Assignment 3: Name ID
Assignment 3: Name ID
Submitted to:
Dr. Kais Zaman
Associate Professor
Submitted by:
Name
ID
1120001030
1.
Utilization=
actual output
design capacity
Efficiency=
actual output
effective capacity
a. Actual output = 7
Design capacity = 10
Effective capacity = 8
Utilization = 7/10= 70%
Efficiency = 7/8 = 87.5%
b. Actual output = 4
Design capacity = 6
Effective capacity = 5
Utilization = 4/6=67%
Efficiency = 4/5 = 80%
c. No. Because efficiency is measured upon effective output. Now if
effective capacity is considerably lower than design capacity then
efficiency would not be a good indicator.
2. Effective capacity = 50% of design capacity
Actual output = 8
actual output
actual output
Utilization=
Efficiency=
design capacity
effective capacity
Let design capacity be x.
Therefore, effective capacity = 0.5x
Actual output = 80% of 0.5x = 0.4x
0.4x=4
Or x=20
So, design capacity needed is 20 jobs per hr.
4.
Machine A
FC
40000
v
10/unit
Revenue =15/unit
Machine B
30000
11/unit
Machine A
40000
2500
Machine B
30000
2500
Machine C
80000
2500
3100
3467
2034
(40000*2)/2500=
32
(30000*2)/2500=
24
80000/2500=32
Machine A
$40000
$10
3100
Machine B
$30000
$11
3467
Machine C
$80000
$12
2034
2500
2500
2500
TC
No. of
machi
nes
neede
d
TC
2500*10+40000=$6
5000/machine
2
2500*11+30000=$57
500/machine
2
2034*12+80000=$104
408/machine
1
3100*10+80000=$1
11000
3467*11+60000=$98
137
2034*12+80000=$104
408