The document discusses several projects to construct or expand electrical substations in Saudi Arabia, including: 1. Construction of new 110/13.8kV substations in Al-Madinah Al-Munawarah and Al-Maabdah, including installation of transformers, capacitor banks, switchgear, and cable feeders. 2. Construction of new 132/13.8kV substations in Buraydah Center and Al-Rayyan Area, Riyadh, including installation of gas insulated switchgear, transformers, capacitor banks, switchgear, and automation/SCADA systems. 3. Construction of a new 132/13.8kV substation in

Uploaded by

Syed Zuber Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views

AL-MAABDAH-KSA-AL-Gihaz-SEC-WOA 2013

The document discusses several projects to construct or expand electrical substations in Saudi Arabia, including: 1. Construction of new 110/13.8kV substations in Al-Madinah Al-Munawarah and Al-Maabdah, including installation of transformers, capacitor banks, switchgear, and cable feeders. 2. Construction of new 132/13.8kV substations in Buraydah Center and Al-Rayyan Area, Riyadh, including installation of gas insulated switchgear, transformers, capacitor banks, switchgear, and automation/SCADA systems. 3. Construction of a new 132/13.8kV substation in

Uploaded by

Syed Zuber Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Al-Barakah-KSA-AL-Gihaz-SEC-WOA 2013

Al-Barakah 110/13.8 KV S/S # MD-434: construction of a fully


automated (IEC 61850) new 110/13.8KV GIS substation in AlMadinah Al-Munawarah, with (3) No incoming 110kV feeder bays,
(3) No x 110/13.8kV 67 MVA Power Transformers, (3) No x 7
MVAR 13.8kV Capacitor Banks, along with associated MV
switchgear including (34) No outgoing 13.8kV cable feeder bays.
The work is including the civil and the architectural works in the
substation.
AL-MAABDAH-KSA-AL-Gihaz-SEC-WOA 2013
110/13.8kV AL-MAABDAH Substation &Extension of 110KV Zahra
substation Portion -1 The construction of fully automated (IEC
61850) new 110/13.8kV GIS substation with 3 incoming 110kv
feeder bays, 3x110/13.8kV, 50/67 MVA Power transformers, 3x7
MVAR 13.8kV Capacitor Banks, along with associated MV
switchgear and civil an architectural works including 34
outgoing 13.8kv cable feeder bays in substation.SCADA & LDC
Extension for the above work. Portion -2 Extension of Zahra
Substation by one 110kV GIS Switchgear bay. SCADA & LDC
Extension for the above work.
Buraydah Center - AL-QASSIM - KSA - ABB - SEC-COA 2011
Buraydah Center 132/13.8 KV S/S # 8832:
construction of new 132/13.8KV substation in
buraydah center, one(1)No. 132KV Gas insulated
switchgear (GIS) with ten (10) Nos. 132/13.8KV GIS
circuit breakers and associated equipment, Three (3)
Nos. 132/13.8KV 60MVA, power transformer, one (1)
13.8KV switchgear with thirty eight (38) Nos. 13.8KV
switchgear circuit breaker panels, three (3) Nos.
13.8KV, 7 MVAR capacitor bank &associate equipment,
cables and civil work.

AL-Rayyan Area - KSA - ABB - SEC-COA 2011


AL-Rayyan 132/13.8 KV S/S 8173: construction of
new 132/13.8KV substation in Al-Rayyan Area,
Riyadh, one (1) No. 132KV SF6 Gas insulated
switchgear (GIS) with ten (10) Nos. 132 KV GIS
circuit breakers and associated equipment, three (3)
Nos. 132/13.8KV 60MVA, power transformer, one (1)
13.8KV switchgear with thirty eight (38) Nos. 13.8KV
switchgear circuit breakers panels three (3) Nos.
13.8KV 7 MVAR capacitor bank & associated
equipment, auxiliary the substation will be with
substation automation system (SAS) & will be
remotely controlled through SCADA system through
gateway & fiber optic channels from the central
regional control center (CRCC).
Hail City - KSA - ABB - SEC-SOA 2011
Hail 132/13.8KV substation in Hail City, one (1) No.
132KV SF6 Gas insulated switchgear (GIS) with ten
(10) Nos. 132KV GIS circuit breakers and associated
equipment, three (3) Nos. 132/13.8KV 60MVA, power
transformer s, one (1) 13.8KV switchgear with thirty
eight (38) Nos. 13.8KV switchgear circuit breaker
panels, three (3) Nos. 13.8KV, 7 MVAR capacitor bank
& associated equipment, auxiliary equipment, cables
and civil works. The substation will be with substation
automation system (SAS) & will be remotely
controlled regional control center (CRCC).Extend the
existing 132KV S/S # 9030 by installing, one (1)
132KV GIS bay and associated control, protection,
relaying, metering, SCADA equipment, cables etc.
Al-Jillah - KSA - ABB - SEC-COA 2011

Al-Jillah 132/33 KV Reinforcement of the existing


132/33KV in Al Jillah Area by replacing the existing
2x50MVA 132/33KV power transformers with
2x100MVA 132/33KV power transformers and
installing new seventeen (17) Nos. 33KV switchgear
circuit breakers panels including control & protection,
metering, SCADA, auxiliary equipment, cables and civil
works with required modification/extension.