0% found this document useful (0 votes)
386 views

Exhibit A Value Engineering Change Proposal

The document is a value engineering change proposal submitted by a contractor to a state or county. It proposes changes to a construction project that would decrease costs. If approved, the contract price would be reduced. It includes a description of the proposed changes, the contractor's cost estimate for the savings, and requires signatures from the contractor and the state/county to validate or reject the change order.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
386 views

Exhibit A Value Engineering Change Proposal

The document is a value engineering change proposal submitted by a contractor to a state or county. It proposes changes to a construction project that would decrease costs. If approved, the contract price would be reduced. It includes a description of the proposed changes, the contractor's cost estimate for the savings, and requires signatures from the contractor and the state/county to validate or reject the change order.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

EXHIBIT A

VALUE ENGINEERING CHANGE PROPOSAL


(10/14/97)

["STATE" OR "NAME OF COUNTY"]


PROJECT TITLE:

VECP NO:

DATE:

PROJECT NO:

CONTRACT NO:

CONTRACTOR:
A.

CHANGES:
The following changes are to be performed in accordance with
all contract stipulations and covenants (Specifications,
drawings, special provisions, etc.):

B.

CONTRACTORS QUOTATION:
The changes included under Part A above will be performed at
a contract price decrease of $
in accordance
with all terms of the contract documents. Six copies of our
cost breakdown are attached herewith. We are aware that
this value engineering change proposal must be approved by
the

in the designated space


["State" or "Name of County"]
below and that no work is to be performed until an approved
change order has been given us. In case of rejection of
this proposal by the

, we will
["State" or "Name of County"]
continue all work in accordance with the existing contract
terms.

C.

NAME

TITLE

SIGNATURE
STATEMENT OF FUNDS:

DATE

Original Contract Price. . . . . . . . . . . . $


Amended Contract Price . . . . . . . . . . . . $
New Contingency Balance Remaining. . . . . . . $

ATTACHMENTS 2

-1-

D.

SUMMARY DESCRIPTION AND POTENTIAL IMPACTS OF THE PROPOSED


CHANGES:

E.

TIME EXTENSION:

F.

VALIDATION OF CHANGE ORDER


Recommended for approval

G.

REJECTION OF CHANGE ORDER

CONSTRUCTION ENGINEER
Approved:

CONSTRUCTION ENGINEER
Disapproved:

PROCUREMENT OFFICER

PROCUREMENT OFFICER

DISTRIBUTION:
DATE

DATE

Reasons for rejection:

ATTACHMENTS 2

-2-

VALUE ENGINEERING CHANGE PROPOSAL


(Contractor-Required Information)
From:
To:
Project:
Location:

VECP No.
Contract No.

INFORMATION REQUIRED OF THE CONTRACTOR: (If answer to any of the


following questions is "Yes", explain in "REMARKS" below.)
YES NO
1.
Does this proposed change affect the time of
completion of the contract as stated in the
General Clauses?
2.
Has the Contractor submitted this proposed change
previously to this office or any other government
agency?
3.
Does this change affect other costs to the
government, such as government-furnished property
or costs of contract-related items?
4.
Does this proposed change increase the maintenance
or operation costs of original or proposed items?
5.
Is a subcontractor involved in this proposed change
to the original contract?
6.
Does the Contractor intend to restrict the
governments right to use any data described
in this proposed change?
7.
Does this proposed change involve use of
proprietary materials?
CHANGES AND/OR REVISIONS TO DRAWINGS AND SPECIFICATIONS: (Attach
applicable contract drawings and specifications, including
Contractors or shop drawings or literature with all changes
marked on the drawings and specifications.)
REMARKS:

Contractors Representative:

Name

Signature

Date

Received by:
["State" or "Name of County"]

Name

Signature

Date
ATTACHMENT 1

VALUE ENGINEERING CHANGE PROPOSAL


(Contractor Summary Submittal)
From:
To:
Project:
Location:

Date:
VECP No.
Contract No.

SUMMARY OF CHANGE (Description - Compare advantages and


disadvantages, include all information required by the contract
clauses and section 3-132-4 for value engineering change
proposals)
Before: (sketch, when applicable) After:

ESTIMATED COST SUMMARY: (Costs shall be estimated in accordance


with the change provisions contained in the General Clauses of
the contract. Attach Cost Estimating Form, for detailed estimate
whenever applicable.)
Qty.
Unit Cost
Totals
A.
Original . . . . . . . . . .
$
$
B.
Proposed . . . . . . . . . .
$
$
C.
Gross Savings (A-B) . . . . . . . . . . . . . . .$
D.
Contractors Implementing
Cost . . . . . . . . . . . . . . . . . . . .$
E.
Total Estimated Decrease (C-D) . . . . . . . . . .$
F.
States Implementing Cost . . . . . $
G.
Difference (E-F) . . . . . . . . . . $
H.
1/2 Difference (E-F) . . . . . . . . . . . . . . .$
2
I.
Reduction in Contract Price (E-H). . . . . . . . .$
DATE BY WHICH A CHANGE ORDER MUST
BE ISSUED SO AS TO OBTAIN MAXIMUM
COST REDUCTION . . . . . . . . . . . . . . . . . .
Date
Contractors Representative:

Name

Signature

Date

Received by:
["State" or "Name of County"]

Name

Signature

Date
ATTACHMENT 2

You might also like