4
5
0.00
Each
0.00 Per Bag
0.00Per 100 Cft
0.00 Per Kg.
0.00 Per Bag
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
1.84
2.80
0.34
No.
No.
Nos.
Per day
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 39
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
24
Laying floor of approved white glazed tile 1/4" thick in white cement 1:2 over
3/4" thick cement mortar 1:2 complete.
Detail
Qty
MATERIAL
1
2
3
4
420
0.10
2.16
5.20
No.
Bag
Bag
Cft.
0.00
Each
0.00 Per Bag
0.00 Per Bag
0.00Per 100 Cft
2.00
4.00
0.50
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
LABOUR
Masons
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
Per day
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 40
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
25
Laying floors of a approved coloured glazed tiles 1/4" thick laid in white
cement and pigment on a bed of 3/4" thick cement mortar 1:2
Detail
Qty
MATERIAL
1
2
3
4
5
0.00
Each
0.00 Per Bag
0.00 Per Bag
0.00 Per Kg.
0.00Per 100 Cft
0.00
0.00
0.00
0.00
0.00
LABOUR
Masons
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
2.00
4.00
0.50
No.
No.
No.
Per day
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 41
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
26
Rubbing and polishing old grit/mosaic floor including repairing voids, un-even
surface complete in all respects.
Detail
Qty
MATERIAL
1
2
3
4
Carborandum Stone
0.50
No.
Wax Polish
0.50 Lb (0.23 Kg.
Tartric Acid
0.34 Lb (0.162 Kg
Cotton waste cloth etc.
0.72
Kg.
Total
Contractor's Profit & Ove ## Percent
Total
0.00
Each
0.00cket of 3 K
0.00 Per Kg.
0.00
P. Kg.
0.00
0.00
0.00
0.00
-
1.00
1.00
0.25
No.
No.
No.
Per day
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 42
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
27
Rubbing and Polishing grit floor, including repairing voids, uneven surface
complete in all respects.
Detail
Qty
MATERIAL
1
2
4
Carborandum Stone
Wax Polish
Cotton waste cloth etc.
Total
Contractor's Profit & Ove ## Percent
Total
1.50
No.
0.5 Lb (0.23 Kg.)
0.08
Kg.
0.00
Each
0.00cket of 3 K
0.00
P. Kg.
0.00
0.00
0.00
0.00
0.00
1.00
1.00
0.40
No.
No.
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 43
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
28
Cleaning and washing mosaic or marble floor with caustic soda mixture
Detail
Qty
MATERIAL
1
2
Caustic Soda
Hassein Cloth
Total
Contractor's Profit & Ove ## Percent
Total
1 Lb (0.45 Kg.)
0.5 Yard (0.46 m)
0.00
0.00
0.25
0.12
No.
No.
Per day
Per day
0.00
0.00
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 44
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
29
Shisham wood boarding or strips flooring 3/4" thick (sawn to required sizes)
tongued and grooved or splayed rebated fixed with brass screws on deedar wood
battens 1"x2" placed at 12" centre to centre including two coats of bitumen laid
hot on the base.
Detail
Qty
MATERIAL
Shisham Wood
100 x 3/4' x 1/12'
Add 5% rebate
Total
Add 60% Wastage
Total
6.25
0.31
6.56
3.94
10.50
Cft.
Cft.
Cft.
Cft.
Cft.
2.29
1.15
3.44
Cft.
Cft.
Cft.
0.00
0.00
0.00
0.00
Bitumen
35 Lbs (15.89 Kg.
Fire Wood
0.125 Lbs (4.67 Kg
Brass Screws 2"
7.00 Dozen
Sand Paper Sheet
1.50 Dozen
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR FOR 300 SFT.
Carpenters
Coolies
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
10.00
5.00
No.
No.
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 45
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
30
Detail
Qty
MATERIAL
Deodar wood planks 100 x 3/4' x 1/12'
Add 5% for rebate
Total
Deodar wood batten 11x10' x 1/6' x 1/8'
Total
Add 50% Wastage
Total
6.25
0.31
6.56
2.29
8.85
4.43
13.28
Cft.
Cft.
Cft.
Cft.
Cft.
Cft.
Cft.
Bitumen
34 Lbs (15.44 Kg.
Fire Wood
0.125 Mds (4.67 Kg
Brass Screws 2" long
7.00 Dozen
Sand Paper
1.00 Dogen
Total
Contractor's Profit & Ove ## Percent
Total
0.00
0.00
0.00
0.00
6.00
6.00
No.
No.
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 46
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
31
Detail
Qty
MATERIAL
Teak Wood (100x' x
4.20
Cft.
/12'
0.20
4.40
0.88
5.28
Cft.
Cft.
Cft
Cft.
2.29
1.15
3.44
Cft.
Cft.
Bitumen
34 Lbs (15.44 Kg.
Sand Paper
2.00 Dozen
Fuel Wood
0.125 Mds (4.67 Kg
Total
Contractor's Profit & Ove ## Percent
Total
0.00
Cft.
0.00
0.00
0.00
0.00
10.00
5.00
No.
No.
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 47
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
32
Shisham wood block flooring 1" thick cut to required size, fixed on a layer of
asphalt bitumen laid on base
Detail
Qty
MATERIAL
Shisham Wood of best quality
100 x 1/12' sawan to required size
Add 100 % Wastage
Total
8.33
Cft.
8.33
16.66
Cft.
Cft.
0.00
0.00
0.00
0.00
6.00
5.00
No.
No.
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 48
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
33
Teak wood block 1" thick cut to required size fixed on a layer of asphalt bitumen laid on
Detail
Qty
MATERIAL
Teak wood for blocks 1"
thick sawn to size 100 x1/12'
Add 40% Wastage
Total
8.33
Cft.
3.33
11.66
Cft.
Cft.
Bitumen
80 Lbs (36.32 Kg.
Primer
5.00 Lbs (2.27 Kg
Fuel Wood
0.125 Lbs (4.67 Kg
Sand Paper
2.00 Dozen
Total
Contractor's Profit & Ove ## Percent
Total
0.00
0.00
0.00
0.00
10.00
5.00
No.
No.
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 49
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
34
Laying wooden paving of hard wood on edge in coal tar and asphalt
a)
Shisham Wood
Detail
MATERIAL
Shisham Wood Sawn into
1" thick or any required
Add 30% Wastage
Total
8.33
Cft.
2.50
10.83
Cft.
Cft.
size
Bitumen
Total
Contractor's Profit & Ove ## Percent
Total
34 Lbs / 15.44 Kg
0.00
Per Kg.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
1.00
3.00
1.00
No.
No.
No.
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 50
Say
Say
Say
Say
0.00
0.00
0.00
0.00
b)
Kikar Wood
Detail
MATERIAL
Kikar Wood
100
8.33
Cft.
2.50
10.83
Cft.
Cft.
12
Wastage 30%
Total
Bitumen
Total
Contractor's Profit & Ove ## Percent
Total
0.00
Per Kg.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
1.00
3.00
1.00
No.
No.
No.
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 51
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
35
Tile skirting laid in 1:2 cement mortar over 3/4" thick cement mortar 1:2 including
cement washing and filling joints complete.
a)
Cement Tiles
Detail
Qty
MATERIAL
240
No.
Cement tiles 8"x8" including 5% breakage
and Wastage
Bags
Cement for laying and pointing cement t 2.45
Sand
6.00
Cft.
Pigment
1 Lb (0.45 Kg.)
Total
Contractor's Profit & Ove ## Percent
Total
0.00
Each
0.00
0.00
0.00
0.00
0.00
1.56
2.50
0.34
No.
No.
No.
Per day
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 52
Say
Say
Say
Say
0.00
0.00
0.00
0.00
b)
Mosaic Tiles
Detail
Qty
MATERIAL
Tiles 6"x6"x3/4"
Cement
Sand
Pigment
White Cement
Total
Contractor's Profit & Ove ## Percent
Total
420
No.
2.54
Bag
6.00
Cft
1 Lbs (0.45 Kg.)
0.08
Bag
0.00
Each
0.00 Per Bag
0.00Per 100 Cft
0.00 Per Kg.
0.00 Per Bag
0.00
0.00
0.00
0.00
0.00
LABOUR
Masons
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
2.00
2.50
0.25
No.
No.
No.
Per day
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 53
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
36
Providing grey cement skirting or dado 3/8" thick including rounding of corner and
straightening of top edge and finishing to smooth surface after plastering
a)
Detail
Qty
MATERIAL
Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total
0.96
2.50
Bag
Cft.
2.50
1.50
0.34
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
Per day
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 54
Say
Say
Say
Say
0.00
0.00
0.00
0.00
b)
Detail
Qty
MATERIAL
Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total
0.66
2.55
Bag
Bag
2.50
1.50
0.34
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
Per day
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 55
Say
Say
Say
Say
0.00
0.00
0.00
0.00
c)
Detail
Qty
MATERIAL
Pigment
Contractor's Profit & Ove ## Percent
Total
0.00
Per Kg.
0.00
Per day
0.00
-
0.50
No.
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 56
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
37
White glazed tiles " thick dado jointed in white cement and laid over 1:2 cement
sand mortar 3/4" thick including finishing complete
Detail
Qty
MATERIAL
Tiles 6"x6"x"
White Cement
Grey Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total
420
0.10
2.16
5.20
No.
Bag
Bag
Cft.
0.00
Each
0.00 Per Bag
0.00 Per Bag
0.00Per 100 Cft
2.50
5.00
0.50
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
Per day
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 57
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
38
Glazed tile dado " thick dado laid in pigment over 1:2 cement sand mortar /4" thick
including finishing
Detail
Qty
MATERIAL
Tiles 6"x6"x"
White Cement
Grey Cement
Pigment
Sand
Total
Contractor's Profit & Ove ## Percent
Total
420
No.
0.10
Bag
2.16
Bag
0.67 Lb (0.30 Kg.
5.00
Cft.
0.00
Each
0.00 Per Bag
0.00 Per Bag
0.00 Per Kg.
0.00Per 100 Cft
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
2.50
5.00
0.50
No.
No.
No.
Per day
Per day
Per day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 58
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
39
Masaic dado or skirting with one part of cement and marble powder in the ratio of
3:! and two parts of marble chips, laid over " thick cement plaster 1:3 including
rubbing and polishing complete with finishing:
a - i)
Detail
Qty
MATERIAL
Grey Cement
0.94
Bags
Marble Powder
0.31 Cwt. (15.75 Kg
Marble Chips
3.00 Cwt.(152.40 Kg
Carbordum Stone
3
No.
Wax Polish
0.5 Lbs (0.23 Kg.
Tartric Acid
0.34 Lbs (0.15 Kg
Total
Contractor's Profit & Ove ## Percent
Total
0.00
Bag
0.00Per 100 Kg.
0.00 Per Kg.
0.00 Per Kg.
0.00Packet 3 Kg
0.00 Per Kg.
0.00
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Coolies
Skilled Cooly
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
2.00
2.00
5.00
1.00
No.
No.
No.
No.
Per
Per
Per
Per
day
day
day
day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 59
Say
Say
Say
Say
0.00
0.00
0.00
0.00
a-ii)
Detail
Qty
MATERIAL
Cement
Marble Powder
Marble Chips
Carboradom Stone
Wax Polish
Linion Cloth
Tartric Acid
1.27
Bags
0.42 Cwt. (21.34 Kg
3 Cwt. (152.40 Kg
3
No.
0.5 Lbs (0.23 Kg.
0.72
Kg.
0.34 Lbs (0.15 Kg
0.00
Bag
0.00Per 100 Kg.
0.00 Per Kg.
0.00
Each
0.00Packet 3 Kg
0.00
P. Kg.
0.00 Per Kg.
0.88
3.40
Bag
Cft.
0.00
Bag
0.00Per 100 Cft
2.00
2.00
5.00
1.00
No.
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason
Cooly
Skilled Cooly
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
Per
Per
Per
Per
day
day
day
day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 60
Say
Say
Say
Say
0.00
0.00
0.00
0.00
b-i)
3/8" thick
Detail
Qty
MATERIAL
i)
3/8" Thick
White Cement
Marble Powder
Marble Chips
Carboradom Stone
Wax Polish
Linion Cloth
Tartric Acid
ii)
0.94
Bags
0.31 Cwt. (15.75 Kg
3 Cwt. (152.40 Kg
3
No.
0.5 Lbs (0.23 Kg.
0.72
Kg.
0.34 Lbs (0.15 Kg
0.00
Bag
0.00Per 100 Kg.
0.00 Per Kg.
0.00
Each
0.00Packet 3 Kg
0.00
P. Kg.
0.00 Per Kg.
0.88
3.40
Bag
Cft.
0.00
Bag
0.00Per 100 Cft
2.00
5.00
2.00
1.00
No.
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
0.00
LABOUR
Mason for Laying
Coolies for rubbing and polishing
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
Per
Per
Per
Per
day
day
day
day
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 61
Say
Say
Say
Say
0.00
0.00
0.00
0.00
b-ii)
(" thick)
Detail
Qty
MATERIAL
i)
Thick
White Cement
Marble Powder
Marble Chips
Carboradom Stone
Wax Polish
Linion Cloth
Tartric Acid
ii)
1.27
Bags
0.42 Cwt. (21.34 Kg
3 Cwt. (152.40 Kg
3
No.
0.5 Lbs (0.23 Kg.
0.72
Kg.
0.34 Lbs / 0.15 Kg
0.00
Bag
0.00Per 100 Kg.
0.00 Per Kg.
0.00
Each
0.00Packet 3 Kg
0.00
P. Kg.
0.00 Per Kg.
0.00
Bag
0.00Per 100 Cft
0.88
3.40
Bag
Cft.
LABOUR
Mason
Skilled Cooly
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
2.00
5.00
2.00
1.00
No.
No.
No.
No.
0.00
0.00
0.00
0.00
Per
Per
Per
Per
day
day
day
day
0.00
0.00
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 62
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION ITEM
40
Detail
Qty
Amount (Rs.)
105
Nos.
0.00
Each
4.56
0.04
Kg.
No.
0.00
0.00
Kg.
Each
1.00
1.50
No.
No.
0.00
0.00
Per day
Per day
LABOUR
Mason
Coolies
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
0.00
0.00
ITEM RATE
Labour Rate Per Sft.
Labour Rate Per Sqm.
Composite Rate per Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 63
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM
41
Providing and Fixing Glass Strip 5mm thick and 1" wide
for dividing mosaic flooring into panels.
Detail
Qty
Amount (Rs.)
100.00
10.00
110.00
Rft.
Rft.
Rft.
ITEM RATE
Composite Rate per Rft.
Rs.
Say
0.00
Rs.
Say
0.00
Note :Labour for fixing already included in item 15 & 22 of this chapter
Page 64
DESCRIPTION OF ITEM
42
Providing and fixing marble strip of any shade for dividing the mosaic flooring into pann
a)
Detail
Qty
Amount (Rs.)
100.00
10.00
110.00
Rft.
Rft.
Rft.
ITEM RATE
Note
Rs.
Say
0.00
Rs.
Say
0.00
Page 65
b)
Detail
Qty
Amount (Rs.)
100.00
10.00
110.00
Rft.
Rft.
Rft.
ITEM RATE
Note
Rs.
Say
0.00
Rs.
Say
0.00
Page 66
CHAPTER NO. 25
IRON WORK
DESCRIPTION OF ITEM:
1
Detail
Qty
Amount
Jamadar (Mate)
Keyman (Skilled Cooly)
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
1.00
1.00
7.00
No.
No.
Nos.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Lft.
Labour Rate Per R M
Rs.
Rs.
Page 1
Say
Say
0.00
0.00
2.
Detail
Qty
Amount
Jamadar (Mate)
Skilled Cooly
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
1.0
1.0
10.0
No.
No.
Nos.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Lft.
Labour Rate per RM
Rs.
Rs.
Page 2
Say
Say
0.00
0.00
3.
Detail
Qty
Amount
Jamadar (Mate)
Keyman (Skilled Cooly)
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
1.0
1.0
6.0
No.
No.
Nos.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Lft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 3
4.
Detail
Unit = Each
Rate
Per Unit
Qty
Amount
LABOUR
1
2
3
Jamadar (Mate)
Keyman (Skilled Cooly)
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
0.5
0.5
5.5
No.
No.
Nos.
0.00
0.00
0.00
0.00
0.00
0.00
Say
0.00
0.00
0.00
0.00
0.00
Say
0.00
10.00 Percent
20.00
Percent
ITEM RATE
Labour Rate Per Each
Rs.
Page 4
5.
Detail
Qty
Amount
LABOUR
1
2
Black Smith
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
0.20
0.50
No.
No.
0.00
0.00
per day
per day
0.00
0.00
Say
0.00
0.00
0.00
0.00
0.00
Say
0.00
10.00 Percent
20.00
Percent
ITEM RATE
Labour Rate Per Each Point
Rs.
Page 5
6.
Detail
Qty
Amount
LABOUR
1
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
0.85
No.
0.00
per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
Percent
ITEM RATE
Labour Rate Per/Each
Rs.
Page 6
Say
0.00
7.
Binding ends of sleepers and timbers of all sizes and kinds including spreading and
restacking.
Detail
Qty
Amount
LABOUR
1
2
3
Fitter
Mate
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
1.5
0.5
5.75
No.
No.
No.
0.00
0.00
0.00
per day
per day
per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
0.00
Percent
Say
ITEM RATE
Labour Rate Per 100 Nos.
Rs.
Page 7
Say
0.00
8.
Opening stacks of sleepers and Timbers of all kinds and sizes including spreading for
inspection and restacking within chain lead.
Detail
Qty
Amount
Mate
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
1.0
14.0
No.
Nos.
0.00
0.00
per day
per day
0.00
0.00
Say
0.00
0.00
0.00
0.00
0.00
0.00
Say
0.00
10.00 Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Nos.
Rs.
Page 8
9.
Small Iron work such as gusset plates, knees, bends, strips, straps, rings etc. including
cutting, drilling, revitting, bending assembling & fixing but excluding erection in position.
Detail
Unit = 1 Cwt.
Rate
Per Unit
Qty
Amount
2
3
Iron
wastage 10%
= 1.0 Cwt.
0.1 Cwt.
1.10 Cwt. or 55.
Char Coal
Steel Revits
Total
Contractor's Profit & O
Total
20.00
55.90
Kg
0.00
per Kg
8.40
0.68
Kg
Kg
0.00
0.00
per Kg
per Kg
1.50
2.50
Nos.
Nos.
Percent
LABOUR
Black Smith
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
per day
per day
10.00 Percent
20.00
Percent
Say
ITEM RATE
Labour Rate for 1 Cwt.
Rs.
Say
Rs.
Say
Rs.
Say
Rs.
Say
Page 9
10.
Fabrication of heavy steel work, with angle, tees, flat iron, round iron and sheet iron for
making trusses, girders, tanks etc. including cutting, drilling, revitting handling,
assembling and fixing but excluding erection in position.
Detail
Unit
Qty
1 Cwt.
Rate
Per Unit
Amount
Iron
wastage 5%
= 1.00 Cwt
= 0.05 Cwt
1.05 Cwt.or
2
3
Char Coal
Steel Revits
Total
Contractor's Profit & O
Total
20.00
53.36
(53.36 Kg.)
7.46
0.45
Kg
0.00
Per Kg.
0.00
Kg
Kg
0.00
0.00
Per Kg.
Per Kg.
0.00
0.00
0.00
0.00
0.00
Percent
LABOUR
1
2
Black Smith
Hammer man
Total
Sundries
Total
Contractor's Profit & O
Total
0.5
0.9
No.
No.
0.00
0.00
per day
per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate/Cwt
Rs.
0.00
Say
0.00
Rs.
0.00
Say
0.00
Rs.
0.00
Say
0.00
Composite Rate/100 Kg
Rs.
0.00
Say
0.00
Page 10
11.
Detail
Unit
Qty
100 Kg
Rate
Per Unit
Amount
Fitter
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
Rate/Cwt
2.0
2.0
No.
No.
0.00
0.00
per day
per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
9
0.00
0.00
Percent
= Rs. 65.88
ITEM RATE
Labour Rate / Cwt.
Rs.
Say
0.00
Rs.
0.00
Say
0.00
Page 11
12.
Detail
Qty
Amount
Black smith
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
1.0
1.0
No.
No.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate 100 Sft.
Rs.
Say
0.00
Labour Rate/Sq.m
Rs.
Say
0.00
Page 12
13.
Detail
Unit
Qty
100 Kg
Rate
Per Unit
Amount
Black smith
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
Rate / Cwt.
2.0
9.5
Nos.
Nos.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
14.25
Percent
Rs.
0.00
0.00
0.00
ITEM RATE
Labour Rate/ One Cwt
Rs.
Say
0.00
Rs.
0.00
Say
0.00
Page 13
14.
Erecting rolled steel beams on old rails in roofs etc., erection and fixing in position.
Detail
Unit
Qty
100 Kg.
Rate
Per Unit
Amount
Black smith
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
0.5
14.5
No.
Nos.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate /Cwt.
Rs.
Say
0.00
Rs.
0.00
Say
0.00
Page 14
15.
Erecting rolled steel beams or rails, erection for posts etc. (other than in roofs).
Detail
Qty
Amount
Black smith
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
Rate/Cwt.
0.5
6.75
No.
Nos.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs.
Say
0.00
Rs.
0.00
Say
0.00
10.00 Percent
20.00
Percent
0.01
30
Rs.
0.00
ITEM RATE
Labour Rate /Cwt.
Labour Rate / 100 Kg.
Page 15
16.
Detail
Qty
Amount
Mild Steel
wastage 10%
2
3
Steel chisel
Coal
Total
Contractor's Profit & O
Total
1 .0 Cwt.
0.1 Cwt
1.1 Cwt. or
20.00
55.90
Kg
0.00
Per Kg.
0.00
0.68
46.51
Kg
Kg
0.00
0.00
Per Kg.
Per Kg.
0.00
0.00
(55.90 Kg)
0.00
0.00
0.00
Percent
LABOUR
1
2
3
Black Smith
Hammer man
Cooly (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
1.5
0.75
0.75
Nos.
No.
No.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
0.00
Percent
ITEM RATE
Labour Rate/ Cwt.
Rs.
0.00
Say
0.00
Composite Rate/Cwt
Rs.
0.00
Say
0.00
Rs.
0.00
Say
0.00
Rs.
0.00
Say
0.00
Page 16
17.
Cutting rails, rolled steel joists and beams with hack saw:a) upto 6" size.
Detail
Qty
Amount
Fitter
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
0.15
0.15
No.
No.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate per Cut
Rs.
Page 17
Say
0.00
17.
Detail
Qty
Amount
Fitter
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
1.20
1
Nos.
No.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate per Cut.
Rs.
Page 18
Say
0.00
18.
Cutting rails or rolled steel beams of size below 6" with Jim.
Detail
Qty
Amount
Fitter
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
1.00
1.00
No.
No.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate per Cut.
Rs.
Page 19
Say
0.00
19.
Detail
Unit / Bend
Rate
Per Unit
Qty
Amount
Steam coal
Total
Contractor's Profit & O
Total
139.95
20.00
Kg
0.00
Per Kg
0.00
0.00
0.00
0.00
Percent
LABOUR
1
2
Black Smith
Hammer man
Total
Sundries
Total
Contractor's Profit & O
Total
0.75
0.75
No.
No.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs.
Say
0.00
Composite Rate/Bend
Rs.
Say
0.00
10.00 Percent
20.00
Percent
ITEM RATE
Page 20
20.
Drilling holes in plates upto 1/2" thick per inch dia or part thereof.
Detail
Qty
Amount
Fitter (Grade I)
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
0.50
2.00
No.
No.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate per hole
Rs.
Page 21
Say
0.00
21.
Extra for drilling holes in plates over each 1/2" thick per inch dia or part thereof.
Detail
Qty
Amount
Fitter (Grade I)
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
0.25
4.00
No.
Nos.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate per hole
Rs.
Page 22
Say
0.00
22.
Detail
Qty
Amount
Riveted
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
0.50
0.50
No.
No.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate for 100 Nos.
Rs.
Page 23
Say
0.00
23.
Detail
Qty
Amount
2.00
2.00
Nos.
Nos.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate for 100 Nos.
Rs.
Page 24
Say
0.00
24.
Detail
Unit / Lft.
Rate
Per Unit
Qty
Amount
1.00
1.00
10.00
No.
No.
Nos.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
0.00
Percent
ITEM RATE
Labour Rate Per Lft.
Rs.
Rs.
Page 25
Say
0.00
Say
0.00
25.
Detail
Unit / Bar
Rate
Per Unit
Qty
Amount
0.50
0.50
1.00
No.
No.
No.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
0.00
Percent
ITEM RATE
Labour Rate Per Bar
Rs.
Page 26
Say
0.00
26.
Cutting GI sheets.
Detail
Qty
Amount
1.00
1.00
No.
No.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate per cut
Rs.
Page 27
Say
0.00
27.
Detail
Qty
Amount
Steam Coal
Total
Contractor's Profit & O
Total
28.00
20.00
Kg
0.00
Per Kg
0.00
0.00
0.00
0.00
Percent
LABOUR
1
2
Black Smith
Hammer man
Total
Sundries
Total
Contractor's Profit & O
Total
1.0
1.0
Nos.
Nos.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate/Notch
Composite Rate/Notch
Page 28
Rs.
0.00
Say
0.00
Rs.
Say
0.00
28.
Detail
Qty
Amount
1.00
1.00
No.
No.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate per Sft.
Rs.
0.00
Say
0.00
Rs.
Say
0.00
Page 29
29.
Detail
Qty
Amount
Carpenter
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
1.00
1.00
No.
No.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate per Sft.
Rs.
0.00
Say
0.00
Rs.
Say
0.00
Page 30
30.
Making and fixing steel grated doors, complete with locking arrangement, angle iron frame 2"x2"x3
3/4" square bars 4" center to center
Detail
Qty
Rate Analysis for 7' x 4' = 28.00
MATERIAL
a)
1
Angle Iron frame 2"x2"x3/8"
vertical 4x7
Top rail 2 x 4'-0"
Bottom & central rail
2
3
b
c
d
e
f
Grating("x")
Gusset Plate (" thick)
8x6"x3"
4x8"x3"
Amount
Sft.
28 Rft
8 Rft
8 Rft.
44 Rft.
= 9x7'-0" = 63 Rft. @
90.44
53.74
1.0 0 Sft.
0.67 Sft.
1.67 Sf
7.58
Total
151.76
Wastage
7.59
Total
159.35
Kg.
Kg.
Kg.
Kg.
0.00
Per Kg.
0.00
Nos.
0.00
Each
0.00
No.
Kg.
Kg.
Kg.
0.00
0.00
0.00
0.00
Each
Per Kg.
Per Kg.
Per Kg.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Nos.
Nos.
Nos.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
6.00
1.00
15.00
2.27
1.13
LABOUR
1
2
3
Black Smith
Hammer man
Blowman
Total
Sundries
Total
Contractor's Profit & O
Total
2.0
3.0
2.0
10.00 Percent
20.00
Percent
ITEM RATE
Page 31
31.
Making and fixing steel grated door with 1/16" thick sheeting including angle iron frame
2"x2"x3/8" and 3/4" square bars 4" center to center with locking arrangement.
Detail
Qty
Rate Analysis for 7'x4'
28 Sft.
MATERIAL
1
2
28 Sft.
1.4 Sft
29.40 S
33.35
Kg.
Per Kg.
2.25
3.00
2.00
Nos.
Nos.
Nos.
Per day
Per day
Per day
lb/Sft.
20.00
Percent
LABOUR
1
2
3
Black Smith
Hammer man
Blowman
Total
Sundries
Total
Contractor's Profit & O
Total
10.00 Percent
20.00
Percent
Say
ITEM RATE
Labour Rate/Sft.
Composite Rate per Sft.
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 32
Amount
32.
Making and fixing grating in opening, including fixing at site with flat iron 2"x3/8" and 3/4"
square bars at 4" cetnre to center.
Detail
Qty
Rate Analysis for 5'x8'
40
Amount
Sft.
MATERIAL
1
a
b
Steel
Frame 2" x 3/8"
3 x 6' = 18 Rft.
Grating 3/4"x3/4"
Total
Wastage @ 5%
@ 2.51 lb/Rft. = 45 lb
20.50
14x 8' = 112 Rft. @ 1.88 lb/ft.
= 210.5
95.54
116.04
5.80
Total
121.84
Coal
Total
Contractor's Profit & O
Total
1.40
20.00
Kg.
Kg.
Kg.
Kg.
0.00
Per Kg.
0.00
Kg.
0.00
Per Kg.
0.00
0.00
0.00
0.00
Percent
LABOUR
1
2
3
Black Smith
Hammer man
Blowman
Total
Sundries
Total
Contractor's Profit & O
Total
1.25
1.25
1.50
Nos.
Nos.
Nos.
0.00
0.00
0.00
Per day
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
0.00
Percent
ITEM RATE
Labour Rate/Sft.
Composite Rate/Sft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 33
33.
Providing and fixing stair railing (all types and designs) of hard wood, including bends
and corners, screwed to 5/8"x5/8" M.S. square bars 2.75 ft. high, at 5.5 inch center to
center, fixed in steps of stairs, M.S. flat 1"x1/8" welded to bars, painting/polishing 3 coats,
etc. complete.
Detail
Qty
Amount
Wooden railing
M.S. flat 1"x1/8" 10 Rft. @ 0.42
10 Rft.
LB/ft. =10x0
1.91
Kg.
= 4.2 lbs/ft.
M.S. square bars (5/8"x5/8") 11x2 = 22 Nos x 3
=66 ft. @ 1.33 lbs/ft.
39.83
Kg.
Painting
0.045 Gallon
Total
Contractor's Profit & O
Total
20.00
0.00
0.00
0.00
0.00
0.00
0.00
Per Kg.
Gallon
0.00
0.00
0.00
Percent
LABOUR
1
2
3
4
5
6
22
2
22
22
0.75
1.0
cuts
cuts
Nos
Nos
No.
No.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Labour Rate/Rft.
Composite Rate/Rft.
Rs.
Rs.
0.00
-
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
ITEM RATE
Page 34
34.
Providing/fixing stair railing consisting of M.S. Box section size 1-1/2"x3" of 16 SWG
welded with M.S. flat 1"x1/8" continuously and welded over M.S. square bars 5/8"x5/8"
punched in M.S. flat 2 ' high @ 5" c/c fixed in steps of stair I/C painting 3 coats
complete.
Detail
Qty
MATERIAL
1
Per Rft.
1.00
0.05
1.05
0.62
Rft.
Rft.
Sft.
Total
LABOUR
1
2
3
Stair railing
Rs. 83.95
Less shisham wood rail
Rs. 40.70
(Ref. 28 (a) (wood)
Rs. 43.
Labour for painting (Ref. as above)
Making/fixing M.S. box section to required
shape i/c bends/corners welding i/c cost of
welding rod.
Total
Sundries
10.00 Percent 0.00
20.00 Percent
Contractor's Profit & O
at Rs. (6.40+0.64)
=
0.00
Total
1.00
0.62
Rft.
Sft.
Per Rft.
Per Sft.
1.00
Rft.
Per Rft.
Labour Rate/Rft.
Composite Rate/Rft.
Rs.
Rs.
Say
Say
Labour Rate/ RM
Composite Rate/RM
Rs.
Rs.
Say
Say
ITEM RATE
Page 35
Amount
35.
Providing and fixing terrace railing of 2" i/d conduit pipe 16 SWG welded with 5/8"x5/8"
square bars 2.75 ft. high fixed at 5" center to center in reinforced cement concrete slab
with suitable arrangement, complete in all respects as per design and drawing.
Detail
Qty
Amount
10
39.83
Rft.
Kg.
0.00
0.00
Per ft.
Per Kg.
0.00
0.00
1.91
Kg.
0.00
Per Kg.
0.00
0.00
0.00
0.00
LABOUR
1
2
3
22
22
66
Nos.
Nos.
Nos.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs.
Rs.
0.00
-
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
ITEM RATE
Page 36
36.
Providing and fixing collapsible gate made of 2"x2"x1/4" tee iron at top and bottom,
channel iron vertical 3/4"x1/4"x1/4"x1/8" at 3" to 5" center to center (Approximately) and flat
iron crosses 3"x3/16" and best quality rollers at bottom of 3" dia meter including holdfast,
handles 12" long of 3/4"x1/4"x1/4"x 1/8" channel iron, locking arrangement inside and out
side, painting 3 coats of black Japan enameled, complete in working order.
Detail
Qty
Rate Analysis for 7'x10'
75
Amount
Sft.
MATERIAL
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
20.00
0.00
Per Kg.
0.00
Nos.
Each
Each
0.00
0.00
0.00
6.00
264.00
192.00
Nos.
0.00
0.00
0.00
2.00
2.00
8.00
0.480
1.30
2.450
0.50
Nos.
Nos.
Nos.
Cft.
Cft.
Cft.
gln.
0.00
Each
0.00
Each
0.00
Each
0.00
P. Bag
0.00 Per % Cft.
Per % Cft.
0.00
gln
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Percent
Page 37
Detail
Qty
Amount
LABOUR
1
2
3
4
5
6
Black Smith
Coolies (Skilled)
Coolies (Unskilled)
Mason
Coolies
Painter
Total
Sundries
Total
Contractor's Profit & O
Total
6
12
6
0.50
1.50
0.33
Nos
Nos
Nos
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
10.00 Percent
20.00
Percent
ITEM RATE
Page 38
37.
Providing and fixing 24 SWG GI sheet rolling shutter, consisting of steel frame of M.S.
channel 2"x1"x1/8", angle iron 1"x1"x1/8", M.S. plat 1'x1'x1/8", GI pipe 1" dia, spring
2' center to center, rollers, 24 SWG, GI covering 1'x1', handles, holdfast & painting three
coats, complete in all respects.
Detail
Qty
Rate Analysis shutter size 8'x9'
MATERIAL
1
GI sheet 24 SWG
i) For shutter 1x7.83x9 =
ii) For box 1x8x3.25 =
iii) For covering plate =
Over lap 10%
Wastage 5%
GI bracket
GI Holdfast
Amount
72' Sft.
18.00
Rft.
0.9 Rft.
18.9 Rf
19.21
lbs/ft.
Kg.
0.00
Per Kg.
0.00
Kg.
0.00
Per Kg.
0.00
Kg.
0.00
Per Kg.
0.00
70.47 Rft.
26.00 Rft.
2.00 Sft.
98.47 Sft.
9.85 Rft..
108.32 Sft.
5.41 Sft.
113.73 Sft.
@ 1.112
57.38
2.00
Kg.
Nos.
0.00
0.00
Per Kg.
Each
0.00
0.00
6.00
Nos.
0.00
Each
0.00
Rft.
Rft.
R
8.40
Rft.
0.00
2.00 Sft
0.10 Sft
2.10 S
4.86
@ 5.10 lbs/Sft.
7.83 Rft.
0.39 Rft.
8.22 R
4.59
@ 1.23 lbs/ft.
8.00
0.40
8.40
Handle 2 Nos
2.00
Nos.
0.00
Each
0.00
GI spring
2.00
Nos.
0.00
Each
0.00
10
3.00
Nos.
0.00
Each
0.00
11
Making (holes/khuda)
2.00
Nos.
0.00
Each
0.00
12
Rivets
0.86
Kg.
0.00
P. Kg.
0.00
13
Greasing
0.80
Kg.
0.00
P. Kg.
0.00
14
Cement
0.00
P. Bag
0.00
Page 39
0.212 Cft.
15
Sand
Total
Contractor's Profit & O
Total
0.50 Cft.
20.00
0.00
0.00
0.00
0.00
Percent
LABOUR
1
2
3
4
Black Smith
Coolies (Skilled)
Coolies (Unskilled)
Mason
Total
Sundries
Total
Contractor's Profit & O
Total
2.50
1.50
1.00
0.50
Nos
Nos
Nos
No.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
Percent
ITEM RATES
Labour Rate/ Sft.
Composite Rate/Sft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 40
38.
Providing and fixing M.S. angle iron 1"x1"x" edge protector nozing of steps of stairs,
having holdfast of 3/8" dia M.S. bars 8" long welded at 2' center to center and embedded
in cement concrete on steps complete in all respects.
Detail
Qty
Rate Analysis for one step
MATERIAL
1
4.00 Rft.
0.20 Rft.
4.20 R
9.74 Lbs or
@ 2.32 lb/ft.
4.42
Kg.
Amount
4 ft. long
3.00
20.00
Nos.
0.00
Per Kg.
0.00
0.00
Each
0.00
0.00
0.00
0.00
Percent
LABOUR
1
2
4.00 No.weld
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate per foot
Composite Rate / Foot.
Rs.
Rs.
0.00
-
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 41
39.
Providing and fixing stair railing of 2' i/d GI pipe, welded with 5/8"x5/8" square M.S.
bars 2'-9" high, fixed in each step, complete in all respects, including painting, polishing
three coats.
Detail
Qty
Amount
1.00 Rft.
0.50 Rft.
10.50
10.50
(Medium Quanlity)
10.00 Rft.
0.50 Rft.
10.50
3.90
@ 0.82 lbs/ft.
20.00
0.00
ft.
0.00
Kg.
0.00
Per Kg.
0.00
0.00
0.00
Per Kg.
Gallon
0.00
0.00
35.75 Rft.
3.58 Rft.
39.33 Rft.
@ 1.33
23.73
Kg.
0.089 Gallon
Rft.
0.00
0.00
0.00
Percent
LABOUR
1
2
3
4
5
Black smith
Mason
Coolies (Unskilled)
Welding GI pipe with M.S. flat 2"x1/8", 10' lo
Welding M.S. square bars with M.S. flat
Total
Sundries
10.00 Percent
Total
Contractor's Profit & O
20.00 Percent
Total
0.50
0.50
0.75
10.00
13.00
No.
No.
No.
Long
Nos.
0.00
0.00
0.00
0.00
0.00
Per day
Per day
Per day
Each
Each
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs.
Rs.
0.00
-
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
ITEM RATE
Page 42
40.
Providing and fixing galvanized wire gauze 24 SWG 144 mesh per square inch fixed to
steel window, complete in all respects.
Detail
Qty
Rate Analysis for 3'x5'
15
Amount
Sft
MATERIAL
1
G. I. wire gauge
wastage 5% over lap
15.00 Sft.
0.75 Sft.
15.75
15.75
Sft.
0.00
Kg.
0.00
Per Kg.
0.00
Dozen
0.00
Dozen
0.00
12.00 Rft.
20.00 Rft.
32.00 Rft.
wastage 5%
1.60 Rft.
33.60
1.61
per foot = 3.56 lbs/ (1.61 Kg)
Machine screws 1/8"x1/2"
5.70
Total
Contractor's Profit & O
Total
20.00
0.00
0.00
0.00
Percent
LABOUR
1
Carpenter /Blacksmith
Total
Sundries
Total
Contractor's Profit & O
Total
0.50
No.
0.00
per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
Percent
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 43
41.
Providing and fixing steel windows with openable glazed panels, using beam section for
frame 1"1x5/8"x1/8" Z section for beams 3/4"x1"x3/4"x1/8", T section sashes 1"x1"x1/8"
glass panes, wooden screeds for glazing, embedded over a thin layer of putty duly
screwed with beams, brass fittings, holdfast, duly painted, complete in all respects,
including all costs of material and labour, etc., as per approved design and as directed by the En
a)
Detail
Qty
MATERIAL
1
Amount
Z-section "x1"x"x1/8"
Horizontal 8x1'-5" = 11.67 Rft.
vertical 8x3'-11" = 31'-8"
Add wastage 5%
T-section 1"x1"x1/8"
Horizontal 8x 1-5"
Add wastage 5%
12.00 Rft.
20.00 Rft.
32.00 Rft.
1.60 Rft
33.60
18.60
@ 1.22 lb/ft
Kg.
0.00
Per Kg.
0.00
Kg.
0.00
Per Kg.
0.00
Kg.
0.00
Per Kg.
0.00
Nos.
0.00
Each
0.00
8.00
Nos
0.00
Each
0.00
43.33 Rft
2.16 Rft.
45.49
19.81
@ 0.96 lb/ft.
11.66 Rft.
0.59 Rft.
12.25
4.44
@ 0.798 lb/ft.
6.00
Iron holdfast
4.00
Nos.
0.00
Each
0.00
4.00
Nos.
0.00
Each
0.00
pins
68.00
Rft.
0.00
Nos.
0.00
0.00
0.00
Page 44
Each
Total Rs.
24.00
Sft.
1333.90
0.00
1333.90
266.78
1600.68
LABOUR
1
Painting 24 Sft.
42.00
24.00
24.00
Sft.
Sft.
0.00
0.00
0.00
0.00
0.00
L.S.
0.00
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
Percent
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Rs.
Rs.
0.00
66.70
Say
Say
0.00
66.70
Rs.
Rs.
-0.05
717.64
Say
Say
0.00
717.65
Page 45
Detail
Qty
Rate Analysis for 24
Amount
Sft.
MATERIAL
1
2
Total
Contractor's Profit & O
Total
20.00
24.00
Sft.
0.00
0.00
0.00
0.00
0.00
Percent
LABOUR
1
0.00
Total
0.00
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
-0.05
0.00
Say
Say
0.00
0.00
Page 46
41
a (i Using
Detail
Qty
Rate Analysis
Amount
MATERIAL
1
2
0.00
24.00
Sft.
0.00
0.00
0.00
0.00
LABOUR
Same as per item No. 41 a (i)
0.01
Total
0.01
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
-0.05
0.00
Say
Say
0.00
0.00
Page 47
41
Detail
Qty
Rate Analysis for 6' x 4'
Amount
24 Sft.
MATERIAL
1
2
20.00
0.00
24.00
Sft.
0.00
0.00
0.00
0.00
Percent
LABOUR
Same as per item No. 41 a (i)
0.01
Total
0.01
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 48
41
Detail
Qty
Amount
20.00
0.00
24.00
Sft.
0.00
0.00
0.00
0.00
Percent
LABOUR
Same as per item No. 40 a(i)
0.01
Total
0.01
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
-0.05
0.00
Say
Say
0.00
0.00
Page 49
41
Detail
Qty
Rate Analysis for 6' x 4'
Amount
24 Sft.
MATERIAL
1
12.00 Rft
20.00 Rft.
32.00 Rft.
1.60 Rft.
33.60 Rft.
@ 1.22
18.60
Kg.
0.00
Kg
0.00
11.67 Rft.
31.67 Rft.
43.33 Rft.
2.16 Rft.
45.49 Rft.
@ 0.96
19.81
Kg.
0.00
Per Kg.
0.00
11.66 Rft.
0.59 Rft.
12.25 Rft.
@ 0798
4.44
Kg.
0.00
Per Kg.
0.00
24.00 Sft.
2.40 Sft.
26.40
26.40
Sft.
0.00
12 Rft.
15.625 Rft.
Total
27.625 Rft.
Add 5% wastage
1.381 Rft
Total
29.006 Rft.
@ 0.32
4.21
Machine screws "x3/16" (3" apart for fixing
wire gauze)
Horizontal 2x6x12/3
48 Nos
Vertical 5x4x12/3
80 Nos
Total
128 No
13.00
Kg.
0.00
Per Kg.
0.00
Dozen
0.00
Dozen
0.00
Iron holdfast
Nos.
0.00
Each
0.00
6.00
Page 50
8.00
Nos
0.00
Each
0.00
4.00
Nos.
0.00
Each
0.00
10
4.00
Nos.
0.00
Each
0.00
11
68.00
Rft.
0.00
12
96.00
Nos.
0.00
0.00
Total
Each
0.00
Page 51
41 - b ( Using
Detail
Qty
Rate Analysis for 6' x 4' = 24
Amount
Sft.
MATERIAL
1
2
excluding cost of
20.00
0.00
24.00
Sft.
0.00
Per Sft.
240.00
240.00
48.00
288.00
Percent
LABOUR
1
42.00
welds
0.00
24.00
Sft.
0.00
0.00
Sft.
0.00
0.00
0.00
0.00
24.00
Sft.
P.Sft
L.S
0.00
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
Percent
ITEM RATE
Labour Rate per Sft
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate Sq.m
Page 52
Rs.
Rs.
0.00
11.95
Say
Say
0.00
11.95
Rs.
Rs.
-0.05
128.88
Say
Say
0.00
128.90
Detail
Qty
Amount
excluding cost of
20.00
0.00
24
Sft.
0.00
0.00
0.00
0.00
Percent
LABOUR
1
42.00
welds
0.00
24.00
Sft.
0.00
24.00
Sft.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.00
Sft.
L.S.
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Rs.
Rs.
0.00
-0.05
Say
Say
0.00
0.00
Rs.
Rs.
-0.05
-0.24
Say
Say
0.00
-0.20
Page 53
Detail
Qty
Amount
excluding cost of
20.00
0.00
24.00
Sft.
0.00
0.00
0.00
0.00
Percent
LABOUR
1
42.00
welds
0.00
24.00
Sft.
0.00
Sft.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.00
Sft,
L.S.
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Rs.
Rs.
0.00
-0.05
Say
Say
0.00
0.00
Rs.
Rs.
-0.05
-0.29
Say
Say
0.00
-0.20
Page 54
Detail
Qty
Amount
excluding cost of
20.00
0.00
24.00
Sft.
0.00
0.00
0.00
0.00
Percent
LABOUR
1
42.00
Weld
0.00
24.00
Sft
0.00
Sft.
0.00
0.00
0.00
0.00
0.00
0.00
Total
Sundries
Total
Contractor's Profit & O
Total
24.00
Sft.
L.S.
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
Percent
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Rs.
Rs.
0.00
-0.05
Say
Say
0.00
0.00
Rs.
Rs.
-0.05
-0.24
Say
Say
0.00
-0.20
Page 55
Detail
Qty
Amount
excluding cost of
20.00
0.00
24.00
Sft.
0.00
0.00
0.00
0.00
Percent
LABOUR
1
42.00
Weld
0.00
24.00
Sft
0.00
Sft.
0.00
0.00
0.00
0.00
0.00
0.00
Total
Sundries
Total
Contractor's Profit & O
Total
24.00
Sft.
L.S.
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
Percent
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Rs.
Rs.
0.00
-0.05
Say
Say
0.00
0.00
Rs.
Rs.
-0.05
-0.29
Say
Say
0.00
-0.20
Page 56
42.
Providing and fixing steel windows using M.S. sheet (16 SWG) moulded tubuler pipe
1"x1" for frame and 1"x1" for leaves including M.S. Square bars "x" welded around
each panel of frame, 5 mm thick glass panes fixed with double M.S. square tubular pipe
3/8"x3/8" (22 SWG) beading with 'U' shapped rubber lining, brass fitting, holdfast,
including painting three coats complete in all respects.
a)
For openable pannels fixed with wire gauze 24 SWG, 12x12 mesh and glass panes 5 mm
thick
Detail
Qty
Amount
18.00 Rft.
22.50 Rft.
40.50 Rft.
Wastage 5%
2.02 Rft.
42.52
19.29
42.52 Rft. @ 1 lb/Rft.
b)
Beams for openable pannels 1"x1 "
Upper Portion
i) Horizontal 2x3 x(1'-10")
11.00 Rft.
ii) Vertical 3x2 x(1'-1")
7.00 Rft.
Lower Portion
ii) Horizontal 2x3x (1'-10")
iv) Vertical 3x2 x (4'-1")
c)
Kg.
0.00
Per Kg.
0.00
Kg.
0.00
Per Kg.
0.00
Kg.
0.00
Per Kg.
0.00
11.00 Rft.
24.25 Rft.
3.00 Rft.
56.25 Rft.
2.81 Rft.
59.06
22.51
@ 0.84 lb/ft.
2
M.S. square beading 3/8"x3/8" tubuler pipe all
around the glass pannels
Upper Portion
i) Horizontal 2x3x (1'-7")
9.75 Rft.
ii) Vertical 3x2 x (1'-1")
6.62 Rft.
Lower Portion
ii) Horizontal 2x3 x(1'-7")
iv) Vertical 3x2 x (3'-11")
For both sides 50x2 =
Add 5% wastage
@ 0.478 lb/ft.
3
9.75 Rft.
23.87 Rft.
50.00 Rft.
100 Rft.
5 Rft.
22.77
105 Rf
Page 57
a)
Upper Portion
i) Horizontal 2x3x (1'-10")
ii) Vertical 3x2 x (1'-4")
b)
iii) Horizontal
Lower Portion
2x3x (1'-10")
5 mm thick glass
3x(1'-7")x(4'-1")
3x(1-7")x(1'-2")
Add 5% wastage
11.00 Rft.
8.00 Rft.
11.00 Rft.
25.25 Rft.
55.25 Rft.
2.76 Rft.
58.00
5.61
Kg.
0.00
Per Kg.
0.00
12.00
Nos.
0.00
Each
0.00
3.00
Nos.
0.00
Each
0.00
19.70 Sft.
5.68 Sft.
25.38 Sft.
1.25 Sft.
26.63
26.63
Sft.
0.00
50.00
Rft.
0.00
36.00
Sft.
0.00
Screws
15.00
Dozen
0.00
10
Kg.
0.00
gln
0.00
per gln
0.00
0.00
0.00
0.00
0.00
0.00
120.00
0.00
0.00
0.00
per day
per day
per day
0.00
0.00
60.00
0.00
0.00
0.00
11
LABOUR
1
2
3
4
5
6
Black smith
Welder
Welding machine on hire basis
Electric charges with electrode
Painter
Glazier
Total
Sundries
10.00 Percent
Total
20.00 Percent
Contractor's Profit & O
Total
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Rft.
Rft.
Rft.
Rft.
7.99
lb/ft.
0.50
0.50
No.
0.50
No.
0.50 No./day
L.S
0.34
No.
0.50
No.
per day
per day
0.00
0.00
0.00
0.00
Page 58
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
42.
b)
Detail
Qty
Amount
Kg.
0.00
Kg.
0.00
Sft.
Sft.
Sft.
32.48
Sft.
0.00
55.00
Rft.
0.00
15.00
Dozen
0.00
Painting 3 coats
0.25
gln
0.00
0.00
Lower Portion
ii) Horizontal 2x3 (1'-10")
iv) Vertical 3x2 (4'-2")
Total
110.00
5.50
115.50
@ 0.145 lb/Rft.
5 mm thick glass
Upper Portion
3(1'-4") (1'-10")
Lower Portion
3(4'-3") (1'-10")
20.00
Rft.
Rft.
7.60
7.56 Sft.
23.375
30.935
1.54
32.475
Add 5% wastage
Total
Contractor's Profit & O
Total
0.00
11.00 Rft.
25.12 Rft.
55 Rft.
Per Kg.
per gln
0.00
0.00
0.00
Percent
LABOUR
1
2
3
Black smith
Welder
Welding machine on hire basis
Page 59
0.50
0.50
0.50
No.
No.
0.00
0.00
120.00
per day
per day
0.00
0.00
60.00
4
5
6
0.25
0.50
No.
No.
0.00
0.00
L.S.
per day
per day
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 60
43.
Providing and fixing windows consisting of M.S. Box section frame 2"x1", leaves frame
1-"x1" Box section frame for glazing 3/8"x3/8" using 16 SWG sheet 'U' shaped rubber
supported with 1"x1/8" M.S. flat for fixing 5 mm thick glass panes M.S. box section frame
"x" of 16 SWG for fixing 24 SWG wire gauze on outer side by means of "x1/8" M.S. flat
and screws I/C all C.P. fitting and painting 3 coats complete in all respect.
Detail
Qty
Amount
12.00 Rft.
5.75 Rft.
Total
Add 5% wastage
Total
@ 1.55 lb/ft.
M.S. box section for leaf 1'-1"x1" of 16 SWG
Vertical
Horizontal
2x2x4-'
2x2x1 - 3/16'
Kg.
0.00
Per Kg.
0.00
5.50 Rft.
7.25 Rft.
37.00 Rft.
1.85 Rft.
38.85
19.74
Kg.
0.00
Per Kg.
0.00
17.00
7.25
5.50
7.25
37.00
1.85
38.85
Kg.
0.00
Per Kg.
0.00
Kg.
0.00
Per Kg.
0.00
17.00
7.25
24.25
Rft.
Rft.
Rft.
Total
@ 1.12 lb/Rft.
M.S. Box section 3/8"x3/8" of 16 SWG for glazing.
for leave
2x2x4-'
Horizontal 2x2x1-13/16
Fan light 2x2x1'-3/8
2x2x1'-13/16
Total
Add 5% wastage
8.00 Rft.
3.63 Rft.
29.375 Rft.
1.468 Rft.
30.343
21.34
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
5.82
@ 0.33 lb/Rft.
M.S. box section "x" of 16 SWG for fixing wire
gauze
for leave
2x2x4'-
17.00 Rft.
2x2x1'-13/16
7.25 Rft.
for fan light 2x2x1'-3/6
5.50 Rft.
2x2x1'-13/16
7.25 Rft.
Total
37.00 Rft.
Add 5% wastage
1.85 Rft.
Total
38.85
7.93
@ 0.45 lb/Rft.
M.S. flat 1"x1/8" for fixing glazing.
for leaves
2x2x4-'
17.00 Rft.
2x2x1'-13/16
7.25 Rft.
for fixed glazing 2x2x1'-3/8
5.50 Rft.
2x2x1'-13/16
7.25 Rft.
Total
37.00 Rft.
Page
Add 5% wastage
1.8561 Rft.
Total
@ 0.424 lb/ft.
M.S. flat for wire gauze "x1/8"
side
2x6'
central 2x6'
horizontal 2x4x1'-13/16
38.85
Add 5% wastage
10
Total
@ 0.318 lb/ft.
Holdfast of angle iron (1-"x1")x1/8"
6x' = 4.50 Rft.
@ 1.27 lb/Rft.
G.I. wire gauze 24 SWG 12x12 meshes
2x4-'x1-13/16'
2x1-3/8'x1-13/16'
Total
Add 10% wastage
7.47
Kg.
0.00
12.00 Rft.
12.00 Rft.
14.50 Rft.
38.50 Rft.
1.93 Rft.
40.43
5.83
kg.
0.00
Per Kg.
0.00
2.59
Kg.
0.00
Per Kg.
0.00
15.40
4.98
20.38
2.04
22.42
Sft.
Sft.
Sft.
Sft.
22.42
Sft.
0.00
14.52
4.66
19.18
1.92
21.10
Sft.
Sft.
Sft.
Sft.
21.10
Sft.
0.00
17.00 Rft.
7.25 Rft.
5.50 Rft.
7.25 Rft.
37.00 Rft.
3.70 Rft.
40.70
40.70
Rft.
0.00
91.00
Nos.
0.00
11
Machine screws
12
6.00
Nos.
0.00
Each
0.00
13
2.00
Nos.
0.00
Each
0.00
14
2.00
Nos.
0.00
Each
0.00
15
G.I. stay
2.00
Nos.
0.00
Each
0.00
16
64.00
L.S.
64.00
17
Paint
(225 mm long)
Total
Contractor's Profit & O
Total
0.50
20.00
gln
0.00
per gln
Percent
0.00
0.00
0.00
LABOUR
1
2
3
4
Black smith
Welder
Welding machine on hire basis for day
Electrode
Page 62
0.34
0.34
0.34
No.
No.
day
0.00
0.00
0.00
per day
per day
per day
L.S
0.00
0.00
0.00
5
6
(Glazier)
Total
Sundries
Total
Contractor's Profit & O
Total
0.50
0.25
No.
No.
0.00
0.00
per day
per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Rs.
Rs.
Rs.
Rs.
Page 63
0.00
Say
Say
0.00
0.00
Say
Say
0.00
0.00
44.
Providing and fixing windows consisting of M.S. Box section frames 2"1" leaves frame
1"1" box section frame for glazing 3/8"x3/8" using 16 SWG sheet 'U' shaped rubber
supported with 1"x1/8" M.S. flat for fixing 5 mm thick glass panes M.S. box section frame
"x" of 16 SWG for fixing 24 SWG wire gauze on outer side by means of "x1/8" M.S. flat
and screws including grill of M.S. flat "x1/8" or "x" square bar with independent frame
of "x" box section of 16 SWG i/c all C.P. fitting and painting 3 coats complete in all
respect.
Detail
Qty
Amount
12.00 Rft.
5.75 Rft.
Total
Add 5% wastae
Total
@ 1.55 lb/ft.
M.S. box section for leaf 1"x1" of 16 SWG
Vertical
Horizontal
2x2x4'-
2x2x1 - 13/16'
Kg.
0.00
5.50 Rft.
7.25 Rft.
37.00 Rft.
1.85 Rft.
38.85
19.74
Kg.
0.00
17.00
7.25
5.50
7.25
37.85
1.85
38.85
5.82
Kg.
0.00
7.93
Kg.
0.00
17.00
7.25
24.25
Rft.
Rft.
Rft.
Total
@ 1.12 lb/Rft.
M.S. Box section 3/8"x3/8" of 16 SWG for glazing.
for leaves
2x2x4'-
Horizontal 2x2x1'-13/16
Fan light 2x2x1'-3/8
2x2x1'-13/16
Total
Add 5% wastage
8.00 Rft.
3.63 Rft.
29.375 Rft.
1.468 Rft.
30.343
21.34
@ 0.33 lb/Rft.
M.S. box section "x" of 16 SWG for fixing
wire gauge
for leaves
2x2x4-'
17.00
2x2x1'-13/16
7.25
for fan light 2x2x1'-3/6
5.50
2x2x1'-13/16
7.25
Total
37.00
Add 5% wastage
1.85
Total
38.85
@ 0.45 lb/ft.
Page 64
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
0.318
17.00
7.25
5.50
7.25
37.00
1.85
38.85
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
7.47
Kg.
0.00
12.00 Rft.
12.00 Rft.
14.50 Rft.
38.50 Rft.
1.93 Rft.
40.43
5.83
Kg.
0.00
0.00
lb/ft.
2.59
Kg.
Sft.
0.00
10
15.40
4.98
20.38
2.04
22.42
Sft.
Sft.
Sft.
Sft.
22.42
Sft.
0.00
14.52
4.66
19.18
1.92
21.10
Sft.
Sft.
Sft.
Sft.
21.10
Sft.
0.00
Page 65
11
17.00 Rft.
7.25 Rft.
5.50 Rft.
7.25 Rft.
37.00 Rft.
3.70 Rft.
40.70
40.70
Rft.
0.00
91.00
Nos.
0.00
12
Machine screws
13
6.00
Nos.
0.00
Each
0.00
14
2.00
Nos.
0.00
Each
0.00
15
2.00
Nos.
0.00
Each
0.00
16
G.I. stay
2.00
Nos.
0.00
Each
0.00
17
Cement
Sand
Bajri
18
Paint
Total
Contractor's Profit & O
Total
0.250 Cft.
0.60 Cft.
1.200
0.25
20.00
gln
0.00
P. Bag
0.00 Per % Cft.
200.00 100 Cft.
0.00
per gln
Percent
0.00
0.00
2.40
0.00
0.00
0.00
LABOUR
1
2
3
4
5
6
Black smith
Welder
Welding machine on hire basis for 1 day
Electrode
Fixer (glass panes) (Glazier)
Painter
Total
Sundries
Total
Contractor's Profit & O
Total
0.50
0.50
0.50
0.427
0.50
0.25
No.
No.
No.
No.
No.
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
0.00
0.00
0.00
0.00
Percent
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.
Rs.
Rs.
Rs.
Rs.
Page 66
0.00
Say
Say
0.00
0.00
Say
Say
0.00
0.00
45.
Detail
Qty
Amount
Total
Contractor's Profit & O
Total
20.00
Each
0.00
Each
0.00
0.00
0.00
0.00
Percent
LABOUR
Fitter
Total
Sundries
Total
Contractor's Profit & O
Total
0.75
No.
0.00
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
Percent
ITEM RATE
Labour Rate / Each
Composite Rate/Each
Rs.
Rs.
Page 67
Say
Say
0.00
0.00
46.
Detail
Qty
Amount
Cost of grating
Total
Contractor's Profit & O
Total
1.00
20.00
Sft.
0.00
0.00
0.00
0.00
Percent
LABOUR
1
2
Mason
Cololies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
0.10
0.05
Nos
Nos.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate /Sft.
Composite Rate per Sft.
Rs.
Rs.
Rs.
Rs.
Page 68
0.00
0.00
Say
Say
0.00
0.00
0.00
Say
Say
0.00
0.00
47.
Detail
Qty
Amount
Black Smith
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total
1.00
1.00
No.
No.
0.00
0.00
Per day
Per day
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
0.00
0.00
Percent
ITEM RATE
Labour Rate /Lft.
Labour Rate Per Metre
Rs.
Rs.
Page 69
Say
Say
0.00
0.00
48.
Providing and fixing angle Iron railing, using 2"x2"x3/8" angle iron post 4 foot long, 5' to 6'
2"x2"x3/8" angle iron top rail and two rows of M.S. flat 2"x" including fixing to side of bri
structure with "U" bolt 1' long " dia, painting etc complete in all respects.
Detail
Qty
Amount
22.50 Rft.
24.00 Rft.
46.50 Rft.
2.33 Rft.
48.83
132.71
@ 5.99 lb/ft.
Wastage 5%
Total
2
0.00
Per Kg.
0.00
Kg.
0.00
Per Kg.
0.00
Nos.
0.00
Each
0.00
0.056
Litre
48.00 Rft.
2.40 Rft.
50.40
49.39
@ 2.16 lb/Rft.
Kg.
20.00
0.00
0.00
0.00
0.00
Percent
LABOUR
1
2
3
4
Welding 15 No . welds
Fitter
Coolies (Unskilled)
Painter
Total
Sundries
Total
Contractor's Profit & O
Total
15.00
0.375
1.50
0.125
Nos
No.
Nos.
No.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs.
Rs.
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
10.00 Percent
20.00
Percent
ITEM RATE
Labour Rate /Rft.
Composite Rate/Rft.
Labour Rate per RM
Composite Rate per RM
Page 70
49.
Providing and fixing barbed wire fencing, consisting of 1"x1"3/16" angle iron post 3 ft.
long 5 to 6 ft. centre to centre embedded in cement concrete 1:4:8 base of size 9"x9"12"
and three rows of barbed wire painting posts etc complete in all respects.
Detail
Qty
Amount
29.25 Rft.
1.46 Rft.
30.71 Rft.
@ 1.84
25.64
Kg.
0.00
Per Kg.
0.00
5.06
Cft.
0.00
Cft.
0.00
Kg.
0.00
Kg
0.00
Nos.
0.00
per No.
0.00
5.06
20.00
9.00
0.00
0.00
0.00
LABOUR
1
2
5.06
Cft.
0.00
0.25
0.25
9
No.
No.
Nos.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rs.
Rs.
Rs.
Rs.
Page 71
per day
per day
Each
0.00
Say
Say
0.00
0.00
Say
Say
0.00
0.00
50.
Providing and fixing barbed wire fencing on compound wall consisting of 1"x1"3/16"
angle iron post 3 ft. long 4 apart embedded in cement concrete 1:4:8 base of size 6"x6"x9"
and 4 rows of barbed wire , including binding wire, painting posts, etc. complete in all
respects.
Detail
Qty
Rate Analysis for 48
Amount
Rft.
MATERIAL
1
39.00 Rft.
3.90 Rft.
42.90 Rft.
@ 1.84
35.81
Kg.
0.00
Per Kg.
0.00
2.44
Cft.
0.00
Cft.
0.00
Kg.
0.00
Per Kg.
0.00
Nos.
0.00
per No.
0.00
2.44
Total
Contractor's Profit & O
Total
20.00
13.00
0.00
0.00
0.00
Percent 0.00
LABOUR
1
2
2.44
Cft.
0.00
0.70
0.75
13
No.
No.
Nos.
0.00
0.00
0.00
0.00
0.00
0.00
per day
per day
Each
0.00
0.00
0.00
0.00
0.00
0.00
Rs.
Rs.
Say
Say
0.00
0.00
Rs.
Rs.
Say
Say
0.00
0.00
Page 72
51
Providing and fixing all types of partly fixed and partly openable glazed anodized bronze colour a
delux section of M/s. Al-Cop or Pakistan cables boring showkhat frame of size 40mm x 100mm and lea
x 40mm wide sections i/c the cos tof 5mm thick imported tinted glass with aluminium triangular gol
to support the glass and leaf edgings using approved standard fittings, locks, 3" wide long handle
required as approved by the engineer inchrage (Follow Note Below).
Detail
Qty
MATERIAL
a)
Amount
3
1.6 mm thick
Unit = 4 x 10
40 Sft.
7
Cost of Material
4'x1"
i) Chowkhat Frame
13"x6"x6"x9"
40mm x 100 mm
4'-0
3 x 4
=
2 x 10 =
1 x 3
Total
Add Wastage 10%
Total
12.00
20.00
3.00
35.00
3.50
38.50
Rft.
Rft.
Rft.
Rft.
27.00
5.50
32.50
3.25
35.75
Rft.
Rft.
Rft.
28.00
8.00
36.00
1.80
37.80
Rft.
Rft.
Rft.
Rft.
0.00
Rft
0.00
0.00
per No.
0.00
Rft.
0.00
per No.
0.00
40.00
Sft.
0.00
Sft.
0.00
20.00
28.00
5.50
53.50
5.35
58.85
Rft.
Rft.
Rft.
Rft.
0.00
per No.
0.00
Rft.
=
=
Total
Add Wastage 5%
Total
iv) Imported tinted glass 5 mm
4 x 10
Rft.
vi) Pivots
4.00
Nos.
0.00
Each
L.S
0.00
8.00
Rft.
0.00
Rft.
0.00
1.00
No.
0.00
Each
0.00
2.00
Nos.
0.00
Each
0.00
Total
B)
0.00
0.00
Labour
a) Labour Charges
For Manuracturing and Fabrication
Aluminium Technician
Carriage Cooly
Carriage Charges
2.00
3.00
40.00
Nos.
Nos.
L.S.
0.00
0.00
per day
per day
0.00
0.00
0.00
Sft.
0.00
Sft.
0.00
0.00
0.00
0.00
0.00
0.00
10.00 Percent
20.00
Percent
ITEM RATE
Labour Rate /100 Rft.
Rs.
Say
0.00
Rs.
0.00
Say
0.00
Note :
i) Increase rate by 20/- P. Sft,. If sections will be of 2mm thickness
ii) Reduce rate by 20/- P. Sft. If sections will be of dull aluminium shade
iii) Reduce rate by 20/- P. Sft if using local pain glass
Page 74
ANALYSIS OF RATE
IRON WORK
52 Providing and fixing all types of glazed aluminium windows of anodized bronze colour partly fixed and
party sliding using deluxe section of M/s. Al-Cop or Pakistan Cables having Frame of size 100mm x
20mm and leaf frame sections of 50mm x 20mm, all of 1.6mm thickness i/c 5mm thick imported
tinted glass with rubber gasket using approved standard latches, hardware etc., as approved by the
engineer incharge.
4'
6'-0
(A)
COST OF MATERIAL
a)
12.00
9.00
21.00
2.10
23.10
Total
Wastage 10%
Total
Rft.
Rft.
Rft.
Rft.
Rft.
@ Rs. 60/b)
Rs.
12.00
12.00
24.00
2.40
26.40
Total
Wastage 10%
Total
@ Rs.
c)
Rft.
Rft.
Rft.
Rft.
Rft.
Rs.
Rubber gasket
4x4 =
2 x 5.25 =
16.00
10.50
26.50
2.65
29.15
Total
Wastage 10%
Total
@ Rs.
B/F
d)
Cost of hardwares
e)
Latches of matching
shade
f)
L.S
1 No.
Rft.
Rft.
Rft.
Rft.
Rft.
Rs.
Rs.
Rs.
Rs.
Rs.
6 x 4.50 = 27 Sft.
@ Rs.
g)
(B)
Rs.
Rs.
Rs.
Rs.
Rs.
2 Nos.
Rs.
3 Nos.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Polistevene or polisulphide
for water tight
L.S
Total
Contractor's 20% Prof
Total
LABOUR
a)
b)
Notes :
i)
ii)
iii)
Reduce rate by
Reduce rate by
Reduce rate by
Labour Rate
P. Sft
P. Sft
P. Sft
27
Composite Rate =
27
Say Rs.
Page 76
S.No.
LB-001
LB-002
LB-003
LB-004
LB-005
LB-006
LB-007
LB-008
LB-009
LB-010
LB-011
LB-012
LB-013
LB-014
LB-015
LB-016
LB-017
LB-018
LB-019
LB-020
LB-021
LB-022
LB-023
LB-024
LB-025
LB-026
LB-027
LB-028
LB-029
LB-030
LB-031
LB-032
LB-033
LB-034
LB-035
LB-036
LB-037
LB-038
LB-039
LB-040
LB-041
LB-042
LB-043
LB-044
LB-045
LB-046
LB-047
LB-048
LB-049
LB-050
LB-051
LB-052
LB-053
LB-054
LB-055
LB-056
LB-057
LB-058
Labour
Chowkidar
Gate Keeper
Beldar
Boatman
Bullockman
Cartman
Camelman
Donkeyman
Greaser
Oiler
Punkha Cooly
Sweeper
Sewerman
White Washer
Cooly Un-skilled (all types)
Waherman
Bahishti
Chainman
Dresser Earthwork
Head Khalasi Survey
Hammar Man
Mali
Quarryman
Skilled Cooly
Tar Sprayer
Armature Winder
Auto Electric Mechanic
Blacksmith
Carpenter
Caner
Chiseler
Denter
Driller
Driver
Electrician
Furniture Polisher
Glazier
Instrument Machanic
Machine Man
Mason
Electric Motor Winder
Moulder
Mechanic
Pettern Maker
Pipe Fitter
Plumber
Spray Painter
Sawyer
Turner
Tailor
Tin Smith
Welder
Boatman with large boat
Boatman with small boat
Bullock (each) (without attendant)
Camel (each) (without attendant)
Donkey (each) (without attendant)
Bullock Cart (without bullock & attendant)
Page 1
UNIT
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
RATE
LB-059
LB-060
LB-061
LB-062
LB-063
LB-064
LB-065
LB-066
LB-067
LB-068
LB-069
LB-070
LB-071
LB-072
LB-073
LB-074
LB-075
LB-076
LB-077
LB-078
LB-079
LB-080
LB-081
LB-082
LB-083
LB-084
LB-085
LB-086
LB-087
LB-088
LB-089
LB-090
LB-091
LB-092
LB-093
LB-094
LB-095
LB-096
LB-097
LB-098
LB-099
LB-100
LB-101
LB-102
LB-103
LB-104
LB-105
LB-106
LB-107
LB-108
LB-109
LB-110
LB-111
LB-112
Per day
Per day
Per Day
Per day
Per day
Per day
Per day
Per day
P.Month
P.Month
P.Month
P.Month
P.Month
P.Month
P.Day
P.Day
Per Day
Per Day
Per Day
P.Day
Per Day
Per Day
P. Acre
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Page 3
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
CHAPTER NO. 14
LINING OF CANAL
DESCRIPTION
OF
ITEM NO
1:
In Bed.
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Labour
Rate Analyses for 125 Sft
Dresser
Unskilled Cooly
Total
Sundries
Total
0.33 No
0.77 No
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Rs.
Say
Rs.
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
Page 1
Item No.
On Slope.
Unit Rate (British System) per 100 Sft
Detail
Qty
Labour
Rate Analyses for 125 Sft
Dresser
Unskilled Cooly
Total
Sundries
Total
0.50 No
1.00 No
Rate
Per Unit (Rs.)
P. Day
P. Day
Amount (Rs.)
## Percent
Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Rs.
Say
Rs.
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
Page 2
DESCRIPTION
OF
ITEM NO
2:
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
0.50 Bag
18.00 Cft
P. Bag
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Rate Analyses for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
0.50 No
1.50 No
0.50 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Composite Rate for 100 Sft
Composite Rate for 1 Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
Page 3
DESCRIPTION
OF
ITEM NO
3:
a)
In Bed.
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
0.34 Bag
4.20 Cft
P. Bag
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Rate Analyses for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
0.33 No
1.00 No
0.50 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Composite Rate for 100 Sft
Composite Rate for 1 Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
Page 4
Item No.
On Slope.
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
0.34 Bag
4.20 Cft
P. Bag
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Rate Analyses for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
0.50 No
1.25 No
0.50 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Composite Rate for 100 Sft
Composite Rate for 1 Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
Page 5
DESCRIPTION
OF
ITEM NO
4:
a)
ratio 1:3
In Bed.
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
0.70 Bag
2.50 Cft
P. Bag
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Rate Analyses for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
0.33 No
1.00 No
0.50 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Composite Rate for 100 Sft
Composite Rate for 1 Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
Page 6
Item No.
ratio 1:3.
On Slope.
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
0.70 Bag
2.50 Cft
Each
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Rate Analyses for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
0.50 No
1.25 No
0.50 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Composite Rate for 100 Sft
Composite Rate for 1 Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
Page 7
DESCRIPTION
OF
ITEM NO
5:
a)
In Bed.
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
1.56 Bag
11.70 Cft
P. Bag
Cft
Total
Contractor's Profit & Ov ## Percent
Total
0.50 No
1.25 No
0.50 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Composite Rate for 100 Sft
Composite Rate for 1 Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
Page 8
Item No.
On Slope.
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
1.56 Bag
11.70 Cft
P. Bag
Cft
Total
Contractor's Profit & Ov ## Percent
Total
0.75 No
1.50 No
0.50 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Composite Rate for 100 Sft
Composite Rate for 1 Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
Page 9
DESCRIPTION
OF
ITEM NO
6:
In Bed.
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Brick Tiles
Cement
Sand
Per
1000 Nos
P. Bag
Cft
###### Nos
3.44 Bag
25.70 Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
2.50 No
5.00 No
0.75 No
## Percent
Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
The rates are only for laying tiles over 1/8" (6mm) thick layer of 1:6 mortar items 1 to 5
above are payable separately.
Page 10
Item No.
On Slope.
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Brick Tiles
Cement
Sand
###### Nos
3.44 Bag
25.70 Cft
1000 Nos
P. Bag
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
2.75 No
6.00 No
0.75 No
P. Day
P. Day
P. Day
## Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
The rates are only for laying tiles over 1/8" (6mm) thick layer of 1:6 mortar items 1 to 5
above are payable separately.
Page 11
DESCRIPTION
OF
ITEM NO
7:
In Bed.
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Brick Tiles
Cement
Sand
###### Nos
6.00 Bag
22.50 Cft
1000 Nos
P. Bag
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
2.50 No
5.00 No
0.75 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
The rates are only for laying tiles over 1/8" (6mm) thick layer of 1:3 mortar items
1 to 5 above are payable separately.
Page 12
Item No.
On Slope.
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Brick Tiles
Cement
Sand
###### Nos
6.00 Bag
22.50 Cft
1000 Nos
P. Bag
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
2.75 No
6.00 No
0.75 No
P. Day
P. Day
P. Day
## Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
The rates are only for laying tiles over 1/8" (6mm) thick layer of 1:3 mortar items
1 to 5 above are payable separately.
Page 13
DESCRIPTION
OF
ITEM
8:
In Bed.
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Bricks
Cement
Sand
###### Nos
3.44 Bags
25.70 Cft
1000 Nos
P. Bag
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
2.50 No
5.00 No
0.75 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
The rates are only for laying bricks over 1/8" (6mm) thick layer of 1:6 mortar items
1 to 5 above are payable separately.
Page 14
Item No.
On Slope.
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Bricks
Cement
Sand
###### Nos
3.44 Bags
25.70 Cft
1000 Nos
P. Bag
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
2.75 No
6.00 No
0.75 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
The rates are only for laying bricks over 1/8" (6mm) thick layer of 1:6 mortar items
1 to 5 above are payable separately.
Page 15
DESCRIPTION
OF
ITEM No
9:
In Bed.
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Bricks
Cement
Sand
###### Nos
6.00 Bags
22.50 Cft
1000 Nos
P. Bag
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
2.50 No
5.00 No
0.75 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
The rates are only for laying bricks over 1/8" (6mm) thick layer of 1:3 mortar items
1 to 5 above are payable separately.
Page 16
Item No.
On Slope.
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Bricks
Cement
Sand
###### Nos
6.00 Bags
22.50 Cft
1000 Nos
P. Bag
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
2.75 No
6.00 No
0.75 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
The rates are only for laying bricks over 1/8" (6mm) thick layer of 1:3 mortar items
1 to 5 above are payable separately.
Page 17
DESCRIPTION
OF
ITEM NO
10:
In Bed.
Ratio 1:2:4
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
Aggregate
17.60 Bags
44.00 Cft
88.00 Cft
P. Bag
Cft
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
1.00 No
6.00 No
0.60 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
Page 18
Item No.
10
In Bed.
Ratio 1:3:6
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
Aggregate
13.00 Bags
46.00 Cft
92.00 Cft
P. Bag
Cft
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
1.00 No
6.00 No
0.60 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
Page 19
Item No.
10
In Bed.
Ratio 1:4:8
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
Aggregate
9.60 Bags
48.00 Cft
96.00 Cft
P. Bag
Cft
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
1.00 No
6.00 No
0.60 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
Page 20
Item No.
10
On Slope.
Ratio 1:2:4
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
Aggregate
17.60 Bags
44.00 Cft
88.00 Cft
P. Bag
Cft
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
1.25 No
7.00 No
0.50 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
Page 21
Item No.
10
On Slope.
Ratio 1:3:6
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
Aggregate
13.00 Bags
46.00 Cft
92.00 Cft
P. Bag
Cft
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
1.25 No
7.00 No
0.50 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
Page 22
Item No.
10
On Slope.
Ratio 1:4:8
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
Aggregate
9.60 Bags
48.00 Cft
96.00 Cft
P. Bag
Cft
Cft
Total
Contractor's Profit & Ov ## Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
1.25 No
7.00 No
0.50 No
P. Day
P. Day
P. Day
## Percent
Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
Page 23
CHAPTER NO. 2
OF
ITEM NO
1:
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
1.00 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Cft
Rs.
0.00
Say
0.00
Rs.
0.00
Say
0.00
Page 1
DESCRIPTION
OF
ITEM NO
2:
a)
Bricks
Detail
10" size.
Rate
Per Unit (Rs.)
Amount (Rs.)
1.25 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 1000 Nos
Rs.
Page 2
0.00
Say
0.00
Item No.
Bricks
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
1.00 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 1000 Nos
Rs.
Page 3
0.00
Say
0.00
DESCRIPTION
OF
ITEM NO
3:
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
1.25 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Bags
Rs.
Page 4
0.00
Say
0.00
DESCRIPTION
OF
ITEM NO
4:
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
0.12 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Nos
Rs.
Page 5
0.00
125
0.00
Say
0.00
DESCRIPTION
OF
ITEM NO
5:
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
0.75 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Mds
Rs.
0.00
Say
0.00
Rs.
0.00
Say
0.00
Page 6
DESCRIPTION
OF
ITEM NO
6:
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
0.60 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per Ton
Labour Rate per Tonne
Rs.
Rs.
Page 7
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION
OF
ITEM NO
7:
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
Labour
Unskilled Cooly
Total
Sundries
Total
0.06 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per Each
Rs.
Page 8
0.00
Say
0.00
DESCRIPTION
OF
ITEM NO
8:
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
Labour
Unskilled Cooly
Total
Sundries
Total
0.03 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per Each No.
Rs.
Page 9
0.00
Say
0.00
DESCRIPTION
OF
ITEM NO
9:
a)
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
2.50 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Nos
Rs.
Page 10
0.00
Say
0.00
Item No.
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
1.25 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Nos
Rs.
Page 11
0.00
Say
0.00
DESCRIPTION
OF
ITEM NO
10:
Detail
Rate Analysis
Labour
for
20
Amount (Rs.)
Ton
Unskilled Cooly
Total
Sundries
Total
Rate
Per Unit (Rs.)
5.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per Ton
Rs.
Rs.
Per Tonne
Page 12
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION
OF
ITEM NO
11:
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
3.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Mds.
Rs.
0.00
Say
0.00
Rs.
0.00
Say
0.00
Page 13
DESCRIPTION
OF
ITEM NO
12:
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
0.50 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne
Rs.
Rs.
Page 14
0.00
Say
Say
0.00
0.00
DESCRIPTION
OF
ITEM NO
13:
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
0.37 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Cft
Rs.
0.00
Say
0.00
Rs.
0.00
Say
0.00
Page 15
DESCRIPTION
OF
ITEM NO
14:
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
0.48 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Cft
Rs.
0.00
Say
0.00
Rs.
0.00
Say
0.00
Page 16
DESCRIPTION
OF
ITEM NO
15:
a)
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
1.25 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 1000 Gln.
Rs.
0.00
Say
0.00
Rs.
0.00
Say
0.00
Page 17
Item No.
15
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
1.25 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 1000 Gln.
Rs.
0.00
Say
0.00
Rs.
0.00
Say
0.00
Page 18
Item No.
15
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
0.16 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Cft
Rs.
0.00
Say
0.00
Rs.
0.00
Say
0.00
Page 19
Item No.
15
Detail
Rate Analysis
Labour
for
Rate
Per Unit (Rs.)
Amount (Rs.)
45 Ton
Unskilled Cooly
Total
Sundries
Total
16.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne
Rs.
Rs.
Page 20
0.00
0.00
Say
Say
0.00
0.00
Item No.
15
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
0.63 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Nos
Rs.
Page 21
0.00
Say
0.00
Item No.
15
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
1.25 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Nos
Rs.
Page 22
0.00
Say
0.00
DESCRIPTION
OF
ITEM NO
16:
a)
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
0.50 No
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Cft
Rs.
0.00
Say
0.00
Rs.
0.00
Say
0.00
Page 23
Item No.
16
Bricks
Detail
Rate Analysis
Labour
for
Rate
Per Unit (Rs.)
Amount (Rs.)
15,000 Nos
Unskilled Cooly
Total
Sundries
Total
16.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 1000 Nos
Rs.
Page 24
0.00
Say
0.00
Item No.
16
Detail
Rate Analysis
Labour
for
Rate
Per Unit (Rs.)
Amount (Rs.)
2,500 Nos
Unskilled Cooly
Total
Sundries
Total
16.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Nos
Rs.
Page 25
0.00
Say
0.00
Item No.
16
Detail
Rate Analysis
Labour
for
Rate
Per Unit (Rs.)
Amount (Rs.)
4,200 Nos
Unskilled Cooly
Total
Sundries
Total
16.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Nos
Rs.
Page 26
0.00
Say
0.00
Item No.
16
Detail
Rate Analysis
Labour
for
Rate
Per Unit (Rs.)
Amount (Rs.)
90 Ton
Unskilled Cooly
Total
Sundries
Total
16.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne
Rs.
Rs.
Page 27
0.00
Say
Say
0.00
0.00
Item No.
16
Detail
Rate Analysis
Labour
for
Rate
Per Unit (Rs.)
Amount (Rs.)
750 Nos
Unskilled Cooly
Total
Sundries
Total
16.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Nos
Rs.
Page 28
0.00
Say
0.00
DESCRIPTION
OF
ITEM NO
17:
Detail
Rate Analysis
Labour
for
Rate
Per Unit (Rs.)
Amount (Rs.)
40 Ton
Unskilled Cooly
Total
Sundries
Total
16.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne
Rs.
Rs.
Page 29
0.00
Say
Say
0.00
0.00
DESCRIPTION
OF
ITEM NO
18:
Detail
Rate Analysis
Labour
for
Rate
Per Unit (Rs.)
Amount (Rs.)
70 Ton
Unskilled Cooly
Total
Sundries
Total
16.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne
Rs.
Rs.
Page 30
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION
OF
ITEM NO
19:
Detail
Rate Analysis
Labour
for
Rate
Per Unit (Rs.)
Amount (Rs.)
1,000 Nos
Unskilled Cooly
Total
Sundries
Total
16.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Nos
Rs.
Page 31
0.00
Say
0.00
DESCRIPTION
OF
ITEM NO
20:
Detail
Rate Analysis
Labour
for
Rate
Per Unit (Rs.)
Amount (Rs.)
2,100 Nos
Unskilled Cooly
Total
Sundries
Total
16.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Nos
Rs.
Page 32
0.00
Say
0.00
DESCRIPTION
OF
ITEM NO
21:
Detail
Rate Analysis
Labour
for
Rate
Per Unit (Rs.)
Amount (Rs.)
2,000 Nos
Unskilled Cooly
Total
Sundries
Total
16.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Nos
Rs.
Page 33
0.00
Say
0.00
DESCRIPTION
OF
ITEM NO
22:
Detail
Rate Analysis
Labour
for
Rate
Per Unit (Rs.)
Amount (Rs.)
3,800 Nos
Unskilled Cooly
Total
Sundries
Total
16.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Nos
Rs.
Page 34
0.00
Say
0.00
DESCRIPTION
OF
ITEM NO
23:
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
4.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Nos
Rs.
Page 35
0.00
Say
0.00
DESCRIPTION
OF
ITEM NO
24:
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
2.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per 100 Nos
Rs.
0.00
Say
0.00
NOTE :
Rate for loading and unloading for Mobile trucks/ boats, item 1-15 will be 80%
of the rate of Railway Wagons.
Page 36
DESCRIPTION
OF
ITEM NO
25:
Detail
Rate Analysis
Labour
for
Rate
Per Unit (Rs.)
Amount (Rs.)
25 Ton
Unskilled Cooly
Total
Sundries
Total
6.00 Nos
0.00 P. Day
#### Percent
Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne
Rs.
Rs.
Page 37
0.00
0.00
Say
Say
0.00
0.00
MATERIAL
Unit
Kitchen Expenses (tea, meat, milt fuel fat & appliances)
LS-01 Ch. 3 Item 16 (i)
-Lantern,
Patromax
lamp
depreciation
and
K.
oil
LS-02 consumption Ch. 3 Item 16 (i)
-Kitchen
Utensil,
cost
of
repair
and
replacement
etc.
Ch.
LS-03
-3 Item 16 (i)
LS-04 Kitchen Utensil, cost of repair and replacement etc. Ch. -3 Item 16 (i)
LS-05 Construction of Temporary Island (Ch. 6 Item 7 (i)
-LS-06 Carriage of material to site of work (Boring Material) -(Ch 6 Item 7 (i)
LS-07 Hire charges of plant (Ch. 6 Item 8 (a) & (b)
-Hire charges of assembling bunch cable wire cutter
LS-08 stressing, jack Hydraulic pump, conce, fixer grout
injecting pump relievable observation and supply of
-recorded data of stresses. (Ch. 6 Item 20)
LS-09 Repair of plate for the down struts spacers (Ch. 6 Item -21)
Hire
charges of wire cutter stressing, Jack, Hydraulic
LS-10 pump relievable cone, observation and supply of recorded
-d
f
(Ch 6
21)
LS-11 Fixture (Ch. 9 Item 18)
-LS-12 Hire Charges of Spray Machine (Ch. 11 Item 6 i, ii & iii) -LS-13 Nail & Screws bolt and brackets (Ch. 12 Item 24 (a)
-LS-14 Accessories for fixing of Eave Board (Ch. 12 Item 28 (b)
LS-15 Cost of Putty and Nails (Ch. 12 Item 44 a)
LS-16 Electricity Charges (Ch. 12 Item 51)
LS-17 Hold Fast (Ch. 12 Item. 57 b)
-----
LS-18 Burner Charges, Kerosene Oil & Scraper (Ch. 13 Item 16)
LS-19 Misc. i.e. small T&P, working of Crane & Tar Boiler (Ch.
18 Item 10)
LS-20 Excavation and fixing (Ch. 18 Item 18 (iv) a)
LS-21 Jointing Plate with T Iron (Ch. 18 Item 18 (iv) a)
--
--
-------------
Page 1
---
RATE
Providing
hard wood
19 C)
Providing
hard wood
19 C)
Providing
hard wood
19 C)
Providing
hard wood
19 C)
Providing
hard wood
19 C)
Providing
hard wood
19 C)
Soldering
MATERIAL
Unit
and fixing temporary wooden tapered plug of
to each end of pipe line for 6" (Ch. 23 Table
-and fixing temporary wooden tapered plug of
to each end of pipe line for 8" (Ch. 23 Table
-and fixing temporary wooden tapered plug of
to each end of pipe line for 10" (Ch. 23 Table
-and fixing temporary wooden tapered plug of
to each end of pipe line for 12" (Ch. 23 Table
-and fixing temporary wooden tapered plug of
to each end of pipe line for 15" (Ch. 23 Table
-and fixing temporary wooden tapered plug of
to each end of pipe line for 18" (Ch. 23 Table
-etc. (Ch. 24 Item 5 i)
--
-------
--
--
----
Page 2
RATE
LIST OF MATERIAL
ITEM
MATERIAL
UNIT
RATE
01.001Cotton waste
Per Kg
Per Kg
01.002Grease
01.003H.S. Diesel oil
Per Ltr.
01.004Kerosine oil
Per Ltr.
01.005Mobil oil
Per Ltr.
01.006Average diesel consumption of a truck
miles/gallon
01.007Average mobile oil consumption of a truck
miles/gallon
Each
03.001Gun powder and fuse for blasting (1 pound and 1 fuse)
03.002Jhambs
Each
03.003Charakharies complete
Each
03.004Manila Rope 1"
Rft
03.005Cost of repair and replacement of 4 Nos. picks axes and 8 No Per Day
03.006Palana with namda for one donkey
Each
03.007Repair and replacement of sacks
Each
Each
03.008Tent
03.009Donkey hut
Each
03.010Royalty for pit sand
% Cft
03.011Nail bolts and nuts
Kg.
03.012Atta
P.Kg.
03.013Phak
per Md
per Md
03.014Grams
06.001Brick Ballast 1" (at site)
100 Cft
06.002Brick Ballast 1" to 1" (at site)
100 Cft
06.003Stone Ballast 1" to 1" (at source)
100 Cft
06.004Brick Bats
100 Cft
06.005Coarse sand (Chenab) (at site)
100 Cft
100 Cft
06.006Harrow/Sand (at site)
06.007Sand (Local) (at site)
100 Cft
06.008Cement (Grey)
Per Bag
Per Bag
06.009Cement (White)
06.010Shingle (Naturally Graded) at site (Bajri)
100 Cft
06.011Aggregate/Stone Crushed " to 1" (Graded) (at site)
100 Cft
M. Ton
06.012M.S. Bars (Plain) " and above (36000 PSI)
06.013M.S. Bars (Deformed) (40 grade)
M. Ton
06.014M.S. bars (Tor Steel 60 grade)
M. Ton
06.015Cost of casing pipe of 18" dia
Per Rft
06.016Cost of casing pipe of 20" dia
Per Rft
06.017Cost of casing pipe of 22" dia
Per Rft
06.018Cost of casing pipe of 24" dia
Per Rft
06.019Nail and Screw (Copper)
Per. Kg.
06.020Brush (Large)
Each
06.021Brush (Small)
Each
06.022Binding wire
Kg
06.023Special Clamps with bolts and nuts
Each
06.024Welding electrode
P.Bundle
06.025Prestressing Cable having 12 Nos. wire
P.Ton
06.026Anchorage cone
per set
06.027Corrugated sheath of 1-9/16" for 12/0.276" (7mm) cable
per metre
06.028Making good recesses
Each end
06.029Steel rope 1"
Rft
06.030U Clamp i/c 5/8" bolts & nuts
each
06.031Steel rope " dia
Rft
06.032Railway track including sleepers bolts & nuts complete
Rft
06.033Crow bar
Each
06.034Aluminum powder
per kg
06.035Aluminum sheet 1/16" to 1/8" (1.6 to 3 mm) thick
per kg
06.036Helical core (compressed for 10 tons)
per metre
06.037G.I. Sheet special "V shaped "
each
06.038Mastic strip
P.Rft
06.039Copper flashing 1/16" thick
P.Sft
06.040Rubber water stopper 10" wide and 1/4" thick
P.Rft
06.041Bitumen
P.Kg.
06.042Sawdust
P.Cft
06.043Wood for heating
P.Kg.
06.044Thermopore sheet 1" (40 mm) thick
m
06.045Thermopore sheet 1" (25 mm) thick
m
06.046Polythene @ 1.13 kg % Sft
P.Kg.
06.047Broken glass
% kg
07.001Ist class bricks 9" x 4" x 3" (225 x 112.5 x 75 mm)
%o Nos.
07.002Fire Clay Bricks 225 x 112.5 x 75 mm
Each
07.003Good earth/clay
100 Cft
07.004Fire resistant cement
0 Kg per bag
Page 1
ITEM
MATERIAL
UNIT
07.005Moulded Special bricks 9" x 4" x 3"
%o Nos.
07.006Sun dried bricks
%o Nos.
07.007Lime (Slaked)
Kg
07.008Lime (Unslaked)
Kg
07.009Brick grinded and sand
Cft
Per Kg.
07.010Hoop Iron
08.001Quarried Stone at source
100 Cft
08.002Headers or through stone (1.5" x 8" x 10")
Each
08.003Pitching stone at source
% Cft
08.004Charcoal
Per Kg
08.005Wood preservative (Heptaclore)
Per Ltr.
Per Kg.
08.006Steel
08.007Hand dressed stone average (2 Cft)
Each
08.008Hand dressed stone average (4 Cft.)
Each
09.001Brick tiles 300 x 150 x 50 mm (12"x6"x2" )
%o Nos.
1
%o Nos.
09.002 Brick tiles 300 x 150 x 40 mm 12"x6"x1 /2")
09.003Brick tiles 300 x 150 x 32 mm (12"x6"x1" )
%o Nos.
%o Nos.
09.004 Brick tiles 225 x 112.5 x 50 mm (9"x41/2"x2")
09.005Brick tiles 225 x 112.5 x 40 mm (9"x41/2"x1")
%o Nos.
09.006G.I. Plain Sheet 18 - 20 SWG
Per kg
09.007G.I Plain Sheet 22 - 24 SWG
Kg
Per Kg
09.008G.I. Corrugated sheet 18 - SWG
09.009G.I. Corrugated sheet 22 - 24 SWG
Per Kg
09.010G.I. Corrugated sheet 20 SWG
Per Kg
09.011G.I. Hook, Nuts and Bolts
Doz
09.012G.I. Washers
Per Kg
09.013Washers Limpet
Per Dozen
Kg
09.014Bhoosa
09.015Pig lead
Kg
09.016Cowdung (wet)
% Kg
09.017A.C. T-bend 100 mm
Each
09.018A.C. Shoe 100 mm
Each
09.019A.C. Ridge Sheet (6mm)
Rft
Per Kg.
09.020Fuel wood
09.021Wire Nails
Per Kg.
09.022Wind tie (rod)
P Kg.
09.023Bitumen washers
Doz
09.024Brick Aggregate
P. Cft
09.025Lead flashing 1/16" thick
P. Sft
09.026C.I. Heads 4"
Each
09.027Clamps with hold fasts etc. (For Rain Water Pipe)
Each
09.028C.I. water down pipe 4" (100mm) dia
P. Rft
09.029C.I. water down pipe down 3" (75mm) dia
P. Rft.
09.030C.I. shoes bend or offsets 4"
Each
09.031Corrugated A.C. sheets
P.Sft
09.032G.I. or limpet washers and bitumastic washers
Doz
09.033Wrought iron bracket complete with bolts, Nuts and rivets et
Each
09.034Polythene 0.03" (0.08 mm)
Pr. Kg.
09.035Thermopore " (12mm) thick
Per Sft.
09.036Thermopore " (19mm) thick
Per Sft.
09.037Thermopore 1" (25mm) thick
Per Sft.
09.038A.C. pipe 4" (100mm) dia
P.Rft
09.039U.I. Clips
Kg.
09.040Screws 3" & 2"
Kg.
10.001Murrum powder fine.
% Cft
10.002Cement concrete tiles 200 x 200 x 20 mm (8" x 8" x ")
Each
10.003Cement Concrete tiles 300 x 300 x 25 mm (12" x 12" x 1")
Each
10.004Cement Concrete tiles 225 x 225 x 20 mm (9" x 9" ")
Each
10.005Cement concrete tiles 150 x 150 x 20 mm (6" x 6" x ")
Each
10.006White Tile (Glazed) 6"x6"x"
Each
10.007Coloured Glazed tiles 150 x 150 x 6 mm (6" x 6" x ")
Each
10.008Coloured Glazed tiles 300 x 300 x 6 mm (12" x 12" ")
Each
10.009Mosaic marble chips tiles300 x 300 x 25 mm (12" x 12" x 1")
Each
10.010Rubber tiles 300 x 300 x 3 mm (12" x 12" x 1/8")
Each
10.011White glazed tiles 300 x 300 x 6mm (12" x 12" x ")
Each
10.012Dressed Stone 2'x2'x2"
Each
10.013Dressed Stone 2'x2'x3"
Each
10.014Carborandum Stone
Each
10.015Pigment for Cement/Concrete
Per Kg
10.016Marble Chips
Per Kg
10.017Marble Powder
100 Kg
10.018Neoprene strip 100 x 6 mm
P. Foot
10.019Wax Polish
3 Kg.
Page 2
RATE
ITEM
MATERIAL
10.020Tartaric Acid
10.021Hessian Cloth
10.022Linen Cloth
10.023Asphalt
10.024Sand Paper
10.025Brass Screws 50 mm long
10.026Glass stip 3 mm thick 40 mm wide
10.027Glass Strips 4 mm thick 40 mm wide
10.028Glass Strips 5 mm thick 50 mm wide
10.029Marble strips 6 mm thick 40 mm wide
10.030Marble strips 10 mm thick 40 mm wide
10.031Sutli
10.032Steam coal
10.0339" thick rubble or broken hard bricks
10.034Hard Marrum
10.035Floor Polish
10.036Adhesive Mixture dry
10.037Surkhi
10.038Fine Aggregate
10.039Primer
11.001Chopped Jute
11.002Distemper (Vinyle Emulsion)
11.003Distemper Plastic bound (Plastic Emulsion)
11.004Distemper Water bound
11.005Rice
11.006Pigment for colour wash
11.007Primer/red oxide pigment
11.008Chopped Straw
11.009Expended metal edge bead 5" wide
12.001Chir Ist Class
12.002Deodar Wood best quality
12.003Deodar Wood 2nd class
12.004Fire Wood
12.005Kail Ist class
12.006Shisham wood Ist class
12.007Teak wood
12.008Partal wood
12.009Kikar wood
12.010Sheets Aluminum 8 - SWG - 24 SWG (local)
12.011Sheets Aluminum " thick and above (local)
12.012Copper sheet 0.80 mm to 2.50 mm
12.013Copper sheet 3.00 mm to 6.00 mm
12.014Formica sheet (8' x 4')
12.015Plain Galvanized iron sheet
12.016Corrugated Galvanized iron sheet
12.017Commercial ply 6 mm thick
12.018Commercial ply 3 mm thick
12.019Shisham wood ply (6 mm thick)
12.020Teak wood ply (6 mm thick)
12.021Thermopore sheet " (12 mm) thick 20 kg/m (39" x 39")
12.022Thermopore sheet " (20 mm) thick 20 kg/m (39" x 39")
12.023Thermopore sheet 1" (25 mm) thick 20 kg/m (39" x 39")
12.024Masonite sheet 5 mm thick for partitions
12.025Masonite Sheet for ceiling
12.026Bacolite sheet (2.50 mm) thick (size 4' x 4')
12.027Bacolite sheet (3.75 mm) thick (size 4' x 4')
12.028Bacolite sheet (4.00 mm) thick (size 4' x 4')
12.029Rubber sheet 5 mm (size 4' x 6')
12.030Zinc Plate 525 x 11 mm
12.031Spike
12.032Glass pan 3 mm thick 16 x to 18 oz
12.033Glass pan 3 mm thick 24 x to 26 oz
12.034Glass plate " (6 mm) thick upto 8 SFT
12.035Glass plate " (6 mm) thick not exceeding 24 SFT
12.036Glass Plate 6 mm thick
12.037Glass Plate 8 mm
12.038Glass Plate " (12 mm) thick
12.039Glue
12.040Machine Screws 38.10 x 7.35 mm
12.041Iron strips 1" x 1/8"
12.042Brass finger plate
12.043Brass hinges 50 mm
12.044Brass hinges 63 mm
Page 3
UNIT
RATE
Per Kg
Per Mtr.
P. Kg.
P. Kg.
Per Doz.
Per Doz.
% Rft
% Rft
% Rft
Rft
Rft
Per Kg
Kg
%Cft.
%Cft.
P. Kg.
Per Kg.
P. % Cft.
% Cft.
P.Kg.
Per Kg
Per Gallon
Per Gallon
Per Gallon
Per Kg
Per Kg
Per Gln.
P.Kg
P. Rft
CFT
CFT
CFT
Kg
CFT
CFT
CFT
CFT
CFT
Per Kg
Per Kg
Per Kg
Per Kg
Per sheet
Per Kg
Per Kg
SFT
SFT
SFT
SFT
P. sheet
P. sheet
P. sheet
P. Sft
P.Sft
eet 4'x4' size
eet 4'x4' size
eet 4'x4' size
eet 4'x6' size
Kg
Per Kg
SFT
SFT
SFT
SFT
SFT
SFT
PSF
Per Kg
Per Doz.
Kg
Each
Each
Each
ITEM
MATERIAL
UNIT
12.045Brass hinges 75 mm
Each
12.046Brass hinges 100 mm
Each
12.047Brass hinges 125 mm
Each
12.048Brass tower bolts 300 mm
Each
12.049Brass tower bolts 225 mm
Each
Each
12.050Brass tower bolts 200 mm
12.051Brass tower bolts 150 mm
Each
12.052Steel nut and bolts (all sizes)
Per Kg
12.053Iron hold fast (for doors/windows)
Each
12.054Iron handle 100 mm 4"
Each
12.055Iron handle 150 mm (6")
Each
Each
12.056Iron handle 200 mm (8")
12.057Brass handle 100 mm
Each
12.058Brass handle 150 mm
Each
12.059C.P. handles 4" (2nd Quality)
Rft
12.060C.P. handles 4"
Each
12.061C.P Handle 6"
P.Doz
Each
12.062C.P. handles 6" (Best Quality)
12.063Handle
Each
12.064Iron sliding bolt 200 mm (8") with screws
Each
Each
12.065Iron sliding bolt 250 mm (10") with screws
12.066Iron sliding bolt 300 mm (12") with screws
Each
12.067Racal plugs 1" (40mm) long
Each
Each
12.068Racal Plug (small)
12.069Push plate (Stainless)
Each
12.070Kikai plate (Aluminum) 4" wide 22 gauge 12" long
Each
12.071Rim lock (China)
Each
12.072Mortise lock (Local)
Each
12.073Sliding bolts Brass 300 mm (12")
Each
12.074Hinges (Iron) 50 mm
Each
12.075Hinges (Iron) 75 mm
Each
12.076Hinges (Iron) 100 mm
Each
12.077Hinges (Iron) 125 mm
Each
12.078Double action spring Hinges (Brass) Medium 4" - 5" (100 to 1 Per pair
12.079Double action spring Hinges (Iron) 4"-5" (100 to 125 mm)
Each set
12.080Brass screw 20 mm
Doz.
12.081Brass screw 25 mm
Doz.
12.082Brass screw 40 mm
Doz.
12.083Door Stops 150 mm
Each
12.084Door stopper 150 mm (wooden)
Each
12.085Foot hinges 1"
Each
12.086Tee hinges 250 mm
Each
12.087Tee hinges 150 mm
Each
12.088Tee hinges 200 mm
Each
12.089Butt Hinges (125mm)
Each
12.090Butt Hinges (150mm)
Each
12.091Hasp & staples (medium size)
Each
12.092Iron tower bolt 100 mm long
Per Doz.
12.093Iron tower bolt 150 mm long
Per Doz.
12.094Iron tower bolt 225mm long
Per Doz.
12.095Iron tower bolt 250 mm long
Per Doz.
12.096Iron tower bolt 300 mm long
Per Doz.
12.097Hold fast with pivot & clamp 4"
Each
12.098Hold fast with pivot & clamp 6"
Each
12.099Hold fast with pivot & clamp 8"
Each
12.100spring hinges (doors/windows)
Each
12.101Wrought Iron Hold Fast (small)
Each
12.102Wrought Iron Hold Fast (Large)
Each
12.103Deodar wooden beading (1" x ")
Rft
12.104Deodar wooden lipping 6 mm
Rft
12.105Deodar wooden lipping 3/8
Rft
12.106Chord with hook (" x ")
Each
12.107Wooden cleat for door
Each
12.108G.I. hook with clamp (doors/windows)
Each
12.109Khunda - Chapka (For Almirah)
Each
12.110Rubber Pad Stopper
Each
12.111Wire Gauze (12x12)
Sft.
12.112Wooden Plug for door
Each
12.113Expended Metal (12mm to 20mm mesh of 16 gauge)
Sft.
12.114Hinges 10" (250mm)
Each
12.115Hinges chocks 4" (100mm) (for battened doors)
Each
12.116Hasp and staple
Each
12.117Hold fast with pivots & clamp for framed and braced doors
Each
Page 4
RATE
ITEM
MATERIAL
UNIT
RATE
12.118Sliding bolts 18" (450mm) long
Each
12.119M.S. Angle Iron 1"x1"x" (40x40x6mm)
P.Kg.
12.120M.S. Flat 6"x"x1/8" (150x6x3mm)
P.Kg.
12.121Hinges Chocks 3" (75mm)
Each
12.122Screws upto 1" long
Doz
Per Doz.
12.123Screws above 1" long
12.124Nails of sorts
Pr. Kg.
12.125Brass spring hinges Complete with Screws
Each
12.126Brass sliding bolt 10" (250mm) long 'complete with screws &
Each
12.1271" (25mm) thick solid flush shutter
Sft.
12.128Solid flush door 1" thick
Sft.
Each
12.129C.P. dasti I/C screws
12.130Hard Board
Sft
12.131Brass butt hinges 2" (50mm)
Each
12.132Brass butt hinges 6" (150mm)
Each
12.133Sawing Charges
Sft
12.134Tie rod welding and fixing arragement
Each
Sft.
12.135Vin board " thick
12.136Vin board " thick
Sft.
12.137Chip Board " (20mm) 700 density
P.Sft
P.Sft
12.138Chip Board " (12mm) 700 density
12.139Full hinges " (20mm) wide (Imported)
Rft
12.140Catcher
Each
Each
12.141lock China
12.142C.P. Hanger rod with 2 hooks
Each
12.143Hanger hook including pull out rod
Each
12.144Brass hooks
Each
12.145Door rubber stopper
Each
12.146G.I. Hook
Each
12.147Hooks forPunkha Pole
Per Dozen
12.148Nails
P.Kg.
12.149Washers
Each
12.150Hard Wood Gutty
Each
12.151M.S clamp
Each
12.152M.S hook
Each
12.153Sand Paper
Each
12.154Tower bolt C.P.
Each
12.155C.P. finger plate with screws
Each
12.156M.S. sheets (plain) 20 SWG
Kg
12.157M.S. Sheet 18 SGW
Sft
12.158M.S. Sheet 22 SGW
Sft
12.159Curtain Railing
Rft.
12.160Electrod
Pkt
12.161Gola (Wood)
P. Ft.
13.001Black Japan paint
Gln.
13.002Chalk powder
Per Kg
13.003Dana Lakh
Per Kg
13.004Emulsion paint
Per Gallon
13.005Paint Enamel
P. Gln
13.006French Polish
Per Kg
13.007Gum and Gun rasin
Per Gallon
13.008Linseed oil
Per Kg
13.009Road marking enamel
Per Ltr.
13.010Solignum paint (Imported)
Per Gallon
13.011Spirit
Per Ltr.
13.012Varnish
Kg
13.013White Enamel paint
Per Gln.
13.014Caustic Soda
Kg
13.015Painting Brushes (average rate)
Each
13.016Mineral Pitch
Kg
13.017Primer Paint
P.Gln
13.018Reflective Paint
P. Gln
13.019Reflective Tape/Paper
P. Sft.
13.020Creosote
P. Gln
13.021Steel Scrapper
Each
13.022Kerosine Oil
Litre
13.023Terpentine oil
Per Ltr.
13.024Water Proofing Emulsion Paint
P.Kg.
16.001Jute bag (Empty) (1.25 Cft.)
Each
16.002New jute bag (4 to 5 Cft.)
Each
16.003Pitching Stone
% Cft
16.004Munj patha ban
Per Kg
16.005G.I Wire No.15
Per Kg
Page 5
ITEM
MATERIAL
UNIT
16.006Bamboo (60 - 120 mm dia) 2.5 meter to 3.0 metre long
Each
16.007Bamboo (60 - 120 mm dia) 3.0 meter to 3.75 metre long
Each
16.008Bamboo (60 - 120 mm dia) 3.75 meter to 4.25 metre long
Each
16.009Bamboo (60 - 120 mm dia) 4.25 meter to 4.90 metre long
Each
16.010Bamboo (60 - 120 mm dia) 4.90 meter to 6.25 metre long
Each
Per Kg
16.011G.I Wire No. 8 to 10
16.012Sutli
P.Kg
16.013wooden vertical stakes 7" to 12" dia for groynes
P. % Nos.
16.014Royality charges of wooden stakes
Each
16.015Shingle / spawl
P.% Cft
16.016Boulder
P.% Cft
P.% Cft
16.017Supply pilchi lead within one mile
16.018Pilchi Roll 6" dia 5' long
P.% Cft
16.019Bajri / shingle
P.% Cft
16.020Royality kikar brush wood
P.% Mds
16.021Kikar wood for pegs
P. Cft
18.001Course aggregate (bajri) for surface dressing (Quarry site) 100 Cft
100 Cft
18.002Graded stone for base course (Quarry site)
18.003Brick Aggregate For Sub Base course (Quarry site)
100 Cft
18.004Pit-run/Bedrun graval (Quarry site)
100 Cft
100 Cft
18.005Stone screaned (Crusher site)
18.006Stone Dust (Quarry/Plant site)
100 Cft
18.007Steel bars (including binding wire)
Per Kg.
Per Kg
18.008Iron post
18.009Elbow 2"
Each
18.010Tee 2" x 2" x 2"
Each
18.011Steel bearing (standard quality)
Each
18.012Rubber bearing pad 1" x 1" x 1" (2.5x2.5x2.5 cm)
P.Cub
18.013A.C pipe 3" i/d
per metre
18.014T.Iron and M.S Plate
P. Kg.
18.015Lettering 4" height
Each
18.016Lettering 3" height
Each
19.001Cast iron head 4"
Per Kg
19.002Cast iron shoe 4"
Per Kg
19.003Cast iron bend 4"
Per Kg
19.004Cast iron off set 4"
Per Kg
19.005G.I spout 4" 460 mm long
Each
19.006AC - bend 4" (100 mm)
Each
19.007AC Shoe 4" (100 mm)
Each
19.008AC Tee (100 mm)
Each
19.009Angle Iron Bracket Set for W.H.B & Cistern
Each
19.010'Angle Iron Bracket Set for Sink
Each
19.011Waste pipe 3 cm (1") (PVC)
Each
19.012Waste pipe 4 cm (1") (PVC)
Each
19.013C.P. waste coupling 3 cm (1")
Each
19.014C.P. waste coupling 4 cm (1")
Each
19.015Rubber plug with chain 3 cm (1")
Each
19.016Rubber plug with chain 4 cm (1")
Each
19.017PVC Flushing bend 3 cm (1")
Each
19.018PVC Flushing bend 4 cm (1")
Each
19.019Plastic rubber connection with check nut
Each
19.020Copper connectionn with check nut:
Each
19.021C.P. Shower rose 1.5 x 10 cm (" x 4")
Each
19.022C.P. Shower rose 2.0 x 15 cm (" x 6")
Each
19.023C.I brackets for high level flushing cistern
Per pair
19.024C.I. Bracket for Wash hand basin
Each
19.025White Glazed earthen ware low down cistern 13.63 ltr. (3/Gln
Each
19.026Coloured Glazed earthen ware low down cistern 13.63 ltr. (3/
Each
19.027White Glazed cast iron low down cistern 13.63 ltr. (3/Gln)
Each
19.028RCC Pipe 4" dia
Rft.
19.029Plastic made low down flushing cistern 13.63 litre (3 gallo
Each
19.030Pedestal for W.H.B
Each
19.031Bolt and Nuts for W.C. (European Type)
Each
19.032A.C soil pipe 6cm (2" dia)
Metre
19.033A.C soil pipe 7.5cm (3" dia)
Metre
19.034A.C soil pipe 10cm (4" dia)
Metre
19.035A.C soil pipe 15cm (6" dia)
Metre
19.036C.I. Soil Down 50 mm (2") dia
Metre
19.037C.I Soil Down 100 mm (4") dia (30 PSI)
Metre
19.038Yarn
per lbs
19.039Chromium plated T-stop cock 1.5 c.m (")
Each
19.040Brass gas cock 1.5 c.m (")
Each
19.041Brass gas cock 2.0 c.m (")
Each
Page 6
RATE
ITEM
MATERIAL
19.042Brass bib cock " (1.5 cm)
19.043Brass bib cock " (2 cm) / brass stop cock
19.044Glazed Earthenware sink 60 x 45 cm (24" x 18")
19.045Glazed Earthenware sink 37.5 x 45 cm (15" x 18")
19.046Statinless steel sink with drain board 120 x 60 cm (48 x 24
Terazzo concrete sink 60 x 45 cm (24" x 18") With drain
19.047
board
19.048Brass ball float valves 15 mm (") dia
19.049Brass ball float valves 20 mm (") dia
19.050Brass ball float valves 25 mm (1") dia
19.051Brass ball float valves 30 mm (1") dia
19.052Brass ball float valves 40 mm (1") dia
19.053Brass ball float valves 50 mm (2") dia
19.054C.P. Mixing Valves " dia (Mixer)
19.055Glass Shelf 60 x 13 cm (24" x 5")
19.056Chromium plated bracket and railling for glass shelf
Glazed earthen ware shelf 60 x 13 cm (24" x 5") with
19.057
chromium plated bracket and railing (Coloured)
Glazed earthen ware shelf 60 x 13 cm (24" x 5")
19.058
withchromium plated bracket and railing (White)
19.059Soap dish chromium plated
19.060Soap dish glazed earthen ware white colour
19.061Soap dish plastic
19.062Toilet Paper Holder (Chromium plated)
19.063Toilet Paper Holder (Plastic)
19.064Towel Rail With Brackets (Chromium plated) 60 x 2 cm (24" x
19.065Towel Rail With Brackets (Chromium plated) 50 x 1.5 cm (20"
19.066Towel Rail With Brackets (Plastic)
19.067C.I floor trap including grating size 10 x 5 cm (4" x 2")
19.068Chromium plated bottle trap 3 cm (1") (with waste pipe)
19.069Chromium plated bottle trap 4 cm (1") (with waste pipe)
19.070Cast iron P-trap 10 cm (4")
19.071Concrete gully trap 4"
19.072Glazed Pee trap 10 cm (4" dia)
19.073PVC grating 15 x 15 cm (6" x 6")
White Glazed earthenware Wash Hand Basins (22" x 16") (56
19.074
cm x 40 cm) with padestal
19.075Wash Hand Basin (22" x 16") (56 cm x 40 cm)} without pedesta
19.076Coloured wash hand basin with pedestal (22" x 16") (56 cm x
19.077Coloured wash hand basin without pedestal (22" x 16") (56 cm
19.078European type water closet without seat and cover (coloured)
19.079European type water closet without seat and cover (white)
19.080Double seat and cover Bekelite
19.081Double seat and cover Plastic
White Glazed earthenware squater (Orisa pattern) WC
19.082
combined with footrest
Coloured {Glazed earthenware squater (Orisa pattern) WC
19.083
combined with footrest}
19.084Terazzo concrete water closet squater type
Glazed earthen ware W.C squater type with seperate foot
19.085
rest (Orisa pattern)
19.086Urinal Glazed earthenware flat back
19.087Pillar cock chromium plated heavy duty 2 cm (")
19.088Pillar cock chromium plated heavy duty 1.5 cm (")
19.089Stop cock under ground 15 mm (") with C.P cover
19.090Stop cock chromium plated heavy duty 2 cm (")
19.091Stop cock chromium plated heavy duty 1.5 cm (")
19.092Swan neck cock single way chromium plated 1.5 cm (")
19.093Swan neck cock double way chromium plated 1.5 cm (")
19.094Swan neck cock three way chromium plated 1.5 cm (")
19.095Gas cock chromium plated oxidised (") single way
19.096Gas cock chromium plated oxidised (") double way
19.097Gas cock chromium plated oxidised (") three way
19.098Looking glass 5 mm thick 55 x 40 cm (22" x 16")
19.099Hanger hook with pullout rod
19.100Gun metal peat/gate valve (screwed) 15 mm (") dia
19.101Gun metal peat/gate valve (screwed) 20 mm (") dia
19.102Gun metal peat/gate valve (screwed) 25 mm (1") dia
19.103 Gun metal peat/gate valve (screwed) 30 mm (1") dia
19.104 Gun metal peat/gate valve (screwed) 40 mm (1") dia
19.105Gun metal peat/gate valve (screwed) 50 mm (2") dia
19.106Gun metal peat/gate valve (screwed) 65 mm (2") dia
19.107Gun metal peat/gate valve (screwed) 80 mm (3") dia
19.108Foot rest for squatter type W.C.
19.109Waste coupling with bracket and waste pipe
19.110Screw (75 mm) 3" long
Page 7
UNIT
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
RATE
ITEM
MATERIAL
C.I. High level flushing cistern 13.63 litre or 3 gallon
19.111
capacity including accessories
19.112C.I. High level flushing cistern I/C all accessaries (1 gall
19.113Soap dish coloured (glazed earthen weare)
19.114Plastic shelf with railing
19.115Bracket
19.1162 cm (") bib cock
19.1171.5 cm (") bib cock
19.118Union brass cock " (1.5 cm)
19.119Union brass cock " (2 cm)
19.120C.I floor trap including grating size 10 x 7.5 cm (4" x 3")
19.121Manhole cover 30 cm (12" dia)
19.122C.I. manhole cover with frame 45 cm (18" dia)
19.123C.I. manhole cover with frame 60 cm (24" dia)
19.124 C.P Bottle trap with waste pipe 3cm (11/4" dia)
19.125 C.P Bottle trap with waste pipe 4cm (11/2" dia)
19.126Nail with Cutter for angle iron brackets
19.127 Copper connection with assessories " dia
19.1281.5 cm (" dia) brass ball valve with assessaries
21.001C.I. gully grating 12" x 12" with hinged safety type (81 lbs
21.002Concrete gully trap 12" x 12"
21.003China ware trap with C.I screen
21.004Iron Bolt 12"
21.005C.I Ventilating Shaft tool 6" to 12" I/d 18' to 36' long
RCC sewer pipes confirming to ASTM C-76-79 (class III wall
21.006
B) 300
mmpipes
(12")confirming
i/d
RCC
sewer
to ASTM C-76-79 (class III wall
21.007
B) 375
mm pipes
(15") i/d
RCC
sewer
confirming to ASTM C-76-79 (class III wall
21.008
B)
mm pipes
(18") i/d
RCC450
sewer
confirming to ASTM C-76-79 (class III wall
21.009
B)
525
mm
(21") i/d
RCC sewer pipes
confirming to ASTM C-76-79 (class III wall
21.010
B)
mm pipes
(24") i/d
RCC600
sewer
confirming to ASTM C-76-79 (class III wall
21.011
B) 675
mm pipes
(27") i/d
RCC
sewer
confirming to ASTM C-76-79 (class III wall
21.012
B) 750
mm pipes
(30") i/d
RCC
sewer
confirming to ASTM C-76-79 (class III wall
21.013
B) 825
mm pipes
(33") i/d
RCC
sewer
confirming to ASTM C-76-79 (class III wall
21.014
B) 900 mm (36") i/d
RCC sewer pipes confirming to ASTM C-76-79 (class III wall
21.015
B) 1070 mm (42") i/d
RCC sewer pipes confirming to ASTM C-76-79 (class III wall
21.016
B) 1220 mm (48") i/d
RCC sewer pipes confirming to ASTM C-76-79 (class III wall
21.017
B) 1370 mm (54") i/d
RCC sewer pipes confirming to ASTM C-76-79 (class III wall
21.018
B) 1520 mm (60") i/d
RCC sewer pipes confirming to ASTM C-76-79 (class III wall
21.019
B) 1680 mm (66") i/d
RCC sewer pipes confirming to ASTM C-76-79 (class III wall
21.020
B) 1830 mm (72") i/d
RCC Pipes conforming (to BS 5911 part I, 1981 class 'L')
21.021
'100
mm (4")
i/d
RCC Pipes
conforming
(to BS 5911 part I, 1981 class 'L')
21.022
'150Pipes
mm (6")
i/d
RCC
conforming
(to BS 5911 part I, 1981 class 'L')
21.023
225 mm (9") i/d
Non/reinforced concrete pipe 100 mm (4") dia conforming to
21.024
ASTM C-14-73 Class I
Non/reinforced concrete pipe 150 mm (6") dia conforming to
21.025
ASTM C-14-73 Class I
Non/reinforced concrete pipe 200 mm (8") dia conforming to
21.026
ASTM C-14-73 Class I
Non/reinforced concrete pipe 225 mm (9") dia conforming to
21.027
ASTM C-14-73 Class I
Non/reinforced concrete pipe 250 mm (10") dia conforming to
21.028
ASTM C-14-73 Class I
dia RCC Sewer pipe 300 mm (12") Conforming to ASTM C-76-79
21.029
(ClassII
RCC
Sewerwall
pipe'B')
'375 cc (15") dia Conforming to ASTM C-76-79
21.030
(ClassII
RCC
Sewerwall
pipe'B')
450 mm (18") dia Conforming to ASTM C-76-79
21.031
(ClassII
wall
'B')
RCC Sewer pipe 525 mm (21") dia Conforming to ASTM C-76-79
21.032
(ClassII
RCC Sewerwall
pipe'B')
600 mm (24") dia Conforming to ASTM C-76-79
21.033
(ClassII
wall
RCC Sewer pipe'B')
675 mm (27") dia Conforming to ASTM C-76-79
21.034
(ClassII
RCC
Sewerwall
pipe'B')
750 mm (30") dia Conforming to ASTM C-76-79
21.035
(ClassII
RCC
Sewerwall
pipe'B')
825 mm (33") dia Conforming to ASTM C-76-79
21.036
(ClassII
RCC
Sewerwall
pipe'B')
900 mm (36") dia Conforming to ASTM C-76-79
21.037
(ClassII wall 'B')
RCC Sewer pipe 1070 mm (42") dia Conforming to ASTM C-76-79
21.038
(ClassII wall 'B')
RCC Sewer pipe 1220 mm (48") dia Conforming to ASTM C-76-79
21.039
(ClassII wall 'B')
RCC Sewer pipe 1370 mm (54") dia Conforming to ASTM C-76-79
21.040
(ClassII wall 'B')
Page 8
UNIT
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Kg
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Per
Per
Per
Per
Per
Per
Per
Per
Per
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Per Ft.
Per Ft.
Per Ft.
RATE
ITEM
MATERIAL
RCC Sewer pipe 1520 mm (60") dia Conforming to ASTM C-76-79
21.041
(ClassII wall 'B')
RCC Sewer pipe 1680 mm (66") dia Conforming to ASTM C-76-79
21.042
(ClassII wall 'B')
RCC Sewer pipe 1830 mm (72") dia Conforming to ASTM C-76-79
21.043
(ClassII wall 'B')
21.044Rubber Ring
RCC Sewer pipe 300 mm (12") dia Conforming to ASTM C-76-79
(class IV wall 'B')
RCC Sewer pipe 380 mm (15") dia Conforming to ASTM C-76-79
21.046
(class IV wall 'B')
RCC Sewer pipe 460 mm (18") dia Conforming to ASTM C-76-79
21.047
(class IV wall 'B')
RCC Sewer pipe 535 mm (21") dia Conforming to ASTM C-76-79
21.048
(class IV wall 'B')
RCC Sewer pipe 610 mm (24") dia Conforming to ASTM C-76-79
21.049
(class IV wall 'B')
RCC Sewer pipe 685 mm (27") dia Conforming to ASTM C-76-79
21.050
(class IV wall 'B')
RCC Sewer pipe 760 mm (30") dia Conforming to ASTM C-76-79
21.051
(class IV wall 'B')
RCC Sewer pipe 800 mm (33") dia Conforming to ASTM C-76-79
21.052
(class IV wall 'B'
RCC Sewer pipe 915 mm (36") dia Conforming to ASTM C-76-79
21.053
(class IV wall 'B')
RCC Sewer pipe 1070 mm (42") dia Conforming to ASTM C-76-79
21.054
(class IV wall 'B')
RCC Sewer pipe 1220 mm (48") dia Conforming to ASTM C-76-79
21.055
(class IV wall 'B')
RCC Sewer pipe 1370 mm (54") dia Conforming to ASTM C-76-79
21.056
(class IV wall 'B')
RCC Sewer pipe 1520 mm (60") dia Conforming to ASTM C-76-79
21.057
(class IV wall 'B')
RCC Sewer pipe 1680 mm (66") dia Conforming to ASTM C-76-79
21.058
(class IV wall 'B')
RCC Sewer pipe 1830 mm (72") dia Conforming to ASTM C-76-79
21.059
(class IV wall 'B')
21.060Steel bolt 12" long
21.061Foundation bolts & nuts " dia 2' long .
21.062Rubber sheet 1/8" thick
21.063Foundation bolts & nuts " dia 1' long
21.064Foundation bolts " dia 2' long.
21.065 Foundation bolts 7/8" dia 2' long.
22.001Winch including cost of tripod, tackle etc. for sinking of w
22.002Steel rope 3/4" dia
22.003One cusic capacity pumping set for dewatering
22.004Sleeper
22.005Bolts & Nuts
A.C pressure pipe '80mm (3") dia Class 'B' BSS with comet
23.001
joint and rubber rings
A.C pressure pipe 100 mm (4") dia Class 'B' BSS with comet
23.002
joint and rubber rings.
A.C pressure pipe 150 mm (6") dia Class 'B' BSS with comet
23.003
joint and rubber rings.
A.C pressure pipe 200 mm (8") dia Class 'B' BSS with comet
23.004
joint and rubber rings.
A.C pressure pipe 250 mm (10") dia Class 'B' BSS with comet
23.005
joint and rubber rings.
A.C pressure pipe 300 mm (12") dia Class 'B' BSS with comet
23.006
joint and rubber rings.
A.C pressure pipe 350 mm (14") dia Class 'B' BSS with comet
23.007
joint and rubber rings.
A.C pressure pipe 400 mm (16") dia Class 'B' BSS with comet
23.008
joint and rubber rings.
A.C pressure pipe 450 mm (18") dia Class 'B' BSS with comet
23.009
joint and rubber rings.
A.C pressure pipe 500 mm (20") dia Class 'B' BSS with comet
23.010
joint and rubber rings.
A.C pressure pipe 600 mm (24") dia Class 'B' BSS with comet
23.011
joint and rubber rings.
A.C pressure pipe 80 mm (3") dia Class 'C' BSS with comet
23.012
joint and rubber rings
A.C pressure pipe 100 mm (4") dia Class 'C' BSS with comet
23.013
joint and rubber rings.
21.045
Page 9
UNIT
Per Ft.
Per Ft.
Per Ft.
Per Inch
dia of
pipe
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Each
Each
P.Kg
Each
Each
Each
Each
Per Rft.
Each
Each
P.Kg
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
RATE
ITEM
MATERIAL
UNIT
RATE
A.C pressure pipe 150 mm (6") dia Class 'C' BSS with comet
23.014
Per Ft.
joint and rubber rings.
A.C pressure pipes 200 mm (8") dia Class 'C' BSS with comet
23.015
Per Ft.
joint and rubber rings.
A.C pressure pipe 250 mm (10") dia Class 'C' BSS with comet
23.016
Per Ft.
joint and rubber rings.
A.C pressure pipe 300 mm (12") dia Class 'C' BSS with comet
23.017
Per Ft.
joint and rubber rings.
A.C pressure pipe 350 mm (14") dia Class 'C' BSS with comet
23.018
Per Ft.
joint and rubber rings.
A.C pressure pipe 400 mm (16") dia Class 'C' BSS with comet
23.019
Per Ft.
joint and rubber rings.
A.C pressure pipe 450 mm (18") dia Class 'C' BSS with comet
23.020
Per Ft.
joint and rubber rings.
A.C pressure pipe '500 mm (20") dia Class 'C' BSS with
23.021
Per Ft.
comet joint and rubber rings.
A.C pressure pipe 600 mm (24") dia Class 'C' BSS with comet
23.022
Per Ft.
joint and rubber rings.
A.C pressure pipe 80 mm (3") dia Class 'D' BSS with comet
23.023
Per Ft.
joint and rubber rings
A.C pressure pipe 100 mm (4") dia Class 'D' BSS with comet
23.024
Per Ft.
joint and rubber rings.
A.C pressure pipe 150 mm (6") dia Class 'D' BSS with comet
23.025
Per Ft.
joint and rubber rings.
A.C pressure pipe 200 mm (8") dia Class 'D' BSS with comet
23.026
Per Ft.
joint and rubber rings.
A.C pressure pipe 250 mm (10") dia Class 'D' BSS with comet
23.027
Per Ft.
joint and rubber rings.
A.C pressure pipe 300 mm (12") dia Class 'D' BSS with comet
23.028
Per Ft.
joint and rubber rings.
A.C pressure pipe 350 mm (14") dia Class 'D' BSS with comet
23.029
Per Ft.
joint and rubber rings.
A.C pressure pipe 400 mm (16") dia Class 'D' BSS with comet
Per Ft.
23.030
joint and rubber rings.
A.C pressure pipe 450 mm (18") dia Class 'D' BSS with comet
23.031
Per Ft.
joint and rubber rings.
A.C pressure pipe 500 mm (20") dia Class 'D' BSS with comet
23.032
Per Ft.
joint and rubber rings.
23.033G.I. pressure pipe 15 mm (") dia BSS-1387 - 1967 (light qua Per Ft.
23.034G.I. pressure pipe 20 mm (") dia BSS-1387 - 1967 (light qua Per Ft.
23.035G.I. pressure pipe 25 mm (1") dia BSS-1387 - 1967 (light qua Per Ft.
23.036G.I. pressure pipe 30 mm (1") dia BSS-1387 - 1967 (light qu Per Ft.
23.037G.I. pressure pipe 40 mm (1") dia BSS-1387 - 1967 (light qu Per Ft.
23.038G.I. pressure pipe 50 mm (2") dia BSS-1387 - 1967 (light qua Per Ft.
23.039G.I. pressure pipe 65 mm (2") dia BSS-1387 - 1967 (light qu Per Ft.
23.040G.I. pressure pipe 80 mm (3") dia BSS-1387 - 1967 (light qua Per Ft.
23.041G.I. pressure pipe 100 mm (4") dia BSS-1387 - 1967 (light qu Per Ft.
23.042G.I. pressure pipe 15 mm (") dia BSS-1387 - 1967 (medium qu Per Ft.
23.043G.I. pressure pipe 20 mm (") dia BSS-1387 - 1967 (medium q Per Ft.
23.044G.I. pressure pipe 25 mm (1") dia BSS-1387 - 1967 (medium q Per Ft.
23.045G.I. pressure pipe 30 mm (1") dia BSS-1387 - 1967 (medium Per Ft.
23.046G.I. pressure pipe 40 mm (1") dia BSS-1387 - 1967 (medium Per Ft.
23.047G.I. pressure pipe 50 mm (2") dia BSS-1387 - 1967 (medium q Per Ft.
23.048G.I. pressure pipe 65 mm (2") dia BSS-1387 - 1967 (medium Per Ft.
23.049G.I. pressure pipe 75 mm (3") dia BSS-1387 - 1967 (medium q Per Ft.
23.050G.I. pressure pipe 100 mm (4") dia BSS-1387 - 1967 (medium Per Ft.
23.051G.I. pressure pipe 125 mm (5") dia BSS-1387 - 1967 (medium Per Ft.
23.052G.I. pressure pipe 150 mm (6") dia BSS-1387 - 1967 (Medium q Per Ft.
23.053G.I. pressure pipe 15 mm (") dia BSS-1387 - 1967 (heavy qua Per Ft.
23.054G.I. pressure pipe 20 mm (") dia BSS-1387 - 1967 (heavy qua Per Ft.
23.055G.I. pressure pipe 25 mm (1") dia BSS-1387 - 1967 (heavy qua Per Ft.
23.056G.I. pressure pipe 30 mm (1") dia BSS-1387 - 1967 (heavy qu Per Ft.
23.057G.I. pressure pipe 40 mm (1") dia BSS-1387 - 1967 (heavy qu Per Ft.
23.058G.I. pressure pipe 50 mm (2") dia BSS-1387 - 1967 (heavy qua Per Ft.
23.059G.I. pressure pipe 65 mm (2") dia BSS-1387 - 1967 (heavy qu Per Ft.
23.060G.I. pressure pipe 75 mm (3") dia BSS-1387 - 1967 (heavy qua Per Ft.
23.061G.I. pressure pipe 100 mm (4") dia BSS-1387 - 1967 (heavy qu Per Ft.
23.062G.I. pressure pipe '125 mm (5") dia BSS-1387 - 1967 (heavy q Per Ft.
23.063G.I. pressure pipe 150 mm (6") dia BSS-1387 - 1967 (heavy qu Per Ft.
23.064 Jointing Material of Socket Joint for 1/2" dia G.I. Pipe for Per % Rft.
23.065 Jointing Material of Socket Joint for 3/4" dia G.I. Pipe fo Per % Rft.
23.066Jointing Material of Socket Joint for 1" dia G.I. Pipe for 1Per % Rft.
23.067 Jointing Material of Socket Joint for 11/4" dia G.I. Pipe fo Per % Rft.
23.068 Jointing Material of Socket Joint for 11/2" dia G.I. Pipe fo Per % Rft.
Page 10
ITEM
MATERIAL
UNIT
RATE
23.069Jointing Material of Socket Joint for 2" dia G.I. Pipe for 1Per % Rft.
23.070 Jointing Material of Socket Joint for 21/2" dia G.I. Pipe fo Per % Rft.
23.071Jointing Material of Socket Joint for 3" dia G.I. Pipe for 1Per % Rft.
23.072Jointing Material of Socket Joint for 4" dia G.I. Pipe for 1Per % Rft.
23.073Jointing Material of Socket Joint for 5" dia G.I. Pipe for 1Per % Rft.
23.074Jointing Material of Socket Joint for 6" dia G.I. Pipe for 1Per % Rft.
23.075Testing charges of G.I. Pipes for 1" dia
Per % Rft.
23.076Testing charges of G.I. Pipes for 1" dia
Per % Rft.
23.077Testing charges of G.I. Pipes for 1" dia
Per % Rft.
23.078Testing charges of G.I. Pipes for 2" dia
Per % Rft.
23.079Testing charges of G.I. Pipes for 2" dia
Per % Rft.
23.080Testing charges of G.I. Pipes for 3" dia
Per % Rft.
23.081Testing charges of G.I. Pipes for 4" dia
Per % Rft.
23.082Testing charges of G.I. Pipes for 5" dia
Per % Rft.
23.083Testing charges of G.I. Pipes for 6" dia
Per % Rft.
23.08450 mm (2") dia 3 mm (1/8") thick M.S blind pipes
Per Ft.
23.08580 mm (3") dia 3 mm (1/8") thick M.S blind pipes
Per Ft.
23.086100 mm (4") dia 3 mm (1/8") thick M.S blind pipes
Per Ft.
23.087125 mm (5") dia 5 mm (3/16") thick M.S blind pipes
Per Ft.
23.088150 mm (6") dia 5 mm (3/16") thick M.S blind pipes
Per Ft.
23.089175 mm (7") dia 5 mm (3/16") thick M.S blind pipe
Per Ft.
23.090200 mm (8") dia 5 mm (3/16") thick M.S blind pipes
Per Ft.
23.091225 mm (9") dia 5 mm (3/16") thick M.S blind pipes
Per Ft.
23.092250 mm (10") dia 6 mm (3/16") thick {M.S blind pipe
Per Ft.
23.093300 mm (12") dia 6 mm (3/16") thick {M.S blind pipe
Per Ft.
23.094375 mm (15") dia 6 mm (3/16") thick {M.S blind pipes
Per Ft.
23.095450 mm (18") dia 6 mm (3/16") thick {M.S blind pipes
Per Ft.
23.096500 mm (20") dia 6 mm (3/16") thick {M.S blind pipes
Per Ft.
23.097550 mm (22") dia 6 mm (3/16") thick {M.S blind pipes
Per Ft.
80-600 mm (3"-24") dia {C.I specials (with Commet joint and
23.098
Per Kg
rubber ring) For A.C Pipes}
23.09980-450 mm (3"- 18") dia C.I Specials of BSS Class B with S Per Kg
23.10080-450 mm (3"- 18") dia C.I Specials of BSS Class B With Fla Per Kg
23.10180-450 mm (3"- 18") dia C.I Specials of BSS Class B with Tyt Per Kg
23.10280 mm (3") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.103100 mm (4") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.104125 mm (5") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.105150 mm (6") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.106200 mm (8") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.107250 mm (10") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.108300 mm (12") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.109375 mm (14") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.110450 mm (18") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.111Single Air Valve 75 mm (3")
Each
23.112Double Air Valve 75 mm (3")
Each
23.113Fire Hydrant BSS 65 mm (2")
Each
23.11480 mm (3") dia P.V.C tapperd core BSS Class 'B'
Each
23.115100 mm (4") dia P.V.C tapperd core BSS Class 'B'
Each
23.116125 mm (5") dia P.V.C tapperd core BSS Class 'B'
Each
23.117150 mm (6") dia P.V.C tapperd core BSS Class 'B'
Each
23.118200 mm (8") dia P.V.C tapperd core BSS Class 'B'
Each
23.119250 mm (10") dia P.V.C tapperd core BSS Class 'B'
Each
23.120300 mm (12") dia P.V.C tapperd core BSS Class 'B'
Each
23.121350 mm (14") dia P.V.C tapperd core BSS Class 'B'
Each
1
Each
23.122 15 mm (1 /4") dia P.V.C tapperd core BSS Class 'D'
23.12340 mm (1") dia P.V.C tapperd core BSS Class 'D'
Each
23.12450 mm (2") P.V.C tapperd core BSS Class 'D'
Each
23.12575 mm (3") dia P.V.C Bends BSS class 'B'
Each
23.126100 mm (4") dia P.V.C Bends BSS class 'B'
Each
23.127100 mm (5") dia P.V.C Bends BSS class 'B'
Each
23.128150 mm (6") dia P.V.C Bends BSS class 'B'
Each
23.12930 mm (1") dia P.V.C Bends BSS class 'D'
Each
23.13040 mm (1") dia P.V.C Bends BSS class 'D'
Each
23.13150 mm (2") dia P.V.C Bends BSS class 'D'
Each
23.13280 mm (3") dia P.V.C Bends BSS class 'D'
Each
23.133100 mm (4") dia P.V.C Bends BSS class 'D'
Each
23.134125 mm (5") dia P.V.C Bends BSS class 'D'
Each
23.135150 mm (6") dia P.V.C Bends BSS class 'D'
Each
23.13680 mmm (3") dia P.V.C Tee BSS Class 'B'
Each
23.137100 mm (4") dia P.V.C Tee BSS Class 'B'
Each
23.138125 mm (5") dia P.V.C Tee BSS Class 'B'
Each
23.139150 mm (6") dia P.V.C Tee BSS Class 'B'
Each
23.140200 mm (8") dia P.V.C Tee BSS Class 'B'
Each
Page 11
ITEM
MATERIAL
23.141250 mm (10") dia P.V.C Tee BSS Class 'B'
23.142300 mm (12") dia P.V.C Tee BSS Class 'B'
23.143350 mm (14") dia P.V.C Tee BSS Class 'B'
23.14430 mm (1") dia P.V.C Tee BSS Class 'D'
23.14540 mm (1") dia P.V.C Tee BSS Class 'D'
23.14650 mm (2") dia P.V.C Tee BSS Class 'D'
23.14780 mm (3") dia P.V.C Tee BSS Class 'D'
23.148100 mm (4") dia P.V.C Tee BSS Class 'D'
23.149125 mm (5") dia P.V.C Tee BSS Class 'D'
23.150150 mm (6") dia P.V.C Tee BSS Class 'D'
23.15180 mmm (3") dia P.V.C sockets BSS Class 'B'
23.152100 mm (4") dia P.V.C sockets BSS Class 'B'
23.153125 mm (5") dia P.V.C sockets BSS Class 'B'
23.154150 mm (6") dia P.V.C sockets BSS Class 'B'
23.155200 mm (8") dia P.V.C sockets BSS Class 'B'
23.156250 mm (8") dia P.V.C sockets BSS Class 'B'
23.157300 mm (12") dia P.V.C sockets BSS Class 'B'
23.158350 mm (14") dia P.V.C sockets BSS Class 'B'
23.15930 mm (1") dia P.V.C sockets BSS Class 'D'
23.16040 mm (1") dia P.V.C sockets BSS Class 'D'
23.16150 mm (2") dia P.V.C sockets BSS Class 'D'
23.16280 mm (3") dia P.V.C sockets BSS Class 'D'
23.163100 mm (4") dia P.V.C sockets BSS Class 'D'
23.164125 mm (5") dia P.V.C sockets BSS Class 'D'
23.165150 mm (6") dia P.V.C sockets BSS Class 'D'
23.166Bleaching powder/chlorine
23.16750 mm (2") dia 4 mm (5/32") Brass strainer incluidng specia
23.16875 mm (3") dia 4 mm (5/32") Brass strainer incluidng specia
23.169100 mm (4") dia 5 mm (3/16") Brass strainer incluidng spec
23.170125 mm (5") dia 5 mm (3/16") Brass strainer incluidng speci
23.171150 mm (6") dia 5 mm (3/16") Brass strainer incluidng speci
23.172175 mm (7") dia 5 mm (3/16") Brass strainer incluidng speci
23.173200 mm (8") dia 5 mm (3/16") Brass strainer incluidng speci
23.174225 mm (9") dia 5 mm (3/16") Brass strainer incluidng speci
23.175250 mm (10") dia 5 mm (3/16") Brass strainer incluidng spec
23.176250 mm (10") dia 6 mm (") Brass strainer incluidng special
23.177300 mm (12") dia 6 mm (") Brass strainer incluidng special
23.178375 mm (15") dia 6 mm (") Brass strainer incluidng special
23.179450 mm (18") dia 6 mm (") Brass strainer incluidng special
23.180500 mm (20") dia 6 mm (") Brass strainer incluidng special
23.181550 mm (22") dia 6 mm (") Brass strainer incluidng special
23.18275 mm (3") dia P.V.C strainer Class 'B'
23.183100 mm (4") dia P.V.C strainer Class 'B'
23.184125 mm (5") dia 60 cm P.V.C strainer Class 'B'
23.185150 mm (6") dia 60 cm P.V.C strainer Class 'B'
23.186200 mm (7") dia 60 cm P.V.C strainer Class 'B'
23.187250 mm (8") dia 60 cm P.V.C strainer Class 'B'
23.188300 mm (9") dia 60 cm P.V.C strainer Class 'B'
23.189350 mm (10") dia 60 cm P.V.C strainer Class 'B'
23.190PVC Stainer Class D 1" dia (30mm)
23.191PVC Stainer Class D 1 dia (40 mm)
23.192PVC Stainer Class D 2" dia (50 mm)
23.193PVC Stainer Class D 3" dia (75 mm)
23.194PVC Stainer Class D 4" dia (100 mm)
23.195PVC Stainer Class D 5" dia (125 mm)
23.196PVC Stainer Class D 6" dia (150 mm)
23.19750 mm (2") i/d, Bail Plug-mild steel
23.19875 mm (3") i/d Bail Plug-mild steel
23.199100 mm (4") i/dBail Plug-mild steel
23.200125 mm (5") i/d Bail Plug-mild steel
23.201150 mm (6") i/d Bail Plug-mild steel
23.202175 mm (7") i/d
Bail Plug-mild steel
23.203200 mm (8") i/d
Bail Plug-mild steel
23.204225 mm (9") i/d
Bail Plug-mild steel
23.205250 mm (10") i/d Bail Plug-mild steel
23.206300 mm (12") i/d Bail Plug-mild steel
23.207375 mm (15") i/d Bail Plug-mild steel
23.208450 mm (18") i/d Bail Plug-mild steel
23.209500 mm (20") i/d Bail Plug-mild steel
23.210550 mm (22") i/d Bail Plug-mild steel
23.21175 mm (3") dia PVC BSS Class 'B' Bail Plug
23.212100 mm (4") dia PVC BSS Class 'B' Bail Plug
23.213125 mm (5") dia PVC BSS Class 'B' Bail Plug
Page 12
UNIT
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Per Kg
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Each
Each
Each
RATE
ITEM
MATERIAL
23.214150 mm (6") dia PVC BSS Class 'B' Bail Plug
23.215200 mm (8") dia PVC BSS Class 'B' Bail Plug
23.216250 mm (10") dia PVC BSS Class 'B' Bail Plug
23.217300 mm (12") dia PVC BSS Class 'B' Bail Plug
23.218350 mm (14") dia PVC BSS Class 'B' Bail Plug
23.21930 mm (1") dia P.V.C. Class 'D' Bail Plug
23.22040 mm (1") dia P.V.C. Class 'D' Bail Plug
23.22150 mm (2") dia P.V.C. Class 'D' Bail Plug
23.22280 mm (3") dia P.V.C. Class 'D' Bail Plug
23.223100 mm (4") dia P.V.C. Class 'D' Bail Plug
23.224125 mm (5") dia P.V.C. Class 'D' Bail Plug
23.225150 mm (6") dia P.V.C. Class 'D' Bail Plug
23.226G.I. pipe with flanged joint 1" dia 40mm (Heavy Quality)
23.227G.I. pipe with G.I. flanged joint 2" dia 50 mm (Heavy Qualit
23.228G.I. pipe with GI. flanged joint 2" dia 65 mm (Heavy Qualit
23.229G.I. pipe with G.I. flanged joint 3" dia 75 mm (Heavy Quali
23.230G.I. pipe with G.I. flanged joint 4" dia 100 mm (Heavy Quali
23.231G.I. pipe with G.I. flanged joint 5" dia 125 mm (Heavy Quali
23.232G.I. pipe with G.I. flanged joint 6" dia 150 mm (Heavy Quali
23.233G.I. pipe with C.I. flanged joint 1" dia 40mm (Medium Quali
23.234G.I. pipe with C.I. flanged joint 2" dia 50 mm (Medium Quali
23.235G.I. pipe with C.I. flanged joint 2" dia 65 mm (Medium Qual
23.236G.I. pipe with C.I. flanged joint 3" dia 75 mm (Medium Qual
23.237G.I. pipe with C.I. flanged joint 4" dia 100 mm (Medium Qual
23.238G.I. pipe with C.I. flanged joint 5" dia 125 mm (Medium Qual
23.239G.I. pipe with C.I. flanged joint 6" dia 150 mm (Medium Qual
23.24075 mm Sluice Valve for A.C. Pipe Line with commet joint & ru
23.241100 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.242150 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.243200 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.244250 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.245300 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.246400 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.247450 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.248Lock for wooden box for pressuring samples off strata from b
23.249Cost of Lubricant for PVC Pipe
23.250Steel Handle 4" (100mm)
23.25175 mm PVC Blind/Pressure Pipe Class "B"
23.252100 mm PVC Blind/Pressure Pipe Class "B"
23.253125 mm PVC Blind/Pressure Pipe Class "B"
23.254150 mm PVC Blind/Pressure Pipe Class "B"
23.255200 mm PVC Blind/Pressure Pipe Class "B"
23.256250 mm PVC Blind/Pressure Pipe Class "B"
23.257300 mm PVC Blind/Pressure Pipe Class "B"
23.258350 mm PVC Blind/Pressure Pipe Class "B"
23.25930 mm PVC Blind/Pressure Pipe Class "D"
23.26040 mm PVC Blind/Pressure Pipe Class "D"
23.26150 mm PVC Blind/Pressure Pipe Class "D"
23.26275 mm PVC Blind/Pressure Pipe Class "D"
23.263100 mm PVC Blind/Pressure Pipe Class "D"
23.264125 mm PVC Blind/Pressure Pipe Class "D"
23.265150 mm PVC Blind/Pressure Pipe Class "D"
23.266Loading expenses for pipes
23.267(Petty store) bolts & nuts etc. for 5" dia bore
23.268(Petty store) bolts & nuts etc. for 6" dia bore
23.269(Petty store) bolts & nuts etc. for 8" dia bore
23.270(Petty store) bolts & nuts etc. for10" dia bore
23.271(Petty store) bolts & nuts etc. for 12" dia bore
23.272(Petty store) bolts & nuts etc. for15" dia bore
23.273(Petty store) bolts & nuts etc. for 18" dia bore
23.274Hire charges of boring material, installation & Carriage (3
23.275Hire charges of boring material, installation & Carriage (4
23.276Hire charges of boring material, installation & Carriage (5
23.277Hire charges of boring material, installation & Carriage (6
23.278Hire charges of boring material, installation & Carriage (8
23.279Hire charges of boring material, installation & Carriage (10
23.280Hire charges of boring material, installation & Carriage (12
23.281Hire charges of boring material, installation & Carriage (15
23.282Hire charges of boring material, installation & Carriage (18
Hire charges of boring material, installation & Carriage
23.283
for (5" dia bore) from 100.10 to 200 Ft. depth
Hire charges of boring material, installation & Carriage
23.284
for (6" dia bore) from 100.10 to 200 Ft. depth
Page 13
UNIT
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Each
Each
Each
Each
Each
Each
Each
Each
Each
Per Kg.
Each
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
P. Day
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
RATE
ITEM
MATERIAL
Hire charges of boring material, installation & Carriage
23.285
for (8" dia bore) from 100.10 to 200 Ft. depth
Hire charges of boring material, installation & Carriage
23.286
for (10" dia bore) from 100.10 to 200 Ft. depth
Hire charges of boring material, installation & Carriage
23.287
for (12" dia bore) from 100.10 to 200 Ft. depth
Hire charges of boring material, installation & Carriage
23.288
for (15" dia bore) from 100.10 to 200 Ft. depth
Hire charges of boring material, installation & Carriage
23.289
for (18" dia bore) from 100.10 to 200 Ft. depth
Hire charges of boring material, installation & Carriage
23.290
for (5" dia bore) from 200.10 to 300 Ft. depth
Hire charges of boring material, installation & Carriage
23.291
for (6" dia bore) from 200.10 to 300 Ft. depth
Hire charges of boring material, installation & Carriage
23.292
for (8" dia bore) from 200.10 to 300 Ft. depth
Hire charges of boring material, installation & Carriage
23.293
for (10" dia bore) from 200.10 to 300 Ft. depth
Hire charges of boring material, installation & Carriage
23.294
for (12" dia bore) from 200.10 to 300 Ft. depth
Hire charges of boring material, installation & Carriage
23.295
for (15" dia bore) from 200.10 to 300 Ft. depth
Hire charges of boring material, installation & Carriage
23.296
for (18" dia bore) from 200.10 to 300 Ft. depth
Hire charges of boring material, installation & Carriage
23.297
for (8" dia bore) from 300.10 to 400 Ft. depth
Hire charges of boring material, installation & Carriage
23.298
for (10" dia bore) from 300.10 to 400 Ft. depth
Hire charges of boring material, installation & Carriage
23.299
for (12" dia bore) from 300.10 to 400 Ft. depth
Hire charges of boring material, installation & Carriage
23.300
for (15" dia bore) from 300.10 to 400 Ft. depth
Hire charges of boring material, installation & Carriage
23.301
for (18" dia bore) from 300.10 to 400 Ft. depth
23.302Repair charges of T&P for 5" dia bore hole
23.303Repair charges of T&P for 6" dia bore hole
23.304Repair charges of T&P for 8" dia bore hole
23.305Repair charges of T&P for 10" dia bore hole
23.306Repair charges of T&P for 12" dia bore hole
23.307Repair charges of T&P for 15" dia bore hole
23.308Repair charges of T&P for 18" dia bore hole
23.309Solvent for PVC Strainer 3" dia (Class B)
23.310Solvent for PVC Strainer 4" - 5" dia (Class B)
23.311Solvent for PVC Strainer 6" dia (Class B)
23.312Solvent for PVC Strainer 8" - 10" dia (Class B)
23.313Solvent for PVC Strainer 12" - 14" dia (Class B)
23.314Solvent for PVC Strainer 1" dia (Class D)
23.315Solvent for PVC Strainer 1" dia (Class D)
23.316Solvent for PVC Strainer 2" dia (Class D)
23.317Solvent for PVC Strainer 3" dia (Class D)
23.318Solvent for PVC Strainer 4" dia (Class D)
23.319Solvent for PVC Strainer 5" dia (Class D)
23.320Solvent for PVC Strainer 6" dia (Class D)
23.321Solvent for PVC Bail Plug 3" dia (Class B)
23.322Solvent for PVC Bail Plug 4" dia (Class B)
23.323Solvent for PVC Bail Plug 5" dia (Class B)
23.324Solvent for PVC Bail Plug 6" dia (Class B)
23.325Solvent for PVC Bail Plug 8" dia (Class B)
23.326Solvent for PVC Bail Plug 10" dia (Class B)
23.327Solvent for PVC Bail Plug 12" dia (Class B)
23.328Solvent for PVC Bail Plug 14" dia (Class B)
23.329Solvent for PVC Bail Plug 1" dia (Class D)
23.330Solvent for PVC Bail Plug 1" dia (Class D)
23.331Solvent for PVC Bail Plug 2" dia (Class D)
23.332Solvent for PVC Bail Plug 3" dia (Class D)
23.333Solvent for PVC Bail Plug 4" dia (Class D)
23.334Solvent for PVC Bail Plug 5" dia (Class D)
23.335Solvent for PVC Bail Plug 6" dia (Class D)
23.336Testing and Disinfecting of PVC Pipe 3" dia
23.337Testing and Disinfecting of PVC Pipe 4" dia
23.338Testing and Disinfecting of PVC Pipe 5" dia
23.339Testing and Disinfecting of PVC Pipe 6" dia
23.340Testing and Disinfecting of PVC Pipe 8" dia
Page 14
UNIT
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
100 Ft.
100 Ft.
100 Ft.
100 Ft.
100 Ft.
RATE
ITEM
MATERIAL
UNIT
RATE
23.341Testing and Disinfecting of PVC Pipe 10" dia
100 Ft.
23.342Testing and Disinfecting of PVC Pipe 12" dia
100 Ft.
23.343Testing and Disinfecting of PVC Pipe 14" dia
100 Ft.
23.344Testing and Disinfecting of G.I Pipe 40mm (1") dia
100 Ft.
23.345Testing and Disinfecting of G.I Pipe 50mm (2") dia
100 Ft.
23.346Testing and Disinfecting of G.I Pipe 63mm (2") dia
100 Ft.
23.347Testing and Disinfecting of G.I Pipe 75mm (3") dia
100 Ft.
23.348Testing and Disinfecting of G.I Pipe 100mm (4") dia
100 Ft.
23.349Testing and Disinfecting of G.I Pipe 125mm (6") dia
100 Ft.
23.350Testing and Disinfecting of G.I Pipe 150mm (7") dia
100 Ft.
23.351Disc for bail plugs
P. Kg.
23.352Testing and Disinfecting of G.I Pipe
P. Lbs
23.353Bottle 2 lbs capacity
Each
23.35475 mm to 450 mm dia CI flanges for pipes
P. Kg.
23.355Cost of C.I. Flanges for Pipe
100 cwt
23.356Welding Charges of spigot or socket, flanged or tyton ends er Inch Bore
23.357Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.358Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.359Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.360Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.361Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.362Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.363Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.364Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.365Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.366Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.367Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.368Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.369Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.370Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.371Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.372M.S. Bolt & Nut 6" to 22" dia bore hole bail plug
Each
23.373M.S. Bolt & Nut 2" to 5" dia bore hole bail plug
Each
23.374Threading Clamp 2" to 6"
Each
23.375Threading Clamp 7" to 22"
Each
%0 Gallon
23.376Water for testing and disinfecting of pipes
23.377Lead
Per Kg.
23.378Yarn
Per Kg.
23.379Disinfecting agent for C.I. Pipe
P. Kg.
23.380Bolt and nuts (3" to 4") for flanged joint
Each
23.381Bolt and nuts (5" to 12") for flanged joint
Each
23.382Bolt and nuts (15" to 18") for flanged joint
Each
23.383Cost of ring for cast iron pipe(3") with tyton joints
Each
23.384Cost of ring for cast iron pipe(4") with tyton joints
Each
23.385Cost of ring for cast iron pipe(5") with tyton joints
Each
23.386Cost of ring for cast iron pipe(6") with tyton joints
Each
23.387Cost of ring for cast iron pipe(8") with tyton joints
Each
23.388Cost of ring for cast iron pipe(10") with tyton joints
Each
23.389Cost of ring for cast iron pipe(12") with tyton joints
Each
23.390Cost of ring for cast iron pipe(15") with tyton joints
Each
23.391Cost of ring for cast iron pipe(18") with tyton joints
Each
23.392Cost of material for joints of sluice Valve for A.C. pipe wi 2 joints
23.393Cost of material for joints of sluice Valve for A.C. pipe wi 2 joints
23.394Cost of material for joints of sluice Valve for A.C. pipe wi 2 joints
23.395Cost of material for joints of sluice Valve for A.C. pipe wi 2 joints
23.396Cost of material for joints of sluice Valve for A.C. pipe wi 2 joints
23.397Cost of material for joints of sluice Valve for A.C. pipe wi 2 joints
23.398Cost of material for joints of sluice Valve for A.C. pipe wi 2 joints
23.399Cost of material for joints of sluice Valve for A.C. pipe wi 2 joints
23.400Material for jointing of fire hydrant
Each
23.401Material for jointing of air valve
Each
23.402Cost of Bolt and nuts for G.I. Flanged Joints 1" to 2"
Each
23.403Cost of Bolt and nuts for G.I. Flanged Joints 2" to 7"
Each
23.404Rubber Insertion for G.I. flanged joints
Per Lbs
23.405Solvent for PVC bends
Per Kg.
23.406Lubricant
Per Kg.
23.407Material for C-I specials with spigot and socket joint fo 2 joints
23.408Material for C-I specials with spigot and socket joint fo 2 joints
23.409Material for C-I specials with spigot and socket joint fo 2 joints
23.410Material for C-I specials with spigot and socket joint fo 2 joints
23.411Material for C-I specials with spigot and socket joint fo 2 joints
23.412Material for C-I specials with spigot and socket joint fo 2 joints
23.413Material for C-I specials with spigot and socket joint fo 2 joints
Page 15
ITEM
MATERIAL
23.414Material for C-I specials with spigot and socket joint fo
23.415Material for C-I specials with spigot and socket joint fo
23.416Material for CI flanged speical with flanged and flanged joi
23.417Material for CI flanged speical with flanged and flanged joi
23.418Material for CI flanged speical with flanged and flanged joi
23.419Material for CI flanged speical with flanged and flanged joi
23.420Material for CI flanged speical with flanged and flanged joi
23.421Material for CI flanged speical with flanged and flanged joi
23.422Material for CI flanged speical with flanged and flanged joi
23.423Material for CI flanged speical with flanged and flanged joi
23.424Material for CI flanged speical with flanged and flanged joi
Casting material (supply of speicals I/c moulding, painting
23.425 carriage to site of work)
CI specials with
spigot
an
socket
joint
Casting material (supply of speicals I/c moulding, painting
23.426 carriage to site of work)
CI flanged
speical with flanged and flanged joints
Casting material (supply of speicals I/c moulding, painting
23.427 carriage to site of work)
CI speicals with
tyton joints / with comet joint and rubber ring complete
23.428Material for AC pipe line with comet joint and rubber ring
23.429Material for AC pipe line with comet joint and rubber ring
23.430Material for AC pipe line with comet joint and rubber ring
23.431Material for AC pipe line with comet joint and rubber ring
23.432Material for AC pipe line with comet joint and rubber ring
23.433Material for AC pipe line with comet joint and rubber ring
23.434Material for AC pipe line with comet joint and rubber ring
23.435Material for AC pipe line with comet joint and rubber ring
23.436Material for AC pipe line with comet joint and rubber ring
23.437Material for AC pipe line with comet joint and rubber ring
24.00117.5 x 10 x cm (7" x 4") {Sal Wood Boards (4.5 cm) 1" thic
24.00222.5 x 10 x cm (9" x 4") {Sal Wood Boards (4.5 cm) 1" thic
24.00322.0 x 25 x cm (8" x 10") {Sal Wood Boards (4.5 cm) 1" thi
24.00425.0 x 30 x cm (10" x 12") {Sal Wood Boards (4.5 cm) 1" th
24.00530.0 x 37 x cm (12" x 14") {Sal Wood Boards (4.5 cm) 1" th
24.00617.5 x 10 x cm (7" x 4") {Teak Wood Boards (4.5 cm) 1.75" t
24.00722.5 x 10 x cm (9" x 4") {Teak Wood Boards (4.5 cm) 1.75" t
24.00820.0 x 25 x cm (8" x 10") {Teak Wood Boards (4.5 cm) 1.75"
24.00925.0 x 30 x cm (10" x 12") {Teak Wood Boards (4.5 cm) 1.75
24.01030.0 x 37 x cm (12" x 14") {Teak Wood Boards (4.5 cm) 1.75
2 way 15 Amp Branch distribution board iron/aluminium clad
24.011 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
3 way 15 for
Amp BDB
Branch
board iron/aluminium clad
24.012 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
4
way 15 for
Amp BDB
Branch
board iron/aluminium clad
24.013 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
5 way 15 for
Amp BDB
Branch
board iron/aluminium clad
24.014 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
6 way 15 for
Amp BDB
Branch
board iron/aluminium clad
24.015 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
7 way 15 for
Amp BDB
Branch
board iron/aluminium clad
24.016 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
8
way 15 for
Amp BDB
Branch
board iron/aluminium clad
24.017 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
9 way 15 for
Amp BDB
Branch
board iron/aluminium clad
24.018 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250 volts
10 way 15for
AmpBDB
Branch
distribution board iron/aluminium clad
24.019 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250 volts
11 way 15for
AmpBDB
Branch
distribution board iron/aluminium clad
24.020 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250 volts
12
way 15for
AmpBDB
Branch
distribution board iron/aluminium clad
24.021 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
2 way 30 for
Amp BDB
Branch
board iron/aluminium clad
24.022 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
3 way 30 for
Amp BDB
Branch
board iron/aluminium clad
24.023 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
4 way 30 for
Amp BDB
Branch
board iron/aluminium clad
24.024 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
5
way 30 for
Amp BDB
Branch
board iron/aluminium clad
24.025 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
6 way 30 for
Amp BDB
Branch
board iron/aluminium clad
24.026 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
7 way 30 for
Amp BDB
Branch
board iron/aluminium clad
24.027 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering for BDB 250 volts
Page 16
2
2
2
2
2
2
2
2
2
2
2
UNIT
joints
joints
joints
joints
joints
joints
joints
joints
joints
joints
joints
Per Cwt
Per Cwt
Per Cwt
2
2
2
2
2
2
2
2
2
2
joints
joints
joints
joints
joints
joints
joints
joints
joints
joints
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
RATE
ITEM
MATERIAL
UNIT
8 way 30 Amp Branch distribution board iron/aluminium clad
24.028 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
Each
covering
for
BDB
250
volts
9 way 30 Amp Branch distribution board iron/aluminium clad
24.029 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
Each
covering
for
BDB
250
volts
10 way 30 Amp Branch distribution board iron/aluminium clad
24.030 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
Each
covering for BDB 250 volts
24.031PVC insulated single core copper conductor cable 3/0.029" 25 Metre
24.032PVC insulated single core copper conductor cable 3/0.036" 2 Metre
24.033PVC insulated single core copper conductor cable 7/0.029" 2 Metre
24.034PVC insulated single core copper conductor cable 7/0.036" 2 Metre
24.035PVC insulated single core copper conductor cable 7/0.044" 2 Metre
24.036PVC insulated single core copper conductor cable 7/0.064" 2 Metre
24.037PVC insulated single core copper conductor cable 19/0.052" 2 Metre
24.038PVC insulated single core copper conductor cable 19/0.064" Per Metre
PVC insulated cotton braided and compounded copper
24.039
Per Metre
conductor cable 3/0.029" 250/440 Volts
PVC insulated cotton braided and compounded copper
24.040
Per Metre
conductor cable 3/0.036" 250/440 Volts
PVC insulated cotton braided and compounded copper
24.041
Per Metre
conductor cable 7/0.029" 250/440 Volts
PVC insulated cotton braided and compounded copper
24.042
Per Metre
conductor cable 7/0.036" 250/440 Volts
PVC insulated cotton braided and compounded copper
Per Metre
24.043
conductor cable 7/0.044" 250/440 Volts
PVC insulated cotton braided and compounded copper
24.044
Per Metre
conductor cable 7/0.064" 250/440 Volts
PVC insulated sheathed single core copper conductor cable
24.045
Per Metre
3/0.029" 250/440 Volts
PVC insulated PVC sheathed single core copper conductor
Per Metre
24.046
cable 3/0.036" 250/440 Volts
PVC insulated PVC sheathed single core copper conductor
24.047
Per Metre
cable 7/0.074" 250/440 Volts
PVC insulated PVC sheathed single core copper conductor
24.048
Per Metre
cable 7/0.036" 250/440 Volts
PVC insulated PVC sheathed single core copper conductor
Per Metre
24.049
cable 7/0.044" 250/440 Volts
PVC insulated PVC sheathed single core copper conductor
24.050
Per Metre
cable 7/0.064" 250/440 Volts
PVC insulated PVC sheathed single core copper conductor
24.051
Per Metre
cable 7/0.064" 660/1100 volts grade
PVC insulated PVC sheathed single core copper conductor
24.052
Per Metre
cable 19/0.064" 660/1100 volts grade
PVC insulated PVC sheathed single core copper conductor
24.053
Per Metre
cable 19/0.064" 660/1100 volts grade
PVC insulated PVC sheathed single core, copper conductor
24.054
Per Metre
cable 19/0.083" 660/1100 volts grade
PVC insulated PVC sheathed single core, copper conductor
24.055
Per Metre
cable 37/0.072" 660/1100 volts grade
PVC insulated PVC sheathed single core, copper conductor
24.056
Per Metre
cable 37/0.083" 660/1100 volts grade
PVC insulated PVC sheathed single core, copper conductor
24.057
Per Metre
cable 37/0.103" 660/1100 volts grade
PVC insulated, PVC sheathed twin core copper conductor
24.058
Per Metre
cable 3/0.029" 250/440 volts
PVC insulated, PVC sheathed twin core copper conductor
24.059
Per Metre
cable 3/0.036" 250/440 volts
PVC insulated, PVC sheathed twin core copper conductor
24.060
Per Metre
cable 7/0.029" 250/440 volts
PVC insulated, PVC sheathed twin core copper conductor
24.061
Per Metre
cable 7/0.036" 250/440 volts
PVC insulated, PVC sheathed twin core copper conductor
24.062
Per Metre
cable 7/0.044" 250/440 volts
PVC insulated, PVC sheathed twin core copper conductor
24.063
Per Metre
cable 7/0.064" 250/440 volts
24.064PVC insulated, PVC sheathed three core cable 660/1100 volts Per Metre
24.065PVC insulated, PVC sheathed three core cable 660/1100 voltsPer Metre
24.066PVC insulated, PVC sheathed three core cable 7/0.029"
66Per Metre
24.067PVC insulated, PVC sheathed three core cable 7/0.036"
660Per Metre
24.068PVC insulated, PVC sheathed three core cable 7/0.044"
660Per Metre
24.069PVC insulated, PVC sheathed three core cable 7/0.064" 660/Per Metre
24.070PVC sheathed 4 core non armoured cable 3/0.029" 660/1100 vPer Metre
24.071PVC sheathed 4 core non armoured cable 3/0.036" 660/1100 vPer Metre
24.072PVC sheathed 4 core non armoured cable 7/0.029" 660/1100 vPer Metre
Page 17
RATE
ITEM
MATERIAL
24.073PVC sheathed 4 core non armoured cable 7/0.036" 660/1100
24.074PVC sheathed 4 core non armoured cable 7/0.044" 660/1100
24.075PVC sheathed 4 core non armoured cable 7/0.064" 660/1100
24.076PVC sheathed 4 core non armoured cable 19/0.052" 660/1100
PVC sheathed armoured with G.I. WIRE 16 SWG cable
24.077
19/0
052" 660/1100
volts
PVC sheathed
armoured
with G.I. WIRE 16 SWG cable
24.078
19/0sheathed
064" 660/1100
volts
PVC
armoured
with G.I. WIRE 16 SWG cable
24.079
19/0sheathed
072" 660/1100
volts
PVC
armoured
with G.I. WIRE 16 SWG cable
24.080
19/0sheathed
083" 660/1100
volts
PVC
armoured
with G.I. WIRE 16 SWG cable
24.081
37/0sheathed
072" 660/1100
volts
PVC
armoured
with G.I. WIRE 16 SWG cable
24.082
37/0sheathed
083" 660/1100
volts
PVC
armoured
with G.I. WIRE 16 SWG cable
24.083
37/0
093"
660/1100
volts
PVC sheathed armoured with G.I. WIRE 16 SWG cable
24.084
37/0
103" stranded
660/1100hard
volts
Aluminium
drawn bare conductor 7/3.099 mm
24.085
(7/0
122")
Flexible wire 7/3.099 mm (7/.122") {PVC insulated PVC
24.086 sheathed armoured with G.I wire 16 SWG for service
conneciton 3 core:}
24.087Flexible twin wire 23/.0076" (23/0.195mm)
24.088PVC wire (3/.029")
24.089Capacitor 2.2 UF for ceiling fan
24.090M.S Clamp " dia (16mm)
24.091M.S Clamp 3/4" dia (20mm)
24.092M.S Clamp 1" dia (25mm)
24.093M.S Clamp 11/4" dia (32mm)
24.094M.S Clamp 1" dia (40mm)
24.095M.S Clamp 2" dia (50mm)
24.096M.S Clamp 4" dia (100mm)
24.097Clamps for electric wiring 15 mm (")
24.098Clamps for electric wiring 20 mm (")
24.099Clamps for electric wiring '25 mm (1")
24.100Clamps for electric wiring '32 mm (1")
24.101Clamps for electric wiring 40 mm (1")
24.102Clamps for electric wiring 50 mm (2")
24.103Clamps for electric wiring '63 mm (2")
24.104Clamps for electric wiring '80 mm (3")
24.105Clamps for electric wiring 100 mm (4")
24.106PVC Inspection Boxes 15 mm (")
24.107PVC Inspection Boxes 20 mm (")
24.108PVC Inspection Boxes 25 mm (1")
24.109PVC Inspection Boxes 30 mm (1")
24.110PVC Inspection Boxes 40 mm (1")
24.111PVC Inspection Boxes 50 mm (2")
24.112PVC Inspection Boxes 75 mm (3")
24.113PVC Inspection Boxes 100 mm (4")
24.114Chokes 40 watts
24.115Chokes 20 watts
24.116Round block of Sahl wood
GEC design Pole mounted street light with holder shade and
24.117 glass for fitting 125/250 watts mercury Vapour lamp
(excluding cost of lamp) with bracket clamp nuts & bolts
24.118Street light pole bracket
24.119Cost of bracket 1" (32 mm) G.I pipe 7 ft. long half round
24.120Shackle Insulator for holding insulated wire
24.121Pin Insulator greeen (medium size)
24.122Staining screws for stay wire of electric pole
24.123Stay wire for electric pole 7/12"
24.124Stay wire for electric pole 7/14"
24.125Bakelite button holder shade large size
24.126Bakelite button holder shade Large size
24.127Bakelite Button Holder large size
24.128Bell push or bed switch
24.129Bakelite lamp holder
24.130Braket lamp holder
24.131Brass bracket with holder
24.132Brass bracket with holder
24.133Brass Button Holder
24.134Call bell 220/250 volts
24.135Ceiling rose bakelite
24.136Cut out bakelite open type
24.137Cut out backolite recessed type
24.138Electric Energy Metre Single Phase} 250 volts 10 AMP
24.139Electric Energy Metre Single Phase 250 volts 30 AMP
24.140Electric Energy Metre Single Phase 250 volts 60 AMP
24.141Three phase 4 wires, 400 volts: 3 x 15 Amps
24.142Three phase 4 wires, 400 volts:3 x 50 Amps
Page 18
UNIT
vPer Metre
vPer Metre
vPer Metre
vPer Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Per Doz.
Per Doz.
Per Doz.
Per Doz.
Per Doz.
Per Doz.
Per Doz.
Per Doz.
Each
Each
Each
Each
Each
Each
Each
Each
Each
Metre
Metre
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
RATE
ITEM
MATERIAL
24.143Three phase 4 wires, 400 volts: 3 x 80 Amps
24.144Electric shoe 3 pin 10/15 Amps
24.145Wall Shoe 3 pin 5 Amps
24.146Wall socket 3 pin 5 Amps
24.147Wall socket 3 pin 5 Amps without Shoe.
24.148Wall socket 3 pin 10/15 Amp open type
24.149Wall socket 3 pin 10/15 Amp recessed type
24.150Wall socket 3 pin 10/15 Amp with shoe
24.151Flouresent tube 40 watts
24.152Starter for Flourscent Tube 40 watts
24.153Kit kat fuses 500 volt 15/20 Amp
24.154Kit kat fuses 500 volt 30/35 Amp
24.155Kit kat fuses 500 volt 60/65 Amp
24.156Kit kat fuses 500 volt 100 Amp
24.157Kit kat fuses 500 volt 200 Amp
24.158Kit kat fuses 500 volt 300 Amp
24.159Kit kat fuses 500 volt 400 Amp
24.160Kit kat fuses 500 volt 500 Amp
24.161Leathoride paper
24.162Cooper nail 2" / 3"
24.163Cooper plates 600 x 600 x 3 mm (2' x 2' x 1/8")
24.164Lightining arrestor Horn type
24.165Copper enamel wire No. 26 to 32
24.166Soldering and varnishing for A.C. ceiling fan
24.167Wooden Gutties
24.168Switch double control open type (5 Amp)
24.169Switch double control piano type (5 Amp)
24.170Switch double controil ring type recessed (5 Amp)
24.171Switch Piano type (5 Amp)
24.172Switch plate type recessed (5 Amp)
24.173Switch ring type (5 Amp)
Double pole 15/20 Amp {Iron/Alminum clad 500 volt main
24.174
switch with kit kat fuse}
Double pole 30/35 Amp {Iron/Alminum clad 500 volt main
24.175
switch with kit kat fuse}
Double pole 60/65 Amp {Iron/Alminum clad 500 volt main
24.176
switch with kit kat fuse}
Double pole 100 Amp {Iron/Alminum clad 500 volt main switch
24.177
with kit kat fuse}
Tripple pole 15/20 Amp {Iron/Alminum clad 500 volt main
24.178
switch with kit kat fuse}
Tripple pole 30/35 Amp {Iron/Alminum clad 500 volt main
24.179
switch with kit kat fuse}
24.180Tripple pole with neutral link 30/35 Amp main switch
24.181Tripple pole with neutral link 60/65 Amp main switch
24.182Tripple pole with neutral link 100 Amp main switch
Iron/Aluminum clad 500 volt main switch with tripple pole
24.183
and neutral link with HRC fueses: 60/65 Amps
Iron/Aluminum clad 500 volt main switch with tripple pole
24.184
and neutral link with HRC fueses:
100 Amps.
Iron/Aluminum clad 500 volt main switch with tripple pole
24.185
and neutral link with HRC fueses:
150 Amps.
Iron/Aluminum clad 500 volt main switch with tripple pole
24.186
and neutral link with HRC fueses:
200 Amps.
Iron/Aluminum clad 500 volt main switch with tripple pole
24.187
and neutral link with HRC fueses:
300 Amps.
Iron/Aluminum clad 500 volt main switch with tripple pole
24.188
and neutral link with HRC fueses:
400 Amps.
Iron/Aluminum clad 500 volt main switch with tripple pole
24.189
and neutral link with HRC fueses:
500 Amps.
24.190Thimble copper 60/65 Amp
24.191Thimble copper 100 Amp
24.192Thimble 150 Amp.
24.193Thimble copper 200 Amp
24.194Thimble copper 300 Amp
24.195Thimble copper 400 Amp
24.196Thimble copper 500 Amp
24.197G.I bend " (15 mm) dia
24.198G.I bend " (20 mm) dia
24.199G.I bend 1" (25 mm) dia
24.200G.I bend 1" (32 mm) dia
24.201G.I bend 1" (40 mm) dia
24.202G.I. Bend 2" dia (50 mm) dia
24.203G.I bend 3" (80 mm) dia
Page 19
UNIT
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Job
Each
Kg
Each
Kg
each
Dozen
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
RATE
ITEM
MATERIAL
24.204M.S. Bend "
(15 mm) dia
24.205M.S. Bend " (20 mm) dia
24.206M.S. Bend 1" (25 mm) dia
24.207M.S. Bend 1" (40 mm) dia
24.208M.S. Conduit Bend 1" (32 mm) dia
24.209M.S. Conduit Bend 1" (40 mm) dia
24.210M.S. Conduit Bend 2" (50 mm) dia
24.211PVC Bend " (12 mm) dia ordinary
24.212PVC Bend " (20 mm) dia ordinary
24.213PVC Bend 1" (25 mm) dia ordinary
24.214PVC Bend 1" (30 mm) dia ordinary
24.215PVC Bend 1" (40 mm) dia ordinary
24.216PVC Bend 2" (50 mm) dia ordinary
24.217PVC Bend 3" dia (75 mm) ordinary
24.218PVC Bend 4" dia (100 mm) ordinary
24.219Inspection box " (15 mm) dia
24.220Inspection box " (20 mm) dia
24.221Inspection box 1" (25 mm) dia
24.222M.S. Inspection box 1" (32 mm) dia
24.223M.S. Inspection box 1" (40 mm) dia to 3" (80mm) dia
24.224Hooks for " to 1" dia pipe
24.225 Hooks for 11/4" to 1" dia pipe
24.226Hook for 2" dia pipe
24.227Hook for 3" dia pipe
24.228 M.S. Conduit pipe "
(15 mm) dia
24.229M.S. Conduit pipe " (20 mm) dia
24.230M.S. Conduit pipe 1" (25 mm) dia
24.231M.S. Conduit pipe 1" (32 mm) dia
24.232M.S. Conduit pipe 1" (40 mm) dia
24.233M.S. Conduit pipe 2" (50 mm) dia
24.234PVC pipe " (12 mm) dia ordinary
24.235PVC pipe " (20 mm) dia ordinary
24.236PVC pipe 1" (25 mm) dia ordinary
24.237PVC pipe 1" (30 mm) dia ordinary
24.238PVC pipe 1" (40 mm) dia ordinary
24.239PVC pipe 2" (50 mm) dia ordinary
24.240PVC Pipe 3" dia (75 mm) ordinary
24.241PVC Pipe 4" dia (100 mm) ordinary
24.242PVC Flexible Pipe " (12 mm) dia
24.243G.I. pipe " dia (15 mm i/d)
24.244G.I. Pipe " dia (20 mm i/d)
24.245G.I. Pipe 1" dia (25 mm i/d)
24.246G.I. pipe 1" dia (32 mm i/d)
24.247G.I. pipe 1" dia (40 mm i/d)
24.248G.I. pipe 2" dia (50 mm i/d)
24.249G.I. pipe 3" dia (75 mm i/d)
24.250G.I. Flexible Pipe " (12 mm) dia
24.251G.I. Flexible Pipe " (20 mm) dia
24.252G.I. Flexible Pipe 1" (25 mm) dia
24.253G.I. Flexible Pipe 1" (32 mm) dia
24.254G.I. Flexible Pipe 1" (40 mm) dia
24.255G.I. Flexible Pipe 2" (50 mm) dia
24.256G.I. Flexible Pipe 3" (80 mm) dia
24.257G.I. Flexible pipe 4" (100 mm)
24.258Screws 1" (25 mm) long
24.259Screws 2" (25 mm) long
24.260Screws 3" (25 mm) long
24.261Screws 4" (25 mm) long
24.262Screws 6" (25 mm) long
24.263G.I reducing socket size 2 x " (50 x 13 mm)
24.264G.I Reducing socket 2 x " dia (50 x 20 mm)
24.265Boring " dia
24.266G.I. Socket " (12 mm) dia
24.267G.I. Socket " (20 mm) dia
24.268G.I. Socket 1" (25 mm) dia
24.269G.I. Socket 1" (32 mm) dia
24.270G.I. Socket 1" (40 mm) dia
24.271G.I. Socket 2" (50 mm) dia
24.272G.I. Socket 3" (80 mm) dia
24.273Brass Socket 1" (40 mm) dia
24.274Brass Socket 2" (50 mm) dia
24.275Brass Socket 4" (100 mm) dia
24.276PVC Socket " (12 mm) dia
Page 20
UNIT
Each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
Each
Each
Each
per doz.
per doz.
Each
Each
Each
Each
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
per mtr.
per mtr.
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
per mtr.
per mtr.
per mtr.
per mtr.
per mtr.
per mtr.
per mtr.
each
Dozen
Dozen
Dozen
Dozen
Dozen
each
each
Metre
each
each
each
each
each
each
each
each
each
each
each
RATE
ITEM
MATERIAL
UNIT
RATE
24.277G.I. Nipple " (12 mm) dia
each
24.278G.I. Nipple " (20 mm) dia
each
24.279G.I. Nipple 1" (25 mm) dia
each
24.280G.I. Nipple 1" (32 mm) dia
each
24.281G.I. Nipple 1" (40 mm) dia
each
24.282G.I. Nipple 2" (50 mm) dia
each
24.283G.I. Nipple 3" (80 mm) dia
each
24.284Brass nipple 1" dia (25mm)
each
24.285Brass Nipple 1" dia (32 mm)
each
24.286Brass Nipple 1" (40 mm) dia
each
24.287Brass Nipple 2" (50 mm) dia
each
24.288Brass Nipple 4" (100 mm) dia
each
24.289PVC Nipple " (12 mm) dia
each
24.290Brass Check nut " (12 mm) dia
each
24.291Brass check nut 1" (40 mm)
each
24.292Brass check nut 1" (25 mm)
each
24.293Brass check nut 1" (32 mm)
each
24.294Brass check nut 2" (50 mm)
each
24.295Brass check nut 4" (100 mm)
each
24.296Check Nuts " (12 mm) dia
each
24.297Check Nuts " (20 mm) dia
each
24.298Check Nuts 1" (25 mm) dia
each
24.299Check Nuts 1" (32 mm) dia
each
24.300Check Nuts 1" (40 mm) dia
each
24.301Check Nuts 2" (50 mm) dia
each
24.302Check Nuts 3" (80 mm) dia
each
24.303M.S Box 4" x 4" (100 x 100 mm)
each
24.304M.S Box 7" x 4" (175 x 100 mm)
each
24.305M.S Box 9" x 4" (225 x 100 mm)
each
24.306M.S Box 8" x 10" (200 x 250 mm)
each
24.307M.S Box 10" x 12" (250 x 300 mm)
each
24.308M.S Box 12" x 14" (300 x 350 mm)
each
24.309Angle iron board including paints (9"x9"x1")
each
24.310Angle Iron board including paint (9"x12"x1")
each
24.311Angle Iron board including paint (10"x12"x1")
each
24.312Angle Iron board including paint (12"x15"x1")
each
24.313Angle Iron board including paint (12"x18"x1")
each
24.314Angle Iron board including paint (10"x15"x1")
each
24.315Anle Iron board including paint (15"x18"x1")
each
24.316Copper strip 1" x 1/8" x 14" (40 x 3 x 350 mm)
each
24.317Copper strip 14" x 2" x 1/8" to 3/16" (350 x 50 x 3 mm to 6
each
24.318Copper strip 14" x 2" x 1/4" (350 x 50 x 6 mm) to 6mm
each
24.319Rag bolts 9" x 5/8" (225 x 16 mm)
each
24.320Reg bolts 12" x 5/8" (300 x 16 mm)
each
24.321Eye bolts
Each
24.322Eye bolts (bigger size) for straining posts, stiffening post
Each
24.323PVC/weather proof cable 3/0.029" (3/0.74 mm) Single core
per mtr.
24.324PVC/weather proof cable /0.029" (7/0.74 mm) Single core
per mtr.
24.325PVC/weather proof cable /0.036" (7/0.91 mm) Single core
per mtr.
24.326PVC/weather proof cable /0.044" (7/1.12 mm) Single core
per mtr.
24.327Nut & Screw
Each
24.328Straining Screw for electric pole
Each
24.329Sal wood casing for wiring
Per mtr.
24.330Wooden strip casing
Per % mtr.
24.331Insulated cleat (small)
each
24.332Insulated cleat (big size)
each
24.333Leather or wooden cleats
each
24.334M.S Hooks
each
24.335M.S bar hook 3/8" (!0 mm) dia
each
24.336Canopy nipple & hook
Per Job
24.337Hook 5/8" (16 mm) with nut & bolts
each
24.338Girder clamp hook 5/8" (16 mm)
each
24.339PVC bushes " (12 mm) dia
each
24.340Glazed porcelain (Imported)
each
24.341Glazed Porcelain counter weight with accessories
each
24.342VIR/PVC cable 3/0.29
per mtr.
24.343Brass lamp holder
each
24.344Brass lamp holder
each
24.345Brass lamp holder
each
24.346Double cone reflector
each
24.347Switch ring type
each
24.348Switch 10/15 Amp
each
24.349Switch 10/15 Amp. recessed
each
Page 21
ITEM
MATERIAL
24.350Plug 3 pin and switch (combined) 10/15 Amp.
24.351Plug 3 pin and switch (recessed) 10/15 Amp.
24.352Pole mounted street light holder shade and glass
24.353Frame with holder
24.354Frame set
24.355Round tube 32 watts
24.356Starter
24.357Choke
24.358Holder
24.359Base patti for tube light
24.360Ball bearing size (6201, 6202, 6203)
24.361Plastic cover
24.362Handle chromium plated for iron box
24.363Nut & bolts " (12 mm) dia 1" (40 mm) long
24.364T - Iron " x 1" x 1" x 5"
24.365Clamps
24.366Steel channel 75 x 40 x 3 mm
24.367steel plate 3"x1"x" )75x40x40 mm)
24.368 Steel plate 3"x 3/4 x 3/4 (75 x 20 x 20 mm)
24.369Bolts and nuts 5/8" dia (16 mm)
24.370Double clamp for anchor rod henley type for pole
24.371Double clamp 9" dia (225 mm)
24.372Clamps with bolts & nuts etc. for street pole
24.373Clamp double for erection of house service pipe Henley
24.374Clamp 2" dia (50 mm)
24.375Steel clamp " dia (12 mm)
24.376G.I clamp (small)
24.377G.I. Clamp (large)
24.378Pole clamp with bolt & nuts for street light pole
24.379Shakle insulator
24.380M.S bolts for suport
24.381Copper wire No.2 to 10
24.382G.I wire (all size)
24.383Cut out
24.384Wooden & leather cleats
24.385Vapour mercury lamp 125 watt with choke set
24.386Vapour mercury lamp 250 watt with choke set
24.387Silver paint
24.388G.I Nuts & Bolts 2" long " (50 mm x 13 mm)
24.389G.I Nuts & Bolts 1" x " long (40 x 6 mm)
24.390Copper wire No.16 & 20 SWG
24.391Copper Wire Old
24.392Enemal wire No.26 SWG to 32 SWG
24.393 Copper tap 1" to 2" x1/8"
24.394Copper rod 1" dia (25 mm)
24.395Copper nail (small)
24.396Copper stapple
24.397Soldering and Vernishing
24.398Salt
24.399Loop wire 4 loop 3/0.029 (3/0.74 mm)
24.400Knob with shaff and plate
25.001Locking arrangements with sliding bolt 1' long and 1" dia
25.002Hard wood stair railing
25.003M.S. Channels
25.004Steel beam
25.005Steel chisel
25.006Grating 3/4"x3/4" size
25.007M.S. Box section of 16 SWG 1" x 3" hand rail
25.008Conduit pipe 2" dia including specials
25.009Roller 3" dia
25.010Rivets with heads 2" long
25.011Rivets 1" long
25.012Locking arrangement collapsible gate
25.013 Handles 12" long of 3/4"x1/4" steel channels for collapsibl
25.014GI sheet 24 SWG
25.015GI bracket for railing shutter
25.016GI Holdfast for railing shutter
25.017GI Pipe 1" dia (light quality)
25.018Handle for railing shutter
25.019GI spring for railing shutter
25.020Rolling gear for railing shutter
25.021Iron Holdfast for steel windows
25.022GI pipe 2" dia (light quality)
Page 22
UNIT
each
each
each
Per Job
Per Job
each
each
each
each
each
each
each
each
each
P.kg
P. Kg.
P.Kg.
P.Kg.
per kg
Each
Each
Each
each
each
each
each
each
each
each
each
each
per kg
per kg
each
each
each
each
P.Gln
each
each
per kg
per kg
per kg
per kg
per kg
each
each
each
per kg
Rft
each
Each
Rft
Kg
Kg
P.Kg.
P.Kg.
P.Rft
P.Ft
each
Each
Each
Each
Each
P.Kg.
Each
Each
P. Rft
Each
Each
Each
Each
P. Foot
RATE
ITEM
MATERIAL
UNIT
1
5
Each
25.023 Window hinges /4" thick with /16" dia pins
25.024Brass casement handle 6" for steel windows
Each
25.025Mild steel casement stay 15" long for steel windows
Each
25.026Wooden strips for fixing glass pans
P.Rft
25.027Steel glazing clips for fixing glass panes
Each
25.028Glass panes 2 mm thick
P. Sft.
25.029Glass panes 2.5 mm thick
P. Sft.
25.030Glass panes 3 mm thick
P. Sft.
25.031Glass panes 4 mm thick
P. Sft.
25.032Glass panes 5 mm thick
P. Sft.
25.033M.S. moulded tubular pipe of 18 SWG
P.Kg.
25.034Brass hinges (4" long)
Each
25.035Brass Handles (4" long)
Each
25.036U' shapped rubber linning (" thick)
P. Rft
25.037Wire gauze galvanized 24 SWG (12x 12 mesh)
P.Sft.
25.038 x M.S square box of 16 SWG for fixing wire gauge
P. Kg.
25.039C.P. tower bolt (225 mm long)
Each
25.040Brass handle special type for steel windows
Each
25.041G.I. Stay for windows
Each
1
P. Sft.
25.042 Grill of M.S. flat "x /8" with frame
25.043Cost of flaps including hinges for G.I. Pipes
Each
25.044Steel grating
P.Sft
25.0451 ft. long M.S. U-Clamp 3/4" dia threaded at both ends incl
Each
25.046Painting small detached articles not exceding 1" sft.
Each
3
Rft
25.047 Aluminum frame 100x20mm (4"x /4")
25.048Aluminum frame 100x40mm (4 x1")
Rft.
25.049Aluminum frame 60x40mm (1" x 2")
Rft.
3
Rft.
25.050 Aluminum frame 50x20mm (2" x /4")
25.051Aluminum leaf edging for aluminium windows
Rft.
25.052Tinted glass 5mm thick
Sft.
25.053Aluminum tringular gola and gasket
Rft.
25.054Pivot for aluminium doors
each
25.055Alimuninum tower bolt 9" long
each
25.056locking arrangement
each
25.057Handle Large
Rft
25.058Rubber gasket for Aluminium Windows
Rft.
25.059Latch for Aluminium Windows
each
25.060Steam Coal
P. Kg.
26.0017 Strand barbed wire
P.Kg.
26.002Anti termite (Heptachlore)
P-Ltr
26.003Cane Singapore
Per Kg.
26.0043/16" dia washers for straining posts, stiffening posts & in
Dozn
26.005Cost of bamboo 10' to 12' long
Each
26.006Cost of iron shoes for survey Jhandy
Each
26.007Cost of red cloth for survey Jhandy
Each
26.008Cost of ordinary wood for pegs
P. Cft.
26.009Hooks for fixing iron gauges
Dozen
26.010Filling cement bags with coal
Per Kg.
26.011Cost of manure
per Cart
26.012Polythene sheet of 300 gauge (0.003 thick)
P.Kg.
26.013Soap
P. Kg.
26.014Eye bolt
Each
26.015Primer (Zinc)
P. Kg.
26.016Weather Sheet Paint
P. Lt
Page 23
RATE
CHAPTER NO. 26
MISCELLANEOUS
DESCRIPTION OF ITEM:
1.
sand mortar
The board is to be of cement plaster " (12 mm) thick with 2" (50
1" (25mm) thick beading
Detail
Qty
Amount
Sand
1.20
0.3
Cement
Total
Contractor's Profit & Ove
Total
Cft
bag
0.00 %Cft.
0.00 per bag
20.0 Percent
LABOUR
1
2
Mason
0.75
1
Coolies
No.
No.
0.00
0.00
0.00
0.00
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATE
Labour Rate Per Sft.
Labour Rate Per Sqm
Composite Rate Per Sft.
Composite Rate Per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 1
Say
Say
2.
Detail
Qty
Amount
FOR 12 NOS.
LABOUR
1
Carpenter
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 12 Nos.
1.25
Nos.
0.00
ITEM RATE
Labour Rate Per Each
Rs.
Page 2
Say
3.
Providing and fixing barbed wire fencing with 4 horizontal and 2 number cross wires fixed
(1:2:4) straining posts 7'x9"x9" (2.14m x 225mm) at 100' (30m) centre to centre stiffenin
x 15 mmx 50mm) at 50' (15m) interval and intermediate posts 7'x5"x5" at 8' centre to centr
steel, its fabrication and placing of steel reinforcement, eye bolt, washers, etc. complet
Detail
Qty
Amount
9.25
2
Cft.
Cft.
Cft.
Cft.
Cft.
Cft.
9.25
Cft.
Lbs.
Lbs.
38.89
85.73
Kg.
Lbs.
85.73
Page 3
B / F :
MATERIAL
3
Kg
Total
4 Nos
2 Nos
20 Nos
26 No
26.0
Total
4 Nos
2 Nos
20 Nos
26 No
26.0
Horizontal 4x48 =
cross wire 2x6x9
Add 5% wastage
Total
Nos.
0.00
Each
Nos
0.00
Dozen
Eye
For
For
For
3/16" washers
For straining posts
For stiffening posts
For intermediate posts
Total
Contractor's Profit & Ove
Total
Total for 100 Rft.
20.0 Percent
2462.21
48
x 100
Rs.
LABOUR
i) R.C.C. work (Item 6a(ii) Chap. 6)
ii) Fabrication of steel work 9Item 9(b) Chap. 6)
iii) Blacksmith for wire fencing
erection.
iv) Coolies
9.25
38.89
Cft.
Kg.
0.75
2.00
No.
Nos.
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATE
Labour Rate Per 100 Lft.
Labour Rate Per LM
Composite Rate 100 Lft.
Composite Rate Per LM
4.
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
0.00
0.00
0.00
0.00
Supplying bamboo jhandies 10' to 12' (3m to 2054m) with iron shoes and flag 15" (375 mm) s
Detail
Rate
Per Unit
Qty
Amount
MATERIAL
1
2
Cost of bamboo
1.00
1.0
1.0
Total
Contractor's Profit & Ove
Total
No.
No.
No.
0.00
0.00
0.00
Each
Each
Each
20.0 Percent
LABOUR
1
2
Carpenter
0.04
Sewing charges
No.
L.S.
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATE
Labour Rate for Each
Composite Rate for Each
Rs.
Rs.
Page 5
Say
Say
0.00
0.00
5.
Supplying wooden pegs for leveling 1" (40mm) dia 6" (150mm)
Detail
Qty
long
Amount
0.78
Cft.
0.50
No.
0.00
0.00
20.0 Percent
LABOUR
1
Carpenter
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 300 Nos.
Total for 100 Nos.
ITEM RATE
Labour Rate Per 100 Nos.
Composite Rate Per 100 Nos.
Rs.
Rs.
Page 6
Say
Say
6.
Supplying wooden pegs for alignment 2" to 3" (50 to 75mm) dia 9"
Detail
Qty
(225mm)
long
Amount
MATERIAL
Cost of wood
Contractor's Profit & Ove
3.00
Cft
20.0 Percent
Total
LABOUR
1
Carpenter
Sundries
10.00 Percent
0.40
No.
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATE
Labour Rate Per 100 Nos.
Composite Rate Per 100 Nos.
Rs.
Rs.
Page 7
Say
Say
0.00
0.00
7.
Fixing enamalled iron gauges flush with masonry including cost of hooks.
Detail
MATERIAL
1
Hooks
Total
Contractor's Profit & Ove
Total for 20 Lft.
6.00
Nos.
0.00
Each
20.0 Percent
LABOUR
1
2
Mason
Coolies
1.00
1.00
No.
No.
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 20 Lft.
ITEM RATE
Labour Rate Per Lft.
Labour Per LM
Composite Rate Per Lft.
Composite Rate Per LM
8.
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
0.00
0.00
0.00
0.00
Detail
Qty
Amount
Mason
Coolies
1.00
1.00
No.
No.
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 30 Nos.
ITEM RATE
Labour Rate Each
Rs.
Page 8
Say
0.00
9.
Fixing mainline iron distance marks in position including making 1:3;6 cement concrete blo
size of block 10x14"x15" = 14.58 Cft.
Detail
MATERIAL
1
2
3
Cement
Sand
Aggregate stone
Total
Contractor's Profit & Ove
Total
1.80
6.75
13.50
Bags
Cft.
Cft.
20.0 Percent
LABOUR
1
2
Mason
Coolies
1.00
2.00
No.
No.
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each
Rs.
Page 9
Say
Say
0.00
0.00
10.
Detail
Qty
Amount
Blacksmith
Coolies
1.00
1.00
No.
No.
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 30 Nos.
ITEM RATE
Labour Rate Per Cut
11.
Rs.
Say
0.00
Detail
Qty
Amount
Blacksmith
Coolies
1.75
1.25
Nos.
Nos.
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 25 Nos.
ITEM RATE
Labour Rate Per Cut
Rs.
Page 10
Say
0.00
12.
Detail
Qty
Amount
Blacksmith
Coolies
1.50
1.00
Nos.
No.
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 30 Nos.
ITEM RATE
Labour Rate Per Each End
13.
Rs.
Say
0.00
Detail
Qty
Amount
Fitter Grade II
Coolies
1.00
1.50
No.
Nos.
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 800 Lft.
ITEM RATE
Labour Rate Per 100 Lft.
Labour Rate Per Lm
Rs.
Rs.
Page 11
Say
Say
0.00
0.00
14.
(40mm)
Detail
Qty
Amount
In ordinary soil
Fitter
Coolies
1.00
3.50
No.
Nos.
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 40 Lft.
b)
Rs.
Rs.
1.00
8.00
No.
Nos.
Say
Say
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 40 Rft.
Labour Rate Per Lft.
Labour Rate Per Lm.
c)
0.00
0.00
Rs.
Rs.
1.00
12.50
No.
Nos.
Say
Say
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 40 Rft.
0.00
0.00
ITEM RATE
Labour Rate Per 1 Lft.
Labour Rate Per Lm.
Rs.
Rs.
Page 12
Say
0.00
15.
re-fitting.
Detail
Qty
Amount
Blacksmith
Coolies
0.50
2.00
No.
Nos.
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 50 Rft.
ITEM RATE
Labour Rate Per Lft.
Labour Rate Per Lm.
16.
Rs.
Rs.
Say
Say
0.00
0.00
Detail
Qty
Amount
LABOUR
1
Blacksmith
Sundries
10.00 Percent
0.20
No.
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATE
Labour Rate Per Each
Rs.
Page 13
Say
0.00
17.
Detail
Qty
Amount
MATERIAL
1
Soap etc.
Total
Contractor's Profit & Ove
Total
0.42
Kg.
0.00 P. Kg.
20.0 Percent
LABOUR
1
Coolies (washerman)
Total
Sundries
0.75
No.
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATE
Labour Rate Per Bed
Composite Rate Per Bed
Rs.
Rs.
Page 14
Say
Say
0.00
0.00
18.
Washing
Durries
Detail
Qty
Amount
MATERIAL
Cost of Soap
1.00
Total
Contractor's Profit & Ove
Total
Kg.
0.00 P. Kg.
20.0 Percent
LABOUR
1
Coolies (washerman)
1.00
Nos.
Total
Sundries
10.00 Percent
Rs.
Rs.
Rs.
Rs.
Page 15
Say
Say
Say
Say
0.00
0.00
0.00
0.00
19
Recaning Chairs.
(i)
Detail
Qty
Amount
MATERIAL
1
Cane
Total
Contractor's Profit & Ove
Total
0.00
Kg.
20.0 Percent
LABOUR
1
Canners
0.35
No.
Total
Sundries
Total
10.00 Percent
Rs.
Rs.
Page 16
Say
Say
0.00
0.00
Detail
Qty
Amount
MATERIAL
1
Cane (Singapur)
Total
Contractor's Profit & Ove
Total
0.00
Kg.
20.0 Percent
LABOUR
1
Canners
0.45
No.
Total
Sundries
Total
10.00 Percent
Rs.
Page 17
Say
Say
0.00
0.00
Detail
MATERIAL
1
Cane (Singapur)
Total
Contractor's Profit & Ove
Total
0.00
Kg.
20.0 Percent
LABOUR
1
Canners
2.00
Nos.
Total
Sundries
Total
10.00 Percent
Rs.
Rs.
Page 18
Say
Say
0.00
0.00
Detail
MATERIAL
1
Cane (Singapur)
Total
Contractor's Profit & Ove
Total for 5 Nos.
0.23
Kg.
0.00
Kg.
20.0 Percent
LABOUR
1
Canners
2.00
Nos.
Total
Sundries
10.00 Percent
Rs.
Rs.
Page 19
Say
Say
0.00
0.00
Detail
Qty
Amount
MATERIAL
1
Cane
Total
Contractor's Profit & Ove
Total
0.114
Kg.
0.00
Kg.
20.0 Percent
LABOUR
1
Canners
0.25
No.
Total
Sundries
10.00 Percent
Rs.
Rs.
Page 20
Say
Say
0.00
0.00
Detail
Qty
Amount
MATERIAL
1
Cane
Total
Contractor's Profit & Ove
Total
0.17
Kg.
0.00
Kg.
20.0 Percent
LABOUR
1
Canners
0.70
No.
Total
Sundries
Total
10.00 Percent
Rs.
Rs.
Page 21
Say
Say
0.00
0.00
19 (v Easy chairs, single caning only back and seat in one piece.
Detail
Qty
Amount
MATERIAL
1
Cane
Total
Contractor's Profit & Ove
Total
0.00
Kg.
20.0 Percent
LABOUR
1
Canners
1.00
No.
Total
Sundries
Total
10.00 Percent
Rs.
Rs.
Page 22
Say
Say
0.00
0.00
19 (v Easy chairs double caning back and seat in one piece or couches (caned area
about 16 Sft. 1.50 Sqm)
Detail
Qty
Amount
MATERIAL
1
Cane
Total
Contractor's Profit & Ove
Total
0.00
Kg.
20.0 Percent
LABOUR
1
Canners
1.50
Nos.
Total
Sundries
Total
10.00 Percent
Rs.
Rs.
Page 23
Say
Say
0.00
0.00
20
Detail
Qty
Amount
MATERIAL
1
=00.1
0.17
=0.04
0.145
0.029
0.174 Cft
Cft.
0.00
Cft
L.S.
20.0 Percent
LABOUR
1
Carpenter
0.18
No.
Total
Sundries
Total
10.00 Percent
Rs.
Rs.
Page 24
Say
Say
0.00
0.00
Detail
Qty
Amount
LABOUR
1
Coolies Skilled
0.65
No.
Total
Sundries
Total
10.00 Percent
22
Rs.
Say
0.00
Sweeping Chimneys
Detail
MATERIAL
Rope, rags, etc.
Contractor's Profit & Ove
L.S
0.00
20.0 Percent
Total
LABOUR
Coolies Unskilled
2.00
Nos.
Total
Sundries
Total
10.00 Percent
Page 25
Rs.
Rs.
Say
Say
0.00
0.00
Detail
Cft
Gallon
Kg.
No.
0.00Per Gallon
0.00 Per Kg.
0.00
Each
No.
No.
LABOUR
1
2
Carpenter
Painter
1.00
0.03
Total
Sundries
10.00 Percent
Page 26
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
0.00
0.00
0.00
0.00
Detail
Qty
Amount
Coolies
1.25
Nos.
Total
Sundries
Total
10.00 Percent
Rs.
Say
0.00
Detail
Qty
Amount
Coolies Unskilled
1.80
Nos.
Total
Sundries
Total
10.00 Percent
Rs.
Page 27
Say
0.00
26
Detail
Qty
Amount
3.00
Nos.
15.00
8.00
1.00
Nos.
Nos.
No.
Total
Sundries
Total
10.00 Percent
Rs.
Say
0.00
27. Filling cement bags with coal and sewing including cost of string.
Detail
Qty
MATERIAL FOR 500 CFT.
Filling cement bags with coal
Contractor's Profit & Ove 20.0 Percent
Total
LABOUR
1 Coolies Unskilled
L.S
10.25
Nos
0.00
Total
Sundries
Total
10.00 Percent
Rs.
Rs.
Rs.
Rs.
Page 28
Amount
Say
Say
Say
Say
0.00
0.00
0.00
0.00
Detail
Qty
Amount
MATERIAL
1
Cost of manure
Total
Contractor's Profit & Ove
Total
Cart
20.0 Percent
LABOUR
1
0.25
Nos
Total
Sundries
Total
10.00 Percent
29
Rs.
Rs.
Say
Say
0.00
0.00
Detail
Qty
Amount
LABOUR
1
0.20
No.
Total
Sundries
Total
10.00 Percent
Rs.
Page 29
Say
0.00
30
Washing
a) Table Cloth
Detail
Qty
Amount
0.50
No.
Total
Sundries
Total
10.00 Percent
b)
Rs.
Say
0.00
Detail
Qty
Amount
0.50
No.
Total
Sundries
Total
10.00 Percent
Rs.
Page 30
Say
0.00
31
Hoisting and placing sleepers for centring, including carriage within one chain.
Detail
Qty
Amount
Mason
Coolies
0.50
3.00
No.
Nos.
Total
Sundries
Total
10.00 Percent
Rs.
Say
0.00
32. Dismantling sleeper from centring including stacking within one chain
Detail
Qty
Amount
Coolies (skilled)
Coolies (unskilled)
1.00
7.00
No.
Nos.
Total
Sundries
Total
10.00 Percent
Rs.
Page 31
Say
0.00
Detail
Qty
Amount
LABOUR
1
Coolies
Unskilled
Sundries
Total
3.75
Nos.
0.00
10.00 Percent
Rs.
Say
34. Fixing 'U' bolt in masonry or concrete including leveling and tying for fixing angle iron
post.
Detail
Qty
Amount
Mason
Blacksmith
Cooly
1.00
1.00
1.00
No.
No.
No.
Total
Sundries
Total
10.00 Percent
Rs.
Page 32
Say
0.00
35.
Detail
Qty
Amount
LABOUR
1
Coolies
3.00
Nos.
Total
Sundries
Total
10.00 Percent
Rs.
Rs.
Page 33
Say
0.00
35 b) By pump (Rate including cost of pump P.O.L etc. and operational charges)
Detail
Qty
Amount
Depreciation
Cost of pump set 6"x5" with 15 HP
diesel engine.
0
Anticipated life of pump
10000
Hours
1/6 x
Residual Charges
0
= 0
Rate of depriciation/hour0
0
10000
Total
Contractor's Profit & Ove 20.0 Percent
Total
Driver
Cooly
1.00
1.00
No.
No.
Total
10.00 Percent
Sundries
Total
296.45
8
Rs.
37.06
4.80 Litre
0.00Per Litre
Mobil Oil
1.00 Litre
0.00Per Litre
L.S.
18.56
L.S.
4.80
148.50
8
Litre
Rs.
ITEM RATE
Labour Rate Per 1000 Cft.
Labour Rate Per Cum
Composite Rate Per 1000 Cft.
Composite Rate Per Cum.
Rs.
Rs.
Rs.
Rs.
Page 34
Say
Say
Say
Say
0.00
0.00
0.00
0.00
36
Detail
Qty
Amount
Blacksmith
Cooly
1.00
1.00
No.
No.
Total
Sundries
Total
10.00 Percent
Rs.
Page 35
Say
0.00
37.
i)
Supplying and Laying polythene sheet over D.P.C., under floor and on roof etc.
300 Gauge (0.003" thick)
Detail
MATERIAL
1
1.500
Lbs.
0.08
Lbs.
1.58 Lbs (0.717 Kg
20.0 Percent
Total
LABOUR
1
Cooly (skilled)
0.15
No.
Total
Sundries
Total
10.00 Percent
Rs.
Rs.
Rs.
Rs.
Page 36
Say
Say
Say
Say
0.00
0.00
0.00
0.00
Detail
MATERIAL
1
0.00
Kg.
20.0 Percent
LABOUR
1
Cooly (skilled)
0.30
No.
Total
Sundries
Total
10.00 Percent
Rs.
Rs.
Rs.
Rs.
Page 37
Say
Say
Say
Say
0.00
0.00
0.00
0.00
38.
Laying 2" thick sand and bitumen carpet on top of foundation of oil tanks
Detail
MATERIAL
2464
= 410 Cft.)
6
1
2
3
4
Sand
Bitumen
Coal
Fuel wood
410.00 Cft.
1.23 Ton
1.00 Mnd. (37.324 K
58.20 Kg.
Total
Contractor's Profit & Ove
Total
0.00er 100 Cf
0.00 Per Ton
0.00 Per Kg.
0.00 Per Kg.
20.0 Percent
LABOUR
1
2
Mason
Cooly
12.00
35.00
Nos.
Nos.
Total
Sundries
Total
10.00 Percent
Rs.
Rs.
Rs.
Rs.
Page 38
Say
Say
Say
Say
0.00
0.00
0.00
0.00
39
Cutting hole 4" x 6" in stone masonry or brick wall with chisel, repairing masonry and
removing debris within one chain lead.
Detail
Qty
Amount
Mason
Cooly Unskilled
1.00
1.00
No.
No.
Total
Sundries
Total
10.00 Percent
40
Rs.
Say
0.00
Detail
Qty
Amount
Mason
Cooly
0.50
0.50
No.
No.
Total
Sundries
Total
10.00 Percent
Rs.
Page 39
Say
0.00
41. Drilling holes in stone or bricks masonry upto 2" dia, per inch depth.
Detail
Cooly
Unskilled
1.00
No.
Total
Sundries
Total
10.00 Percent
Rs.
Rs/
Page 40
Say
Say
0.00
0.00
42
Detail
Termite Liquid
Spraying Machine
1.04 Litre
L.S.
Total
Contractor's Profit & Ove
Total
0.00 P. Litre
0.00
20.0 Percent
Sprayman
1.00
No.
Total
Sundries
Total
10.00 Percent
Rs.
Rs.
Rs.
Rs.
Page 41
Say
Say
Say
Say
0.00
0.00
0.00
0.00
43
Providing and fixing barbed wire fencing with 4 horizontal and two cross wires, with RCC
1:2:4 posts 5.5' x 6" x9" at 8 ft. centre to centre. Reinforced with 4 number 3/8" dia ve
1/8" dia stirrups 12" centre to centre, complete in all respects.
i)
Amount
Cft.
13.400
Cft.
25.51
Kgs.
Kg.
28.00
Nos.
0.00
Each
28.00
Nos.
0.00
dozen
192.00 Lft.
112.8 Lft.
304.80 Lft.
15
14.74
320.00 Lft.
Wastage 5%
320 Lt. @ 1.25 Cwt/450 Yard =0.29 Cwt
iv) Eye bolts 4 No.x7 post
v)
Washers
Contractor's Profit & Ove 20.00 Percent
on item iii and iv and (v)
Total
(I to V)
x
Rate per 100 Rft.
100
48
LABOUR
i)
RCC
13.40per Cft
0.75
2.00
No.
Nos.
Total
10.00
Contractor's Profit & Ove 20.00
Total for 48 Rft.
Sundries (Item-III)
Percent #
Percent #
867.21
48
ITEM RATE
Labour Rate Per 100 Rft.
Labour Rate Per Metre
Composite Rate Per 100 Rft
Composite Rate Per Metre
Rs.
Rs.
Rs.
Rs.
Page 42
100 =
Say
Say
Say
Say
Say
0.00
0.00
0.00
0.00
ii)
Qty
Amount
1.75
0.28
13.40
Cft.
Per Cft.
9.55
Cft.
25.51
Kg.
192.00 Lft.
112.8 Lft.
304.80 Lft.
15.2 Lft.
320.00 Lft.
14.74
Kg.
28.00
Nos.
0.00
Each
28.00
Nos.
0.00
dozen
Cft.
1.47 x 6.5
Washers
Total
Contractor's Profit & Ove 20.00 Percent
Total for 48 Rft.
x 100
48
Say
0.00
LABOUR
i)
13.40
Cft.
9.55
Cft.
25.51
Kg.
0.75
2.00
No.
Nos.
Total
10.00
Total
Contractor's Profit & Ove 20.00
Total for 48 Rft.
Sundries (Item-IV)
Percent #
Percent #
100
48
ITEM RATE
Labour Rate Per 100 Rft.
Labour Rate Per Metre
Composite Rate Per 100 Rft.
Composite Rate Per Metre
Rs.
Rs.
Rs.
Rs.
Page 43
Say
Say
Say
Say
0.00
0.00
0.00
0.00
CHAPTER NO. 17
OUTLETS
DESCRIPTION OF ITEM:
1.0
Rate for all finished works include the removal of the surplus debris un-used material and
a)
Detail
Qty
Amount
Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
2.50
Nos.
Rs.
0.00
1.5
per day
Say
Percent
Percent
ITEM RATE
Labour Rate Per Job
b)
Detail
Qty
Amount
Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
3.30
Nos.
Rs.
0.00
1.5
per day
Say
Percent
Percent
ITEM RATE
Labour Rate Per Job
Page 1
by
c)
Detail
Qty
Amount
Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
5.00
Nos.
Rs.
0.00
1.5
per day
Say
Percent
Percent
ITEM RATE
Labour Rate Per Job
d)
Detail
Qty
Amount
Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
6.75
Nos.
Rs.
0.00
1.5
per day
Say
Percent
Percent
ITEM RATE
Labour Rate Per Job
e)
Detail
Qty
Amount
Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
10.00
Nos.
Rs.
0.00
1.5
per day
Say
Percent
Percent
ITEM RATE
Labour Rate Per Job
Page 2
2.
Dismantling Outlets
Note :
These rates are for total dismantlement and removal of material. The rates do
not include earth work for which rates are given in item No. 1 above
a)
Detail
Qty
Amount
Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
2.50
Nos.
Rs.
0.00
1.5
per day
Say
Percent
Percent
ITEM RATE
Labour Rate for Each
b)
Detail
Qty
Amount
Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
3.75
Nos.
Rs.
0.00
1.5
per day
Say
Percent
Percent
ITEM RATE
Labour Rate for Each
Page 3
c)
A.P.M.
Detail
Qty
Amount
Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
5.00
Nos.
Rs.
0.00
1.5
per day
Say
Percent
Percent
ITEM RATE
Labour Rate for Each
d)
Detail
Qty
Amount
Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
6.25
Nos.
Rs.
0.00
1.5
per day
Say
Percent
Percent
ITEM RATE
Labour Rate for Each
e)
Detail
Qty
Amount
Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
3.75
Nos.
Rs.
0.00
1.5
per day
Say
Percent
Percent
ITEM RATE
Labour Rate for Each
Page 4
f)
Detail
Qty
Amount
Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
5.00
Nos.
Rs.
0.00
1.5
per day
Say
Percent
Percent
ITEM RATE
Labour Rate for Each
g)
Detail
Qty
Amount
Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
6.25
Nos.
Rs.
0.00
1.5
per day
Say
Percent
Percent
ITEM RATE
Labour Rate for Each
Page 5
Detail
Qty
Amount
MATERIAL
1
2
3
Brick
Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
20
0.25
1
Nos.
Bag
Cft.
0.33
0.33
No.
No.
Per 1000 No
Per Bag
Cft.
Percent
3.50
3.50
0.70
4.20
LABOUR
1
Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
per day
per day
Say
Say
Percent
Percent
ITEM RATE
Labour Rate for Each
Composite Rate for Each
Rs.
Rs.
Dismentalling Walls, taking out Temporary A.P.M. Bricks Block and fixing
iron block and rebuilding dismantled walls.
Detail
Qty
Amount
Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.75
1.00
No.
No.
Rs.
0.00
1.25
per day
per day
Say
Percent
Percent
ITEM RATE
Labour Rate Per Job
Page 6
Detail
Qty
Amount
Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
0.75
1.00
No.
No.
Rs.
0.00
1.25
per day
per day
Say
Percent
Percent
ITEM RATE
Labour Rate for Each
Constructing watching and removing bund for outlet built in running water
Detail
Qty
Amount
5.00
Nos.
Rs.
0.00
1.25
6.75
Nos.
Rs.
0.00
1.25
per day
Say
per day
Say
Percent
Percent
ITEM RATE
Labour Rate for Each
Percent
Percent
ITEM RATE
Labour Rate for Each
Page 7
Detail
Qty
Amount
MATERIAL
1
2
3
Brick
Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
30
0.30
2.00
Nos.
Bag
Cft.
0.40
0.75
No.
No.
Rs.
0.00
1.5
Rs.
Per 1000 No
Per Bag
100 Cft.
Percent
per day
per day
Say
Say
Percent
Percent
ITEM RATE
Detail
Qty
Amount
MATERIAL
1
2
3
Brick
Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
50
0.50
2.00
Nos.
Bag
Cft.
0.75
1.50
No.
Nos.
Rs.
0.00
1.5
Per 1000 No
Per Bag
100 Cft.
Percent
per day
per day
Say
Say
Percent
Percent
ITEM RATE
Labour Rate for Each
Composite Rate for Each
Rs.
Page 8
9
Note:
Extra Labour in Fixing A.P.M. and O.F. Outlets block including Dressing of Bricks.
Rate to be Rs. 5.00 less in case of O.F.
Outlets when there is no O.F. iron block
a)
Detail
Qty
Amount
MATERIAL
1
2
Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
0.20
1.00
Bag
Cft.
Per Bag
100 Cft.
1.00
1.00
No.
No.
per day
per day
Rs.
0.00
1.25
Say
Rs.
Say
Qty
Amount
Percent
Percent
Percent
ITEM RATE
b)
Detail
MATERIAL
1
2
Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
0.20
1.00
Bag
Cft.
0.75
0.75
No.
No.
Rs.
0.00
1.25
Per Bag
Per 100 Cft
Percent
per day
per day
Say
Say
Percent
Percent
ITEM RATE
Labour Rate for Each
Composite Rate for Each
Rs.
Page 9
c)
Detail
Qty
Amount
MATERIAL
1
2
Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
0.20
1.00
Bag
Cft.
Per Bag
Per 100 Cft.
-
Percent
0.60
0.60
No.
No.
per day
per day
Rs.
0.00
1.25
Say
Rs.
Say
Qty
Amount
Percent
Percent
ITEM RATE
d)
Detail
MATERIAL
1
2
Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
0.15
1.00
Bag
Cft.
0.50
0.50
No.
No.
Rs.
0.00
1.25
Rs.
Per Bag
Per 100 Cft
Percent
per day
per day
Say
Say
Percent
Percent
ITEM RATE
Page 10
e)
Detail
Qty
Amount
MATERIAL
1
2
Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
0.10
1.00
Bag
Cft.
0.40
0.40
No.
No.
Rs.
0.00
1.25
Rs.
Per Bag
Per 100 Cft
Percent
per day
per day
Say
Say
Amount
Percent
Percent
ITEM RATE
10
Detail
Qty
MATERIAL
1
2
3
Shingle/Stone Crushed
Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
1.00
0.25
1.00
Cft.
Bag
Cft.
0.33
0.33
No.
No.
Percent
LABOUR
Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
per day
per day
Percent
Percent
ITEM RATE
Labour Rate for Each
Rs.
Say
Rs.
Say
Page 11
11
Detail
Qty
Amount
0.02
0.02
No.
No.
Rs.
0.00
1.25
Rs.
per day
per day
Say
Say
Percent
Percent
ITEM RATE
12
Note:
Water allowance for constructing outlets or culverts when canal water is not flowing
At the discreation of Engineering-in-charges depending upon
the distance and source or supply
Detail
Qty
Amount
Cooly (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Grand Total
1.22
Nos.
Rs.
0.00
1.5
2.50
Nos.
Rs.
0.00
1.5
per day
Say
per day
Say
Percent
Percent
ITEM RATE
Labour Rate Per Each
Coolies (Unskilled)
Sandries
10.00
Total
Contractor's Profit & Ove 20.00
Grand Total
Percent
Percent
ITEM RATE
Labour Rate Per Each
Page 12
13
Hoisting and placing R.C. slabs or stone in position in outlets or W.C. culverts
Detail
Qty
Amount
0.20
0.65
No.
No.
Rs.
0.00
1.5
per day
per day
Say
Percent
Percent
ITEM RATE
Labour Rate for Each
14
a)
Detail
Qty
Amount
LABOUR
1
2
Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Grand Total
0.20
1.00
Bag
Cft.
Per Bag
Per 100 Cft.
-
Percent
0.25
2.00
No.
Nos.
Rs.
0.00
15
0.00
15
per day
per day
Say
Say
Percent
Percent
ITEM RATE
Labour Rate Per Foot
Compsite Rate for Foot
Rs.
Rs.
Say
Rs.
Say
Page 13
b)
Detail
0.20
1.00
Bag
Cft.
0.20
0.75
No.
No.
Rs.
Rs.
0.00
15
0.00
15
Per Bag
Per 100 Cft
Percent
LABOUR
1
2
Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Grand Total
per day
per day
Percent
Percent
ITEM RATE
=
Say
Say
Rs.
Say
Rs.
Say
15
a)
Detail
2.00
Nos.
Rs.
0.00
15
Rs.
per day
Say
Say
Percent
Percent
ITEM RATE
Page 14
b)
Detail
0.75
No.
Rs.
0.00
15
Rs.
per day
Say
Say
Percent
Percent
ITEM RATE
16
Changing Pipe Outlets by removing One Pipe and replacing it at the same site
with another pipe complete with earth and puddling
a)
Detail
0.20
1.00
Bag
Cft.
Per Bag
Per 100 Cft
0.20
2.50
No.
Nos.
per day
per day
15
15
Say
Say
Say
Say
Percent
LABOUR
1
2
Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total for 15 Feet
ITEM RATE
Percent
Percent
Rs.
Rs.
Rs.
Rs.
Page 15
b)
Detail
0.20
1.00
Bag
Cft.
Per Bag
Per 100 Cft
0.10
1.25
No.
Nos.
per day
per day
Rs.
Say
Rs.
0.00
15
15
Say
Rs.
Rs.
Say
Say
Percent
LABOUR
1 Mason
2 Coolies (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Grand Total
Percent
Percent
ITEM RATE
Page 16
CHAPTER NO. 13
DESCRIPTION
OF
ITEM NO
1:
a)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Oil Terpen tine
Brushes (Small)
Sand Paper
P. Ltr
Each
P. Doz
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Unskilled Cooly
Total
Sundries
Total
0.20 No
P. Day
##### Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Page 1
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
1
b)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Linseed oil
Brushes (Small)
0.40 Kg
0.06 No.
P. Kg
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Unskilled Cooly
Total
Sundries
Total
0.20 No
P. Day
Page 2
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
2:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
N I L
Labour
Rate Analysis for 125 Sft
Unskilled Cooly
Total
Sundries
Total
0.50 No
P. Day
##### Percent
Item Rates
Labour Rate Per 100 Sft
Rs.
Rs.
Page 3
0.00
1.25
Say
Say
DESCRIPTION
OF
ITEM NO
3:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
N I L
Rate Analysis for 125 Sft
Labour
Unskilled Cooly
Total
Sundries
Total
2.00 No
P. Day
##### Percent
Item Rates
Labour Rate Per 100 Sft
Rs.
Rs.
Page 4
0.00
1.25
Say
Say
DESCRIPTION
OF
ITEM NO
4:
a)
i)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total
0.33 No
0.33 No
P. Day
P. Day
Page 5
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
ii)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Cooly
Total
Sundries
Total
0.25 No
0.25 No
P. Day
P. Day
Page 6
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total
0.20 No
0.20 No
P. Day
P. Day
Page 7
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total
0.17 No
0.17 No
P. Day
P. Day
Page 8
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total
0.33 No
0.33 No
P. Day
P. Day
Page 9
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total
0.25 No
0.25 No
P. Day
P. Day
Page 10
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
i)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total
0.20 No
0.20 No
P. Day
P. Day
Page 11
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
ii)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total
0.17 No
0.17 No
P. Day
P. Day
Page 12
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Rft
Painter
Unskilled Cooly
Total
Sundries
Total
0.17 No
0.17 No
P. Day
P. Day
Page 13
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Rft
Painter
Unskilled Cooly
Total
Sundries
Total
0.12 No
0.12 No
P. Day
P. Day
Page 14
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 200 Nos
Painter
Unskilled Cooly
Total
Sundries
Total
1.00 No
0.25 No
P. Day
P. Day
Page 15
##### Percent
Rs.
Say
Rs.
Say
Item No.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 175 No.
Painter
Unskilled Cooly
Total
Sundries
Total
0.75 No
0.25 No
P. Day
P. Day
Page 16
##### Percent
Rs.
Say
Rs.
Say
Item No.
i)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 175 No.
Painter
Unskilled Cooly
Total
Sundries
Total
2.00 No
0.50 No
P. Day
P. Day
Page 17
##### Percent
Rs.
Say
Rs.
Say
Item No.
ii)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 175 No.
Painter
Unskilled Cooly
Total
Sundries
Total
1.00 No
0.50 No
P. Day
P. Day
Page 18
##### Percent
Rs.
Say
Rs.
Say
DESCRIPTION
OF
ITEM NO 5:
a)
Painting/ new surface preparing surface and
painting corrugated surface, patent roofing etc.
i)
Priming Coat
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Painter
Unskilled Cooly
Total
Sundries
Total
0.50 No
0.12 No
P. Day
P. Day
##### Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Page 19
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
5
a)
ii)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total
0.25 No
0.08 No
P. Day
P. Day
Page 20
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
5
b)
i)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Unskilled Cooly
Total
Sundries
Total
0.25 No
0.08 No
P. Day
P. Day
Page 21
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
5
b)
ii)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Unskilled Cooly
Total
Sundries
Total
0.12 No
0.12 No
P. Day
P. Day
Page 22
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
5
c)
i)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Painter
Unskilled Cooly
Total
Sundries
Total
0.50 No
0.12 No
P. Day
P. Day
##### Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Page 23
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
5
c)
ii)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Cooly
Total
Sundries
Total
0.25 No
0.08 No
P. Day
P. Day
Page 24
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
5
d)
i)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Painter
Unskilled Cooly
Total
Sundries
Total
0.25 No
0.17 No
P. Day
P. Day
##### Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Page 25
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
5
d)
ii)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Unskilled Cooly
Total
Sundries
Total
0.12 No
0.12 No
P. Day
P. Day
Page 26
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
5
e)
i)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Painter
Unskilled Cooly
Total
Sundries
Total
0.17 No
0.17 No
P. Day
P. Day
##### Percent
Item Rates
Labour Rate Per 100 Lft
Labour Rate Per Rm
Composite Rate Per 100 Lft
Composite Rate Per Rm
Page 27
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
5
e)
ii)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Rft
Painter
Unskilled Cooly
Total
Sundries
Total
0.08 No
0.08 No
P. Gln
P. Gln
Page 28
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
5
f)
i)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Nos
Painter
Unskilled Cooly
Total
Sundries
Total
0.75 No
0.75 No
P. Day
P. Day
Page 29
##### Percent
Rs.
Say
Rs.
Say
Item No.
5
f)
ii)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 No
Painter
Unskilled Cooly
Total
Sundries
Total
0.40 No
0.33 No
P. Day
P. Day
Page 30
##### Percent
Rs.
Say
Rs.
Say
Item No.
5
g)
i)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Painter
Unskilled Cooly
Total
Sundries
Total
1.75 No
1.00 No
P. Day
P. Day
##### Percent
Item Rates
Labour Rate Per 100 Nos
Page 31
Rs.
Say
Rs.
Say
Item No.
5
g)
ii)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Oil Paint
Brushes (Small)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 No
Painter
Unskilled Cooly
Total
Sundries
Total
0.75 No
0.50 No
P. Day
P. Day
Page 32
##### Percent
Rs.
Say
Rs.
Say
Item No.
5
h)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint etc.
0.018 Gln.
P. Gln
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Total
Sundries
Total
0.06 No
P. Day
Page 33
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
6:
Detail
First Coat.
Unit Rate (British System) per 100 Sft
Qty
Material
Coaltar
Mineralpitch
Slaked lime
Kerosene Oil
Fuel Wood
0.75Cwt (
10Lbs (4.
9Lbs (4
1Gln (4.
32.45
Rate
Per Unit (Rs.) Amount (Rs.)
38) Kg
5) Kg
) Kg
55) Ltr
Kg.
P.
P.
P.
P.
P.
Kg
Kg
Kg
Ltr
Kg
Material
For 100 Sft
i) First Coat
=
0.00
20
Brushes
0.18 No.
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total
0.25 No
0.25 No
P. Day
P. Day
##### Percent
Page 34
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
Second Coats.
Detail
Material
For 100 Sft
ii Second Coat
Rate
Per Unit (Rs.) Amount (Rs.)
Brushes
0.18 No.
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total
0.16 No
0.25 No
P. Day
P. Day
Page 35
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
7:
Detail
On new works.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.) Amount (Rs.)
Material
French Polish
Brushes
0.5Lbs 23) Kg
0.12 No.
P. Kg
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 175 Sft
Polisher
Unskilled Cooly
Total
Sundries
Total
4.50 No
1.00 No
P. Day
P. Day
Page 36
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
Old work.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
French Polish
Brushes
0.25Lbs ( 0.11) Kg
0.12 No.
P. Kg
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 175 Sft
Polisher
Unskilled Cooly
Total
Sundries
Total
2.00 No
1.00 No
P. Day
P. Day
Page 37
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
8:
Detail
First Coat.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Varnish
Brushes
0.33Gln ( 1.50) Kg
0.12 No.
P. Kg
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Polisher
Unskilled Cooly
Total
Sundries
Total
0.20 No
0.20 No
P. Day
P. Day
Page 38
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
Second Coat.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Varnish
Brushes
0.25Gln ( 1.13) Kg
0.10 No.
P. Kg
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 200 Sft
Polisher
Unskilled Cooly
Total
Sundries
Total
0.10 No
0.10 No
P. Day
P. Day
Page 39
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
Third Coat.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Varnish
Brushes
0.2Gln ( 0.91) Kg
0.06 No.
P. Kg
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 200 Sft
Polisher
Unskilled Cooly
Total
Sundries
Total
0.10 No
0.10 No
P. Day
P. Day
Page 40
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
9:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Bitumen
Fuel
20Lbs ( 9.07) Kg
4.26 Kg.
P. Kg
P. Kg
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Unskilled Cooly
Total
Sundries
Total
0.50 No
P. Day
Page 41
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Bitumen
Fuel
10Lbs ( 4.54) Kg
2.84 Kg.
P. Kg
P. Kg
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Cooly
Total
Sundries
Total
0.40 No
P. Day
Page 42
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Bitumen
Fuel
10Lbs ( 4.54) Kg
2.84 Kg.
P. Kg
P. Kg
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Cooly
Total
Sundries
Total
0.33 No
P. Day
Page 43
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
10:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
100 Nos
Material
Paint
Brushes
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per No.
Total
Sundries
Total
0.00
100
Labour
Rate Analysis for 150 Nos
Painter (Artisit)
Unskilled Cooly
1.00 No
1.00 No
P. Day
P. Day
Page 44
##### Percent
Rs.
Say
Rs.
Say
DESCRIPTION
OF
ITEM NO
11:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per No.
Total
Sundries
Total
0.00
100
Labour
Rate Analysis for 150 No.
Painter (Artisit)
Unskilled Cooly
1.00 No
1.00 No
P. Day
P. Day
##### Percent
Rs.
Say
Rs.
Say
Page 45
DESCRIPTION
OF
ITEM NO
12:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
1.00 Sft
P. Sft
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Plinth, Per Inch height
Labour
Painter (Artisit)
Unskilled Cooly
Total
Sundries
Total
0.59
1.00 No
0.50 No
P. Day
P. Day
##### Percent
Rs.
Say
Rs.
Say
Page 46
DESCRIPTION
OF
ITEM NO
13:
Coaltar Painting.
a)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Coaltar
Fuel etc.
P. Kg
P. Kg
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Skilled Cooly
Total
Sundries
Total
0.33 No
P. Day
Page 47
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
13
Coaltar Painting.
b)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Coaltar
Fuel etc.
10Lbs (4 .5) Kg
2.18 Kg.
P. Kg
P. Kg
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Skilled Cooly
Total
Sundries
Total
0.20 No
P. Day
Page 48
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
14:
Solignum Painting.
a)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Solignum Paint
Brushes
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Total
Sundries
Total
0.33 No
P. Day
Page 49
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
14
Solignum Painting.
b)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Solignum Paint
Brushes
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Total
Sundries
Total
0.50 No
P. Day
Page 50
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
15:
Creosote Painting.
a)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Creosote
Brushes fuel
0.20 Gallon
0.12 No.
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Total
Sundries
Total
0.33 No
P. Day
Page 51
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
15
Creosote Painting.
b)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Creosote
Brushes fuel
0.34 Gln
0.16 No.
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Total
Sundries
Total
0.50 No
P. Day
Page 52
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
16:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Burner Charges
Kerosene Oil
Scraper
L.S.
L.S.
L.S.
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Skilled Cooly
Unskilled Cooly
Total
Sundries
Total
1.00 No
0.25 No
P. Day
P. Day
##### Percent
Page 53
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
17:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Caustic soda
0.09
Kg.
P. Kg.
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Cooly
Total
Sundries
Total
0.50 No
P. Day
Page 54
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
18:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
0.04 No.
0.5Lbs (0. 05) Gln
0.2Lbs (0. 02) Gln
Each
P. Gln
P. Gln
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per No.
Total
Sundries
Total
0.00
10
Labour
Rate Analysis for 15 No.
Painter (Artist)
Unskilled Cooly
0.50 No
0.50 No
P. Day
P. Day
Page 55
##### Percent
Rs.
Say
Rs.
Say
DESCRIPTION
OF
ITEM NO
19:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
10 Rft
Material
Paint white and black
Brushes
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Rft
Total
Sundries
Total
0.00
10
Labour
Rate Analysis for 15 Rft
Painter (Artist)
Unskilled Cooly
1.00 No
1.00 No
P. Day
P. Day
Page 56
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
20:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
10 Rft
Material
Paint black and white
Brushes
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Rft
Total
Sundries
Total
0.00
10
Labour
Rate Analysis for 15 Rft
Painter (Artist)
Unskilled Cooly
0.50 No
0.50 No
P. Day
P. Day
Page 57
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
21:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
10 Rft
Material
Paint black and white
Brushes
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Rft
Labour
Rate Analysis for 15 Rft
Painter (Artist)
Cooly
Total
Sundries
Total
P. Gln
Each
0.00
10
2.00 Nos
1.00 No
P. Day
P. Day
Page 58
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
22:
a)
i)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint black and white
Brushes
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 2 Nos
Painter (Artist)
Unskilled Cooly
Total
Sundries
Total
1/7
1/7
No
No
P. Day
P. Day
-
##### Percent
Page 59
Rs.
Say
Rs.
Say
Item No.
22
a)
Detail
Two Coat.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint white and black
Brushes
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 2 Nos
Painter (Artist)
Cooly
Total
Sundries
Total
0.25 No
0.25 No
P. Day
P. Day
Page 60
##### Percent
Rs.
Say
Rs.
Say
Item No.
22
b)
Detail
One Coat.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.) Amount (Rs.)
No.
Material
Paint white and black
Brushes
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Total
Sundries
Total
0.00
8
Labour
Rate Analysis for 15 Nos
Painter (Artist)
Cooly
1/7
1/7
No
No
P. Day
P. Day
-
##### Percent
Page 61
Rs.
Say
Rs.
Say
Item No.
22
b)
Two Coat.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
No.
Material
Paint white and black
Brushes
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Each
0.00
8
Labour
Rate Analysis for 15 No.
Painter (Artist)
Cooly
0.25 No
0.25 No
Total
Sundries
##### Percent
Total
Rate Per No.
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per Each
Page 62
P. Day
P. Day
Rs.
Say
Rs.
Say
Item No.
22
c)
One Coat.
Detail
Rate Analysis
for
1.5
Rate
Per Unit (Rs.) Amount (Rs.)
Nos.
Material
Paint white and black
Brushes
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Each
0.00
1.5
Labour
Rate Analysis for 2.5 No.
Painter (Artist)
Cooly
Total
Sundries
Total
0.20 No
0.20 No
P. Day
P. Day
##### Percent
Page 63
Rs.
Say
Rs.
Say
Item No.
22
c)
Two Coat.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Each
Total
Sundries
Total
0.00
1.5
Labour
Rate Analysis for 2.5 No.
Painter (Artist)
Cooly
0.33 No
0.33 No
P. Day
P. Day
Page 64
##### Percent
Rs.
Say
Rs.
Say
DESCRIPTION
OF
ITEM NO
23:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
1.00 No
P. Day
##### Percent
Page 65
Rs.
Say
Rs.
Say
DESCRIPTION
OF
ITEM NO
24:
a)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
2.00 No
P. Day
##### Percent
Page 66
Rs.
Say
Rs.
Say
Item No.
24
Aluminium paint.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
2.00 No
P. Day
##### Percent
Page 67
Rs.
Say
Rs.
Say
DESCRIPTION
OF
ITEM NO
25:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Total
Sundries
Total
0.37
36.85
100
Labour
Rate Analysis for 150 Letters
Painter (Artist)
Unskilled Cooly
1.60 No
1.60 No
P. Day
P. Day
Page 68
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
26:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Sand Paper
3.00
No.
P. Doz
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Unskilled Cooly
Total
Sundries
Total
1.50 No
P. Day
Page 69
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
27:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Steel Scrapper
1.00
No.
P. Doz
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Unskilled Cooly
Total
Sundries
Total
2.00 Nos
P. Day
Page 70
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
28:
Detail
Rate Analysis
for
Rate
Per Unit (Rs.) Amount (Rs.)
600 Sft
Material
Chalk
Spirit
1.00
No.
1.00 Litre
P. Doz
P. Lit
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft
Total
Sundries
Total
0.00
6
Labour
Rate Analysis for 750 Sft
Unskilled Cooly
10.00 Nos
P. Day
Page 71
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
29:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Oil
Brushes
P. Ltr
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Cooly
Total
Sundries
Total
0.50 Nos
P. Day
Page 72
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
30:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
3 Nos
Paint
Brushes
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Rate for Each
Labour
Rate Analysis for
Skilled cooly
0.00
3
4 Nos
Total
Sundries
Total
1.00 No
P. Day
##### Percent
Page 73
Rs.
Say
Rs.
Say
DESCRIPTION
OF
ITEM NO
31:
Detail
First Coat.
Unit Rate (British System) per 100 Sft
Qty
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes
Sand Paper
P. Gln
Each
P. Doz
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for
Painter
Unskilled Cooly
125 Sft
Total
Sundries
Total
0.33 No
0.06 No
P. Day
P. Day
##### Percent
Page 74
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
31
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Emulsion Paint
Sand paper
P. Gln
P. Doz
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for
Painter
Unskilled Cooly
125 Sft
Total
Sundries
Total
0.25 No
0.05 No
P. Day
P. Day
##### Percent
Page 75
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
32:
a)
i)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint Durasum
Brushes
1.50 Kg
0.12 No.
P. Kg
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for
Painter
Unskilled Cooly
125 Sft
Total
Sundries
Total
0.33 No
0.06 No
P. Day
P. Day
##### Percent
Page 76
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
32
a)
ii)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Emulsion Paint
Brushes
Sand Paper
1.25 Kg
0.12 No.
0.17 No.
P. Kg
Each
P. Doz
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for
Painter
Unskilled Cooly
125 Sft
Total
Sundries
Total
0.25 No
0.05 No
P. Day
P. Day
##### Percent
Page 77
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
32
b)
i)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes
1.25Lbs ( 0.57) Kg
0.10 No.
P. Kg
Each
Total
Contractor's Profit & Ove ##### Percent
Total
0.33 No
0.06 No
P. Day
P. Day
##### Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Page 78
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
32
b)
ii)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Emulsion Paint
Sand paper
1.10Lbs ( 0.50) Kg
0.67 No.
P. Kg
P. Doz
Total
Contractor's Profit & Ove ##### Percent
Total
0.25 No
0.05 No
P. Day
P. Day
##### Percent
Page 79
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
32A
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
i) Varnish
ii) Putty and sand paper (L.S)
iii) Primer (Zine) 1 Kg (for % Sft) @ Rs.80.00 per Kg.
iv) Weather shield paint 0.7 Litre (for 100 Sft)
@ Rs.120.00 per Litre
Total
Contractor's Profit & Ove ##### Percent
Total
1 kg
1 LS
1
0.7
P. Kg
L.S
P. Kg
Labour
Painter
Cooly
Total
Sundries
Total
0.40 No
0.80 No
P. Day
P. Day
##### Percent
Item Rates
Labour Rate Per % Sft
Labour Rate Per Sqm
Composite Rate Per % Sft
Composite Rate Per Sqm
Page 80
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
32A
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
i) Weather Shield paint
0.67 litre (for 100 Sft) @ 120/- per litre
0.67
P. Lit
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Painter
Cooly
Total
Sundries
Total
0.25 No
0.40 No
P. Day
P. Day
##### Percent
Item Rates
Labour Rate Per % Sft
Labour Rate Per Sqm
Composite Rate Per % Sft
Composite Rate Per Sqm
Page 81
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
32A
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
i) Weather Shield paint
0.67 litre (for 100 Sft) @ 120/- per litre
0.67
P. Lit
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Painter
Cooly
Total
Sundries
Total
0.25 No
0.40 No
P. Day
P. Day
##### Percent
Item Rates
Labour Rate Per % Sft
Labour Rate Per Sqm
Composite Rate Per % Sft
Composite Rate Per Sqm
Page 82
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
33:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
700 Rft
Material
Road marking enamel
Brushes
P. Ltr
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Rft
Total
Sundries
Total
0.00
700
Labour
Rate Analysis for 1000 Rft
Painter
Cooly
1.00 No
1.00 No
P. Day
P. Day
Page 83
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
34:
Detail
Rate Analysis
for
Rate
Per Unit (Rs.) Amount (Rs.)
700 Rft
Material
Reflective Paint
Brushes
P. Ltr
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Rft
Total
Sundries
Total
0.00
700
Labour
Rate Analysis for 1000 Rft
Painter
Cooly
1.00 No
1.00 No
P. Day
P. Day
Page 84
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
35:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brush
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for
Painter
14 No
Total
Sundries
Total
1.00 No
P. Day
##### Percent
Page 85
Rs.
Say
Rs.
Say
DESCRIPTION
OF
ITEM NO
36:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brush
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for
Painter
6 Nos
Total
Sundries
Total
1.00 No
P. Day
##### Percent
Page 86
Rs.
Say
Rs.
Say
DESCRIPTION
OF
ITEM NO
37:
Detail
Material
Rate Analysis for 7 Metre
Paint
Brush
Rate
Per Unit (Rs.) Amount (Rs.)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Rate for One Metre
Total
Sundries
Total
0.00
7
Labour
Rate Analysis for 200 Metre
Painter
1.00 No
P. Day
##### Percent
Item Rates
Labour Rate Per Rm
Composite Rate Per Rm
Labour Rate Per Rft
Composite Rate Per Rft
Page 87
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
37
Detail
Material
Rate Analysis for 7 Metre
Paint
Brushes
Rate
Per Unit (Rs.) Amount (Rs.)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Rate for One Metre
Total
Sundries
Total
0.00
7
Labour
Rate Analysis for 100 Metre
Painter
1.00 No
P. Day
##### Percent
Item Rates
Labour Rate Per Rm
Composite Rate Per Rm
Labour Rate Per Rft
Composite Rate Per Rft
Page 88
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
37
Detail
Material
Rate Analysis for 7 Metre
Paint
Brushes
Rate
Per Unit (Rs.) Amount (Rs.)
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Rate for One Metre
Total
Sundries
Total
0.00
7
Labour
Rate Analysis for 60 Metre
Painter
1.00 No
P. Day
##### Percent
Item Rates
Labour Rate Per Rm
Composite Rate Per Rm
Labour Rate Per Rft
Composite Rate Per Rft
Page 89
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
38:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
Paint
Brushes
P. Gln
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Painter
Total
Sundries
Total
0.03 No
P. Day
##### Percent
Item Rates
Labour Rate Per Each
Page 90
Rs.
Say
Rs.
Say
DESCRIPTION
OF
ITEM NO
39:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
0.16 No
P. Day
##### Percent
Page 91
Rs.
Say
Rs.
Say
CHAPTER NO. 16
Cutting pilchi frash or sarkanda including carriage within one mile (1.6 Km.)
Detail
Qty
1.90
10.00
Percent
20.00
Percent
Nos.
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM
2
Weaving matresses
Detail
Qty
3.60
10.00
Percent
20.00
Percent
Nos.
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Rs.
Rs.
Page 1
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
3 a)
Supplying and filling jute bags 1.25 Cft. capacity with sand or earth sewing and
stacking in dry
Detail
Qty
0.00 Each
0.00 Per Kg.
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total for 10 Bags
LABOUR
0.45
10.00
Percent
20.00
Percent
No.
ITEM RATE
Labour Rate Per Bag
0.00
10
-
+ 0.00
10
Page 2
0.00
0.00
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
b)
Supplying and filling jute bags 1.25 Cft. Capacity with sand or earth sewing
and laying in position under water
Detail
Qty
0.00 Each
0.00 Per Kg.
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total for 10 Bags
LABOUR
0.70
10.00
Percent
20.00
Percent
No.
ITEM RATE
Labour Rate Per Bag
0.00
10
-
+ 0.00
10
Page 3
0.00
0.00
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
4 a)
Supplying and filling new jute bags 4 to 5 Cft. capacity, with sand or earth
Sewing and stacking in dry.
Detail
Qty
(Rate Analysis for 65 Bags)
MATERIAL
0.00 Each
0.00 Per Kg.
LABOUR
7
Nos.
ITEM RATE
Labour Rate Per Bag
0.00
65
-
+ 0.00
65
Page 4
0.00
0.00
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
b)
Supply and filling new jute bags 4 to 5 Cft. capacity with sand or earth, sewing
and laying in position under water.
Detail
Qty
(Rate Analysis for 65 Bags)
MATERIAL
0.00 Each
0.00 Per Kg.
LABOUR
10
Nos.
ITEM RATE
Labour Rate Per Bag
0.00
65
-
+ 0.00
65
Page 5
0.00
0.00
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
5
Carriage of jute bags 1.25 Cft. capacity filled with sand or earth
Detail
Qty
A)
0.50
10.00
Percent
20.00
Percent
Bags
No.
Rs.
0.00
Say
0.18
10.00
Percent
20.00
Percent
Bags
No.
Rs.
0.00
Say
0.07
10.00
Percent
20.00
Percent
Rs.
Page 6
No.
0.00
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
6
Carriage of new jute bags 4 to 5 Cft. Capacity filled with sand or earth
Detail
Qty
A)
First Chain
2.00
10.00
Percent
20.00
Percent
Bags
Nos.
Rs.
0.00
Say
0.70
10.00
Percent
20.00
Percent
No.
Rs.
0.00
Say
0.27
10.00
Percent
20.00
Percent
Rs.
Page 7
No.
0.00
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
7
Detail
Unit of Rate
100 Sft.
Rate
Per Unit (Rs.) Amount (Rs.)
Qty
a)
LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total
0.90
10.00
Percent
20.00
Percent
b)
Nos.
Rs.
Rs.
0.00
0.00
Say
Say
LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total
1.50
10.00
Percent
20.00
Percent
c)
Nos.
Rs.
Rs.
0.00
0.00
Say
Say
LABOUR
Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total
Labour Rate Per 100 Sft.
Labour Rate Per Sqm
1.75
10.00
Percent
20.00
Percent
Rs.
Rs.
Page 8
Nos.
0.00
0.00
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
8
Detail
Unit of
Qty
MATERIAL
1
Sutli, Strings
Contractor's Profit & Ov
Total
Percent
10.00
Percent
20.00
Percent
LABOUR
Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total
1.40
No.
ITEM RATE
Labour Rate Per 100 Nos.
Composite Rate Per 100 Nos.
Rs.
Rs.
Page 9
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
9
Detail
Qty
MATERIAL
Munjban
100 x 5 seer
2.15
Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total
1.95
Kg.
LABOUR
10.00
Percent
20.00
Percent
Nos.
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Rs.
Rs.
Rs.
Rs.
Page 10
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
10
Detail
Qty
1.20
10.00
Percent
20.00
Percent
Nos.
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM
11
Detail
Qty
3.62
10.00
Percent
20.00
Percent
Nos.
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Rs.
Rs.
Page 11
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
b)
Detail
Qty
2.42
10.00
Percent
20.00
Percent
Nos.
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
c)
Rs.
Rs.
Say
Say
Detail
Qty
2.87
10.00
Percent
20.00
Percent
Nos.
ITEM RATE
Labour Rate
Labour Rate
Rs.
Rs.
Page 12
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
12
Detail
Unit of
Rate Per No
Rate
Per Unit (Rs.) Amount (Rs.)
Qty
(Rate Analysis for Two Nos.)
MATERIAL
Munjban (rough)
Contractor's Profit & Ov
Total
Percent
10.00
Percent
20.00
Percent
LABOUR
Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total
0.25
No.
ITEM RATE
Labour Rate Per Bag
0.00
2
-
+ 0.00
2
Page 13
0.00
0.00
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
13
Providing and weaving G.I. wire netting for wire crates with G.I. wire of approved size
(including siding and partition to make crates).
a)
6" mesh
(i)
Detail
Qty
MATERIAL
G.I. Wire No. 15 (500' long)
Contractor's Profit & Ov 20.00
Total
3.08
0.62
3.70
Percent
LABOUR
Black smith
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
0.70
0.70
10.00
Percent
20.00
Percent
No.
No.
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 14
3.70
0.40
Say
Say
Say
Say
3.70
0.40
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
13
Providing and weaving G.I. wire netting for wire crates with G.I. wire of approved size
(including siding and partition to make crates).
a)
6" mesh
(ii)
Detail
Qty
MATERIAL
G.I. Wire No. 10 (500' long)
Contractor's Profit & Ov 20.00
Total
0.75
0.75
LABOUR
Black smith
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
No.
No.
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 15
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
a)
6" mesh
Detail
Qty
MATERIAL
G.I. Wire No. 8 (500' long)
Contractor's Profit & Ov 20.00
Total
0.75
0.75
LABOUR
Black smith
Cooly
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
No.
No.
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 16
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
13 b)
4" mesh
(i)
Detail
Qty
MATERIAL
G.I. Wire No. 15 750' long
Contractor's Profit & Ov 20.00
Total
0.90
0.90
LABOUR
Black smith
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
No.
No.
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 17
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
13 b)
4" mesh
(ii)
Detail
Qty
MATERIAL
G.I. Wire No. 10 750' long
Contractor's Profit & Ov 20.00
Total
1.00
1.00
LABOUR
Black smith
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
No.
No.
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 18
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
13 b)
4" mesh
Detail
Qty
MATERIAL
G.I. Wire No. 8 750' long
Contractor's Profit & Ov 20.00
Total
LABOUR
Black smith
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
1.00
1.00
10.00
Percent
20.00
Percent
No.
No.
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 19
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
14
Providing and laying shingle on top of bund, including handling of material within
three chains (90 metres)
Detail
Qty
MATERIAL
Shingle
Contractor's Profit & Ov
Total
20.00
Percent
10.00
Percent
20.00
Percent
110.00
Cft.
0.00 r 100 Cf
1.00
No.
LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Rs.
Rs.
Rs.
Rs.
Page 20
0.02
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
15
Supply and Dumping at site, without boat, including handling of material within
three chains (90 metres).
a)
Stone or boulder
Detail
Qty
MATERIAL
Boulder
Contractor's Profit & Ov
Total
20.00
Percent
10.00
Percent
20.00
Percent
110.00
Cft.
0.00er 100 C
1.75
No.
LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
b)
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
Shingle or Spawl
Detail
Qty
MATERIAL
Shingle / Spawl
Contractor's Profit & Ov
Total
20.00
Percent
10.00
Percent
20.00
Percent
110.00
Cft.
0.00er 100 C
1.75
No.
LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
c)
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
Brick Bats
Page 21
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
Detail
Qty
MATERIAL
Brick Bat
Contractor's Profit & Ov
Total
20.00
Percent
10.00
Percent
20.00
Percent
110.00
Cft.
0.00er 100 C
1.35
No.
LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Rs.
Rs.
Rs.
Rs.
Page 22
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
16
Supply and damping by boat including loading into boats within 3 chains lead
and hire charges of boat and boatman
a)
Stone, Boulder
Detail
Qty
MATERIAL
Stone or Boulder
Contractor's Profit & Ov
Total
20.00
110.00
Cft.
0.00er 100 C
1.00
2.00
No.
No.
Percent
LABOUR
Boatman with large boat
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Rs.
Rs.
Rs.
Rs.
Page 23
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
b)
Shingle, Spawl
Detail
Qty
MATERIAL
Spawl
Contractor's Profit & Ov
Total
20.00
110.00
Cft.
0.00er 100 C
1
2
No.
No.
Percent
LABOUR
Boatman with large boat
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
c)
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
Brick Bats
Detail
Qty
MATERIAL
Brick Bat
Contractor's Profit & Ov
Total
20.00
110.00
Cft.
0.00er 100 C
1
1.6
No.
No.
Percent
LABOUR
Boatman with Large Boat
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
DESCRIPTION OF ITEM
17
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
Detail
Qty
MATERIAL
Brick Bat
Contractor's Profit & Ov
Total
20.00
110.00
Cft.
0.00er 100 C
1.00
1.30
No.
Nos.
Percent
LABOUR
Skilled Cooly
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Rs.
Rs.
Rs.
Rs.
Page 25
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
18
Supplying and filling bricks in wire crates and hand packing (excluding cost of crates)
Detail
Qty
MATERIAL
Bricks
Contractor's Profit & Ov
Total
20.00
1500.00
Nos.
0.00r 1000 No
1.00
1.80
No.
Nos.
Percent
LABOUR
Cooly (Skilled)
Coolies (Unskilled)
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate Per 100 Cft.
Composite Rate Per Cum.
Rs.
Rs.
Rs.
Rs.
Page 26
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
19
Supplying and filling in wire crates, including sewing crates (excluding cost of crates)
i)
Stone or Boulders
Detail
Qty
MATERIAL
Stone or Boulders
Contractor's Profit & Ov
Total
20.00
110.00
Cft.
0.00er 100 C
1.00
2.20
No.
Nos.
Percent
LABOUR
Cooly (Skilled)
Coolies (unskilled)
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate Per 100 Cft.
Composite Rate Per Cum.
Rs.
Rs.
Rs.
Rs.
Page 27
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
ii
Shingle or Spawl
Detail
Qty
MATERIAL
Shingle or Sprawl
Contractor's Profit & Ov
Total
20.00
110.00
Cft.
0.00er 100 C
1.00
2.20
No.
Nos.
Percent
LABOUR
Cooly (Skilled)
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Rs.
Rs.
Rs.
Rs.
Page 28
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
20
Detail
Qty
0.44
10.00
Percent
20.00
Percent
No.
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM
21
Detail
Qty
2.00
10.00
Percent
20.00
Percent
Nos.
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Rs.
Rs.
Page 29
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
22
Detail
Qty
MATERIAL
Supply pilchi lead within one mile
(As per item No. 1 of this chapter)
Total
######
Sft.
0.00er 100 S
LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total
1.00
10.00
Percent
20.00
Percent
No.
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
DESCRIPTION OF ITEM
23
Surface protection with pilchi matresses carriage upto one mile (1.76 Km)
Detail
Qty
MATERIAL
Supply pilchi lead
20.00
Cft.
0.00er 100 C
2.50
No.
LABOUR
Coolies
Sundries (10%)
10.00
Total
Contractor's Profit & Ov 20.00
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Percent
Percent
Rs.
Rs.
Rs.
Rs.
Page 30
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
24
Detail
Qty
MATERIAL
Cutting pilchi and carriage to river ba
lead upto one mile
i.
ii.
######
= 0.17 Cft.
= 1.02 Cft.
Cft.
0.00 r 100 Cf
0.85 Cft.
1.02
Cft.
0.45
Kg.
######
Cft.
0.00 r 100 Cf
2.00
0.50
Nos.
No.
25.00
Nos.
0.00er 100 No
Percent
iii.
551.06
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 31
######
59.29
######
59.29
Say
Say
Say
Say
551.05
59.30
551.05
59.30
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
25
Construction groynes upto 5 feet with single row of woodem vertical stacks 7"
to 12" dia. One average lead one mile
Detail
Qty
LABOUR
Vertical stakes 7" - 12" dia 1 foot a p 21.00
Nos.
Supports
4.00
Nos.
Total
25.00
No.
Wastage 10%
2.50
Nos.
Total
27.50
Nos.
Say
28.00
Nos.
Ordinary coir (Ban)
0.35 Sr. (0.33 Kg.)
Royalty charges for 28 Nos. Stakes
28.00
Nos.
Total
Contractor's Profit & Ov 20.00 Percent
0.00 r 100 No
0.00 Per Kg.
0.00 Each
LABOUR
Skilled Cooly
Cooly
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
0.85
1.00
10.00
Percent
20.00
Percent
No.
No.
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 32
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
26
Detail
Qty
LABOUR
Lai stickes 7" - 12" thick
vertical stakes 9" - 12" thick
22.00
Nos
2' apart or two rows cross wise
3.00
Nos.
Supports
4.00
Nos.
Total
29.00
Nos.
Wastage 10%
2.90
Nos.
Total
31.90
Nos.
Say
32.00
Nos.
Ordinary coir (Ban)
Seer (0.47 Kg.)
Royalty charges for 32 Nos. Stakes
32.00
Nos.
Total
Contractor's Profit & Ov 20.00 Percent
0.00 r 100 No
0.00 Per Kg.
0.00 Each
LABOUR
Skilled Cooly
Cooly
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
1.20
2.00
10.00
Percent
20.00
Percent
No.
No.
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 33
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
27
Providing and laying stone pitching/filling, dry hand packed, as filling behind
retaining walls or in pitching and aprons
Detail
Qty
MATERIAL
Stone
Contractor's Profit & Ov
20.00
######
Cft.
1.00
1.00
No.
No.
100 C
0.00r
Percent
LABOUR
Skilled Cooly
Cooly
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Rs.
Rs.
Rs.
Rs.
Page 34
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
28
Providing and laying stone pitching with hammer dressed stones on surface
laid in courses
Detail
Qty
MATERIAL
Pitching Stone
Contractor's Profit & Ov
20.00
######
Cft.
2.25
3.00
No.
No.
100 C
0.00r
Percent
LABOUR
Mason
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
DESCRIPTION OF ITEM
Page 35
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
29
On slope
Detail
Qty
MATERIAL
Pitching Stone
Contractor's Profit & Ov
20.00
######
Cft.
1.50
3.00
Nos
Nos
100 C
0.00r
Percent
LABOUR
Mason
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
Page 36
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
29 b)
On level
Detail
Qty
MATERIAL
Pitching Stone
Contractor's Profit & Ov
20.00
######
Cft.
1.50
2.50
Nos
Nos
100 C
0.00r
Percent
LABOUR
Mason
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
Page 37
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
30
On level
Detail
Qty
MATERIAL
Spawl
Contractor's Profit & Ov
20.00
######
Cft.
0.25
1.00
No.
No.
100 C
0.00r
Percent
LABOUR
Mason
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Rs.
Rs.
Rs.
Rs.
Page 38
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
b)
On Slope
Detail
Qty
MATERIAL
Spawl
Contractor's Profit & Ov
20.00
######
Cft.
0.48
1.00
No.
No.
100 C
0.00r
Percent
LABOUR
Mason
Cooly
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Rs.
Rs.
Rs.
Rs.
Page 39
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
31
Providing and laying stone pitching hand packed, with surface leveled off to the correct
section and voide filled in 1:8 cement, sand mortar, in floors of bridges along banks
and in aprons, etc.
i)
Detail
Qty
MATERIAL
Pitching Stone
Cement
Sand
Total
Contractor's Profit & Ov
20.00
######
2.70
26.40
Cft.
Bags
Cft.
0.00r 100 C
0.00 Per Bag
0.00r 100 C
2.50
2.78
0.50
Nos.
Nos.
No.
Percent
LABOUR
Mason
Coolies
Bahishti
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Note
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
Page 40
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
ii)
Detail
Qty
MATERIAL
Pitching Stone
Cement
Sand
Total
Contractor's Profit & Ov
20.00
######
2.70
26.40
Cft.
Bags
Cft.
0.00r 100 C
0.00 Per Bag
0.00r 100 C
2.50
2.28
0.50
Nos.
Nos.
No.
Percent
LABOUR
Mason
Coolies
Bahishti
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Note
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
Page 41
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
iii)
Detail
Qty
MATERIAL
Pitching Stone
Cement
Sand
Total
Contractor's Profit & Ov
20.00
######
2.70
26.40
Cft.
Pegs
Cft.
0.00r 100 C
0.00 Per Peg
0.00r 100 C
1.25
1.50
0.37
Nos.
Nos.
No.
Percent
LABOUR
Mason
Coolies
Bahishti
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.
Note
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
Page 42
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
32
Detail
Qty
MATERIAL
Cement
Sand
Total
Contractor's Profit & Ov
20.00
6.00
22.30
Pegs
Cft.
0.50
1.34
0.25
No.
Nos.
No.
Percent
LABOUR
Mason
Coolies
Bahishti
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 43
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
Detail
Qty
MATERIAL
Cement
Sand
Total
Contractor's Profit & Ov
Total
Say
20.00
2.70
26.40
Pegs
Cft.
0.50
1.00
0.25
No.
Nos.
No.
Percent
636.00
LABOUR
Mason
Coolies
Bahishti
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 44
######
68.43
Say
Say
Say
Say
636.00
68.45
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
33
Detail
Qty
MATERIAL
Sand
Contractor's Profit & Ov
Total
Say
20.00
50.00
Cft.
0.20
0.50
No.
No.
100 C
193.00
86.52
0.00r
Percent
LABOUR
Mason
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
Say
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm
Composite Rate per 100 Sft.
Composite Rate per Sqm.
Rs.
Rs.
Rs.
Rs.
Page 45
86.52
9.31
######
30.08
Say
Say
Say
Say
86.50
9.30
279.50
30.10
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
34
Detail
Qty
MATERIAL
Pegri
Contractor's Profit & Ov
20.00
Percent
10.00
Percent
20.00
Percent
30.00
Cft.
0.00r
100 C
1.25
Nos.
LABOUR
Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate per 100 Cft.
Composite Rate per Cum
Rs.
Rs.
Rs.
Rs.
Page 46
Say
Say
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
35
Removing stone and repitching hand packed on slopes or level after making good
damaged slope/portion.
Detail
Qty
0.85
1.50
3.00
10.00
Percent
20.00
Percent
No.
Nos.
Nos.
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Rs.
Rs.
Page 47
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
36
Collecting and stacking boulders from nullah beds or loose shale, or from any other
site, within 3 chains lead
Detail
Qty
2.00
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Nos.
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM
37
Levelling and dressing stone filling under blocks and grouting with shingle
Detail
Qty
MATERIAL
Shingle
Contractor's Profit & Ov
20.00
30.00
Cft.
0.25
1.00
No.
No.
100 C
0.00r
Percent
LABOUR
Masons
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
Say
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate per 100 Cft.
Composite Rate per Cum
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
DESCRIPTION OF ITEM
38
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
Detail
Qty
MATERIAL
Bajri
Contractor's Profit & Ov
20.00
20.00
Cft.
0.25
1.00
No.
No.
100 C
0.00r
Percent
LABOUR
Masons
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
Say
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate per 100 Cft.
Composite Rate per Cum
39
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
DESCRIPTION OF ITEM
Breaking stone into spawls and stacking
Detail
Qty
1.50
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Rs.
Rs.
No.
Say
Say
DESCRIPTION OF ITEM
40
Fixing floating spurs with materials from canal plantation within one mile lead
a)
Detail
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
Qty
1.00
1.00
7.00
10.00
Percent
20.00
Percent
No.
No.
Nos.
ITEM RATE
Labour Rate Per No.
b)
Rs.
225
0.00
Say
Detail
Qty
1.00
1.00
7.00
10.00
Percent
20.00
Percent
No.
No.
Nos.
ITEM RATE
Labour Rate Per No.
Rs.
Page 50
200
0.00
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
Detail
Qty
1.00
1.00
7.00
10.00
Percent
20.00
Percent
No.
No.
Nos.
ITEM RATE
Labour Rate Per No.
d)
Rs.
Above
######
0.00
Say
Detail
Qty
1.00
1.00
7.00
10.00
Percent
20.00
Percent
No.
No.
Nos.
ITEM RATE
Labour Rate Per No.
Rs.
Page 51
60.00
0.00
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
DESCRIPTION OF ITEM
41
a (i)
Staking and bushing from canal plantation within one mile. (Royalty to be paid to
Forest Department or private owner if and when required.
Cutting and supply un-sharpened pegs 3.5 long, 3" to 6" dia from canal plantation
sites lead within one mile (1.6 Km.)
Detail
MATERIAL
Kikar wood required for 100 No. Pegs
100 x 3.5 x 9/24x9/24 x 1/4x22/7 =38.70 Cft
Add 20% Wastage
Say
7.74 / 46.44
46.50 Cft.
35.00
Mds.
0.00r 100
Nos.
0.00 Per
Md
24.70
24.70
LABOUR
Coolies for Cutting of wood for Pegs
Sundries
10.00 Percent
Total
Contractor's Profit & Ov 20.00 Percent
Total
No.
ITEM RATE
Labour Rate for 100 Pegs
Composite Rate for 100 Pegs.
Rs.
Rs.
Page 52
24.70
Say
Say
24.70
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
Detail
0.50
0.50
10.00
Percent
20.00
Percent
No.
No.
0.00 Per
0.00 Per
day
day
ITEM RATE
Labour Rate for 100 Pegs
Rs.
Say
Detail
1.40
10.00
Percent
20.00
Percent
Nos.
ITEM RATE
Labour Rate for 100 Pegs
Rs.
Page 53
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
41 (a) Tying pegs with Munj/Patha ban one line including tying around the pegs.
Detail
MATERIAL
Requirement of ban for one chain
length of row of killas including a tie
around the pegs.
100 + (50x1 x 9/24 x 22
Add 10% wastage
Total
Say
158.96
15.89
174.85
175.00
Lft.
Lft.
Lft.
Lft.
20.00
Percent
10.00
Percent
20.00
Percent
Kg.
LABOUR
Cooly
Sundries
Total
Contractor's Profit & Ov
Total
0.10
No.
0.00 Per
day
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Page 54
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
41 (a) Cutting and supplying brushwood from canal plantation on private source (Lead within one mile)
and wattling between stakes and intertwining. (Thickness of wattled brush wood 1.0 average)
Detail
MATERIAL
Requirement of brush wood
Length 100 Ft.
Thickness 1 Ft.
Height 2.5 Ft.
Contents 100x1.0'x2.5' 250 Cft.
250 Cft. or 188 Mds.
Royalty charges @ 20.00 % Cft.
ii.
Mds.
######
1.00
Mds.
No.
Per 100 Md
0.00 Per day
LABOUR
Cutting brushwood
Cooly skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total
Say
Percent
Percent
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Page 55
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
Detail
(4 feet)
MATERIAL
Wood required for 100 No. pegs =
= 100 x 4 x 9/24 x 9/24 x x 22/7 = 44.20 Cft.
20% Wastage 8.84/53.04 = 8.84
Cft.
53.04
Weight of 53 Cft. green wood
@ 62 Lbs per Cft.
= 53 x 62/82.50 = 39.83 Mds.
Royalty of Wood @ 70.00 Per % Mds.
39.83
Mds.
0.00 er % Mds
39.83
Mds.
0.00 er % Mds
LABOUR
Cutting of wood
Total Material and Labour
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Say
Say
41 (b) Sharpening one end of pegs 4'.0 long 3" to 6" dia.
Detail
Qty
0.50
0.50
10.00
Percent
20.00
Percent
No.
No.
1.25
ITEM RATE
Labour Rate for 100 No. Pegs
Rs.
Say
41 (b) Driving pegs 4'-0" long 3" to 6" dia (driven 1.25' below the available bed or ground (average)
Page 56
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
Detail
1.00
0.73
No.
No.
Percent
Percent
ITEM RATE
Labour Rate for 100 No. Pegs
Patha
Rs.
Say
Detail
MATERIAL
Same as per item No. 41(a) (iv)
Total
LABOUR
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Page 57
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
41 (b) Cutting and supplying brushwood from canal plantation or private source (lead within one mile)
wattling between stakes and intertwining. (Thickness of wattled brush wood 1.0' (average)
Detail
MATERIAL
Requirement
of brushwood
Length 100'
Thickness 1'-0"
Height 2.75'
Content 100x1.0x2.75 = 275 Cft.
Royalty of brush wood 275 Cft.
######
Cft.
20.00 r 100 Cf
2.50
1.00
Nos.
Nos.
55.00
LABOUR
Cooly Unskilled
for cutting brushwood
Cooly skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total
Percent
Percent
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Page 58
55.00
Say
Say
55.00
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
41 (c) Cutting and supplying unsharpened pegs 5'-0" long 3" to 6" dia from canal plantation
(lead within one mile)
Detail
MATERIAL
Wood required for 100 No. pegs
100 x 5'.0 x 9/24 x 9/24 x x 22/7
55.25 Cft.
Add wastage 20%
11.05
66.30 Cft.
Mds.
0.00Per % Md
Mds.
0.02 er % Mds
0.01
LABOUR
49.82
ITEM RATE
Labour Rate Per 100 No. Pegs
Composite Rate Per 100 No. Pegs
Rs.
Rs.
0.01
0.01
Say
Say
41 (c) Sharpening one end of pegs 5'-0" long 3" to 6" dia.
Detail
Qty
0.55
0.50
10.00
Percent
20.00
Percent
Rs.
No.
No.
Say
41 c - Driving pegs 5'-0" long 3" to 6" dia (driven 1.5' below the available bed on ground (average).
Page 59
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
Detail
Qty
1.00
1.00
10.00
Percent
20.00
Percent
No.
No.
ITEM RATE
Labour Rate
Rs.
Say
41 (c) Tying Peg with Munj / Patha ban one line including tying around the pegs.
Detail
MATERIAL
Same as per Item 41 (a) (iv)
LABOUR
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Page 60
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
41 (c) Cutting and supply brushwood from canal plantation or private source (lead within one mile) an
between stakes and intertwining thickness of wattled brush wood 1.0')
Detail
MATERIAL
Requirement of brush wood
Length 100 Ft.
Thickness 1.0'
Height 3.5'
CONTENTS
100 X 1.0 X 3.5
= 350 Cft.
Weight of brush wood
350x62
82.5
Mds.
0.00 r 100 Cf
No.
MATERIAL
Cooly skilled for wattling brush wood
Sundries
10.00 Percent
Total
Contractor's Profit & Ov 20.00 Percent
Total
1.50
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Page 61
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
41 (d) Cutting and supplying unsharpened pegs 6'-0" long 3" to 6" dia from canal plantation (lead wit
Detail
Qty
MATERIAL
Wood required for 100 No. pegs
100 x 6 x 9/24 x 9/24 x x 22/7 = 66.30 Cft.
Add wastage 20% 13.26
Say
Cft.
79.6 Cft.
59.80
Mds.
0.00 r 100 Md
4.00
Nos.
LABOUR
Coolies for cutting wood for pegs.
Sundries
10.00 Percent
Total
Contractor's Profit & Ov 20.00 Percent
Total
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Say
Say
Detail
Qty
Analysis for 125 Nos.
MATERIAL
Carpenter
Cooly
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total
ITEM RATE
Labour Rate Per 100 No. Pegs
0.65
0.60
No.
No.
Percent
Percent
Rs.
Page 62
0.01
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
41 (d) Driving pegs 6'-0" long 3'-6" driven 1.75' below the available bed of ground (average)
Detail
Qty
1.20
1.20
10.00
Percent
20.00
Percent
Nos.
Nos.
ITEM RATE
Labour Rate Per 100 No. Pegs
Rs.
Say
41 (d) Tying pegs with Munj / Patha ban (one line including tying around the pegs)
Detail
Qty
MATERIAL
Same as per item No. 41 (a)(iv)
LABOUR
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Page 63
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
41 (d) Cutting and supplying brush wood from canal plantation or private source (lead within one mile
wattling between stakes and intertwining, thickness of wattled brush wood 1'.0 average
Detail
Qty
MATERIAL
Requirement of brush wood
Length 100 Ft.
Thickness 1 Ft.
Height
4.25 Ft.
Contents 100 x 1.0 x 4.25 = 425 Cft.
Weight of brush wood = 425 x 62 = 319.40 ######
82.5
Mds.
0.00 r 100 Md
Nos.
Nos.
LABOUR
For cutting brush wood
Coolies skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total
3.00
1.00
Percent
Percent
ITEM RATE
Total Labour Per Chain
Composite Rate Per Chain
Rs.
Rs.
Page 64
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
41 (e) Cutting and supplying un-sharpened pegs 6'-1" to 8'-0" long 4" to 8" dia from canal plantation
within one mile.
Detail
Qty
MATERIAL
Wood required for 100 No. pegs
100 x 7'.0 x x x x
22
= 137.
7
27.50 Cft.
165.00 Cft.
Total
######
Mds.
0.00er 100 Md
3.00
Nos.
LABOUR
Coolies for Cutting Wood
Sundries
Total
Contractor's Profit & Ov
Total
10.00
Percent
20.00
Percent
ITEM RATE
Total Labour Per 100 No. Pegs
Composite Rate Per 100 No. Pegs
Rs.
Rs.
Say
Say
41 (e) Sharpening one end of pegs 6'-1" to 8'-0" long, 4" to 8" dia.
Detail
Qty
0.80
0.80
No.
No.
Percent
Percent
Rs.
Page 65
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
41 (e) Driving pegs 6'-1" to 8'-0' long 4" to 8" dia driven 2'-0" below the available bed or ground (
Detail
Qty
1.30
1.35
10.00
Percent
20.00
Percent
Nos.
Nos.
ITEM RATE
Labour Rate Per 100 No. Pegs
Rs.
Page 66
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
41 (e) Tying pegs 4" to 8" dia with Munj / Patha ban (one line including tying around the pegs).
Detail
MATERIAL
Requirements of Munj / Patha ban for one
Chain length including winding of Peg
100 + (50 x x 22 / 7)
=
178.57
Add. wastage @ 10% =
Total length =
Say = 200 Lft.
Lft.
17.86
196.43
196
080
20.00
Sr.
LABOUR
Same as per Item 41 (a) (iv)
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Page 67
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
41 (e) Cutting and supplying brush wood (from canal plantation or private source lead within one mile
wattling between stacks and intertwining (thickness or wattled brush wood 1.0 average).
Detail
MATERIAL
Requirement of brush wood
Length
100.00 Ft.
Thickness
1.00
Ft.
Height
5.00
Ft.
Contents 100 x 1'.0" x 5'.0" = 500 Cft.
Weight of 500 Cft. Brush Wood
500 x 62 =
375.75 Mds]
Royalty of brush wood 500 Cft.
Total
Say
######
Mds.
0.00er 100 Md
3.00
1.50
Nos.
Nos.
LABOUR
Coolies Unskilled
for cutting brush wood
Cooly skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total
Say
ITEM RATE
Percent
Percent
Rs.
Rs.
Page 68
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
42
Staking with bamboos from market and brushing from canal plantation or private source
(Royalty of brush wood for brushing or cost to private owners if and when required).
Detail
MATERIAL
Bamboos
Contractor's Profit & Ov
Total
######
20.00
Nos.
0.00
Each
Percent
ITEM RATE
Cost of 100 No. Bamboos
(a)
Rs.
Say
i Sharpening one end of bamboos 8'-1" to 10' long 2" to 5" dia
Detail
0.70
0.70
10.00
Percent
20.00
Percent
No.
No.
0.00
0.00
Each
Each
ITEM RATE
Labour Rate Per 100 No. Bamboos
Rs.
Page 69
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
(a) ii Driving bamboos 8'-1" to 10'-0" long 2" to 5" dia. Driven2.5' below the available 'bed or gro
Detail
1.45
1.45
10.00
Percent
20.00
Percent
ITEM RATE
Labour Rate Per 100 No. Bamboos
Nos.
Nos.
Rs.
Say
2 (a) ivTying bamboos 2" to 5" dia with munj/Patha ban two lines including tying around the bamboos.
Detail
MATERIAL
Requirement of Munj/Patha ban for
one chain length
200 + 50 (15/48 x 22 / 7) = 249 Lft.
Add wastage 10%
=
25 Lft.
Total
=
Say
=
274 Lft.
275 Lft.
LABOUR
Cooly unskilled
Sundries
Total
Contractor's Profit & Ov
Total
0.15
10.00
Percent
20.00
Percent
No.
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Say
Say
42 (a) v Cutting and supply brushwood from canal plantation or private source lead within one mile and
between stakes and intertwining (thickness of wattled brushwood 1'.0 average)
Page 70
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
Detail
MATERIAL
Requirement of brush wood
Length
100.00 Ft.
Thickness
1.00
Ft.
Height
6.50
Ft.
Contents 100 x 1.0' x 6.5 = 650 Cft.
Weight of brush wood = 650 x 62= 488 Mds ######
82.5
Total
Mds.
0.00 r 100 Md
LABOUR
Unskilled Coolies
for cutting brushwood
Cooly skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total
3.50
2.00
Nos.
Nos.
Percent
Percent
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Say
Say
Detail
Qty
MATERIAL
Bamboos
Contractor's Profit & Ov
######
20.00
Nos.
0.00
Each
Percent
Total
ITEM RATE
Material Rate Per 100 No. Bamboos
Rs.
Detail
Qty
to 5"
Say
dia
Page 71
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
0.80
0.80
10.00
Percent
20.00
Percent
No.
No.
ITEM RATE
Total Labour Rate Per 100 No. Bamboos
Rs.
Say
(b) ii Driving bamboos 10'-1" to 12'-0" long 2" to 5" (driven 2.75' below the available bed or groun
Detail
Qty
1.55
1.60
10.00
Percent
20.00
Percent
Nos.
Nos.
ITEM RATE
Total Labour Rate Per 100 No. Bamboos
Rs.
Page 72
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
2 (b) ivTying bamboos 2" to 5" dia with BSWG No. 10 (two lines including tying around the bamboos and
tie around the topend only)
Detail
MATERIAL
Requirement of B.S.W.G 10 for one chain
length (two lines 2(100 + 50 x 15/48x22/7)=298 Lft
top and only 50 x 15/48x22/7 = 50 Lft.
Total 348 Lft.
Add 5% wastage = 18 Lft. = 366 Lft.
Weight of 100 yard of
B.S.S.W.G. No. 10(13.12) Lbs.
Weight of 366 Left = 366/300x13.12
= 16 Lbs or 0.143 Cwt.
B.S.W.G. No. 10
16.00 Lbs. (7.27 Kg
Contractor's Profit & Ov 20.00 Percent
Total
LABOUR
Cooly Unskilled
Sundries
Total
Contractor's Profit & Ov
Total
0.50
10.00
Percent
20.00
Percent
No.
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Page 73
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
42 (b) v Wattling brushwood between stakes and intertwining (thickness of wattled brush wood 1'.0 avera
Detail
MATERIAL
Requirement of brush wood lenth=100 Ft.
Thickness
= 1'-0"
Height
= 8.25 Ft.
Contents 100 x 1 x 8.25 = 825 Cft.
Weight of brush wood = 825 x 62= 620 Mds
82.5
Royality of brush wood
######
Mds.
Total
0.00 r 100 Md
LABOUR
Cooly Unskilled
for cutting brush wood
Cooly skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total
4.50
2.25
Nos.
Nos.
Percent
Percent
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Say
Say
Detail
Qty
MATERIAL
Bamboos
Contractor's Profit & Ov
Total
######
20.00
Nos.
0.00
Each
Percent
ITEM RATE
Material Rate Per 100 No. Bamboos
Rs.
Say
2 (c) iiSharpening one end of bamboo 12'-1" to 14' long 2" to 5" dia.
Page 74
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
Detail
Qty
0.90
0.90
10.00
Percent
20.00
Percent
No.
No.
0.00
0.00
Each
Each
ITEM RATE
Labour Rate Per 100 No. Bamboos
Rs.
Say
(c) ii Driving bamboos 12'-1" to 14' long 2" to 5" dia . Driven 3.5' below the available bed or grou
Detail
Qty
1.80
1.80
10.00
Percent
20.00
Percent
Nos.
Nos.
0.00
0.00
Each
Each
ITEM RATE
Labour Rate Per 100 No. Bamboos
Rs.
Page 75
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
2 (c) ivTying bamboos 2" to 5" dia with B.S.W.G. No. 10 Two lines including tying around the bamboo a
third tying around the topend only.
Detail
MATERIAL
Same as per Item No. 42 (b) (iv)
Total
LABOUR
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Say
Say
42 (c) v Cutting and supplying brushwood from canal plantation / private source lead within one mile an
between stakes and intertwining thickness of wattled brush wood 1'-0" average.
Detail
MATERIAL
Requirement of brush wood length=100 Ft.
Thickness
= 1'-0"
Height
= 9.50 Ft.
Contents 100 x 1 x 9.50 = 950 Cft.
Weight of brush wood =
950x62 =714 Mds
82.5
Royality of brush wood
714
Total
Mds.
0.00r 100 Md
Nos.
Nos.
LABOUR
Coolies unskilled
for cutting brush wood
Cooly skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total
5.50
2.50
Percent
Percent
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Say
Say
Page 76
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
Detail
Qty
MATERIAL
Bamboos
Contractor's Profit & Ov
Total
100
20.00
Nos.
0.00
Each
Percent
ITEM RATE
Material Rate Per
Rs.
Detail
Qty
Say
1.00
1.00
10.00
Percent
20.00
Percent
No.
No.
0.00
0.00
Each
Each
1.25
ITEM RATE
Labour Rate Per 100 No. Bamboos
Rs.
Page 77
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
long 2" to 5" dia. Driven 4'-0"' below the available bed or
Detail
Qty
2.00
2.00
10.00
Percent
20.00
Percent
125
Nos.
Nos.
0.00
0.00
Each
Each
x 100 =
ITEM RATE
Labour Rate Per 100 Nos.
(d)
Rs.
Say
ivTying bamboos 2" to 5" dia with B.S.W.G. No. 10 Two lines including tying around the bamboo a
third tying around the top only.
Detail
MATERIAL
Same as per Item No. 42 (b) (iv)
Total
LABOUR
ITEM RATE
Labour Rate Per 100 Nos.
Comparative Rate Per 100 Nos.
Rs.
Rs.
Page 78
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
42 (d) v Cutting and supplying brush wood from canal plantation / private source lead within one mile a
between stakes and intertwining thickness of wattled brush wood 1'-0" average.
Detail
MATERIAL
Requirement of brush wood length=100 Ft.
Thickness
= 1'-0"
Height
= 11 Ft.
Contents 100 x 1 x 11
= 1100 Cft.
Weight of brush wood = 1100 x 62=826.67
82.5
Mds.
Royalty of brush wood
Total
######
Mds.
0.00er 100 Md
6.20
3.00
Nos.
Nos.
LABOUR
Cooly Unskilled
for cutting brush wood
Cooly skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total
Percent
Percent
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Page 79
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
2 (e)
Detail
Qty
MATERIAL
Bamboos
Contractor's Profit & Ov
100
20.00
Nos.
0.00
Each
Percent
ITEM RATE
Composite Rate Per 100 Nos.
(e)
Rs.
Say
i Sharpening one end of bamboo 16'-1" to 20' long 2" to 5" dia.
Detail
Qty
1.20
1.20
10.00
Percent
20.00
Percent
Nos.
Nos.
0.00
0.00
Each
Each
1.25
ITEM RATE
Labour Rate Per 100 No. Bamboos
Rs.
Page 80
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
long 2" to 5". Driven 4'-0"' below the available bed or gro
Detail
Qty
2.40
2.40
10.00
Percent
20.00
Percent
Nos.
Nos.
0.00
0.00
Each
Each
Say
1.25
Rs.
2 (e) ivTying bamboos 2" to 5" dia with B.S.W.G. No. 10 Two lines including tying around the bamboos
third tying around the top only.
Detail
MATERIAL
Same as per Item No. 42 (b) (iv)
Total
LABOUR
ITEM OF RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Page 81
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
42 (e) v Cutting and supplying brush wood from canal plantation / private source lead within one mile a
between stakes and intertwining thickness of wattled brush wood 4'-0" average
Detail
MATERIAL
Requirement of brush wood length=100 Ft.
Thickness
= 1'-0"
Height
= 14 Ft.
Contents 100 x 1' x 14' = 1400 Cft.
Weigth of brush wood = 1400 x 62 =1052
82.5
Mds.
Royalty of brush wood
######
Mds.
0.00 r 100 Md
Total
LABOUR
Cooly Unskilled
for cutting brush wood
Cooly skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total
Say
7.50
4.00
Nos.
Nos.
Percent
Percent
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row
Rs.
Rs.
Page 82
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
43
Cutting and supplying brush wood from canal plantation or from any other source
within one mile
Detail
Qty
MATERIAL
LABOUR
Cooly
Sundries
Total
Contractor's Profit & Ov
Total
0.50
10.00
Percent
20.00
Percent
No.
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate Per 100 Cft.
Composite Rate Per Cum
44
Rs.
Rs.
Rs.
Rs.
Say
Say
Say
Say
Detail
Qty
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
45
0.50
10.00
Percent
20.00
Percent
No.
1.25
Rs.
Rs.
Say
Say
Covering road 10' to 12' wide with 3" sarkanda or jungle upto one chain lead
Page 83
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
Detail
Qty
1.20
10.00
Percent
20.00
Percent
Nos.
1.25
ITEM RATE
Labour Rate Per Chain
Labour Rate Per 30 Metre
Rs.
Rs.
Say
Say
Detail
Qty
6.50
10.00
Percent
20.00
Percent
Nos.
1.25
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Rs.
Rs.
Page 84
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
Detail
Qty
5.50
10.00
Percent
20.00
Percent
Nos.
1.25
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Rs.
Rs.
Page 85
Say
Say
C:\SCHD-RAT\PROT-DIV.XLS/ZAK
CHAPTER NO. 19
Item No. 1
(i)
White
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
1.00
0.222
4.00
0.161
0.40
0.80
No.
Kg.
Nos.
Bag
Cft.
Cft.
each
P. Kg.
each
Bag
% Cft.
% Cft.
20.00 Percent
Plumber
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
1.00 No.
per day
per day
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 1
Say
Say
DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware water closet European Typ
excluding seat and cover.
Item No. 1
(ii)
Coloured
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
1.00
0.222
4.00
0.161
0.40
0.80
No.
Kg.
Nos.
Bag
Cft.
Cft.
0.00 each
0.00 P. Kg.
0.00 each
0.00
Bag
0.00 % Cft.
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
1.00 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 2
0.00
0.05
Say
Say
0.00
0.05
DESCRIPTION OF ITEM:
Providing and fixing double seat and cover only.
Item No. 2
(i)
Bakelite.
Detail
Amount (Rs.)
MATERIAL
1
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
0.25 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 3
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing double seat and cover only.
Item No. 2
(ii)
Plastic.
Detail
Amount (Rs.)
MATERIAL
1
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
0.25 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 4
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware water closet, squatt
(orisa pattern) combined with foot rest.
Item No. 3
(i)
White
Detail
Amount (Rs.)
MATERIAL
1
2
3
1.00 No.
0.021 Bag
0.056 Cft.
0.00 each
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.50 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 5
0.00
0.00
Say
Say
0.00
0.00
Item No. 3
(ii)
Coloured.
Detail
Amount (Rs.)
MATERIAL
1
2
3
1.00 No.
0.021 Bag
0.056 Cft.
0.00
each
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.50 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 6
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 4
Providing and fitting white glazed earthen ware water closet, squat
with separate foot rest.
Detail
Amount (Rs.)
MATERIAL
1
2
1.00 No.
2.00 Nos.
0.00
0.00
each
each
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.50 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 7
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 5
Detail
Amount (Rs.)
MATERIAL
1
2
3
1.00 No.
0.021 Bag
0.056 Cft.
0.00 each
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.50 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 8
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware wash hand basin 56 x 40 c
(22" x 16"), including bracket set, waste pipe and waste coupling,
Item No. 6
(i)
Detail
Amount (Rs.)
MATERIAL
1
2
3
1.00 No.
1.00 No.
1.00 No.
0.00
0.00
0.00
each
each
each
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
1.00 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 9
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware wash hand basin 56 x 40 c
(22" x 16"), including bracket set, waste pipe and waste coupling,
Item No. 6
(ii)
Detail
Amount (Rs.)
MATERIAL
1
2
3
1.00 No.
1.00 No.
0.00
0.00
each
each
0.00
0.00
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
1.00 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 10
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware wash hand basin 56 x 40 c
(22" x 16"), including bracket set, waste pipe and waste coupling,
Item No. 6
(iii)
Detail
Amount (Rs.)
MATERIAL
1
2
W.H. Basin
Waste coupling, Bracket, Waste Pipe
Total
Contractor's Profit & Overh
Total
1.00 No.
1.00 No.
0.00
0.00
each
each
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.75 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 11
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware wash hand basin 56 x 40 c
(22" x 16"), including bracket set, waste pipe and waste coupling,
Item No. 6
(iv)
Detail
Amount (Rs.)
MATERIAL
1
2
1.00 No.
1.00 No.
0.00
0.00
each
each
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.75 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 12
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 7
Providing and fixing stainless steel sink with drain board, size 12
(48" x 24") including bracket set, waste pipe and waste coupling.
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
1.00
1.00
1.00
2.00
0.042
0.130
No.
No.
No.
Nos.
Bag
Cft.
0.00 each
0.00 each
0.00 each
0.00 each
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.75 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 13
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 8
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
Total
Contractor's Profit & Overh
Total
1.00
2.00
1.00
1.00
0.067
0.280
No.
Nos.
No.
No.
Bag
Cft.
0.00 each
0.00 each
0.00 each
0.00 each
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.75 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 14
0.00
-0.05
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing glazed earthen ware sink, including bracket se
pipe and waste coupling.
Item No. 9
(i)
60 x 45 cm (24" x 18")
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
Total
Contractor's Profit & Overh
Total
1.00
2.00
1.00
1.00
0.053
0.144
No.
Nos.
No.
No.
Bag
Cft.
0.00 each
0.00 each
0.00 each
0.00 each
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.75 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 15
0.00
-0.05
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing glazed earthen ware sink, including bracket se
pipe and waste coupling.
Item No. 9
(ii)
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
6
7
1.00
1.00
1.00
2.00
0.053
0.144
No.
No.
No.
Nos.
Bag
Cft.
0.00 each
0.00 each
0.00 each
0.00 each
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.75 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 16
0.00
-0.05
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 10
Detail
Amount (Rs.)
MATERIAL
1
2
3
1.00 No.
2.00 Nos.
2.00 Nos.
Gutties
Screw (75 mm) 3" long
Total
Contractor's Profit & Overh
Total
0.00 each
0.00 P. Doz
0.00 each
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 17
0.00
-0.20
Say
Say
0.00
-0.20
DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware low down flushing cistern
litres (3 gallons) capacity, including bracket set, copper connecti
Item No. 11
(i)
White
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
Total
Contractor's Profit & Overh
Total
1.00
one pair
1.00
0.04
0.23
No.
No.
Bag
Cft.
0.00 each
0.00 per pair
0.00 each
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.75 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 18
0.00
0.20
Say
Say
0.00
0.20
DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware low down flushing cistern
litres (3 gallons) capacity, including bracket set, copper connecti
Item No. 11
(ii)
Coloured
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
1.00
one pair
1.00
0.04
0.23
No.
No.
Bag
Cft.
0.00 each
0.00 per pair
0.00 each
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.75 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 19
0.00
0.20
Say
Say
0.00
0.20
DESCRIPTION OF ITEM:
Item No. 12
Providing and fitting plastic made low down flushing cistern 13.63
(3 gallons) capacity, including bracket set, copper connection, etc
complete.
Coloured & White.
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
1.00
one pair
1.00
0.04
0.23
No.
No.
Bag
Cft.
0.00 each
0.00 per pair
0.00 each
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.75 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each (White)
Composite rate for Each (Coloured)
Rs.
Rs.
Rs.
Page 20
0.00
0.20
687.45
Say
Say
Say
0.00
0.20
687.45
DESCRIPTION OF ITEM:
Item No. 13
Providing and fixing white enamelled cast iron low down flushing ci
13.63 litters (3 gallons) capacity, including bracket set, copper c
etc.
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
1.00 No.
one pair
0.021 Bag
0.056 Cft.
0.00 each
0.00 per pair
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.75 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 21
0.00
0.05
Say
Say
0.00
0.05
DESCRIPTION OF ITEM:
Providing and fixing C.I. highlevel flushing cistern including cost
bracket set copper connection etc.
Item No. 14
(i)
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
Total
Contractor's Profit & Overh
Total
1.00 No.
one pair
0.021 Bag
0.056 Cft.
0.00
each
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.10 Nos.
0.75 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 22
0.00
0.05
Say
Say
0.00
0.05
DESCRIPTION OF ITEM:
Providing and fixing C.I. highlevel flushing cistern including cost
bracket set copper connection etc.
Item No. 14
(ii)
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
1.00 No.
one pair
0.021 Bag
0.056 Cft.
0.00
each
0.00
0.00
0.00
0.00
0.00
0.00
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.10 Nos.
0.75 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 23
0.00
0.05
Say
Say
0.00
0.05
DESCRIPTION OF ITEM:
Item No. 15
Detail
Amount (Rs.)
MATERIAL
1
2
3
Total
Contractor's Profit & Overh
Total
1.00 No.
2.00 Nos.
2.00 Nos.
0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 24
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting, glazed earthen ware soap dish.
Item No. 16
(i)
White.
Detail
Amount (Rs.)
MATERIAL
1
2
3
Total
Contractor's Profit & Overh
Total
1.00 No.
2.00 Nos.
2.00 Nos.
0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 25
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting, glazed earthen ware soap dish.
Item No. 16
(ii)
Detail
Amount (Rs.)
MATERIAL
1
2
3
1.00 No.
2.00 Nos.
2.00 Nos.
0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 26
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 17
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
1.00
2.00
4.00
0.010
0.060
No.
Nos.
Nos.
Bag
Cft.
0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 27
0.00
-0.01
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing chromium plated towel rail.
Item No. 18
(i)
Detail
2 cm (3/4") dia.
Amount (Rs.)
MATERIAL
1
2
3
Total
Contractor's Profit & Overh
Total
1.00 No.
2.00 Nos.
4.00 Nos.
0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 28
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing chromium plated towel rail.
Item No. 18
(ii)
Detail
Amount (Rs.)
MATERIAL
1
2
3
1.00 No.
2.00 Nos.
4.00 Nos.
0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 29
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 19
Detail
Amount (Rs.)
MATERIAL
1
2
3
Total
Contractor's Profit & Overh
Total
1.00 No.
4.00 Nos.
0.00 each
0.00 P. Doz
0.00
0.00
4.00 Nos.
0.00 P. Doz
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 30
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing glass shelf 60 x 13 cm (24" x 5") with 5 mm th
glass.
Item No. 20
(i)
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
1.00
1.00
4.00
2.00
0.010
0.060
No.
No.
Nos.
Nos.
Bag
Cft.
0.00 each
0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.25 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 31
0.00
-0.01
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing glass shelf 60 x 13 cm (24" x 5") with 5 mm th
glass.
Item No. 20
(ii)
Detail
Amount (Rs.)
MATERIAL
1
Glass Shelf
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 32
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware shelf 60 x 13 cm (24" x 5
chromium plated bracket and railing.
Item No. 21
(i)
White.
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
1.00
2.00
4.00
0.010
0.060
No.
Nos.
Nos.
Bag
Cft.
0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.25 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 33
0.00
-0.01
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware shelf 60 x 13 cm (24" x 5
chromium plated bracket and railing.
Item No. 21
(ii)
Coloured.
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
1.00
2.00
4.00
0.010
0.060
No.
Nos.
Nos.
Bag
Cft.
0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.25 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 34
0.00
-0.01
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting.
Item No. 22
(i)
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
1.00
2.00
2.00
0.005
0.030
No.
Nos.
Nos.
Bag
Cft.
0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 35
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting.
Item No. 22
(ii)
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
1.00
2.00
4.00
0.010
0.060
No.
Nos.
Nos.
Bag
Cft.
0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 36
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting.
Item No. 22
(iii)
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
1.00
2.00
4.00
0.010
0.06
No.
Nos.
Nos.
Bag
Cft.
0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 37
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting.
Item No. 22
(iv)
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
1.00
2.00
2.00
4.00
0.004
0.020
No.
Nos.
Nos.
Nos.
Bag
Cft.
0.00 each
0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 38
0.00
0.01
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing chromium plated pillar - cock, heavy.
Item No. 23
(i)
2 cm
(").
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 39
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing chromium plated pillar - cock, heavy.
Item No. 23
(ii)
1.5 cm (").
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 40
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing chromium plated stop Cock Heavy.
Item No. 24
(i)
2 cm (").
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 41
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing chromium plated stop Cock Heavy.
Item No. 24
(ii)
1.5 cm (").
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 42
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 25
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
1.00
4.00
4.00
0.022
0.060
No.
Nos.
Nos.
Bag
Cft.
0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Cooly un-killed
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.25 No.
0.25 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 43
0.00
0.02
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing chromium plated bib cock.
Item No. 26
(i)
2 cm (").
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 44
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing chromium plated bib cock.
Item No. 26
(ii)
1.5 cm (").
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 45
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 27
Providing and fixing chromium plated tee stop cock 1.5 cm (").
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 46
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing, chromium plated shower rose.
Item No. 28
(i)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 47
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing, chromium plated shower rose.
Item No. 28
(ii)
2 cm x 15 cm (" x 6")
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 48
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 29
Providing & Fixing, chromium plated mixing valve, for wash hand bas
sinks or shower.
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 49
0.00
0.02
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing gun metal peet/gate valve (screwed).
Item No. 30
(i)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 50
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing gun metal peet/gate valve (screwed).
Item No. 30
(ii)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 51
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing gun metal peet/gate valve (screwed).
Item No. 30
(iii)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 52
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing gun metal peet/gate valve (screwed).
Item No. 30
(iv)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 53
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing gun metal peet/gate valve (screwed).
Item No. 30
(v)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 54
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting, Chromium plated or brass oxidised, swan neck
1.5 cm (" dia).
Item No. 31
(i)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
Cost of cock
Total
Contractor's Profit & Overh
Total
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 55
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting, Chromium plated or brass oxidised, swan neck
1.5 cm (" dia).
Item No. 31
(ii)
Detail
Amount (Rs.)
MATERIAL
1
Cost of cock
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 56
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting, Chromium plated or brass oxidised, swan neck
1.5 cm (" dia).
Item No. 31
(iii)
Detail
Amount (Rs.)
MATERIAL
1
Cost of cock
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 57
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing, union brass cock.
Item No. 32
(i)
Detail
Amount (Rs.)
MATERIAL
1
Cost of cock
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 58
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing, union brass cock.
Item No. 32
(ii)
2 cm (" dia).
Detail
Amount (Rs.)
MATERIAL
1
Cost of cock
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 59
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 33
(i)
Providing and fixing floor trap of Cast Iron including concrete cha
all-round and C.I grating.
10 x 5 cm (4" x 2").
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
1.00
0.065
0.160
0.310
No.
Bag
Cft.
Cft.
0.00 each
0.00
Bag
0.00 % Cft.
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 60
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing floor trap of Cast Iron including concrete cha
all-round and C.I grating.
Item No. 33
(ii)
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
Total
Contractor's Profit & Overh
Total
1.00
0.065
0.160
0.310
No.
Bag
Cft.
Cft.
0.00 each
0.00
Bag
0.00 % Cft.
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 61
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting P-trap including concrete chamber with cast i
gully grating.
Item No. 34
(i)
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
1.00
0.016
0.040
0.081
No.
Bag
Cft.
Cft.
0.00 each
0.00
Bag
0.00 % Cft.
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber/Mason
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 62
0.00
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting P-trap.
Item No. 34
(ii)
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
1.00
0.016
0.040
0.081
Cement
Sand
Crushed Stone
Total
Contractor's Profit & Overh
Total
No.
Bag
Cft.
Cft.
0.00 each
0.00
Bag
0.00 % Cft.
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber/Mason
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 63
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 35
Detail
Amount (Rs.)
MATERIAL
1
2
3
4
5
6
1.00
1.00
0.119
0.190
0.323
20.00
Brick
Total
Contractor's Profit & Overh
Total
No.
No.
Bag
Cft.
Cft.
No.
0.00 each
0.00 each
0.00
Bag
0.00 % Cft.
0.00 % Cft.
0.00 %0 No.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
20.00 Percent
Plumber/Mason
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate for Each
Composite rate for Each
Rs.
Rs.
Page 64
0.00
0.00
0.01
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing & fitting cast iron soil pipe with:
Detail
Amount (Rs.)
Total
Contractor's Profit & Overh
Total
Material cost/metre
=
0.00
2
2.00 Metre
0.00per metre
0.00
2.36 Kg.
0.25 Lbs
1.45 Kg.
0.00
0.00
0.00
0.00
-
20.00 Percent
0.00
0.00
Plumber/Mason
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
2.00 Nos.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 65
DESCRIPTION OF ITEM:
Providing & fitting cast iron soil pipe with:
Detail
Amount (Rs.)
2.00 Metre
0.00per metre
0.00
0.23 Kg.
0.13 Lbs
0.73 Kg.
0.00
0.00
0.00
0.00
-
20.00 Percent
224.73
Plumber/Mason
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
2.00 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
-0.01
0.02
Say
Say
0.00
0.00
Page 66
DESCRIPTION OF ITEM:
Cement caulked joint.
10 cm (4") dia.
Detail
Amount (Rs.)
2.00 Meter
0.25 Lbs
0.022 Bag
0.00per metre
0.00
Lbs
0.00
Bag
0.00
0.00
0.00
0.00
0.00
20.00 Percent
Mason/Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.25 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 67
DESCRIPTION OF ITEM:
Cement caulked joint.
5 cm (2") dia.
Detail
Amount (Rs.)
2.00 Metre
0.13 Lbs
0.011 Bag
0.00per metre
0.00
Lbs
0.00
Bag
0.00
0.00
0.00
0.00
0.00
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.25 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 68
DESCRIPTION OF ITEM:
Providing and fitting, A.C Soil pipe with cement caulked joint, inc
specials.
Item No. 37
(i)
6 cm i/d.
Detail
Amount (Rs.)
3.00 Metre
0.25 Lbs
0.022 Bag
0.00per metre
0.00
0.00
Lbs
Bag
0.00
0.00
0.00
0.00
0.00
0.00
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.25 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.02
0.01
Say
Say
0.00
0.00
Page 69
DESCRIPTION OF ITEM:
Providing and fitting, A.C Soil pipe with cement caulked joint,
including all specials.
Item No. 37
(ii)
Detail
Amount (Rs.)
3.00 Metre
0.25 Lbs
0.022 Bag
0.00per metre
0.00
0.00
Lbs
Bag
0.00
0.00
0.00
0.00
0.00
0.00
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.25 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 70
DESCRIPTION OF ITEM:
Providing and fitting, A.C Soil pipe with cement caulked joint,
including all specials.
Item No. 37
(iii)
10 cm (4" dia).
Detail
Amount (Rs.)
4.00 Metre
0.31 Lbs
0.028 Bag
0.00per metre
0.00
0.00
Lbs
Bag
0.00
0.00
0.00
0.00
0.00
0.00
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.25 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 71
DESCRIPTION OF ITEM:
Providing and fitting, A.C Soil pipe with cement caulked joint,
including all specials.
Item No. 37
(iv)
Detail
Amount (Rs.)
4.00 Metre
0.500 Lbs
0.044 Bag
0.00per metre
0.00
0.00
Lbs
Bag
0.00
0.00
0.00
0.00
0.00
0.00
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.25 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 72
DESCRIPTION OF ITEM:
Providing and fitting cast iron specials, such as tee bend, collar,
plain type.
Item No. 38
(i)
Detail
Amount (Rs.)
LABOUR FOR
1
2
5.00
0.91
2.91
0.50
Lead
kg
kg
kg
lbs
0.00
0.00
0.00
0.00
per kg
per kg
per kg
per lbs
0.00
0.00
0.00
0.00
0.00
0.00
20.00 Percent
60 NOS.
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
1.20 Nos.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Kg
Composite rate per Kg
Rs.
Rs.
Page 73
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting cast iron specials, such as tee bend, collar,
cross, etc. plain type.
Item No. 38
(ii)
Detail
Amount (Rs.)
5.00
0.50
0.040
0.230
Yarn
Cement
Sand
Total
Contractor's Profit & Overh
Total
Material cost per Kg
kg
lbs
Bag
Cft.
0.00 per kg
0.00 per lbs
0.00
Bag
0.00 % Cft.
0.00
0.00
0.00
0.00
0.00
0.00
20.00 Percent
Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
1.00 No.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Kg
Composite rate per Kg
Rs.
Rs.
Page 74
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Supply and fitting of cast iron Manhole cover with frame, etc. comp
Item No. 39
(i)
30 cm (12" dia).
Detail
Amount (Rs.)
MATERIAL
1
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 75
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Supply and fitting of cast iron Manhole cover with frame, etc. comp
Item No. 39
(ii)
45 cm (18" dia).
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 76
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Supply and fitting of cast iron Manhole cover with frame, etc. comp
Item No. 39
(iii)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
Total
Contractor's Profit & Overh
Total
0.00
each
0.00
0.00
-
20.00 Percent
1.00 No.
0.25 No.
Helper (Cooly)
Total
Sundries
Total
Contractor's Profit & Overh
Total
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 77
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 40
Detail
Amount (Rs.)
2.00 metre
6.56 Rft
0.00
0.00
0.00
20.00 Percent
Plumber
Helper (Cooly)
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
2.00 Nos.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Metre
Labour rate per Ft.
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 78
DESCRIPTION OF ITEM:
Providing and fitting chromium plated or oxidised gas Cock
6 mm (" dia)
Item No. 41
(i)
Single way.
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 79
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting chromium plated or oxidised gas Cock
6 mm (" dia)
Item No. 41
(ii)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 80
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fitting chromium plated or oxidised gas Cock
6 mm (" dia)
Item No. 41
(iii)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 81
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 42
Detail
Amount (Rs.)
MATERIAL
1
Nipple or bush 6 mm to 10 mm
(1/4" - 3/8") i/d.
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 82
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing, brass gas cock.
Item No. 43
(i)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
0.25 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 83
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing, brass gas cock.
Item No. 43
(ii)
2 cm (" dia).
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
0.25 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 84
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing brass stop cock/bib cock.
Item No. 44
(i)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
0.25 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 85
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing and fixing brass stop cock/bib cock.
Item No. 44
(ii)
2 cm (" dia).
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
0.25 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 86
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 45
Detail
Amount (Rs.)
Plumber/Mason
Coolies skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
3.00 Nos.
0.00
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Rs.
Page 87
0.00
Say
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing, chromium plated waste coupling.
Item No. 1
(i)
3 cm (1" dia)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber/Mason
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 88
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing, chromium plated waste coupling.
Item No. 1
(ii)
4 cm (1" dia).
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber/Mason
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 89
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing rubber plug with chain.
Item No. 2
(i)
3 cm (1" dia).
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
0.10 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 90
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing rubber plug with chain.
Item No. 2
(ii)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
0.10 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 91
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing waste pipe of PVC.
Item No. 3
(i)
3 cm (1" dia).
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 92
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing waste pipe of PVC.
Item No. 3
(ii)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 93
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing flushing
Item No. 4
(i)
bend of P.V.C.
3 cm (1" dia).
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 94
0.01
-0.02
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing flushing
Item No. 4
(ii)
bend of P.V.C.
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 95
0.01
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing chromium plated bottle trap with waste
pipe etc. complete.
Item No. 5
(i)
3 cm (1" dia).
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 96
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing chromium plated bottle trap with waste
pipe etc. complete.
Item No. 5
(ii)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 97
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing angle iron brackets for
Item No. 6
(i)
Detail
Amount (Rs.)
MATERIAL
1
2
2.00 Nos.
4.00 Nos.
Total
Contractor's Profit & Overh
Total
0.00
0.00
each
each
0.00
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 98
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing angle iron brackets.
Item No. 6
(ii)
Sink.
Detail
Amount (Rs.)
MATERIAL
1
2
2.00 Nos.
4.00 Nos.
Total
Contractor's Profit & Overh
Total
0.00
0.00
each
each
0.00
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 99
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing 1.5 cm (" dia) connection, including check
nuts etc.
Item No. 7
(i)
Detail
Amount (Rs.)
MATERIAL
1
1.00 Nos.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 100
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing 1.5 cm (" dia) connection, including check
nuts etc.
Item No. 7
(ii)
Copper connection.
Detail
Amount (Rs.)
MATERIAL
1
Copper Connection
assessories
Total
Contractor's Profit & Overh
Total
1.00 Nos.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 101
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing brass ball float valve.
Item No. 8
(i)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 102
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing brass ball float valve.
Item No. 8
(ii)
2 cm (" dia).
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 103
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing brass ball float valve.
Item No. 8
(iii)
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 104
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing brass ball float valve.
Item No. 8
(iv)
3 cm (1" dia).
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 105
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing brass ball float valve.
Item No. 8
(v)
4 cm (1" dia).
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 106
0.00
0.00
Say
Say
0.00
0.00
REPLACEMENT
DESCRIPTION OF ITEM:
Providing and fixing brass ball float valve.
Item No. 8
(vi)
5 cm (2" dia).
Detail
Amount (Rs.)
MATERIAL
1
1.00 No.
0.00
each
0.00
0.00
-
20.00 Percent
Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total
1.00 No.
0.00
0.00
-
10.00 Percent
20.00 Percent
ITEM RATES
Labour rate per Each
Composite rate per each
Rs.
Rs.
Page 107
0.00
0.00
Say
Say
0.00
0.00
CHAPTER NO. 18
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
Brick
Sand
Total
Contractor's Profit & O
Total
1400 Nos.
22 Cft
20.00
0.00
0.00
No.
% Cft
0.00
0.00
0.00
-
Percent
LABOUR
1
2
3
Mason
Cooly
Bahisthi
Total
Sundries
Total
Contractor's Profit & O
Total
1.35 Nos.
2.65 Nos.
0.10 No.
10.00
Percent
20.00
Percent
0.00
0.00
0.00
0.00
-
COMPACTION CHARGES
1
Working of DRR
0.25 hour
0.00
0.00
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 1
DESCRIPTION OF ITEM:
Item No. 2
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
Brick aggregate
Sand
Total
Contractor's Profit & O
Total
122 Cft
24 Cft
20.00
0.00
0.00
% Cft
% Cft
0.00
0.00
0.00
-
Percent
LABOUR
2
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & O
Total
2.00 Nos.
10.00
Percent
20.00
Percent
0.00
0.00
-
COMPACTION CHARGES
1
Working of DRR
0.75 hour
0.00
0.00
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
-0.55
-0.19
Say
Say
-0.50
-0.10
Page 2
DESCRIPTION OF ITEM:
Item No. 3
(i)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
20.00
120 Cft
0.00
% Cft
0.00
0.00
-
Percent
LABOUR
2
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & O
Total
2.00 Nos.
10.00
Percent
20.00
Percent
0.00
0.00
-
COMPACTION CHARGES
1
Working of DRR
0.75 hour
0.00
0.00
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 3
DESCRIPTION OF ITEM:
Item No. 3 (a)
(ii)
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
Crushed stone
Total
Contractor's Profit & O
Total
120 Cft
20.00
0.00
% Cft
0.00
0.00
-
Percent
LABOUR
2
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & O
Total
2.00 Nos.
10.00
Percent
20.00
Percent
0.00
0.00
-
COMPACTION CHARGES
1
Working of DRR
0.75 hour
0.00
0.00
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 4
DESCRIPTION OF ITEM:
Item No. 4
Detail
Rate
Per Unit
Amount (Rs.)
MATERIAL
1
2
122 Cft
22 Cft
20.00
0.00
0.00
% Cft
% Cft
0.00
0.00
0.00
-
Percent
LABOUR
1
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & O
Total
2.50 Nos.
10.00
Percent
20.00
Percent
0.00
0.00
-
COMPACTION CHARGES
1
Working of DRR
0.75 hour
0.00
0.00
ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 5
DESCRIPTION OF ITEM:
Item No. 5
Providing and laying road edging of 3" (75 mm) wide and 9" (228 mm)
deep brick on end. complete in all respects.
Detail
Rate
Per Unit
Amount (Rs.)
Bricks
Total
Contractor's Profit & O
Total
288 Nos.
20.00
0.00 Nos.
0.00
0.00
-
Percent
LABOUR
1
2
Mason
Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total
0.50 No.
0.50 No.
10.00
Percent
20.00
Percent
0.00
0.00
0.00
-
ITEM RATES
Labour rate per one foot
Labour rate per metre
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
-0.05
Say
Say
0.00
0.00
Page 6
DESCRIPTION OF ITEM:
Item No. 6
Providing and laying bituminous prime coat, using 10 lbs (4.537 liters)
Kerosene Oil and 10 lbs (4.55 kg) binder.
Detail
Rate
Per Unit
Amount (Rs.)
Binder (Bitumen)
Kerosene oil
Fuel wood
Total
Contractor's Profit & O
Total
4.55 kg
4.537 litre
0.07 kg
20.00
100.00per tonne
0.00per litre
0.00 per kg
4.55
0.00
0.00
4.55
0.91
5.46
Percent
LABOUR
1
10.00
Percent
20.00
Percent
0.20 No.
0.00
0.00
-
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
Say
Say
0.00
0.00
Page 7
DESCRIPTION OF ITEM:
Item No. 7
Providing and laying bituminous tack coat, using 15 lbs (6.80 kg) of
bitumen.
Detail
Rate
Per Unit
Amount (Rs.)
Bitumen
Fuel wood
Total
Contractor's Profit & O
Total
6.80 kg
0.11 kg
20.00
per tonne
0.00 per kg
0.00
0.00
0.00
-
Percent
LABOUR
1
10.00
Percent
20.00
Percent
0.20 No.
0.00
0.00
-
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 8
DESCRIPTION OF ITEM:
Item No. 8 (I - i)
1- Ist Coat
Detail
Amount (Rs.)
Bajri
Bitumen
Fuel wood
550 Cft
1.81 Tonne
223.92 kg
Total
Contractor's Profit & O 20.00
Total
Material cost per 100 Sft
0.00 % Cft
per tonne
0.00 per kg
0.00
0.00
0
0.00
-
% on 1&0.00
30549.86 x 100
10000
0.00
LABOUR
1
2
3
Tar Sprayer
Chowkidar
Cooly
Total
Sundries
Total
Contractor's Profit & O
Total
1.00 No.
1.00 No
12.00 Nos.
10.00
Percent
20.00
Percent
RATE
0.00
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Road Roller
Tar Boiler
8.00 hrs
8.00 hrs
Total
0.00
0.00
#VALUE!
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm
Page 9
Rs.
Rs.
#VALUE!
#VALUE!
Say
Say
#VALUE!
#VALUE!
Rs.
Rs.
#VALUE!
#VALUE!
Say
Say
#VALUE!
#VALUE!
DESCRIPTION OF ITEM:
Item No. 8 (1-ii)
FIRST COAT
Using 35 lbs (15.880 kg) bitumen and 4.0 Cft (0.113 cu.m) bajri of nomi
size " (20 mm) per 100 Sft.
Detail
Amount (Rs.)
Bajri
Bitumen
Fuel wood
Total
Contractor's Profit & O
Total
Rate per 100 Sft
=
400 Cft
1.588 Tonne
196 kg
20.00
0.00 % Cft
per tonne
0.00 per kg
0.00
-
% on 1&0.00
26392.90 x
10000
0.00
0.00
0.00
100
0.00
LABOUR
1
2
3
Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & O
Total
1.00 No.
1.00 No
12.00 Nos.
10.00
Percent
20.00
Percent
RATE
0.00
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Road Roller
Tar Boiler
8.00 hrs
8.00 hrs
Total
0.00
0.00
#VALUE!
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
#VALUE!
#VALUE!
Say
Say
#VALUE!
#VALUE!
Rs.
Rs.
#VALUE!
#VALUE!
Say
Say
#VALUE!
#VALUE!
Page 10
DESCRIPTION OF ITEM:
Item No. 8 (2-i)
SECOND COAT.
Using 25 lbs (11.343 kg) bitumen and 2.75 Cft (0.077 m) bajri of nomin
size " (12 mm) per 100 Sft.
Detail
Amount (Rs.)
Bajri
Bitumen
Fuel wood
Total
Contractor's Profit & O
Total
Rate per 100 Sft
=
357.5 Cft
1.475 Tonne
182.5 kg
20.00
0.00
% Cft
tonne
0.00 per Kg
0.00
-
% on 1&0.00
24446.69 x
13000
0.00
0.00
0.00
100
0.00
LABOUR
1
2
3
Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & O
Total
1.00 No.
1.00 No
12.00 Nos.
10.00
Percent
20.00
Percent
RATE
0.00
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Road Roller
Tar Boiler
8.00 hrs
8.00 hrs
Total
0.00
0.00
#VALUE!
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
Say
Say
0.00
0.00
Page 11
DESCRIPTION OF ITEM:
Item No. 8 (2-ii)
SECOND COAT
Using 18 lbs (8.17 kg) bitumen and 2.0 Cft (0.056 m) bajri of
nominal size 3/8" (10 mm).
Detail
Amount (Rs.)
Bajri
Bitumen
Fuel wood
Total
Contractor's Profit & O
Total
Rate per 100 Sft
=
260.0 Cft
1.062 Tonne
131.38 kg
20.00
0.00 % Cft
per tonne
0.00 per kg
0.00
-
% on 1&0.00
17614.43 x
13000
0.00
0.00
0.00
100
0.00
LABOUR
1
2
3
Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & O
Total
1.00 No.
1.00 No
12.00 Nos.
10.00
Percent
20.00
Percent
RATE
0.00
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Road Roller
Tar Boiler
8.00 hrs
8.00 hrs
Total
0.00
0.00
#VALUE!
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 12
DESCRIPTION OF ITEM:
Item No. 8 (3)
THIRD COAT
Using 14 lbs (6.35 kg) bitumen and 1.5 Cft (0.0472 m) bajri of
nominal size " (6 mm) per 100 Sft.
Detail
Amount (Rs.)
Bajri
Bitumen
Fuel wood
Total
Contractor's Profit & O
Total
Rater par 100 Sft
=
285.0 Cft
1.207 Tonne
149.3 kg
20.00
0.00 % Cft
per tonne
0.00 per kg
0.00
0.00
0.00
0.00
-
% on 1&0.00
19967.39 x 100
19000
0.00
LABOUR
1
2
3
Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & O
Total
1.00 No.
1.00 No
12.00 Nos.
10.00
Percent
20.00
Percent
RATE
0.00
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Road Roller
Tar Boiler
8.00 hrs
8.00 hrs
Total
0.00
0.00
#VALUE!
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 13
DESCRIPTION OF ITEM:
Item No. 9 (a)
(i)
Detail
Amount (Rs.)
Bajri
Bitumen
Fuel wood
Total
Contractor's Profit & O
Total
Rate per 100 Sft
=
375.0 Cft
1.497 Tonne
185.11 kg
20.00
0.00
% Cft
0.00 per kg
0.00
-
% on 1&0.00
24871.21 x
15000
0.00
0.00
0.00
100
-0.01
LABOUR
1
2
3
Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & O
Total
1.00 No.
1.00 No
12.00 Nos.
10.00
Percent
20.00
Percent
RATE
0.00
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Road Roller
Tar Boiler
8.00 hrs
8.00 hrs
Total
0.00
0.00
#VALUE!
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm
Page 14
Rs.
Rs.
#VALUE!
#VALUE!
Say
Say
#VALUE!
#VALUE!
Rs.
Rs.
#VALUE!
#VALUE!
Say
Say
#VALUE!
#VALUE!
DESCRIPTION OF ITEM:
Item No. 9 a (ii)
Using 20 lbs (9.074 kg) bitumen and 2.0 Cft (0.056 m) bajri of nominal
size 3/8" (10 mm) per 100 Sft.
Detail
Amount (Rs.)
Bajri
Bitumen
Fuel wood
Total
Contractor's Profit & O
Total
Rate per 100 Sft
=
300 Cft
1.361 Tonne
168.31 kg
20.00
0.00 % Cft
per tonne
0.00 per kg
0.00
-
% on 1&0.00
22409.14 x
15000
0.00
0.00
0.00
100
0.00
LABOUR
1
2
3
Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & O
Total
1.00 No.
1.00 No
12.00 Nos.
10.00
Percent
20.00
Percent
RATE
0.00
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Road Roller
Tar Boiler
8.00 hrs
8.00 hrs
Total
0.00
0.00
#VALUE!
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Rs.
Rs.
#VALUE!
#VALUE!
Say
Say
#VALUE!
#VALUE!
Rs.
Rs.
#VALUE!
#VALUE!
Say
Say
#VALUE!
#VALUE!
Page 15
DESCRIPTION OF ITEM:
Item No. 10(vii)
Detail
Mixed Design
Amount (Rs.)
(54%)
(36%)
(4%)
= (6%)
MATERIAL
Unit weight of Mix
100 x 2/12
= 16.67 Cft (% Sft)
Total weight
3
4
5
6
7
= 145 lbs/Cft
12.43 Cft
0.00
% Cft
0.00
8.70 Cft
0.00
% Cft
0.00
1.07 Cft
0.00
% Cft
0.00
per ton
0.00
145.00 lbs
65.91 kg
Total
Contractor's Profit & O 20.00 on 12&3 0.00
Cost of Brushes and other special Tool
0.30
Contractor's Profit & Overheads (20%) on item '6'
Material cost per 100 Sft (2" thick)
0.00
0.00
0.00
0.00
LABOUR
Labour required at site of work co-ordinating the
working of Machinery of complete unit of premix
plant (Mixing plant, Generator, pick up, including
establishment P.O.L and Depreciation etc.
(Mixing plant, Generator, Pickup, including
establishment POL and depreciation etc.)
Page 16
Asphalt plant
Dumper
Loader
Bulldozer
Paver Finisher
Road Roller
Water Loory
Road Roller
Tractor
Misc. i.e. small T&P, working
of Crane & Tar Boiler
1.00
10.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
No.
Nos.
Nos.
No.
No.
No.
No.
No.
No.
0.00 per
0.00 per
0.00 per
0.00 per
0.00 per
0.00 per
0.00 per
0.00 per
0.00 per
hour
hour
hour
hour
hour
hour
hour
hour
hour
L.S
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ITEM RATES
Labour rate per 100 Sft (1" thick)
Labour Sqm (25 mm thick)
Rs.
Rs.
Say
Say
0.00
0.00
Rs.
Rs.
Say
Say
0.00
0.00
Page 17
DESCRIPTION OF ITEM:
Item No. 11
Scarifying old road surface including removal of debris within 1 chain (30.0 m)
Detail
Amount (Rs.)
LABOUR
1
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & O
Total
0.33 No.
10.00
Percent
20.00
Percent
ITEM RATES
Labour rate for 100 Sft
Labour rate for 1 Sqm
Rs.
Rs.
Page 18
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Providing R.C.C railing on bridges as per standard drawing.
Item No. 12
Detail
Amount (Rs.)
5.88 Cft
5.00 Cft
10.88 Cf
18
12
22
12
Total
104'.0 @ 0.36 lbs/ft
Steel 5/8"dia post:3 x 4 x
Railing 8 x 12
60
12
0.00
0.00 per kg
including
cost of
0.00
= 77 ft
27 ft.
10.88 Cft
37.44 lbs
104 ft.
37.44 lbs
60.0 ft.
96.0 ft.
156 ft.
156.00
193.44 l
156.00 lbs
29.01 lbs
222.45 lbs
100.93 kg
binding wire
2524.00
201.92
LABOUR
1
2
-8.92
-18.17
448.04
35.84
ITEM RATES
Labour rate per foot
Labour rate per metre
Rs.
Rs.
35.84
117.54
Say
Say
35.85
117.55
Rs.
Rs.
237.76
779.85
Say
Say
237.75
779.85
Page 19
DESCRIPTION OF ITEM:
Providing and fixing G.I pipe railing as per standard drawing.
Item No. 13
Detail
Amount (Rs.)
Wastage 3%
3
4
Short bend (
Tee 2 x 2" x 2"
= 0.66 l
10.35 kg
= 22.76 lbs
(10.35 kg)
46 - 6"
2' - 3"
48.9"
1.5"
50'.2"
elbow) 2"
50' - 2"
15.30 metre
0.00 per kg
0.00per metre
4.00 Nos.
2.00 Nos.
Pipe fitter
Cooly
Total
Sundries
Total
Contractor's Profit & O
Total
3064.44
= 15.3 mtr
0.00
0.00
0.00
0.00
Total
Contractor's Profit & O 20.00 Percent
Total
Rate per foot
3989.63 =
257.40
15.50
LABOUR
1
2
3064.44
612.89
3,677.33
257.40
1.00 No.
1.00 No.
10.00
Percent
20.00
Percent
0.00
0.00
0.00
-
ITEM RATES
Labour rate per foot
Labour rate per metre
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
257.45
844.24
Say
Say
257.45
844.25
Page 20
DESCRIPTION OF ITEM:
Item No. 14
Providing and fixing steel bearings of standard quality and type at sit
work.
Detail
Amount (Rs.)
MATERIAL
1
Steel bearing
Total
Contractor's Profit & O
Total
1.00 No.
20.00
0.00
each
0.00
0.00
-
Percent
ITEM RATES
Composit rate for each
Rs.
0.00
Say
0.00
DESCRIPTION OF ITEM:
Item No. 15
Detail
Amount (Rs.)
MATERIAL
1
1.00 cubic
0.00
0.00
-
Percent
ITEM RATES
Composite rate per cub. inch
Composite rate per cub. cm
Rs.
Rs.
Page 21
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 16
Providing and laying expansion joint of neoprine strip 4" x " (100 x 6
and plastic bitumen.
Detail
Amount (Rs.)
MATERIAL
1
2
20.00
0.80 Foot
1.14 kg
0.00per metre
per kg
0
0
0.00
-
Percent
LABOUR
1
Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total
0.10 No.
10.00
Percent
20.00
Percent
0.00
0.00
-
ITEM RATES
Labour rate per foot
Labour rate per foot
Rs.
Rs.
Rs.
Rs.
Page 22
0.00
0.00
Say
Say
0.00
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 17
Detail
Amount (Rs.)
MATERIAL
1
0.457 m)
20.00
0.457 Metre
0.00per metre
0.00
0.00
-
Percent
LABOUFor 20 Nos.
1
Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total
1.00 No.
10.00
Percent
20.00
Percent
0.00
0.00
-
ITEM RATES
Labour rate per each
Rs.
0.00
Say
0.00
Rs.
0.00
Say
0.00
Page 23
DESCRIPTION OF ITEM:
Providing and erection at site of work.
Item No. 18
(i)
Detail
Amount (Rs.)
MATERIAL
i) P.C.C 1 : 4: 8 in foundation
1 x 3.5 x 1.875 x 1.75 =
D/d mile stone 1 x 2 x 0.375 x 1.5 =
11.48 Cft
1.13 Cft
10.35 Cf
3.38 Cft
0.47 Cft
2.91 Cft
10.35 Cft
0.00Per % Cft
2.91 Cft
0.00
Per Cft
0.00
0.00 per kg
0.00
15.00 Sft
0.00Per % Sft
0.00
each
28.00 Nos.
0.00
0.00
0.00
0.00
6.18 kg
each
each
Total
0.00
LABOUR
i) Excavation of foundation (Item No.21(b) Chap.3)
1 x 3.5 x 1.875 x 1.25 =
8.20 Cft
Rate as per item 3(1)
ii) P.C.C 1 : 4 : 8 in foundation
as per item (i) above
Rate as per (Item 3(b) of Chapter No.6)
iii) R.C.C 1 : 2: 4 (as per item (ii) above
Rate as per (Item 6a(i) Chapter No.6)
vi) Steel reinforcement " dia
8.20 Cft
10.35 Cft
2.91 Cft
0.00Per Cft
0.00
0.00 Per
0.00
Cft
Per Cft
0.00
6.18 kg
0.00 per kg
0.00
% Sft
0.00
Page 24
15.08 Sft
28.00 Nos.
each
each
0.00
ITEM RATES
Labour rate per Mile/Km Stone
Composite rate per Mile/Km Stone
Rs.
Rs.
Page 25
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 18
(ii)
Detail
Amount (Rs.)
MATERIAL
i) P.C.C 1 : 4: 8 in foundation
1 x 1.5 x 0.75 x 1.0 =
D/d mile stone 0.75 x 0.208 x 1.5 =
1.13 Cft
0.23 Cft
0.90 Cft
0.90 Cft
0.00Per % Cft
0.00
0.18 Cft
Per % Cft
0.00
1.2
1.20 kg
0.00 per kg
0.00
Sft
Sft
Sft
1.60 Sft
0.00Per % Sft
0.00 each
0.00
0.00
each
0.00
0.00
Total
LABOUR
i) Excavation of foundation (Item NO.21(b) of Chap.3)
1.50 x 0.75 x 0.50
=
0.56 Cft
0.56 Cft
ii) P.C.C 1 : 4 : 8 in foundation
as per item (i) above
Rate as per (Item No.3(b) Chapter No.6)
0.90 Cft
iii) R.C.C 1 : 2: 4 (as per item (ii) above
Rate as per (Item 6(a)i Chapter No.6)
0.18 Cft
vi) Steel reinforcement " dia
each
0.00Per Cft
0.00
0.00Per % Cft
0.00
Per % Cft
0.00
1.20 kg
0.00 per kg
0.00
1.60 Sft
0.01Per % Sft
0.00
each
0.00
0.00
0.00
Rs.
Rs.
0.00
each
ITEM RATES
Labour rate per furlong ( Km) Stone
Composite rate per furlong ( Km) Stone
Page 26
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 18
(iii)
Detail
Amount (Rs.)
MATERIAL
i) R.C.C 1: 2: 4
0.75 x 0.75 x 3
=
(Rate as per item 6 (6 b) (i)
ii) Steel reinforcement 3/8" dia
1 x 2.5
1.70 Cft
1.70 Cft
=
Per
Cft
0.00
2.5 Rft
0.42 kg
0.00 per kg
Total
0.00
0.00
LABOUR
i) Excavation of foundation (Item No.21(b) Chap.3)
0.75 x 0.75 x 1.50
=
0.84 Cft
ii) R.C.C 1 : 2: 4 (as per item (ii) above)
Rate as per (Item No.6(a) (i) of Chapter No.6)
iii) Steel reinforcement " dia
0.84 Cft
0.00Per Cft
0.00
1.70 Cft
Per % Cft
0.00
0.42 kg
0.00 per kg
0.00
0.00
ITEM RATES
Labour rate for each pillar
Composite rate for each pillar
Rs.
Rs.
Page 27
0.00
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 18 (iv)
(a)
Detail
Amount (Rs.)
MATERIAL
i) P.C.C. 1 : 4 : 8 in foundation
2 x 2 x 2.5
=
Rate as per item 6(3)
ii) Steel
a) T. Iron 0.25 x 0.25 x 0.375
9 Rft @ 7.17 lbs/ft. =
b) M.S plate 1/8" thick
10.00 Cft
Total
Rate as per item 8(a)
iii) Painting and lettering
10.00 Cft
0.00Per % Cft
0.00
36.60 kg
0.00 per kg
0.00
0.00
0.00
9.00 Rft
64.53 lbs
16.01 lbs
80.54 lb
each
each
Total
0.00
LABOUR
i) Excavation and fixing
ii) P.C.C (1 : 4: 8) in foundation
(as per item (i) above)
Rate as per (Item 3(b) of Chapter No.6)
iii) Febrication of steel
L.S
10.00 Cft
0.00 Per
36.60 kg
0.00 per kg
Cft
0.00
0.00
0.00
L.S
0.00
0.00
0.00
ITEM RATES
Labour rate for each sign
Composite rate for each sign
Rs.
Rs.
Page 28
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 18 (iv)
(b)
Detail
Amount (Rs.)
MATERIAL
i) P.C.C. 1 : 4 : 8 in foundation
2 x 2 x 2.5
=
Rate as per item 6(3)
ii) Steel
a) T. Iron 0.25 x 0.25 x 0.375
9 Rft @ 7.17 lbs/ft. =
b) M.S plate 1/8" thick
1.7.3 2 @ 5.10 lbs/sft=
Total
Rate as per item 8(a)
iii) Painting and lettering
10.00 Cft
10.00 Cft
0.00Per % Cft
0.00
33.35 kg
0.00 per kg
0.00
9.00 Rft
64.53 lbs
8.83 lbs
73.36 lb
each
each
Total
0.00
0.00
LABOUR
i) Excavation and fixing
ii) P.C.C (1 : 4 : 8) in foundation
(as per item (i) above)
Rate as per (Item 3(b) of Chapter No.6)
iii) Febrication of steel
L.S
10.00 Cft
0.00 Per
33.35 kg
0.00 per kg
Cft
0.00
0.00
0.00
L.S
L.S
0.00
0.00
0.00
ITEM RATES
Labour rate for each Post
Composite rate for each Post
Rs.
Rs.
Page 29
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 19
Detail
Amount (Rs.)
MATERIAL
1
2
Brick
Sand
Total
Contractor's Profit & O
Total
1400.00 Nos.
22.00 Cft
20.00
0.00 Nos.
0.00 % Cft
0.00
0.00
0.00
-
Percent
LABOUR
1
2
3
Cooly skilled
Cooly
Bahishti
Total
Sundries
Total
Contractor's Profit & O
1.35 Nos.
2.65 Nos.
0.10 No.
10.00
Percent
20.00
Percent
per day
per day
per day
0
0
0
0.00
-
ITEM RATES
Labour rate per 100 Cft
Labour rate for m
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Rs.
Rs.
0.00
0.00
Say
Say
0.00
0.00
Page 30
CHAPTER NO. 9
ROOFING
Note 1.
Rates for all finished works include the removal of surplus debris, unused
material and by products.
Add extra 13%, 32% and 51% on labour rates only or 6%, 15% and 23% on
composite rates for 2nd, 3rd fourth and subsequent floors respectively.
Note 2.
DESCRIPTION
OF
ITEM NO
1:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Tiles 12"x6"x1"
Cement for laying
Pointing under side 1:2
Plaster of tiles in between and over tiles 1:6
Plaster along parapet
Sand
Sand
Sand
Sand
Sand
for
for
for
for
for
400
0.26
0.17
1.10
0.23
1.76
Nos
Bag
Bag
Bag
Bag
Bags
P. Bag
Cft
Cft
Cft
Cft
Cft
Cft
P. Cft
10.00 Cft
33.00 Cft
43.00 Cft
P. Cft
1.96
0.41
8.28
1.71
1.00
13.36
Page 1
1000 Nos
Item No.
1
Detail
17Sr (15
0.75
0.75Cft (
34Lbs(15
0.2Md (7
Total
Contractor's Profit & Ove 20
Total
Rate
Per Unit (Rs.)Amount (Rs.)
.8)Kg
Cft
15) Kg
.43)Kg
.44)Kg
P. Kg
P. Cft
P 100
P. Kg
P. Kg
Percent
Labour
Rate Analysis for 125 Sft
Masons for laying tiles
Mason for pointing
Mason for cement plaster
Mason for mud plaster
Unskilled Coolies
Bahishti
Total
Sundries
Total
1.50
0.75
1.00
0.40
3.65
Nos
Nos
No
No
Nos
6.00 Nos
1.25 Nos
10
Percent
Percent
Each
P. Day
P. Day
Item Rates
Labour Rate Per 100 S
Labour Rate P/ Sqm
Rs.
Rs.
Rs.
Rs.
Page 2
Say
Say
Say
Say
DESCRIPTION
OF
ITEM NO
2:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Tiles 12"x6"x2"
Cement for laying in 1:6 mortar
Cement for plaster
1:6
Cement for pointing 1:2
Cement for Plaster along parapet
Sand
Sand
Sand
Sand
Sand
for
for
for
for
for
200.00
0.23
0.55
0.17
0.23
1.18
Nos
Bag
Bag
Bag
Bag
Bags
Per
1000 N
P. Bag
Cft
Cft
Cft
Cft
Cft
Cft
P. Cft
10.00 Cft
33.00 Cft
43.00 Cft
P. Cft
P. Cft
P. Kg
P 100
P. Kg
P. Kg
1.68
4.14
0.43
1.71
1.00
8.96
0.75
17Sr (15.
0.75Cft (
34Lbs(15
0.2Mds(7
Cft
81) Kg
15) Kg
.43) Kg
.44) Kg
Percent
Page 3
Item No.
2
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Rate Analysis for 125 Sft
Masons
Unskilled Coolies
Bahishti
Total
Sundries
Total
10
Percent
Percent
2.50 Nos
5.00 Nos
1.00 No
P. Day
P. Day
P. Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Rs.
Rs.
Page 4
Say
Say
Say
Say
DESCRIPTION
OF
ITEM NO
3:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Coaltar
Fine sand
Charcoal for heating coaltar
Total
Contractor's Profit & Ove 20
Total
7.72 Kg.
1.00 Cft
3.00 Kg.
P. Kg
P. Cft
P. Kg.
Percent
Labour
Mason
Unskilled Cooly
Total
Sundries
Total
0.12 No
0.25 No
P. Day
P. Day
10
Percent
Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Rs.
Rs.
Rs.
Rs.
Page 5
Say
Say
Say
Say
Note.
DESCRIPTION
OF
ITEM NO
4:
a)
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Deodar wood 2x10 (9"x1"x5")
Wastage 20%
Wire Nails
Total
Contractor's Profit & Ove 20
Total
0.54 Cft
0.11 Cft
0.65 Cft
P. Cft
0.28 Kg.
P. Kg
Percent
Labour
Rate Analysis for 150 Sft
Carpenter for making grooves in batten
and fixing of wooden strips
Unskilled Cooly
Total
Sundries
Total
10
Percent
Percent
0.50 No
0.50 No
Each
P. Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Rs.
Rs.
Page 6
Say
Say
Say
Say
Item No.
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
9 No x2/3"x5/12"
2 No x2/3"x5/12"
1.88 Cft
0.28 Cft
0.27
0.17
0.44
1.02
0.65
1.67
Bag
Bag
Bag
Cft
Cft
Cft
P. Bag
P. Cft
2.04 Cft
P. Cft
Percent
Labour
Rate Analysis for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
10
Percent
Percent
0.50 No
1.00 No
0.13 No
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 7
Item No.
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Bricks including wastage (30+15)
Cement
Sand
Total
Contractor's Profit & Ove 20
Total
45.00 Nos
0.20 Bag
0.75 Cft
Per
1000 N
P. Bag
P. Cft
Percent
Labour
Rate Analysis for 125 Sft
Mason
Cooly
Bahishti
Total
Sundries
Total
0.17 No
0.17 No
0.10 No
10
Percent
Percent
P. Day
P. Day
P. Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 8
DESCRIPTION
OF
ITEM NO
5:
Detail
Qty
Material
Brick tiles 225 x 112.5 x 40 mm (9"x41/2"x1")
Sand for grouting
Sand for blinding
360.00
2.50
1.25
3.75
0.75
Nos
Cft
Cft
Cft
Bag
Rate
Per Unit (Rs.)Amount (Rs.)
Cement
Good earth lead upto 100' (30 M) and lift
upto 20' (6 M)
43.00 Cft
Two coats of bitumen
15.42 4Lbs(15 .42) Kg
Total
Contractor's Profit & Ove 20
Total
Per
1000 N
P. Cft
P. Bag
P. Cft
P. Kg
Percent
Labour
Rate Analysis for 150 Sft
Plasterer
Mason for Laying
Mason for Grouting
Cooly for and plaster
Cooly for grouting laying
Cooly for grouting
Painter for bitumen
Bahishti
Total
Sundries
Total
10
Percent
Percent
0.125
0.500
0.125
0.75
0.50
0.65
0.25
1.40
0.50
0.50
No
No
No
No
No
No
No
Nos
No
No
Each
Each
Each
Each
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 9
DESCRIPTION
OF
ITEM NO
6:
a)
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Bricks
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand
9"x4"x3"
for laying
for plastering Soffits
for concrete in haunches
for concrete in flanges
for
for
for
for
laying
plastering soffit
concrete in haunches
concrete in flanges
Per
1000 N
P. Bag
Cft
Cft
Cft
Cft
Cft
P. Cft
32.00 Cft
3.00 Cft
35.00 Cft
P. Cft
P.
P.
P.
P.
550.00
1.60
0.57
2.00
0.60
4.77
Nos
Bag
Bag
Bag
Bag
Bags
10.00
4.26
16.20
1.50
31.96
33.00
17Lbs(15
0.75
0.75 Cft (
Page 10
Cft
.81) Kg
Cft
15) Kg
Cft
Kg
Cft
100
a)
Detail
(1:6:12)
Bitumen
Fuel
Kail wood for centring
Rate
Per Unit (Rs.)Amount (Rs.)
34Lbs(15 .42) Kg
0.2Mds(7 .44) Kg
0.4 Cft.
Total
Contractor's Profit & Ove 20
Total
P. Kg
P. Kg
P. Cft
Percent
Labour
Rate Analysis for 125 Sft
Masons
Carpenter
Unskilled Coolies
Bahishti
Total
Sundries
Total
10
Percent
Percent
3.50
0.50
7.00
1.00
Nos
No
Nos
No
P.
P.
P.
P.
Day
Day
Day
Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 11
Item No.
Detail
Material
Bricks
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand
9"x4"x3"
for laying
for plastering Soffits
for concrete in haunches
for concrete in flanges
for
for
for
for
laying
plastering soffit
concrete in haunches
concrete in flanges
Rate
Per Unit (Rs.)Amount (Rs.)
Per
1000 N
P. Bag
Cft
Cft
Cft
Cft
Cft
P. Cft
31.00 Cft
3.00 Cft
34.00 Cft
P. Cft
P. Cft
P. Kg
P. Cft
P.% Kg
P. Kg
P. Kg
P. Cft
550.00
1.60
0.57
4.10
0.60
6.87
Nos
Bag
Bag
Bag
Bag
Bags
10.00
4.26
15.40
1.50
31.16
33.00
17Lbs(15
0.75
0.75Cft (
34Lbs(15
0.2Mds(7
0.411
Percent
Page 12
Cft
.81) Kg
Cft
15) Kg
.43) Kg
.44) Kg
Cft.
b)
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Rate Analysis for 125 Sft
Masons
Carpenter
Unskilled Coolies
Bahishti
Total
Sundries
Total
10
Percent
Percent
3.50
0.50
7.00
1.00
Nos
No
Nos
No
P.
P.
P.
P.
Day
Day
Day
Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 13
DESCRIPTION
OF
ITEM NO
7:
a)
Detail
(1:6:12)
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Bricks
Cement
Cement
Cement
Cement
Cement
9"x4"x3"
for laying
for plastering top
for plastering soffits
for concrete in haunches
for concrete in flanges
Per
1000 N
P. Bag
Cft
Cft
Cft
Cft
Cft
Cft
P. Cft
32.00 Cft
3.00 Cft
35.00 Cft
P. Cft
550.00
1.60
0.51
0.57
2.00
0.60
5.28
Nos
Bag
Bag
Bag
Bag
Bag
Bags
10.00
3.84
4.26
16.20
1.50
35.80
Page 14
a)
Detail
(1:6:12)
Bitumen
Fuel
Deodar wood (2nd Class)
Rate
Per Unit (Rs.)Amount (Rs.)
34Lbs(15 .43) Kg
0.2Mds(7 .44) Kg
0.50 Cft
Total
Contractor's Profit & Ove 20
Total
P. Kg
P. Kg
P. Cft
Percent
Labour
Rate Analysis for 125 Sft
Masons
Carpenter
Unskilled Coolies
Bahishti
Total
Sundries
Total
10
Percent
Percent
2.75
0.50
5.50
1.00
Nos
No
Nos
No
P.
P.
P.
P.
Day
Day
Day
Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 15
Item No.
(1:3:6)
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Bricks
Cement
Cement
Cement
Cement
9"x4"x3"
for laying
for plastering soffits
for concrete in haunches
for concrete in flanges
Per
1000 N
P. Bag
Cft
Cft
Cft
Cft
Cft
Cft
P. Cft
31.00 Cft
3.00 Cft
34.00 Cft
P. Cft
550.00
1.60
0.57
4.10
0.60
6.87
Nos
Bag
Bag
Bag
Bag
Bags
10.00
3.84
4.26
15.40
1.50
35.00
Page 16
b)
Detail
(1:3:6)
Bitumen
Fuel
Kail wood centring
Rate
Per Unit (Rs.)Amount (Rs.)
34Lbs(15 .43) Kg
0.2Mds(7 .44) Kg
0.411 Cft.
Total
Contractor's Profit & Ove 20
Total
P. Kg
P. Kg
P. Cft
Percent
Labour
Rate Analysis for 125 Sft
Masons
Carpenter
Unskilled Coolies
Bahishti
Total
Sundries
Total
10
Percent
Percent
2.75
0.50
5.50
1.00
Nos
No
Nos
No
P.
P.
P.
P.
Day
Day
Day
Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 17
DESCRIPTION
OF
ITEM NO
8:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Rate Analysis for 125 Sft
Masons
Carpenter
Total
Sundries
Total
1.00 No
1.00 No
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate for Per 1
Rs.
Rs.
Page 18
DESCRIPTION
OF
ITEM NO
9:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Cement
Sand
Shingle
Kail wood
7.46
28.00
56.00
0.411
Total
Contractor's Profit & Ove 20
Total
Bags
Cft
Cft
Cft.
P.
P.
P.
P.
Bag
Cft
Cft
Cft
Percent
Labour
Masons
Coolies
Coolies
Coolies
Coolies
for
for
for
for
0.50
3.00
3.00
2.00
1.00
Carpenter
Bahishti
Total
Sundries
Total
No
Nos
Nos
Nos
No
1.00 No
1.00 No
10
Percent
Percent
P.
P.
P.
P.
P.
Day
Day
Day
Day
Day
P. Day
P. Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 19
DESCRIPTION
OF
ITEM NO
10:
a)
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Earth lead upto 100' (30 M) and lift upto
20' (6 M)
Bhoosa
Clay
Cowdung
Total
Contractor's Profit & Ove 20
Total
33
17Lbs(15
0.75
0.75Cft (
Cft
.81) Kg
Cft
15) Kg
P. Cft
P. Kg
P. Cft
P % Kg
Percent
Labour
Rate Analysis for 125 Sft
Bahishti
Coolies for lifting and ramming earth
Mason
Total
Sundries
Total
10
Percent
Percent
0.12 No
1.00 No
0.12 No
P. Day
P. Day
P. Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 20
Item No.
10
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Earth lead upto 100' (30 M) and lift upto
20' (6 M)
Bhoosa
Fine clay for gobri
Cowdung
Total
Contractor's Profit & Ove 20
Total
43
17Lbs(15
0.75
0.75 Cft (
Cft
.81) Kg
Cft
15) Kg
P. Cft
P. Kg
P. Cft
P % Kg
Percent
Labour
Bshishti
Coolies for lifting and ramming earth
Mason
Total
Sundries
Total
10
Percent
Percent
0.18 No
1.00 No
0.12 No
P. Day
P. Day
P. Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 21
DESCRIPTION
OF
ITEM
NO
11:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Fine clay
Cowdung
0.75 Cft
0.75 Cft ( 15) Kg
Total
Contractor's Profit & Ove 20
Total
P. Cft
P. 100
Percent
Labour
Rate Analysis for 150 Sft
Mason
Bahishti
Sundries
Total
0.12 No
0.06 No
P. Day
P. Day
Total
10 Percent
Percent
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 22
DESCRIPTION
OF
ITEM NO
12:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Bitumen
Sand
Fuel wood
34Lbs(15 .43) Kg
1.00 Cft
0.12Mds( 4.46)Kg
Total
Contractor's Profit & Ove 20
Total
P. Kg
P. Cft
P. Kg
Percent
Labour
Rate for
Cooly for heating & laying
Total
Sundries
Total
125
Sft
1.00 No
10
Percent
Percent
P. Day
Item Rates
Labour Rate for Per 1
Labour Rate for P/ Sq
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 23
DESCRIPTION
OF
ITEM NO
13:
a)
20
Detail
S. W. G.
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Sheets of 20 gauge
= 100 Sft.
wastage & overlaping @ 20% = 20 Sft
=120 Sft 2Cwt (102 .65) Kg
Wind tie (rod)
22Lbs(9 .98) Kg
G.I. bolts and nuts
2.00 Doz
Limpet washers
2.00 Doz
G.I. Hook, bolts & nuts
1.50 Doz
Bitumen washers
3.85 Doz
Charcoal
4 Sr. (3. 75) Kg
Total
Contractor's Profit & Ove 20
Total
P. Kg
P. Kg
Doz
Doz
Doz
Doz
P. Kg
Percent
1.00 No
1.00 No
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 24
Item No.
13
22
Detail
S. W. G.
Rate
Per Unit (Rs.)Amount (Rs.)
Material
C.G.I. Sheets of 22 gauge including over
lapping and wastage.
120 Sft
Wind tie (rod)
G.I. bolts and nuts
Limpet washers
G.I. Hook, bolts & nuts
Bitumen washers
Charcoal
Total
Contractor's Profit & Ove 20
Total
1.7Cwt (8 6.39)Kg
P. Kg
22Lbs(9
2.00
2.00
1.50
3.82
4 Sr. (3.
P. Kg
Doz
Doz
Doz
Doz
P. Kg
.98) Kg
Doz
Doz
Doz
Doz
72) Kg
Percent
1.00 No
1.00 No
10
Percent
Percent
0.00 P. Day
0.00 P. Day
Item Rates
Labour Rate for Per 1
Labour Rate for P/ Sq
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 25
Item No.
13
24
Detail
S. W. G.
Rate
Per Unit (Rs.)Amount (Rs.)
Material
C.G.I. Sheets of 24 gauge including over
lapping and wastage.
120 Sft
1.34Cwt(6 8.10)Kg
P. Kg
Wind tie
G.I. bolts and nuts
Limpet washers
G.I. Hook, bolts & nuts
Bitumen washers
Charcoal
22Lbs(9
2.00
2.00
1.50
3.82
4 Sr. (3.
P. Kg
Doz
Doz
Doz
Doz
P. Kg
Total
Contractor's Profit & Ove 20
Total
.98) Kg
Doz
Doz
Doz
Doz
72) Kg
Percent
Labour
Rate
for
150
Sft
Blacksmith
Cooly
Total
Sundries
Total
1.00 No
1.00 No
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 26
DESCRIPTION
OF
ITEM NO
14:
Detail
Rate Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
15 Rft
Material
Cement for " (12mm) plaster
Cement for floating
Cement for side filling
0.18
0.06
0.26
0.50
1.10
Sand
Total
Contractor's Profit & Ove 20
Total
Bag
Bag
Bag
Bags
Cft
P. Bag
P. Cft
Percent
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
0.67 No
0.67 No
0.09 No
10
Percent
Percent
P. Day
P. Day
P. Day
Item Rates
Labour Rate Per Rft
Labour Rate for Per R
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 27
DESCRIPTION
OF
ITEM NO
15:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Cement
Sand
Aggregate (Stone)
0.20 Bag
0.55 Cft
1.25 Cft
Total
Contractor's Profit & Ove 20
Total
P. Bag
P. Cft
P. Cft
Percent
0.20 No
0.20 No
0.05 No
10
Percent
Percent
P. Day
P. Day
P. Day
Item Rates
Labour Rate for Each
Rs.
Say
Rs.
Say
Page 28
DESCRIPTION
OF
ITEM NO
16:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Cement
Sand
Brick Aggregate
Bricks
0.37
2.00
2.00
42.00
Total
Contractor's Profit & Ove 20
Total
Bag
Cft
Cft
No
P. Bag
P. Cft
P. Cft
1000 N
Percent
Labour
Rate Analysis
for
1.25 No.
Mason
Cooly
Bahishti
Total
Sundries
Total
0.20 No
0.20 No
0.05 No
10
Percent
Percent
P. Day
P. Day
P. Day
Item Rates
Labour Rate for Each
Rs.
Rs.
Page 29
Say
Say
DESCRIPTION
OF
ITEM NO
17:
a)
Detail
Qty
Rate
Per Unit (Rs.)Amount (Rs.)
Material
G.I. sheets =
1.05 Sft
Add. 10% for joints and wastage 0.10 Sft
1.15 Sft @ 1.31 Lbs/Sft
Add for clamps bolts nuts and rivets.
Total
Contractor's Profit & Ove 20
Total
1.5Lbs(0. 68) Kg
0.125 Kg
P. Kg
P. Kg.
Percent
Labour
Rate Analysis
Blacksmith
Unskilled Cooly
Mason
Total
Sundries
Total
for
1.25 Rft
0.03 No
0.03 No
0.03 No
10
Percent
Percent
P. Day
P. Day
P. Day
Item Rates
Labour Rate Per Rft
Labour Rate for Per R
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 30
DESCRIPTION
OF
ITEM NO
17:
b)
Detail
Qty
Rate
Per Unit (Rs.)Amount (Rs.)
Material
G.I. sheets
1.31 Sft
Add. 10% for joints and wastage 0.13 Sft
1.44 Sft @ 1.31 Lbs/Sft
Add for clamps bolts nuts and rivets.
Total
Contractor's Profit & Ove 20
Total
1.90Lbs(0 .86) Kg
0.125 Kg
P. Kg
P. Kg.
Percent
0.03 No
0.03 No
0.03 No
10
Percent
Percent
P. Day
P. Day
P. Day
Item Rates
Labour Rate Per Rft
Labour Rate for Per R
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 31
DESCRIPTION
OF
ITEM NO
18:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
G.I. sheets
1.00 Lbs
22 guage
0.96 Sft
0.96 Sft @ 1.31 Lbs/Sft
Fixture
Total
Contractor's Profit & Ove 20
Total
1.26Lbs(0 .57) Kg
L.S.
P. Kg
Percent
0.03 No
0.03 No
0.03 No
10
Percent
Percent
P. Day
P. Day
P. Day
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 32
DESCRIPTION
OF
ITEM NO
19:
Providing and fixing 1/16" (1.5mm) thick lead
flashing over roof expansion joint complete in all
respects.
Detail
Rate Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
100 Sft
Material
Lead flashing 1/16" thick
Nails (Copper) etc.
100.00 Sft
1.00 Kg.
Total
Contractor's Profit & Ove 20
Total
Sft
P. Kg.
Percent
Labour
Driller
Helper
Total
Sundries
Total
1.00 No
1.00 No
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 33
DESCRIPTION
OF
ITEM NO
20:
a)
Detail
Rate Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
6 Rft
Material
C.I. pipe 4" (100mm) dia
Hold fasts with bolts
Cement mortar for fixing hold fast
Cement
Sand
Pig lead
Paint
6.00 Rft
1.00 No
0.07
0.58
0.5Lbs(0
0.05
Total
Contractor's Profit & Ove 20 Percent
Total
Rate per Rft
Bag
Cft
.23) Kg
Gln
P. Rft
Each
Bag
% Cft.
P. Kg
P. Gln
0.00
6
Labour
Unskilled Cooly
Mason
Total
Sundries
Total
0.20 No
0.20 No
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 34
Item No.
20
Detail
Rate Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
6 Rft
Material
C.I. pipe down 3" (75mm) dia
Hold fasts with bolts
Cement mortar for fixing hold fast
Cement
Sand
Pig lead
Paint
6.00 Rft
1.00 No
0.048
0.39
0.5Lbs(0
0.03
Total
Contractor's Profit & Ove 20 Percent
Total
Rate for One Reft
Bag
Cft
.23) Kg
Gln
P. Rft
Each
Bag
% Cft.
P. Kg
P. Gln
0.00
6
Labour
Cooly
Mason
Total
Sundries
Total
0.20 No
0.20 No
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 35
DESCRIPTION
OF
ITEM NO
21:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
C.I. Heads 4"
Clamps with hold fasts etc.
Cement
Sand
Pig lead
Paint
1.00
1.00
0.05
0.29
0.5Lbs(0
0.01
No
No
Bag
Cft
.23) Kg
Gln
Each
Each
Bag
% Cft.
P. Kg
P. Gln
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Cooly
Mason
Pipe fitter
Total
Sundries
Total
0.09 No
0.09 No
0.09 No
10
Percent
Percent
P. Day
P. Day
P. Day
Item Rates
Labour Rate for Each
Rs.
Say
Composite Rate
Rs.
Say
for E
Page 36
DESCRIPTION
OF
ITEM NO
22:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
C.I. shoes bend or offsets
Pig lead
Paint
4"
1.00 No
0.5Lbs ( 0.23)Kg
0.01 Gln
Each
P. Kg
P. Gln
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Pipe fitter
Cooly
Total
Sundries
Total
0.05 No
0.05 No
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate for Each
Rs.
Say
Composite Rate
Rs.
Say
for E
Page 37
DESCRIPTION
OF
ITEM NO
23:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
G.I. sheets 22 gauge length 28" (712mm)
and width 6" (150mm)
28 x 6
=
1.17 Sft
12 x 12
Cost of cement mortor for fixing
Cement
Sand
1.28Lbs ( 0.68)Kg
P. Kg
0.048 Bag
0.39 Cft
Bag
% Cft.
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Cooly
Mason
Blacksmith
Total
Sundries
Total
0.10 No
0.10 No
0.10 No
10
Percent
Percent
P. Day
P. Day
P. Day
Item Rates
Labour Rate for Each
Rs.
Say
Composite Rate
Rs.
Say
for E
Page 38
DESCRIPTION
OF
ITEM NO
24:
Detail
Rate Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
100 Sft
Material
Deodar wood
Screw 11/2" long
Nails of sorts
5.00 Cft
4.50 Doz
1.6488Sr (1. 64) Kg
P. Cft
Doz
P. Kg
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Unskillied Cooly
Carpenter
Total
Sundries
Total
3.00 Nos
4.00 Nos
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 39
DESCRIPTION
OF
ITEM NO
25:
a)
22
Detail
B. W. G.
Rate Analysis
Sheets Roofing.
Rate
Per Unit (Rs.)Amount (Rs.)
Material
a) 22 B.W.G. sheet of size 6'x4' (1.8x1.20
M) in 400 sft (40 Sm) area including over
lapping and wastage 25% for 100 sft
5.85/4 = 1.46 cwt .
Wastage 25% (400+25%) 500 Sft
@ 1.12 Lbs/Sft
Rolls 5" (0.125m) wide 16' (4.86 M)
long or
16x5x7/12 = 0.54/4 = 0.14
Deodar wood for battens 2"x1" size 7
Nos of 16' length =
Add. 23% wastage
7x16x1/6x1/8.
Bolts, nuts
Limpet Washer
U.I. Clips
Total
Contractor's Profit & Ove 20
Total
5.85Cwt(29 7.20)Kg
P. Kg
P. Kg
2.33 Cft
0.58 Cft
2.91 Cft
P. Cft
1.00 Kg.
4.00 Doz.
1.29 Kg.
P. Kg.
Doz.
Per Kg
Percent
0.00
4
Page 40
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Rate Analysis for 500 Sft
Cooly
Carpenter
Blacksmith
Total
Sundries
Total
12.00 Nos
1.50 Nos
8.00 Nos
10
Percent
Percent
P. Day
P. Day
P. Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 41
Item No.
25
b)
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
560 Lbs
52.64 Lbs
254.08 Kg
23.88 Kg
2.90 Cft
1.60 Kg.
1.29 Kg.
P.
P.
P.
P.
P.
Kg
Sft
Cft
Kg.
Kg.
Total
Contractor's Profit & Ove 20 Percent
Total
Rate for 100 Sft
Labour
0.00
4
12.00 Nos
1.50 No
8.00 Nos
10
Percent
Percent
P. Day
P. Day
P. Day
0.00
5
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 42
DESCRIPTION
OF
ITEM NO
26:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Corrugated A.C. sheets with 25% over
lapping and wastage.
G.I. or limpet washers and bilumatic
washers.
G.I. bolts with nuts.
G.I. hook bolts and nuts 6"x5/16"
125 Sft
P. Sft
7 Doz
2 Doz
1.5 Doz
Doz
Doz
Doz
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Rate
for
150
Sft
Cooly
Carpenter
Total
Sundries
Total
2.00 Nos
1.00 No
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 43
DESCRIPTION
OF
ITEM NO
27:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
0.50 No
0.06 No
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate Per 100 S
Rs.
Say
Rs.
Say
Page 44
DESCRIPTION
OF
ITEM NO
28:
Detail
Rate Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
61 Rft
Material
A.C. ridge sheet for a shed of 60'x30'
(18x15 M) or 61 Rft
G.I. bolts and nut with washers
Bituminous washer
61.00 Rft
5.00 Doz
5.00 Doz
P. Rft
Doz
Doz
Total
Contractor's Profit & Ove 20 Percent
Total
Rate Per Rft
0.00
61
Labour
Rate Analysis for 100 Rft
Cooly
Carpenter
Total
Sundries
Total
2.00 Nos
1.50 No
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 45
DESCRIPTION
OF
ITEM NO
29:
a)
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
G.I. Sheet 22 gauge
10% for over lapping
1.50 Sft
0.15 Sft
1.65 Sft
1.85 Lbs
0.84 Kg
0.08 Cft
P. Kg
P. Cft
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Cooly
Carpenter
Blacksmith
Total
Sundries
Total
0.03 No
0.03 No
0.03 No
10
Percent
Percent
P. Day
P. Day
P. Day
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 46
Item No.
29
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
G.I. Sheet 24 gauge
10% for over lapping
2.31 Sft @ 0.83 Lbs/Sft
Deodar wood
2.10 Sft
0.21 Sft
=
1.94 Lbs
2.31 Sft
0.88 Kg
0.07 Cft
P. Kg
P. Cft
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Cooly
Carpenter
Blacksmith
Total
Sundries
Total
0.06 No
0.03 No
0.03 No
10
Percent
Percent
P. Day
P. Day
P. Day
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 47
Item No.
29
Detail
Rft
Rate
Per Unit (Rs.)Amount (Rs.)
Material
22 Gauge G.I. Sheet
Add 10% for over lapping
2.75 Sft @ 1.12 Lbs/Sft
Deodar wood
2.50 Sft
0.25 Sft
=
3.08 Lbs
Total
Contractor's Profit & Ove 20
Total
1.40 Kg
0.07 Cft
2.75 Sft
P. Kg
P. Cft
Percent
Labour
Cooly
Carpenter
Blacksmith
Total
Sundries
Total
0.06 No
0.03 No
0.03 No
10
Percent
Percent
P. Day
P. Day
P. Day
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 48
DESCRIPTION
OF
ITEM NO
30:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
G.I. Sheet
(22 Guage)
Wrought iron bracket complete with bolts,
Nuts and rivets etc.
1.38Lbs(0 .63) Kg
P. Kg
1.00 No
Each
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Cooly
Blacksmith
Total
Sundries
Total
0.03 No
0.03 No
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 49
DESCRIPTION
OF
ITEM NO
31:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Pacca bricks
Cement
Sand
50.00 Nos
0.17 Bag
0.88 Cft
Per
1000 N
P. Bag
P. Cft
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Rate Analysis for 1.5 No.
Cooly
Mason
Total
Sundries
Total
1.00 No
1.00 No
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate for Each
Rs.
Say
Rs.
Say
Page 50
DESCRIPTION
OF
ITEM NO
32:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
0.25 No
0.25 No
10
Percent
Percent
Item Rates
Labour Rate for Each
Rs.
Page 51
Say
DESCRIPTION
OF
ITEM NO
33:
Detail
Rate Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
100 Rft
Material
Ready mortar 100 Rft
100x1/6x1/24 = 0.69 Cft
Cement
0.75
=
3
Sand
Total
Contractor's Profit & Ove 20
Total
0.20 Bag
P. Bag
0.50 Cft
P. Cft
Percent
0.00
100
Labour
Rate Analysis
Unskilled Cooly
Mason
Bahishti
for
150 Rft
1.00 No
1.00 No
0.03 No
P. Day
P. Day
P. Day
0.13 No
0.44 No
P. Day
P. Day
10
Percent
Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Metre
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 52
DESCRIPTION
OF
ITEM NO
34:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
G.I. sheet 20 gauge 2'x1'= 2Sft @ 1.44Lbs
Bitumen for paint
Polythene film 300 gauge
4 Nos x 3" (75mm) long 3/8" (10mm)
dia bar
=
0.18 Rft
2.88Lbs(1 .31) Kg
2.72Lbs(1 .23) Kg
0.05Lbs(0 .03) Kg
P. Kg
P. Kg
P. Kg
0.03 Kg
P. Kg
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Rate Analysis for 2 Sft
Cooly
placing in position
Blacksmith for cutting of G.I. sheet
Welding of bars 4 points
Total
Sundries
Total
10
Percent
Percent
0.02 No
0.03 No
4.00 Nos
P. Day
P. Day
P. Poi
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 53
DESCRIPTION
OF
ITEM NO
35:
i)
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Brick tiles 9"x4"x1" (225x112.5x40mm)
Sand
Cement
Bitumen
Earth
Polythene 0.03" (0.08mm) including
wastage 5%
Thermopore " (12mm) thick 1/c 5%
wastage
Total
Contractor's Profit & Ove 20
Total
Per
1000 N
P. Cft
P. Bag
P. Kg
P. Cft
1.58Lbs(0 .72) Kg
P. Kg
105.00 Sft
P. Sft
350.00
2.00
0.50
34Lbs(15
20.00
Nos
Cft
Bag
.43) Kg
Cft
Percent
Labour
Plasterer
Mason for laying
Mason for grouting
0.13
0.50
0.13
0.75
No
No
No
No
P. Day
0.50
0.75
0.25
1.50
No
No
No
Nos
P. Day
Page 54
i)
Detail
0.50 No
0.50 No
10
Percent
Percent
Rate
Per Unit (Rs.)Amount (Rs.)
P. Day
P. Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 55
Item No.
35
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Clay tiles 9"x4"x1" (225x112.5x40mm)
Sand
Cement
Bitumen
Earth
Polythene 0.03" (0.08mm) 1/c
wastage 5%
Thermopore " (19mm) thick 1/c 5%
wastage
Total
Contractor's Profit & Ove 20
Total
Per
1000 N
P. Cft
P. Bag
P. Kg
P. Cft
1.58Lbs(0 .72) Kg
P. Kg
105.00 Sft
P. Sft
350.00
2.00
0.50
34Lbs(15
20.00
Nos
Cft
Bag
.43) Kg
Cft
Percent
Labour
Plasterer
Mason for laying
Mason for grouting
0.13
0.50
0.13
0.75
0.75
No
No
No
No
Say
0.50
0.75
0.25
1.50
No
No
No
Nos
Page 56
P. Day
P. Day
ii)
Detail
0.50 No
0.50 No
10
Percent
Percent
Rate
Per Unit (Rs.)Amount (Rs.)
P. Day
P. Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 57
Item No.
35
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Brick tiles 9"x4"x1" (225x112.5x40mm)
Sand
Cement
Bitumen
Earth
Polythene 0.03" (0.08mm) 1/c
wastage 5%
Thermopore 1" (13mm) thick 1/c 5%
wastage
Total
Contractor's Profit & Ove 20
Total
Per
1000 N
P. Cft
P. Bag
P. Kg
P. Cft
1.58Lbs(0 .72) Kg
P. Kg
105.00 Sft
P. Sft
350.00
2.00
0.50
34Lbs(15
20.00
Nos
Cft
Bag
.43) Kg
Cft
Percent
Labour
Plasterer
Mason for laying
Mason for grouting
0.13
0.50
0.13
0.76
No
No
No
No
P. Day
0.50
0.75
0.25
1.50
No
No
No
Nos
P. Day
Page 58
Item No.
35
iii)
Detail
0.50 No
0.50 No
10
Percent
Percent
Rate
Per Unit (Rs.)Amount (Rs.)
P. Day
P. Day
Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 59
DESCRIPTION
OF
ITEM NO
36:
Detail
Rate Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
13 Rft
Material
A.C. pipe 4" (100mm) dia
A.C. T-bend 4" (100mm) dia
A.C. shoe
Clamps & Nuts
13.00
1.00
1.00
2.00
Total
Contractor's Profit & Ove 20
Total
Rft
No
No
Nos
P. Rft
Each
Each
Each
Percent
0.00
13
Labour
Rate Analysis
Plumber
Unskilled Cooly
Total
Sundries
Total
for
20 Rft
0.20 No
0.20 No
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 60
DESCRIPTION
OF
ITEM NO
37:
i)
Detail
Rate Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
40 Rft
Material
Cement for repairing Jharry
Sand
Total
Contractor's Profit & Ove 20
Total
0.11 Bag
0.57 Cft.
Bag
% Cft.
Percent
0.00
40
Labour
Rate Analysis
for
50 Rft
Mason
Total
Sundries
Total
1.00 No
10
Percent
Percent
P. Day
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 61
Item No.
37
Detail
Rate Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
40 Rft
Material
Cement
Sand
0.20 Bag
1.15 Cft.
Total
Contractor's Profit & Ove 20
Total
0.00
40
50 Rft
Mason
Cooly
Total
Sundries
Total
Percent
Labour
Rate Analysis
Bag
% Cft.
1.50 No
0.25 No
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 62
DESCRIPTION
OF
ITEM NO
38:
i)
Detail
Rate Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
12 Holes
Material
Cement
Sand
0.111 Bag
0.57 Cft.
Total
Contractor's Profit & Ove 20
Total
Bag
% Cft.
Percent
Labour
Mason
Total
Sundries
Total
1.00 No
10
Percent
Percent
P. Day
Item Rates
Labour Rate for Each
Rs.
Say
Rs.
Say
Page 63
Item No.
38
Detail
Rate Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
25 Holes
Material
Cement
Sand
0.111 Bag
0.57 Cft.
Total
Contractor's Profit & Ove 20
Total
Bag
% Cft.
Percent
Labour
Mason
Total
Sundries
Total
1.00 No
10
Percent
Percent
P. Day
Item Rates
Labour Rate for Each
Rs.
Say
Rs.
Say
Page 64
DESCRIPTION
OF
ITEM NO
39:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Mason
Unskilled Coolies
Total
Sundries
Total
0.20 No
0.60 No
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate for Each
Rs.
Page 65
Rs.
DESCRIPTION
OF
ITEM NO
40:
Detail
Rate Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
35 Nos
Labour
Mason
Unskilled Coolies
Total
Sundries
Total
1.00 No
1.00 No
10
Percent
Percent
P. Day
P. Day
Item Rates
Labour Rate for Each
Rs.
Page 66
Rs.
DESCRIPTION
OF
ITEM NO
41:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Mason
Unskilled Coolies
Total
Sundries
Total
1.00 No
3.00 Nos
10
Percent
Percent
70 Nos
25 Nos
P. Day
P. Day
0.00
70
Say
0.00
50
Say
0.00
40
Say
0.00
30
Say
0.00
25
Say
Page 67
DESCRIPTION
OF
ITEM NO
42:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Mason
Unskilled Coolies
Total
Sundries
Total
1.00 No
3.00 Nos
10
Percent
Percent
25 Nos
P. Day
P. Day
0.00
25
Say
0.00
20
Say
0.00
15
Say
0.00
13
Say
0.00
12
Say
0.00
11
Say
0.00
10
Say
0.00
9
Say
Page 68
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
0.00
7
Say
0.00
6.5
Say
0.00
6
Say
Page 69
DESCRIPTION
OF
ITEM NO
43:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Mason
Unskilled Coolies
Total
Sundries
Total
1.00 No
4.00 Nos
10
Percent
Percent
40 Nos
P. Day
P. Day
0.00
40
Say
0.00
18
Say
0.00
15
Say
0.00
12
Say
0.00
11
Say
0.00
10
Say
0.00
8
Say
0.00
5
Say
Page 70
DESCRIPTION
OF
ITEM NO
44:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Cement
Sand
Aggregate
0.25 Bag
1.26 Cft
2.53 Cft
P. Bag
P. Cft
P. Cft
Total
Total
Percent
Sundries
Total
0.40 No
0.40 No
P. Day
P. Day
Total
10 Percent
Percent
Item Rates
Labour Rate for Each
Rs.
Say
Rs.
Say
Page 71
CHAPTER NO. 15
SHEET PILING
1
2
3
DESCRIPTION
OF
ITEM NO
1:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.25 No
10
Percent
20
Percent
0.00 P. Day
Item Rates
Labour Rate Per Cut
Rs.
Page 1
0.00
1.25
0.00
Say
DESCRIPTION
OF
ITEM NO
2:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.37 No
10
Percent
20
Percent
0.00 P. Day
Item Rates
Labour Rate Per Cut
Rs.
Page 2
0.00
1.25
0.00
Say
DESCRIPTION
OF
ITEM NO
3:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Total
Sundries
Total
Contractor's Profit & Ov
Total rate for 125 Sft
4.25 Nos
2.00 Nos
10
Percent
20
Percent
0.00 P. Day
0.00 P. Day
Item Rates
Labour Rate Per 100 Sft
Rs.
Rs.
Page 3
0.00
1.25
0.00
Say
0.00
Say
DESCRIPTION
OF
ITEM NO
4:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Total
Sundries
Total
Contractor's Profit & Ov
Total rate for 125 Sft
4.00 Nos
2.00 Nos
10
Percent
20
Percent
0.00 P. Day
0.00 P. Day
Item Rates
Labour Rate Per 100 Sft
Rs.
0.00
1.25
0.00
Say
0.00
Say
Page 4
DESCRIPTION
OF
ITEM NO
5:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Total
Sundries
Total
Contractor's Profit & Ov
Total rate for 125 Sft
2.50 Nos
2.00 Nos
10
Percent
20
Percent
0.00 P. Day
0.00 P. Day
Item Rates
Labour Rate Per 100 Sft
Rs.
0.00
1.25
0.00
Say
0.00
Say
Page 5
DESCRIPTION
OF
ITEM NO
6:
Dolleying piles.
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.20 No
0.20 No
10
Percent
20
Percent
0.00 P. Day
0.00 P. Day
Item Rates
Labour Rate for Each
Rs.
Page 6
0.00
1.25
0.00
Say
DESCRIPTION
OF
ITEM NO
7:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.33 No
10
Percent
20
Percent
0.00 P. Day
Item Rates
Labour Rate for Each
Rs.
Page 7
0.00
12
0.00
Say
DESCRIPTION
OF
ITEM NO
8:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00 No
4.00 Nos
2.00 Nos
10
Percent
20
Percent
0.00 P. Day
0.00 P. Day
0.00 P. Day
Item Rates
Labour Rate Per Foot
Rs.
Rs.
Page 8
0.00
1.5
0.00
Say
0.00
Say
DESCRIPTION
OF
ITEM NO
9:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00 No
3.00 Nos
5.00 Nos
10
Percent
20
Percent
0.00 P. Day
0.00 P. Day
0.00 P. Day
Item Rates
Labour Rate Per Job
Rs.
Page 9
0.00
1.25
0.00
Say
DESCRIPTION
OF
ITEM NO
10:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00 No
5.00 Nos
5.00 Nos
10
Percent
20
Percent
0.00 P. Day
0.00 P. Day
0.00 P. Day
Item Rates
Labour Rate Per Job
Rs.
Page 10
0.00
1.25
0.00
Say
DESCRIPTION
OF
ITEM NO
11:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00 No
7.00 Nos
7.00 Nos
10
Percent
20
Percent
0.00 P. Day
0.00 P. Day
0.00 P. Day
Item Rates
Labour Rate Per Job
Rs.
Page 11
0.00
1.25
0.00
Say
DESCRIPTION
OF
ITEM NO
12:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.25 Nos
8.00 Nos
8.50 Nos
10
Percent
20
Percent
0.00 P. Day
0.00 P. Day
0.00 P. Day
Item Rates
Labour Rate Per Chain
Rs.
Rs.
Page 12
0.00
1.25
-0.05
Say
-0.05
Say
DESCRIPTION
OF
ITEM NO
13:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Total
Sundries
Total
Contractor's Profit & Ov
Total
0.37 No
10
Percent
20
Percent
0.00 P. Day
Item Rates
Labour Rate Per Ton
Rs.
Rs.
Page 13
0.00
1.25
0.00
Say
-0.05
Say
DESCRIPTION
OF
ITEM NO
14:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Total
Sundries
Total
Contractor's Profit & Ov
Total
3.00
18.00
12.00
9.50
10
Percent
20
Percent
Nos
Nos
Nos
Nos
0.00
0.00
0.00
0.00
P.
P.
P.
P.
Day
Day
Day
Day
Item Rates
Labour Rate for Each
Rs.
Page 14
0.00
1.5
0.00
Say
DESCRIPTION
OF
ITEM NO
15:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Total
Sundries
Total
Contractor's Profit & Ov
Total
3.00
18.00
12.00
9.50
10
Percent
20
Percent
Nos
Nos
Nos
Nos
0.00
0.00
0.00
0.00
P.
P.
P.
P.
Day
Day
Day
Day
Item Rates
Labour Rate for Each
Rs.
Page 15
0.00
1.3
0.00
Say
DESCRIPTION
OF
ITEM NO
16:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Total
Sundries
Total
Contractor's Profit & Ov
Total
1.00 No
2.50 Nos
3.75 Nos
10
Percent
20
Percent
Item Rates
Labour Rate Per Chain
Rs.
Page 16
Rs.
0.00 P. Day
0.00 P. Day
0.00 P. Day
0.00
1.25
0.00
Say
0.00
Say
CHAPTER NO. 22
SINKING OF WELLS
DESCRIPTION
Item No.
OF
ITEM:
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within
A)
i)
Qty
Amount
3.00
4.43
Nos
7.43
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 1
Item No.
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
A)
ii)
Detail
Qty
Amount
3.00
4.76
Nos
7.76
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 2
Item No.
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
A)
iii)
Detail
Qty
Amount
3.00
5.73
Nos
8.73
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 3
Item No.
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
A)
iv)
Detail
Qty
Amount
3.00
7.02
Nos
10.02
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 4
Item No.
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
B)
i)
In
Hard
Soil.
Detail
Qty
Amount
4.00
5.05
Nos
9.05
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 5
Item No.
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
B)
In
ii)
Hard
Soil.
to 10' (3 M) depth
Detail
Qty
Amount
4.00
5.46
Nos
9.46
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 6
Item No.
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
B)
In
iii)
Hard
Soil.
Detail
Qty
Amount
4.00
6.34
Nos
10.34
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 7
Item No.
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
B)
In
iv)
Hard
Soil.
Detail
Qty
Amount
4.00
7.63
Nos
11.63
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 8
Item No.
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
C)
i)
In
Hard
Detail
Qty
Amount
4.00
15.52
Nos
Total
19.52
Nos.
Sundries
10.00
Percent
Percent
Nos
-
Per day
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 9
Item No.
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
C)
In
ii)
Hard
Detail
Qty
Amount
4.00
16.22
Nos
Total
20.22
Nos.
Sundries
10.00
Percent
Percent
Nos
-
Per day
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 10
Item No.
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
C)
In
iii)
Hard
Detail
Qty
Amount
4.00
17.08
Nos
21.08
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 11
Item No.
Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
C)
In
iv)
Hard
Detail
Qty
Amount
4.00
18.63
Nos
22.63
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 12
DESCRIPTION
Item No.
OF
ITEM :
Dry sinking of well including loading and removing excavated material, within one chain (30 metre).
A)
In ordinary soil.
i)
Detail
Qty
Amount
10.00
30.00
Nos
40.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 13
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
A)
In ordinary soil.
ii)
Detail
Qty
Amount
10.00
40.00
Nos
50.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 14
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
A)
In ordinary soil.
iii)
Detail
Qty
Amount
10.00
50.00
Nos
60.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 15
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
A)
In ordinary soil.
iv)
Detail
Qty
Amount
10.00
60.00
Nos
70.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 16
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
A)
In ordinary soil.
v)
Detail
Qty
Amount
10.00
70.00
Nos
80.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 17
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
A)
In ordinary soil.
vi)
Detail
Qty
Amount
10.00
80.00
Nos
90.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 18
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
A)
In ordinary soil.
vii)
Detail
Qty
Amount
10.00
90.00
Nos
100.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 19
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
A)
In ordinary soil.
viii)
Detail
Qty
Amount
10.00
100.00
Nos
110.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 20
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
B)
In Hard Soil.
i)
Detail
Qty
Amount
25.00
30.00
Nos
55.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 21
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
B)
In Hard Soil.
ii)
Detail
Qty
Amount
25.00
40.00
Nos
65.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 22
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
B)
In Hard Soil.
iii)
Detail
Qty
Amount
25.00
50.00
Nos
75.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 23
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
B)
In Hard Soil.
iv)
Detail
Qty
Amount
25.00
60.00
Nos
85.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 24
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
B)
In Hard Soil.
v)
Detail
Qty
Amount
25.00
70.00
Nos
95.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 25
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
B)
In Hard Soil.
vi)
Detail
Qty
Amount
25.00
80.00
Nos
105.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 26
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
B)
In Hard Soil.
vii)
Detail
Qty
Amount
25.00
90.00
Nos
115.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 27
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
B)
In Hard Soil.
viii)
Detail
Qty
Amount
25.00
100.00
Nos
125.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 28
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
C)
i)
Detail
Qty
Amount
40.00
35.00
Nos
75.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 29
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
C)
ii)
Detail
Qty
Amount
40.00
45.00
Nos
85.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 30
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
C)
iii)
Detail
Qty
Amount
40.00
55.00
Nos
95.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 31
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
C)
iv)
Detail
Qty
Amount
40.00
65.00
Nos
105.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
10.00
Percent
Percent
Total
Sundries
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 32
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
C)
v)
Detail
Qty
Amount
40.00
75.00
Nos
115.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 33
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
C)
vi)
Detail
Qty
Amount
40.00
85.00
Nos
125.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 34
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
C)
vii)
Detail
Qty
Amount
40.00
95.00
Nos
135.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 35
Item No.
Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
C)
viii)
Detail
Qty
Amount
40.00
105.00
Nos
145.00
Nos.
Total
Sundries
Nos
-
Per day
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 36
DESCRIPTION
Item No.
OF
ITEM:
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 Metre).
i)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
6.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
#######
Say
10621.65
Rs.
198.60
Say
198.60
Page 37
Item No.
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 metre).
ii)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
6.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 38
Item No.
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 metre).
iii)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
6.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 39
Item No.
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 metre).
iv)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
6.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 40
Item No.
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 metre).
v)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
6.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 41
Item No.
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 metre).
vi)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
6.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 42
Item No.
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 metre).
vii)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
6.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 43
Item No.
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 metre).
viii)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
6.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 44
Item No.
Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 metre).
ix)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
6.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 45
DESCRIPTION OF ITEM
Item No. 4
Wet Sinking of Well in cohesive soil (value of C more than 5) for depth below spring level including charges of
machinery, shoring, kentledge and removal of excavated soil within one chain (30 Metre).
Detail
Qty
A.
Amount
1.00
No.
Per No.
350.00
Rft.
Per Rft.
100.00
Nos.
er 100 Nos
15.00
Nos.
Each
0.38
0.40
Kg.
Kg.
P. Kg.
P. Kg.
4 Sleepers / planks
Cost of 15 Nos. sleeper @ Rs.
Each
0.00
Depriciation 1/6
=
0.00
Total
0.00
0.00
0.00=
50
0.00
15
5 Cotton waste
Grease
Total
Contractor's Profit & Ove 20.00
Total
Percent
0.00
0.00
#########
Cft.
0.00 x 350
26,000
Page 46
B.
a)
2.00
Nos.
Each
Running Cost
b)
Fuel etc.
Diesel Oil
1.137 Litre
gallon/Hrs/Pump
CREW
Driver
2.00
Nos.
0.00
4
10.00
Each
-
Percent
Page 47
Item No.
Wet sinking of well in cohesive soil (value of C more than 5) for depth below spring level including charges of
machinery, shoring kentledge and removal of excavated soil within one chain (30 metre).
(1)
i)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
0.00
x 1000
150
ITEM RATE
Composite Rate per 1000 Cft
Rs.
Say
0.00
Rs.
Say
0.00
Page 48
Item No.
1)
ii)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
0.00
x 1000
120
ITEM RATE
Composite Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 49
Item No.
(1)
iii)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
0.00
x 1000
100
ITEM RATE
Composite Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 50
Item No.
iv)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
0.00
x 1000
75
ITEM RATE
Composite Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 51
Item No.
v)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
0.00
x 1000
65
ITEM RATE
Composite Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 52
Item No.
vi)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
0.00
x 1000
60
ITEM RATE
Composite Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 53
Item No.
(1)
vii)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
0.00
x 1000
55
ITEM RATE
Composite Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 54
Item No.
viii)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
0.00
x 1000
53
ITEM RATE
Composite Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 55
Item No.
ix)
80' (24 M)
- to any depth
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
0.00
x 1000
50
ITEM RATE
Composite Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 56
DETAIL OF SLEEPERS
Detail
Qty
Amount
MATERIAL
Sleeper
15.00
Depreciation
Nos
1/6
Each
0.00
= -
50
ITEM RATE
Rate for
Sleeper
Rs.
Page 57
DESCRIPTION
OF
ITEM:
Item No. 5
Wet sinking of well in shingle, or gravel etc. for depth below spring level, including charges of machinery, sho
removal of excavated spoil within one chain load.
Detail
Rate
Per Unit
Qty
A.
Amount
1.00
No.
Per No.
350.00
Rft.
Per Rft.
100.00
Nos.
er 100 Nos
15.00
Nos.
Each
0.38
0.40
Kg.
Kg.
P. Kg.
P. Kg.
4 Sleepers / planks
Cost of 15 Nos. sleeper @ Rs.
Each
0.00
Depriciation 1/6
=
0.00
Total
0.00
0.00
0.00=
50
0.00
15
5 Cotton waste
Grease
Total
Contractor's Profit & Ove 20.00
Total
0.00
0.00
Percent
B.
a)
#########
Cft.
0.00 x 350
26000.00
2.00
Nos.
Each
4.00
4.00
0.00
Running Cost
b)
Fuel etc.
Diesel Oil
1.137 Litre
gallon/Hrs/Pump
CREW
Driver
2.00
Rft of Well
Nos.
4
Page 58
Each
-
Sundries
Total
10.00
Percent
Page 59
+ 0.00
0.00
0.00
0.00
0.00
Item No.
Wet sinking of well in shingle or gravel etc. for depths below spring
shoring, kentledge and removal of excavated soil with in one chain.
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
x 1000
(0.02)
110
Rs.
(0.02)
Say
0.00
Rs.
(0.01)
Say
0.00
Page 60
Item No.
Wet sinking of well in shingle or gravel etc. for depths below spring
shoring, kentledge and removal of excavated soil with in one chain.
Detail
Qty
Amount
Total
x 1000
90
Rs.
Say
0.00
Rs.
(0.01)
Say
0.00
Page 61
Item No. 5
Wet sinking of well in shingle or gravel etc. for depths below spring
shoring, kentledge and removal of excavated soil with in one chain.
iii)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
x 1000
75
ITEM RATE
Composite Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 62
Item No.
Wet sinking of well in shingle or gravel etc. for depths below spring
shoring, kentledge and removal of excavated soil with in one chain.
iv)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
x 1000
55
ITEM RATE
Composite Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 63
Item No.
Wet sinking of well in shingle or gravel etc. for depths below spring level including charges of machinery,
shoring, kentledge and removal of excavated soil with in one chain (30 metre).
v)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
x 1000
50
ITEM RATE
Composite Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 64
Item No.
Wet sinking of well in shingle or gravel etc. for depths below spring level including charges of machinery,
shoring, kentledge and removal of excavated soil with in one chain (30 metre)
vi)
50' (15 M)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
x 1000
45
ITEM RATE
Composite Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 65
Item No.
Wet sinking of well in shingle or gravel etc. for depths below spring level including charges of machinery,
shoring, kentledge and removal of excavated soil with in one chain (30 metre).
vii)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
x 1000
43
ITEM RATE
Composite Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 66
Item No.
Wet sinking of well in shingle or gravel etc. for depths below spring level including charges of machinery,
shoring, kentledge and removal of excavated soil with in one chain (30 metre).
viii)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
x 1000
42
ITEM RATE
Composite Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 67
Item No.
Wet sinking of well in shingle or gravel etc. for depths below spring level including charges of machinery,
shoring, kentledge and removal of excavated soil with in one chain (30 metre).
ix)
Detail
Qty
Amount
2.00
Nos
Per day
2 Coolies
4.00
Nos
Per day
3 Coolies skilled
1.00
Nos
Per day
Total
Sundries
10.00
Percent
Percent
Total
x 1000
38
ITEM RATE
Composite Rate per 1000 Cft.
Rs.
Say
0.00
Rs.
Say
0.00
Page 68
DESCRIPTION
OF
Item No.
ITEM:
Detail
Rate
Per Unit
Amount
Per Cft.
MATERIAL
Kikar Wood
1 x 12/3' x
2
(1
/3'
/3 + ) x 1
0.5
/3'
2.36
1.81
Cft
Cft.
=
2.36 Cft.
4.76
Kg
Per kg.
9.07
Kg.
Per Kg.
Total
Percent
Rs.
LABOUR
1 Carpenter
1.00
No
Per day
2 Cooly
1.00
No
Per day
3 Black Smith
0.50
No
Per day
4 Hammar Man
0.50
No
Per day
Total
Sundries
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per Cft.
Rs.
Say
0.00
Rs.
0.15
Say
0.15
Rs.
Say
0.00
Rs.
0.25
Say
0.25
Page 69
DESCRIPTION
OF
Item No.
ITEM:
Detail
Qty
Amount
LABOUR
1 Carpenter
0.40
No
Per day
Total
Sundries
10.00
Percent
Percent
Total
ITEM RATE
Labour Rate per Each
Rs.
Page 70
Say
0.00
DESCRIPTION OF ITEM:
Item No. 8
MAKING AND LAYING RCC WELL
Providing making and laying RCC Well Curb in position, using coarse sand, including all kinds of
form, moulds, curing, shuttering, rendering and finishing the exposed surface, (including screening
and washing of aggregrate.
(a)
MATERIAL
1
2
3
4
5
6
7
Cement
Sand (Lawrancepur)
Shingle (Bajri)
Bolts & Nuts
Partal Wood for Template
Tar Coal
Nails
Total
Contractor's Profit & Ove 20.00
Total
22.50
Bags
42.00
Cft
84.00
Cft
1.75
Kg.
1.20
Cft
20 .00 Lbs (9.07 Kg.
0.25 Lbs (0.11 Kg.)
Per
Per
Per
Per
Per
Per
Per
Bag
Cft.
Cft.
Kg.
Cft.
Kg.
Kg.
Per
Per
Per
Per
day
day
day
day
Percent
LABOUR
1
2
3
4
Mason
Carpenter
Coolies
Bahishties
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total Rate
6.00
6.00
13.00
3.00
Nos
Nos
Nos
Nos
ITEM RATE
Labour Rate per Cft.
Labour Rate per Cum
Composite Rate per Cft.
Composite Rate per Cum
Rs.
Rs.
Rs.
Rs.
Page 71
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 8
MAKING AND LAYING RCC WELL
Providing making and laying RCC Well Curb in position, using coarse sand, including all kinds of
form, moulds, curing, shuttering, rendering and finishing the exposed surface, (including screening
and washing of aggregrate.
(b)
MATERIAL
1
2
3
4
5
6
7
Cement
Sand (Lawrancepur)
Shingle (Bajri)
Bolts & Nuts
Partal Wood for Template 1/10th
Tar Coal
Nails
Total
Contractor's Profit & Ove 20.00
Total
17.60
Bags
44.00
Cft
88.00
Cft
1.75
Kg.
1.20
Cft.
20.00 Lbs (9.07 Kg.)
0.25 Lbs (0.11 Kg.)
Per Bag
Per Cft
Per Cft.
Per Cft.
Per Kg.
Per Kg.
Per Kg.
Percent
LABOUR
1
2
3
4
Mason
Carpenter
Coolies
Bahishties
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total Rate
6.00
6.00
13.00
3.00
Nos
Nos
Nos
Nos
Per
Per
Per
Per
day
day
day
day
Percent
Percent
ITEM RATE
Labour Rate per Cft.
Labour Rate per Cum
Composite Rate per Cft.
Composite Rate per Cum
Rs.
Rs.
Rs.
Rs.
Page 72
Say
Say
Say
Say
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 9
FIXING STRUCTURAL STEEL
Providing and fixing structural steel for cutting edge.
Detail
Qty
Amount
Per Kg.
Percent
0.50
No
Per day
0.50
No
Per day
ITEM RATE
Labour Rate Per 100 Kg.
Composite Rate per 100 Kg.
Rs.
Rs.
Page 73
Say
Say
0.00
0.00
DESCRIPTION OF ITEM:
Item No. 10
MAKING AND REMOVING FALSE MASONRY
Making and removing false masonry on well.
Detail
Qty
Amount
MATERIAL
Pacca Brick
Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total
1,350.00
2.66
26.67
Nos
Bags
Cft
er 0/00 Nos
Per Bag
er 100 Cft
Percent
/00 No
950.00
/0 Cft
84.00
1,034.00
Masons
Coolies
Coolies
Bahishti
Coolies for demolishing
Coolies for Scraping mortar of bricks
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total Rate for 150 Cft.
Total Rate for 100 Cft.
2.50
3.00
1.00
0.50
4.25
2.90
Nos
Nos
No
No
Nos
Nos
Per
Per
Per
Per
Per
Per
day
day
day
day
day
day
ITEM RATE
Labour Rate per 100 Cft.
Labour Rate per Cum
Composite Rate per 100 Cft.
Composite Rate for Cum
Rs.
Rs.
Rs.
Rs.
Page 74
Say
Say
Say
Say
0.00
0.00
0.00
0.00
CHAPTER NO. 8
STONE MASONRY
DESCRIPTION
OF
ITEM NO
1:
a)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
100 Cft
Per % Cft
20 Nos
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Total
Sundries
Total
2.00 Nos
3.00 Nos
Per Day
Per Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 1
Item No.
b)
In Mud Mortar
Unit Rate (British System) per 100 Cft
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Good earth
100 Cft
Per % Cft
20 Nos
45 Cft
Each
%Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
2.50 Nos
3.50 Nos
0.25 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 2
Item No.
c)
(1 Lime 2 Sand).
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
100 Cft
Per % Cft
20 Nos
224 Kg
30 Cft
Each
Per Kg.
Per %Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
4.00 Nos
5.00 Nos
0.50 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Rs.
Rs.
Page 3
(0.05)
-
Say
Say
Say
Say
Item No.
d)
i)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Through Stone or headers
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm)
20 Nos.
Cement
Sand
100 Cft
Per % Cft
20 Nos
9 Bag
33.75 Cft
Each
P. Bag
Per %Cft
Total
Contractor's Profit & Ove ##### Percent
Total
118.13
118.13
23.63
141.75
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
4.00 Nos
5.00 Nos
0.50 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Rs.
Rs.
Page 4
(0.03)
141.75
50.06
Say
Say
Say
Say
141.75
50.05
Item No.
d)
ii)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Through Stone or headers
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand
100 Cft
Per % Cft
20 Nos
7.20 Bag
36.0 Cft
Each
Each
Per % Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
4.00 Nos
5.00 Nos
0.50 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Rs.
Rs.
Page 5
(0.02)
-
Say
Say
Say
Say
Item No.
d)
iii)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Through Stone or headers
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand
100 Cft
Per % Cft
20 Nos
5.14 Bag
38.57 Cft
Each
Each
Per%Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
4.00 Nos
5.00 Nos
0.50 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
(0.02)
Say
Say
Rs.
Rs.
(0.05)
Say
Say
Page 6
Item No.
d)
iv)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Through Stone or headers
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand
100 Cft
Per % Cft
20 Nos
4 Bag
40 Cft
Each
Each
Per%Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
4.00 Nos
5.00 Nos
0.50 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Rs.
Rs.
Page 7
(0.02)
-
Say
Say
Say
Say
DESCRIPTION
OF
ITEM NO
2:
a)
Dry Masonry
Unit Rate (British System) per 100 Cft
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
100 Cft
Per % Cft
20 Nos
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Total
Sundries
Total
3.00 Nos
3.00 Nos
Per Day
Per Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 8
Item No.
b)
In Mud Mortar
Unit Rate (British System) per 100 Cft
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Good earth
100 Cft
Per % Cft
20 Nos
45 Cft
Each
Per% Cft
Total
Contractor's Profit & Ove ##### Percent
Total
300.00
300.00
60.00
360.00
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
4.00 Nos
4.00 Nos
0.50 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Rs.
Rs.
Page 9
360.00
127.13
Say
Say
Say
Say
360.00
127.15
Item No.
c)
(Ratio 1:2)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Through Stone or headers
Lime Slaked (Ground)
Sand
100 Cft
Per % Cft
20 Nos
5.33/ 199 Kg
26.67 Cft
Each
Per Per Kg
Per%Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
4.75 Nos
5.00 Nos
0.75 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Rs.
Rs.
Page 10
(0.01)
Say
Say
Say
Say
Item No.
d)
i)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250mm) 35 Nos.
Cement
Sand
100 Cft
Per % Cft
35 Nos
8 Bag
30 Cft
Each
Each
Per%Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
4.75 Nos
5.00 Nos
0.75 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 11
Item No.
d)
ii)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone including wastage
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(450x200x250mm) 35 Nos.
Cement
Sand
100 Cft
Per % Cft
35 Nos
6.40 Bag
32 Cft
Each
Each
Per%Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
4.75 Nos
5.00 Nos
0.75 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
0.01
Say
Say
Rs.
Rs.
Say
Say
Page 12
Item No.
d)
iii)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(450x200x250mm) 35 Nos.
Cement
Sand
100 Cft
Per % Cft
35 Nos
4.57 Bag
34.20 Cft
Each
Each
Per%Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
4.75 Nos
5.00 Nos
0.75 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 13
Item No.
d)
iv)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250mm) 35 Nos.
Cement
Sand
100 Cft
Per % Cft
35 Nos
3.56 Bag
35.60 Cft
Each
Each
Per%Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
4.75 Nos
5.00 Nos
0.75 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 14
DESCRIPTION
OF
ITEM NO
3:
a)
Dry Masonry
Unit Rate (British System) per 100 Cft
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
100 Cft
Per % Cft
20 Nos
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Total
Sundries
Total
2.50 Nos
3.00 Nos
Per Day
Per Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 15
Item No.
b)
In Mud Mortar
Unit Rate (British System) per 100 Cft
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Good earth
100 Cft
Per % Cft
20 Nos
45 Cft
Each
Per % Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
3.00 Nos
4.00 Nos
0.50 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
0.01
Say
Say
Rs.
Rs.
Say
Say
Page 16
Item No.
c)
(Ratio 1:2)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
100 Cft
Per % Cft
20 Nos
224 Kg
30 Cft
Each
Per Per Kg
Per % Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
4.50 Nos
5.00 Nos
0.75 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 17
Item No.
d)
i)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Through Stone or headers
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand
100 Cft
Per % Cft
20 Nos
9 Bag
33.75 Cft
Each
Each
Per % Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
4.50 Nos
5.00 Nos
0.75 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
1.20
Say
Say
1.20
Page 18
Item No.
d)
ii)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
100 Cft
Per % Cft
20 Nos
7.2 Bag
36 Cft
Each
Each
Per % Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
4.50 Nos
5 Nos
0.75 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 19
Item No.
d)
iii)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand
100.00 Cft
Per % Cft
20 Nos
5.14 Bag
38.57 Cft
Each
Each
Per % Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
4.50 Nos
5.00 Nos
0.75 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
0.01
0.00
Say
Say
Page 20
Item No.
d)
iv)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250) 20 Nos.
Cement
Sand
100 Cft
Per % Cft
20 Nos
4 Bag
40 Cft
Each
Each
Per % Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
4.50 Nos
5.00 Nos
0.75 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 21
DESCRIPTION
OF
ITEM NO
4:
a)
Dry Masonry
Unit Rate (British System) per 100 Cft
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
100 Cft
Per % Cft
20 Nos
Each
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Total
Sundries
Total
3.50 Nos
3.50 Nos
Per Day
Per Day
##### Percent
Rs.
Rs.
0.01
Say
Say
Rs.
Rs.
Say
Say
Page 22
Item No.
b)
In Mud Mortar
Unit Rate (British System) per 100 Cft
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 30x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Good earth
100 Cft
Per % Cft
20 Nos
43 Cft
Each
Per % Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
5.00 Nos
5.00 Nos
0.50 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
0.01
Say
Say
Rs.
Rs.
Say
Say
Page 23
Item No.
c)
(Ratio 1:2)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone including wastage
Through Stone or headers
Lime Slaked (Ground)
Sand
100 Cft
20 Nos
5.33 Mds(19 9)Kg
26.67 Cft
Per % Cft
Each
Per Per Kg
Per % Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
5.50 Nos
5.50 Nos
0.75 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Rs.
Rs.
Page 24
0.01
(0.00)
Say
Say
Say
Say
Item No.
d)
i)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Through Stone or headers
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250)
35 Nos.
Cement
Sand
100 Cft
Per % Cft
35 Nos
8 Bag
30 Cft
Each
Each
Per % Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
5.50 Nos
5.50 Nos
0.75 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 25
Item No.
d)
ii)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250mm) 35 Nos.
Cement
Sand
100 Cft
Per % Cft
35 Nos
6 Bag
32 Cft
Each
Each
Per % Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
5.50 Nos
5.50 Nos
0.75 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 26
Item No.
d)
iii)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250mm) 35 Nos.
Cement
Sand
100 Cft
Per % Cft
35 Nos
4.57 Bag
34.20 Cft
Each
Each
Per % Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
5.50 Nos
5.50 Nos
0.75 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 27
Item No.
d)
iv)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250mm) 35 Nos.
Cement
Sand
100 Cft
Per % Cft
35 Nos
3.56 Bag
35.60 Cft
Each
Each
Per % Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
5.50 Nos
5.50 Nos
0.75 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 28
DESCRIPTION
OF
ITEM NO
5:
a)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Lime Slaked (Ground)
Sand
Charcoal
Steel
200
4Md (149.30
20
30Lb (13.61
3.3Lb (1.50
Cft
Kg)
Cft
Kg)
Kg)
Per
Per
Cft
Per
Per
% Cft
Kg.
Kg.
Kg.
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total
17.00
10.00
1.00
1.00
1.00
Nos
Nos
No
No
No
Per
Per
Per
Per
Per
Day
Day
Day
Day
Day
##### Percent
Rs.
Rs.
Rs.
Rs.
Page 29
(0.01)
Say
Say
Say
Say
Item No.
b)
i)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Cement
Sand
Charcoal
Steel
200
6
22.50
30Lb (13.61
3.3Lb (1.50
Cft
Bag
Cft
Kg)
Kg)
Per % Cft
Each
Cft
Per Kg.
Per Kg.
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total
17.00
10.00
1.00
1.00
1.00
Nos
Nos
No
No
No
Per
Per
Per
Per
Per
Day
Day
Day
Day
Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
0.01
Say
Say
Page 30
Item No.
b)
ii)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Cement
Sand
Charcoal
Steel
200
4.80
24
30Lb (13.61
3.3Lb (1.50
Cft
Bag
Cft
Kg)
Kg)
Per % Cft
Each
% Cft
Per Per Kg
Per Per Kg
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total
17.00
10.00
1.00
1.00
1.00
Nos
Nos
No
No
No
Per
Per
Per
Per
Per
Day
Day
Day
Day
Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 31
Item No.
b)
iii)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Cement
Sand
Charcoal
Steel
200
3.44
25.70
30Lb (13.61
3.3Lb (1.50
Cft
Bag
Cft
Kg)
Kg)
Per % Cft
Each
Cft
Per Per Kg
Per Per Kg
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total
17.00
10.00
1.00
1.00
1.00
Nos
Nos
No
No
No
Per
Per
Per
Per
Per
Day
Day
Day
Day
Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 32
DESCRIPTION
OF
ITEM NO
6:
a)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Lime Slaked (Ground)
Sand
Charcoal
Steel
250 Cft
2Md (74.65 Kg)
10 Cft
0.73Md(27.2 5)Kg
4Lb (1.82 Kg)
Per
Per
Cft
Per
Per
% Cft
Per Kg
Per Kg
Per Kg
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total
40.00
8.00
1.00
1.50
1.50
Nos
Nos
No
No
No
Per
Per
Per
Per
Per
Day
Day
Day
Day
Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 33
Item No.
b)
i)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Cement
Sand
Charcoal
Steel
250
3
11.25
0.73Md (27.25
4Lb (1.82
Cft
Bag
Cft
Kg)
Kg)
Per % Cft
Each
Per % Cft
Per Per Kg
Per Per Kg
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total
40.00
8.00
1.00
1.50
1.50
Nos
Nos
No
No
No
Per
Per
Per
Per
Per
Day
Day
Day
Day
Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
0.01
0.00
Say
Say
Page 34
Item No.
b)
ii)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Cement
Sand
Charcoal
Steel
250
2.40
12
60Lb (27.22
4Lb (1.82
Cft
Bag
Cft
Kg)
Kg)
Per % Cft
Each
Per % Cft
Per Per Kg
Per Per Kg
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total
40.00
8.00
1.00
1.50
1.50
Nos
Nos
No
No
No
Per
Per
Per
Per
Per
Day
Day
Day
Day
Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 35
Item No.
b)
iii)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Quarried Stone
Cement
Sand
Charcoal
Steel
250
1.73
13
60Lb (27.22
4Lb (1.82
Cft
Bag
Cft
Kg)
Kg)
Per % Cft
Each
Per % Cft
Per Per Kg
Per Per Kg
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total
40.00
8.00
1.00
1.50
1.50
Nos
Nos
No
No
No
Per
Per
Per
Per
Per
Day
Day
Day
Day
Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
0.01
Say
Say
Page 36
DESCRIPTION
OF
ITEM NO
7:
i)
First Floor
Unit Rate (British System) per 100 Cft
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
0.40 No
1.35 No
Per Day
Per Day
##### Percent
Rs.
0.01
Say
Rs.
0.00
Say
Page 37
tem No.
ii)
Second Floor
Detail
Rate
Per Unit (Rs)
Amount (Rs)
1.20 No
2.60 Nos
Per Day
Per Day
##### Percent
Rs.
Say
Rs.
Say
Page 38
Item No.
iii)
Third Floor
Detail
Rate
Per Unit (Rs)
Amount (Rs)
2 Nos
3.90 Nos
Per Day
Per Day
##### Percent
Rs.
Say
Rs.
Say
Page 39
Item No.
Fourth
iv)
Detail
Floor
Rate
Per Unit (Rs)
Amount (Rs)
3.60 Nos
5.60 Nos
Per Day
Per Day
##### Percent
Rs.
Say
Rs.
Say
Page 40
DESCRIPTION
OF
ITEM NO
8:
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
0.50 No
1 No
Per Day
Per Day
##### Percent
Rs.
Say
Rs.
Say
Page 41
DESCRIPTION
OF
ITEM NO
9:
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
Material
Semi circular opening 15'x1.5'x1.5' = 33.8 Cft
Kikar wood = 3.75 Cft to be used for
60 times 3.75/60 = 0.06 Cft
0.06 Cft
Earth
2.00 Cft
Per Cft
% Cft
1.50 Nos
1.50 Nos
Per Day
Per Day
##### Percent
Rs.
Say
Rs.
Say
Page 42
DESCRIPTION
OF
ITEM NO
10:
a)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
30 Cft
0.75Lb (0.34 Kg)
10Lb (4.54 Kg)
Per % Cft
Per Kg.
Per Kg.
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Total
Sundries
Total
18.00 Nos
Per Day
##### Percent
Rs.
Say
Rs.
Say
Page 43
tem No.
10
b)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
18 Nos
Per Day
##### Percent
Rs.
Say
Rs.
Say
Page 44
DESCRIPTION
OF
ITEM NO
11:
Dressing Stones
a)
Hammer Dressed
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
5 Nos
2.50 Nos
Per Day
Per Day
##### Percent
Rs.
Say
Rs.
Say
Page 45
tem No.
11
b)
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
10 Nos
4 Nos
Per Day
Per Day
##### Percent
Rs.
Say
Rs.
Say
Page 46
tem No.
11
c)
Chisel dressed
Detail
Rate
Per Unit (Rs)
Amount (Rs)
12 Nos
5 Nos
Per Day
Per Day
##### Percent
Rs.
Say
Rs.
Say
Page 47
tem No.
11
d)
Fine dressed
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs)
Amount (Rs)
28 Nos
5 Nos
1 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Say
Rs.
Say
Page 48
DESCRIPTION
OF
ITEM NO
12:
Detail
Qty
Rate Analysis for
Rate
Per Unit (Rs)
Amount (Rs)
234 Sft
a) Detail of Wood
i)Top bottom
2x18'x5x5 =
6.25 Cft
12x12
iiVertical post 4" (100mm) apart
6x13'x5/12x5/12 = 13.55 Cft
iii) Horizontal Pieces
3x18'x5/12x
=
5.62 Cft
iv) Diagonl Strutts
20x6x5/12x1/6
=
6.25 Cft
31.67 Cft
Wastage 20%
6.33
38.00 Cft
This wood can be used 10 time hence
wood for our operation would be = 38/10
3.80 Cft
b) Stone (Quarried)
1x18x13x5/12
Deduct Scantling
=
=
98.00 Cft
32.00 Cft
66.00 Cft
112 Cft
Page 49
3.80
0.333
0.333
0.304
112.00
3.00
Cft
Kg.
Kg.
Ltr
Cft
Bag
3.40 Bag
Cft
Per
Per
Per
Per
Per
Per Bag
Kg.
Kg.
Litre
% Cft
Bag
Item No.
12
Unit Rate (British System) per 100 Sft
Detail
Qty
Sand
Steel
Coal
40 Cft
3Lb (1.36 Kg)
0.5Md (18.66 Kg)
Rate
Per Unit (Rs)
% Cft
Per Kg.
Per Kg.
Total
Contractor's Profit & Ove ##### Percent
Total
Amount (Rs)
Labour
Carpenters for wood work
UnsKilled Coolies
Masons for dressing of stones including
laying
Unskilled Coolies for laying
Masson for plaster
Unskilled Coolies
Blacksmith
Bellow-man
Total
Sundries
Total
4.00 Nos
2.00 Nos
10.00
5.00
3.00
3.00
0.50
0.50
Nos
Nos
Nos
Nos
No
No
Per Day
Per Day
Per
Per
Per
Per
Per
Per
Day
Day
Day
Day
Day
Day
##### Percent
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Page 50
DESCRIPTION
OF
ITEM NO
13:
Detail
Qty
Rate Analysis
for
Rate
Per Unit (Rs)
Amount (Rs)
4 Cft
Material
Hand dressed stone average 4 Cft
Cement
Sand
1
0.06
0.30
No
Bag
Cft.
Each
Bag
% Cft
Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Mason
Unskilled Coolies
Blacksmith
Total
Sundries
Total
0.25 No
2.00 Nos
0.12 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
(0.08)
Say
Say
Rs.
Rs.
(0.30)
Say
Say
Page 51
(0.30)
DESCRIPTION
OF
ITEM NO
14:
Detail
Qty
Material
Rate Analysis
for
1 No
0.03 Bag
0.17 Cft.
Total
Contractor's Profit & Ove ##### Percent
Total
Rate Analysis
for
Each
Bag
% Cft
0.01
0.01
0.01
2.00
1 Cft
Mason
Unskilled Coolies
Blacksmith
Total
Sundries
Total
Amount (Rs)
2 Cft
Labour
Rate
Per Unit (Rs)
0.05 No
0.25 No
0.03 No
Per Day
Per Day
Per Day
##### Percent
Rs.
Rs.
0.25
Say
Say
0.25
Rs.
Rs.
0.01
0.33
Say
Say
0.35
Page 52
CHAPTER NO. 20
SURFACE DRAINAGE
DESCRIPTION
OF
ITEM NO
1:
a)
i)
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
Bricks
0.96 Bag
3.20 Cft
260.00 Nos
0.00 Each
0.00 P. Cft
0.00 Per 1000 No
Total
Contractor's Profit & Ove 20 Percent
Total
312.00
312.00
62.40
374.40
0.67 No
1.00 No
0.25 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per 100 Rft
Labour Rate Per Rm
Composite Rate Per 100 Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
374.39
12.08
Say
Say
374.40
12.10
Page 1
Item No.
a)
ii)
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
Bricks
0.64 Bag
4.00 Cft
260.00 Nos
0.00 Each
0.00 P. Cft
0.00 Per 1000 No
Total
Contractor's Profit & Ove 20 Percent
Total
0.67 No
1.00 No
0.25 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per 100 Rft
Labour Rate Per Rm
Composite Rate Per 100 Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 2
Item No.
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
Bricks
1.30 Bag
4.70 Cft
380.00 Nos
0.00 Each
0.00 P. Cft
0.00 Per 1000 No
Total
Contractor's Profit & Ove 20 Percent
Total
1.00 No
1.50 No
0.38 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per 100 Rft
Labour Rate Per Rm
Composite Rate Per 100 Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.01
0.00
Say
Say
Page 3
Item No.
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
Bricks
0.83 Bag
5.20 Cft
380.00 Nos
0.00 Each
0.00 P. Cft
0.00 Per 1000 No
Total
Contractor's Profit & Ove 20 Percent
Total
1.00 No
1.50 No
0.38 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per 100 Rft
Labour Rate Per Rm
Composite Rate Per 100 Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 4
DESCRIPTION
OF
ITEM NO
2:
a)
(1:3)
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Pacca Bricks
Cement
Sand
350.00 Nos
1.50 Bag
5.60 Cft
Total
Contractor's Profit & Ove 20 Percent
Total
1.00 No
1.50 No
0.33 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.01
0.00
Say
Say
Page 5
Item No.
Ratio
(1:5)
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Bricks
Cement
Sand
350.00 Nos
1.00 Bag
6.25 Cft
Total
Contractor's Profit & Ove 20 Percent
Total
1.00 No
1.50 No
0.33 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 6
Item No.
Ratio
(1:6)
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Bricks
Cement
Sand
350.00 Nos
0.86 Bag
6.40 Cft
Total
Contractor's Profit & Ove 20 Percent
Total
1.00 No
1.50 No
0.33 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 7
DESCRIPTION
OF
ITEM NO
3:
a)
(1:3)
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Bricks
Cement
Sand
525.00 Nos
2.30 Bag
8.55 Cft
Total
Contractor's Profit & Ove 20 Percent
Total
1.50 No
2.00 No
0.50 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 8
Item No.
Ratio
(1:5)
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Bricks
Cement
Sand
525.00 Nos
1.50 Bag
9.50 Cft
Total
Contractor's Profit & Ove 20 Percent
Total
1.50 No
2.00 No
0.50 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 9
Item No.
Ratio
(1:6)
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Bricks
Cement
Sand
525.00 Nos
1.30 Bag
9.78 Cft
Total
Contractor's Profit & Ove 20 Percent
Total
1.50 No
2.00 No
0.50 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
-0.01
Say
Say
Page 10
DESCRIPTION
OF
ITEM NO
4:
a)
(1:3)
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Bricks
Cement
Sand
350.00 Nos
1.50 Bag
5.60 Cft
Total
Contractor's Profit & Ove 20 Percent
Total
0.75 No
1.50 No
0.50 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 11
Item No.
Ratio
(1:5)
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Bricks
Cement
Sand
350.00 Nos
1.00 Bag
6.25 Cft
Total
Contractor's Profit & Ove 20 Percent
Total
0.75 No
1.50 No
0.50 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 12
Item No.
Ratio
(1:6)
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Bricks
Cement
Sand
350.00 Nos
0.86 Bag
6.40 Cft
Total
Contractor's Profit & Ove 20 Percent
Total
0.75 No
1.50 No
0.50 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 13
DESCRIPTION
OF
ITEM NO
5:
a)
(1:3)
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Bricks
Cement
Sand
525.00 Nos
2.30 Bag
8.55 Cft
Total
Contractor's Profit & Ove 20 Percent
Total
1.00 No
2.80 Nos
0.50 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 14
Item No.
Ratio
(1:5)
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Bricks
Cement
Sand
525.00 Nos
1.50 Bag
9.50 Cft
Total
Contractor's Profit & Ove 20 Percent
Total
1.00 No
2.80 Nos
0.50 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 15
Item No.
Ratio
(1:6)
Unit Rate (British System) per 100 Sft
Detail
Qty
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Bricks
Cement
Sand
525.00 Nos
1.30 Bag
9.78 Cft
Total
Contractor's Profit & Ove 20 Percent
Total
1.00 No
2.80 Nos
0.50 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 16
DESCRIPTION
OF
ITEM NO
6:
a)
Type I
Detail
CC 1:6:12
1x100x5/6'x1/6'
Rate
Per Unit (Rs.)
Amount (Rs.)
13.89 Cft
Say: 13.90 Cft
CC 1:2:5
1x100x5/6'x11/24'
38.19 Cft
D/D 1x100x22/7xxxx
2.45 Cft
D/D 1x100x(6"+10")x"
2
2.78 Cft
32.96 Cft
Say: 33.00 Cft
Surface Rendering
1x100x22/7x3/12'
1x100x(2"+2")
12
78.57 Sft
33.33 Sft
111.90 Sft
Say: 112 Sft
Material
Cement for.
Cement Concrete 1:6:12
Cement Concrete 1:2:5
" Cement PLaster 1:1
Sand for.
Cement Concrete 1:6:12
Cement Concrete 1:2:5
" Cement PLaster 1:1
0.90
4.78
1.03
6.71
Bag
Bag
Bag
Bag
0.00 Each
6.81
14.95
1.29
23.05
Cft
Cft
Cft
Cft
0.00 P. Cft
Page 17
a)
Type I
Detail
13.62 Cft
29.70 Cft
Rate
Per Unit (Rs.)
0.00 P. Cft
0.00 P. Cft
Amount (Rs.)
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
1.50 No
3.00 Nos
0.75 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Rs.
Rs.
0.05
0.26
Say
Say
0.05
0.25
Rs.
Rs.
0.10
0.33
Say
Say
0.10
0.35
Page 18
Item No.
Type II
Unit Rate (British System) per Rft
Qty
CC 1:6:12
1x100x(1'-2"+1'-8")x7"
88.10
2
Deduction.
1x100x(8"+11")x4"
28.77
2
Net Total
59.33
CC 1:2:5
1x100x(11"+8")x4"
28.77
2
1x100x(1-8")x4"
56.94
Total
85.71
Deduction.
1x100x0.82
8.20
1x100(7 3/8"+10") 2 1/8"
17.34
2
1x100(10"+1"-8")x0.87
4.21
2
Total
29.75
85.71 - 29.75
Net Tot 55.96
Surface Rendering
With Cement Sand Mortar1:1of" thick
220.00
Material
Cement for.
Cement Concrete 1:6:12
Cement Concrete 1:2:5
" Cement PLaster 1:1
Sand for.
Cement Concrete 1:6:12
Cement Concrete 1:2:5
" Cement PLaster 1:1
Rate
Per Unit (Rs.)
Amount (Rs.)
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Sft
3.84
5.62
2.27
11.73
Bags
Bags
Bags
Bags
0.00 Each
28.86
17.54
2.86
49.26
Cft
Cft
Cft
Cft
0.00 P. Cft
Page 19
b)
Type II
Detail
57.70 Cft
35.10 Cft
Rate
Per Unit (Rs.)
0.00 P. Cft
0.00 P. Cft
Amount (Rs.)
-
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
3.00 Nos
6.00 Nos
1.50 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 20
Item No.
Type III
Unit Rate (British System) per Rft
Qty
Material
CC 1:6:12
1x100(1'-3 5/8"+1'-11")
2
2'x100'x4"x1"
Total
Deduction.
1x100x(8"+1'-")x5"
2
Net Total
CC 1:2:5
1x100(8"+1'-2") 5"
2
1x100x1'-11"x4"
Total
Deduction.
1x100x.082
1x100(7-3/8"+1'-")6"
2
1x100(1'-"+1'-11")x"
2
Total
107.81 - 58.84
Net Total
Surface Rendering.
Surface Area.
1x9.4'x100
12
2x6"x100
12
117.33 Cft
9.38 Cft
126.71 Cft
40.93 Cft
85.78 Cft
43.92 Cft
63.89 Cft
107.81 Cft
8.20 Cft
41.40 Cft
9.24 Cft
58.84 Cft
48.97 Cft
78.33 Sft
108.33 Sft
Page 21
Rate
Per Unit (Rs.)
Amount (Rs.)
c)
Type III
Unit Rate (British System) per Rft
Detail
Qty
2x5"x100
12
Material
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand
Required.
for.
Concrete 1:6:12
Concrete 1:2:5
for Surface rendering
Say
for.
for 1:6:12
for 1:2:5
for Surface rendering
Rate
Per Unit (Rs.)
Amount (Rs.)
87.50 Sft
274.16 Sft
Say: 274.20 Sft
5.57
7.10
2.52
15.19
15.00
Bags
Bags
Bags
Bags
40.00
22.00
3.00
65.00
84.00
44.07
Cft
Cft
Cft
Cft
Cft
Cft
0.00 Each
0.00 P. Cft
0.00 P. Cft
0.00 P. Cft
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
2.75 Nos
10.00 Nos
1.30 Nos
0.00 P. Day
0.00 P. Day
0.00 P. Day
Total
Sundries
10 Percent
Total
Contractor's Profit & Ove 20 Percent
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 22
Item No.
Type IV
Unit Rate (British System) per Rft
Qty
Material
CC 1:6:12
1x100(1'-3 "+2'-1")x11"
2
2x100x4"x1"
Total
Deduction.
1x100x(8"+1-3")x8"
2
Net Total
CC 1:2:5
1x100(8"+1'-4") 8"
2
1x100x2'-1"x4"
Total
Deduction.
1x100x0.082
1x100(7'-3/8"+1'-2")x8"
2
1x100(1'-2"+2'-1")x"
2
Total
141.74 - 85.82
Net Total
Surface Rendering.
1x9.4/1x100
12
2x5x100
12
2x9x100
12
Rate
Per Unit (Rs.)
164.73 Cft
9.38 Cft
174.11 Cft
69.35 Cft
104.76 Cft
71.60 Cft
70.14 Cft
141.74 Cft
8.20 Cft
67.20 Cft
10.42 Cft
85.82 Cft
55.92 Cft
78.33 Sft
87.50 Sft
158.33 Sft
324.16 Sft
Say: 324.16 Sft
Page 23
Amount (Rs.)
d)
Type IV
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
Material Required.
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand
for.
for 1:6:12
for 1:2:5
for Surface rendering
for.
for 1:6:12
for 1:2:5
for Surface rendering
6.81
8.11
2.98
17.90
Bags
Bags
Bags
Bags
0.00 Each
51.33
25.33
3.73
80.39
102.66
50.33
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
0.00 P. Cft
0.00 P. Cft
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
3.25 Nos
11.83 Nos
1.67 Nos
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
-0.05
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 24
Item No.
Type V
Unit Rate (British System) per Rft
Qty
Material
CC 1:6:12
1x100(1'-7"+2'-3")x10"
2
2x100x(6"x4")5"
2
170.44 Cft
44.01 Cft
Total
Deduction.
1x100x(8"+1'-2")x7"
2
Net Total
CC 1:2:5
1x100(8"+1'-6")x1'-1"
2
1x100x2'-3"x4"
Total
Deduction.
1x100x0.082
1x100(7-3/8"+1'-5")x11"
2
1x100(1-5"+2'-3")x"
2
Total
97.83 - 120.40
Net Total
Surface Rendering with 1:1 C/S.
Mortor " thick.
1x9.4"x100
12
214.45 Cft
59.24 Cft
155.21 Cft
120.75 Cft
77.08 Cft
197.83 Cft
8.20 Cft
100.48 Cft
11.72 Cft
120.40 Cft
77.43 Cft
78.33 Sft
Page 25
Rate
Per Unit (Rs.)
Amount (Rs.)
e)
Type V
Detail
2x5"x100
12
2x1'-1"x100
Sand
Sand
Sand
Sand
Amount (Rs.)
87.50 Sft
Total
Material
Cement
Cement
Cement
Cement
Rate
Per Unit (Rs.)
Required.
for.
for 1:6:12
for 1:2:5
for Surface rendering
for.
for 1:6:12
for 1:2:5
for Surface rendering
216.66 Sft
382.49 Sft
Say: 382.50 Sft
9.96
11.22
3.52
24.70
75.00
35.00
4.40
114.40
150.15
69.70
Bags
Bags
Bags
Bags
0.00 Each
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
0.00 P. Cft
0.00 P. Cft
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
4.00 Nos
16.00 Nos
2.20 No
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
-0.02
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 26
Item No.
Type VI
Unit Rate (British System) per Rft
Qty
Material
CC 1:6:12
1x100(1'-7"+2'-6")x1-1"
2
2x100x(6"x4")5"
2
Rate
Per Unit (Rs.)
230.25 Cft
42.01 Cft
Total
Deduction.
1x100x(8"+1-5 1/8")x10"
2
Net Total
CC 1:2:5
1x100(8"+1'-9 1/8")x1'-4"
2
1x100x2'-6-1/8"x4"
Total
Deduction.
1x100(7'-3/8"+1'-7 5/8")x1'-2"
2
1x100(1'-7 5/8"+2'-6 1/8")x0.75"
2
1x100x0.082
Total
45.49 - 159.44
Net Total
Surface Rendering.
1x9.4x100
12
2x5"x100
12
2x1'-4/12"x100
272.26 Cft
91.58 Cft
180.68 Cft
161.81 Cft
83.68 Cft
245.49 Cft
138.28 Cft
12.96 Cft
8.20 Cft
159.44 Cft
86.05 Cft
78.33 Sft
87.50 Sft
Total
266.66 Sft
432.49 Sft
Say: 432.50 Sft
Page 27
Amount (Rs.)
f)
Type VI
Detail
Material
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand
Required.
for.
for 1:6:12
for 1:2:5
for Surface rendering
for.
for 1:6:12
for 1:2:5
for Surface rendering
Rate
Per Unit (Rs.)
Amount (Rs.)
11.74
12.48
3.98
28.20
Bags
Bags
Bags
Bags
0.00 Each
88.53
38.98
4.97
132.48
177.07
77.45
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
0.00 P. Cft
0.00 P. Cft
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
4.55 Nos
18.50 Nos
2.50 Nos
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 28
Item No.
Type VII
Unit Rate (British System) per Rft
Qty
Material
CC 1:6:12
1x100(1'-7"+2'-8")x1-4 3/8"
2
2x100x(6"x4")5"
2
292.82 Cft
40.10 Cft
Total
Deduction.
1x100x(8"+9'-7")1'-1 3/8"
2
Net Total
CC 1:2:5
1x100(8"+1'-11")1'-6.5/8"
2
1x100x2'-8"x4"
Total
Deduction.
1x100x0.082
1x100(7 3/9"+1'-10")1'-5"
2
1x100(1'-10"+2'-8")x7/8"
2
Total
93.99 - 203.28
Net Total
Surface Rendering with 1:1 CS mortor.
1x9.4x100
12
332.92 Cft
127.71 Cft
205.21 Cft
203.71 Cft
90.28 Cft
293.99 Cft
8.20 Cft
178.52 Cft
16.56 Cft
203.28 Cft
90.71 Cft
78.33 Sft
Page 29
Rate
Per Unit (Rs.)
Amount (Rs.)
g)
Type VII
Detail
2x5"x100
12
2x1'-7/12"x100
Material Required.
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand
for.
for 1:6:12
for 1:2:5
for Surface rendering
for.
for 1:6:12
for 1:2:5
for Surface rendering
Rate
Per Unit (Rs.)
Amount (Rs.)
87.50 Sft
316.66 Sft
482.49 Sft
Say: 482.50 Sft
13.34
13.15
4.44
30.93
Bags
Bags
Bags
Bags
0.00 Each
100.55
41.09
5.55
147.19
201.00
81.64
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
0.90 P. Cft
0.00 P. Cft
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
5.04 Nos
20.50 Nos
2.78 Nos
0.00 P. Day
0.00 P. Day
0.00 P. Day
Total
Sundries
10 Percent
Total
Contractor's Profit & Ove 20 Percent
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Rs.
Rs.
-0.01
-0.01
Say
Say
Rs.
Rs.
-0.01
-0.03
Say
Say
Page 30
Item No.
Type VIII
Unit Rate (British System) per Rft
Qty
Material
CC 1:6:12
1x100(1'-7"+2'-10 7/8")1' 7"
2x100x(6"+4")5"
2
Total
Deduction.
1x100x(8"+1'-9 7/8")1'-4"
2
Net Total
CC 1:2:5
1x100(8"+2-1 7/8")1'-9"
2
1x100(2'-10 7/8")4"
Total
355.43 Cft
40.10 Cft
395.53 Cft
165.97 Cft
229.56 Cft
249.95 Cft
96.88 Cft
346.83 Cft
Deduction.
1x100x0.082
1x100(7 3/8"+2'-3/8")1'-8"
2
1x100(2'-3/8"+2'-10 7/8")x"
2
Total
6.83 - 247.05
Net Total
8.20 Cft
223.42 Cft
15.43 Cft
247.05 Cft
99.78 Cft
78.33 Sft
Page 31
Rate
Per Unit (Rs.)
Amount (Rs.)
h)
Type VIII
Detail
2x5"x100
12
2x1'-10.1/12"x100
Sand
Sand
Sand
Sand
Amount (Rs.)
87.50 Sft
375.00 Sft
540.83 Sft
Material Required.
Cement
Cement
Cement
Cement
Rate
Per Unit (Rs.)
Say :
for.
for 1:6:12
for 1:2:5
for Surface rendering
for.
for 1:6:12
for 1:2:5
for Surface rendering
540.85 Sft
14.92
14.50
4.98
34.40
Bags
Bags
Bags
Bags
0.00 Each
112.48
45.30
6.22
164.00
250.00
90.00
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
0.00 P. Cft
0.00 P. Cft
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
5.63 Nos
22.90 Nos
3.10 Nos
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 32
Item No.
Type IX
Unit Rate (British System) per Rft
Qty
Material
CC 1:6:12
1x100(1'-10 3/8"+3'-3")x1'-8"
2
2x100x(7"+4")9"
2
Total
Deduction.
1x100x(9 3/8"+1'-11")x1'-4"
2
Net Total
CC 1:2:5
1x100(9 3/8"+2'-6")x2'-1"
2
1x100(3'-3")4"
Total
Deduction.
1x100x0.082
1x100(7 3/8"+2'-11/2")x2'-"
2
1x100(2'-2"+3'-3")x"
2
Total
0.11 - 303.80
Net Total
Surface Rendering with (1:) C/S Mortar.
1x9.4/x100
12
2x6x100
12
427.99 Cft
80.30 Cft
508.29 Cft
181.22 Cft
327.07 Cft
347.45 Cft
122.66 Cft
470.11 Cft
8.20 Cft
278.41 Cft
17.19 Cft
303.80 Cft
166.31 Cft
78.33 Sft
104.17 Sft
Page 33
Rate
Per Unit (Rs.)
Amount (Rs.)
i)
Type IX
Detail
2x1'-10.1/12"x100
Material
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand
Rate
Per Unit (Rs.)
Amount (Rs.)
375.00 Sft
557.50 Sft
Required.
for.
for 1:6:12
for 1:2:5
for Surface rendering
for.
for 1:6:12
for 1:2:5
for Surface rendering
21.26
24.11
5.13
50.50
Bags
Bags
Bags
Bags
0.00 Each
160.26
75.34
6.41
242.01
320.53
149.68
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
0.00 P. Cft
0.00 P. Cft
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
6.66 Nos
31.91 Nos
4.03 Nos
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 34
Item No.
Type X
Unit Rate (British System) per Rft
Qty
Material
CC 1:6:12
1x100(1'-10"+3'-5")x1'-10"
2
2x100x(8"+4")9"
2
503.91 Cft
82.47 Cft
Total
Deduction.
1x100x(9"+2'-1")1'-6"
2
Net Total
CC 1:2:5
1x100(9"+2'-8")2'-4"
2
1x100x3'-5"4"
Total
586.38 Cft
226.43 Cft
359.95 Cft
410.76 Cft
130.47 Cft
541.23 Cft
Deduction.
1x100x0.082
1x100(7' 3/8"+2'-5")2'-2"
23
1x100(2'-5"+3'-5")x"
2
Total
- 360.49
Net Total
Surface Rendering with (1:1) Cement
Sand Mortar.
8.20 Cft
333.86 Cft
18.43 Cft
360.49 Cft
180.74 Cft
620.00 Sft
Page 35
Rate
Per Unit (Rs.)
Amount (Rs.)
j)
Type X
Detail
Material
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand
Required.
for.
for 1:6:12
for 1:2:5
for Surface rendering
for.
for 1:6:12
for 1:2:5
for Surface rendering
Rate
Per Unit (Rs.)
Amount (Rs.)
23.40
26.20
5.70
55.30
Bags
Bags
Bags
Bags
0.00 Each
176.37
81.85
7.13
265.35
352.75
162.61
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
0.00 P. Cft
0.00 P. Cft
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
7.35 Nos
35.00 Nos
4.43 Nos
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.00
0.00
Say
Say
Page 36
Item No.
Type XI
Unit Rate (British System) per Rft
Qty
Material
CC 1:6:12
1x100(1'-10"+3'-8")x2'-1 3/8"
2
2x100x(8"+4")9"
2
599.05 Cft
82.47 Cft
Total
Deduction.
1x100x(9"+2'-4")1'-9"
2
Net Total
CC 1:2:5
1x100(9"+2'-11")2'-7"
1x100x3'-8"x4"
Total
Deduction.
1x100x0.082
1x100(7' 3/8"+2'-7")2'-5"
2
1x100(2'-7"+3'-8")x"
2
Total
.27 - 428.70
Net Total
Surface Rendering with (1:1) Cement
Sand Mortar.
681.52 Cft
285.09 Cft
396.43 Cft
490.99 Cft
138.28 Cft
629.27 Cft
8.20 Cft
400.71 Cft
19.79 Cft
428.70 Cft
200.57 Cft
711.70 Sft
Page 37
Rate
Per Unit (Rs.)
Amount (Rs.)
k)
Type XI
Detail
Material
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand
Required.
for.
for 1:6:12
for 1:2:5
for Surface rendering
for.
for 1:6:12
for 1:2:5
for Surface rendering
Rate
Per Unit (Rs.)
Amount (Rs.)
25.77
29.08
6.55
61.40
Bags
Bags
Bags
Bags
0.00 Each
194.25
91.12
8.18
293.55
388.50
180.51
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
0.00 P. Cft
0.00 P. Cft
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total
8.34 Nos
38.94 Nos
4.96 Nos
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
-0.02
-0.02
Say
Say
Page 38
Item No.
Type XII
Unit Rate (British System) per Rft
Qty
Material
CC 1:6:12
1x100(1'-10"+3'-10")x2'-4"
2
2x100x(8"+4")9"
2
84.63 Cft
Total
Deduction.
1x100x(9"+2'-6")2'-"
2
Total
CC 1:2:5
1x100(9"+3'-1")2'-10"
1x100x3'-10"x4"
Total
Deduction.
1x100x0.082
1x100(7' 3/8"+2'-10")2'-8"
2
90
681.72 Cft
1x100(2'-10"+3'-10")x"
2
Total
- 495.98
Net Total
Surface Rendering with (1:1) Cement
Sand Mortar.
766.35 Cft
338.91 Cft
427.44 Cft
557.81 Cft
146.09 Cft
703.90 Cft
8.20 Cft
466.17 Cft
21.61 Cft
495.98 Cft
207.92 Cft
765.82 Sft
Page 39
Rate
Per Unit (Rs.)
Amount (Rs.)
l)
Type XII
Detail
Material
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand
Required.
for.
for 1:6:12
for 1:2:5
for Surface rendering
for.
for 1:6:12
for 1:2:5
for Surface rendering
Rate
Per Unit (Rs.)
Amount (Rs.)
27.78
30.15
7.05
64.98
Bags
Bags
Bags
Bags
0.00 Each
209.45
94.19
7.05
310.69
418.90
187.12
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
0.00 P. Cft
0.00 P. Cft
Total
Contractor's Profit & Ove 20 Percent
Total
Labour
Mason
Cooly
Bahishti
Total
Sundries
Total
8.89 Nos
41.50 Nos
5.30 Nos
0.00 P. Day
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
-0.05
-0.01
Say
Say
Page 40
DESCRIPTION
OF
ITEM NO
7:
a)
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
0.25 Bags
1.20 Cft
0.00 Each
0.00 P. Cft
Total
Contractor's Profit & Ove 20 Percent
Total
1.00 No
4.00 Nos
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.25
0.87
Say
Say
Page 41
0.25
0.85
Item No.
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
0.50 Bags
2.40 Cft
0.00 Each
0.00 P. Cft
Total
Contractor's Profit & Ove 20 Percent
Total
1.00 No
7.00 Nos
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.55
1.80
Say
Say
Page 42
0.55
1.80
Item No.
Detail
Rate
Per Unit (Rs.)
Amount (Rs.)
Material
Cement
Sand
0.75 Bags
3.75 Cft
0.00 Each
0.00 P. Cft
Total
Contractor's Profit & Ove 20 Percent
Total
2.00 No
8.00 Nos
0.00 P. Day
0.00 P. Day
10 Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Rs.
Rs.
0.00
0.00
Say
Say
Rs.
Rs.
0.80
2.62
Say
Say
Page 43
CHAPTER NO. 12
WOOD WORK
DESCRIPTION
OF
ITEM NO.
1:
a)
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Deodar Wood including wastage (II Class)
Nail
Screws above 1" long
Total
Contractor's Profit & Ove
Total
20
1.15 Cft
0.020 Kg.
1.00 Dozen
0.00 P. Cft
0.00 P. Cft
0.00 P.Doz
Percent
Labour
Carpentre
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total
0.63 No
0.25 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Cft
Labour Rate Per Cum
Composite Rate Per Cft
Composite Rate Per Cum
Page 1
0.00 P. Day
0.00 P. Day
Rs.
Rs.
0.01
0.23
Say
Say
0.25
Rs.
Rs.
#####
#####
Say
Say
(0.10)
(5.00)
Item No.
b)
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Shisham wood including 15% wastage
Nail
Screws above 1" long
Total
Contractor's Profit & Ove
Total
20
1.15 Cft
0.023 Kg.
1.00 Dozen
0.00 P. Cft
0.00 P. Cft
0.00 P.Doz
Percent
1.00 No
0.50 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Cft
Labour Rate Per Cum
Composite Rate Per Cft
Composite Rate Per Cum
Page 2
0.00 P. Day
0.00 P. Day
Rs.
Rs.
0.10
Say
Say
0.10
Rs.
Rs.
#####
#####
Say
Say
(0.30)
(10.40)
DESCRIPTION
OF
ITEM NO.
2:
a)
Deodar Wood.
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
i) Deodar Wood
5.5x5/12x5/12 =
Wastage 15%
0.97
0.97 Cft
0.15 Cft
1.12 Cft
3.80
5.80
0.29
6.09Lb (2
1.00
20
0.00 P. Kg
0.00 P. Doz
2.00 Lbs
5%
Total
Contractor's Profit & Ove
Total
0.00 P. Cft
Percent
Page 3
Lbs
Lbs
Lbs
.76)Kg
Dozen
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Carpenters
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total
0.32 No
0.25 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Cft
Labour Rate Per Cum
Composite Rate Per Cft
Composite Rate Per Cum
Page 4
0.00 P. Day
0.00 P. Day
Rs.
Rs.
0.12
Say
Say
0.10
Rs.
Rs.
0.26
Say
Say
0.25
Item No.
b)
Shisham Wood
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
i) Shisham Wood
5.5x5/12x5/12 =
Wastage 15%
0.97
0.97 Cft
0.15 Cft
1.12 Cft
ii)Iron Strip
1.6' (480mm) long iron strip 1"
(37mm) wide x1/8" (3mm) thick @
0.625 Lbs/ft. (0.930 Kg/Mtr).
2 Nox1' (380mm) long iron bars
" (20mm) on both ends @ 1.502
Lbs/ft. (2.235 Kg/m).
Wastage
3.80
5.80
0.29
6.09Lb (2
1.00
20
0.00 P. Kg
0.00 P. Doz
2.00 Lbs
5%
Total
Contractor's Profit & Ove
Total
0.00 P. Cft
Percent
Page 5
Lbs
Lbs
Lbs
.76)Kg
Dozen
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Carpenters
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total
0.32 No
0.25 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Cft
Labour Rate Per Cum
Composite Rate Per Cft
Composite Rate Per Cum
Page 6
0.00 P. Day
0.00 P. Day
Rs.
Rs.
0.12
Say
Say
0.10
Rs.
Rs.
#####
#####
Say
Say
(0.20)
DESCRIPTION
OF
ITEM NO
3:
i)
Detail
4' x 6.75' =
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Teak Wood
Frame
Top Rail 4'x3"x4"
Vertical 2x7'x3"x4"
Vertical Style 4x6'-6"x4"x2"
Horizental Rail 2x1'-10"x4"x2"
Middle Rail 2x1'-10"x6"x2"
Lock Rail 2x1'-10"x6"x2"
Bottom Rail 2x1'-10"x8"x2"
0.45
1.33
1.46
0.20
0.20
0.31
0.42
Panells
2x14"x22"x"
4x14"x18.5"x"
0.27 Cft
0.45 Cft
Beading
2(14"+14"+22"+22")x5/8"
(1 + 2)
2x8
Cft
Cft
Cft
Cft
Cft
Cft
Cft
0.02 Cft
4(14"+14"+18"+18")5/8"
(1 + 2)
2x8
0.02 Cft
Wastage 12%
5.13 Cft
0.62 Cft
5.75 Cft
Page 7
0.00 P. Cft
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws above 1" long
Glue
Spikes
Total
Contractor's Profit & Ove
Total for 27 Sft.
8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20
20
Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
Each
Each
P. Doz
P. Kg.
P. Kg.
Percent
0.00
27
0.00 P. Day
0.00 P. Day
Labour
Carpenters
Cooly Unskilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
3.00 Nos
1.25 Nos
10
Percent
20
Percent
Page 8
730.54
27
27.06
Rs.
Rs.
#####
#####
Say
Say
27.05
291.15
Rs.
Rs.
#####
#####
Say
Say
27.00
291.15
Item No.
ii)
Detail
4' x 6.75'
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Teak Wood
Frame
Top Rail 4'x3"x4"
Vertical 2x7'x3"x4"
Vertical Style 4x6'-6"x4"x1"
0.45 Cft
1.33 Cft
1.25 Cft
Horizontal Rail
Top 2x1'-10"x4"x1"
Middle 2x1'-10"x4"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x8"x1"
0.18
0.18
0.27
0.36
Panels
2x14"x22"x"
4x14"x18.5"x"
0.27 Cft
0.44 Cft
Beading
2(14"x14"x22"+22")x5/8"
(1 + 2)
2x8
Cft
Cft
Cft
Cft
0.01 Cft
4(14"+14"+18.5"+18.5")5/8"
(1 + 2)
2x8
0.02 Cft
Wastage 12%
4.76 Cft
0.57 Cft
5.33 Cft
Page 9
0.00 P. Cft
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Fitting
7,462.00
8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20
20
Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
Each
Each
P. Doz
P. Kg.
P. Kg.
7,462.00
1,492.40
8,954.40
Percent
8954.40
27
331.64
Labour
Carpenters
Cooly Unskilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
3.00 Nos
1.25 Nos
10
Percent
20
Percent
0.00
27
Rs.
Rs.
Rs.
Rs.
Page 10
0.00 P. Day
0.00 P. Day
#####
#####
Say
Say
Say
Say
331.60
3,568.10
Item No.
iii)
Detail
4' x 6.75' =
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Teak Wood for Frame
Frame
Top Rail 1x4'x3"x4"
Vertical 2x7'x3"x4"
Vertical style 4x6'-6"x4"x1"
0.45 Cft
1.33 Cft
1.08 Cft
Leaves
Top Rail 2x1'-10"x4"x1"
Middle 2x1'-10"x4"x1"
Lock 2x1'-10"x6"x1"
Bottom 1x1'-10"x8"x1"
0.15
0.15
0.23
0.30
Panels
2x14"x22"x5/8"
4x14"x18.5"x5/8"
0.23 Cft
0.44 Cft
Beading
2(14"x14"x22"+22")x5/8"
(1 + 2)
2x8
Cft
Cft
Cft
Cft
0.01 Cft
4(14"+14"+18.5"+18.5")5/8"
(1 + 2)
2x8
0.02 Cft
Wastage 12%
4.39 Cft
0.53 Cft
4.92 Cft
Page 11
0.00 P. Cft
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
6,888.00
Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws above 1" long
Glue
Spikes
Total
Contractor's Profit & Ove
Total for 27 Sft.
8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20
20
Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
Each
Each
P. Doz
P. Kg.
P. Kg.
6,888.00
1,377.60
8,265.60
Percent
8265.60
27
306.13
Labour
Carpenters
Unskilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
3.00 Nos
1.25 Nos
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
0.00
27
Rs.
Rs.
Rs.
Rs.
Page 12
0.00 P. Day
0.00 P. Day
#####
#####
Say
Say
Say
Say
306.05
3,292.95
DESCRIPTION
OF
ITEM NO
4:
a)
i)
Detail
4' x 6.75'
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Teak Wood
Top Rail 1x4'x3"x"
Vertical 2x7'x3"x"
Fillet 2(15"+15"+25"+25")1"x3/8"
Fillet 2(15"+15"+19"+19")x"x3/8"
0.04
0.15
0.02
0.03
Leaf
Vertical Style 4x6'-6"x4"x1"
1.27 Cft
Horizontal
Top 2x1'-10"x1"x1"
Middle 2x1'-10"x3"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x6"x1"
0.06
0.07
0.27
0.27
2.18
0.22
2.40
Wastage 10%
Page 13
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Fitting
3,360.00
Total
Contractor's Profit & Ove
Total for 27 Sft
20
6.00
2.00
2.00
2.00
2.00
Nos
Nos
Nos
Nos
Doz
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
P. Doz
4.83
7.33
12.16
1.82
13.98
Sft
Sft
Sft
Sft
Sft
0.00 Sft
3,360.00
672.00
4,032.00
Percent
4032.00
27
149.33
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft
Rate Per Sft
0.50 Nos
0.25 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
0.00 P. Day
0.00 P. Day
0.00
27
Rs.
Rs.
Rs.
Rs.
Page 14
#####
#####
Say
Say
Say
Say
149.30
1,606.30
DESCRIPTION
OF
ITEM NO
4:
a)
ii)
Detail
4' x 6.75' =
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Teak Wood
Top Rail 1x4'x3"x"
Vertical 2x7'x3"x"
Fillet 2(15"+15"+25"+25")1"x3/8"
Fillet 2(15"+15"+19"+19")1"x3/8"
0.04
0.15
0.02
0.03
Leaf
Vertical Style = 4'x6'-6"x4"x1"
1.27 Cft
Horizontal
Top 2x1'-10"x1"x1"
Middle 2x1'-10"x3"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x6"x1"
0.06
0.07
0.27
0.27
2.18
0.22
2.40
Wastage 10%
Page 15
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
Detail
Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6" (150mm)
Hook & Clamps
Screws / Nail
Spring Hings
Wire Gauze
2x1'-2"x2'-1"
4x1'-2"x1'-7"
=
=
Wastage 10%
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
20
Rate
Per Unit (Rs.)Amount (Rs.)
6.00
2.00
2.00
2.00
2.00
2.00
Nos
Nos
Nos
Nos
Doz
Nos
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
P. Doz
Each
4.83
7.33
12.16
1.22
13.38
Sft
Sft
Sft
Sft
Sft
0.00 Sft
3,986.80
147.66
Percent
3986.80
27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft
0.50 Nos
0.25 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
0.00 P. Day
0.00 P. Day
0.00
27
Rs.
Rs.
Rs.
Rs.
Page 16
#####
#####
Say
Say
Say
Say
147.65
1,588.80
Item No.
i)
Detail
4' x 6.75'
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Ist Class Teak Wood
Vertical Style 4x6'-6"x4"x1"
1.09 Cft
Horizontal
Top Rail 2x1-10"x3"x1"
Middle 2x1-10"x1"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x6"x1"
Fillet 2(15"+15"+25"+25")"x3/8"
Fillet 2(15"+15"+19"+19")"x3/8"
Top Rail 1x4'x3"x"
Vertical Rail 2x7'x3"x"
Wastage 10%
Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6" (150mm)
Hook & Clamps
Screws / Nail
0.12
0.06
0.24
0.24
0.02
0.03
0.05
0.15
2.00
0.20
2.20
6
2
2
2
2
Page 17
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
Nos
Nos
Nos
Nos
Doz
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
P. Doz
Detail
Wire Gauze
2x1'-2"x2'-1"
4x1'-2"x1'-7"
4.83
7.33
12.16
1.82
13.98
Wastage 15%
Total
Contractor's Profit & Ove
Total for 27 Sft.
20
Rate
Per Unit (Rs.)Amount (Rs.)
Sft
Sft
Sft
Sft
Sft
0.00 Sft
Percent
0.00
27
0.00 P. Day
0.00 P. Day
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
0.50 Nos
0.25 No
10
Percent
20
Percent
0.00
27
Rs.
Rs.
Rs.
Rs.
Page 18
#####
Say
Say
Say
Say
Item No.
ii)
Detail
4' x 6.75'
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Ist Class Teak Wood
Vertical Style 4x6-6"x4"x1"
1.09 Cft
Horizontal
Top Rail 2x1'-10"x3"x1"
Middle 2x1'-10"x1"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x6"x1"
Fillet 2(15"+15"+25"+25")"x3/8"
Fillet 2(15"+15"+19"+19")"x3/8"
Top Rail 1x4'x3"x"
Vertical Rail 2x7'x3"x"
Wastage 10%
Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6" (150mm)
Hook & Clamps
Screws / Nail
Spring hings
0.12
0.06
0.24
0.24
0.02
0.03
0.05
0.15
2.00
0.20
2.20
6
2
2
2
2
2
Page 19
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
Nos
Nos
Nos
Nos
Doz
Nos
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
Doz
Each
Detail
Wire Gauze
2x1'-2"x2'-1"
4x1'-2"x1'-7"
4.83
7.33
12.16
1.82
13.98
Wastage 15%
Total
Contractor's Profit & Ove
Total for 27 Sft.
20
Rate
Per Unit (Rs.)Amount (Rs.)
Sft
Sft
Sft
Sft
Sft
0.00 Sft
Percent
0.00
27
0.00 P. Day
0.00 P. Day
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
0.50 Nos
0.25 No
10
Percent
20
Percent
0.00
27
Rs.
Rs.
Rs.
Rs.
Page 20
#####
Say
Say
Say
Say
Item No.
Detail
3' x 4'
12
Rate
Per Unit (Rs.)Amount (Rs.)
Sft
Material
Teak Wood
Horizontal Strips 2x3'x3"x"
Vertital Strips 2x3.5'x3"x"
0.09
0.11
0.2
0.03
0.23
12
1.2
13.20
Wastage 15%
Wire gauze =
Wastage 10%
1x3x4
Fitting
Screws above 1" long
Nail
Total
Contractor's Profit & Ove
Total for 12 Sft.
Cft
Cft
Cft
Cft
Cft
Sft
Sft
Sft
2.00 Doz
0.07 Kg.
20
0.00 P. Cft
0.00 Sft
0.00 Doz
0.00 P. Kg.
5.28
1.06
6.34
Percent
6.34
12
Page 21
5.28
-
0.53
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 12 Sft.
0.40 No
0.20 No
10
Percent
20
Percent
Page 22
0.00 P. Day
0.00 P. Day
0.00
12
Rs.
Rs.
Say
Say
Rs.
Rs.
0.53
5.69
Say
Say
0.55
5.70
Item No.
Detail
4' x 2'
Rate
Per Unit (Rs.)Amount (Rs.)
8 Sft
Material
Teak Wood
Horizontal Rail 2x4'x2"x2"
Vertital Rail 2x2'x2"x2"
Strip Rail 2x4'x2"x2"
Strips Rail 2x1 2/3'x2"x2"
Moulding
0.22
0.11
0.05
0.03
0.15
0.56
0.09
0.65
Wastage 15%
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
8.00 Sft
0.80 Sft
8.80 Sft
0.00 Sft
2.00 Doz
0.07 Doz
6.00 Nos
0.00 P. Doz
0.00 P. Doz
0.00 Each
20
3.00
0.60
3.60
Percent
3.60
8
Page 23
3.00
0.45
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 8 Sft.
0.25 No
0.125 No
10
Percent
20
Percent
Page 24
0.00 P. Day
0.00 P. Day
0.00
8
Rs.
Rs.
0.05
Say
Say
0.05
Rs.
Rs.
0.46
4.94
Say
Say
0.45
4.95
DESCRIPTION
OF
ITEM NO
5:
Detail
4' x 2'
8 Sft
Material
Teak Wood
Cover moulding/ Strips.
2x2'x1/12'x3/12'
2x3x10/12'x1/12'x3/12'
Wastage 15%
Expended Metal
4'x2'
Wastage 5%
Nail and Screw
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft
20
0.08
0.16
0.24
0.04
0.28
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
8.00
0.40
8.40
2.00
Sft
Sft
Sft
Doz
0.00 Sft
0.00 P. Doz
0.00 P. Day
0.00 P. Day
0.00
8
Rs.
Rs.
Percent
0.00
8
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
0.25 No
0.25 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Rs.
Rs.
Page 25
0.01
#####
Say
Say
Say
Say
DESCRIPTION
OF
ITEM NO
6:
Detail
Qty
Rate Analysis
for
4' x 3'
12 Sft
Material
Teak Wood Frame
2Nox4'x2"x2"
2Nox3'x2"x2"
Moulding 13 2/3x1/12x2/12
0.23
0.17
0.20
0.60
0.09
0.69
Wastage 15%
Expanded Metal
1'x4'x3'
Wastage 5%
Nail and Screw
Total
Contractor's Profit & Ove
Total for 12 Sft.
Rate Per Sft
Cft
Cft
Cft
Cft
Cft
Cft
12.00 Sft
0.60 Sft
12.60 Sft
L.S.
20
0.00 P. Cft
0.00 Sft
Percent
9.60
12
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 12 Sft.
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
0.50 No
0.25 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 26
=
0.00 P. Day
0.00 P. Day
8.00
8.00
1.60
9.60
0.80
0.01
0.00
0.01
12
Rs.
Rs.
0.00
0.01
Say
Say
Rs.
Rs.
0.80
8.62
Say
Say
0.80
8.60
DESCRIPTION
OF
ITEM NO
7:
a)
Detail
Rate Analysis
for
4' x 6.75'
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Top Rail 4x3"x4"
Vertical Rail 2x7'x3"x4"
Vertical Style 4x6'x6"x4"x2"
Horizotal Style 2x1'-10"x4"x2"
Middle Style 2x1'-10"x4"x2"
Middle Style 2x1'-10"x4"x2"
Bottom Style 2x1'-10"x8"x2"
0.45
1.33
1.46
0.20
0.20
0.31
0.42
Panells
2'x14"x22"x"
4'x14"x18.5"x"
0.27 Cft
0.45 Cft
Beading
2(14"+14"+22"+22")5/8"(1"+2")
Cft
Cft
Cft
Cft
Cft
Cft
Cft
0.02 Cft
2x8
0.02 Cft
2x8
5.13 Cft
0.77 Cft
5.90 Cft
4(14"+18.5"+18.5")5/8"(1"+2")
Wastage 15%
Page 27
0.00 P. Cft
Detail
Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws / Nail
Glue
Spikes
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20
20
Rate
Per Unit (Rs.)Amount (Rs.)
Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
Each
Each
Doz
P. Kg.
P. Kg.
0.00 P. Day
0.00 P. Day
Percent
0.00
27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
3.00 Nos
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 28
0.00
27
Rs.
Rs.
#####
#####
Say
Say
Rs.
Rs.
#####
#####
Say
Say
Item No.
Detail
Rate Analysis
for
4' x 6.75' =
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Top Rail 4x3"x4"
Vertical Rail 2x7'x3"x4"
Vertical Style 4x6-6"x4"x1"
0.45 Cft
1.33 Cft
1.25 Cft
Horizontal Rail
Top 2x1'-10"x4"x1"
Middle 2x1'-10"x4"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x8"x1"
0.18
0.18
0.27
0.36
Panells
2'x14"x22"x"
4'x14"x18.5"x"
0.27 Cft
0.44 Cft
Beadings
2(14"+14"+22"+22")5/8" (1"+2")
4(14"+14"+18.5"+18.5")5/8"(1"+2")
Wastage 15%
Page 29
Cft
Cft
Cft
Cft
0.01 Cft
2x8
0.02 Cft
2x8
4.76 Cft
0.71 Cft
5.47 Cft
0.00 P. Cft
Detail
Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws / Nail
Glue
Spikes
Total for 27 Sft.
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20
20
Rate
Per Unit (Rs.)Amount (Rs.)
Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
Each
Each
Doz
P. Kg.
P. Kg.
(0.01)
Percent
0.00
27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
3.00 Nos
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 30
0.00 P. Day
0.00 P. Day
0.01
0.00
0.01
27
Rs.
Rs.
0.00
#####
Say
Say
Rs.
Rs.
#####
#####
Say
Say
(0.10)
Item No.
Detail
Rate Analysis
for
4' x 6.75'
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Top Rail 1x4x3"x4"
Vertical Rail 2x7x3"x4"
Vertical Style 4x6'-6"x4"x1"
0.45 Cft
1.33 Cft
1.20 Cft
Horizontal Rail
Top 2x1'-10"x4"x1"
Middle 2x1'-10"x4"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x8"x1"
0.15
0.15
0.23
0.30
Panells
2'x14"x22"x"x5/8"
4'x14"x18.5"x5/8"
0.22 Cft
0.44 Cft
Beadings
2(14"+14"+22"+22")5/8"(1"+2")
4(14"+14"+18.5"+18.5")5/8"(1"+2")
Wastage 15%
Page 31
Cft
Cft
Cft
Cft
0.01 Cft
2x8
0.02 Cft
2x8
4.50 Cft
0.68 Cft
5.18 Cft
0.00 P. Cft
Detail
Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws / Nail
Glue
Spibes
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
6.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20
20
Rate
Per Unit (Rs.)Amount (Rs.)
Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
Each
Each
Doz
P. Kg.
P. Kg.
0.00 P. Day
0.00 P. Day
Percent
0.00
27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
3.00 Nos
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 32
0.00
27
Rs.
Rs.
#####
Say
Say
Rs.
Rs.
#####
Say
Say
DESCRIPTION
OF
ITEM NO
8:
a)
Detail
Rate Analysis
for
3' x 7'
Rate
Per Unit (Rs.)Amount (Rs.)
21 Sft
Material
Deodar Wood
Top Rail 1x3x3"x4"
Vertical Rail 2x7"x3"x4"
0.35 Cft
1.36 Cft
Leaf
Plank 1x2 2/12x6 17/24x1/12
Battens 3x2x1/3'x3/8'x5/8'
Braces 2x3 47/48x3/8x5/8
1.44
0.27
0.31
3.73
0.56
4.29
Wastage 15%
Fitting
Hinges 10" (250mm)
Tower Bolts 9" (225mm)
Bolts 8" (200mm) with staple for pad
lock.
Wrought Iron hold fast
Hinges chocks 4" (100mm)
Door stop 6" (150mm)
Handles 6" (150mm)
Screws above 1" long
Nails of sorts
Total
Contractor's Profit & Ove
Total for 21 Sft.
20
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
3.00 Nos
0.00 Each
1.00 No
0.00 Each
1.00
6.00
1.00
1.00
2.00
2.00
0.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
No
Nos
No
No
Nos
Doz
Kg
Percent
0.00
21
Page 33
Each
Each
Each
Each
Each
Doz
P. Kg
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 21 Sft.
Rate Per Sft
2.50 Nos
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 34
0.00 P. Day
0.00 P. Day
(0.01)
0.00
21
Rs.
Rs.
#####
#####
Say
Say
Rs.
Rs.
0.08
1.01
Say
Say
0.10
1.00
Item No.
Detail
Rate Analysis
for
3' x 6.5'
Rate
Per Unit (Rs.)Amount (Rs.)
19.5 Sft
Material
Deodar Wood
Top Rail 1x3'x'x3/8
Vertical Rail 2x6'xx3/8
Leaf Plank 1x2 7/12x6 5/24x 1/16
Ledges 2x3 13/20x1/3x1/12
Braces 2x3 13/20x1/3x1/12
Wastage 15%
Fitting
Hinges 5" (125mm)
Tower Bolts 9" (225mm)
Wrought Iron hold fast
Hinges chocks 4" (100mm)
Door stops 6" (150mm)
Handles 6" (150mm)
Screws above 1" long
Nails of sorts
Total
Contractor's Profit & Ove
Total for 19.5 Sft.
20
0.35
1.17
1.00
0.20
0.20
2.92
0.44
3.36
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
3.00
3.00
4.00
1.00
1.00
2.00
2.00
0.06
Nos
Nos
Nos
No
No
Nos
Doz
Kg
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Percent
0.00
19.5
Page 35
Each
Each
Each
Each
Each
Each
P. Doz
P. Kg
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 19.5
2.00 Nos
1.00 No
10
Percent
20
Percent
0.00
19.5
Rs.
Rs.
Rs.
Rs.
Page 36
0.00 P. Day
0.00 P. Day
#####
#####
Say
Say
Say
Say
(0.70)
(7.20)
DESCRIPTION
OF
ITEM NO
9:
Detail
Rate Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
100 Sft
Material
Deodar Wood
T. Hinges 6" (150mm)
Tower bolt 6" (150mm)
Stops
Nails
Screws
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft
9.50
4.00
2.00
2.00
0.063
2.00
20
Cft
Nos
Nos
Nos
Kg.
Dozen
0.00
0.00
0.00
0.00
0.00
0.00
Cft
Each
Each
Each
Kg.
P. Doz
0.00 P. Day
0.00 P. Day
Percent
0.00
100
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
16.00 Nos
3.00 Nos
10
Percent
20
Percent
Page 37
0.00
100.0
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
10:
Detail
Rate Analysis
for
3' x 6.5' =
Rate
Per Unit (Rs.)Amount (Rs.)
19.5 Sft
Material
Deodar Wood
Chowkhat 2x6'x3"x4"
1x3"x3"x4"
Leaf Batten 1x2'-7"x6"-3"x1/12
Styles 3x2'-5"x4"-1"
Braces 2x3.0"x4"x1"
Wastage 15%
Fitting
Hinges Chocks 4" (100mm)
Door Stop 6" (150mm)
Tower Bolts 9" (225mm)
Tower Hinges 8" (200mm)
Wrought Iron hold fast
Hasp and staple
Handles
Screws above 1' long
Nails of sorts
Total
Contractor's Profit & Ove
Total for 19.5 Sft
20
1.30
0.19
1.35
0.26
0.20
3.30
0.50
3.80
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
1.00
1.00
2.00
2.00
4.00
1.00
2.00
2.00
0.13
No
No
Nos
Nos
Nos
No
Nos
Doz
Kg
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,237.69
Percent
2237.69
19.5
Page 38
Each
Each
Each
Each
Each
Each
Each
P. Doz
P. Kg
114.75
Detail
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 19.5 Sft.
Rate
Per Unit (Rs.)Amount (Rs.)
2.50 Nos
1.00 No
10
Percent
20
Percent
Page 39
0.00 P. Day
0.00 P. Day
0.00
19.5
Rs.
Rs.
0.05
Say
Say
0.05
Rs.
Rs.
#####
#####
Say
Say
114.75
1,234.75
DESCRIPTION
OF
ITEM NO
11:
i)
Detail
8' x 8'
Rate
Per Unit (Rs.)Amount (Rs.)
64 Sft
Material
Deodar Wood
22 gauge G.I. Plain sheet
Wastage 10%
7.00
64.00
6.40
70.40
6.00
3.00
1.00
0.23
20
0.00 Cft
0.00
0.00
0.00
0.00
0.00
Sft
Each
P. Doz
Each
P. Kg
0.00 P. Day
0.00 P. Day
0.00
64.0
Rs.
Rs.
Say
Say
Rs.
Rs.
0.05
Say
Say
0.05
Percent
0.00
64
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 64 Sft.
Rate Per Sft
Cft
Sft
Sft
Sft
Nos
Doz
No
Kg
3.50 Nos
1.50 Nos
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 40
DESCRIPTION
OF
ITEM NO
11:
ii)
Detail
Rate Analysis
for
8' x 8'
64 Sft
Material
Deodar Wood
22 gauge G.I. Plain sheet
Wastage 10%
7.00
128.00
12.80
140.80
6.00
3.00
1.00
0.47
20
Cft
Sft
Sft
Sft
Nos
Doz
No
Kg
0.00 P. Cft
0.00
0.00
0.00
0.00
0.00
Sft
Each
P. Doz
Each
P. Kg
0.00 P. Day
0.00 P. Day
Percent
0.00
64
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Rate
Per Unit (Rs.)Amount (Rs.)
4.00 Nos
1.50 Nos
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 41
0.00
64.0
Rs.
Rs.
0.05
Say
Say
0.05
Rs.
Rs.
0.05
Say
Say
0.05
Item No.
11
i)
Detail
Rate Analysis
for
8' x 8'
64 Sft
Material
Partal Wood
22 gauge G.I. Plain sheet
Wastage 10%
7.00
64.00
6.40
70.40
6.00
3.00
1.00
0.23
20
Cft
Sft
Sft
Sft
Nos
Doz
No
Kg
0.00 P. Cft
0.00
0.00
0.00
0.00
0.00
Sft
Each
P. Doz
Each
P. Kg
0.00 P. Day
0.00 P. Day
Percent
0.00
64
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Rate
Per Unit (Rs.)Amount (Rs.)
3.50 Nos
1.50 Nos
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
0.00
64.0
Rs.
Rs.
Rs.
Rs.
Page 42
#####
Say
Say
Say
Say
Item No.
11
ii)
Detail
Rate Anaylsis
for
8' x 8'
64 Sft
Material
Partal Wood
22 gauge G.I. Plain sheet
Wastage 10%
7.00
128.00
12.80
140.80
6.00
3.00
1.00
0.47
20
Cft
Sft
Sft
Sft
Nos
Doz
No
Kg
0.00 P. Cft
0.00
0.00
0.00
0.00
0.00
Sft
Each
P. Doz
Each
P. Kg
0.00 P. Day
0.00 P. Day
Percent
0.00
64
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Rate
Per Unit (Rs.)Amount (Rs.)
4.00 Nos
1.50 Nos
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 43
0.00
64.0
Rs.
Rs.
0.05
Say
Say
0.05
Rs.
Rs.
0.05
Say
Say
0.05
DESCRIPTION
OF
ITEM NO
12:
a)
i)
Detail
Rate Analysis
for
4' x 6.75'
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Deodar Wood Frame
Top Rail 1x4x3"x"
Vertical Rail 2x7x3"x"
Fillet 2(15+15+25+25)x3/8
Leaves 2(15+15+19+19)x3/8
0.04
0.15
0.02
0.03
Vertical Style
4x6'-6"x4"x1
1.27 Cft
Horizontal
Top 2x1'-10"x3"x1"
Middle 2x1'-10"x1"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x6"x1"
Wastage 10%
Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6"
Hook & Clamp
Screws / Nails
Page 44
Cft
Cft
Cft
Cft
0.07
0.06
0.27
0.27
2.18
0.22
2.40
Cft
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
6.00
2.00
2.00
2.00
2.00
Nos
Nos
Nos
Nos
Doz
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
P. Doz
Detail
Wire Gauge
2x1'-2"x2'-1"
4x1'-2"x1'-7"
4.83
7.33
12.16
1.82
13.98
Wastage 15%
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
20
Rate
Per Unit (Rs.)Amount (Rs.)
Sft
Sft
Sft
Sft
Sft
0.00 Sft
0.00 P. Day
0.00 P. Day
Percent
0.00
27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
1.50 Nos
0.75 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 45
0.00
27.0
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
12
ii)
Detail
Rate Analysis
for
4' x 6.75'
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Deodar Wood Frame
Top Rail 1x4'x3"x"
Vertical Rail 2x7'x3"x"
Fillet 2(15"+15"+25"+25")"x3/8"
Leaves 2(15"+15"+19"+19")"x3/8"
0.04
0.15
0.02
0.03
Vertical Style
4x6'-6"x4"x1"
1.27 Cft
Horizontal
Top 2x1'-10"x3"x1"
Middle 2x1'-10"x1"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x6"x1"
Wastage 10%
Fitting
Hinges 4" (100mm)
Tower Bolts
Handles 6" (150mm)
Hook & Clamp
Screws / Nails
Spring Hinges
Page 46
Cft
Cft
Cft
Cft
0.07
0.06
0.27
0.27
2.18
0.22
2.40
Cft
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
6.00
2.00
2.00
2.00
2.00
2.00
Nos
Nos
Nos
Nos
Doz
Nos
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
P. Doz
Each
Detail
Wire Gauge
2x1'-2"x2'-1"
4x1'-2"x1'-7"
4.83
7.33
12.16
1.82
13.98
Wastage 15%
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
20
Rate
Per Unit (Rs.)Amount (Rs.)
Sft
Sft
Sft
Sft
Sft
0.00 Sft
0.00 P. Day
0.00 P. Day
Percent
0.00
27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft
1.50 Nos
0.75 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
0.00
27.0
Rs.
Rs.
Rs.
Rs.
Page 47
#####
Say
Say
Say
Say
Item No.
12
i)
Detail
Rate Analysis
for
4'x6.75' =
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
1st Class Deodar Wood
Vertical Style 4x6'-6"x4"x1"
1.09 Cft
Horizontal
Top 2x1'-10"x3"x1"
Middle 2x1'-10"x1"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x6"x1"
Fillets 2(15"+15"25+25) x 3/8
Frame 4(15"+15"19+19) x 3/8
Top Rail 1x4x3"x1"
Vertical Rail 2x7x3"x1"
Wastage 10%
Fitting
Hinges 4" (100mm)
Tower Bolts 9" (228mm)
Handles 6" (150mm)
Hook & Clamp
Screws / Nails
Page 48
0.12
0.06
0.24
0.24
0.02
0.03
0.05
0.15
2.00
0.20
2.20
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
6.00
2.00
2.00
2.00
2.00
Nos
Nos
Nos
Nos
Doz
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
P. Doz
Detail
Wire Gauge
2x1'-2"x2'-1"
4x1'-2"x1'-7"
4.83
7.33
12.16
1.82
13.98
Wastage 15%
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
20
Rate
Per Unit (Rs.)Amount (Rs.)
Sft
Sft
Sft
Sft
Sft
0.00 Sft
0.00 P. Day
0.00 P. Day
Percent
0.00
27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft
1.50 Nos
0.75 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 49
0.00
27
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
12
ii)
Detail
Rate Analysis
for
4'x6.75' =
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
1st Class Deodar Wood
Vertical Style 4x6'-6"x4"x1"
1.09 Cft
Horizontal
Top 2x1'-10"x3"x1"
Middle 2x1'-10"x1"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x6"x1"
Fillets 2(15"+15"25+25) x 3/8
Top Rail 1x4'x3"x1"
Vertical Rail 2x7'x3"x1"
Wastage 10%
Fitting
Hinges 4" (100mm)
Tower Bolts 9" (228mm)
Handles 6" (150mm)
Hook & Clamp
Screws / Nails
Spring
Page 50
0.12
0.06
0.24
0.24
0.02
0.05
0.15
1.97
0.22
2.19
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
6.00
2.00
2.00
2.00
2.00
2.00
Nos
Nos
Nos
Nos
Doz
Nos
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
P. Doz
Each
Detail
Wire Gauge
2x1'-2"x2'-1"
4x1'-2"x1'-7"
4.83
7.33
12.16
1.82
13.98
Wastage 15%
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
20
Rate
Per Unit (Rs.)Amount (Rs.)
Sft
Sft
Sft
Sft
Sft
0.00 Sft
0.00 P. Day
0.00 P. Day
Percent
0.00
27
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft
1.50 No
0.75 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 51
0.00
27
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
12
Rate Analysis
for
4' x 3'
Rate
Per Unit (Rs.)Amount (Rs.)
12 Sft
Material
Wood Work
Wood
Wire gauze
Nails
Total
Contractor's Profit & Ove
Total for 12 Sft.
Rate Per Sft
0.25 Cft
12.00 Sft
L.S.
20
0.00 P. Cft
0.00 Sft
8.00
1.60
9.60
0.80
Percent
9.60
12
8.00
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft
0.50 No
0.25 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 52
0.00 P. Day
0.00 P. Day
0.00
12
Rs.
Rs.
Say
Say
Rs.
Rs.
0.80
8.61
Say
Say
0.80
8.60
Item No.
12
Rate Analysis
for
2' x 4'
Rate
Per Unit (Rs.)Amount (Rs.)
8 Sft
Material
Deodar Wood
Horizontal Rail 2x4"x2"x2"
Vertical Rail 2x2"x2"x2"
Strips 2x4"x2"x"
Strips 2x1'-8"x2"x"
Moulding
L.S.
Wastage 20%
Wire Gauze 144 Mesh/Sqare in CW 4x2
Wastage 10%
0.22
0.11
0.05
0.03
0.06
0.47
0.09
0.56
8.00
0.80
8.80
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Sft
Sft
Cft
0.00 P. Cft
0.00 P. Sft
Fitting
Screws above 1" long
Nails
Wooden Plugs
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft
2.00 Doz
0.08 Kg
6.00 Nos
20
0.00 P. Doz
0.00 P. Kg
0.50 Each
Percent
3.43
8
Page 53
(0.14)
3.00
2.86
0.57
3.43
0.43
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft
0.50 No
0.25 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 54
0.00 P. Day
0.00 P. Day
0.00
8
Rs.
Rs.
0.05
Say
Say
0.05
Rs.
Rs.
0.43
4.77
Say
Say
0.45
4.75
DESCRIPTION
OF
ITEM NO
13:
Detail
Rate Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
18 Sft
Material
Deodar Wood
Nail
Screws above 1" long
Hinges 4" (100mm)
Tower Bolt 9" (225mm)
Hasp & Staple
Total
Contractor's Profit & Ove
Total for 18 Sft.
Rate Per Sft
2.30
0.126
2.50
4.00
2.00
1.00
20
0.00
0.00
0.00
0.00
0.00
0.00
P. Cft
P. Kg.
P. Doz
Each
Each
Each
0.00
18
1.50 No
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 55
0.00 P. Day
0.00 P. Day
Percent
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Cft
Kg.
Doz
Nos
Nos
No
0.00
18
Rs.
Rs.
Say
Say
Rs.
Rs.
0.05
Say
Say
0.05
DESCRIPTION
OF
ITEM NO
14:
a)
Detail
Rate Analysis
for
4' x 6.75'
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Structural Steel
M.S. Angle Iron 1"x1"x" (40x40x6mm)
Vertical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
18.90 Rft @ 2.32 Lbs/Rft
M.S. Flat 2"x" (50x6mm)
Vertical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
18.9 @ 1.68 Lbs/ft
M.S. Flat Patti 1"x1/8" (25x3mm) at
bottom.
4 @ 0.42 Lbs/ft
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
20
43.85 Lbs
31.75 Lbs
1.68 Lbs
77.28Lb (3 5.06)Kg
0.00 P. Kg
Percent
0.00
27
Page 56
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Making holes in frame for hinges 4x4
Welding plate with angle iron
Welding hold fast with frame
Welding M.S.Steel bar with frame
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft
16.00
18.00
6.00
2.00
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 57
Nos
Nos
Nos
Nos
0.00
0.00
0.00
0.00
Each
Each
Each
Each
0.00
27
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
14
b)
Detail
Rate
Analysis
for
4' x 6.75' =
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Structural Steel
Tee Iron 1"x1"x" (40x40x6mm)
Vertical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
18.90ft @ 2.32 Lbs/ft
M.S. Flat "x" (12x6mm)
18.90ft @ 0.425 Lbs/ft
M.S. Bar " dia 4' @ 0.67 Lbs/ft
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
20
44.60 Lbs
8.03 Lbs
2.68 Lbs
55.31Lb (2 5.10) Kg
0.00 P. Kg
Percent
0.00
27
Page 58
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Making holes in frame for hinges 4x4
Welding plate with angle iron
Welding hold fast with frame
Welding M.S.Steel bar with frame
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft
16.00
18.00
6.00
2.00
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 59
Nos
Nos
Nos
Nos
0.00
0.00
0.00
0.00
Each
Each
Each
Each
0.00
27
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
15
Single Rebate.
Detail
Rate
Analysis
for
4' x 7'
Rate
Per Unit (Rs.)Amount (Rs.)
28 Sft
Material
M.S. Sheet 20 Swg 15"(375mm) wide
18' long x15/12 (5.486x0.380m)
Wastage 10%
M.S. Flat
3.5 Rft @
M.S. Flat
4.5 Rft @
22.50
2.25
24.75
25.00
17.02
1.86
Kg.
Kg.
Kg.
Kg. Or
Kg
Lbs
SAY
6"x"x1/8" (150x6x3mm)
0.531 Lbs/Rft
hold fast 9"x1"x1/8" (225x25x3mm)
0.425 Lbs/Rft
1.91 Lbs
3.77Lb (1 .71) Kg
Fitting
Hinges 4" (100mm)
Screws
Nails
Welding Charges
Cement sand mortar ratio 1:8 for
filling hollow space 18'x4'/12"x3/12
including wastage (0.057m)
(5.486x0.100x0.075m) 2.00 Cft
Page 60
6.00 Nos
3.00 Doz
0.28 Kg.
0.00 Kg.
0.00 P. Kg
0.00 Each
0.00 P. Doz
0.00 P. Kg.
Detail
Material
Cement
Sand
Cement Concrete 1:2:4 for fixing hold fast
Cement
Sand
Bajri
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft
20
Rate
Per Unit (Rs.)Amount (Rs.)
0.20 Bag
2.00 Cft
0.00 Each
0.00 P. Cft
0.08 Bag
0.20 Cft.
0.40 Cft.
0.00 Bag
0.00 % Cft.
0.00 % Cft.
0.50 No
0.50 No
0.00 P. Day
0.00 P. Day
0.50 No
0.00 P. Day
Percent
0.00
28
Labour
Moulder/ Black Smith
Cooly
SKilled Cooly (for Mortor Filling in the
hallow space)
Total
Sundries
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 61
0.00
28
Rs.
Rs.
Say
Say
Rs.
Rs.
0.10
Say
Say
0.10
Item No.
15
Double Rebate.
Detail
Rate
Analysis
for
4' x 7'
Rate
Per Unit (Rs.)Amount (Rs.)
28 Sft
Material
M.S. Sheet 20SWG 17"(432mm) wide
19' longx18x18/17(5.486x0.432)= 25.50 Sft
Wastage 10%
28.05 Sft
M.S.
4.50
M.S.
4.50
2.55 Sft
19.10 Kg
Fitting
Hinges 4" (100mm)
6.00 Nos
Screws
3.00 Doz
Nails
0.28 Kg.
Welding Charges
Cement sand mortar ratio 1:8 for
filling hollow space
18"x11/24x4/12 = (5.486x0.275x0.1m) 2.75 Cft
Page 62
0.00 P. Kg
0.00 P. Kg
0.00 Each
0.00 P. Doz
0.00 P. Kg.
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Cement
Sand
Cement Concrete 1:2:4 for (fixing
hold fast)
Cement
Sand
Bajri
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft
20
0.00 Each
0.00 P. Cft
0.08 Bag
0.20 Cft.
0.40 Cft.
0.00 Bag
0.00 % Cft.
0.00 % Cft.
0.75 No
0.50 No
0.00 P. Day
0.00 P. Day
0.50 No
0.00 P. Day
Percent
0.00
28
0.28 Bag
2.75 Cft
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 63
0.00
28
Rs.
Rs.
Say
Say
Rs.
Rs.
1.30
8.49
Say
Say
1.30
8.50
DESCRIPTION
OF
ITEM NO
16:
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
21 Sft
Material
4" (100mm) double section spring
hinges iron.
Brass finger plate
6" (150mm) brass tower bolt
Brass screws 1" (40mm)
Brass Screw 1" (25mm)
3.00
2.00
1.00
2.00
2.50
Nos
Nos
No
Doz
Doz
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
P. Doz
P. Doz
4.00
2.00
2.00
2.00
2.00
3.00
3.00
Nos
Nos
Nos
Nos
Nos
Doz
Doz
0.50
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
Each
P. Doz
P. Doz
2.00
2.00
Total
Contractor's Profit & Ove
Total for 21 Sft.
Rate Per Sft
262.50-112.96
20
Percent
-2.40
21
Page 64
(2.00)
(0.40)
(2.40)
(0.11)
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft
0.05 No
0.05 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 65
0.00 P. Day
0.00 P. Day
0.00
21
Rs.
Rs.
#####
Say
Say
Rs.
Rs.
#####
#####
Say
Say
(0.20)
DESCRIPTION
OF
ITEM NO
17:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Brass spring hinges Complete with
screws
Total
Contractor's Profit & Ove
Total
20
1 No
0.00 Each
Percent
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
0.05 No
0.05 No
10
Percent
20
Percent
Item Rates
Labour Rate for Each
Composite Rate for Each
Page 66
0.00 P. Day
0.00 P. Day
Rs.
0.00
Say
Rs.
0.00
Say
DESCRIPTION
OF
ITEM NO
18:
i)
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
16 Each
Material
Sliding bolt 10"(250mm) long complete with
screws & nuts.
Total
Contractor's Profit & Ove
Total
20
16 Nos
0.00 Each
Percent
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
1.00 No
0.50 No
10
Percent
20
Percent
Item Rates
Labour Rate for Each
Page 67
0.00 P. Day
0.00 P. Day
Rs.
0.00
16
0.00
Say
Rs.
0.00
16
0.00
Say
Item No.
18
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
16 Each
Material
Sliding bolt 12" (300mm) long complete
with screws with & nuts.
Total
Contractor's Profit & Ove
Total
20
16 Nos
0.00 Each
Percent
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
1.00 No
0.50 No
10
Percent
20
Percent
Item Rates
Labour Rate for Each
Page 68
0.00 P. Day
0.00 P. Day
Rs.
0.00
16
0.00
Say
Rs.
0.00
16
0.00
Say
Item No.
18
Detail
Rate
Anaylysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
16 Each
Material
Brass sliding bolt 10" (250mm) long
complete with screws & nuts.
Total
Contractor's Profit & Ove
Total
20
16 Nos
0.00 Each
Percent
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
1.00 No
0.50 No
10
Percent
20
Percent
Item Rates
Labour Rate for Each
Page 69
0.00 P. Day
0.00 P. Day
Rs.
0.00
16
0.00
Say
Rs.
0.00
16
0.00
Say
Item No.
18
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
16 Each
Material
Brass sliding bolt 12" (300mm) long
complete with screws & nuts.
Total
Contractor's Profit & Ove
Total
20
16 Nos
0.00 Each
Percent
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
1.00 No
0.50 No
10
Percent
20
Percent
Item Rates
Labour Rate for Each
Page 70
0.00 P. Day
0.00 P. Day
Rs.
0.00
16
0.00
Say
Rs.
0.00
16
0.00
Say
DESCRIPTION
OF
ITEM NO
19:
i)
Detail
Rate
Analysis
for
4' x 7' =
28
Rate
Per Unit (Rs.)Amount (Rs.)
Sft
(Brass Fittings)
Material
9" (225mm) Tower bolt
6" (150mm) Handles
2" (50mm) Butt hinges
Screws 1"
3.00
3.00
2.00
3.50
Nos
Nos
Nos
Doz
0.00
0.00
0.00
0.00
Each
Each
Each
P. Doz
3.00
3.00
2.00
3.50
Nos
Nos
Nos
Doz
0.00
0.00
0.00
0.00
Each
Each
Each
P. Doz
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft
222.38-101.04
0.00 P. Day
0.00 P. Day
0.00
28
Rs.
Rs.
Say
Say
Rs.
Rs.
0.08
0.91
Say
Say
0.10
0.90
20
Percent
0.00
28
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft
0.04 No
0.04 No
10
Percent
20
Percent
Page 71
Item No.
19
Detail
Rate
Analysis
for
4' x 7'
28
Rate
Per Unit (Rs.)Amount (Rs.)
Sft
(Brass Fittings)
Material
9" (225mm) Tower balt
6" (150mm) Handles
2" (50mm) butt hinges
Screws 1"
2.00
2.00
2.00
3.50
Nos
Nos
Nos
Doz
0.00
0.00
0.00
0.00
Each
Each
Each
P. Doz
2.00
2.00
2.00
3.00
Nos
Nos
Nos
Doz
0.00
0.00
1.00
0.00
Each
Each
Each
P. Doz
2.00
2.00
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft
153.75-73.12 =
20
Percent
-2.40
28
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft
0.04 No
0.04 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
0.00 P. Day
0.00 P. Day
0.00
28
Rs.
Rs.
Rs.
Rs.
Page 72
(2.00)
(0.40)
(2.40)
(0.09)
#####
#####
Say
Say
Say
Say
(0.80)
DESCRIPTION
OF
ITEM NO
20:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Rim lock complete with screws
Deduct cost of handle
Total
Contractor's Profit & Ove
Total
1.00 No
2.00 Nos
20
0.00 Each
0.00 Each
Percent
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
0.17 No
0.13 No
10
Percent
20
Percent
Item Rates
Labour Rate for Each
Composite Rate for Each
Page 73
0.00 P. Day
0.00 P. Day
Rs.
0.00
Say
Rs.
0.00
Say
DESCRIPTION
OF
ITEM NO
21:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Mortice lock compelte with screws
Deduct cost of handles
Total
Contractor's Profit & Ove
Total
20
1.00 No
2.00 Nos
0.00 Each
0.00 Each
Percent
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
0.25 No
0.17 No
10
Percent
20
Percent
Item Rates
Labour Rate for Each
Composite Rate for Each
Page 74
0.00 P. Day
0.00 P. Day
14.45
14.45
1.45
15.90
3.18
19.07
Rs.
19.07
Say
19.05
Rs.
19.07
Say
19.05
DESCRIPTION
OF
ITEM NO
22:
a)
Detail
8 Sft
0.08
0.16
0.24
0.05
0.29
0.30
8.00
0.80
8.80
2.00
Wastage 20%
SAY
Expanded metal 1x4x2
Wastage 10%
Nails / Screws
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft
20
Cft
Cft
Cft
Cft
Cft
Cft
Sft
Sft
Sft
Doz
0.00 P. Cft
0.00 Sft
0.00 P. Doz
0.00 P. Day
0.00 P. Day
0.00
8
Rs.
Rs.
Percent
0.00
8
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
0.25 No
0.25 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Rs.
Rs.
Page 75
#####
#####
Say
Say
Say
Say
(0.20)
(1.90)
Item No.
22
b)
Detail
Rate
Analysis
for
4' x 3'
12 Sft
Material
Deodar Wood Frame
2 No 4'x2/12"x212"
2 No 3'x2/12"x212"
Moulding 1x13 2/3'x1/12x2/12
0.23
0.17
0.20
0.60
0.12
0.72
12.00
1.20
13.20
2.00
Wastage 20%
Expended metal 1x4x3
Wastage 10%
Nails / Screws
Total
Contractor's Profit & Ove
Total for 12 Sft.
Rate Per Sft
20
Cft
Cft
Cft
Cft
Cft
Cft
Sft
Sft
Sft
Doz
0.00 P. Cft
0.00 Sft
0.00 P. Doz
0.00 P. Day
0.00 P. Day
0.00
12
Rs.
Rs.
Percent
0.00
12
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 12 Sft.
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
0.50 No
0.25 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Rs.
Rs.
Page 76
#####
#####
Say
Say
Say
Say
(0.10)
(1.30)
DESCRIPTION
OF
ITEM NO
23:
Detail
Rate
Analysis
for
3' x 5'
Rate
Per Unit (Rs.)Amount (Rs.)
15 Sft
Material
Deodar Wood
Sides 2x1'x5'x1/12"
Back 1x3'x5'x"
Top & Bottom 2x3'x1'x1/12"
Plank 3x3'x1'x1/12"
Shutters 2x1.5'x5'x1/12"
0.84
0.94
0.50
0.75
1.25
4.28
0.43
4.71
Wastage 10%
Fittings Brass
Hings 3" (75mm)
Hasp & Staple (Brass)
Brass Handle 6" (150mm)
Wooden Plugs
Nails / Screws
Bitumen
Total
Contractor's Profit & Ove
Total for 15 Sft.
Rate Per Sft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
6.00 Nos
1.00 No
2.00 Nos
10.00 Nos
L.S.
1.43
Kg.
20
0.00 P. Cft
0.00
0.00
0.00
0.50
0.00 P. Kg.
5.00
19.00
-
24.00
4.80
28.80
1.92
Percent
28.80
15
Page 77
Each
Each
Each
Each
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 15 Sft.
Rate Per Sft
2.50 No
0.50 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
0.00 P. Day
0.00 P. Day
0.00
15
Rs.
Rs.
Rs.
Rs.
Page 78
1.92
#####
Say
Say
Say
Say
1.90
20.60
Item No.
23
Rate
Analysis
for
3' x 5'
15 Sft
Material
Deodar Wood
Plank 3x10x3'x1'x1/12"
Shutters 2x1.5'x5'x1/12"
0.75
1.25
2.00
0.20
2.20
Wastage 10%
Fittings Brass
Hings 3" (75mm)
Hasp & Staple (Brass)
Brass Handle 6" (150mm)
Wooden Plugs
Nails / Screws
Total
Contractor's Profit & Ove
Total for 15 Sft.
Rate Per Sft
Cft
Cft
Cft
Cft
Cft
6.00 Nos
1.00 No
2.00 Nos
6.00 Nos
L.S.
20
0.00 P. Cft
0.00
0.00
0.00
0.50
Each
Each
Each
Each
18.00
15
1.75 Nos
0.50 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
3.00
12.00
0.00 P. Day
0.00 P. Day
0.00
15
Rs.
Rs.
Rs.
Rs.
Page 79
15.00
3.00
18.00
1.20
Percent
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 15 Sft.
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
1.20
#####
Say
Say
Say
Say
1.20
12.90
Item No.
24
Rate
Per Unit (Rs.)Amount (Rs.)
Page 80
Cft
3.68 P. Cft
3.35
Kg
0.00 Kg
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
Sft
Sft
Sft
0.00 Sft
Rft
Rft
Rft
0.00 Rft
Detail
20
8.00
2.00
1.00
12.00
1.00
0.20
0.428
Rate
Per Unit (Rs.)Amount (Rs.)
Nos
Nos
No
Nos
Doz
Kg.
Gln.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
P. Doz
P.Kg.
P. Gln.
3.35
0.67
4.02
0.26
Percent
4.02
15.75
Labour
For bringing the leaves to proper size
fixing deodar wood lipping with glue
and nail making/ fixing deodar wood
frame & fixing at site with rawal plug &
screws.
Carpenter
Helper
Total
Sundries
Total
Contractor's Profit & Ove
Total for 15.75 Sft.
Rate Per Sft
1.00 No
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 81
0.00 P. Day
0.00 P. Day
0.00
15.75
Rs.
Rs.
Say
Say
Rs.
Rs.
0.26
2.50
Say
Say
0.25
2.50
DESCRIPTION
OF
ITEM NO
25:
i)
Detail
Rate
Analysis for
4' x 6.5' =
Rate
Per Unit (Rs.)Amount (Rs.)
26 Sft
Material
Partal Wood
Boxing
Side 2x6-1/3x22/12x3/48
Top & Bottom 2x4 22/12x3/48
Foot Rack 1x3-7/8x22/12x3/48
Vertical Style 1x5x22/12x3/48
Strips 6x22/12x1/8x3/48
Back 2x1x22/12x3/48
Wastage 15%
Shutters Deodar Wood
1x1-2/3x6x1/12
1x2-1/3x6x1/12
Wastage 15%
Hard Board
4x6
Wastage 10%
Sawing Charges
6.88x10
Page 82
1.45
0.92
0.44
0.57
0.09
0.34
3.81
0.57
4.38
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
0.91
1.26
2.17
0.33
2.50
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
26.00 Sft
2.60 Sft
28.60 Sft
0.00 Sft
68.80 Sft
0.00 Sft
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Fittings
Hings 4" (100mm)
Handle
Tie rod welding fixing arragement
Hanger hook including pull out rod
Tower bolt 4" (100mm)
Bitumen Painting
Total
Contractor's Profit & Ove
Total for 26 Sft.
Rate Per Sft
20
6.00
2.00
2.25
2.00
1.00
1.43
Nos
Nos
Nos
Nos
Nos
Kg.
0.00
0.00
0.00
0.00
-0.08
0.00
Each
Each
Each
Each
Each
Each
(0.08)
(0.02)
(0.10)
(0.00)
Percent
-0.10
26
(0.08)
-
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft
4.00 No
2.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
0.00 P. Day
0.00 P. Day
0.00
26
Rs.
Rs.
Rs.
Rs.
Page 83
#####
#####
Say
Say
Say
Say
(3.70)
(39.90)
Item No.
25
ii)
Detail
Rate
Analysis for
8' x 5'
Rate
Per Unit (Rs.)Amount (Rs.)
40 Sft
Material
Deodar Wood
Boxing
Vetical Side 2x8x22/12x3/48
Control Side 1x7-7/8x22/12x3/48
Horizontal T&B 2x4 11/12x22/12x3/48
Shelves 5x2x22/12x3/48
Vertical 1x1x22/12x3/48
Shoes 2xx1/5x1/12
Sutter 2x2 3/5x8x1/12
Strips 2x8x1/12x1/24
Strips 2x5x1/12x1/24
Wastage 15%
Hard Wood Board
Back 5x8
Wastage 10%
Sawing Charges :
10.20x10
Bitumen Painting 2 Coat
Painting 3 Coats
1.83
0.90
1.13
1.15
0.17
0.02
3.47
0.06
0.03
8.76
1.31
10.07
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
40.00 Sft
4.00 Sft
44.00 Sft
0.00 Sft
102.00 Sft
0.00 Sft
0.00 Each
0.00 P. Gln.
1.43 Kg.
0.27 Kg.
Page 84
Detail
Fittings
Hings 4" (100mm)
Handle
Tie rod welding fixing arragement
Hanger hook including full out rod
Screws
Tower bolt 4" (100mm)
Nail
Locking arrangement
Total
Contractor's Profit & Ove
Total for 40 Sft.
Rate Per Sft
20
6.00 Nos
2.00 Nos
-0.10 Each
0.00 Each
2.00
4.00
1.00
0.19
1.00
0.00
0.00
-0.08
0.00
0.00
Nos
Doz
Nos
Kg
Nos
Each
P. Doz
Each
P. Kg
Each
-0.82
40
6.00 Nos
2.00 Nos
1.00 Nos
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
0.00 P. Day
0.00 P. Day
0.00 P. Day
0.00
40
Rs.
Rs.
Rs.
Rs.
Page 85
(0.60)
(0.08)
(0.68)
(0.14)
(0.82)
(0.02)
Percent
Carpenters
Skilled Cooly
Painter
Total
Sundries
Total
Rate
Per Unit (Rs.)Amount (Rs.)
#####
#####
Say
Say
Say
Say
(0.20)
(2.80)
Item No.
26
7.5' x 7' =
Rate
Per Unit (Rs.)Amount (Rs.)
52.50 Sft
Material
RCC shelves (Precast RCC 1x1-x3 top
and bottom
2x7-x2x1/8
4x2-x2x1/8
Steel Reinforcement
6.12x1.50
" thick vin board (one side ply) for
boxing.
Top/ Bottom 6x2x2-x1-7/8
Side 6x2x1-1/8x1-7/8
Back 6x2-x1-1/8
Top/ Bottom 3x2x2-x1-7/8
Vertical 6x2x1-x1-7/8
Side 2x4x1-7/8
Back 3x2x2-x1-
Back 1x2-x4
Wastage 10%
Vin board " thick on both side ply
6x2-x1-
3x4x2-
Wastage 10%
Page 86
3.62 Cft
2.50 Cft
6.12 Cft
0.00 P. Cft
9.18 Kg
0.00 P. Kg
50.63
25.31
15.18
25.31
28.12
15.00
16.87
9.00
185.42
18.54
203.96
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
0.00 Sft
16.87
27.00
43.87
4.38
48.25
Sft
Sft
Sft
Sft
Sft
0.00 Sft
Detail
Deodar Wood
Frame 4x7x3/12x1/12
Frame 4x7-x3/12x1/12
Lipping 3x6x2-x1/16x1/24
Lipping 6x2x1-1/8x1/16x1/24
Lipping 2x3x4x1/16x1/24
For drawers side supporting
3x2x1-7/8x1/12x1/24
Drawers 3x2-x1-1/8x1/24
Side 2x3x1-7/8x1-1/8x1/24
Wastage 35%
Hard Board for drawers
3x2-x1-7/8(3x0.686x0.573=1.179
Wastage 10%
Full hinges " (20mm) wide (Imported)
3x4 (3x1.219 = 3.657)
3x1-1/8 (3x0.343 = 1.029)
Wastage 5% (Add Wastage 5%)
C.P. Handle
Catcher (Germany)
China Lock (Glone)
Rawal Plug 1" (40mm)
Screws above 1" long
C.P. Hanger rod with 2 hooks
C.P. Hooks
Page 87
0.58
0.62
0.11
0.04
0.06
Cft
Cft
Cft
Cft
Cft
0.04
0.32
0.53
2.30
0.81
3.11
Cft
Cft
Cft
Cft
Cft
Cft
Rate
Per Unit (Rs.)Amount (Rs.)
0.00 P. Cft
12.65 Sft
1.26 Sft
13.91 Sft
0.00 Sft
12.00
3.37
15.37
0.76
16.13
Rft
Rft
Rft
Rft
Rft
0.00 Rft
9.00
9.00
3.00
30.00
2.50
1.00
2.00
Nos
Nos
Nos
Nos
Doz
No
Nos
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
P. Doz
Each
Each
Detail
Glue
Nail
Painting
2.00 Kg
L.S.
2.86 Gln.
4(7 x 7)
Total
Contractor's Profit & Ove
Total for 52.50 Sft.
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
20
0.00 P. Kg
0.00 P. Gln.
32.00
-
32.01
6.40
38.41
0.73
Percent
38.41
52.50
Labour
Labour for making ward robe complete
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft
52.50 Sft
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 88
29.00 Sft
1,522.50
1,522.50
152.25
1,674.75
334.95
2,009.70
38.28
2009.70
52.50
Rs.
Rs.
#####
#####
Say
Say
38.30
411.90
Rs.
Rs.
#####
#####
Say
Say
64.75
696.85
DESCRIPTION
OF
ITEM NO
27:
a)
Detail
Rate Analysis
for
4' x 6.75'
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Teak Wood
Top Rail 1x4x3"x4"
Vertical Rail 2x7x3"x4"
0.45
1.33
1.78
0.22
2.00
6.00
Wastage 12%
Iron hold fast
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
20
Cft
Cft
Cft
Cft
Cft
Nos
0.00 P. Cft
0.00 Each
0.00 P. Day
0.00 P. Day
Percent
0.00
27
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
0.70 No
0.50 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 89
0.00
27
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
27
b)
Detail
Rate Analysis
for
4' x 6.75'
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
For Frame
Top Rail 1x4'x3"x4"
Vertical Rail 2x7'x3"x4"
0.45
1.33
1.78
0.27
2.05
6.00
Wastage 15%
Iron hold fast
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
20
Cft
Cft
Cft
Cft
Cft
Nos
0.00 P. Cft
0.00 Each
0.00 P. Day
0.00 P. Day
Percent
0.00
27
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
0.50 No
0.25 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 90
0.00
27
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
27
c)
Detail
Rate
Analysis
for
4' x 6.75'
27 Sft
Material
Shishim Wood
Top Rail 1x4'x3"x4"
Vertical Rail 2x7'x3"x4"
0.45
1.33
1.78
0.27
2.05
6.00
Wastage 15%
Iron hold fast
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
20
Rate
Per Unit (Rs.)Amount (Rs.)
Cft
Cft
Cft
Cft
Cft
Nos
0.00 P. Cft
0.00 Each
0.00 P. Day
0.00 P. Day
Percent
0.00
27
Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
0.50 No
0.40 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 91
0.00
27
Rs.
Rs.
Say
Say
Rs.
Rs.
0.05
Say
Say
0.05
DESCRIPTION
OF
ITEM NO
28:
a)
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
100 Sft
Material
Deodar Wood
Nail & Screws bolt and brackets
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft
20
9.50 Cft
L.S.
0.00 P. Cft
0.00 P. Day
0.00 P. Day
Percent
0.00
100
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft
4.00 Nos
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 92
0.00
100
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
28
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
100 Sft
Material
Deodar Wood
Asscessories for fixing
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft
7.12 Cft
L.S.
20
0.00 P. Cft
0.00 P. Day
0.00 P. Day
Percent
0.00
100
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft
4.00 Nos
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 93
0.00
100
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
28
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
100 Sft
Material
Deodar Wood
Asscessories for fixing
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft
4.75 Cft
L.S.
20
0.00 P. Cft
0.00 P. Day
0.00 P. Day
Percent
0.00
100
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft
4.00 Nos
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 94
0.00
100
Rs.
Rs.
Say
Say
Rs.
Rs.
0.05
Say
Say
0.05
DESCRIPTION
OF
ITEM NO
29:
Making and fixing deodar wood shelves,
including brackets.
i)
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
100 Sft
Material
Deodar Wood
Accessoires for fitting
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft
9.50 Cft
L.S.
20
0.00 P. Cft
0.00 P. Day
0.00 P. Day
Percent
0.00
100
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft
4.00 Nos
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 95
0.00
100
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
29
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
100 Sft
Material
Deodar Wood
Asscessories for fixing
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft
14.25 Cft
L.S.
20
0.00 P. Cft
0.00 P. Day
0.00 P. Day
Percent
0.00
100
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft
4.00 Nos
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 96
0.00
100
Rs.
Rs.
Say
Say
Rs.
Rs.
0.05
Say
Say
0.05
Item No.
29
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
100 Sft
Material
Deodar Wood
Asscessories for fixing
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft
19.00 Cft
L.S.
20
0.00 P. Cft
0.00 P. Day
0.00 P. Day
Percent
0.00
100
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft
4.00 Nos
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 97
0.00
100
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
30:
a)
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
10 Nos
Material
Hinges 2" (50mm)
Screws 1" (25mm)
Deodar wood
Total
Contractor's Profit & Ove
Total
10.00 Nos
3.50 Doz
0.21 Cft
20
0.00 Each
0.00 P. Doz
0.00 P. Cft
Percent
Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
0.40 No
0.20 No
10
Percent
20
Percent
Item Rates
Labour Rate for Each
Page 98
0.00 P. Day
0.00 P. Day
Rs.
0.00
10
0.00
Say
Rs.
0.00
10
-0.25
Say
(0.20)
Item No.
30
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Brass hooks
Deodar Wood
Screws/ Nails
Total
Contractor's Profit & Ove
Total
1 No
0.01 Cft
2.00 Nos
20
0.00 Each
0.00 P. Cft
0.00 P. Doz
0.44
0.44
0.09
0.53
Percent
0.05 No
0.05 No
10
Percent
20
Percent
Item Rates
Labour Rate for Each
Rs.
Page 99
Rs.
0.00 P. Day
0.00 P. Day
0.00
1.25
0.00
Say
0.48
Say
0.50
Item No.
30
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
30 Nos
Material
Door rubber stopper
Gutty
Screws
Total
Contractor's Profit & Ove
Total
30.00 Nos
30.00 Nos
2.50
Doz
20
0.00 Each
0.00 Each
0.00 P. Doz
Percent
Labour
Carpenter
Total
Sundries
Total
Contractor's Profit & Ove
Total
0.25 No
10
Percent
20
Percent
Item Rates
Labour Rate for Each
Page 100
0.00 P. Day
Rs.
0.00
30
0.00
Say
Rs.
0.00
30
-0.10
Say
(0.10)
Item No.
30
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
G.I. Hook
Gutty
Total
Contractor's Profit & Ove
Total
1.00 No
1.00 No
20
0.00 Each
0.00 Each
Percent
0.08 No
10
Percent
20
Percent
Item Rates
Labour Rate for Each
Rs.
Page 101
Rs.
0.00 P. Day
0.00
30
0.00
Say
0.00
Say
DESCRIPTION OF
Item No. 31
ITEM:
Hard wood railing of any shape and design
including bends and corners fixed in positi
including polishing complete as directed
by Engineer Incharge.
a)
Shisham Wood.
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
12 Rft
Material
Shisham wood
Sand paper
Polishing material
Total
Contractor's Profit & Ove
Total 12 Rft.
Rate Per Rft
0.90 Cft
3.00 Nos
0.075 Kg.
20
0.00 P. Cft
0.00 Each
0.00 P. Kg.
0.00 P. Day
0.00 P. Day
0.00 P. Day
Percent
0.00
12
Labour
Carpenters
Skilled Cooly
Polisher
Total
Sundries
Total
Contractor's Profit & Ove
Total for 12 Rft.
Rate Per Rft
1.50 No
0.75 No
0.50 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Page 102
0.00
12
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
31
Teak Wood.
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
10 Rft
Material
Teak wood
Sand paper
Polishing material
Total
Contractor's Profit & Ove
Total for 10 Rft.
Rate Per Rft
0.90 Cft
3.00 Nos
0.075 Kg.
20
0.00 P. Cft
0.00 Each
0.00 P. Kg.
0.00 P. Day
0.00 P. Day
0.00 P. Day
Percent
0.00
10
Labour
Carpenters
Skilled Cooly
Polisher
Total
Sundries
Total
Contractor's Profit & Ove
Total for 10 Rft.
Rate Per Rft
1.00 No.
0.50 No
0.20 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Page 103
0.00
10
Rs.
Rs.
0.01
Say
Say
Rs.
Rs.
0.01
Say
Say
DESCRIPTION
OF
ITEM NO
32:
Deodar wood dado or Picture Rail 3"x1"
(50x40mm) as per approved design including
moulding and fixed in place, cost of screws
plugs and painting complete.
Detail
Rate
Analysis
for
10 Rft
Material
Deodar wood
Sand paper
Rawal Plugs
Screws
Polishing material
Total
Contractor's Profit & Ove
Total for 10 Rft.
Rate Per Rft
Rate
Per Unit (Rs.)Amount (Rs.)
0.60
1.00
0.50
0.50
0.038
20
Cft
Sht
No
Doz
Kg.
0.00
0.00
0.00
0.00
0.00
P. Cft
P. Sht
Each
P. Doz
P. Kg.
0.00 P. Day
0.00 P. Day
0.00 P. Day
Percent
0.00
10
Labour
Carpenter
Skilled Cooly
Polisher
Total
Sundries
Total
Contractor's Profit & Ove
Total for 10 Rft.
Rate Per Rft
0.50 No
0.25 No
0.10 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
0.00
10
Rs.
Rs.
Rs.
Rs.
Page 104
#####
#####
Say
Say
Say
Say
(0.10)
DESCRIPTION
OF
ITEM NO
33:
a)
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
300 Sft
Labour
Sawyer
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
1.50 Nos
1.50 Nos
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Rs.
Page 105
Rs.
0.00 P. Day
0.00 P. Day
0.00
300
x 100 =154.28
0.02
0.00 Say
Item No.
33:
Detail
Rate
Analysis
for
Rate
Per Unit
Amount
450 Sft
Labour
Sawyer
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
3.00 Nos
3.00 Nos
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Rs.
Page 106
Rs.
0.00 P. Day
0.00 P. Day
0.00
450
0.00
x 100=205.7
Say
DESCRIPTION
OF
ITEM NO
34:
a)
Soft Wood.
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
300 Sft
Labour
Sawyer
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
1.00 No
0.77 No
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Rs.
Page 107
Rs.
0.00 P. Day
0.00 P. Day
0.00
300
0.00
x 100=94.97 Say
Say
(0.01)
Item No.
34
Hard Wood.
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
300 Sft
Labour
Sawyer
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
1.50 Nos
1.16 Nos
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Rs.
Page 108
Rs.
0.00 P. Day
0.00 P. Day
0.00
300
0.00
x 100=142.62 S
Say
DESCRIPTION
OF
ITEM NO
35:
Detail
Rate
Analysis
for
5 Sft
Material
Deodar Wood
Horizontal Planks
Top 4x5x1/3x1/24
Vertical 2x1x1/6x5/68
Supports along sun shade
2x3/2x1/8x5/48
Suporting brackets 2x1x1/8x5/48
Front ears hard strips 1x5x1/4x1/12
Wastage 10%
Sawing & Nails
Total
Contractor's Profit & Ove
Total for 5 Sft.
Rate Per Sft
20
0.28 Cft
0.06 Cft
0.04 Cft
0.03 Cft
0.10 Cft
0.51 Cft
0.05 Cft
0.56 Cft
L.S.
0.00 P. Cft
9.60
5
0.25 No
0.10 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
0.00 P. Day
0.00 P. Day
0.00
5
Rs.
Rs.
Rs.
Rs.
Page 109
8.00
8.00
1.60
9.60
1.92
Percent
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Rate
Per Unit (Rs.)Amount (Rs.)
1.92
#####
Say
Say
Say
Say
1.90
20.65
DESCRIPTION
OF
ITEM NO
36:
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
18 Sft
Material
Kail or Chir Wood
Nails
Glue
Iron Hook
Total
Contractor's Profit & Ove
Total for 18 Sft.
Rate Per Sft
1.64
0.093
0.075
1.00
20
Cft
Kg.
Kg.
No.
0.00
0.00
0.00
0.00
P. Cft
P. Kg.
P. Kg.
Each
0.00 P. Day
0.00 P. Day
Percent
0.00
18
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 18 Sft.
Rate Per Sft
0.75 No
0.75 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 110
0.00
18
Rs.
Rs.
Say
Say
Rs.
Rs.
0.01
Say
Say
DESCRIPTION
OF
ITEM NO
37:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Deodar wood
Hooks
Total
Contractor's Profit & Ove
Total
2.50 Cft
2.00
Doz
20
0.00 P. Cft
0.00 P. Doz
Percent
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total
0.20 No
0.10 No
10
Percent
20
Percent
Item Rates
Labour Rate for Each
Composite Rate for Each
Page 111
0.00 P. Day
0.00 P. Day
Rs.
Say
Rs.
0.00
Say
DESCRIPTION
OF
ITEM NO
38:
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
70 Rft
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total
1.00 No
0.50 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Rft
Rs.
Page 112
Rs.
0.00 P. Day
0.00 P. Day
0.00
70
0.00
Say
Say
DESCRIPTION
OF
ITEM NO
39:
Detail
Rate
Analysis
for
15 Rft
Material
Deodar Wood
Detail of Deodar Wood
2x5/6x15x1/8
Stops 14x2x1/8x5/6
and Rail 2x15xx
and Rail 2x4x3xx
3.12
3.65
1.88
1.50
10.15
Wastage
L. S
0.35
10.50
Nails
0.93
Bolts " to 3" (12 to 76mm) long
5.880
Steel rods dia 3x3'-6" = 10.5 Rft
15.3Lb (7
Washers
12.00
Total
Contractor's Profit & Ove
Total for 15 Rft.
Rate Per Rft
Labour
Carpenter
Blacksmith
Hammer-man
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 15 Rft.
Rate Per Rft
Rate
Per Unit (Rs.)Amount (Rs.)
20
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg
Kg.
.5Kg)
Nos
0.00
0.00
0.00
0.00
0.00
P. Cft
P. Kg
P. Kg
P. Kg
Each
Percent
0.00
15
2.00
0.50
0.50
2.00
10
Percent
20
Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Page 113
Nos
No
No
Nos
0.00
0.00
0.00
0.00
P.
P.
P.
P.
Day
Day
Day
Day
0.00
15
Rs.
Rs.
0.01
Say
Say
Rs.
Rs.
#####
#####
Say
Say
(7.30)
(24.00)
DESCRIPTION
OF
ITEM NO
a - (i)
40:
Detail
128 Sft
128.00 Sft
6.40 Sft
134.40 Sft
1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.47
2.00
Wastage 15%
Nails of all sorts
Screws
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
20
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg
Doz
0.00 Sft
0.00 P. Cft
0.00 P. Kg
0.00 P. Doz
Percent
0.00
128
1.00 Nos
1.00 Nos
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
0.00 P. Day
0.00 P. Day
0.00
128
100
Rs.
Rs.
Rs.
Rs.
Page 114
100
#####
#####
Say
Say
Say
Say
(1.00)
(0.10)
Item No.
40
a - (ii)
Detail
128 Sft
128.00 Sft
6.40 Sft
134.40 Sft
Deodar Wood
Frame work 2x16x3"x2"
Horizontal post 1x16x2"x2"
Vertical post 3x8x2"x2"
Vertical post 3x8x2"x2"
1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.47
2.00
Wastage 15%
Nails of all sorts
Screws
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft
20
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg
Doz
0.00 Sft
0.00 P. Cft
0.00 Kg
0.00 P. Doz
Percent
0.00
128
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
1.00 Nos
1.00 Nos
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
0.00 P. Day
0.00 P. Day
0.00
128
100
Rs.
Rs.
Rs.
Rs.
Page 115
100
#####
#####
Say
Say
Say
Say
(1.00)
(0.10)
Item No.
40
a - (iii)
Detail
Rate
Analysis
for
128 Sft
Material
Masonite sheet 1x8x16
Wastage 5%
128.00 Sft
6.40 Sft
134.40 Sft
1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.47
2.00
Wastage 15%
Nails of all sorts
Screws
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
20
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg
Doz
0.00 Sft
0.00 P. Cft
0.00 P. Kg
0.00 P. Doz
Percent
0.00
128
1.00 Nos
1.00 Nos
10
Percent
20
Percent
336.60
128
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Page 116
100
170.00 P. Day
85.00 P. Day
100
170.00
85.00
255.00
25.50
280.50
56.10
336.60
262.97
Rs.
Rs.
#####
#####
Say
Say
262.95
28.30
Rs.
Rs.
#####
#####
Say
Say
261.90
28.20
Item No.
40
b (1)
Detail
128 Sft
256.00 Sft
12.80 Sft
268.80 Sft
1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.70
2.00
Wastage 15%
Nails of all sorts
Screws of all sorts
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
20
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg
Doz
0.00 Sft
0.00 P. Cft
0.00 P. Kg
0.00 P. Doz
Percent
0.00
128
1.20 Nos
1.20 Nos
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
0.00 P. Day
0.00 P. Day
0.00
128
100
Rs.
Rs.
Rs.
Rs.
Page 117
100
#####
#####
Say
Say
Say
Say
(1.00)
(0.10)
Item No.
40
b - (ii)
Detail
Rate
Analysis
for
128 Sft
Material
Ply Wood Sheet 2 x 16 x 8 (2 x 4.876 x
2.438) =
23.78 M
Wastage 5%
Deodar Wood for frame work
Horizontal post 2x16x3"x2"
Cross 1x16x2"x2"
Vertical post 2x8x3"x2"
Vertical post 3x8x2"x2"
20
12.80 Sft
268.80 Sft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg
Doz
0.00 Sft
0.00 P. Cft
0.00 P. Kg
0.00 P. Doz
Percent
0.00
128
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
256.00 Sft
1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.70
3.00
Wastage 15%
Nails of all sorts
Screws
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
1.20 Nos
1.20 Nos
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Page 118
100
0.00 P. Day
0.00 P. Day
0.00
128
100
Rs.
Rs.
#####
Say
Say
Rs.
Rs.
#####
#####
Say
Say
(1.60)
(0.10)
Item No.
40
b - (iii)
Detail
Rate
Analysis
for
128 Sft
Material
Masonite sheet 2x16'x8'
Wastage 5%
256.00 Sft
12.80 Sft
268.80 Sft
1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.70
2.00
Wastage 15%
Nails of all sorts
Screws
Total
Contractor's Profit & Ove
Total
Rate Per Sft
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
20
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg
Doz
0.00 Sft
0.00 P. Cft
0.00 P. Kg
0.00 P. Doz
Percent
0.00
128
1.20 Nos
1.20 Nos
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Page 119
100
0.00 P. Day
0.00 P. Day
0.00
128
100
Rs.
Rs.
#####
Say
Say
Rs.
Rs.
#####
#####
Say
Say
(1.00)
(0.10)
DESCRIPTION
OF
ITEM NO
i)
41:
Detail
Rate
Analysis
for
192 Sft
Material
Hard Board 16x12
192.00 Sft
Partal Wood
7x16x3"x1"
9x16x3"x1"
3.50
3.38
6.88
0.69
7.57
32.00
3.00
0.70
0.178
4.00
4.00
Wastage 10%
Hard Wood Gutti
Screws
Nail
Cement for grouting
M.S clamp
M.S hook
Total
Contractor's Profit & Ove
Total for 192 Sft.
Rate Per Sft
20
Cft
Cft
Cft
Cft
Cft
Nos
Doz
Kg
Bag
Nos
Nos
0.00 Sft
0.00
0.00
0.00
0.00
0.00
0.00
0.00
P. Cft
Each
P. Doz
P. Kg
P. Bag
Each
Each
0.00 P. Day
0.00 P. Day
0.00 P. Day
Percent
0.00
192
Labour
Carpenter
Cooly Skilled
Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 192 Sft.
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
3.00 Nos
2.00 Nos
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
0.00
192
100
Rs.
Rs.
Rs.
Rs.
Page 120
100
#####
#####
Say
Say
Say
Say
(1.00)
(0.10)
Item No.
41
ii)
Detail
Rate
Analysis
for
192 Sft
Material
Chip Board 1x16x12
192.00 Sft
3.50
3.38
6.88
0.69
7.57
32.00
3.00
0.70
0.178
4.00
4.00
Wastage 10%
Wooden Hand Gutti
Screws
Nail
Cement for grouting
M.S clamp
M.S hook
Total
Contractor's Profit & Ove
Total for 192 Sft.
Rate Per Sft
Labour
Carpenter
Cooly Skilled
Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 192 Sft.
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
20
Cft
Cft
Cft
Cft
Cft
Nos
Doz
Kg
Bag
Nos
Nos
0.00 Sft
0.00
0.00
0.00
0.00
0.00
0.00
0.00
P. Cft
Each
P. Doz
P. Kg
P. Bag
Each
Each
0.00 P. Day
0.00 P. Day
0.00 P. Day
Percent
0.00
192
3.00 Nos
2.00 Nos
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
0.00
192
100
Rs.
Rs.
Rs.
Rs.
Page 121
100
#####
#####
Say
Say
Say
Say
(1.00)
(0.10)
Item No.
41
iii)
Detail
192 Sft
192.00 Sft
3.50
3.38
6.88
0.69
7.57
32.00
3.00
0.70
0.178
4.00
4.00
Wastage 10%
Wooden Hand Gutti
Screws
Nail
Cement for grouting
M.S clamp
M.S hook
Total
Contractor's Profit & Ove
Total for 192 Sft.
Rate Per Sft
Labour
Carpenter
Cooly Skilled
Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
20
Cft
Cft
Cft
Cft
Cft
Nos
Doz
Kg
Bag
Nos
Nos
0.00 Sft
0.00
0.00
0.00
0.00
0.00
0.00
0.00
P. Cft
Each
P. Doz
P. Kg
P. Bag
Each
Each
0.00 P. Day
0.00 P. Day
0.00 P. Day
Percent
0.00
192
3.00 Nos
2.00 Nos
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
0.00
192
100
Rs.
Rs.
Rs.
Rs.
Page 122
100
#####
#####
Say
Say
Say
Say
(1.00)
(0.10)
Item No.
41
iv)
Detail
192 Sft
192.00 Sft
3.50
3.38
6.88
0.69
7.57
32.00
3.00
0.70
0.178
4.00
4.00
Wastage 10%
Wooden Hand Gulli
Screws
Nail
Cement for grating
M.S clamp
M.S hook
Total
Contractor's Profit & Ove
Total for 192 Sft.
Rate Per Sft
20
Cft
Cft
Cft
Cft
Cft
Nos
Doz
Kg
Bag
Nos
Nos
0.00 Sft
0.00
0.00
0.00
0.00
0.00
0.00
0.00
P. Cft
Each
P. Doz
P. Kg
P. Bag
Each
Each
0.00 P. Day
0.00 P. Day
0.00 P. Day
Percent
0.00
192
Labour
Carpenter
Cooly Skilled
Cooly Unskilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 192 Sft.
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
3.00 Nos
2.00 Nos
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
0.00
192
100
Rs.
Rs.
Rs.
Rs.
Page 123
100
#####
#####
Say
Say
Say
Say
(1.00)
(0.10)
Item No.
42
i)
Detail
Rate
Analysis
for
12' x 12' =
Rate
Per Unit (Rs.)Amount (Rs.)
144 Sft
Material
Thermopore " thick
Wastage 5%
144.00 Sft
7.20 Sft
151.20 Sft
Deodar Wood
Frame Main 3x12x3"x2"
Cross 3x12x1"x2"
Wooden Strips 12x1"x"
1.53
0.77
0.25
2.55
0.51
3.06
Wastage 20%
Sawing charge
Making holes in walls
Wooden gutties 3 interval
Screws above 1" long
Nail
M.S. hooks
M.S. clamps
Cement sand for repair
Sand
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft
Cft
Cft
Cft
Cft
Cft
Cft
3.06 Cft
L.S.
16.00 Nos
6.00 Doz
0.70 Kg
4.00 Nos
4.00 Nos
0.083 Bag
1.500 Cft.
20
0.00 Sft
0.00 P. Cft
0.00 P. Cft
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Percent
0.00
144
Page 124
100
Each
P. Doz
P. Kg
Each
Each
P. Bag
% Cft.
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Carpenters
Cooly Skilled
Cooly
Mason
Total
Sundries
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft
2.25
2.00
0.50
0.25
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Nos
Nos
No
No
P.
P.
P.
P.
Day
Day
Day
Day
0.00
144
100
Rs.
Rs.
Rs.
Rs.
Page 125
0.00
0.00
0.00
0.00
#####
#####
Say
Say
Say
Say
(2.90)
(0.30)
Item No.
42
a)
ii)
Detail
Rate
Analysis
for
12' x 12' =
Rate
Per Unit (Rs.)Amount (Rs.)
144 Sft
Material
Thermopore 1" thick
Wastage 5%
144.00 Sft
7.20 Sft
151.20 Sft
Deodar Wood
Frame Main 3x12x2"x3"
Cross 3x12x1"x2"
Wooden Strips 4x12x1"x"
1.53 Cft
0.77 Cft
0.25 Cft
2.55 Cft
0.51 Cft
3.06 Cft
3.06 Cft
L.S.
6.00 Doz
0.70 Kg
4.00 Nos
4.00 Nos
L.S.
Wastage 20%
Sawing charge
Making holes in walls
Screws of all sorts
Nail
M.S. hooks
M.S. clamps
Cement sand for repair
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft
20
0.00 Sft
0.00 P. Cft
0.00
0.00
0.00
0.00
0.00
Percent
24.00
144
Page 126
100
P. Doz
P. Kg
Each
Each
20.00
20.00
4.00
24.00
16.67
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Carpenter
Cooly Skilled
Cooly
Mason
Total
Sundries
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft
2.25
2.00
0.50
0.25
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Nos
Nos
No
No
P.
P.
P.
P.
Day
Day
Day
Day
0.00
144
100
Rs.
Rs.
Rs.
Rs.
Page 127
0.00
0.00
0.00
0.00
#####
1.49
Say
Say
Say
Say
13.85
1.50
Item No.
42
b)
i)
Detail
Rate
Analysis
Rate
Per Unit (Rs.)Amount (Rs.)
144 Sft
Material
Thermopore " thick
Wastage 5%
144.00 Sft
7.20 Sft
151.20 Sft
Pertal Wood
Frame Main Style 3x12x2"x3"
Cross Style 3x12x1"x2"
Cross Style 4x12x1"x"
1.53 Cft
0.77 Cft
0.25 Cft
2.55 Cft
0.51 Cft
3.06 Cft
3.06 Cft
L.S.
16.00 Nos
6.00 Nos
0.70 Kg
4.00 Nos
4.00 Nos
0.083 Bag
1.500 Cft.
Wastage 20%
Sawing charge
Making holes in walls
Wooden gutties 3 interval
Screws of all sorts
Nail
M.S. hooks
M.S. clamps
Cement sand for repair
Sand
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft
20
0.00 Sft
0.00 P. Cft
0.00 P. Cft
0.50
0.00
0.00
0.00
0.00
0.00
0.00
Each
P. Doz
P. Kg
Each
Each
P. Bag
% Cft.
Percent
9.60
144
Page 128
100
8.00
8.00
1.60
9.60
6.67
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Carpenter
Cooly Skilled
Cooly
Mason
Total
Sundries
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft
2.25
2.00
0.50
0.25
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Page 129
Nos
Doz
No
No
0.00
0.00
0.00
0.00
P.
P.
P.
P.
Day
Day
Day
Day
0.00
144
100
Rs.
Rs.
Say
Say
Rs.
Rs.
3.72
0.40
Say
Say
3.70
0.40
Item No.
42
b)
ii)
Detail
Rate
Analysis for
12' x 12' =
Rate
Per Unit
Amount
144 Sft
Material
Thermopore 1" thick
Wastage 5%
144.00 Sft
7.20 Sft
151.20 Sft
Pertal Wood
Frame Main Style 3x12x2"x3"
Cross Style 3x12x1"x2"
Cross Style 4x12x1"x"
1.53 Cft
0.77 Cft
0.25 Cft
2.55 Cft
0.51 Cft
3.06 Cft
3.06 Cft
L.S.
16.00 Nos
6.00 Doz
0.70 Kg
4.00 Nos
4.00 Nos
0.083 Bag
1.500 Cft.
Wastage 20%
Sawing charge
Making holes in walls
Wooden gutties 3 interval
Screws of all sorts
Nail
M.S. hooks
M.S. clamps
Cement sand for repair
Sand
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft
20
0.00 Sft
0.00 P. Cft
0.00 P. Cft
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Percent
0.00
144
Page 130
100
Each
P. Doz
P. Kg
Each
Each
P. Bag
% Cft.
Detail
Labour
Carpenter
Cooly Skilled
Cooly
Mason
Total
Sundries
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft
2.25
2.00
0.50
0.25
10
Percent
20
Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm
Rate
Per Unit (Rs.)Amount (Rs.)
Nos
Nos
No
No
P.
P.
P.
P.
Day
Day
Day
Day
0.00
144
100
Rs.
Rs.
Rs.
Rs.
Page 131
0.00
0.00
0.00
0.00
#####
#####
Say
Say
Say
Say
(2.80)
(0.30)
DESCRIPTION
OF
ITEM NO
43:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Mason
Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
0.25 No
0.25 No
10
Percent
20
Percent
Item Rates
Labour Rate for Each
0.01
Rs.
Page 132
0.00 P. Day
0.00 P. Day
0.01
Say
Item No.
43
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Mason
Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
0.125 No
0.125 No
10
Percent
20
Percent
Item Rates
Labour Rate for Each
Rs.
Page 133
0.00 P. Day
0.00 P. Day
0.00
Say
DESCRIPTION
OF
ITEM NO
44:
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
14 Sft
Material
Detail of glass panes
Glass Panes
Wastage 10%
14.00 Sft
1.40 Sft
15.40 Sft
L.S.
20
0.00 Sft
0.00 P. Day
0.00 P. Day
Percent
0.00
14
Labour
Glazier for cutting and fixing glass
panes including supplying front & back.
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 134
0.25 No
0.25 No
0.00
14
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
44
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
14 Sft
Material
Glass Panes
D. Wood
Cost of nails and putty.
Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft
14.00 Sft
0.09 Cft
L.S.
20
0.00 Sft
0.00 P. Cft
0.00 P. Day
0.00 P. Day
0.00 P. Day
Percent
0.00
14
Labour
Glazier for cutting and fixing glass
panes including supplying front & back.
Cooly Skilled
Cartpenter for
Total
Sundries
Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
0.25 No
0.25 No
0.13 No
0.00
14
Rs.
Rs.
Rs.
Rs.
Page 135
#####
Say
Say
Say
Say
DESCRIPTION
OF
ITEM NO
45:
Detail
Rate
Analysis
for
15 Sft
15 Sft
Material
Glass Panes
Wastage 10%
15.00 Sft
1.50 Sft
16.50 Sft
0.06 Cft
L.S.
Rate
Per Unit (Rs.)Amount (Rs.)
20
0.00 Sft
0.00 P. Cft
Percent
0.00
15
Labour
Glazier
Cooly Skilled
Cartpenter
Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 15 Sft.
Rate Per Sft
0.38
0.38
0.13
0.13
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 136
No
No
No
No
0.00
0.00
0.00
0.00
P.
P.
P.
P.
Day
Day
Day
Day
0.00
15
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
a)
46:
Cutting to required sizes and fixing glass
with putty.
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
14 Sft
Material
Cost of nails & putty
Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft
L.S.
20
0.00 P. Day
0.00 P. Day
Percent
0.00
14
Labour
Glazier
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft
0.20 No
0.15 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
0.00
14
Rs.
Rs.
#####
Rs.
Rs.
Page 137
Say
Say
Say
Say
Item No.
46
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
16 Sft
Material
Deodar wood for fillets
Putty and nails
Total
Contractor's Profit & Ove
Total for 16 Sft.
Rate Per Sft
0.10 Cft
L.S.
20
0.00 P. Cft
Percent
0.00
16
Labour
Glazier
Cooly Skilled
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 16 Sft.
Rate Per Sft
0.20
0.20
0.10
0.10
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 138
No
No
No
No
0.00
0.00
0.00
0.00
P.
P.
P.
P.
Day
Day
Day
Day
0.00
16
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
47:
a)
Detail
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
8 Sft
Material
Plate glass " (6mm) thick
Wastage 10%
8.00 Sft
0.80 Sft
8.80 Sft
0.05 Cft
L.S.
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft
20
0.00
8
0.17
0.17
0.06
0.06
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 139
No
No
No
No
0.00
0.00
0.00
0.00
Percent
Labour
Glazier
Cooly Skilled
Carpenter
Cooly Skilled
Total
Sundries
Total
0.00 Sft
0.00 P. Cft
P.
P.
P.
P.
Day
Day
Day
Day
0.00
8
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
47
Rate
Analysis
for
Rate
Per Unit (Rs.)Amount (Rs.)
16 Sft
Material
Plate glass " (6mm) thick
Wastage 10%
16.00 Sft
1.60 Sft
17.60 Sft
0.10 Cft
L.S.
20
0.00 Sft
0.00 P. Cft
Percent
0.00
16
Labour
Glazier
Cooly Skilled
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 16 Sft.
Rate Per Sft
0.33
0.33
0.13
0.13
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
No
No
No
No
0.00
0.00
0.00
0.00
Day
Day
Day
Day
0.00
16
Rs.
Rs.
Rs.
Rs.
Page 140
P.
P.
P.
P.
#####
#####
Say
Say
Say
Say
(0.20)
DESCRIPTION
OF
ITEM NO
48:
i)
Detail
Rate
Material
Analysis
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
lbs
lbs
lbs
lbs
Kgs
0.00 per Kg
0.00 P. Cft
Cft
Cft
Cft
Cft
Cft
0.24 Cft
0.47 Cft
0.01 Cft
0.02 Cft
2.74 Cft
0.82 Cft
3.56 Cft
Wastage 30%
Page 141
Detail
Fitting
Hinges 4" (100mm)
Tower bolt 9: (225mm)
Handle 6" (150mm)
Iron hold fast
Rubber
Hook & clamp
Screws
Glue
Spikes
Sawing charge
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
20
Rate
Per Unit (Rs.)Amount (Rs.)
8.00
3.00
3.00
6.00
2.00
2.00
Nos
Nos
Nos
Nos
Nos
Nos
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
Each
Each
2.50
0.05
0.13
35.60
Doz
Kg.
Kg.
Sft
0.00
0.00
0.00
0.00
P. Doz
P.Kg.
P.Kg.
Sft
Percent
0.00
27
Labour
Carpenter
Cooly Skilled
Welder
Blacksmith
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
2.40
1.80
1.00
0.57
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Nos
Nos
No
No
P.
P.
P.
P.
Day
Day
Day
Day
0.00
27
Rs.
Rs.
Rs.
Rs.
Page 142
0.00
0.00
0.00
0.00
#####
#####
Say
Say
Say
Say
(1.30)
(14.10)
Item No.
48
ii)
Detail
Rate
Analysis
for
4' x 6.75' =
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
T-Iron 1"x1"x"
Vetical 2x7
Horizontal 1x4
14 Rft
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
18.90 Rft 2.36 Lbs/Rft
M.S. bar " = 4' @ 0.67 Lbs
M.S. flat "x"=18.90 Rft @ 0.425 Lbs
44.60
2.68
8.03
55.31Lbs (
Lbs
Lbs
Lbs
25.10)Kg
Deodar Wood
Vertical Style 4x6'-8"x4"x1"
Horizontal Top 2x1'-11"x4"x1"
Middle Top 2x1'-11"x4"x1"
Local Top 2x1'-11"x6"x1"
Bottom Top 2x1'-11"x8"x1"
1.12
0.16
0.16
0.24
0.32
Panells
2x16"x23"x5/8"
4x16"x19"x5/8"
0.24 Cft
0.47 Cft
Beading
2(16+16+23+23) 5/8
(1+2)
2x8
4(16+16+19+19) 5/8
(1+1)
2x8
0.00 P. Kg
0.00 P. Cft
Cft
Cft
Cft
Cft
Cft
0.01 Cft
0.02 Cft
2.74 Cft
0.82 Cft
3.56 Cft
Wastage 30%
Page 143
Detail
Fitting
Hinges 4" (100mm)
Tower bolt 9: (225mm)
Handle 6" (150mm)
Iron hold fast
Rubber
Hook & clamp
Screws
Glue
Spikes
Sawing charge
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.13
35.60
20
Rate
Per Unit (Rs.)Amount (Rs.)
Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.
Sft
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
Each
Each
P. Doz
P.Kg.
P.Kg.
Sft
Percent
0.00
27
Labour
Carpenter
Cooly Skilled
Welder
Blacksmith
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
2.40
1.80
1.00
0.57
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Nos
Nos
No
No
P.
P.
P.
P.
Day
Day
Day
Day
0.00
27
Rs.
Rs.
Rs.
Rs.
Page 144
0.00
0.00
0.00
0.00
#####
#####
Say
Say
Say
Say
(0.10)
(0.60)
DESCRIPTION
OF
ITEM NO
49:
a)
Detail
Rate
Analysis
for
4' x 6.75'
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Angle Iron 1"x1"x"
Vetical 2x7
Horizontal 1x4
14 Rft
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
43.85 Lbs
M.S. flat 2"x" (50x6mm)
Vetical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
18.90 Rft @ 1.68 Lbs/Rft
31.75 Lbs
M.S. flat patti 1"x1/8" (25x3mm) at bott
1.68 Lbs
77.28Lbs (35.06 Kg.
Deodar Wood
Vertical Style 2x6'-8"x4"x1"
0.47 Cft
Vertical Style 3x6'-8"x2"x1"
0.35 Cft
Horizontal Style 1x3'-11"x4"x1"
0.14 Cft
Middle Style 1x3'-11"x4"x1"
0.14 Cft
Lock Style 1x3'-11"x6"x1"
0.21 Cft
Bottom Style 1x3'-11"x8"x1"
0.27 Cft
Side Strip 2x6'-8"x1"x1/8"
0.02 Cft
Side Strip 2x3'-8"x1"x1/8"
0.01 Cft
1.61 Cft
Wastage 35%
0.56 Cft
2.17 Cft
Page 145
0.00 P. Kg
0.00 P. Cft
Detail
Fitting
Hinges 4" (100mm)
Tower bolt 9: (225mm)
Handle 6" (150mm)
Iron hold fast
Rubber chocks
Hook & clamp
Screws
Glue
Spikes
Sawing charge
4.00
2.00
2.00
6.00
1.00
1.00
2.50
0.75
0.20
21.70
Rate
Per Unit (Rs.)Amount (Rs.)
Nos
Nos
Nos
Nos
No
No
Doz
Kg.
Kg.
Sft
53.38 Sft
8.01 Sft
61.39 Sft
20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
Each
Each
P. Doz
P.Kg.
P.Kg.
Sft
0.00 Sft
1 No
1 Nos
0.00 Each
0.00 Each
1 Nos
1 No
0.00 P. Day
0.00 P. Day
0.00
27
Rs.
Rs.
Percent
0.00
27
Labour
Welder for making frame
Black Smith
For Panelling pressing and erecting door
Carpentre
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Rs.
Rs.
Page 146
#####
#####
Say
Say
Say
Say
(1.30)
(14.10)
DESCRIPTION
OF
ITEM NO
49:
b)
Detail
Rate
Analysis
for
4' x 6.75'
Rate
Per Unit (Rs.)Amount (Rs.)
27 Sft
Material
Tee Iron 1"x1"x"
Vetical 2x7
Horizontal 1x4
14 Rft
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft @ 2.36
44.60
M.S. flat "x" (40x6mm)
Vetical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
8.03
18.90 Rft @ 0.423L
M.S. bar " dia = 4 Rft @ 0.67 Lbs
2.68
55.31Lbs (
Deodar Wood
Vertical Style 2x6'-8"x4"x1"
0.47
Vertical Style 3x6'-8"x2"x1"
0.35
Horizontal Style 1x3'-11"x4"x1"
0.14
Middle Style 1x3'-11"x4"x1"
0.14
Lock Style 1x3'-11"x6"x1"
0.21
Bottom Style 1x3'-11"x8"x1"
0.27
Side Strip 2x6'-8"x1"x1/8"
0.02
Side Strip 2x3'-8"x1"x1/8"
0.01
1.61
Wastage 35%
0.56
2.17
Page 147
Lbs
Lbs
Lbs
25.10 Kg
0.00 P. Kg
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
0.00 P. Cft
Detail
Fitting
Hinges 4" (100mm)
Tower bolt 9: (225mm)
Handle 6" (150mm)
Iron hold fast
Rubber chocks
Hook & clamp
Screws
Glue
Spikes
Sawing charge
4.00
2.00
2.00
6.00
1.00
1.00
2.50
0.75
0.20
21.70
Rate
Per Unit (Rs.)Amount (Rs.)
Nos
Nos
Nos
Nos
No
No
Doz
Kg.
Kg.
Sft
53.38 Sft
8.01 Sft
61.39 Sft
20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Each
Each
Each
Each
Each
Each
P. Doz
P.Kg.
P.Kg.
Sft
0.00 Sft
1 No
1 Nos
0.00 Each
0.00 Each
1 Nos.
1 No.
0.00 P. Day
0.00 P. Day
0.00
27
Rs.
Rs.
Percent
0.00
27
Labour
Welder for making frame
Black Smith
For Rendring & Erection Door
Carpentre
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Rs.
Rs.
Page 148
#####
#####
Say
Say
Say
Say
(1.30)
(14.10)
DESCRIPTION
OF
ITEM NO
50:
Remarks :
Detail
Rate
Analysis for
3.5' x 7' =
Rate
Per Unit (Rs.)Amount (Rs.)
24.5 Sft
Material
Solid flush
Door leaf 1" (40mm) thick sterling
or equivalent with commerical ply
(5mm) thick both sides.
3"x7'-0' = 24.50 Sft
24.50 Sft
0.00 Sft
21.00 Rft
0.00 per/ft.
0.00
0.00
0.00
0.00
0.00
0.00
20
4.00
2.00
2.00
1.00
1.00
2.00
Nos
Nos
Nos
No
No
Nos
Percent
0.00
24.5
Page 149
Each
Each
Each
Each
Each
Each
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
For planning & fixing of lipping with
door fitting complete.
Carpentre
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 24.5 Sft.
Rate Per Sft
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
1.00 No
1.00 No
0.00 P. Day
0.00 P. Day
0.00
24.5
Rs.
Rs.
Rs.
Rs.
Page 150
#####
Say
Say
Say
Say
(0.20)
DESCRIPTION
OF
ITEM NO
51:
Detail
Rate
Analysis
for
4' x 7'
Rate
Per Unit (Rs.)Amount (Rs.)
28 Sft
Material
M.S. Sheet 18 SWG
for chowkhat
18'x15"
Wastage 20%
M.S. Sheet 22 SWG
for shutter
26x7 1/8
Wastage 20%
M.S. Flat 1"x1/16" (25x2mm)
6'-9"x0.21
23.44 Sft
4.69 Sft
28.13 Sft
0.00 Sft
31.50 Sft
6.30 Sft
37.80 Sft
0.00 Sft
0.00 P. Kg
1.43Lb (065) Kg
Fitting
Hinges 4" (100mm)
Tower bolt 9: (225mm)
Handle 6" (150mm)
Iron hold fast
Screws
Welding electrode
Electricity Charges
6.00 Nos
2.00 Nos
2.00 Nos
6.00 Nos
L.S.
4.00 Nos
L.S.
0.21 Bag
0.76 Cft
1.52 Cft
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft
20
0.00
0.00
0.00
0.00
0.00 Each
0.00 Each
0.00 P. Cft
0.00 P. Cft
Percent
4.80
28
Page 151
Each
Each
Each
Each
4.00
-
4.00
0.80
4.80
0.17
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Welder
Blacksmith
Mason
Coolies
Total
Sundries
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft
0.50
2.50
0.25
0.75
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 152
No
Nos
No
No
0.00
0.00
0.00
0.00
P.
P.
P.
P.
Day
Day
Day
Day
0.00
28
Rs.
Rs.
Say
Say
Rs.
Rs.
0.17
1.84
Say
Say
0.15
1.85
DESCRIPTION
OF
ITEM NO
52:
Detail
Rate
Analysis
for 4
Rate
Per Unit (Rs.)Amount (Rs.)
Rft
Material
Aluminium plate 4" (100mm) wide
and 24 SWG
Total
Contractor's Profit & Ove
Total for 4 Rft.
Rate Per Rft
20
0.18 Kg
0.00 P. Kg
0.00 P. Day
Percent
0.00
4
Labour
Carpenter
Total
Sundries
Total
Contractor's Profit & Ove
Total for 4 Rft.
Rate Per Rft
0.12 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rqm
Page 153
0.00
4
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
DESCRIPTION
OF
ITEM NO
53:
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Material
Rate For 10 Rft
Railing
Cutting of Railing
Screws
Guttis
Deodar wood
Total
Contractor's Profit & Ove
Total for 10 Rft.
10.00 Rft
1.00 Dozen
6.00 Nos
0.21 Cft
20
0.00 P. Rft
0.00 P, Doz
0.00 Each
0.00 P. Cft
Percent
0.00
10
0.00 P. Day
Labour
Rate For
Carpenter
80 Rft
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft
1.00 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm
Page 154
0.00
80
Rs.
Rs.
Say
Say
Rs.
Rs.
0.15
0.54
Say
Say
0.15
0.55
DESCRIPTION
OF
ITEM NO
54:
Detail
2 x 3
Rate
Per Unit (Rs.)Amount (Rs.)
8.75 Sft
Material
M.S. Flat Frame for Grill "x1/8"
(20x3mm)
2'+3'+2'+3'
12 Sft
@ 0.32 Lbs/Rft
M.S. Flat "x1/8" (12x3mm)
Straight 3x2x3
Flower 6x4x1
Side 6x4x
Front 6x1x2
Total
Wastage 5%
21.00 Rft.
30.00 Rft.
6.00 Rft.
12.00 Rft.
69.00 Rft.
3.45 Rft.
72.45Lb (7.0 )Kg
0.00 P. Kg
@ 0.21 lbs/rft 15.21 lbs
6.00 Nos
L.S.
0.33 Pkt
0.098Lb (0. 08) Gl
20
0.00 P. Kg
0.00 Each
Page 155
154.00
0.00 Pkt
0.00 P. Gl
(11.00)
21.12
-
164.12
32.82
196.94
22.51
Percent
196.94
8.75
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Welder
Blacksmith
Masson
Painter
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft
0.17
0.17
0.20
0.09
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Nos
No
Nos
No
P.
P.
P.
P.
Day
Day
Day
Day
0.00
8.75
Rs.
Rs.
Rs.
Rs.
Page 156
0.00
0.00
0.00
0.00
#####
#####
Say
Say
Say
Say
22.45
241.80
DESCRIPTION
OF
ITEM NO
55:
Detail
4 x 3
Rate
Per Unit (Rs.)Amount (Rs.)
12 Sft
Material
Wire Gauge 144 (12x12) Mesh
Wastage 10%
12.00 Sft
1.20 Sft
13.20 Sft
0.00 Sft
0.00 P. Kg
0.00 P. Doz
0.00 P. Day
0.00 P. Day
0.00
55
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
20
Percent
0.00
12
1.00 No
0.40 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 157
DESCRIPTION
OF
ITEM NO
56:
a)
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
16 Sft
16.00
0.17
0.04
0.22
0.19
0.116
Glue
Nails
Total
Contractor's Profit & Ove
Total for 16 Sft.
Rate Per Sft
20
0.00 P. Cft
0.00 P. Cft
0.00 P. Cft
0.00 P. Day
Percent
0.00
16
Labour
Labour for sawing, planning and fixing
16 Rft (4.876Rm) moulding in position
carpenter.
Total
Sundries
Total
Rft
Cft
Cft
Cft
Kg.
Kg.
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 158
0.50 No
0.00
16
Rs.
Rs.
0.05
Say
Say
0.05
Rs.
Rs.
#####
Say
Say
(0.10)
Item No.
56
b)
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
16 Sft
Material
Deodar wood 2x(6'-10')+2'-3"
16x2"x5/8"
Wastage 25%
16.00
0.17
0.04
0.22
0.26
0.116
Glue
Nails
Total
Contractor's Profit & Ove
Total for 16 Sft.
Rate Per Sft
20
0.00 P. Cft
0.00 P. Cft
0.00 P. Cft
0.00 P. Day
Percent
0.00
16
Labour
Labour for sawing, planning and fixing
16 Rft (4.876Rm) moulding in position
carpenter.
Total
Sundries
Total
Rft
Cft
Cft
Cft
Kg.
Kg.
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 159
0.50 No
0.00
16
Rs.
Rs.
0.05
Say
Say
0.05
Rs.
Rs.
0.05
0.14
Say
Say
0.05
0.15
DESCRIPTION
OF
ITEM NO
57:
a)
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
13 Sft
0.44
0.11
0.20
0.75
0.19
0.94
0.82
0.08
0.90
12.94
1.29
14.23
0.29
0.116
4.00
Wastage 25%
PCC (1:3:6) 6"x10"x1"
Wastage 10%
Teak Wood Ply
Wastage 10%
17.25 x 0.75
Glue
Nails
Hold fast
Total
Contractor's Profit & Ove
Total for 13 Sft.
Rate Per Sft
20
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Sft
Sft
Sft
Kg.
Kg.
Nos
0.00 P. Cft
0.00 P. Cft
0.00
0.00
0.00
0.00
Percent
0.00
13
Page 160
Sft
P. Cft
P. Cft
Each
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 13 Sft.
Rate Per Sft
0.50 No
0.50 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 161
0.00 P. Day
0.00 P. Day
0.00
13
Rs.
Rs.
#####
Say
Say
(0.10)
Rs.
Rs.
0.05
Say
Say
0.05
Item No.
57
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
13 Sft
Deodar wood
PCC (1:3:6)
Commercial ply
Glue
Nails
Hold fast
Total
Total
Contractor's Profit & Ove
Total for 13 Sft.
Rate Per Sft
0.94 Cft
0.90 Cft
14.23 Sft
0.29 Kg.
0.116 Kg.
L.S.
20
Percent
20
Percent
0.33
13
0.00
0.31
0.00
0.00
0.00
P.
P.
P.
P.
P.
Cft
Cft
Sft
Cft
Cft
0.28
0.28
0.06
0.33
0.33
0.03
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 13 Sft.
Rate Per Sft
0.50 No
0.50 No
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 162
0.00 P. Day
0.00 P. Day
0.00
13
Rs.
Rs.
#####
Say
Say
(0.10)
Rs.
Rs.
#####
#####
Say
Say
(0.60)
(6.40)
DESCRIPTION
OF
ITEM NO
58:
a)
Detail
3.5 x 7
24.50 Sft
Material
Length of Architrave
2(7'-0")+3'-6"
17.50 Rft
quantity (3/12'x'x1/12')x17.5'
Wastage 25%
Teak Wood
Nails
Total
Contractor's Profit & Ove
Total for 24.50 Sft.
Rate Per Sft
20
0.18 Cft
0.05 Cft
0.23 Cft
0.00 P. Cft
0.093 Kg.
0.00 P. Kg.
Percent
0.00
24.50
Labour
Carpenter
Fixing in position
Total
Sundries
Total
Rate
Per Unit (Rs.)Amount (Rs.)
0.25 No
L.S.
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 163
0.00 P. Day
0.00
24.50
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
58
b)
Detail
24.50 Sft
Material
Length of Architrave
2(7')+3'-6"
17.50 Rft
quantity (3/12'x'x1/12')x17.5'
Wastage 25%
Deodar wood
Nails
Total
Contractor's Profit & Ove
Total for 24.50 Sft.
Rate Per Sft
20
0.18 Cft
0.05 Cft
0.23 Cft
0.00 P. Cft
0.186 Kg.
0.00 P. Kg.
Percent
0.00
24.50
Labour
Carpenter
Fixing in position
Total
Sundries
Total
Contractor's Profit & Ove
Total for 24.50
Rate Per Sft
Rate
Per Unit (Rs.)Amount (Rs.)
0.25 No
L.S.
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
Page 164
0.00 P. Day
0.00
24.50
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Item No.
58
Rate
Per Unit (Rs.)Amount (Rs.)
Material
a) Vin Board 3/4
Vin Board
Total
Wastage 20%
Total
2x8x1 =
5x2x1 =
24.00
15.00
39.00
7.80
46.80
Sft.
Sft.
Sft.
Sft.
0.00 P. Sft.
16.00 Sft.
0.00 P. Sft.
0.65 Ft.
0.00 P. Cft.
0.08 Litre
0.00 P. Litr
0.00 P. Ft.
0.00 P. Gall
0.00 P. Day
0.00
0.00
0.00 Each
16.00
10.00
26.00
5.20
31.2
31.2 x 1 x 3"
12 x 12
d) Termite
e) Gola
Wastage 20%
Total
8x2x2
Ft.
Ft.
Ft.
Ft.
32.00 Ft.
6.40
38.40 Ft.
4.00 Nos.
Page 165
h) Screws
3.75 Dozen
0.00 P. Doz
i) Hinges
2.00 Nos.
0.00 Each
Total
Contractor's Profit & Ove
Total
20
Percent
Labour
Carpenter
Helper
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft
1.50 Nos.
1.25 Nos.
10
Percent
20
Percent
Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm
0.00 P. Day
0.00 P. Day
0.00
16
Rs.
Rs.
Rs.
Rs.
Page 166
Say
Say
Say
Say
37
Sr.
No.
MATERIAL
LABOUR
SOLVENT
Each
Profit
Percent
4
(3 + 4) Quantity
Rate
Total Contractor
20
1
JOINTING
Daily
Total
Daily
Amount
progress Charges
Grand
RATE
Total
Labour Composite
(10 + 13)
(5 + 15)
Profit
5
Kgs.
6
Per Kg.
7.00
20.00
9
(8 + 9)
10
(Joints)
11
12
13
14
15
16
3" (75mm)
0.00
0.00
1/27
0.00
0.00
0.00
50.00
0.01
0.00
0.00
0.00
4" (100mm)
0.00
0.00
1/20
0.00
0.00
0.00
50.00
0.01
0.00
0.00
0.00
3
4
5" (125mm)
6" (150mm)
0.00
0.00
0.00
0.00
1/16
1/15
0.00
0.00
0.00
0.00
0.00
0.00
40.00
40.00
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1/64
0.00
0.00
0.00
60.00
0.01
0.00
0.00
0.00
1" (32mm)
0.00
1" (40mm)
0.00
0.00
1/50
0.00
0.00
0.00
60.00
0.01
0.00
0.00
0.00
2" (50mm)
0.00
0.00
1/40
0.00
0.00
0.00
60.00
0.01
0.00
0.00
0.00
3" (75mm)
0.00
0.00
1/27
0.00
0.00
0.00
50.00
0.01
0.00
0.00
0.00
4" (100mm)
0.00
0.00
1/20
0.00
0.00
0.00
50.00
0.01
0.00
0.00
0.00
6
7
5" (125mm)
6" (150mm)
0.00
0.00
0.00
0.00
1/16
1/15
0.00
0.00
0.00
0.00
0.00
0.00
40.00
40.00
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00
DAILY PROGRESS
Plumber 1 N
Cooly
0.9
Total
0.00
0.00
0.00
Sundries
Total
Contractor Profit
10.00 Percent
20.00 Percent
0.00
0.00
0.00
Total
Say
0.01
0.01
38
Sr.
No.
Size
1
1
2
3
4
2
3" (75mm)
4" (100mm)
5" (125mm)
6" (150mm)
MATERIAL
LABOUR
JOINTING
Grand
RATE
SOLVENT
Daily
Daily Amount Total
Labour Composite
Rate Contractor's Total
Each
Profit
(3 + 4) Quantity Rate
TotalContractor's Total progress Charges
(10 + 13)
(5 + 15)
20.00
Kgs. Per Kg.
20.00 (8 + 9)
(Joints)
3
4
5
6
7
8
9
10
11
12
13
14
15
16
0.00
0.0 1/18
0.00
0.00
0.00 50.00
0.01
0.00
0.00
0.00
0.00
0.0 1/13
0.00
0.00
0.00 50.00
0.01
0.00
0.00
0.00
0.00
0.0 1/11
0.00
0.00
0.00 40.00
0.01
0.00
0.00
0.00
0.00
0.0 1/10
0.00
0.00
0.00 40.00
0.01
0.00
0.00
0.00
1" (32mm)
1" (40mm)
2" (50mm)
3" (75mm)
4" (100mm)
5" (125mm)
6" (150mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1/40
1/33
1/27
1/18
1/13
1/11
1/10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.00
60.00
60.00
50.00
50.00
40.00
40.00
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
DAILY PROGRESS
Plumber 1 N
Cooly
0.9
Total
0.00
0.00
0.00
Sundries
Total
Contractor Profit
10.00 Percent
20.00 Percent
0.00
0.00
0.00
Total
Say
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39
Sr.
No.
1
1
2
3
4
5
6
7
8
(ii)
1
2
3
4
5
6
7
Size
Rate
Each
2
3" (75mm)
4" (100mm)
5" (125mm)
6" (150mm)
8" (200mm)
10" (250mm)
12" (300mm)
14" (350mm)
3
-
MATERIAL
LABOUR
ContrTotal
SOLVENT
Total Contraactor's
(3 + 4) Quantity Rate
10.00
Kgs. Per Kg.
ctor's
10.00
4
5
6
7
8
9
0.00
0.00 1/27
0.00
0.00
0.00
0.00 1/20
0.00
0.00
0.00
0.00 1/16
0.00
0.00
0.00
0.00 1/15
0.00
0.00
0.00
0.00 1/10
0.00
0.00
0.00
0.00
1/8
0.00
0.00
0.00
0.00
1/7
0.00
0.00
0.00
0.00
1/6
0.00
0.00
Total
(8 + 9)
No. of
Joints
JOINTING
Grand
RATE
Daily Amount Total
Labour Composite
Charges
(10 + 13)
(5 + 15)
10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11
50.00
50.00
40.00
40.00
30.00
30.00
25.00
25.00
12
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.00
60.00
60.00
50.00
50.00
40.00
40.00
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1/64
1/50
1/40
1/27
1/20
1/16
1/15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
DAILY PROGRESS
Plumber 1 N
Cooly
0.9
Total
0.00
0.00
0.00
Sundries
Total
Contractor Profit
10.00 Percent
20.00 Percent
0.00
0.00
0.00
Total
Say
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40 -
Sr.
No.
1
1
2
3
4
5
6
7
8
Size
Rate
Each
2
3" (75mm)
4" (100mm)
5" (125mm)
6" (150mm)
8" (200mm)
10" (250mm)
12" (300mm)
14" (350mm)
3
-
MATERIAL
LABOUR
ContraTotal
SOLVENT
Total Contractor's
(3 + 4) Quantity Rate
Profit
Kgs. Per Kg.
ctor's
20.00
Profit
20.00
4
5
6
7
8
9
0.00
0.00 1/27
0.00
0.00
0.00
0.00 1/20
0.00
0.00
0.00
0.00 1/16
0.00
0.00
0.00
0.00 1/15
0.00
0.00
0.00
0.00 1/10
0.00
0.00
0.00
0.00
1/8
0.00
0.00
0.00
0.00
1/7
0.00
0.00
0.00
0.00
1/6
0.00
0.00
Total
(8 + 9)
JOINTING
Grand
Daily
Daily Amount Total
Progress Charges
(10 + 13)
RATE
Labour Composite
(5 + 15)
10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11
50.00
50.00
40.00
40.00
30.00
30.00
25.00
25.00
12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15
-
0.00
0.00
0.00
60.00
60.00
60.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1" (32mm)
1" (40mm)
2" (50mm)
0.00
0.00
0.00
0.00
0.00
0.00
1/64
1/50
1/40
0.00
0.00
0.00
0.00
0.00
0.00
DAILY PROGRESS
Plumber 1 N
Cooly
0.9
Total
0.00
0.00
0.00
Sundries
Total
Contractor Profit
10.00 Percent
20.00 Percent
0.00
0.00
0.00
Total
Say
0.00
0.00
0.00
0.00
0.00
1- Boring for tube well in all types of soil except shingle and rock from ground level to 100 Ft (30 Metre) depth
Dia of
bore
Time (Day)
required to
complete
100' (30M)
Daily
labour
charges
Labour
per foot
Hire charges
of boring
material
installation
and carriage
Loading Expenses
Per Foot
No. of Rate per Amount
day
day
3"
#VALUE! #VALUE!
0.00 0.02
0.00
0.00
4"
#VALUE! #VALUE!
0.00 0.04
0.00
0.00
5"
#VALUE!
#VALUE!
0.00 0.10
0.00
6"
#VALUE!
#VALUE!
0.00 0.20
8"
11
#VALUE!
#VALUE!
10"
13
#VALUE!
12"
14
15"
18"
Repair
charges
of T & P
10
Petty store
bolts &
nuts etc.
11
Total
Column (6,
9, 10, 11)
12
0.00
0.00
0.00
0.00
0.00 0.30
0.00
#VALUE!
0.00 0.40
#VALUE!
#VALUE!
17
#VALUE!
18
#VALUE!
Contractors,
Profit& over heads 20%
on Column
No.12
Total
Grand Total
Rate per Ft/
Rs. per
foot
Rate per
Metre
(12 + 13)
(5 + 14)
Say
13
14
15
16
17
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
0.00 0.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00 0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00 0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
2- Boring for tube well in all types of soil except shingle gravel and rock from a depth of 100.10 to 200 Ft (30 to 60 Metre)
below ground level, including sinking and with drawing of casing pipe complete.
S.
Dia of
Time (Day)
Daily
Labour
Hire charges
Loading Expenses
Repair
Petty store
Total
Contractors'
No.
bore
required to
labour
per foot
of boring
Per Foot
charges
bolts &
Column (6,
complete
charges
of T & P
nuts etc.
9, 10, 11)
on Column
100' (30M)
material
No. of
Rate per
installation
day
day
Amount
Total
Grand Total
Rate per
Rate per
Rft
Metre
16
17
No.12
(12 + 13)
(5 + 14)
13
14
15
and carriage
5"
10
#VALUE!
#VALUE!
0.00 0.30
0.00
6"
14
#VALUE!
#VALUE!
0.00 0.40
8"
15
#VALUE!
#VALUE!
10"
16
#VALUE!
12"
17
15"
18"
10
11
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
0.00 0.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00 0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00 0.50
0.00
0.00
20.00
0.00
20.00
2.00
22.00 #VALUE!
#VALUE!
#VALUE!
20
#VALUE!
#VALUE!
0.00 0.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
21
#VALUE!
#VALUE!
0.00 0.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
12
3- Boring for tube well in all types of soil except shingle gravel and rock from a depth of 200.10 to 300 Ft (60 to 90 Metre)
below ground level including sinking and with drawing of casing pipe complete.
S.
Dia of
Time (Day)
Daily
Labour
Hire charges
Loading Expenses
Repair
Petty store
Total
Contractors,
No.
bore
required to
labour
per foot
of boring
Per Foot
charges
bolts &
Column (6,
complete
charges
of T & P
nuts etc.
9, 10, 11)
on Column
100' (30M)
material
No. of
Rate per
installation
day
day
Amount
Total
Total
Rate per
Rate per
Rft
Metre
No.12
(12 + 13)
(5 + 14)
Say
13
14
15
16
17
and carriage
5"
14
#VALUE!
#VALUE!
0.00 0.40
0.00
6"
18
#VALUE!
#VALUE!
0.00 0.50
8"
19
#VALUE!
#VALUE!
10"
20
#VALUE!
12"
21
15"
18"
10
11
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
0.00 0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00 0.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00 0.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
22
#VALUE!
#VALUE!
0.00 0.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
23
#VALUE!
#VALUE!
0.00 0.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
12
4- Boring for tube well in all types of soil except shingle gravel and rock from a depth of 300.10 to 400 Ft (90 to 120 Metre)
below ground level including sinking and with drawing of casing pipe complete.
S.
No.
Dia of
bore
Time (Day)
required to
complete
100' (30M)
Daily
labour
charges
8"
23
#VALUE!
#VALUE!
0.00 0.60
0.00
10"
24
#VALUE!
#VALUE!
0.00 0.70
12"
25
#VALUE!
#VALUE!
15"
27
#VALUE!
18"
27
#VALUE!
Repair
charges
of T & P
Petty store
Total
bolts & Column (6,
nuts etc. 9, 10, 11)
Grand Total
Rate per Ft/
No.12
(12 + 13)
(5 + 14)
Say
13
14
15
16
17
on Column
10
11
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
0.00 0.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00 0.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00 0.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00 #VALUE!
#VALUE!
#VALUE!
12
Rate per
Metre
Total
Contractors'
Profit& overheads 20%
(75 to 100mm)
dia bore.
Rate
Per Unit (Rs.) Amount (Rs.)
Labour for 30 M
Foreman
Skilled Cooly
Unskilled Cooly
Chowkidar
Total
Sundries
Total
1.00
2.00
1.00
1.00
No
Nos
No
No RATE
0 P. Day
0 P. Day
0 P. Day
P. Day
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#### Percent
#VALUE!
#VALUE!
#VALUE!
(125 to 150mm)
dia bore.
Rate
Per Unit (Rs.) Amount (Rs.)
Labour
Foreman
Skilled Cooly
Unskilled Cooly
Chowkidar
Total
Contractor's Profit
Total
1.00
4.00
1.00
1.00
No
0.00
Nos
0.00
No
0.00
No RATE
P. DAY
P. DAY
P. DAY
P. DAY
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#### Percent
#VALUE!
#VALUE!
#VALUE!
dia bore.
Rate
Per Unit (Rs.) Amount (Rs.)
Labour
Foreman
Skilled Cooly
Unskilled Cooly
Chowkidar
Total
Sundries
Total
1.00
6.00
1.00
1.00
No
0.00
Nos
0.00
No
0.00
No RATE
P. Day
P. Day
P. Day
P. Day
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#### Percent
#VALUE!
#VALUE!
#VALUE!
(250 to 300mm)
dia bore.
Rate
Per Unit (Rs.) Amount (Rs.)
Labour
Foreman
Skilled Cooly
Unskilled Cooly
Chowkidar
1.00
6.00
2.00
1.00
No
0.00
Nos
0.00
Nos
0.00
No RATE
P. Day
P. Day
P. Day
P. Day
#VALUE!
Total
#### Percent
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Sundries
Total
Say
(375 to 450mm)
dia bore.
Rate
Per Unit (Rs.) Amount (Rs.)
Labour
Foreman
Skilled Cooly
Unskilled Cooly
Chowkidar
1.00
8.00
2.00
1.00
No
0.00
Nos
0.00
Nos
0.00
No RATE
P. Day
P. Day
P. Day
P. Day
#VALUE!
Total
#### Percent
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Sundries
Total
Say
DESCRIPTION OF ITEM NO 5:
(a)
i)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Material
1 Reg pumps etc.
24.00 Hrs
2 Generator set light arrangement
8.00 Hrs
3 Carriage from store to site of work for
reverse rotary drilling reg complete set
and generator set etc.
L. S.
Total
Labour
Foreman for 3 shifts (One No. per shift 3.00
Driller for 3 shifts (One No. per shift 3.00
Helper for 3 shifts (One No. per shift) 54.00
Electrician for 8 hours
1.00
Mechanic for 3 shifts
3.00
Total
Sundries
Total
Nos
Nos
Nos
No
Nos
0.00 Ph
0.00 Ph
0.00
0.00
0.00
0.00
0.00
P. Shi
Say
P. Shi
P. Shi
P. Shi
P. Shi
#### Percent
Detail
Material
( P.O.L )
H.S.D. for rig for 24 hours
H.S.D. for generator for 8 hours
Cotton waste for rig for 24 hours
Mobil oil
Mix. Expenditure
Total
Rate
Per Unit (Rs.) Amount (Rs.)
##### Ltr
0.00
72.64 Ltr
0.00
7.90 Kg RATE
22.70 Ltr
0.00
L. S.
Ltr
Ltr
Kg
Ltr
#VALUE!
#VALUE!
Machinery
Labour
Material (lubricate P.O.L)
#VALUE!
Total
Contractor's Profit&overhe #### Percent
Total
#VALUE!
#VALUE!
#VALUE!
Daily Expenditure
Daily Progress
Charges Per Feet
#VALUE!
##### Ft
#VALUE!
121
say
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Item No.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Daily Expenditure
Daily Progress
#VALUE!
##### Ft
#VALUE!
115
say
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Item No.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Daily Expenditure
Daily Progress
#VALUE!
92.00 Ft
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Item No.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Daily Expenditure
Daily Progress
#VALUE!
88.40 Ft
#VALUE!
88.40
say
10
#VALUE!
#VALUE!
#VALUE!
#VALUE!
DESCRIPTION OF ITEM NO 6:
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
#VALUE!
46.00 Ft
#VALUE!
46
say
11
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Item No.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
#VALUE!
42.58 Ft
#VALUE!
42.58
say
12
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Item No.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Daily Expenditure
Daily Progress
#VALUE!
38.68 Ft
#VALUE!
38.68
say
13
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Item No.
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
#VALUE!
28.73 Ft
#VALUE!
28.73
say
14
#VALUE!
#VALUE!
#VALUE!
#VALUE!
DESCRIPTION OF ITEM NO 7:
Detail
Material
Deodar Wood (2nd Class)
Top and bottom 2x4'x2.5'x1/12' 1.66 Cft
Sides 2(4'+2'-4")x1/12'x'
0.79 Cft
Partition 9x2'-4"x'x1/24'
0.44 Cft
Strips 6x3'x6"xx1/24
0.44 Cft
3.33 Cft
Wastage
15%
Total
Lock
Hinges
Steel Handle 4" (100mm)
0.50 Cft
3.83
1.00
2.00
2.00
Cft
No
No.
Nos
0.00
0.00
0.00
0.00
P. Cf
Each
Each
Each
Total
Contractor's Profit & ove #### Percent
Total
Labour
Sawing charges
Carpenter
(3.83Cft x 10)
38.30 Sft
0.75 No
15
0.00 Sft
0.00 P. Day
Detail
L. S.
####
Rs.
say
Rs.
Say
16
DESCRIPTION OF ITEM NO 8:
Detail
Material
Bottle 2 lbs capcity
Rate
Per Unit (Rs.) Amount (Rs.)
2.00 Nos
0.00 Each
Total
Contractor's Profit & ove #### Percent
Total
Labour
Taking samples of water from bore
hole including bailing or pumping.
Sealing the water sample and
providing necessary packing etc.
Handling charges
L. S.
L. S.
L. S.
Total
Contractor's Profit & ove #### Percent
Total
Rs.
Rs.
say
Say
17
9-
S.
No.
Providing and installing Brass Strainer in Tube Well Bore Hole including Socket, special Socket, Studs
etc. complete.
Dia of
Strainer
Thickness
Rate of
of
strainer
Strainer (Per Ft i/c
Specials
Stud, and
Socket)
Contractor's
Profit
20.00
Percent
Total
Material
LABOUR
4+5
Daily
Progress
in Ft
Daily
Expenses
Rs.
10
2"
5/32"
0.00
0.00
0.00
200.00
#VALUE!
#######
0.00
3"
5/32"
0.00
0.00
0.00
200.00
#VALUE!
#######
4"
3/16"
0.00
0.00
0.00
150.00
#VALUE!
5"
3/16"
0.00
0.00
0.00
130.00
6"
3/16"
0.00
0.00
0.00
7"
3/16"
0.00
0.00
8"
3/16"
0.00
9"
3/16"
10"
10
Rate
per Metre
16
#VALUE!
######
#VALUE!
0.00
#VALUE!
######
#VALUE!
#######
0.00
#VALUE!
######
#VALUE!
#VALUE!
#######
0.00
#VALUE!
######
#VALUE!
120.00
#VALUE!
#######
0.00
#VALUE!
######
#VALUE!
0.00
100.00
#VALUE!
#######
0.00
#VALUE!
######
#VALUE!
0.00
0.00
80.00
#VALUE!
#######
0.00
#VALUE!
######
#VALUE!
0.00
0.00
0.00
80.00
#VALUE!
#######
0.00
#VALUE!
######
#VALUE!
3/16"
0.00
0.00
0.00
70.00
#VALUE!
#######
0.00
#VALUE!
######
#VALUE!
10"
1/4"
0.00
0.00
0.00
70.00
#VALUE!
#######
0.00
#VALUE!
######
#VALUE!
11
12"
1/4"
0.00
0.00
0.00
70.00
#VALUE!
#######
0.00
#VALUE!
######
#VALUE!
12
15"
1/4"
0.00
0.00
0.00
60.00
#VALUE!
#######
0.00
#VALUE!
######
#VALUE!
13
18"
1/4"
0.00
0.00
0.00
60.00
#VALUE!
#######
0.00
#VALUE!
######
#VALUE!
14
20"
1/4"
0.00
0.00
0.00
50.00
#VALUE!
#######
0.00
#VALUE!
######
#VALUE!
15
22"
1/4"
0.00
0.00
0.00
50.00
#VALUE!
#######
0.00
#VALUE!
######
#VALUE!
13
Composite
15
20
12
Composite Labour
Rate/Ft
Rate
6 + 12
per Metre
14
Contractor's Profit
11
Labour
Rate
Per Ft.
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Foreman
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total
Contractor's Profit & Ove
Total
1.00
1.00
4.00
1.00
No
0.00
No
0.00
Nos
0.00
No RATE
P.
P.
P.
P.
Day
Day
Day
Day #VALUE!
#VALUE!
#VALUE!
#VALUE!
10.00 Percent
20.00 Percent
#VALUE!
#VALUE!
Rs.
#VALUE!
Rate
Per Unit (Rs.)Amount (Rs.)
20
Labour
Foreman
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total
Contractor's Profit & ove
Total
1.00
2.00
6.00
1.00
No
0.00
Nos
0.00
Nos
0.00
No RATE
P. Day
P. Day
P. Day
P. Day
#VALUE!
#VALUE!
#VALUE!
#VALUE!
10.00
20.00
#VALUE!
#VALUE!
Daily Labou
Rs.
#VALUE!
10
Providing and Installing M. S. Bail Plug in Tube Well Bore Hole (Eac
M A T E R I A L
S.
No.
Dia of
bore
Plug
Rate
Length Per Foot
Total
(3 x 4)
12
13
14
15
2"
1.50
0.00
0.00
0.14 1/4"
0.53
0.67
0.07
0.74
0.33
0.00
0.00
0.00
3"
1.50
0.00
0.00
0.30 1/4"
0.53
0.83
0.08
0.91
0.41
0.00
0.00
0.00
4"
2.00
0.00
0.00
0.51 3/8"
1.50
2.01
0.20
2.21
1.00
0.00
0.00
0.00
5"
2.00
0.00
0.00
1.22 3/8"
1.50
2.72
0.27
2.99
1.36
0.00
0.00
0.00
6"
2.00
0.00
0.00
1.72 3/4"
6.00
7.72
0.77
8.49
3.85
0.00
0.00
0.00
7"
2.00
0.00
0.00
2.30 3/4"
6.00
8.30
0.83
9.13
4.14
0.00
0.00
0.00
8"
2.00
0.00
0.00
2.97 3/4"
6.00
8.97
0.90
9.87
4.48
0.00
0.00
0.00
9"
2.00
0.00
0.00
3.72 3/4"
6.00
9.72
0.97
10.69
4.85
0.00
0.00
0.00
10"
2.00
0.00
0.00
6.23 3/4"
6.00 12.23
1.22
13.45
6.10
0.00
0.00
0.00
10
12"
2.00
0.00
0.00
8.83 3/4"
6.00 14.83
1.48
16.31
7.40
0.00
0.00
0.00
10
11
11
15"
2.00
0.00
6.00 19.57
1.96
21.53
9.76
0.00
0.00
0.00
12
18"
2.00
0.00
6.00 25.34
2.53
27.87 12.64
0.00
0.00
0.00
13
20"
2.00
0.00
6.00 29.74
2.97
32.71 14.84
0.00
0.00
0.00
14
22"
2.00
0.00
6.00 34.60
3.46
38.06 17.26
0.00
0.00
0.00
ch).
L A B O U R
Material
Welding Cutting
Total Threading Disc
Disc
Total
Grand
Total
Say
Clamp
(5 + 14
+ 15)
16
17
18
19
20
21
22
Contractor's
Profit
20.00
23
C O S T
24
25
26
27
28
29
30
Say
31
Rate
Labour
Per Plug Rate
Length
(31 x 3)
32
33
(Rs.)
Composite
(24 + 33)
34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
80
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
80
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
56
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30
#VALUE!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30
#VALUE!
11- Providing and installing PVC Strainer BSS Class "B" in Tube Well Bore Hole including Sockets and Solvents etc. complete.
S.
No.
Dia of
Strainer
Rate Contractor's
Per Ft
Profit
20.00
Percent
Total
Labour
Charges
Per Day
Labour
Cost
Per Ft
Solvent
(3 + 4)
Daily
Progress
in Ft
Lowering Contractor's
Charges
Profit
20.00
Percent
11
Say
12
13
Labour
Composite
(5 + 14)
Labour
Composite
14
15
16
17
3"
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
4"
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
5"
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
6"
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
8"
0.00
0.00
0.00
0.00
0.00
10"
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
12"
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
14"
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
10
Total
(8 + 9 +
10 + 11)
0.00
#VALUE!
0.00
12- Providing and installing PVC Strainer BSS Class "D" in Tube Well Bore Hole including Sockets and Solvents etc. complete.
MATERIAL
S.
No.
Dia of
Pipe
Total
Daily
Progress
Labour
Charges
Per Day
Labour
Cost
Per Ft
3+4
LABOURE
Solvent
Lowering
Charges
Contractor's
Profit
20.00
Percent
Total
(8 + 11
+ 12)
Labour
Composite
(5 + 13)
Labour
Composite
11
13
14
15
16
17
1"
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
1"
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
2"
0.00
0.00
0.00
0.00
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
3"
0.00
0.00
0.00
200.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4"
0.00
0.00
0.00
180.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5"
0.00
0.00
0.00
180.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6"
0.00
0.00
0.00
160.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10
13 - i - Providing and installing PVC Bail/ End Plug in Tube Well Bore Hole:
MATERIAL
S. No.
Dia of
Bail /
End Plug
LABOURE
Solvent Contractor's
Total
Lowering
Profit
Charges
20.00
6+7
Percent
Rate
Total
Labour
8+9
Labour
10
11
Composite
5 + 10
say
3"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12
13 - ii Providing and installing PVC Bail/ End Plug in Tube Well Bore Hole:
MATERIAL
S. No.
Dia of
Bail /
End Plug
LABOURE
Solvent Contractor's
Total
Lowering
Profit
Charges
20.00
(6 + 7)
Percent
Rate
Total
Labour
(8 + 9)
Labour
10
11
Composite
(10 + 5)
say
1"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12
14- Providing and installing M.S. blind pipe socketed/ welded joint M.S. reducer (where necessary) in
Tube Well Bore Hole including jointing/ welding with strainer etc. complete.
S.
No.
Dia of
Pipe
Thickness
of Pipe
Rate
Per Ft
Contractor's
Profit
20.00
Percent
Total
Daily
Daily
Progress Charges
Lowering Contractor's
Charges Profit 20%
Rs.
#VALUE!
(4 + 5)
Total
Labour
Composite
(6 + 13)
Labour
Composite
(9 + 10)
Grand
Total
(8 + 11)
11
12
13
14
15
16
say
1
2"
1/8"
0.00
0.00
3"
1/8"
0.00
4"
1/8"
5"
0.00
100
#VALUE!
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
100
#VALUE!
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
0.00
80
#VALUE!
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
3/16"
0.00
0.00
0.00
80
#VALUE!
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
6"
3/16"
0.00
0.00
0.00
56
#VALUE!
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
7"
3/16"
0.00
0.00
0.00
56
#VALUE!
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
8"
3/16"
0.00
0.00
0.00
48
#VALUE!
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
9"
3/16"
0.00
0.00
0.00
48
#VALUE!
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
10"
"
0.00
0.00
0.00
48
#VALUE!
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
10
12"
"
0.00
0.00
0.00
40
#VALUE!
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
11
15"
"
0.00
0.00
0.00
40
#VALUE!
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
12
18"
"
0.00
0.00
0.00
32
#VALUE!
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
13
20"
"
0.00
0.00
0.00
30
#VALUE!
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
14
22"
"
0.00
0.00
0.00
30
#VALUE!
0.00
0.00
#VALUE!
#VALUE!
#VALUE!
10
10
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total
1.00
0.50
0.75
1.00
No
0.00
Nos
0.00
Nos
0.00
No RATE
P. Day
P. Day
P. Day
P. Day
#VALUE!
##### Percent
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Rs.
say
#VALUE!
#VALUE!
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total
1.00
0.50
1.50
1.00
No
0.00
Nos
0.00
Nos
0.00
No RATE
P. Day
P. Day
P. Day
P. Day
#VALUE!
##### Percent
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Rs.
say
#VALUE!
#VALUE!
20
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total
0.50
0.60
1.00
1.00
No
0.00
Nos
0.00
Nos
0.00
No RATE
P. Day
P. Day
P. Day
P. Day
#VALUE!
##### Percent
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Rs.
#VALUE!
#VALUE!
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Foreman
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total
1.00
2.00
6.00
1.00
No
0.00
Nos
0.00
Nos
0.00
No RATE
P. Day
P. Day
P. Day
P. Day
#VALUE!
##### Percent
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Rs.
#VALUE!
15- Providing and installing PVC blind pipe BSS Class "B" in Tube Well Bore Hole including Sockets and
Solvents and jointing with strainer etc. complete.
S.
No.
Dia of
Strainer
Rate
Per Ft
Contractor's
Profit
20.00
Percent
Total
(3 + 4)
Daily
Labour Labour Lowering
Progress Charges Per Ft Charges
Per Day
Solvent
Total
(9 + 10)
10
11
3"
0.00
0.00
0.00
200
###### ######
0.00
0.00
0.00
#VALUE!
4"
0.00
0.00
0.00
180
###### ######
0.00
0.00
0.00
#VALUE!
5"
0.00
0.00
0.00
180
###### ######
0.00
0.00
0.00
#VALUE!
6"
0.00
0.00
0.00
160
###### ######
0.00
0.00
0.00
#VALUE!
8"
0.00
0.00
0.00
128
###### ######
0.00
0.00
0.00
#VALUE!
10"
0.00
0.00
0.00
128
###### ######
0.00
0.00
0.00
#VALUE!
12"
0.00
0.00
0.00
104
###### ######
0.00
0.00
0.00
#VALUE!
14"
0.00
0.00
0.00
104
###### ######
0.00
0.00
0.00
#VALUE!
20
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total
1.00
2.00
1.00
1.00
No
0.00
Nos
0.00
No
0.00
No RATE
P.
P.
P.
P.
Day
Day
Day
Day #VALUE!
10.00 Percent
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Rs.
#VALUE!
Detail
Rate
Per Unit (Rs.)Amount (Rs.)
Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total
1.00
2.00
2.00
1.00
No
0.00
Nos
0.00
Nos
0.00
No RATE
P.
P.
P.
P.
Day
Day
Day
Day #VALUE!
10.00 Percent
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Rs.
#VALUE!
16- Providing and installing PVC blind pipe BSS Class "D" in Tube Well Bore Hole including Sockets and Solvents
and jointing with strainer etc. complete.
S.
No.
Dia of
Strainer
Daily
Daily
Labour Solvent
Progress Charges Rate
Per Ft
Total
(9 + 10)
10
11
Contractor's Total
Rate per Rft
Rate per Metre
Profit
(8 + 11 Labour Composite Labour Composite
20.00
12)
(5 + 13)
Percent
4
13
14
15
16
17
1"
0.00
0.00
0.00
260
###### ######
0.00
0.00
0.00
1"
0.00
0.00
0.00
260
###### ######
0.00
0.00
0.00
2"
0.00
0.00
0.00
240
###### ######
0.00
0.00
0.00
3"
0.00
0.00
0.00
200
###### ######
0.00
0.00
0.00
4"
0.00
0.00
0.00
180
###### ######
0.00
0.00
0.00
5"
0.00
0.00
0.00
180
###### ######
0.00
0.00
0.00
6"
0.00
0.00
0.00
160
###### ######
0.00
0.00
0.00
Lowering
Charges
Contractor's Profit
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total
1.00
1.00
1.00
1.00
No
No
No
No
0.00 P.
0.00 P.
0.00 P.
RATE
P.
Day
Day
Day
Day
#VALUE!
10.00 Percent
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Rs.
#VALUE!
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total
1.00
2.00
1.00
1.00
No
0.00
Nos
0.00
No
0.00
No RATE
P.
P.
P.
P.
Day
Day
Day
Day
#VALUE!
10.00 Percent
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
Rs.
#VALUE!
Detail
Material
(P. O.
L.)
Rate
Per Unit (Rs.) Amount (Rs.)
##### Ltr
13.62 Ltr
1.13 Kg
L.S.
0.00 P. Ltr
0.00 P. Ltr
0.00 P. Kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Composite Rate P
Rs.
0.00
100
Say
Item No.
17
Detail
Material
(P. O.
L.)
Rate
Per Unit (Rs.) Amount (Rs.)
##### Ltr
18.16 Ltr
1.36 Kg
L.S.
0.00 P. Ltr
0.00 P. Ltr
0.00 P. Kg
Total
Contractor's Profit & Ove 20.00 Percent
Total
Composite Rate P
Rs.
0.00
100
Say
Detail
Material
Bajri 3/8" - 1/8" (10-3mm)
Wastage
5%
100 Cft
Rate
Per Unit (Rs.) Amount (Rs.)
0.00 % Cft
Total
Contractor's Profit & Ove 20.00 Percent
Total
Labour
Washing and Pouring bag
Skilled Coolies
Unskilled Coolies
Total
Sundries
Total
3.30 Nos
1.00 No
0.00 P. Day
0.00 P. Day
10.00 Percent
Rs.
Rs.
Composite Rate P
Composite Rate P
Rs.
Rs.
19- Laying, cutting, jointing, testing and disinfecting cast iron pipe line in trenches with spigot and socket
caulked lead joint, including cost of materials, such as lead, yarn, etc. complete in all respects.
S. nterna Weight of
No. dia of 18' length
pipe of pipe in
lbs
Weight of Carriage of
Lowering
Cutting
Pluging
Testing
100' length 100' pipe
into
ends
with
and
of pipe in
from field
trenches
chipping, temporary disinfecting
ton
store to site strin- ging & fini- shing wooden
lead four
laying to surface to
plug
chain @ Rs.
correct
uniform
alignment
finish
Tons
and grade
3"
170.00
0.429
0.00
0.00
4"
190.00
0.48
0.00
0.00
5"
324.00
0.82
0.00
0.00
6"
410.00
1.03
0.00
8"
591.00
1.49
10"
794.00
12"
8
9
0.00
Jointing
with lead
joint
Total
charges for
100' (30 M)
(5 + 6 + 7 +
+8+9+
10)
Composite
Composite
rate Per Ft
rate Per
Metre
10
11
12
13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1018.00
2.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15"
1389.00
3.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18"
1834.00
4.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19 - a
- Lowering into trenches, stringing and laying C.I. pipe line to correct alignment and gradient.
S. nterna
No. dia
LABOUR
Daily
Progress
Daily
Charges
3"
400
0.00
0.00
Plumber
1 No
0.00
0.00
4"
400
0.00
0.00
Coolies
2 Nos
0.00
0.00
5"
300
0.00
0.00
6"
300
0.00
0.00
8"
225
0.00
0.00
Total
10"
175
0.00
0.00
12"
150
0.00
0.00
Total
15"
125
0.00
0.00
18"
100
0.00
0.00
Total
Sundries
0.00
10.00 Percent
20.00
20.00 Percent
0.00
0.00
19 - bCutting cast iron pipe, chipping & finishing the face to uniform finish =
S.
No.
I/D
of
Pipe
3"
8.00
0.00
0.00
0.00
4"
6.00
0.00
0.00
0.00
LABOUR
5"
4.00
0.00
0.00
0.00
Pipe fitter
6"
3.00
0.00
0.00
0.00
Unskilled Cooly
8"
2.00
0.00
0.00
0.00
Total
10"
1.50
0.00
0.00
0.00
Sundries
12"
1.25
0.00
0.00
0.00
Total
15"
1.10
0.00
0.00
18"
1.00
0.00
0.00
0.00
Rate per
100 ft
per cut
1 No
0.00
0.00
2 Nos
0.00
0.00
0.00
10.00
Percent
0.00
20.00
Percent
0.00
19 - c
S.
No.
Providing and fixing temporary wooden tapered plug of hard wood to each end of pipe line.
Assume for 500 ft.
Size
of
plug
Area of
plug
3"
4"
9x(3)2
4x144
9x(4)2
4x144
5"
9x(5)2
4x144
6"
8"
Length
9x(6)2
4x144
9x(8)2
4x144
PLUG
Content
in
Cft
Rate Per
Cft
Amount
(5 X 6)
10
L. S.
11
12
13
Grand
Total
for 500'
(15+10
+ 7)
Rate for
100'
16
17
18
0.50
0.02
0.00
0.00
34.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.50
0.04
0.00
0.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Hard Wood
1 Cft @
0.00 Rs.
0.00
0.00
20.00
0.00
0.50
0.07
0.00
0.00
25.00
0.00
0.00
0.00
0.00
0.00
0.50
0.10
0.00
0.00
19.00
0.00
0.00
0.00
0.00
0.00
0.00
Contractor's
Profit &
0.00 Overheads
0.50
0.17
0.00
0.00
15.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.75
0.41
0.00
0.00
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
0.00
10"
12"
15"
18"
9x(10)
4x144
9x(12)2
4x144
9x(15)2
4x144
9x(18)2
4x144
Daily Charges
0.75
0.59
0.00
0.00
9.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.23
0.00
0.00
7.00
0.00
0.00
0.00
0.00
0.00
0.00
Carpenter
0.00 1
Turner
0.00 1
1.00
1.77
0.00
0.00
5.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
Sundries
Total
Contractor's
Profit
Total
0.00
0.00
0.00
0.00
10.00
20.00
0.00
0.00
0.00
0.00
0.00
19 - d
S. I/D of Volume
No. pipe in of Water
Inch required
in Gallon
Amount
@ Rs
0.00
Per
Gallons
Disinfecting
Agent
Lbs/Kg
Amount
@ Rs.
Hire
Charges
0.00
of testing
Per Lbs/Kg operatus
Total
(7 + 6
+ 4)
Contractor's
Profit
20.00
Percent
Total
(8 + 9)
10
Plugging
of Pipe
11
LABOUR
Labour for
testing &
disinfecting
(11 + 12)
12
13
Rate Charges
for 200 Rft
Total
16
3"
310.00
0.00
0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 Mechanic
1 No.
0.00
0.00
4"
720.00
0.00
1.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 Coolies
2 Nos
0.00
0.00
5"
850.00
0.00
1.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6"
1830.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 Sundries
8"
2180.00
0.00
3.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
10"
3410.00
0.00
5.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Percent
12"
4910.00
0.00
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
15"
8730.00
0.00
14.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rate per
0.00 100 Rft
18"
11000.00
0.00
18.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
10.00
Percent
0.00
0.00
0.00
0.00
19 - e
Jointing cast iron pipe line in trenches with spigot and socket. Caulked lead joints
including cost of material such as lead, yarn etc., complete in all respect.
1
1
2
3
4
5
6
7
8
9
2
3"
4"
5"
6"
8"
10"
12"
15"
18"
Lead
Lbs/Kg
Rate
Lbs/Kg
4.10
5.20
6.30
7.90
10.80
15.00
17.30
23.00
31.50
5
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.25
0.38
0.44
0.44
0.63
0.75
1.06
1.50
2.07
Fuel
Rate P.
Lbs
7
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Amount
6x7
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
5+8
+9
9
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Contractor's
Profit
20.00
Percent
Total
Material
Per Joint
10 + 11
11
12
0.15
0.19
0.24
0.28
0.30
0.50
0.59
0.76
0.99
16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sundires
Total
Contractor's Profit & Overheads
Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Daily Charges
Plumber
Cooly
Assistant Plumber (skilled cooly)
1 No
3 Nos
1 No
0.00
0.00
0.00
Total
0.00
0.00
0.00
0.00
Composite
rate for
100' length
16 x 100
18
17
Composite Composite
rate for
rate for
Rft
Metre
18
-
18
-
20- Laying cutting, jointing, testing and disinfecting cast iron pipe line in trenches with flanged and flanged
complete in all respects.
S.
No.
1
1
2
3
4
5
6
7
8
9
Internal Weight of
dia of 12' length
pipe
of pipe in
lbs
2
3"
4"
5"
6"
8"
10"
12"
15"
18"
20 - a
S.
No.
1
2
3
4
5
6
7
8
9
3
-
4
0.50
0.65
0.85
1.05
1.49
2.05
2.60
3.55
4.70
Pluging
with
temporary
wooden plug
Testing and
disinfecting
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11
12
Composite
rate per
Metre
13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Lowering into trenches, stringing and laying C.I. pipe line to correct alignment and gradient.
Internal
dia
3"
4"
5"
6"
8"
10"
12"
15"
18"
LABOUR
Daily
Progress
400
400
300
300
225
175
150
125
100
Daily
Charges
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Amount per
100 ft
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rate 100 ft
Plumber
Coolies
1 No
2 Nos
0.00
0.00
Total
Sundries
10.00 Percent
20.00 Percent
Total
Contractor's Profit & Overheads
say
0.00
Total
say
20 - b Cutting cast iron pipe, chipping & finishing the face to uniform finish =
S.
No.
I/D
of
Pipe
1
1
2
3
4
5
6
7
8
9
2
3"
4"
5"
6"
8"
10"
12"
15"
18"
20 - c -
3
8.00
6.00
4.00
3.00
2.00
1.50
1.25
1.10
1.00
4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rate per
100 ft
per cut
6
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
LABOUR
Pipe fitter
Unskilled Cooly
1 No
2 Nos
Total
Sundries
Total
Contractor's Profit & Overheads
0.00
0.00
0.00
0.00
0.00
10.00
Percent
20.00
Percent
0.00
0.00
Providing and fixing temporary wooden tapered plug of hard wood to each end of pipe line.
Detail
S.
No.
Size
of
plug
3"
Area of
plug
Length
PLUG
Contant
in
Cft
Rate Per
Cft
Amount
(5 X 6)
10
L. S.
11
12
13
14
Total
(13+14)
15
Grand
Total
for 500'
(15+10
+ 7)
Rate for
100'
16
17
500'
3
x(3)2
18
4x144
0.50
0.02
0.00
0.00
34.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.50
0.04
275.00
11.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.50
0.07
275.00
19.25
25.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Hard Wood
0.00 Cft @ Rs.
0.50
0.10
275.00
27.50
19.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.50
0.17
275.00
46.75
15.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.75
0.41
275.00
112.75
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.75
0.59
275.00
162.25
9.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Carpenter 1 No.
0.00
0.00
1.00
1.23
275.00
338.25
7.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Turner 1 No.
0.00
0.00
1.00
1.77
275.00
486.75
5.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Daily Charges
x(4)2
2
4"
4x144
x(5)2
3
5"
6"
8"
4x144
x(6)2
4x144
x(8)2
4x144
0.00
0.00
20.00
0.00
Total
0.00
x(10)2
6
10"
4x144
x(12)2
7
12"
4x144
x(15)2
8
15"
4x144
x(18)2
9
18"
4x144
Total
Sundries
Total
Contractor's
Profit &
Overheads
Total
0.00
10.00 Percent
0.00
20.00 Percent
0.00
20 - d -
S.
No.
I/D of
pipe in
Inch
Volume
of Water
required
in Gallon
Amount
@ Rs
Per
Gallons
1
1
2
3
4
5
2
3"
4"
5"
6"
8"
3
310.00
720.00
850.00
1830.00
2180.00
4
0.00
0.00
0.00
0.00
0.00
6
7
10"
12"
3410.00
4910.00
8
9
15"
18"
8730.00
11000.00
20 - e
Disinfecting
Agent
Lbs/Kg
Amount
@ Rs
Per Lbs/Kg
Hire
Charges
of testing
operatus
(7 + 6
+ 4)
0.00
Total
Contractor's
Profit
20.00
Percent
Total
(8 + 9)
0.50
1.20
1.40
2.00
3.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9
0.00
0.00
0.00
0.00
0.00
10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.70
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14.50
18.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Plugging
of Pipe
11
LABOUR
Labour for
testing &
disinfecting
Total
Composite
for 1000 Rft
(11+12)
(10 + 13)
12
13
14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1
1
2
3
4
5
6
7
8
9
Rate Charges
for 200 Rft
15
16
1 No.
0.00 Mechanic
2 Nos
0.00 Coolies
0.00
10.00
0.00 Sundries
0.00
Contractor's
Profit &
0.00 Overheads 20.00
0.00
Rate per 100
0.00 Rft
0.00
0.00
0.00
0.00
0.00
0.00
Total
Percent
Total
0.00
Percent
Total
0.00
0.00
Laying, cutting, jointing, testing & disinfecting C.I. pipe line in trenches with flanged &
flanged joint complete in all respects.
Rate for
100'
I/D of
pipe
2
3"
4"
5"
6"
8"
10"
12"
15"
18"
3
5/8"
5/8"
5/8"
5/8"
3/4"
3/4"
3/4"
7/8"
7/8"
4
2"
2"
3"
3"
3"
3"
3"
4"
4"
Amount
5x6
6
4.00
4.00
6.00
6.00
8.00
12.00
12.00
12.00
12.00
7
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
7+9
9
0.46
0.61
1.00
1.18
1.20
1.86
2.50
2.84
3.42
0.00
0.00
24.00
28.32
28.80
44.86
60.24
69.36
82.08
10
0.00
0.00
24.00
28.32
28.80
44.86
60.24
69.36
82.08
Contractor's
Profit
20.00
Percent
Total
Material
P. Joint
10 + 11
11
12
0.00
0.00
1.20
1.42
1.44
2.24
3.01
3.47
4.10
0.00
0.00
25.20
29.74
30.24
47.10
63.25
72.83
86.18
No. of
Joints in
One Day
13
11.00
10.00
9.00
8.00
8.00
6.00
5.00
3.00
2.00
Labour
Daily
Charges
14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Daily Charges
Plumber
Cooly
1 No
1 No
0.00
0.00
0.00
Sundires
Total
Contractor's Profit & Overheads
Total
10.00 Percent
20.00 Percent
0.00
0.00
0.00
0.00
14 / 13
Composite
rate
P. Joint
for 12'
15
16
Amount
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rate Per
100' pipe
length
16 x 100
12
17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Composite
rate per
Ft
Composite
rate per
Metre
18
18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Internal Weight of
dia of 12' length
pipe
of pipe in
lbs
Weight
of 100'
length
of pipe
in ton.
Carriage of
Lowering into
Cutting ends
100' pipe
trenches strin- chipping, finifrom field store ging & laying to shing surface
to site lead correct alignment to uniform
four chain Ton
and grade
finish
@ of Rs.
10
Composite
Composite
rate per Ft
rate per
Metre
12
13
3"
0.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4"
0.48
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5"
0.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6"
1.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8"
1.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10"
1.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12"
2.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15"
3.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18"
4.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
S.
No.
21 - a
Pluging
Testing and
with
disinfecting
temporary
wooden plug
11
Lowering into trenches, stringing and laying C.I. pipe line to correct alignment and gradient.
Internal
dia
LABOUR
Daily
Progress
Daily
Charges
Amount per
100 ft
3"
400
0.00
0.00
4"
400
0.00
0.00
5"
300
0.00
0.00
6"
300
0.00
0.00
8"
225
0.00
0.00
10"
175
0.00
0.00
12"
150
0.00
0.00
15"
125
0.00
0.00
18"
100
0.00
0.00
Rate 100 ft
Plumber
1 No
Coolies
2 Nos
0.00
0.00
Total
Sundries
10.00 Percent
20.00 Percent
Total
Contractor's Profit & Overhe
Total
21 - b Cutting cast iron pipe, chipping & finishing the face to uniform finish =
S.
No.
I/D
of
Pipe
1
1
2
3
4
5
6
7
8
9
2
3"
4"
5"
6"
8"
10"
12"
15"
18"
21 - c -
3
8.00
6.00
4.00
3.00
2.00
1.50
1.25
1.10
1.00
4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rate per
100 ft
per cut
6
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
LABOUR
Pipe fitter
Unskilled Cooly
Total
Sundries
Total
Contractor's Profit & Overheads
1 No
2 Nos
0.00
0.00
0.00
0.00
0.00
10.00
Percent
20.00
Percent
0.00
0.00
Providing and fixing temporary wooden tapered plug of hard wood to each end of pipe line.
Detail
S.
No.
Size
of
plug
Area of
plug
Length
PLUG
Contant
in
Cft
Rate Per
Cft
Amount
(5 X 6)
10
L. S.
11
Total
(13+14)
15
Grand
Total
for 500'
(15+10
+ 7)
16
500'
Rate for
100'
17
18
x(3)2
1
3"
4x144
0.50
0.02
0.00
0.00
34.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.50
0.04
0.00
0.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.50
0.07
0.00
0.00
25.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Hard Wood
0.00 Cft @ Rs.
0.50
0.10
0.00
0.00
19.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.50
0.17
0.00
0.00
15.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.75
0.41
0.00
0.00
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.75
0.59
0.00
0.00
9.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Carpenter 1 No.
0.00
0.00
1.00
1.23
0.00
0.00
7.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Turner 1 No.
0.00
0.00
1.00
1.77
0.00
0.00
5.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Daily Charges
x(4)2
2
4"
4x144
x(5)
5"
6"
8"
4x144
x(6)2
4x144
x(8)2
4x144
0.00
0.00
20.00
0.00
Total
0.00
x(10)2
6
10"
4x144
x(12)2
7
12"
4x144
x(15)2
8
15"
4x144
x(18)2
9
18"
4x144
Total
Sundries
Total
Contractor's
Profit &
Overheads
Total
0.00
10.00 Percent
0.00
10.00 Percent
0.00
20 - d -
S.
No.
1
1
2
3
4
5
I/D of
pipe in
Inch
2
3"
4"
5"
6"
8"
Volume
of Water
required
in Gallon
3
310.00
720.00
850.00
1830.00
2180.00
Amount
@ Rs
Per
Gallons
4
0.00
0.00
0.00
0.00
0.00
Disinfecting
Agent
Lbs/Kg
5
0.50
1.20
1.40
2.00
3.65
Amount
@ Rs.
Per Lbs/Kg
Hire
Charges
of testing
operatus
(7 + 6
+ 4)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
0.00
0.00
0.00
0.00
0.00
Contractor's
Profit
20.00
Percent
9
0.00
0.00
0.00
0.00
0.00
Total
(8 + 9)
10
0.00
0.00
0.00
0.00
0.00
Plugging
of Pipe
11
0.00
0.00
0.00
0.00
0.00
LABOUR
Labour for
testing &
disinfecting
Total
Composite
for 1000 Rft
(11+12)
(10 + 13)
12
13
14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rate Charges
for 200 Rft
15
0.00
0.00
0.00
0.00
0.00
6
7
10"
12"
3410.00
4910.00
0.00
0.00
5.70
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
9
15"
18"
8730.00
11000.00
0.00
0.00
14.50
18.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rate for
100'
16
0.00 Mechanic
0.00 Coolies
0.00
0.00 Sundries
0.00
1 No.
0.00
0.00
2 Nos
10.00
Contractor'
s Profit &
0.00 Overheads 10.00
0.00
Rate per
0.00 100 Rft
0.00
0.00
0.00
0.00
Total
Percent
Total
Percent
Total
0.00
0.00
0.00
21
Laying, cutting, jointing, testing & disinfecting cast iron pipe line in trenches with tyton joints
complete in all respect.
S.
No.
I/D of
pipe in
Inche
1
1
2
3
4
5
6
7
8
9
2
3"
4"
5"
6"
8"
10"
12"
15"
18"
Cost of Ring
Amount Contra ctor's
Profit
20.00
Percent
4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
Material
P. joint
Total
Material
for 100'
6 x 100
18
Composite
rate per
100 ft
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21
Laying,cutting,jointing,testing and disinfecting Cast Iron Pipe line in trenches with Tyton joints,complete in all respect.
S.
No.
Internal
dia of
pipe
1
2
3
4
5
6
7
8
9
3"
4"
5"
6"
8"
10"
12"
15"
18"
eight of 10 Carriage of
Lowering into
Cutting ends
length of
100' pipe
trenches strin- chepping, finipipe in ton from field store ging & laying to shing surface
to site lead correctalignment to uniform
four chain @
and grade
finish
Rs. Tons
3
0.47
0.48
0.80
1.02
1.47
1.97
2.52
3.45
4.55
5
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Pluging
Testing and Jointing Total charges
with
disinfecting with rubber
for 100'
temporary
ring
(30 M)
wooden plug
(4 + 5 + 6 +
7 + 8 +9)
7
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Composite
Composite
rate Per Ft
rate Per
Metre
11
12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21 - a
S.
No.
Internal
dia
1
2
3
4
5
6
7
8
9
3"
4"
5"
6"
8"
10"
12"
15"
18"
Lowering into trenches, stringing and laying C.I. pipe line to correct alignment and gradient.
LABOUR
Daily
Progress
400
400
300
300
225
175
150
125
100
Daily
Charges
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Amount per
100 ft
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rate 100 ft
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Plumber
Coolies
Total
Sundries
Total
Contractor's Profit & Overhe
Total
0.00
0.00
1 No
2 Nos
0.00
0.00
0.00
10.00 Percent
20.00 Percent
0.00
0.00
21 - b Cutting cast iron pipe, chipping & finishing the face to uniform finish =
S.
No.
I/D
of
Pipe
3"
8.00
0.00
0.00
0.00
4"
6.00
0.00
0.00
0.00
LABOUR
5"
4.00
0.00
0.00
0.00
Pipe fitter
6"
3.00
0.00
0.00
0.00
Unskilled Cooly
8"
2.00
0.00
0.00
0.00
Total
10"
1.50
0.00
0.00
0.00
Sundries
12"
1.25
0.00
0.00
0.00
Total
15"
1.10
0.00
0.00
0.00
18"
1.00
0.00
0.00
0.00
Rate per
100 ft
per cut
1 No
0.00
0.00
2 Nos
0.00
0.00
0.00
10.00
Percent
0.00
20.00
Percent
0.00
22 Providing, laying, cutting, jointing, testing and disinfecting GI pipeline in trenches, with socket joint, using GI pipes of BSS 1387 - 1967
complete in all respects, with specials and valves.
Material
S. Dia of Rate per
No. pipe in 100' for
Inche
light
quality
"
Adust- Wastage
orum
2%
1%
Special
10%
Total
3+4+
5+6
Contractor's
Profit
20.00
Perfect
Total
No of
Joints
in line
18
19
Composite
18 / 100 19 / 100
0.00
0.00
10.00
40.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
35.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
28.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
28.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
25.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
23.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
Contractor's Profit & Overheads
Total
0.00
20.00 Percent
Sundries
0.00
20.00 Percent
Total
0.00
17
0.00
0.00
16
15 + 16
+ 17
Composite for
100'
9 + 18
0.00
2 Nos.
15
Testing Labour
0.00
Cooly
14
Carriage
0.00
0.00
13
Total
13 + 14
x 10
0.00
0.00
12
Total
jointing
material
1 No.
11
Daily
Cost
Charges per
Joint
Plumber
10
Progress
Rate
20
21
22
23
22 Providing, laying, cutting, jointing, testing and disinfecting GI pipeline in trenches, with socket joint, using GI pipes of BSS 1387 - 1967
complete in all respects, with specials and valves.
20
Material
S. Dia of Rate per
No. pipe in 100' for
Inche
light
quality
"
Adust- Wastage
orum
2%
1%
Special
10%
Total
3+4+
5+6
Contractor's
Profit
20.00
Perfect
Total
No of
Joints
in line
18
19
Composite
18 / 100 19 / 100
0.00
0.00
10.00
40.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
35.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
28.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
28.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
25.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
23.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10
5"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
20.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11
6"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
20.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
Contractor's Profit & Overheads
Total
0.00
20.00 Percent
Sundries
0.00
10.00 Percent
Total
0.00
17
0.00
0.00
16
15 + 16
+ 17
Composite for
100'
9 + 18
0.00
2 Nos.
15
Testing Labour
0.00
Cooly
14
Carriage
0.00
0.00
13
Total
13 + 14
x 10
0.00
0.00
12
Total
jointing
material
1 No.
11
Daily
Cost
Charges per
Joint
Plumber
10
Progress
Rate
20
21
22
23
22 Providing, laying, cutting, jointing, testing and disinfecting GI pipeline in trenches, with socket joint, using GI pipes of BSS 1387 - 1967
complete in all respects, with specials and valves.
Material
S. Dia of Rate per
No. pipe in 100' for
Inche
light
quality
"
Adust- Wastage
orum
2%
1%
Special
10%
Total
3+4+
5+6
Contractor's
Profit
20.00
Perfect
Total
No of
Joints
in line
18
19
Composite
18 / 100 19 / 100
0.00
0.00
10.00
40.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
35.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
28.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
28.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
25.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
23.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10
5"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
20.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11
6"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
20.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
Contractor's Profit & Overheads
Total
0.00
20.00 Percent
Sundries
0.00
10.00 Percent
Total
0.00
17
0.00
0.00
16
15 + 16
+ 17
Composite for
100'
9 + 18
0.00
2 Nos.
15
Testing Labour
0.00
Cooly
14
Carriage
0.00
0.00
13
Total
13 + 14
x 10
0.00
0.00
12
Total
jointing
material
1 No.
11
Daily
Cost
Charges per
Joint
Plumber
10
Progress
Rate
20
21
22
23
10
23
Providing laying, cutting, jointing, testing & disinfecting AC pipeline of BSS with "B" Class working pressure pipe in
trenches with cement joint & rubbering complete in all respect.
Labour for 100'
Material
S. Dia Cost of WastNo. of pipe with age
pipe coment
2%
joint &
rubber
ring
Total
(3 + 4)
Contractor's
Profit
20.00
Percent
Total
(5 + 6)
Carriage
for 100'
Per ft
AC pipe
length
(4 chain)
Grand
Lowering Cutting Cleaning
Total
into
end
end of
for 100 Ft trenches
pipe
& laying
10
11
12
Plugging
wooden
plug
14
15
Labour
Composite
10 + 16
3"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10
20"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11
24"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13
Testing
and
disinfecting
16
17
18
19
20
21
24
Providing laying, cutting, jointing, testing & disinfecting AC pipeline of BSS with "C" Class working pressure pipe in
trenches with cement joint & rubbering complete in all respect.
Labour for 100'
Material
S. Dia Cost of WastNo. of pipe with age
pipe coment
2%
joint &
rubber
ring
Total
(3 + 4)
Contractor's
Profit
20.00
Percent
Total
(5 + 6)
Carriage
for 100'
Per ft
AC pipe
length
(4 chain)
Grand
Lowering Cutting Cleaning
Total
into
end
end of
for 100 Ft trenches
pipe
& laying
Testing
and
disinfecting
Plugging
wooden
plug
14
15
Labour
Composite
10 + 16
20
10
11
12
3"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10
20"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11
24"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13
16
17
18
19
20
21
25
Providing laying, cutting, jointing, testing & disinfecting AC pipeline of BSS with "D" Class working pressure pipe in
trenches with commet joint & rubbering complete in all respect.
Labour for 100'
Material
S. Dia Cost of WastNo. of pipe with age
pipe coment
2%
joint &
rubber
ring
Total
(3 + 4)
Contractor's
Profit
20.00
Percent
Total
(5 + 6)
Carriage
for 100'
Per ft
AC pipe
length
(4 chain)
Grand
Lowering Cutting Cleaning
Total
into
end
end of
for 100 Ft trenches
pipe
& laying
10
11
12
Plugging
wooden
plug
14
15
Labour
Composite
10 + 16
3"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10
20"
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13
Testing
and
disinfecting
16
17
18
19
20
21
re
re
re
23.Cleaning pipe placing rubber in position pressing with assembling machine, of AC pipe.
S.
#
I/D
of
Pipe
No of
joining
per day
1
1
2
2
3"
4"
3
36.00
32.00
3
4
5
6
7
8
9
10
11
6"
8"
10"
12"
14"
16"
18"
20"
24"
28.00
24.00
20.00
16.00
14.00
13.00
12.00
10.00
8.00
Labour
charges
per day
Amount
Hire
Charges
of Machine
Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 machine, and jointing.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 LABOUR
0.00 Plumber
1 No
0.00 Skilled Cooly
1 No
0.00
Total
0.00
Sundries
0.00
0.00
Total
0.00
Contractor's Profit & Overheads
0.00
0.00
0.00
10.00
Percent
20.00
Percent
0.00
0.00
0.00
0.00
0.00
0.00
0.00
23 - Lowering into trenches, stringing and laying to correct alignment AC pipe "Class B" etc.
S.
No.
Size
of
pipe
No. of
Days
for 100'
Labour for
Charges
per day
Amount
3"
0.500
0.00
0.00
4"
0.515
0.00
0.00
6"
0.703
0.00
0.00
8"
0.974
0.00
0.00
Plumber
10"
1.289
0.00
0.00
Unskilled Cooly
12"
1.673
0.00
0.00
14"
1.915
0.00
0.00
16"
2.157
0.00
0.00
18"
2.555
0.00
0.00
10
20"
2.981
0.00
0.00
11
24"
3.480
0.00
0.00
1 No
0.00
0.00
2 Nos
0.00
0.00
Total
Sundries
0.00
10 Percent
Total
Contractor's Profit & Overheads
0.00
0.00
20 20.00
0.00
0.00
23 Providing, laying, cutting, jointing testing & disinfecting A.C. pipe line of BSS with "B Class" working
pressure pipe in trenches with cement joint and rubber ring complete in all respect.
Detail for 1000'
(Disinfecting and testing Rate
rate for 100'
S.
#
Dia Volume of
of
Water in
pipe P. Gallon
Amount
@ Rs
0
Per
Gallons
Disinfecting
agent
in Lbs
Amount
Hire
@ Rs. Charges
of testing
0
Per
apparatus
Lbs
Total
4+6
+7
Contractor's
Profit
20.00
Percent
Total
8+9
10
11
12
13
Composite
rate for
ft
10 + 13
14
Composite
Composite Rate
rate for
Rate per
Rate per
% ft.
Rft
Metre
15
16
17
3"
310.00
0.00
0.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4"
720.00
0.00
1.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6"
1820.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8"
2180.00
0.00
3.65
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10"
3410.00
0.00
5.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12"
4910.00
0.00
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14"
6810.00
0.00
11.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16"
8710.00
0.00
14.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18"
11000.00
0.00
18.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10
20"
13600.00
0.00
22.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11
24"
19600.00
0.00
32.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1 No.
0.00
0.00
Sundires
Cooly
2 Nos
0.00
0.00
Total
0.00
Total
Total
10.00
0.00
0.00
20.00
0.00
0.00
0
2
0.00
Assume
S.
#
Size
of
pipe
Area of
Plug Sft
3"
4"
9x(3)2
4x144
9x(4)2
4x144
6"
9x(6)2
4x144
8"
10"
12"
14"
16"
18"
10
20"
11
24"
9x(8)2
4x144
9x(10)2
4x144
9x(12)2
4x144
9x(14)2
4x144
9x(16)2
4x144
9x(18)2
4x144
9x(20)2
4x144
9x(20)2
4x144
PLUG
Length
Rate
per Cft
MATERIAL
Contents Amount
in Cft
5x6
10
for
500'
L.S.
Sundries
10
Percent
Total
11
12
13
14
15
Grand
Total
for 500'
7 + 10
+ 15
Rate
for 100'
Rate
per Metre
16
17
18
19
0.50
0.00
0.02
0.00
34.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.50
0.00
0.04
0.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.50
0.00
0.10
0.00
19.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Hard Wood
0.00 1 Cft
0.00
0.00
20.00
0.00
Daily Charges
0.50
0.00
0.17
0.00
15.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Contractor'
s Profit &
0.00 Overheads
0.75
0.00
0.41
0.00
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.75
0.00
0.59
0.00
9.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.75
0.00
1.07
0.00
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
1.40
0.00
7.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Carpenter
0.00 1 No.
Turner
0.00 1 No.
1.00
0.00
1.77
0.00
5.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
2.18
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 Sundries
1.25
0.00
3.93
0.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
0.00
0.00
0.00
0.00
Total
0.00
20.00
Total
Contractor'
s Profit &
Overheads
Total
0.00
0.00
0.00
20.00
0.00
0.00
Lowering into trenches, stringing and laying to correct alignment AC pipe "Class D" etc.
S.
No.
Size
of
pipe
1
1
2
3
4
5
6
7
8
9
10
11
2
3"
4"
6"
8"
10"
12"
14"
16"
18"
20"
24"
3
0.500
0.515
0.703
0.974
1.289
1.673
1.920
2.157
2.555
2.981
3.480
4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5
Lowering into trenches stringing and laying to correct alignment.
0.00
0.00
Daily Labour Charges
0.00
0.00
Plumber
1 No
0.00
0.00
0.00
Unskilled Cooly
2 Nos
0.00
0.00
0.00
Total
0.00
0.00
Sundries
10
Percent
0.00
0.00
Total
0.00
0.00 Contractor's Profit & Overheads
20
Percent
0.00
0.00
0.00
0.00
26
S.
No.
Providing, laying cutting jointing testing and disinfecting PVC pipeline of BSS with Class "B" working
pressure pipe in pipes trenches complete in all respect.
Assume for 500'
Rate for P. ft
Dia
of
pipe
Rate
for 100'
Wastage
2%
MATERIAL
Total
Contractor's
Profit
20.00
Percent
Total
(5 + 6)
Weight
in
Kg
Rate
Amount
of
Lubricant (8 x 9)
in Kg
LABOUR
ContraTotal
Labour
ctor's
as per
Profit
(10 + 11) detail
20.00
Percent
10
11
13
(12 +13)
14
15
17
18
3"
0.00
0.00
0.00
0.00
0.00
0.303
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4"
0.00
0.00
0.00
0.00
0.00
0.339
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5"
0.00
0.00
0.00
0.00
0.00
0.464
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6"
0.00
0.00
0.00
0.00
0.00
0.544
0.00
0.00
0.00
0.00
20.00
20.00
20.00
0.20
0.20
0.66
0.66
8"
0.00
0.00
0.00
0.00
0.00
0.789
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10"
0.00
0.00
0.00
0.00
0.00
0.865
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12"
0.00
0.00
0.00
0.00
0.00
1.037
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14"
0.00
0.00
0.00
0.00
0.00
1.179
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#####
16
12
Total
19
20
Labour for laying, cutting, jointing, pipeline in trenches with PVC pipes of BSS with
"B" Class working pressure, complete in all respect.
Rate for
S. #
Dia
of
pipe
100
ft
Total
Rate
for 100'
6+7
2"
0.00
0.10
0.00
0.00
-0.22
-0.22
3"
0.00
1/8
0.00
0.00
0.00
0.00
4"
0.00
1/6
0.00
0.00
0.00
0.00
5"
0.00
1/5
0.00
0.00
0.00
0.00
6"
0.00
1/5
0.00
0.00
0.00
0.00
8"
0.00
2/7
0.00
0.00
0.00
0.00
10"
0.00
2/5
0.00
0.00
0.00
0.00
12"
0.00
1/2
0.00
0.00
0.00
0.00
14"
0.00
2/3
0.00
0.00
0.00
0.00
#####
#####
-
Plumber
1 No
0.00
0.00
S. Coolies
2 No
0.00
0.00
Total
Sundries
0.00
10.00 Percent
0.00
20.00 Percent
0.00
Total
Contractor's P
Total
0.00
0.00
27
Providing, laying, cutting, jointing, testing & disinfecting pipeline in trenches with PVC pipes of BSS with "D"
Class working pressure, complete in all respect.
Dia
of
pipe
Material
Rate for
100'
Wastage
2%
Total
(3 + 4)
Labour
Contractor's
Profit
20.00
Percent
6
Total
(5 + 6)
10
Contractor's
Profit
20.00
Percent
11
Total
(10+11)
13
14
2"
0.00
0.00
0.00
0.00
0.00 0.259
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3"
0.00
0.00
0.00
0.00
0.00 0.303
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4"
0.00
0.00
0.00
0.00
0.00 0.339
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5"
0.00
0.00
0.00
0.00
0.00 0.464
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6"
0.00
0.00
0.00
0.00
0.00 0.544
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12
Labour Total
as per
detail (12+13)
24
15
16
17
18
19
20
28
a-
Providing and fixing cast iron special of BSS class "B" (such as bend, tee, cross collar, reducer, tail piece, flanged spigot,
cap, flanged socket, taper, angle branch, plug, etc.) for cast iron pipe line, complete.
C-I specials with spigot and socket joint.
Labour
S.
No.
Dia
of
pipe
Average
Waight
in
Lbs
3"
46.00
0.00
4"
61.00
0.00
5"
88.00
0.00
Labour Material
Total
Total
for
for
Labour for weight
2 Joints 2 Joints
2 Joints of special
4+5
6"
111.00
or
138.84
Kg
0.00
8"
182.00
0.00
10"
273.00
0.00
12"
392.00
or
396.55
Kg
0.00
15"
540.00
0.00
746.00
or
583.48
Kg
0.00
18"
Total
Cost
Rate
per Kg
10
11
12
Rate
per Kg
13
Rate per Kg
Labour
Composite
13 + 14
14
15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28 b-
Providing and fixing cast iron special of BSS class "B" (such as bend, tee, cross collar, reducer, tail piece, flanged spigot,
cap, flanged socket, taper, angle branch, plug, etc.) for cast iron pipe line, complete.
CI flanged special with flanged and flanged joints.
Labour
S.
No.
Dia
of
pipe
Average
Weight
in
Lbs/Kg
3"
32.00
4"
48.00
5"
83.00
6"
93.00
8"
161.00
10"
250.00
12"
376.00
15"
453.00
18"
646.00
Material
10
11
12
13
Rate
Rate per Kg
Labour
Composite
rate per
rate per
Kg
Kg
14
15
or
116.15
Kg
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
or
357.08
Kg
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
or
498.00
Kg
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28
c-
Providing and fixing cast iron special of BSS class "B" (such as bend, tee, cross collar, reducer, tail piece, flanged spigot,
cap, flanged socket, taper, angle branch, plug, etc.) for cast iron pipe line, complete.
CI specials with tyton joints.
Weight
S.
No.
Dia
of
pipe
Labour
Average
Weight
in
Lbs
3"
42.00
4"
60.00
5"
84.00
6"
109.00
8"
175.00
10"
265.00
12"
374.00
15"
654.00
18"
898.00
Material
10
Contractor's
Profit
20.00
11
Rate
per
Kg
Total
12
13
Rate
Rate per Kg
Labour
Composite
rate per
rate per
Kg
Kg
14
15
324.76
Lbs or
147.62
Kg
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Lbs or
244.20
Kg
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
921.80
Lbs or
419.00
Kg
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
29
Providing and fixing C.I. special of BSS Class "B" (such as bend, tee, cross, collar, reducer, tail piece, flanged socket, flanged
spigot, cap, taper, angle branch plug etc.) for AC pipe line with comet joint and rubber ring complete.
Labour
S.
#
Dia
of
pipe
Average
Weight
in
Lbs
3"
46.00
4"
61.00
6"
97.00
8"
175.00
10"
250.00
12"
370.00
16"
549.00
18"
693.00
20"
937.00
24"
1317.00
Material
10
11
12
13
Rate per Kg
Labour
Composite
rate per
rate per
Kg
Kg
14
15
204 Lbs
or 92.56
Kgs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2037 Lbs
or
927.23
Kgs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2254 Lbs
or 1022
Kgs
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30 - Providing and fixing sluice valve of BSS quality and weight Class "B" for cast iron pipe
Each
Material
S. Dia of
No. sluice
valve
Labour
Cost of
sluice
valve
Contractor's
Profit
20
Percent
Total
No of
day
Daily
Labour
Rate
Total
Labour
(3 + 4)
3"
0.00
0.00
4"
0.00
5"
6"
Composite
(5 + 9)
10
0.340
0.00
0.00
0.00 Labour
3" to 8"
0.00
0.370
0.00
0.00
0.00 Plumber
1 No
0.00
0.00
0.00
0.00
0.666
0.00
0.00
2 No
0.00
0.00
0.00
0.00
0.710
0.00
0.00
0.00
8"
0.00
0.00
0.829
0.00
0.00
0.00 Sundries
10"
0.00
0.00
0.889
0.00
0.00
0.00
12"
0.00
0.00
0.999
0.00
0.00
15"
0.00
0.00
1.325
0.00
0.00
0.00
18"
0.00
0.00
1.525
0.00
0.00
0.00 Labour
Total
0.00
10.00 Percent
Total
0.00
20.00 Percent
Total
0.00
0.00
10" to 18"
Plumber
1 No
0.00
0.00
Skilled Coolies
2 No
0.00
0.00
Unskilled Coolies
2 No
0.00
0.00
Total
Sundries
0.00
10.00 Percent
Total
Contractor's Profit & O
Total
0.00
0.00
0.00
20.00 Percent
0.00
0.00
31
S.
No.
Providing and fixing sluice valve of BSS quality & weight for AC pipeline with
commet joint & rubber ring complete i/c cost of jointing material.
Dia
of
sluice
Material
Cost of
sluice
valve
Contractor's
Profit
20.00
Percent
4
Labour
Material
Total
6+7
Labour
rate
(3 + 4)
Rate
Composite
rate
5+8
3"
0.00
0.00
0.00
0.00
0.00
0.00
4"
0.00
0.00
0.00
0.00
0.00
0.00
6"
0.00
0.00
0.00
0.00
0.00
0.00
8"
0.00
0.00
0.00
0.00
0.00
0.00
10"
0.00
0.00
0.00
0.00
0.00
0.00
12"
0.00
0.00
0.00
0.00
0.00
0.00
16"
0.00
0.00
0.00
0.00
0.00
0.00
18"
0.00
0.00
0.00
0.00
0.00
0.00
10
31a Providing and fixing sluice valve of BSS quality and weight for A.C. pipe line with cement joint
and rubber ring complete including cost of jointing material.
Labour
Charge
per day
Sr.
No.
Size
No. of
Day
Amount
3"
12.30
0.00
0.00
4"
11.40
0.00
0.00
6"
10.35
0.00
0.00
8"
7.40
0.00
0.00
10"
9.30
0.00
0.00
12"
6.93
0.00
0.00
16"
6.10
0.00
0.00
18"
5.78
0.00
0.00
Daily Charge
10' to 18"
Plumber
Skilled Cooly
Coolies
1 No.
2 Nos.
Total
Sundries
Total
Contractor's Pro
1 No.
2 Nos.
2 Nos.
Total
Sundries
Total
Contractor's Pro
0.00
0.00
10.00 Percent
20.00 Percent
0.00
0.00
0.00
10.00 Percent
20.00 Percent
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32 Providing and fixing fire hydrant BSS quality and weight of 2" dia including cost of
jointing material.
Sr.
No.
Dia of
Pipe
2"
Material
Cost of Contractor's
Hydrant
Profit
20.00
Fixing (Labour)
Rate
Labour Composite
Total
Labour Material
Total
0.00
33 Providing and fixing Air Valve 3" (75mm) internal dia of BSS quality and weight complete
with jointing material.
Material
Cost of Contractor's
Air Valve
Profit
20.00
Fixing (Labour)
Rate
Labour Composite
Total
Sr.
No.
Dia of
Pipe
Single
0.00
Double
0.00
Labour Material
Total
20
34 Providing and fitting CI flanges on pipes, including turning, threading, facing and fitting etc.
complete in all respects.
S.
#
Dia
of
pipe
3"
No of
end
thread
P. day
Per Flange
Labour
Daily
End
Cutting
Total
Charges thread
end
per end
(5 + 6)
Material
Weight cost per cwt
of
flange
in Lbs
Total
10
Rates
Per Flange
Per Kgs
Labour
Compo- Labour Composite
site
(10 + 11)
11
12
13
14
15.00
0.00
0.00
0.00
0.00
8.40
0.00
0.00
0.00
0.00
0.00
0.00 Labour
4"
14.00
0.00
0.00
0.00
0.00
12.60
0.00
0.00
0.00
0.00
0.00
0.00 Turner
1 No
0.00
0.00
5"
12.00
0.00
0.00
0.00
0.00
17.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6"
11.00
0.00
0.00
0.00
0.00
21.00
0.00
0.00
0.00
0.00
0.00
0.00
Average
b
Sundries
0.00
10.00 Percen
0.00
8"
9.00
0.00
0.00
0.00
0.00
35.70
0.00
0.00
0.00
0.00
0.00
0.00
Total
0.00
10"
7.00
0.00
0.00
0.00
0.00
52.50
0.00
0.00
0.00
0.00
0.00
0.00
12"
5.00
0.00
0.00
0.00
0.00
74.55
0.00
0.00
0.00
0.00
0.00
0.00
Average
c
Total
15"
3.00
0.00
0.00
0.00
0.00
110.00
0.00
0.00
0.00
0.00
0.00
0.00
18"
2.00
0.00
0.00
0.00
0.00
153.00
0.00
0.00
0.00
0.00
0.00
0.00
Average
Total
L.S.
0.00
35
Cutting C.I. Pipe and welding spigot or socket, flanged or tyton end after finishing ends of pipes.
Circumference Welding Charges
of Pipe in
Rate per Total
Inch.
Inch.
(4 + 5)
Cutting
2 Ends and
Finishing
(Double Col. 3)
G.Total
Say
Rate per
inch bore
Rate per
cm bore
10
11
Sr. No.
Dia of
Pipe Inch.
Cutting
End
3" (75mm)
0.00
9.42
0.00
0.00
0.00
0.00
0.00
4" (100mm)
0.00
12.57
0.00
0.00
0.00
0.00
0.00
5" (125mm)
0.00
15.71
0.00
0.00
0.00
0.00
0.00
6" (150mm)
0.00
18.85
0.00
0.00
0.00
0.00
0.00
Average
5
8" (20mm)
0.00
25.13
0.00
0.00
0.00
0.00
0.00
10" (250mm)
0.00
31.42
0.00
0.00
0.00
0.00
0.00
12" (300mm)
0.00
37.70
0.00
0.00
0.00
0.00
0.00
Average
8
15" (385mm)
0.00
47.12
0.00
0.00
0.00
0.00
0.00
18" (450mm)
0.00
56.55
0.00
0.00
0.00
0.00
0.00
Average
36 Providing, laying, cutting, jointing, testing and disinfecting G.I. Pipe Line in trenches, with flanged joints, using G.I. pipe of BSS 1387-1967 Heavy Quality complete in a
respects, including specials and valves:i)
Sr.
Dia of
No. Pipe Inch
1
a
b
c
d
e
f
g
2
1" (40mm)
2" (50mm)
2" (63mm)
3" (75mm)
4" (100mm)
6" (125mm)
8" (150mm)
Cost
100'
heavy
quality
3
-
Speical
10%
Advot
1%
4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Wastage
2%
Total Contractor
(3 + 4 +
Profit
+ 5 + 6)
10%
7
0.00
0.00
0.00
0.00
0.00
0.00
0.00
DAILY PROGRESS
Mechanic 1 No. 170
0.00
Cooly
2 No. 75
0.00
Total
Sundries
10.00 Percent
Total
Total
Daily
Progress
10
11
Daily
Charges
Total
Size
(7 + 8)
8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
No. of
Joints
9
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
8
8
6
6
6
6
20
20
20
15
12
10
10
12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14
3/8
3/8
5/8
5/8
5/8
5/8
5/8
15
3.00
3.00
3.00
4.00
4.00
4.00
4.00
16
-
17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
36 Providing, laying, cutting, jointing, testing and disinfecting G.I. Pipe Line in trenches, with flanged joints, using G.I. pipe of BSS complete in all 1387-1967 Medium Qua
respects, including specials and valves:ii)
Sr.
No.
Dia of
Pipe
Inch.
1
a
b
c
d
e
f
g
2
1" (40mm)
2" (50mm)
2" (63mm)
3" (75mm)
4" (100mm)
6" (125mm)
8" (150mm)
3
-
4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20
Advot
1%
5
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Wastage
2%
Total
Contractor's
Profit
20.00
Total
No. of
Joints
Daily
Progress
10
11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
DAILY PROGRESS
Mechanic 1 No. 170
0.00
Cooly
2 No. 75
0.00
Total
Sundries
10.00 Percent
Total
0.00
0.00
0.00
0.00
0.00
8
8
8
6
6
6
6
20
20
20
15
12
10
10
Daily
Charges
12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Labour
for
Size
100'
13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14
3/8
3/8
5/8
5/8
5/8
5/8
5/8
15
3.00
3.00
3.00
4.00
4.00
4.00
4.00
16
-
17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
all
h of Pipe
Wt. Amount
Lbs.
Rs.
0.00
per Lbs.
18
19
0.35
0.00
0.35
0.00
0.50
0.00
0.50
0.00
0.60
0.00
0.60
0.00
0.60
0.00
Total
(13 +
17 +
19)
20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Contrator
Profit
10%
21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
Carriage
(20 +
21)
22
23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Testing
Grand
&
Total
Disfi- (22 + 23
necting
+ 24)
24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26
-
27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
uality
Carriage
23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Testing
Grand
and
Total
disin- (22 + 23
fection
+ 24)
24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sr. No. 41
Making Connection for new Water Supply lines with the running main, including excavation of
trench and refilling, complete, but excluding cost of pipe and specials, etc.
i)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Labour
Cooly for excavating/ refilling the
trench
0.50 No
Plumber for cutting, connecting
pipe, etc. 2 cuts
0.25 No
Total
Sundries
Total
0.00 P. Day
0.00 P. Day
10.00 Percent
Say
Rs.
0.00
20
ii)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Labour
Cooly for excavating/ refilling the
trench
0.50 No
Plumber for cutting, connecting
pipe, etc. 2 cuts
0.25 No
Total
Sundries
Total
0.00 P. Day
0.00 P. Day
10.00 Percent
Contractor's#REF!
Total
Percent
Say
Rs.
0.00
iii)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Labour
Cooly for excavating/ refilling the
trench
0.50 No
Plumber for cutting pipe, etc.
2 cuts
0.50 No
Total
Sundries
Total
0.00 P. Day
0.00 P. Day
10.00 Percent
Say
Rs.
0.00
iv)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Labour
Cooly for excavating/ refilling the
trench
0.50 No
Plumber for cutting pipe, etc.
2 cuts
0.50 No
Total
Sundries
Total
0.00 P. Day
0.00 P. Day
10.00 Percent
Say
Rs.
0.00
v)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Labour
Cooly for excavating/ refilling the
trench
0.50 No
Plumber for cutting pipe, etc.
2 cuts
0.75 No
Total
Sundries
Total
0.00 P. Day
0.00 P. Day
10.00 Percent
Say
Rs.
0.00
vi)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Labour
Cooly for excavating/ refilling the
trench
0.50 No
Plumber for cutting pipe, etc.
2 cuts
0.75 No
Total
Sundries
Total
0.00 P. Day
0.00 P. Day
10.00 Percent
Say
Rs.
0.00
vii)
Detail
Rate
Per Unit (Rs.) Amount (Rs.)
Labour
Cooly for excavating/ refilling the
trench
0.50 No
Plumber for cutting pipe, etc.
2 cuts
1.00 No
Total
Sundries
Total
0.00 P. Day
0.00 P. Day
10.00 Percent
Say
Rs.
0.00
Detail
Gully trap frame hinged saUnit Rate (British System) per Set
Rate Per
Unit (Rs.)
Qty.
Amount
(Rs.)
1. RCC Cover
a) 2"x22"x2" size angle iron rings =
1 x 22 x 26 = 6.81 Rft.
7 12
Weight @ 4.04 Lbs/Ft = 27.51 Lbs (12.43) Kg
b) M.S. round bars " dia
Straight bras
1 x 26 = 26 inch
2 x 24 = 48 inch
2 x 18 = 36 inch
bent up bars
1 x 2 = 28 inch
2 x 26 = 52 inch
2 x 20 = 40 inch
230 inch or 19.17 ft.
Bars in upper distribution ring 1x22/7x1.5 =
Bar in lower distribution ring 1x22/7x1.25 =
in overlaps distribution ring 2x =
28.81 Ft. @ 0.667 Lbs/Rft. = 19.22 Lbs
a + b = 27.51 + 19.22 = 46.73 Lbs or
21.20 Kg
19.17
4.71
3.93
1.00
28.81
Ft.
Ft.
Ft.
Ft.
Ft.
21.20
Kg
58.524
P. Kg
C.O.
RCC (1:2:4) in situ or precast
1 x 22 x 26 x 26 x x 6+5+5 x 1
7 12 12
3
12
1.74
Cft.
0.14
1.60
Cft
Cft
P. Cft
-
Labour
1. Welding ends of engle iron rings
2. Welding ends of M.S. bar to angle iron
3. Fixing manhole cover and frame
including carriage to site complete in all
respect.
4. Labour for RCC 1:2:4 concrete
(Item 6 b(i) Chapter No. 6)
Total
Contractor's profit & overhead chg:20% on 1.2 Rs.
Total
Item Rates
Labour Rate Per Set
Composite Rate Per Set
1.00
20.00
L.S.
1.74
No.
Nos.
Each
Each
Cft
P. Cft
Rs.
Rs.
Say
Say
DESCRIPTION OF ITEM
1.
Providing and Laying RCC Pipe moulded with cement concrete 1:1:3 with spigot socket or collar joint etc. including cost of reinforcement,
conforming to B.S. 5911 Part 1.1981, Class "L", including Carriage of Pipe from factory to site of work, lowering in trenches to correct
alignment and grade, jointing, cutting pipes where necessary, finishing and testing etc. complete.
of Pipe
mm
2%
Ring -
Total
Per Inc
Meter
2
Profit
Carriage
Total
Per Pipe
Laying Jointing
Daily
Daily
20
Dia Pipe
1
Contractor
Testing
Labour
Charges
Labour Composite
Total
Per Pipe
Per
Per Foot
Foot
Labour
Composite
Rate
Rate
Per
Per
Metre
Metre
17
18
Percent
10
11
12
13
14
15
16
4" (100mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
180.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6" (150mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
150.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9" (225mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
DESCRIPTON OF ITEM
Providing and laying non-reinforced concrete pipe moulded with Cement Concrete 1:1:3 Conforming to ASTM specification 14-73 Class-I including Carriage of
Pipe from Factory to Site of Work, Lowering in Trenches to Correct Alignment and Grade Jointing Cutting Pipe where necessary, finishing and testing etc.
complete.
Dia of
Pipe
mm
Rate per
3%
Ring -
Total
Per Inc
Metre
2
Profit
Carriage
Total
20
Dia Pipe
1
Contractor
Wt. in
Laying Jointing
Amount
Testing
Daily
Daily
Per
Progress
Expenses
Pipe
10
11
12
Ton
Charges
Total
Labour
Composite
Labour
Composite
Rate
Rate
Per
Per
Per
Per
Foot
Foot
Metre
Metre
15
16
17
18
Percent
13
14
4" (100mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.043
0.00
180.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6" (150mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.061
0.00
150.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8"(200mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.094
0.00
144.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9" (225mm)
0.00
0.00
0.00
0.00
0.00
0.00
0.127
0.00
136.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10"(250mm
0.00
0.00
0.00
0.00
0.00
0.00
0.133
0.00
135.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 1
DESCRIPTION OF ITEM
3 Providing and laying RCC Pipe Sewers, Moulded with Cement Concrete 1:1:3 Confirming to ASTM Specification C-76-79 Class-II, Wall B, Including Carriage of
Pipe from Factory to tWith C.I. Gully trap frame hinged safety type.
etc. Complete.
Sr.
No.
Dia of
Pipe
Inch.
Length
of Pipe
Ft.
Thicknes
of
Pipe
(Inches)
Rate Per
Ft.
Wastage
2%
MATERIAL
Rubber
Ring Per
Inch Rs.
0.00
6
Total
Contractors
Profit
20.00
Total
Carriage
Daily
Progress Amount
10
11
13
14
Testing
Charges
15
Total
16
1. 12" (300mm)
2.439
2.00
0.00
0.00
0.00
0.00
0.00
0.00
23.00
0.00
15.00
0.00
0.00
0.00
2. 15"(380mm)
2.439
2.25
0.00
0.00
0.00
0.00
0.00
0.00
17.00
0.00
12.00
0.00
0.00
0.00
3. 18"(460mm)
2.439
2.50
0.00
0.00
0.00
0.00
0.00
0.00
13.00
0.00
10.00
0.00
0.00
0.00
4. 21"(535mm)
2.439
2.75
0.00
0.00
0.00
0.00
0.00
0.00
10.00
0.00
8.00
0.00
0.00
0.00
5. 24"(1610mm
2.439
3.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
0.00
7.00
0.00
0.00
0.00
6. 27"(685mm)
2.439
3.25
0.00
0.00
0.00
0.00
0.00
0.00
7.00
0.00
6.00
0.00
0.00
0.00
7. 30"(760mm)
2.439
3.50
0.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
5.00
0.00
0.00
0.00
8. 33"(800mm)
2.439
3.75
0.00
0.00
0.00
0.00
0.00
0.00
5.00
0.00
4.00
0.00
0.00
0.00
9. 36"(915mm)
2.439
4.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
3.25
0.00
0.00
0.00
10. 42"(1070mm
2.439
4.50
0.00
12.50
0.00
12.50
2.50
15.00
3.00
0.00
2.50
0.00
0.00
0.00
11. 48"(1220mm
2.439
5.00
0.00
14.50
0.00
14.50
2.90
17.40
2.00
0.00
7.00
0.00
0.00
0.00
12. 54"(1370mm
2.439
5.50
0.00
16.80
0.00
16.80
3.36
20.16
2.00
0.00
5.00
0.00
0.00
0.00
13. 60"(1520mm
2.439
6.00
0.00
22.60
0.00
22.60
4.52
27.12
1.00
0.00
4.00
0.00
0.00
0.00
14. 66"(1680mm
2.439
6.50
0.00
27.50
0.00
27.50
5.50
33.00
1.00
0.00
2.50
0.00
0.00
0.00
15. 72"(1830mm
2.439
7.00
0.00
32.50
0.00
32.50
6.50
39.00
1.00
0.00
2.00
0.00
0.00
0.00
Page 2
DESCRIPTION OF ITEM
4 Providing and laying RCC Pipe Sewers, Moulded with Cement Concrete 1:1:3 Confirming to ASTM Specification C-76-79 Class-III wall B, Including Carriage of
Pipe from Factory to the Site of Work, Lowering in Trenches to Correct Alignment and Grade Jointing with Rubber Ring, Cutting Pipes where necessary, Testing
etc. Complete. in all respects.
Sr.
No.
Dia of
Pipe
Inch
Market
Rate
Meter
2
Total
Rate
per Pipe
12
Total
Testing
Charges
Per Pipe
13
Total
per
Pipe
Labour
rate per
ft.
15
14
1. 12" (300mm)
0.00
0.00
0.00
0.00
0.00
0.00
23.00
0.00
15.00
(0.25)
2. 15"(380mm)
0.00
0.00
0.00
0.00
0.00
0.00
17.00
0.00
12.00
(0.25)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3. 18"(460mm)
0.00
0.00
0.00
0.00
0.00
0.00
13.00
0.00
10.00
(0.25)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4. 21"(535mm)
0.00
0.00
0.00
0.00
0.00
0.00
10.00
0.00
8.00
(0.25)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5. 24"(1610mm
0.00
0.00
0.00
0.00
0.00
0.00
8.00
0.00
7.00
(0.25)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6. 27"(685mm)
0.00
0.00
0.00
0.00
0.00
0.00
7.00
0.00
6.00
4.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7. 30"(760mm)
0.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
5.00
4.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8. 33"(800mm)
0.00
0.00
0.00
0.00
0.00
0.00
5.00
0.00
4.00
4.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9. 36"(915mm)
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
3.25
4.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10. 42"(1070mm
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
2.50
4.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11. 48"(1220mm
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
7.00
(1.25)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12. 54"(1370mm
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
5.00
(1.25)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13. 60"(1520mm
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
4.00
(1.25)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14. 66"(1680mm
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
2.50
(1.25)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15. 72"(1830mm
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
2.00
(1.25)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 3
DESCRIPTION OF ITEM
5 Providing and laying RCC Pipe Sewers, Moulded with Cement Concrete 1:1:3 Confirming to ASTM Specification C-76-79 Class-IV, Wall B, Including Carriage of
Pipe from Factory to the Site of Work, Lowering in Trenches to Correct Alignment and Grade Jointing with Rubber Ring, Cutting Pipes where necessary, Testing
etc. Complete.
Sr.
No.
Dia of
Pipe
mm
Market
Rate
Per
Metre
2
Wastage
2%
Carriage
Daily
Amount
Progress
(Rs.)
Total
Total
Testing
Charges
Per Pipe
13
Total
Per
Pipe
14
15
16
17
18
1. 12" (300mm)
0.00
0.00
0.00
0.00
0.00
0.00
23.00
0.00
15.00
0.00
0.00
0.00
0.00
0.00
0.00
2. 15"(380mm)
0.00
0.00
0.00
0.00
0.00
0.00
17.00
0.00
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3. 18"(460mm)
0.00
0.00
0.00
0.00
0.00
0.00
13.00
0.00
10.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4. 21"(535mm)
0.00
0.00
0.00
0.00
0.00
0.00
10.00
0.00
8.00
0.00
0.00
0.00
0.00
0.00
0.00
5. 24"(1610mm
0.00
0.00
0.00
0.00
0.00
0.00
8.00
0.00
7.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6. 27"(685mm)
0.00
0.00
0.00
0.00
0.00
0.00
7.00
0.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7. 30"(760mm)
0.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
5.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8. 33"(800mm)
0.00
0.00
0.00
0.00
0.00
0.00
5.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9. 36"(915mm)
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
3.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10. 42"(1070mm
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
2.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11. 48"(1220mm
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
7.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12. 54"(1370mm
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
5.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13. 60"(1520mm
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14. 66"(1680mm
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
2.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15. 72"(1830mm
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 4
6 Lowering of Sub Soil Water table by Installation of Tubewell along Sewer Line and Pumping Out Water, for Excavation in Open Cutting below Sub Soil Water Level,
Concreting, Curing, Laying and Jointing Pipes, Filling hauncher etc, till the Completion of Sewer Line, including Disposal of Pumped Out Water
Depth of Distance
Seria Lowering Between
No.
of
Bore Hole
Meter
Meter
Hours
PUMPING
Rate
per
Hour
Amount
Shifting
Pump &
Installation
at New
Site (Rs.)
7
Depreciation
Charges of
Pumping
Depth of
Machinery
Bore
Boring
Equipment
8
9
BORING
Rate
Per
Meter
10
Disposal of Charges
pumped out by Pump
Amount
water
Rate Per
per 30 M
Hour
distance
11
12
14
Total
6+7+8+
11+12+14
15
Grand
Total
Rate
Per
Ft.
Adopted
in
CSR 1998
18
19
15+16
0-1'
100.00
20
0.00
0.00
20.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0-2'
76.00
64
0.00
0.00
29.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0-3'
62.00
70
0.00
0.00
45.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0-4'
52.00
75
0.00
0.00
57.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0-5'
550.00
80
0.00
0.00
60.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0-6'
43.00
88
0.00
0.00
64.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0-7'
38.50
92
0.00
0.00
69.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0-8'
34.00
94
0.00
0.00
70.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0-9'
33.00
96
0.00
0.00
55.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10
0-10'
31.00
99
0.00
0.00
60.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11
0-11'
30.00
102
0.00
0.00
65.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12
0-12'
29.00
106
0.00
0.00
70.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 5
13
Amount
Contractor
Profit
20.00
16
17
SEWERAGE
DESCRIPTION OF ITEM NO 7:
a)
Detail
/8
Rate
Composite
Amount
Labour Composite
0.00 %0 Cft
0.00
0.00 % Cft
0.00 % Cft
0.00
0.00
0.00 % Cft
0.00
0.00
-0.01 % Sft
0.00
0.00
0.00 % Cft
0.00
0.00
= 2.23'
/8
= 3.56'
10.24 Cft
Total
Deduction
Sewer
'x'x22/7x
0.60
Drain
1x'x'x22/7x'
0.10
0.70 Cft
0.00 % Cft
Net ( 10.24 - 0.70 ) =
9.5 9.54 Cft
Item No. 4(i) of Chap. 7
Cement Plaster (1:3) " thick
inside chamber 1x4x2 3/8'
=
9.50
outside chamber 2x2'x'
=
3.75
2x2 1/8'x' =
3.19
16.44
Top
1x2'x'
1.87
3
1x1 /8'x'
1.00
3
1x2'x /8'
1.00
20.31 Sft -0.01 % Sft
Floor bed
1x1x /12
Item 5 (f) Chap. No. 6
0.08 Cft
Detail
0.00 % Cft
Rate
Composite
Amount
Labour Composite
1.00 No
0.00 P. No
0.00
2.00 Nos
0.00 P. No
0.00
0.00
0.00
0.00
0.00
Page 7
Item No.
Detail
1x2x /8x2
2x1x'x2
/8
/8
Rate
Composite
Amount
Labour Composite
0.00 %0 Cft
0.00
0.00 % Cft
0.00 % Cft
0.00
0.00
0.00 % Cft
0.00
0.00
-0.01 % Sft
0.00
0.00
0.00 % Cft
0.00
0.00
2.23
= 3.56
10.24 Cft
1x2x /8
1.00
20.31 Sft -0.01 % Sft
Floor bed
1x1x /12
As per item No. 5 of Chapter 6
0.08 Cft
0.00 % Cft
Page 8
Detail
1.00 No
Rate
Composite
Amount
Labour Composite
0.00 P. No
0.00
P. No
0.00
0.00
0.00
0.00
0.00
Page 9
DESCRIPTION OF ITEM NO 8:
Detail
Excavation in foundation
1x5'x3'x3' = 53 Cft
53.00 Cft
5.83 Cft
Rate
Composite
Amount
Labour Composite
0.00 %0 Cft
0.00
0.00 % Cft
0.00 % Cft
0.00
0.00
0.00 % Cft
0.00
0.00
0.62
0.00 % Cft
0.75
0.19
Total
0.94 Cft
22.50 - 0.94 = 21.56 Cft 21.56 Cft
0.00 % Cft
0.00 % Cft
0.00
0.00
% Sft
% Sft
0.00
0.00
% Cft
0.00
0.00
0.00 P. Kg
0.00
0.00
Net
=
=
Detail
Rate
Composite
0.00 P. Kg
0.00 P. Kg
P. No
Amount
Labour Composite
0.00
0.00
0.00
1.00 No
68.57 P. No
P. No
0.00
9.16
Page 10
0.00
0.00
0.00
0.00
DESCRIPTION OF ITEM NO 9:
Detail
Qty
Rate
Per Unit (Rs) Amount (Rs)
Material
Cement for 1/8" thick nero
100x1/8x1/12 = 1.04 Cft= 0.83 cwt
Total
Contractor's Profit & Ove
Total
Labour
0.83 Bag
20.00 Percent
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
0.00 P. Bag
0.60 Nos
0.60 Nos
0.13 No
P. Day
P. Day
P. Day
10.00 Percent
20.00 Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm
Page 13
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Detail
Rate
Per Unit (Rs) Amount (Rs)
Material
Total bricks required = 525 out of which
33% shall be replaced.
No: of new bricks required 175 Nos
Sand
Total
Contractor's Profit & Ove
Total
175 Nos
16.70 Cft
%0 Nos
%Cft
20.00 Percent
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Ove
Total
0.65 No
1.25 Nos
0.08 No
P. Day
P. Day
P. Day
10.00 Percent
20.00 Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm
Page 14
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Detail
Rate
Analysis
for
100
Rate
Per Unit (Rs) Amount (Rs)
Sft
Material
Total bricks required shall be 350 Nos
New brick to be supplied in replacement 33%
1.350x1/3 = 117 Nos
117 Nos
16.70 Cft
%0 Nos
%Cft
20.00 Percent
Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Ove
Total
0.40 No
0.75 No
0.05 No
P. Day
P. Day
P. Day
10.00 Percent
20.00 Percent
Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm
Page 15
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
a)
Detail
Rate
Per Unit (Rs) Amount (Rs)
Material
Sub-base/base (Item 3(i) of Chap. 18)
Carpetting 2" (50mm) thick (Item 10 Chap. 18)
(Item 10 Chapter 18)
Total
27.50 Cft
100.00 Sft
% Cft
%Sft
Labour
Labour (Item 3(i) Chap 18)
Carpeting (Item 10 Chapter 18)
27.50 Cft
100.00 Sft
% Cft
% Sft
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm
Page 16
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
b)
Detail
Rate
Per Unit (Rs) Amount (Rs)
16.70 Cft
100.00 Sft
% Cft
% Cft
Total
Labour
Sub-base (Item No. 3(i) Chapter 18
Carpeting
16.70 Cft
100.00 Sft
% Cft
% Sft
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm
Page 17
c)
Detail
Rate
Per Unit (Rs) Amount (Rs)
Material
Sub-base (Item No. 3(i) of Chpater 18
Bajri
Bituman
Total
Contractor's Profit & Ove
Item 2 & 3 on 'Rs.
Total
27.78 Cft
8.25 Cft
65Lbs (29 .50) Kg
% Cft
%Cft
P. Kg
20.00 Percent
Labour
Sub base/base (Item No. 3(i) Chap. 18
100 Sft Surfacing (two coats)
(Item 8 (1-1) & (2-1) Chap 18)
(Road and Road Structure)
Total
27.78 Cft
100.00 Sft
% Cft
% Sft
Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm
Page 18
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
Detail
Qty
Rate
Per Unit (Rs) Amount (Rs)
Material
Providing 1"x1"x3/16" (32x32x5mm)
angle iron step of 8"x12" (200x300mm)
5
1
outer over all dimensions 2 /16'x /12'x2' = 0.48 Sft
(0.704x0.025x0.761) = 0.013 M
0.48 Sft @ 7.65 Lbs = 3.69 Lbs or
1.68 Kg.
Total
Contractor's Profit & Ove
Total
1.68 Kg
P. Kg
20.00 Percent
Labour
Blacksmith
Unskilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
0.01 No
0.01 No
P. Day
P. Day
10.00 Percent
20.00 Percent
Page 19
Detail
Qty
Mason
Carriage from store to site
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate
Per Unit (Rs) Amount (Rs)
0.05 No
L.S.
Each
10.00 Percent
20.00 Percent
Item Rates
Labour Rate for Each
Composite Rate for Each
Page 20
Rs.
Say
Rs.
Say
Detail
Qty
Rate
Per Unit (Rs) Amount (Rs)
Carriage of Manhole
Frame and cover average weight of
each set = 127 Kg.
cart load up to 4 miles (6.44 Km)
@ Rs.
per cart load.
Total
Labour
Setting the frame to correct and level on
the reinforcement of man hole chamber
top/Rcc slab/ caping.
Unskilled Coolies
Mason
Total
Sundries
Total
Contractor's Profit & Ove
Total
0.12 No
0.12 No
P. Day
P. Day
10.00 Percent
20.00 Percent
Item Rates
Labour Rate Per Set
Rs.
Page 21
Say
Detail
Rate
Per Unit (Rs) Amount (Rs)
RCC Cover
1.M.S. flat iron ring 3"x" (75x6mm) =
1 x 22 x 22 x = 1.44 Sft
7
12
1.44 Sft weight @ 10.21 Lbs = 14.70 Lbs (6.67) Kg
2.M.S. round bars " dia
Straight bars 4 x 22
=
7.33 ft
12
Straight bars 4 x 1.75 = 7.00 ft
14.33 Rft
Weight of bars @ 0.667 Lbs/Rft
(0.992 Kg/Rft) = 9.60 Lbs (4.36) Kg
Total 1+2 = 6.67+4.36 = 11.03 Kg
Material
Steel required
C.I. frame
Total
Contractor's Profit & Ove
Total
11.03 Kg
1Md (37 .324)Kg
P. Kg
P. Kg
20.00 Percent
0.73 Cft
P. Cft
Page 22
Detail
Qty
Rate
Per Unit (Rs) Amount (Rs)
Labour
Welding of flat iron
Welding ends of M.S. round bars with
ring.
Fixing manhole frame & cover including
carriage to site
Labour for Precast Concrete
(Item 5 (f) Chapter No. 6)
Total
Contractor's Profit & Ove
Total
20.00 Percent on R
1.00 No
Each
16.00 Nos
Each
P. Cft
L. S.
0.73 Cft
Item Rates
Labour Rate Per Set
Composite Rate Per Set
Page 23
Rs.
Say
Rs.
Say
Detail
Qty
RCC Cover
a.2"x2"x" size angle iron rings =
1 x 22 x 26 =
6.81 Rft
7
12
Weight @ 4.04 Lbs/ft = 27.51 Lbs (12.430) Kg
b.M.S. round bars " dia
Straight bras 1 x 26
=
26 inches
2 x 24
=
48
2 x 18
=
36
bent up bars 1 x 28
=
28
2 x 26
=
52
2 x 20
=
40
230 Inchs or 19.17 ft
Bars in upper distribution ring 1x22/7x1.5 =
Bar in lower distribution ring 1x22/7x1.25 =
in overlaps distribution ring 2x =
28.81 ft @ 0.667 Lbs/Rft = 19.22 Lbs
a + b = 27.51 + 19.22 = 46.73 Lbs or
21.20 Kg
Tee Shaped C.I. Frame 37.324
Rate
Per Unit (Rs) Amount (Rs)
19.17 ft
4.71
3.93
1.00
28.81 Ft
21.20
37.324
Material
Steel
Total
Contractor's Profit & Ove
Total
58.524 Kg
P. Kg
20.00 Percent
Page 24
Detail
1.74 Cft
3
12
0.14 Cft
1.60 Cft
0.14 Cft
(Item 5 (f) Chapter No. 6)
Rate
Per Unit (Rs) Amount (Rs)
-
P. Cft
Each
Each
P. Cft
Total
Labour
1. Welding ends of engle iron rings.
1.00 No
2. Welding ends of M.S. bar to angle iron.
20.00 No
3. Fixing manhole cover and frame
including carriage to site complete in all
respect.
L. S.
4. Labour for RCC 1:2:4 concrete
1.74 Cft
(Item 5 (f) Chapter No. 6)
Total
Contractor's Profit & Ove
20.00 Percent on Rs. Item 1&2
Total
Item Rates
Labour Rate Per Set
Composite Rate Per Set
Page 25
Rs.
Say
Rs.
Say
Detail
Steel :
L. iron for frame 3"x3"x"
1x 22 x 27 = 7.07 ft @ 4.89 Lbs/Rft = 34.57 Lbs
7
12
L. iron for cover 2"x2"x"
1x 22 x 26 = 6.81 ft @ 4.04 Lbs/Rft = 27.51 Lbs
7
12
62.08 Lbs
M.S. round straight bars
1 x 26
=
26 inchs
2 x 24
=
48
2 x 18
=
36
1 x 28
=
28
2 x 26
=
52
2 x 20
=
40
230 Inchs or 19.17 ft
Bars in upper distribution ring 1x22/7x1.5
Bar in lower distribution ring 1x22/7x1.25
Bar in overlaps distribution ring
2x
Bar in holdfast of frame 4x0.75
weight @ 0.667Lbs/ft x31.81 = 21.22 lbs
= 62.08 + 21.22 =
83.30 Lbs or
37.80 Kg
Rate
Per Unit (Rs) Amount (Rs)
19.17 ft
4.71 ft
3.93
1.00
3.00
31.81
ft
ft
ft
Ft
Material
Steel
Total
Contractor's Profit & Ove
Total
37.80 Kg
P. Kg
20.00 Percent
Page 26
Detail
1.74 Cft
12
0.14
Rate
Per Unit (Rs) Amount (Rs)
0.14 Cft
1.60 Cft
P. Cft
1.00 No
1.00 No
Each
Each
24.00 Nos
Each
P. Cft
Total
Labour
1.i. Welding ends of engle iron rings for
frame 3"x3"x"
ii. For cover 2"x2"x"
iii. Ends of MS bars to angle iron ring in
RCC cover
20 Nos
iv. End of M.S. holdfast to the ring of the
frame.
4 N
2. Fixing manhole frame and cover
including carriage from store complete
in all respects.
3. Labour for RCC 1:2:4 concrete
(Item 5 (f) Chapter No. 6)
Total
Contractor's Profit & Ove
20.00 Percent on Item 1
Total
Item Rates
Labour Rate Per Set
Composite Rate Per Set
Page 27
L.S.
1.60 Cft
Rs.
Say
Rs.
Say
Detail
Qty
Analysis Rate for
Rate
Per Unit (Rs) Amount (Rs)
2100 Cft
T & P Required :
R.S. joist 6"x12" size 25'-0"
Winch crab with steel rope and v-clamps.
M.S. bucket 2'x2'x2'
Tripod of G.I. pipe 3" (75mm) i/d
Chain pully block of one ton capacity
Wooden plank 10"x10"x1"
Cross planks
10
Longitudnal
20 x 12
1.00
1.00
1.00
1.00
1.00
No
No
No
No
No
24 Nos
=
6 Nos
30 Nos
30.00 ft
3.00 ft
2121.50 Cft (S2100 Cft)
0.50 Day
2.00 Days
2.50 Days
P. Day
20.00 Percent
Page 28
Detail
Qty
Rate
Per Unit (Rs) Amount (Rs)
Labour
Coolies Unskilled
For digging
For Lifting & removing
For carrying
2.00
8.00
2.00
12.00
24.00
Nos
Nos
Nos
Nos
Nos
Each
10.00 Percent
20.00 Percent
Item Rates
Labour Rate Per 100 Cft
Labour Rate Per Cum
Composite Rate Per 100 Cft
Composite Rate Per Cum
Page 29
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
a)
i)
Detail
Rate
Analysis
for
16
Rate
Per Unit (Rs) Amount (Rs)
Cwt
Material
C.I. vantilating shaft 18' long weighing
16 cwt = 21.78 md. (813 Kg) including
column pipe, base, cowl, plates, and other
accessories including carriage to site.
Foundation bolts & nuts " dia 1' long
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total
813.00 Kg
4.00 Nos
P. Kg
No
0.37 Kg
L. S.
P. Kg
20.00 Percent
Labour
Pipe fitter
Unskilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
1.00 No
4.00 Nos
P. Day
P. Day
10.00 Percent
20.00 Percent
Page 30
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
a)
ii)
Detail
Rate
Analysis
for
18
Rate
Per Unit (Rs) Amount (Rs)
Cwt
Material
C.I. vantilating shaft 24' long weighing
18 cwt = 24.50 md. (915 Kg) including
column pipe, base, cowl, and other plates
and accessories including carriage to site.
Foundation bolts & nuts " dia 2' long .
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total
915.00 Kg
4.00 Nos
P. Kg
No
0.37 Kg
L. S.
P. Kg
20.00 Percent
Labour
Pipe fitter for 1 day = 1 No
Unskilled Cooly for 1 day = 4 Nos
Total
Sundries
Total
Contractor's Profit & Ove
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
1.25 Nos
5.00 Nos
P. Day
P. Day
10.00 Percent
20.00 Percent
Page 31
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
a)
iii)
Detail
Rate
Analysis
for
Rate
Per Unit (Rs) Amount (Rs)
20 Cwt
Material
C.I. vantilating shaft 30' including column pipe,
base, cowl and other accessories including
carriage to site weighing 20 cwt or 1016 kg
Foundation bolts & nuts " dia 2' long .
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total
1016.00 Kg
4.00 Nos
0.37 Kg
L. S.
P. Kg
No
P. Kg
20.00 Percent
Labour
Pipe fitter 1 No for 1.5 days
Unskilled Cooly 4 No for 1.5 days
Total
Sundries
Total
Contractor's Profit & Ove
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
1.50 Nos
6.00 Nos
P. Day
P. Day
10.00 Percent
20.00 Percent
Page 32
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
a)
iv)
Detail
Rate
Analysis
for
Rate
Per Unit (Rs) Amount (Rs)
22.3 Cwt
Material
C.I. vantilating shaft 36' long including
column pipe base, cowl, other plates,
accessories & carriage to site 22.3 Cwt
(1133.21 kg).
Foundation bolts & nuts " dia 2' long .
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total
1133.21 Kg
4.00 Nos
0.37 Kg
L. S.
P. Kg
Each
P. Kg
20.00 Percent
Labour
Pipe fitter 1 No for 1 days
Unskilled Cooly 4 No for 1 days
Total
Sundries
Total
Contractor's Profit & Ove
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
1.75 Nos
7.00 Nos
P. Day
P. Day
10.00 Percent
20.00 Percent
Page 33
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
b)
i)
Detail
Rate
Analysis
for
Rate
Per Unit (Rs) Amount (Rs)
25 Cwt
Material
C.I. vantilating shaft 18' long including
column pipe base, cowl, plates and other
accessories including carriage to site 25 Cwt
(1270.42 kg).
Foundation bolts & nuts " dia 2' long .
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total
1270.42 Kg
4.00 Nos
0.37 Kg
L. S.
P. Kg
Each
P. Kg
20.00 Percent
Labour
Pipe fitter
Unskilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
1.00 Nos
6.00 Nos
P. Day
P. Day
10.00 Percent
20.00 Percent
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg
Page 34
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
b)
ii)
Detail
Rate
Analysis
for
Rate
Per Unit (Rs) Amount (Rs)
29 Cwt
Material
C.I. vantilating shaft 24' long including
base, column pipe, cowl, plates, other
accessories & carriage to site 29 Cwt or
39.47 Mds: cast iron pipe. (1473.68 kg).
Foundation bolts & nuts " dia 2' long .
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total
1473.68 Kg
4.00 Nos
0.37 Kg
L. S.
P. Kg
Each
P. Kg
20.00 Percent
Labour
Pipe fitter 1 No for 1 day
Unskilled Cooly 6 Nos for 1 day
Total
Sundries
Total
Contractor's Profit & Ove
Total
1.25 Nos
7.50 Nos
P. Day
P. Day
10.00 Percent
20.00 Percent
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg
Page 35
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
b)
iii)
Detail
Rate
Analysis
for
Rate
Per Unit (Rs) Amount (Rs)
32.5 Cwt
Material
C.I. vantilating shaft 30' long including base,
column pipe, cowl, plates, other accessories &
carriage to site 32.5cwt or 44.24md (1651.54)
Foundation bolts " dia 2' long.
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total
1651.54 Kg
4.00 Nos
0.37 Kg
L. S.
P. Kg
Each
P. Kg
20.00 Percent
Labour
Pipe fitter 1 No for 1 day
Unskilled Cooly 6 Nos for 1 day
Total
Sundries
Total
Contractor's Profit & Ove
Total
1.50 Nos
9.00 Nos
P. Day
P. Day
10.00 Percent
20.00 Percent
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg
Page 36
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
b)
iv)
Detail
Rate
Analysis
for
Rate
Per Unit (Rs) Amount (Rs)
36 Cwt
Material
C.I. vantilating shaft 36' long including
base, column pipe, cowl, plates, bolts and
other accessories 36 Cwt or 1829.40 kg.
Foundation bolts " dia 2' long.
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total
1829.40 Kg
4.00 Nos
0.37 Kg
L. S.
P. Kg
Each
P. Kg
20.00 Percent
Labour
Pipe fitter 1 No for 2 day
Unskilled Cooly 6 Nos for 2 day
Total
Sundries
Total
Contractor's Profit & Ove
Total
2.00 Nos
12.00 Nos
P. Day
P. Day
10.00 Percent
20.00 Percent
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg
Page 37
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
c)
i)
Detail
Rate
Analysis
for
Rate
Per Unit (Rs) Amount (Rs)
36 Cwt
Material
C.I. vantilating shaft including base column
pipe, cowl, plates, bolts, and other
accessories etc. 36 Cwt or 1829.40 kg.
Foundation bolts 7/8" dia 2' long.
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total
1829.40 Kg
4.00 Nos
0.37 Kg
L. S.
P. Kg
Each
P. Kg
20.00 Percent
Labour
Pipe fitter for 1 day
Unskilled Cooly for 1 day
Total
Sundries
Total
Contractor's Profit & Ove
Total
1.00 Nos
8.00 Nos
P. Day
P. Day
10.00 Percent
20.00 Percent
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg
Page 38
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
c)
ii)
Detail
Rate
Analysis
for
Rate
Per Unit (Rs) Amount (Rs)
42 Cwt
Material
C.I. vantilating shaft including base column
pipe, cowl, plates, bolts, and other
accessories etc. 42 Cwt or 2134 kg.
Foundation bolts 7/8" dia 2' long.
2134.00 Kg
4.00 Nos
0.37 Kg
L. S.
P. Kg
Each
P. Kg
20.00 Percent
Labour
Pipe fitter 1 No for 1 day
Unskilled Cooly 8 Nos for 1 day
Total
Sundries
Total
Contractor's Profit & Ove
Total
1.50 Nos
12.00 Nos
P. Day
P. Day
10.00 Percent
20.00 Percent
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg
Page 39
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
c)
iii)
Detail
Rate
Analysis
for
Rate
Per Unit (Rs) Amount (Rs)
48 Cwt
Material
C.I. vantilating shaft 30' long including base,
cowl, column pipe, plates. studs and other
accessories etc. 48 Cwt or 65.33 Md. =
Foundation bolts 7/8" dia 3' long.
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Hire charges of T & P
Total
Contractor's Profit & Ove
Total
2439.00 Kg
4.00 Nos
0.37 Kg
L. S.
P. Kg
Each
P. Kg
20.00 Percent
Labour
Pipe fitter 1 No for 2 day
Unskilled Cooly 8 Nos for 2 day
Total
Sundries
Total
Contractor's Profit & Ove
Total
2.00 Nos
16.00 Nos
P. Day
P. Day
10.00 Percent
20.00 Percent
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg
Page 40
Rs.
Rs.
Say
Say
Rs.
Rs.
Say
Say
a)
Detail
Rate
Per Unit (Rs) Amount (Rs)
Labour
Drivers
Unskilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
3.00 Nos
5.50 Nos
P. Day
P. Day
10.00 Percent
20.00 Percent
Item Rates
Labour Rate Per Well
Rs.
Page 41
Say
b)
Detail
Rate
Per Unit (Rs) Amount (Rs)
Labour
Driver
Unskilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
5.00 Nos
12.00 Nos
P. Day
P. Day
10.00 Percent
20.00 Percent
Item Rates
Labour Rate Per Well
Rs.
Page 42
Say