Constrcution Site Forms For Site Data
Constrcution Site Forms For Site Data
Project:
LOGO
TITL
DRAWING SUBMITTAL
Ref. No. :
Date :
Architectural
Electrical
Civil
Structural
Mechanical
Interior Design
Description / Title
Submitted For:
1. For Approval
2. For Information
3.
4.
For Further
For Your F
The submittal documents are in strict conformity with the design drawings and the specification. Minor deviations are indic
in the submitted documents. All aspects of associated works have been considered and coordinated.
Technical M
Received by:
Name: _________________
Remarks / Comments:
\\sce_sce_ho\projects\al juhaini\forms
Date: ____________
Signature: ____________
Status
Date
\\sce_sce_ho\projects\al juhaini\forms
Approved
Approved as noted
Rejected - Resubmit
Contractor:
TITL
WING SUBMITTAL
New Submittal
Resubmittal
Others
Specs. No.
Drwg. No.
Code
Signature: _______________
\\sce_sce_ho\projects\al juhaini\forms
Original + 2 Copy
No Action
Authorized by P.M.
\\sce_sce_ho\projects\al juhaini\forms
Consultant:
Project:
LOGO
TITL
DOCUMENTS SUBMITTAL
Ref. No. :
Date :
Architectural
Electrical
Civil
Furniture
Structural
Mechanical
Interior Design
Others
Description*
Manufacturer
Supplier
Drawing
Sample
Certificate
Having checked this submittal, we certify that it confirms to the requirements of the Contract Documents in all respects,
except as otherwise indicated herein (
)
Material Engineer/Name & Signature : ____________________
Received by:
Date
Remarks / Comments:
Status
Approved
Approved as noted
Rejected - Resubmit
Project Manager:
Date
Main Contractor:
New Submittal
Resubmittal
urniture/Equipment
Specs. No.
Drwg. No.
No. of Catalogue/Sample
Calculation
Code
Document
No Action
Date
_______________
Name & Signature
Consultant:
Project:
TITLE
LOGO
Date:
Building Ref:
-
Area Ref:
Level Ref:
Description:
Inspections
1. Civil/Structural inspection
2. Civil/Structural inspection
3. Structural inspection
4. Structural inspection
5. Architectural inspection
6. Electrical inspection
7. Electrical inspection
8. Mechanical inspection
9. Plumbing inspection
10. Interior inspection
11. Document Controller
No
Starting Time
Ending Time
Eng.A.A.Hamed,Project Director
Signature:
Date :
Signature:
Date :
Signature:
Date :
Signature:
Date :
Main Contractor:
ME
nding Time
Hrs
Signature
Remarks
roject Director
Consultant:
Project:
TITLE
LOGO
Acknow. No
Building Ref:
Date:
Area Ref:
OT Request No
DescrIption:
Date:
Starting Time
Ending Time
Inspections
No
Starting Time
Ending Time
1. Civil/Structural inspection
2. Civil/Structural inspection
3. Structural inspection
4. Structural inspection
5. Architectural inspection
6. Electrical inspection
7. Electrical inspection
8. Mechanical inspection
9. Plumbing inspection
10. Document Controller
Al-Latifia Engineer Incharge
Contractor's Manager
Signature:
Signature:
Date :
Consultant's Engineer Incharge
Date :
Consultnat Project Manager
Signature:
Signature:
Date :
Date :
Main Contractor:
WORKED
ng Time
:
:
Signature
Remarks
nager
Consultant:
Project:
LOGO
TITLE
RFI
Building Ref:
Date of Request
Area Ref:
Level Ref:
Descreption:
Inspections
Name
1. Civil inspection
2. Structural inspection
3. Architectural inspection
4. Electrical inspection
5. Mechanical inspection
6. Survey inspection
7. QA/QC Head
8. Site Engineer
9. Sr. Site Engineer
10 Construction Manager
11. Project Coordinator
Consultant's Comments:
Contractors QC
Signature
Date
STATUS:
A.
Approved
B.
Approved as Noted
Signature
Date :
Code:
Work to Proceed
Reinspection
Contractor:
..)
Name
Consultant
Signature
Hrs
Date
Code
C. Reinspection required
Signature:
Date :
Reinspection required
Consultant:
Project:
LOGO
TITLE
Date :
Item No.:
Date of Arrival:
Item Description:
Location Stored:
To: Consultant
Please be advised that said material and / or equipment has been delivered to site and safely stored as agreed in the location
indicated. Further, we hereby certify that the material and/or equipment delivered and stored is/are as specified and approved
as per sample / certification sheet list and item number indicated. It is understood that your approval does only constitute a
review of general conformance to the contract document and accepted standards at the time of inspection.
Attachment:
Packaging List
Invoice
Contractor
Date _____________________
Construction
To: Contractor
Following the inspection of above material which was conducted on the date mentioned below, please be advised that we
confirm receipt of your delivery note with the following comments as noted:
Our review of approval/delivery note of above material does not relieve the contractor of his responsibility under the terms
of the contract nor authorize additional compensation.
Location as agreed
Checked and accepted
Accepted subject to compliance as noted
Rejected
Date _____________________
Contractor:
TITLE
INSPECTION REQUEST
Project:
Project No:
Client:
Consultant:
DATE:
DAY SHIFT
NIGHT SHIFT
OTHERS
ACTIVITIES :
GRAND TOTAL :
Area/Building:
Area/Building:
Area/Building
Area/Building:
Name
Signature
Date
Attachments
:
:
:
DAY:
NOTES:
:
:
:
AM TO
PM TO
PM AM -
PM PM
AM TO
AM
OTES:
DAILY
PM
M TO
AM
DAILY REPO
RY REPORT
REPORT #
WEATHER
Area/Building :
Area/Building:
ELECTRO MECHANICAL WORKS
Area/Building:
Area/Building:
Area/Building:
ACKNOWLEDGED BY :
Name
Signature
Date
TEMPERATURE
C at 07 :
L WORKS
L WORKS
L WORKS
C at 07 : 00 Hrs ; C at 14 : 00 Hrs
____)
:
:
:
:
] Rain
] Others
Overnight Minimum
; C at 14 : 00 Hrs
CONSTRUCTION EMPLOY
Title
Construction Equipm
Equipment
SUB-CONTRACTOR
Title
1 of 3
PLOYEES (Total)
No.
uipment
No.
TOR
No.
S (Total)
Title
SEE DETAILS
nt
Equipment
SEE DETAILS
Sub-Con. Name
No.
0
0
No.
Trade
Project
Project No.
From
To
No.
:
:
:
:
Date :
Title
PROJECT DIRECTOR
ADMIN MANAGER
TECHNICAL MANAGER
ENGINEERING MANAGER
PLANNING MANAGER
PROCUREMENT HEAD
Project
Project No.
From
To
No.
:
:
:
:
Date :
Title
MEP MANAGER
CONTRACT ADMINISTRATOR
PROJECT COORDINATOR
10
11
12
13
Project
Project No.
From
To
No.
:
:
:
:
Date :
Title
14
ELECTRICAL ENGINEER
15
MECHANICAL ENGINEER
16
PLANNING ENGINEER
17
PROCUREMENT ENGINEER
18
QUANTITY SURVEYOR
19
DRAFTSMAN
20
ACCOUNTANT
Project
Project No.
From
To
No.
21
:
:
:
:
Date :
Title
LOGESTIC IN-CHARGE
Project
Project No.
From
To
No.
:
:
:
:
Date :
Title
22
IT
23
DOCUMENT CONTROLLER
24
PURCHASER
25
OFFICE SECRETARY
26
RECEPTIONIST
27
OFFICE BOY
Site Staff
Project
Project No.
From
To
No.
:
:
:
:
Date :
Title
28
CONSTRUCTION MANAGER
29
30
31
QA/QC MANAGER
32
SAFETY MANAGER
33
34
Project
Project No.
From
To
No.
:
:
:
:
Date :
Title
35
36
37
38
39
QA/QC ENGINEER
44
LAND. SURVEYOR
40
CIVIL FOREMAN
Project
Project No.
From
To
No.
:
:
:
:
Date :
Title
42
ELEC. FOREMAN
43
MECH. FOREMAN
41
Project
Project No.
From
To
No.
:
:
:
:
45
LAB. TEAM
46
TIMEKEEPER
Date :
Title
Workers
47
SAFETY OFFICER
48
ELECTRICIAN
49
PLUMBER
50
WELDER
Project
Project No.
From
To
No.
:
:
:
:
Date :
Title
51
PAINTER
52
CARPENTER
53
MASON
54
STEEL FIXER
55
LABOUR
56
MECHANIC
57
EQUIPMENT OPERATOR
Project
Project No.
From
To
No.
:
:
:
:
Date :
Title
58
59
60
DRIVER
61
WAREHOUSE STAFF
62
STORE KEEPER
63
SECURITY GUARD
64
Project
Project No.
From
To
No.
65
:
:
:
:
Date :
Title
OTHERS
Grand Total
Project
Project No.
From
To
4
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
4
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
4
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
4
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
4
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
4
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
4
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
4
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
4
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
4
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
4
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
4
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
:
:
:
:
Date :
REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
No.
1
2
3
4
5
6
:
:
:
:
Date :
Project
Project No.
From
7
To
8
9
10
11
12
13
14
15
:
:
:
:
Date :
Project
Project No.
From
16
To
17
18
19
20
21
22
23
24
:
:
:
:
Date :
Project
Project No.
From
25
To
26
27
28
29
30
31
32
33
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
MACHINE DESCRIPTION
Front Loaders
Mobile Crane
Generators (Large)
Generators (Small)
Vibrator
Air Compressor ( electric )
Project
:
Project No. :
From
: ( diesel )
Air Compressor
To
:
Bar Bending Machine
Backhoe Loader (JCB)
Diesel Tanks
Water Tanks (Large)
Water Tanks (Small)
Water Trucks
Bobcats
Radial Saw
Date :
Project
:
Project No. :
From
Jack Hammer :
To
:
Tower crane
Water Pump
Welding machine
Helicopter
Dump Trucks
Tower light
Dump Trailer
Power Screed
Date :
Project
:
Project No. :
From
:
Screeder machine
To
:
Plate Compactor
Forklift
Poukling
Roller Compactor ( 10 / 7 / 1.5 ton )
Placing Boom
Spider Pump
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Grand Total
Project
Project No.
From
To
1
:
:
:
:
Date :
MACHINERY REPORT
3
10
11
12
13
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
0
0
To
:
:
:
:
Date :
0
Project
Project No.
From
To
14
15
:
:
:
:
Date :
16
17
18
19
20
21
22
23
24
25
26
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
0
0
To
:
:
:
:
Date :
0
Project
Project No.
From
To
27
28
:
:
:
:
Date :
29
30
31
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
No.
1
2
3
4
5
6
7
:
:
:
:
Date :
DAILY SU
Title
Project
Project No.
From
To
No.
8
9
10
11
12
13
14
:
:
:
:
Date :
DAILY SU
Title
Project
Project No.
From
To
No.
15
16
17
18
19
20
21
:
:
:
:
Date :
DAILY SU
Title
Project
Project No.
From
To
No.
22
23
24
25
26
27
28
:
:
:
:
Date :
DAILY SU
Title
Project
Project No.
From
To
No.
29
30
31
32
33
34
35
:
:
:
:
Date :
DAILY SU
Title
Project
Project No.
From
To
No.
36
37
38
39
44
40
42
:
:
:
:
Date :
DAILY SU
Title
Project
Project No.
From
To
No.
43
41
:
:
:
:
Date :
DAILY SU
Title
Project
Project No.
From
To
No.
45
46
47
48
49
50
51
:
:
:
:
Date :
DAILY SU
Title
Project
Project No.
From
To
No.
52
53
54
55
56
57
58
:
:
:
:
Date :
DAILY SU
Title
Project
Project No.
From
To
No.
59
60
61
62
63
64
65
:
:
:
:
Date :
DAILY SU
Title
Project
Project No.
From
To
No.
:
:
:
:
Grand Total
Date :
DAILY SU
Title
Project
Project No.
From
To
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
:
:
:
:
Date :
10
11
12
13
14
15
Project
Project No.
From
To
:
:
:
:
Date :
LABOUR REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
LABOUR REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
LABOUR REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
LABOUR REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
LABOUR REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
LABOUR REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
LABOUR REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
LABOUR REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
LABOUR REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
LABOUR REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
:
:
:
:
Date :
LABOUR REPORT
16
17
18
19
20
21
22
23
24
25
26
27
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
28
29
:
:
:
:
Date :
30
31
Project
Project No.
From
To
No.
1
2
3
4
5
6
:
:
:
:
Date :
Project
Project No.
From
7
To
8
9
10
11
12
13
14
15
:
:
:
:
Date :
Project
Project No.
From
16
To
17
18
19
20
21
22
23
24
:
:
:
:
Date :
Project
Project No.
From
25
To
26
27
28
29
30
31
32
33
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
S
MACHINE DESCRIPTION
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Grand Total
Project
Project No.
From
To
:
:
:
:
Date :
SUBCONTRACTOR MACHINERY RE
1
10
11
12
13
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
0
0
To
:
:
:
:
Date :
0
Project
Project No.
From
To
:
:
:
:
Date :
REPORT
14
15
16
17
18
19
20
21
22
23
24
25
26
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
0
0
To
:
:
:
:
Date :
0
Project
Project No.
From
To
27
28
:
:
:
:
Date :
29
30
31
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Consultant:
Project:
LOGO
TITL
MATERIAL SUBMITTAL
Ref. No. :
Date :
Architectural
Electrical
Civil
Furniture
Structural
Mechanical
Interior Design
Others
Description*
Manufacturer
Supplier
Drawing
Sample
Certificate
Having checked this submittal, we certify that it confirms to the requirements of the Contract Documents in all respects,
except as otherwise indicated herein (
)
Material Engineer/Name & Signature : ____________________
Received by:
Date
Remarks / Comments:
Status
Approved
Approved as noted
Rejected - Resubmit
Project Manager:
Date
Main Contractor:
New Submittal
Resubmittal
urniture/Equipment
Specs. No.
Drwg. No.
No. of Catalogue/Sample
Calculation
Code
Document
No Action
Date
_______________
Name & Signature
Work Permit
This to inform you that as per our schedule we are going to start the wo
Drawing Ref.:
Attachments':
Description of Work
S/N
Location
2
3
4
5
6
7
8
9
10
Departments Approval
S/N
Department
Electrical
Mechanical
Construction
QA/QC
Safety
S/N
Approval
Managers
Planning Manager
Construction Manager
Comments
Comments
Hot Work
Cold Work
Welding
Painting
Grinding
Insulation
Cutting/Burning
Electrical Work
Mechanical work
Conduit Activities
Doc.No: WP001
Rev.0
Date:28-Dec-2011
Location
Hot
el tower Z1-1
Revised Date
Cold
Start Date
End Date
31-Dec-11
8-Jan-12
Signature
Name
Signature
. PROJECT
Activity Schedule
FOOTING
COLUMNS
RETAINING WALL
SHEAR WALL
Team Leader
steel fixers
Carpenter
Mason
unskilled labors
Others
mobile crane
Team Leader
steel fixers
Carpenter
Mason
unskilled labors
Others
mobile crane
Team Leader
steel fixers
Carpenter
Mason
unskilled labors
Others
mobile crane
Team Leader
steel fixers
Carpenter
No
Total Fee
Resources
Monthly Fee
Particular
Date:
Total
Hours
Qty
Budget
Cost
Date:
Da
Day (1/2)
Day (
Bi-weekl
Mason
unskilled labors
Others
mobile crane
SLABS
Team Leader
steel fixers
Carpenter
Mason
unskilled labors
Others
mobile crane
OTHERS
Team Leader
steel fixers
Carpenter
Mason
unskilled labors
Others
mobile crane
0
Date:
Date:
Date:
Date:
Date:
Day (3/4)
Day (5/6)
Day (8/9)
Day (10/11)
Day (12/13)
ekly
ivities to be
med
Remarks
ACTUAL
ges
ges
Project
Project No.
From
To
:
:
:
:
Date :
;l
Labour
Actual Finish
Steel Fixer
Planned Finish
Activities/Description
Carpenter
S/N
Group
Actual Start
Qty / NoS
Planned Start
Duration
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Period From:
Others
Mason
To:
Remarks
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
1
2
3
4
5
6
7
8
9
10
11
12
13
A.C. Technician
Carpenter Shuttering
Carpenter Finishing
Carpenter (Group Leader)
CAD Operator
Cook
Crane Operator (Tower)
Crane Operator (Mobile)
Driver
Document Controller
Document Messenger
Electrician
Engineer Civil
14
Activity 10 / Zone 10
Activity 9/ Zone 9
Activity 8 / Zone 8
Activity 7 / Zone 7
Activity 6 / Zone 6
Activity 5/ Zone 5
Activity 4 / Zone 4
Activity 3 / Zone 3
Trade
Activity 2/ Zone 2
Sl. No.
Activity 1 / Zone 1
Project
Project No.
From
To
:
:
:
:
Date :
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Engineer Architect
Engineer Electrial
Enginner Mechanical
Erector
Foreman Civil
Foreman Electrical
Foreman Mechanical
Foreman Plumber
Foreman Finishing
Guard
Labour
Lab Technician
Mason
Mason (Tile Fixing)
Activity 10 / Zone 10
Activity 9/ Zone 9
Activity 8 / Zone 8
Activity 7 / Zone 7
Activity 6 / Zone 6
Activity 5/ Zone 5
Activity 4 / Zone 4
Activity 3 / Zone 3
Trade
Activity 2/ Zone 2
Sl. No.
Activity 1 / Zone 1
Project
Project No.
From
To
:
:
:
:
Date :
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Activity 10 / Zone 10
Activity 9/ Zone 9
Activity 8 / Zone 8
Activity 7 / Zone 7
Activity 6 / Zone 6
Activity 5/ Zone 5
Activity 4 / Zone 4
Activity 3 / Zone 3
Trade
Activity 2/ Zone 2
Sl. No.
Activity 1 / Zone 1
Sl. No.
49
50
51
52
53
Total
Trade
Surveyor
Safety Engineer
Safety Officer
Safety Group Leader
Welder
Activity 10 / Zone 10
Activity 9/ Zone 9
Activity 8 / Zone 8
Activity 7 / Zone 7
Activity 6 / Zone 6
Activity 5/ Zone 5
Activity 4 / Zone 4
:
:
:
:
Activity 3 / Zone 3
Activity 2/ Zone 2
Activity 1 / Zone 1
Project
Project No.
From
To
Date :
0
14
0
0
0
0
0
0
0
0
0
0
0
10
Balance
Rental
Total available
Total Required
Activity 14 / Zone 14
Activity 13 / Zone 13
Activity 12 Zone 12
Activity 11 / Zone 11
Project
Project No.
From
To
:
:
:
:
Date :
2
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Balance
Rental
Total available
Total Required
Activity 14 / Zone 14
Activity 13 / Zone 13
Activity 12 Zone 12
Activity 11 / Zone 11
Project
Project No.
From
To
:
:
:
:
Date :
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Balance
Rental
Total available
Total Required
Activity 14 / Zone 14
Activity 13 / Zone 13
Activity 12 Zone 12
Activity 11 / Zone 11
Project
Project No.
From
To
:
:
:
:
Date :
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Balance
Rental
Total available
Total Required
Activity 14 / Zone 14
Activity 13 / Zone 13
Activity 12 Zone 12
Activity 11 / Zone 11
Project
Project No.
From
To
:
:
:
:
Date :
0
0
0
0
0
0
0
0
0
0
0
0
Project
Project No.
From
To
:
:
:
:
Date :
NO.
8
9
10
11
12
13
14
TARGETED
QUANTITIES
TALLY #
TRADE
P/A
O/T
NO.
15
16
17
18
19
20
21
TALLY #
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
REPORT
DATE
NAME OF FOREMAN : .
TALLY NO OF FOREMAN : .
COMPLETED
QUANTITIES
REMARKS
NEER SIGNATURE
FOREMAN SIGNATURE
TRADE
P/A
O/T
Project
Project No.
From
To
:
:
:
:
Date :
CALENDER
Day of Week:
Date
Temp 9 AM
Activity Desccription
Activity Description
Activity ID
Activity ID
Early Start
Early Start
Actual Start
Early Fin
Act. Finish
Actual Start
Estimated
Accidents
Activity Description
Subcontractor
Location
Report filed
Hospital
First Aid
WorkForce
AL- LATIFIA
Type
Foreman
Gang Leader
Skilled
Man power
# Men
# Hours
Type
AL- LATIFIA
Subcontractor
Laborer
Trainee
Foreman
Skilled
Laborer
Trainee
NO EFFECT
ATMOSPHERIC CONDITIONS
Sunny
Rainy
Dusty
pe
HIGH R.
Time AM
ZONE REFERENCE
LOW R
CAR PK
Time PM
Quantity
General Comments
General Comments
# hrs
Notes/Problems
B.U
Unit
VITIES
FFECT
RANK/POSITION
HOURS AT JOB
FROM
7:00 AM
TO
TOTAL
6:00PM
11:00 Hrs.
Project
Project No.
From
To
:
:
:
:
Date :
To:
M/s:
Date:
Reference to our schedule of concrete for day ________, please note that the revised quanity will be as follows:
Date
Location
Item
Qty. in M3
Pouring Time
Time interval
Strength
Project
Project No.
From
To
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Type
Pump
Remarks
Project
Project No.
From
To
:
:
:
:
Date :
CC:
Project
Project No.
From
To
:
:
:
:
Date :
MATERIALS REQUEST
Mat. Req No. .
Delivery Date Required:-----------------------
Sl No.
Name:
Sign:
Description
Unit
..
Approval
..
352
Qty
Project
Project No.
From
To
:
:
:
:
Date :
Notes
352
Project
Project No.
From
To
:
:
:
:
Date :
Delayed Item
Unit
Qty
Project
Project No.
From
To
:
:
:
:
Prepared BY:
Store Keeper:
Copy to: Purchase Manager & Purchase Responsible.
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Requested by
Remarks
Project
Project No.
From
To
:
:
:
:
NOTED BY:
PURCHASE MGR.
Date :
Project
Project No.
From
To
:
:
:
:
Date :
:
:
:
:
:
:
Order No
Building
Storey
Member Location
Zone/Area/Building
Shop Drawing Reference
Item
Bar
Mark
Bar Dia.
(mm)
Project
:
Project No. :
From
:
To
:
Site Engineer
Date :
Project
Project No.
From
To
:
:
:
:
Unit Length
(m)
Date :
Unit Weight
(kg/m)
Project
Project No.
From
To
ne Manager
:
:
:
:
Date :
Project
Project No.
From
To
:
:
:
:
Date :
Sl.No.
Dwg.No.
Requested By:
Description
Approved By:
No. of
Copies
Issued By:
Name:________________ Name:_______________
Name___________
Name__________
Sign.________________
Sign._______________
Sign.___________
Sign.__________
Date________________
Date_______________
Date___________
Date__________
Project
Project No.
From
To
:
:
:
:
Paper Size
Date :
Remarks
Received By:
From:
To:
Cycle of 6 week Look ahead Schedule & 2 week Look ahead Schedule
Week 1
-21
PL.
-14
S.E
-7
P.M.T
Week 2
7
S.E
Week 3
14
2
P.M.T
Week 4
21
28
S.E
P.M.T
PL.
Week 5
S.E
Week 6
35
Week 7
Week 8
Week 9
42
P.M.T
Date: 23.02.2011
Week 10
Week 11
Week 12
10
as the P.M.T
11
12