SOM6629519 Unit Control System Acceptance Test Procedure
SOM6629519 Unit Control System Acceptance Test Procedure
14.FEB.13
REVISED
12.DEC.12
REVISED
23.SEP.11
REVISED
090768
:
A1
- APPROVED
A2
- APPROVED AS NOTED
A3
NA
- NOT APPLICABLE
SIGNED BY :
DATE
PROMEL
C.I. 3047-3046
FIRENZE ITALIA
1
0
REVISED
ISSUE FOR APPROVAL
Bargellini
Bargellini
Peccianti
Peccianti
Lazzeri
Lazzeri
REV
DESCRITPTION
PREPD
CHKD
APPRD
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
REVISED SH.: 1, 18
DATE
APPROVED
Electronically Stored
CHECKED
Electronically Stored
REVISION DATE
14-Feb-13
23.09.11
13.05.11
EXECUTED
REVISION
3
SECURITY CODE
SIME
SCALE
REPLACES/DERIVED FROM
1st EXECUTION
ORIGINAL JOB
SIZE
N/A
N/A
13-May-11
180.0057-58
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
1 of 25
GE NuovoPignone - Electronically Approved Drawing - Checked: Chakraborty A.; Approved: Stoppa L. - Internal DT-'N'
1. INTRODUCTION....................................................................................................................4
2. WAYOFCARRYINGOUTTHEINSPECTION............................................................................5
2.1 INSTRUMENTFORCARRYINGOUTTHEFAT............................................................................5
2.2 CORRECTIVEMEASURES..........................................................................................................5
2.3 REFERENCEDOCUMENTS&DRAWINGS:................................................................................6
3. PHYSICALCONTROLOFTHESYSTEM....................................................................................7
3.1 VISUAL&DIMENSIONALTEST.................................................................................................7
3.2 INSULATIONANDDIELECTRICTEST.........................................................................................8
3.3 EARTHINGCHECK....................................................................................................................8
4. POINTTOPOINTWIRINGTEST.............................................................................................9
THERELEVANTTESTCERTIFICATEWILLBEINCLUDEDINUCSTESTREPORT...........................9
5. UCSPOWERDISTRIBUTIONCHECK.......................................................................................9
5.1 110VDCFROMDCPFEEDER1(10H)POWERSUPPLYDISTRIBUTION...................................9
5.2 110VDCFROMDCPFEEDER2(30MIN)POWERSUPPLYDISTRIBUTION...........................10
5.3 110VDCFROMDCPFEEDER3(10H)POWERSUPPLYDISTRIBUTION(FORFFSECTION
PANEL)...........................................................................................................................................10
5.4 230VAC50HZFROMMAINPOWERSUPPLYDISTRIBUTION...............................................11
5.5 110VACINTERNALLYGENERATEDPOWERSUPPLYDISTRIBUTION....................................12
5.6 24VDCINTERNALLYGENERATEDPOWERSUPPLYDISTRIBUTION......................................13
6. TRAINVIEWSERVERPANELPOWERDISTRIBUTIONCHECK................................................14
6.1 110VDCFROMDCPFEEDER4(10H)POWERSUPPLYDISTRIBUTION.................................14
6.2 230VAC50HZFROMMAINSPOWERSUPPLYDISTRIBUTION.............................................14
6.3 230VAC50HZFROMMAINPOWERSUPPLYDISTRIBUTION...............................................15
6.4 110VACINTERNALLYGENERATEDPOWERSUPPLYDISTRIBUTION...................................15
6.5 110VACINTERNALLYGENERATEDPOWERSUPPLYDISTRIBUTION...................................16
7. SIMULATORPANELDESCRIPTION.......................................................................................16
8. MARKVIESYSTEMTEST......................................................................................................17
9. MARKVIESSYSTEMTEST....................................................................................................17
10. CHECKI/OSIGNAL..............................................................................................................18
11. AUXILIARYSUBSYSTEM......................................................................................................20
11.1 FIREFIGHTINGDETECTIONSYSTEM..................................................................................20
11.2 ANTISURGECONTROLLER(CCCSERIES5).........................................................................20
11.3 BENTLYNEVADAVIBRATIONANDTEMPERATURESYSTEMTEST.....................................21
12. ESDPUSHBUTTONTEST.....................................................................................................22
13. UCSSUBSYSTEMSINTEGRATIONTEST................................................................................22
14. LCPINTEGRATIONTEST......................................................................................................22
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
2 of 25
15.
16.
17.
18.
19.
SOFTWAREFUNCTIONALTEST............................................................................................23
HEATSOAKTEST.................................................................................................................23
BURNINTEST.....................................................................................................................23
CERTIFICATIONCHECK........................................................................................................24
PUNCHLISTFORMAT..........................................................................................................25
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
3 of 25
1.
INTRODUCTION
The scope of this procedure is to define the Unit Control System test activity that will be
carried out at Unit Control System supplier factory.
The aim of the FAT of this system is to check its conformance with the following:
A fundamental and essential prerequisite for carrying out the Factory Acceptance Test is the
performance of the internal inspection, along with the certificates, relevant checklist and
product quality plan (PQP).
ACRONIMS:
FAT = Factory Acceptance Test
UCS = Unit Control System
HMI= Human Machine Interface
DCS = Distributed Control System
MCC = Motor Control Center
PQP = Product Quality Plan
BN = Bently Nevada 3500 System
FF = Fire Fighting
I/O = Input/Output
DCP = Direct Current Panel
DACA= AC/DC Power Conversion Module
NTSW = Network Switch
LCP = Local Control Panel
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
4 of 25
2.
The test of this system can be divided into two distinct phases:
2.1
In order to carry out the tests, instruments, with an appropriate precision, that are able to
simulate the signals of the field instruments are used where possible.
The following types of simulator are used and available:
Simulator Panel, as described at 7.
Measuring instruments (multimeter, Megaohmeter, etc.) used during the internal inspection
phases and the certification documents of the equipment by third parties are also available.
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
5 of 25
DOCUMENT DESCRIPTION
NP Code
Customer Code
ITN 04240/A
N.A.
SOM5464708 /3
SOM6629532 /3
SOM6629520 /3
SOM6751158 /3
SOM6628418 /3
SOM5081820 /1
SOM6629548 /4
SOM6629523 /4
SOM6629813 /3
SOM6750807/4
VP-18-101-C-231-001A/B-SK006
VP-18-101-C-231-001A/B-SK0017
VP-18-101-C-231-001A/B-SK002
VP-18-101-C-231-001A/B-SK004
VP-18-101-C-231-010A/B-SK001
VP-18-101-C-231-001A/B-SK003
VP-18-101-C-231-001A/B-SK005
VP-18-101-C-231-001A/B-SK010
VP-18-101-C-231-001A/B-SK100
Generally this test will be carried out according to N.P. standard document ITN 04240/A.
On positive result, acceptance signs will be placed on the relevant PQP (Product Quality
Plan) test report prepared by panel manufacturer. This document is a sequence of check
lists according to the Factory Acceptance Test Procedure (this document).
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
6 of 25
3.1
Panel and associated equipments, shall be visually checked to verify that the construction was
made according to the following drawings:
- U.C.S. Construction Drawing & Equipment List (see 2.3).
The following checks in particular have to be carried out:
Checking the correct manufacture and the conformity of the finishing and the
dimensions of the parts which make up the system to the specifications;
Checking that the labels present on the system structures and on the connecting
cables allow the item to be identified easily;
Checking that the front panel labels and the warning labels on each door (in English
language) are present;
Checking that all installed components correspond in types and quantities to the
referenced drawings;
Checking that installation of components and wiring correspond to requirements.
This activity has the aim of checking that the construction and the various mechanical
assemblies have been carried out correctly. The following is also checked:
This phase is considered to be passed unless there are deficiencies noted in the abovementioned points.
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
7 of 25
3.2
This test will be carried out in accordance with the N.P: standard document ITN 04240/A.
The aim of the test is to verify the insulation of all the active parts that have no ground
reference and to measure the insulation resistance. No dielectric strength test is repeated
because it is already carried out in the internal inspection phases on the applicable parts.
Moreover, if it is repeated more than once it can have a damaging effect on the system.
Insulation tests are carried out on the applicable parts that havent ground reference. To carry
out the above-mentioned test, the panel must not be connected to power supply and all the
subsystems must be disconnected. The relevant test certificate will be included in each UCS
test report.
Dielectric Test, in order to verify the withstand strength of power supply circuits, shall be carried
out for 60 sec. and with the following voltages:
- circuits with operating voltage Ui 12V : 280 VRMS 50Hz
- circuits with operating voltage 12V Ui 60V : 500 VRMS 50Hz
- circuits with operating voltage Ui > 60V : 2xUi + 1000 VRMS (min. 1500 VRMS) 50Hz
This test shall be carried out using a Multimeter or Ohm-meter to confirm the continuity of the
following:
a. P.E. Protection earth
To verify continuity between the earth and all part of the cabinet including instrument
chassis.
b. F.E. Functional Earth
To verify continuity between the instrument earth bar connection and instrument cable
screen terminals.
c. I.S.E. Intrinsically Safe Earth
To verify continuity of the I.S.E. earth bar system connection between each other.
2.
Also using a Multimeter or Ohm-meter the P.E., F.E. and I.S.E. bars are to be confirmed
100% isolated from each other. F.E. and I.S.E. earths must be isolated from the cabinet.
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
8 of 25
With panel powered off, just perform a continuity check with Ohm-meter.
This test will be carried out following the drawings:
- U.C.S. Wiring Diagram (see 2.3)
The relevant test certificate will be included in UCS test report
NOTE: All tests present in this document have been performed internally by supplier at 100%,
the test to be witnessed by Customer for 100%.
5. UCS POWER DISTRIBUTION CHECK.
5.1 110VDC FROM DCP FEEDER 1 (10H) - POWER SUPPLY DISTRIBUTION
With reference to the pages of Wiring Diagram power supply pages only (see 2.3) verify the
following points:
Correct cross section and type of cables.
Correct size, type and rating of fuses and breakers.
Correct connection of power distribution with all devices supplied at 110Vdc.
Control that all conductors and wire-ways are safely and properly fixed in the control panel.
POWER ON test for sockets.
Verify that all devices are functioning properly.
Functionality of each single DC load shall be checked.
EQUIPMENT
MARK VIe
MARK VIeS
DC/AC Inverter 110Vdc/110Vac G#1A
DC/DC Module 110Vdc/24Vdc G#2B
Bently Nevada Temperature Monitor (Line B)
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
9 of 25
5.2 110VDC FROM DCP FEEDER 2 (30 MIN) - POWER SUPPLY DISTRIBUTION
With reference to the pages of Wiring Diagram power supply pages only (see 2.3) verify the
following points:
Correct cross section and type of cables.
Correct size, type and rating of fuses and breakers.
Correct connection of power distribution with all devices supplied at 110Vdc.
Control that all conductors and wireways are safely and properly fixed in the control panel.
Functionality of each single DC load shall be checked.
EQUIPMENT
DC/AC Inverter 110Vdc/110Vac G#1B
DC/DC Module 110Vdc/24Vdc G#3B
Bently Nevada Vibration Monitor (Line B)
5.3 110VDC FROM DCP FEEDER 3 (10H) - POWER SUPPLY DISTRIBUTION (FOR FF
SECTION PANEL)
With reference to the pages of Wiring Diagram power supply pages only (see 2.3) verify the
following points:
Correct cross section and type of cables.
Correct size, type and rating of fuses and breakers.
Correct connection of power distribution with all devices supplied at 110Vdc.
Control that all conductors and wireways are safely and properly fixed in the control panel.
Verify that all devices are functioning properly.
Functionality of each single DC load shall be checked.
EQUIPMENT
DC/DC Module 110Vdc/24Vdc G#4A (FF SECTION)
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
10 of 25
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
11 of 25
With reference to the pages of Wiring Diagram power supply pages only (see 2.3) verify the
following points:
Correct cross section and type of cables.
Correct size, type and rating of fuses and breakers.
Correct connection of power distribution with all devices supplied at 110VAC.
Control that all conductors and wireways are safely and properly fixed in the control panel.
Verify that all devices are functioning properly.
Functionality of each single AC load shall be checked.
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
12 of 25
With reference to the pages of Wiring Diagram power supply pages only (see 2.3) verify the
following points:
Correct cross section and type of cables.
Correct size, type and rating of fuses and breakers.
Correct connection of power distribution with all devices supplied at 24VDC.
Control that all conductors and wireways are safely and properly fixed in the control panel.
Verify that all devices are functioning properly.
Functionality of each single DC load shall be checked.
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
13 of 25
With reference to the pages of Wiring Diagram power supply pages only (see 2.3) verify the
following points:
Correct cross section and type of cables.
Correct size, type and rating of fuses and breakers.
Correct connection of power distribution with all devices supplied at 110Vdc.
Control that all conductors and wireways are safely and properly fixed in the control panel.
Functionality of each single DC load shall be checked
EQUIPMENT
DC/AC Inverter 110Vdc/110Vac G#2B
6.2
With reference to the pages of Wiring Diagram power supply pages only (see 2.3) verify the
following points:
Correct cross section and type of cables.
Correct size, type and rating of fuses and breakers.
Correct connection of power distribution with all devices supplied at 230Vac.
Control that all conductors and wireways are safely and properly fixed in the control panel.
POWER ON test for lights, heaters, and sockets.
Verify that all devices are functioning properly.
Functionality of each single AC load shall be checked.
EQUIPMENT
AC/AC Module 230Vac/110Vac G#2A
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
14 of 25
6.3
With reference to the pages of Wiring Diagram power supply pages only (see 2.3) verify the
following points:
Correct cross section and type of cables.
Correct size, type and rating of fuses and breakers.
Correct connection of power distribution with all devices supplied at 230Vac.
Control that all conductors and wireways are safely and properly fixed in the control panel.
POWER ON test for lights, heaters, and sockets.
Verify that all devices are functioning properly.
Functionality of each single AC load shall be checked.
EQUIPMENT
Service Socket XS-CCC
Internal Light EL1
Ventilation Fan V1
Anticondensation Heater EH1
6.4
With reference to the pages of Wiring Diagram power supply pages only (see 2.3) verify the
following points:
Correct cross section and type of cables.
Correct size, type and rating of fuses and breakers.
Correct connection of power distribution with all devices supplied at 110VAC.
Control that all conductors and wireways are safely and properly fixed in the control panel.
Verify that all devices are functioning properly.
Functionality of each single AC load shall be checked.
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
15 of 25
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
16 of 25
Verify the software configuration, the power supply, tagging and labeling.
Connect the HMI computer to the Mark VIe Ethernet switch via Ethernet cable.
Start the execution of the development software for Mark VIe.
Download the application program from HMI to the Mark VIe. Verify that download has
been performed with success.
Ensure that HMI Monitor and graphics are functioning properly.
Observe for any error message that might come out on the monitor.
Override diagnostic alarms due to absence of the Gas Turbine.
Verify if the Mark VIe functions works properly or not.
Any non-conforming items / problem found shall be indicated in the proper area of the UCS
Wiring Diagram by drawing a cloud around it and recorded in the punch list.
9. MARK VIeS SYSTEM TEST
The Mark VIeS is the main item in this control system..
The Supplier shall verify and demonstrate that all components/ items for the completion of
Mark VIeS system have been successfully installed and functioning.
The procedure to verify the system functionality:
1. Verify the software configuration, the power supply, tagging and labeling.
2. Connect the HMI computer to the Mark VIeS Ethernet switch via Ethernet cable.
3. Start the execution of the development software for Mark VIeS.
4. Download the application program from HMI to the Mark VIeS. Verify that download has
been performed with success.
5. Ensure that HMI Monitor and graphics are functioning properly.
6. Observe for any error message that might come out on the monitor.
7. Override diagnostic alarms due to absence of the Gas Turbine.
8. Verify if the Mark VIeS functions works properly or not
Any non-conforming items / problem found shall be indicated in the proper area of the UCS
Wiring Diagram by drawing a cloud around it and recorded in the punch list.
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
17 of 25
10.
All tests present in this document have been performed internally by supplier at 100%, The
test to be witnessed by Customer for 100%.
1. All input/ output signals corresponding to each tag number inside I/O List shall be
tested.
For each I/O signal, verify the unit and range set inside Mark VIe, Mark VIeS and FF
System against the unit and range specified for the signal in the Field Instrument List
document (ref. to para 2.3).
2. For every I/O signal having alarm function, check the following:
a. Alarm status inside HMI graphic corresponding to the signal.
b. Verify consistency between alarm settings inside Mark VIe, Mark VIeS and FF
System against the alarm setting specified in the Field Instrument List document
(ref. to para 2.3).
c. Verify the consistency of tag number and service description in printer output for
the signal (if any).
With reference to the UCS I/O List and UCS Wiring Diagram, verify the correct acquisition (with
the appropriate simulator, see point 2.1) for the signals of following common types.
For each I/O signal, a base range set inside Mark VIe, Mark VIeS and FF system is used.
Observe and verify consistency of tag number for each I/O signal inside software environment
and inside Mark VIe, Mark VIeS graphic.
Confirm the accuracy of the analog input / output signal is within acceptable limit of (0.1-0.3) %
(Deviation with respect to base range).
<3>
Verify the 2 out of 3 logic of the redundant instruments.
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
REVISED WHERE SHOWN <3>
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
18 of 25
> Test is passed when the value in engineering unit in correctly displayed on all destination
points.
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
19 of 25
11.
AUXILIARY SUBSYSTEM
11.1
11.2
Control:
Correct input signal acquisition
Correct output signal management
Correct operation and signalling in case of faults
Correct signals visualization on HMI
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
20 of 25
11.3
6
7
Verify the hardware configuration, the power supply, tagging and labeling.
Configuration of the individual cards (acquisition method and scale and alarm and trip
threshold level)
Diagnostics at power-on.
Communication Mark VIe/Mark VIeS <-> Bently Nevada 3500
Acquisition of axial displacement and radial vibration signals, by means of the whole
terminal/interconnecting cable/card connection, of 0% - 50% - 100% of the field and of
some values included in the range; control of axial displacement proximitors open
circuit management alarms; control of the alarm and trip thresholds; control of the card
status summary signal.
Verify the acquisition of the monitor rack on local HMI (Bargraph, Trend) screen.
Observe for any error message that might come out on the display.
Any non-conforming items / problem found shall be indicated in the proper area of the UCS
Wiring Diagram by drawing a cloud around it and recorded in the punch list.
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
21 of 25
12.
This test verifies the correct connection between subsystems. The input signals are simulated,
with the aid of appropriate simulators, on origin subsystem and the outputs checked on target
subsystem.
Control:
Correct signal updating on target subsystem.:
FF <-> Mark VIe (Hardware)
Bently Nevada <-> Mark Vie/Mark VIeS (Hardware)
CCC <-> Mark VIe/Mark VIeS (Hardware)
It shall be demonstrated that the systems communicates each other.
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
22 of 25
16.
Following test will be done by panel supplier internally, test report will be checked.
For this test the UCS is placed in a climatic room. UCS Internal/external temperatures are
measured and recorded by an external device. A selection of Boolean and 4-20 mA I/O' s is
chosen and the associated status is continuously recorded by means of trend displays.
The temperature of the climatic room is raised up to 45 C; heaters are then turned off until
ambient temperature is detected, when they are turned on again .
Test duration is 48 Hours.
During this period no any hardware failure shall be observed, and the status of the selected
I/O shall be verified to be not changed.
17.
BURN IN TEST
Following test will be done by panel supplier internally, test report will be checked.
This test consists in a continuous power up of the UCS, at ambient temperature.
Test duration is 120 Hours.
During this period hardware failure shall not be observed.
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
23 of 25
18.
CERTIFICATION CHECK
Applicable conformity declaration/certificates (CE / UL/ CSA etc.) will be verified as per project
requirements.
GE-NP shall provide:
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
24 of 25
CLIENTE:
N. ORDINE .
CUSTOMER
ORDER No.
COMMESSA N.P.
N.P. JOB
PROCEDURA DI TEST
TEST PROCEDURE
Pag.
Tipo di pannello:
Type of panel:
No. di serie:
Serial No.:
Q.t
Q.ty
PUNCH LIST
Description
Collaudatore/
Operator:
Data/
Date:
Approvato/
Approved:
To be solved within
Data/Date:
Checked
Approvazione Cliente/
Customerss
TITLE:
DOCUMENT CODE
SOM6629519
REVISION DESCRIPTION:
NO REVISION IS INTRODUCED IN THIS PAGE
By
PAGE MARKER
N/A
ORIGINAL JOB
180.0057-58
Data/Date:
REVISION
3
SECURITY CODE
N
SIZE
THIS DOCUMENT IS AND CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION OF Nuovo Pignone S.r.l. WHICH SHALL NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE
WRITTEN PERMISSION OF Nuovo Pignone S.r.l. . UNPUBLISHED WORK 2013 Nuovo Pignone S.r.l.. ALL RIGHTS RESERVED.
LANGUAGE
A
SHEET
25 of 25