Inspection and Test Plan: On-Shore Pipeline Certification
Inspection and Test Plan: On-Shore Pipeline Certification
Project
Owner
User
Location
:
:
:
:
Project Ref. :
Project Duration :
R
S
W
P
:
:
:
:
Review
Surveillance / Inspection
Witness Inspection
Perform & Provide
SW
V
H
N/A
:
:
:
:
Spot Witness
Verify
Hold point
Not Applicable
Surveillance Inspection
No
Activity
Document Review
- QA / QC Procedure
- Construction procedure
- Design basis
a. Pipeline routing, incl. ROW
b. Physical and chemical characteristics of fluid
c. Material selection incl. Internal corrosion
assessment
d. Temperature / pressure profile
e. Pressure containment (wall thickness calc.)
f. Pipeline expansion (if applicable)
g. Free span assessment (if applicable)
h. Lateral snaking assessment (if applicable)
I. Crossing design (if applicable)
j. Tie-in design (if applicable)
k. Trenching assessment (if applicable)
l. Pig launcher / receiver design (if applicable)
m. Flange calculations (if applicable)
n. T-joints, valves, etc. (if applicable)
-
Pipeline drawings
WPS / PQR and Welder Certificate
NDT procedure and NDT personnel certificate
Repair procedure
Hydrostatic test procedure
Cleaning, pigging, and drying procedures
Safety devices and Instrumentation system
Environmental protection and control system
Corrosion control system
a. Cathodic protection design report
b. Anode manufacturing and installation spec.
c. Coating manufacturing specifications
d. Field joint coating specification
e. Corrosion monitoring system specification
f. Material take off / data sheets
Operation and maintenance procedure
Reference
Document
Documents required
Acceptance
Criteria
3rd Party
Contractor /
Installator
Owner Insp. Comp MIGAS
SNI-13-3474
Owner Spec.& SNI-13-3474
QA Manual, QC Procedure
Construction Procedure
SNI-13-3474
Owner Spec.& SNI-13-3474
P
P
R
R
R
R
Design document
Design document
N/A
N/A
P
P
R
R
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Design document
Design document
Calculation sheet
Design document
Design document
Design document
Design document
Design document
Design document
Design document
Design document
Design document
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
Owner
API Spec 5L
SNI-13-3474
SNI-13-3474
SNI-13-3474
SNI-13-3474
SNI-13-3474
API 1102
SNI-13-3474
SNI-13-3474
SNI-13-3474
ASME B16.5
SNI-13-3474
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
P
P
P
P
P
P
P
P
P
P
P
P
R
R
R
R
R
R
R
R
R
R
R
R
Drawings
WPS / PQR and Welder Certificate
NDT procedure and personnel certificate
Repair procedure
Hydrostatic test procedure
Cleaning procedure
Data sheet, manufacturer certificate
AMDAL / UKL-UPL report
P
P
P
P
P
P
P
N/A
R
R
R
R
R
R
R
P
V
R
R
R
R
R
R
R
Owner
Owner
Owner
Owner
Owner
Owner
Design report
Design report
Design specification
Design specification
Design specification
Data sheets
Owner
Owner
Owner
Owner
Owner
Owner
N/A
N/A
N/A
N/A
N/A
P
P
P
P
P
P
R
R
R
R
R
R
R
N/A
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
API Spec 5L
SNI-13-3474
SNI-13-3474
SNI-13-3474
SNI-13-3474
SNI-13-3474
API 1102
SNI-13-3474
SNI-13-3474
SNI-13-3474
ASME B16.5
SNI-13-3474
NACE
NACE
NACE
NACE
NACE
API Spec 5L
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
Spec.&
NACE
NACE
NACE
NACE
NACE
API Spec 5L
Project
Owner
User
Location
:
:
:
:
Project Ref. :
Project Duration :
R
S
W
P
:
:
:
:
Review
Surveillance / Inspection
Witness Inspection
Perform & Provide
SW
V
H
N/A
:
:
:
:
Spot Witness
Verify
Hold point
Not Applicable
Surveillance Inspection
No
Activity
Pipeline Installation
a. Pipeline material inspection & tracebility
b. Pipeline route and ROW survey
c. Repairs of damage to external & internal coat
d. Welding inspection (incl. Electrode & fit-up)
e. Non Destructive Testing process
f. Excavation, welding and NDT of repairs
g . Field joints coating / insulation (if any)
h. Pipe lowering activities
i. Tie-in (line-up and fit-up)
j. Trenching
k. Safety devices and instrument inspection
Reference
Document
Final Report
- Installation data package / dossier
- Certificate / Result of inspection
Documents required
Acceptance
Criteria
3rd Party
Contractor /
Installator
Owner Insp. Comp MIGAS
P
P
S
S
N/A
N/A
P
P
P
P
P
P
P
P
P
P
P
H
R&S
R & SW
R & SW
R & SW
R & SW
R & SW
R&S
R&S
R&S
R &W
H
R&S
R&S
R & SW
R & SW
R & SW
R & SW
R & SW
R&W
R & SW
R&W
R&W
Sampling report
Catalog product
P
P
P
N/A
Check list
Calibration certificate
Test procedure and report
Test procedure and report
R
R
V
V
P
P
R&S
R&S
SW
V&H
P
P
R&H
R&S
H
R & SW
R
N/A
R
P
Note: This ITP has been discussed and approved by all parties concerned during Pre-inspection meeting
User
...
Contractor
...
PJIT
......
Ditjen MIGAS
..................................................