Test Approach Test Scenarios Test Conditions and Expected Results Test Cycle Control Sheet Test Script
Test Approach Test Scenarios Test Conditions and Expected Results Test Cycle Control Sheet Test Script
Domains: Testing
Back to top
Key Considerations
The following people use this information:
The test lead uses this deliverable to plan the work for the test.
The tester uses this deliverable to execute the test.
The project manager uses this deliverable as an input to create and maintain the project work
plan and technology implementation plan.
Back to top
Relationships
Categories Work Products - Alphabetical
Roles Responsible:
Tester
Test Lead
Modified By:
Application Designer
Developer
Human Performance Developer
Project Manager
Technical Architect
Technical Designer
Tester
Test Lead
Tasks Input To:
2191 Confirm Application Analysis Deliverables
2391 Confirm Technical Architecture Analysis Deliverables
3182 Plan Assembly Test
3191 Confirm Application Design Deliverables
3391 Confirm Technical Architecture Design Deliverables
4188 Build and Test Application Components
4191 Confirm Application Build
4345 Install and Build Development Environment
4355 Install and Build Execution Environment
4365 Install and Build Operations Environment
4545 Develop Performance Support Materials
4591 Confirm Change Enablement Materials
5128 Prepare and Execute Assembly Test
5131 Confirm Assembly-tested Application
5148 Prepare and Execute Product Test
5158 Prepare and Execute Performance Test
5168 Perform Mock Conversion
5171 Confirm Product-tested Application
5188 Prepare and Execute User Acceptance Test
5191 Confirm User-accepted Application
5328 Prepare and Execute Technical Architecture Assembly Test
5538 Test Training and Performance Support Materials
6118 Prepare for Migration
6148 Perform Operational Readiness Test