Subdivision Regulations Rewrite
Subdivision Regulations Rewrite
Item 8
What is Subdivision?
Division or assemblage of a piece, or pieces of
land for the purpose of sale or development.
Process by which proposed lot and road
layouts are determined by the Planning Board
prior to the submission of a record plat.
M-NCPPC
Purpose of Subdivision
Establishment of value/entitlements
Change of use
Incentives to follow the process
Record plat as a precursor to sale of property
Building permit
M-NCPPC
M-NCPPC
Objectives
M-NCPPC
Improved Organization
Current Table of Contents
Article I. In General.
Article I. In General.
Division 50.1. Purpose
Division 50.2. Defined Terms
Division 50.3. General Requirements
Article II. Subdivision Plans.
Division 50.4. Preliminary Plan
Division 50.5. Pre-Preliminary Plan
Division 50.6. Simplified Preliminary Plan
Division 50.7. Minor Subdivisions
Article III. Plats.
Division 50.8. Plats-Generally
Article IV. Administration.
Division 50.9. Waivers from this Chapter
Division 50.10. Administrative Procedures
M-NCPPC
Article I. In General
Division 50.1. Purpose
Division 50.2. Defined Terms
Division 50.3. General Requirements
Limit exception to platting for farm dwellings to
parcels that are at least 25 acres in size
Expanded pre-58 exception to parts of lots
Added exception for reconstruction of detached
dwellings
M-NCPPC
M-NCPPC
M-NCPPC
Street frontage;
Alignment;
Size;
Shape;
Width;
Area; and
Suitability for residential use.
M-NCPPC
M-NCPPC
Minor Subdivisions
Moved private institutional lots and lots in the
agricultural zone to the Simplified Subdivision Plan
process.
No platting of a parcel containing an existing dwelling
under the zoning standards in effect when the
dwelling was constructed.
Limit consolidation to one-family detached
residential lots to avoid loss of potential road
improvements for non-residential lots that are going
to redevelop and do an APF with site plan.
M-NCPPC
M-NCPPC
M-NCPPC
Waiver Provisions
Old Section 50-38
(1)
M-NCPPC
M-NCPPC
Next Steps
Modify the draft as needed based on todays
discussion
Release for review and comments prior to the
Planning Board hearing
Hearing date of April 23, 2015 or April 30,
2015
Board work sessions in May
Approval and transmittal to the County
Council by early June
M-NCPPC