Systems: The Basics - Part 1: Design as a Prelude to Validation
4 Water
by Bob Elms and Cindy Green
Systems: The Basics - Part 2: Validation and Maintenance
11 Water
by Bob Elms and Cindy Green
to Validating Purified Water or Water-For-Injection System
21 AbyGuide
Benjamin J. Roczniak
Validation of a Water Purification System: An Inherently Flawed Process?
25 Proper
by William V. Collentro
of HVAC Systems in Pharmaceutical & Biotechnology Facilities - Part I
32 Validation
by Brian Scott, Jeff Hargroves and Jerry Bauers
of HVAC Systems in Pharmaceutical & Biotechnology Facilities - Part II
38 Validation
by Brian Scott, Jeff Hargroves and Jerry Bauers
and Endotoxins: Their Generation and Prevention in Pharmaceutical Water Systems
53 Pyrogens
by Drew Coleman and Douglas Burns
a Water Quality Failure/Incident Investigation
63 Conducting
by Shahid T. Dara
Building Controls Systems
73 Validating
by Jeffrey L. Waters
Report: A Pocket Guide to Auditing Pharmaceutical Water Systems
77 Special
by Graham Bunn
Validation: Validating USP Purified Water, Compressed Air and HVAC Systems
87 Facility
by Jean-Pierre Thiesset
Aspects of Validating Hydrogen Peroxide Gas Cycles in Isolator Systems
99 Key
by James R. Rickloff, M.S.
of Process Gas Systems
110 Validation
by Jeff Hargroves
Water Systems: A System Perspective Under the New USP Quality Requirements
116 Purified
by Tod E. Ransdell
Considerations in Water Purification Systems Validation
122 Management
by Shahid T. Dara
Study of the Design of Production Systems of Purified Water for the Pharmaceutical Industry
130 The
~ Negre and J.R. Tic Grau
by I. Lerin Riera, R. Salazar Macian, J.M. S un
Qualification: Some Practical Advice
149 Autoclave
by Gamal Amer, Ph.D. and Robert G. Beane, Jr.
of Purified Water Systems
153 Qualification
by David W. Vincent
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Ta
INke
TEARdv
anTItaVge
AC
E
of
ouRrK3%
WO
SHOOnPLi
S ne
&
Ord
er
SESD
Sis
IOcount
NS
PO Box 6004,
Duluth, MN 55806
218.740.7028 or 888.524.9922 U.S. Only
Fax: 218.740.6308
Web Site: www.ivthome.com
E-Mail: [email protected]
www.ivthome.com
Special Edition: Utilities Qualification
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
Defining the
Industry
\di-fin-ing\th \in-d s-tre
e
n exclusive lexicon of
more than 750 terms,
symbols, references and
acronyms commonly used
in drug and diagnostic
industries.
Free with
Membership
Only
$ 00
79.
PO Box 6004
Duluth, MN 55806
Phone: 218.740.7028 or
888.524.9922 US Only Fax: 218.740.6308
E-mail: [email protected]
Web Site: www.ivthome.com
52
53
54
55
56
57
58
59
60
61
62
Conducting a
Water
Quality
This article, based
on various
procedures
developed by the
author over the
years, will provide
an overview of
such an SOP with
special references
to water
quality failure
investigation...
by
Shahid T. Dara
President
COMPLIANCE Consulting Inc.
Failure/
Incident
Investigation
What is Quality
Failure/Incident?
Quality failure refers to a situation where a finished drug product, process, or service does not
meet its expected attributes or
specifications. Quality incident, on
the other hand, could be a failure
of the quality system practices,
which may or may not lead to a
quality failure of a product, process, or service. Both cases,
however, should be fully investigated and documented.
63
Shahid T. Dara
Section I
Quality Failure/Incident
Investigation Procedure
A quality failure/incident investigation procedure
should address the following areas as appropriate,
(see Figure 1 for a summarized list):
Figure 1
Elements of Quality
Failure/Incident Investigation
Procedure
Define quality failure/incident
Define quality significance of the failure/incident
Define the cause of quality failure/incident
Facilities
Utilities
Components
Equipment
Process
Drug product
Analytical
Personnel
Quality failure/incident investigation
Facilities
Utilities
Components
Equipment
Process
Drug product
Personnel
Procedures and documentation practices
Corrective action plan
Summary, conclusion, and sign off
Shahid T. Dara
cause for a quality failure/incident. Sample manipulation can have potential negative impact on the
quality of the material being sampled.
Both active and inactive raw materials can have
a direct bearing on drug product quality if these
are not of desired quality or their quality is compromised either during sampling process or due to
improper storage conditions.
Packaging/labeling component quality defects
can cause potential stability concerns as well as
mislabeling situations. Almost one-third of all the
drug product recalls in recent years were due to
mislabeling of drug products, per FDA enforcement
reports.
Equipment
If manufacturing/packaging equipment is a
potential cause for a quality failure/incident, review
the following:
Process
Review the manufacturing process in detail to
see if there were any deviations or anomalies. Also
review the process conditions, like temperature,
humidity, machine speed set ups, order of addition
of ingredients, process time limits, etc. A review of
process validation records might well be in order if
considered necessary.
Drug Product
Review other batches of the same drug product
to see if this is a product-specific quality issue or
an isolated incident. Also review batches of related
drug products manufactured under a similar set of
conditions. This will help determine if other drug
products are also involved. This part of the investigation demands extreme diligence on the part of
the quality management team, as it can have farreaching implications. In recent years, FDA has
repeatedly cited pharmaceutical manufacturers for
failure to perform an in-depth investigation of quality failure/incidents.
Personnel
This is an issue that is difficult to measure, as it
tends to indirectly validate the effectiveness of an
Special Edition: Utilities Qualification
65
Shahid T. Dara
employee training program. Make sure that the
individuals involved in all phases of a given quality
failure/incident have the knowledge, expertise, and
training to carry out their assignments, and there is
documented evidence to support this claim. If not,
an isolated quality failure/incident could be an indication of a major systemic quality problem within
the organization.
Procedures and Documentation Practices
A review of the SOPs, batch records, analytical
procedures, etc., is also required to complete this
investigation. This assures that the procedures are
detailed enough and easy to follow for the operator; if not, revisions might be needed.
Section II
Water Quality Failure
Investigation Procedure
Water purification systems are designed and
qualified to assure a consistent supply of purified
water of the desired quality. However, despite our
best efforts, a water sample may fail to meet its
specifications.
Water quality failure/incident has far-reaching
implications, as purified water and water-for-injection are widely used in drug product manufacturing
and facilities and equipment cleaning. In Section I
of this article, quality failure/incident investigation
procedure was discussed. Section II of this article,
based on the authors personal experiences in
handling water system quality failures, will provide
a detailed overview of water quality failure investigation procedure, both during validation and routine monitoring of the water purification system.
In order to accomplish a comprehensive investigation of a water quality failure incident, it is important that different aspects of the investigation be
assigned to different departments within an organization according to their expertise. This is especially true if the incident happens during validation
or major revalidation of a water purification system.
The investigation team should include:
Engineering and Maintenance along with
Validation to review the water purification system for physical and functional integrity from
an engineering, as well as, a validation point
of view.
Quality Assurance to review the procedural
and training issues, as well as the drug product(s) involved from a compliance point of
view.
Quality Control to review the chemical and
microbiological testing issues, as well as the
Shahid T. Dara
water sampling techniques.
Drug safety and information to review the
safety concerns to decide the disposition of
affected drug product(s).
The investigation should be led by Quality
Assurance and may also involve Manufacturing if
needed. The investigation team should discuss all
findings of the investigation before designing a corrective action plan and deciding the disposition of
the drug product(s) involved.
Figure 2
67
Shahid T. Dara
test data should be part of the validation file for a
given water purification system. Sudden changes
in source water quality can cause purified water
failure, especially after natural disasters like floods.
Source water test data from the local water authority and in-house periodic source water test results
should be reviewed to determine any sudden
change in source water quality. This review should
also indicate any trends that might be developing
over recent weeks, especially after heavy rains or
floods in the area, as they can affect the composition of natural water reservoirs.
Pretreatment
Source water is pretreated to minimize the level
of both organic and inorganic impurities before
water is actually processed through the final purification step. If pretreatment steps are not precisely
controlled and routinely monitored for performance
within preset limits, these could cause quality failure of the water produced.
Carbon Filter
Activated carbon filters are used to remove dissolved chlorine and other gases from source
water, along with organic materials before water
is subjected to the final purification process.
However, carbon filters can promote microbial
growth and, therefore, foul the downstream
components. Frequent monitoring and sanitization of carbon filters should be carried out to
prevent this situation. Nonetheless, carbon filters can be a cause of water quality failure.
Chlorination
Chlorine is added to the source water to
decrease its bioburden. It also helps to minimize microbial growth in the pipes and storage
equipment. Local water authorities usually add
a chlorine gas generating chemical to water to
produce 1 2 PPM of chlorine gas, like
sodium hypochlorite. However, there is a downside to the presence of chlorine in water, as it
tends to corrode stainless steel surfaces and
will deteriorate reverse-osmosis membranes. It
is, therefore, very important that chlorine be
removed from water before it actually reaches
the purification and storage stage.
However, if there is insufficient or no chlorine in
the source water, the purification system downstream may not be able to remove all the microbial contaminants, thereby causing a quality failure of the water produced.
Depth Filters
Source water is passed through a series of
coarse filters to remove suspended solids. The
filtration media could be different grades of
sand. However, such filters tend to harbor
microbes and should be periodically backwashed to remove all the trapped waste. If left
unsanitized, these filters could contaminate
the water with microbes, causing failure of the
water produced after purification.
68
Purification System
Deionization
Deionization is not considered an acceptable
water purification process by FDA to produce
water-for-Injection (WFI); however, it is used to produce purified water. Cation, anion, and mixed bed
resins are used to remove ionic impurities from
source water. The quality of these resin beds can
be monitored by determining the conductivity of
effluent water. A sudden increase in effluent water
conductivity indicates that a resin bed needs to be
regenerated. Ion exchange resin tank regeneration
should be controlled, and regenerated tanks should
not sit idle, as this can promote microbial growth.
Also, if there is a leakage of sodium ions from a
cation exchange resin, the water produced will have
a higher pH, greater than 7.0.
Reverse Osmosis
Reverse osmosis membranes are efficient water
purifiers when used in series. However, these can
harbor microbial growth, as they are chlorine sensitive and, therefore, can produce water of suspect
quality. Also, if the membranes are not periodically
backwashed, these would become overloaded and
let organic and inorganic impurities pass through.
Distillation
Shahid T. Dara
Distillation is the method of choice for producing
WFI, assuming it is a continuous process. If, for some
reason, the system is idle for a period of time, the
feed sections of the still can become dead legs and
promote microbial growth. On start up, if used unsanitized, this could produce WFI with high endotoxins.
Storage and Distribution
Storage tank, distribution piping, and associated
controls are critical to maintaining the quality of the
water being produced. If there are leaks in the system, these could contaminate the entire system.
Likewise, the vent filter on the storage tank should
be checked for integrity and also to see that it is not
harboring any microbes in the condensate, as both
could compromise the quality of water. There should
be a procedure in place for changing the sterile vent
filter on the storage tank. Many times, water quality
is compromised by the addition of foreign material
during filter changeover. Typically, filter change is
followed by a complete sanitization cycle. The
heating and cooling system is another critical part
of this puzzle, as the water quality is totally dependent on its storage temperature before it is used.
Sanitization process
Water purification systems are periodically
sanitized to remove any biofilm and organic build
up on different water contact surfaces. If a chemical sanitizing agent is used, there is potential for
residual chemicals in the purified water, unless
the system is thoroughly flushed and drained.
Chlorination
Review the source water data to see if there
was sufficient chlorine in the water. Also, review
the residual chlorine level of pretreated water processed downstream, especially in case of a
reverse osmosis water purification system.
Depth Filters
Check the backwash records to see if the depth
filters were backwashed and sanitized per requirements, as these can cause both microbial and
chemical contamination of the water being purified.
Sampling
Water samples are drawn during validation and
routine monitoring of a water purification system.
This step is very critical and can cause water
quality failure if sampling procedure(s) are not
strictly adhered to. Details will be discussed in the
investigation section of this article.
Analytical issues
Both chemical and microbiological testing have
their own set of variables which could cause a
water sample to fail. It could be the instrument,
sample prep, or the procedure. Details will be discussed in the investigation section of this article.
Carbon Filter
Review the monitoring data for post carbon bed
to see if there was any proliferation of microbes,
which could have contaminated the system downstream.
Purification System
Deionization
Review the regeneration procedure and schedule for cation, anion, and mixed bed resin tanks to
detect any deviation, especially if the tanks were
Special Edition: Utilities Qualification
69
Shahid T. Dara
sitting idle for a long period of time after regeneration, thereby causing microbial contamination of
water. Also, the conductivity data for effluent water
should be reviewed to determine if the tanks were
changed as per schedule and not totally exhausted
before replacement.
Sanitization process
Review the water purification system sanitization procedure and frequency to determine if they
could be contributing factors in water quality failure, especially when residual chemicals or high/low
pH values are detected.
Reverse Osmosis
The reverse osmosis membranes should be
checked for integrity if these were exposed to high
chlorine source water. Also, the membrane backflushing procedure should be reviewed to determine
if it is effective in removing all the build up. The
reverse osmosis system sanitization procedure and
frequency should be checked to see if they need
any revisions, both in procedure and frequency.
Sampling
Draw multiple water samples on a daily basis
during validation and routine monitoring of a
water purification system. The sampling procedure and the individual samplers technique are
key to obtaining uncompromised water samples.
While investigating a water quality failure/incident,
the sampling process should be scrutinized in
detail. Review the following to determine if there
is any chance to compromise the integrity of the
sample:
Distillation
Ensure that the system was in operation per
approved specifications. If there was a shutdown,
was the system sanitized before start up? Check
that all the alarms and controls are functioning and
within calibration. Look for any dead legs in the
system as potential breeding grounds for microbes.
Storage and Distribution
Check the storage tank, distribution piping, and
all points of use for leaks or other physical defects.
Examine the vent filter on the storage tank for
integrity and to see if it is harboring any microbes
in the condensate. Check the heat exchanger and
chiller controls for proper function to assure the
water is maintained at its desired storage and circulation temperature.
If plastic pipes are used, like PVDF, etc., these
should be checked, as they tend to sag over time,
leading to potential dead legs and, therefore, could
promote microbial growth. The drain pipe from the
storage tank should have at least a two-inch gap or
twice the pipes diameter, whichever is greater,
between the pipe and the floor drain to prevent
back siphon of floor drain.
Controls, Alarms
Todays water purification systems have a number of controls and alarms to operate the system
within specifications while controlling the costs.
One should review all the controls and alarms in
case of a water quality failure/incident to see if they
are functioning properly and are within calibration,
where applicable.
70
Sampling procedure
The sampling procedure should be reviewed to
determine the level of detail and clarity of statement for a nontechnical person to understand it.
Also review the training requirements spelled out in
the SOP and audit training records.
Sampling technique
If sampling is a potential cause for water quality
failure, QA should review the sampling technique
and perhaps have a microbiologist watch the individual sampler conduct the actual sampling under realtime conditions. This will provide a wealth of information as to the effectiveness of sampling technique
as described in the sampling procedure and how
people are trained. The sampling procedure should
simulate actual practice when the system is used to
draw water for manufacturing or cleaning activities,
i.e., flush the system for 10 seconds before withdrawing water, etc.
Sample container prep
Water sample containers are specially prepared. Microbiological samples are taken in sterile
containers, while chemical samples are taken in
containers which have been specially cleaned and
rinsed with WFI to minimize contamination. While
investigating a water quality failure/incident, one
should also review the sample container prep practices. This could involve reviewing cleaning procedures and any studies done on these containers
after cleaning to determine the effectiveness of the
cleaning procedure. If presterilized containers are
Shahid T. Dara
obtained from an outside vendor, obtain access to
the vendors sterilization procedure and supporting
validation documents. Nonsterile sample containers have been blamed for false failures of water
samples.
Analytical issues
Chemical and microbiological tests are usually
performed by the quality control laboratory, and
this phase of investigation is best accomplished
if a chemist and a microbiologist are asked to
review different aspects of the analytical work. In
particular, the following should be closely examined:
Analytical instruments
Review analytical instruments to determine if
they are within calibration and performance limits.
Also check for any unusual repair or maintenance activity that might have affected the performance of the instrument.
Analytical procedures
Analytical procedures should be reviewed for
both chemical and microbiological testing to determine if there are any issues and if the procedures
adequately guide the analyst in a step-by-step process to execute the test.
Analyst training
Review training records for the analyst to make
sure he/she was qualified to perform the test under
review.
Sample storage and preparation
Water samples are usually transported to the
quality control laboratory, where they might sit for
a while before testing is conducted. Review sample storage conditions as well as the time elapsed
before testing was performed. Some companies
refrigerate water samples upon receipt and may
test them after 24 hours or so. This practice
should be discouraged, as it could result in suspect data. Also, review the sample preparation
techniques in the laboratory to assure that they do
not compromise the integrity of the sample.
Testing time limits
Water samples should be tested as soon as
they are received by the quality control laboratory.
However, if the company has a practice that allows
the samples to be stored for a limited time before
Personnel
This part of the investigation should determine if
there are any deficiencies in the training program
and if the people are qualified to perform their
assignments.
Procedures and Documentation Practices
All the procedures and documentation
involved should be reviewed to see if there is
need for revisions, or new procedures should be
prepared to supplement ones already in existence. Also, a determination should be made to
assess whether all critical data is being reviewed
by the appropriate people to make critical decisions (if needed).
71
Shahid T. Dara
72
Validating Building
Controls Systems
By Jeffrey L. Waters
Landis & Staefa
hy should a company
These recommendations must
validate its Building
be interpreted and implemented by
Controls System? Tothe individual facility operators,
Environmental
days international competition and
but other industry guidelines are
wary consumers mandate some kind
more specific. The ASHRAE 1995
control in drug
of quality control in almost every
Handbook HVAC Applications
industry. Voluntary compliance with
(pg. 13.8), [for chemical] Labmanufacturing
the International Organization for
oratory Ventilation Systems, states,
facilities
has
drawn
Standardization (ISO) is one of the
Minimum ventilation rates are
hallmarks of many successful busiincreased attention generally in the range of 6 to 10 air
nesses. The ISO 9000 standard is
changes per hour [ACPH] when
from the FDA in
even recognized by the Food and
occupied. Actual air change rates
Drug Administration (FDA) in
may be significantly higher in labs
the 1990s.
its internet file (ftp://ftp.fda.gov/
with a high concentration of fume
CBER/ misc/cgmp.txt). The princihoods. For example, a 30-by-50ples and practices elucidated in the
foot lab with 10-foot ceilings
ISO standards are not in conflict with those provided
(15,000 square feet) containing 10 fume hoods
by the cGMP (current Good Manufacturing Practices) exhausting 1000 cubic feet per minute each (a total
regulations, the FDA states in the file. Indeed, the
of 10,000 CFM) would experience a ventilation
voluntary ISO standards share common principles
rate of 40 ACPH. On the other hand, labs with a
with FDAs cGMP requirements.
single fume hood or bio-safety cabinet may require
Environmental control in drug manufacturing
supplementary general exhaust ducts to provide
facilities has drawn increased attention from the adequate air changes. Simple mechanical Constant
FDA in the 1990s. The cGMP (21CFR 211.46), last
Air Volume (CAV) systems are less expensive to
modified in 1995, says in part:
install and start up, but a computerized Building
Controls System (BCS) provides dynamic control
(a) Adequate ventilation shall be provided.
and monitoring of parameters such as air pressure
(b) Equipment for adequate control over air presand humidity. Variable Air Volume (VAV) controls
sure, micro-organisms, dust, humidity and tem- minimize energy usage by reducing supply and
perature shall be provided when appropriate for exhaust flow when fume hoods are closed or the
the manufacture, processing, packing, or holdfacility is unoccupied.
ing of a drug product.
Air filtration in most critical applications is pro(c) Air filtration systems, including pre-filters and
vided by High Efficiency Particulate Air (HEPA) filparticulate matter air filters, shall be used on air ters. Strict specifications (such as Military Standard
supplies to production areas when appropriate.
MIL-F-51079B for fire resistant biological filters)
Special Edition: Utilities Qualification
73
Jeffrey L. Waters
74
Jeffrey L. Waters
75
Jeffrey L. Waters
76
Name: _______________________________________________
Title:_________________________________________________
Company: ____________________________________________
Address: _____________________________________________
City: _________________________State: ________Zip: _______
Telephone:____________________________________________
Fax: _________________________________________________
E-Mail: _______________________________________________
Subject: ______________________________________________
A Pocket Guide to
uditing a
Pharmaceutical Water System
Control of water
production and its
usage are critical
in producing
a product . . .
by
Graham Bunn
Manager, GMP Audit
AstraZeneca
77
Graham Bunn
Documentation
All systems require complete and accurate documentation including qualification, maintenance,
change control, investigations, and analytical/microbiological results to provide evidence that the system is in a state of control. Documentation should
be checked against the SOP requirements applicable at the time the work was performed and against
current industry standards. The current revision of
the schematic diagram must accurately reflect the
actual system and be authenticated by a suitably
qualified person. The auditor can use a copy of the
diagram as a checklist during the tour. The date of
the diagram should correlate with the last change
control if physical changes were made that required
changes to the diagram. A typical water system is
shown in Figure 1.
The following documentation and SOPs can be
requested for review in the audit conference room:
Maintenance records for system components.
These must be completed in compliance with
the SOP requirements and provide a complete record.
Qualification documentation (installation,
operational, and performance). The qualification must be performed against a suitably
approved protocol before the initiation of the
work. The results must meet predefined
acceptance criteria or be adequately justified.
Change control log and supporting documentation. The dates that the system was
approved for use should be compared to any
Figure 1
UV 254 nm
78
Softener
Circulation
Loop with
Points of use
Acid
Steam
Jacketed
Storage
Tank
Reverse
Osmosis
UV 254 nm
Mixed Bed
Ion
Exchange
Cationic /
Anionic
Exchange
Beds
Filter
Graham Bunn
floor and especially from leaking pipes is cause for
concern. This is the first indication of the care and
attention the area receives from the maintenance
staff. Some of these areas are operated and maintained to a high standard. In a larger facility this
may be maintained by the dedicated engineering
staff compared to the smaller unit, which may be
supported by other staff, but cGMP requirements
are the same irrespective of the water being produced by the system. Area and equipment log
books may be requested at this time, as it is sometimes more useful for the auditor to examine these
in situ. This also enables assessment of the individuals responsible for the areas in their own environment. The SOPs applicable to the individual plant
areas should be easily accessible so that users can
refer to them whenever necessary.
Generation
Resin bed cartridges sent to a contractor for
regeneration should be dedicated to the company
to minimize any potential for contamination from an
unknown user. Any chemicals used in the system
for sanitization, regeneration of resins, etc., must
be adequately stored, labeled, and as with any
component of a pharmaceutical product, quarantined, tested, and released for use by Quality
Control. A note of readings on gauges and digital
readouts should be made for future reference and
checked against operating ranges in the qualification documentation. Any readings that appear to be
at the upper or lower end of the ranges or are fluctuating erratically should be investigated further. All
major components of the system should be examined for general condition and appearance.
Excessive leaking or rusting are an indication of a
problem area, which warrants further investigation
and explanation.
79
Graham Bunn
antine and subsequent testing against an
approved protocol with predefined acceptance criteria and ultimately release for use by QA.
Summary
Water systems are complex and one of the critical components in a sterile manufacturing facility.
Failure of any part of the system could cause multiple problems and potentially result in a product
recall. Adherence to SOPs, strict maintenance of
change control, and clear definition of responsibilities will assist in minimizing potential problems.
Meeting expectations of this guide and checklist
80
Graham Bunn
will not ensure that your facility will not receive an
FDA form 483. Auditing is based on education,
experience, competency, and instinct. It cannot
solely be taught in the classroom but also has to
be learned by practical application.
Good luck in passing your next inspection as I
may be the auditor at your door.
References
1. Current Good Manufacturing Practice for the
Manufacture, Processing, Packaging or Holding of
Drugs; General. 21 CFR part 210. Current Good
Manufacturing Practice for Finished Pharmaceuticals.
21 CFR part 211.
2. Preamble, 1978 GMPs: Federal Register, 29
September 1978 (Vol. 43, No. 190, pp. 45013-45336).
Literature Sources
1.
2.
Quality Improvement
HANDBOOK
What is Quality Improvement? The Role of the Quality Unit in Achieving Company Success
Prevent Negative Regulatory Experiences Satisfy Customer Quality Expectations Identifying and
Implementing Quality Improvements Identifying and Implementing Quality Cost Reductions
The Impact of Quality Philosophies on Quality Improvement
Production-and Sales-Driven Quality Paper- and Procedure-Driven Quality Pharmaceutical Elegance
Quality Based on Conformance to Requirements Statistics-Based Quality Reduction of Variability
Can Term Limits Improve Quality Decision-Making?
Preventing Risk Creep Maintaining a Sense of Criticality Rotate Jobs Actively Participate in Industry Groups Establish Clear and
Complete Documentation to Guide Decisions Personal Motivation
Corporate Consolidation: A Tool for Quality Improvement?
Recognizing That Job Security is a Myth Impact of Corporate Consolidations on the Quality Unit Practical Steps for Marrying Different
Quality Systems or Cultures
Quality Through People: Three Things Every Employee Desires
Treat Employees With Respect Help Employees Feel Their Work is Important Give Employees the Ability and Freedom to Impact Their Job
20 Practical Suggestions for Improving Your Quality Operation
Contact Us Today!
PO Box 6004, Duluth, MN 55806
Tel: 218-740-7028 888-524-9922 U.S. Only Fax: 218-740-6308
E-Mail: [email protected] Web Site: www.ivthome.com
Only
$
49. 00
81
Graham Bunn
Yes, No, NA
or Information
Feed Water
What is the source for the plant water (city or private supply well ground water,
or surface water)?
Is source water entering the facility, whether from a municipal supply or a private
well, tested for microbiological contamination, and what are the specifications?
Is coliform bacteria testing performed according to 40 CFR 141.14; 141.21?
Is source water entering the facility tested for chemical contamination, or are
municipality reports provided?
Does the water meet the EPA specifications for potable water?
What is the frequency of testing?
If the results are provided by the water supplier, are they reviewed and approved
by a suitably qualified user?
What actions are taken if specifications are not met?
If the water is being tested by the user, is a written SOP describing sampling
and testing available?
82
Graham Bunn
83
Graham Bunn
84
Graham Bunn
85
Graham Bunn
Purified Water
Microbial >50CFU/ml alert level. >100 CFU/ml action limit. (Note: These may
vary by company).
Conductivity
Stage 1: Uncorrected for temperature or carbon dioxide. Sample limit
is 1.3S/cm. On-line method.
Stage 2: Carbon dioxide and temperature corrected. Sample limit is 2.4S/cm.
Stage 3: Utilizes a sliding pH scale to determine conductivity acceptability.
Apparent Total Organic Carbon 500ppb limit response.
Note that water usage may direct the appropriate specification e.g., antacids
do not have an effective preservative system and require an action limit commensurate with their formulation.
86
Facility Validation
Validating USP Purified Water, Compressed
Air and HVAC Systems
By Jean-Pierre Thiesset
Alcon Laboratories, Inc.
A validation plan
does not necessarily
need to be an
all-encompassing
100-page
document.
A United States Pharmacopoeia (USP) purified water system that produces USP purified
water for use in component and
final product cleaning. This water
is not used as a constituent of the product itself.
A compressed air system, which generates oil
free air, used in manufacturing processes to blow off
components and final products. This system also supplies compressed air to manufacturing equipment.
A heating, ventilation and air conditioning
(HVAC) system that controls temperature, humidity
and differential pressure for a class 100,000 controlled manufacturing environment (CME).
Successful facility validation requires organization, attention to the different systems and processes
one-at-a-time, and patience. It is important not to try
to complete the validation before it starts.
The first step is forming a validation team. The
importance of assembling a team that includes all
interested parties at the beginning of the project is
obvious. At a minimum, this team should include, representatives from facilities, manufacturing, quality,
validation engineering and information technology.
87
Jean-Pierre Thiesset
6. Planning and organization: project goals, objectives and expected benefits, project organization, constraints, impact on existing systems
and operations, proposed time line and major
milestones.
7. Validation methodology: broad overview of
the validation approach to be taken.
8. Validation responsibilities: consider the suppliers responsibilities as well as those of the
validation team.
9. Validation procedure. Installation Qualification (IQ), Operational Qualification
(OQ) and Performance Qualification (PQ)
requirements. List the specific protocols
which must be implemented, (usually one
per system, or one for each specific IQ, OQ
and PQ). Note: List only major tests that
must be included in each qualification. It is
not necessary to provide explicit detail
within the scope of this document. (The
detailed procedure for executing a qualification of a particular system will be specified
within a specific protocol for that qualification).
10. Validation deliverables. These might include
supplier qualification, operational procedures,
process documents, preventive maintenance
schedules for each piece of equipment, training plans, and other documentation.
11. Acceptance criteria. List the acceptance criteria for the validation project plan.
12. Attachments. It may be helpful to use a check
sheet format that contains the list of specific
protocols to implement. This section should refer to supporting documentation, such as drawings, flowcharts, and Gantt charts.
The most difficult part of a USP purified water system validation is not the OQ, but the IQ. An important
part of a quality USP purified water system resides in
its architecture, piping, valves characteristics, and
installation method. Knowing that, it becomes evident
that the validation must start even before the first pipe
is installed by the choice of the right company to perform the soldering, installation and verification.
It is recommended that vendor selection criteria
include a requirement for the vendor to provide a
quality assurance plan for the project. Their plan
Jean-Pierre Thiesset
Figure 1
4
5
6
Test Designation
Drawings and
schematics review.
Manuals review.
Major components
identification.
Major components installation.
Connections verification.
Wiring verification.
Tagging verification.
Utilities verification.
Plant capacity.
10
Personal computer
software installation
(if applicable).
11
Program review
(if applicable).
12
Supplier validation
questionnaire review.
13
Equipment verification
by a safety officer.
Calibration verification.
2
3
14
Test Description
Verify that drawings and schematics are available for the following when
applicable: major components, connections, wiring, inter-connections, piping.
Verify that a manual is available for each major component.
Record the following for each major component: designation, brand,
model, serial number.
Verify that each major component is correctly installed.
Verify that connections conform to drawings and schematics.
Verify that wiring conforms to drawings and schematics, and wires
and cables are identified at both ends.
Verify that valves, gauges, relays, contractors and fuses are identified
and tagged according to drawings and schematics.
Verify that the following utilities conform to manufacturer specifications
when applicable: power supply (voltage), air pressure and quality,
water pressure and quality.
Verify that the plant has the capacity to produce the required utilities
without impacting the existing processes.
Verify that the computer is in compliance with the minimum software
requirements, that the software is available on appropriate medium (e.g.,
CD-ROM, diskette), that no error message is displayed during the
software installation, and the software main menu can be displayed
after installation. Verify that the software is compatible Year 2000 (i.e.,
will continue to operate correctly on January 01, 2000 and the years after).
Verify that program listing (source code) and functional flowchart are
available for review, that the program is correctly commented and
contains no dead code, and the program has been saved for backup
(current and previous versions saved on separate directories or drives).
This is a questionnaire sent to the supplier of pieces of equipment which
contain hardware or software ensuring that the supplier has a software
quality assurance system in place. It is used to evaluate the extent of validation
testing required.
A safety officer must verify that the equipment is safe for use in a
manufacturing environment.
A representative from the metrology department must verify that pieces of
equipment which required calibration have been calibrated, and that a
rationale has been written for the pieces of equipment which do not
require calibration.
89
Jean-Pierre Thiesset
30 minutes. It is critical to ensure that the power supply to the UV lights is shut off during the sanitizing
cycle preventing a deterioration of the UV lights.
Ideally, the system is designed to automatically cut
the power supply to the UV lights when the temperature reaches 50C, (122F), and turns it back on
when the temperature comes back under 40C
(104F). For safety, it is important to install a pressure release valve in order to allow the release of the
excess pressure generated during the sanitizing cycle
when the temperature increases. This valve must be
checked ensuring it is working properly.
The next step is verifying that the control system is
operating as necessary. The control of the resistivity,
temperature and other parameters are performed by a
computerized system. First, it is necessary to verify
that the values recorded by the control system conform
to the actual values. One method to do this is measuring all the parameters with calibrated instruments.
Record the date and time the measurements are taken,
along with the values obtained. Compare these manually obtained values to those recorded and saved by the
control system during the same period. During the
OQ, it is necessary to verify that the control system
acts and reacts as it is intended. For example, the system must maintain temperature at an acceptable range,
activate correct indicator lights based resistivity readings. The system may also generate customized special reports or exception reports. An important fact to
remember is that all computerized systems, including
most of todays USP purified water systems, contain
software programs which need to be validated.
During the operational qualification, chemical
and microbial tests will be performed. It is important
to define the testing frequency conducted at each
point-of-use. At a minimum, chemical tests consist
of the following:
Description
Resistivity
pH
Total solids
Chloride
Sulfate
Ammonia
Calcium
Carbon dioxide
Heavy metals
Jean-Pierre Thiesset
Figure 2
Test
C
H
E
M
M
I
C
R
O
B
I
A
L
POU
X
Loop
N/A
A
A
B
B
A
A
B
B
A
A
A
A
A
A
A
A
A
A
B
B
B
B
B
B
B
B
B
B
Days
Ctrl
Begin
End
Begin
End
Begin
End
Begin
End
POU-A1
POU-A2
POU-A3
POU-A4
POU-A5
POU-A6
POU-A7
POU-A8
POU-A9
POU-A10
POU-B1
POU-B2
POU-B3
POU-B4
POU-B5
POU-B6
POU-B7
POU-B8
POU-B9
POU-B10
1
X
X
X
X
X
X
X
X
X
X
Operational
Qualification
2
3
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
4
X
X
X
X
X
X
X
X
X
X
5
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Performance Qualification
Phase 1
6
7
8
9 10
X
X
X X X
X
X
X X X
X
X
X X X
X
X
X X X
X
X
X X X
X
X
X X X
X
X
X X X
X
X
X X X
X
X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
11 12
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
= Point of Use
= Test to be performed
= Sanitizing Cycle to be Performed
Oxidizable substances
As the system is stated to be a USP purified water
system, the acceptance criteria for these chemical tests
must comply with the USP purified water specifications.
The chemical tests must be performed at points located
as close as possible to the beginning and end of each
loop, and at a control point located before the purification system. (This control point should fail the test, as it
is located before the purification system). The microbial
tests must be performed at each point of use. The validation acceptance level for Colony Forming Units
(CFUs) per ml should be below the alert level. For examSpecial Edition: Utilities Qualification
91
Jean-Pierre Thiesset
Figure 3
USP Purified
Water System
Yes
No
Yes
Yes
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Compressed
Air System
No
Yes
No
No
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Air
Handling System
No
Yes
No
No
No
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Jean-Pierre Thiesset
leak testing followed by verification that all equipment and measurement tools were appropriately calibrated will conclude the IQ.
93
Jean-Pierre Thiesset
Jean-Pierre Thiesset
95
Jean-Pierre Thiesset
Jean-Pierre Thiesset
Figure 4
________.
________.
________.
________.
Room #:__________.
Date: ____________.
Performed by:________________________.
%RH at 3:
Temp at 3:
%RH at 8:
Temp at 8:
East
North
South
%RH at 3: ________.
Temp at 3: ________.
%RH at 8: ________.
Temp at 8: ________.
______.
______.
______.
______.
West
%RH at 3:
Temp at 3:
%RH at 8:
Temp at 8:
________.
________.
________.
________.
Instrument ID #: __________________.
Calibration Date:__________________.
Calibration Due Date:______________.
%RH at 3: ________.
Temp at 3: ________.
%RH at 8: ________.
Temp at 8: ________.
The PQ of the HVAC system consists of the monitoring of the following parameters every hour over
at least thirty consecutive days:
Temperature. A typical acceptance criteria
could be > 20C (68F) and < 25C (77F).
%RH. A typical acceptance criteria could be >
30 %RH, and < 65 %RH.
Differential pressures. Acceptance criteria is
very specific and based on use and product requirements.
Always assure that all acceptance criteria is consistent with those defined in the approved system
specification for each particular case
A temperature and %RH Mapping might be performed for each room at the end of the thirty day
testing period to confirm that the entire room is still
in compliance with its specifications.
The PQ concludes with verification of calibration
status of all equipment, and assuring that all measurements made during the testing phase are acceptable.
97
Jean-Pierre Thiesset
References
1.
2.
3.
4.
5.
6.
Membersh
ip
Only
$
99. 00
A Year
Our
Mission
To expand the global knowledge base for validation and compliance professionals
in FDA-regulated industries through the development of academic journals, timely
educational conferences and exhaustive documentation. By creating a cooperative
forum between industry experts and FDA personnel, IVT is dedicated to advancing
validation technology and practice and assuring compliance with regulations.
99
100
101
102
103
104
105
106
107
108
109
This articles
covers the
pertinent aspects
of IQ, OQ, and
PQ related to
process gas
systems and many
of the potential
problem areas.
Design Considerations
Jeff Hargroves
Figure 1
Typical
Acceptance Criteria
90-110 psig
Flow, min.
10 scfm
Temperature, max.
90F
Purity
Particulate
Microbial
Dewpoint
Hydrocarbon
Characteristic
Pressure, min. & max.
Dewpoint
Carbon Monoxide
Carbon Dioxide
111
Jeff Hargroves
equipment and motors in the process areas. In classified (such as 100,000, 10,000, and 100) areas,
where process gases directly contact the product,
final filters are advisable.
Point-of-use filters should be in place, or at least
considered during PQ of the system. Many companies qualify the system without the point-of-use filters in place to ensure system integrity even if the filter develops a leak during its use.
Filter model numbers should be documented, and
controls should be established to ensure the same filters are used over the life of the system. The manufacturer may vary, but critical characteristics, such as filter materials, flow rate, and particulate filtration levels
must be maintained. This information can be documented in the system or equipment SOPs, or in the
maintenance management system. The filters found in
the system two years after the initial qualification must
have the same critical characteristics as the filters that
were originally designed, specified, and qualified.
Final filters serving class 100, or cleaner areas,
should be integrity tested. The frequency of testing
should be commensurate with their use. For this reason, it is often advisable to locate the filters outside
the process area. A common design approach is
using medical grade copper in the distribution system, transitioning to stainless before entering into
process areas, with dielectric couplings at the transition. This transition point is usually a good place to
locate the systems final filters.
personnel can test the alarms much faster than someone who is unfamiliar with, and could possibly damage the equipment. Plus, the tests usually take only a
few hours with someone familiar with the equipment, versus a few days for someone who does not
work regularly with the equipment.
For high purity gas systems, requirements for the
material in product contact closely mirror those of a
high purity water system. All new high purity systems should be pressure tested, cleaned, and flushed
according to preapproved procedures. For stainless
steel lines serving aseptic process areas (downstream of final filters), the weld maps should be
matched to the weld logs and to the material certifications. If passivation has been specified, its proper
execution and flushing should be verified.
Jeff Hargroves
ational scenarios. This includes testing each compressor in a lead and lag position.
Backup compressors or gas cylinders should be
tested with the rest of the system. All potential operating scenarios should be explored during the operational qualification process. If an operating scenario
affects the quality of the gas produced, it should be
incorporated into the hydrocarbon, dewpoint, and
microbial testing.
Pressure
Although pressure is probably the simplest characteristic to measure for a large system, a bucket full
of fittings may be needed to provide connections to
Flow
The flow rate of each point-of-use should be
measured to verify that user requirements are met.
However, for many drops, there may be no predetermined user requirement. Typically, a baseline
flow measurement is taken for each drop, whether
or not it has a predetermined specification. By
obtaining a flow rate measurement for each use
point, a comprehensive document is established,
which can be used in the future to help make decisions about whether the system can support a new
piece of equipment. For example, if on initial test,
only 10 scfm could be obtained, it is clear that the
line size or supply pressure will need to be increased
to support equipment that requires 25 scfm.
Performing the flow test at each drop also provides a visual check for large pockets of stagnate
water in the pipeline. This can be important because
dewpoint measurements may not be performed at
all locations. Condensate may form in the lines
during the initial installation of a system, or after an
old portion of an existing system has not been used
for an extended period. If water is found in the line,
the system may not have been adequately cleaned
and flushed.
Flow rate diversity tests should also be performed
to identify how many (and which) points-of-use can
be operated simultaneously. For a new system,
diversity values should be predefined in the design
documents. For existing systems, a few interviews
with the equipment users should provide sufficient
information for educated assumptions about simultaneous use of equipment. Simultaneous recording
of flow rate and supply pressure at critical points-ofSpecial Edition: Utilities Qualification
113
Jeff Hargroves
use provides very useful information about the ability of the system to perform as designed.
Flowmeters can be found in most process equipment and instrumentation catalogues. A good contract calibration company should be able to calibrate
the flowmeter, and provide a standardization table
for each process gas.
Purity
Dewpoint
Dewpoint can be a difficult characteristic to measure. The equipment used to measure dewpoint
If claims are made about the purity of the process include chilled mirror, moisture level conversions, and
gas, then testing should be performed to demon- others. The chilled mirror method is usually accurate
strate that the appropriate specifications are met. A enough to meet the process requirements. Alternsample is typically obtained into a vacuum conatively, Draeger tubes (or their equivalent) can be used
tainer or bag that can be transported to a laboratory.
to measure moisture levels in ppm, which can be converted
to
dewpoint.
Additionally, there are handFor more reliable, precise data, a gas
held measurement instruments that can be submerged
sample can be obtained for
in the process gas to provide
laboratory analysis.
dynamic measurements.
It is important that the
The methods used to obtain the sample, and to
dewpoint measurement be taken at the correct temperdemonstrate purity should be carefully documented
ature and pressure. The dewpoint conversion informaand reproducible.
tion provided by manufacturers is often only applicable at atmospheric pressure and standard temperature.
Hydrocarbon
Measurements taken at other pressures and temperatures must be converted to ensure that the system specAmong the many ways that hydrocarbon tests can
ifications are met. Measurements taken at high presbe performed, the most common is the use of Draeger,
sure can also damage the measurement equipment.
or equivalent, tubes to indicate the approximate level
Particulate
of contamination. These indications are generally not
traceable to a standards bureau, such as NIST, but
Most standard particle counters can be used to
they are a reliable, repeatable, and commonly
measure particulate levels in process gases. The
accepted method for discerning system contaminasame caution with respect to pressure also applies to
tion.
For more reliable, precise data, a gas sample can particle monitors. The supply gas is limited to very
low pressure thresholds. The monitors usually conbe obtained for laboratory analysis. This is usually
necessary for demonstrating compliance with tain their own pump because they are mainly used
for collecting samples from room air.
breathing air standards. Most large contract environFlow must also be carefully controlled during
mental testing laboratories provide the vacuum conparticulate measurement. Particle counters are usutainers used to obtain and transport the sample.
ally designed to pull the sample at 0.1 or 1.0 cfm.
Hydrocarbon measurements should be taken near
Most particle counter manufacturers can provide a
the source during maximum load conditions to
ensure that minimum system requirements are met. dispersion tube that can be used to bring the gas
down to the required flow and pressure.
They should be tested at points-of-use where prodThe calculations provided in Federal Standard
uct will be contacted. Bracketing should be used on
209E can be used to translate the sample measurelarge systems to keep the number of tests to a man114
Jeff Hargroves
ment to a specific confidence level for the room classification being tested. Again, the particulate level
should correspond to the particulate level of the room
into which the process gas is being exhausted.
Microbial
Microbial air samples can also be difficult to
obtain. A variety of sampling devices, such as slit-toagar, centrifugal, and direct impact, can be used. The
best method will closely mirror the sampling technique used for open air measurements in your facility.
In recent years, sampling devices have been
designed specifically for process gas sampling. A
sampling atrium can be used to pull samples directly
from the process gas line. The sampling atrium can
be sterilized between uses to ensure that it does not
add to the microbial load of the sample. An agar
plate, such as that used for room air sampling, can be
easily and aseptically placed into the atrium for sample capture. The amount of air that passes over the
agar plate should match that of a typical room air
sample, usually at least 40 liters.
Summary
If it is approached methodically, validation of process gas systems should not be an overwhelming task.
The potential impact of the specific system on the
product and the process must be considered.
Execution of a well-developed plan that demonstrates
conformance to the predefined criteria should be simply a milestone on the way to a validated facility.
Post Validation
After the initial qualification, process gas systems
should be maintained in a qualified state. To accomplish this, the following actions should be taken:
Utilize change control.
Develop preventive maintenance (PM) and
operational SOPs.
Calibrate any critical instruments.
Train mechanics and operators on the SOPs.
Point-of-use filters should be included in a PM
program. All point-of-use filters can be changed by
maintenance personnel at a specified frequency,
such as semiannual. Alternatively, point-of-use filters are considered part of the process equipment
that it serves. In this method, production operators
are responsible for checking and replacing the filter
as part of the equipment setup. The main benefit of
this approach is that filters are maintained with the
same frequency as the equipment. If equipment is
not used, money is not wasted on filters, but if equipment is used frequently, the filters receive a corresponding level of attention.
Special Edition: Utilities Qualification
115
Purified Water
Water Systems:
Systems: AASystem
Purified
System
PerspectiveUnder
Underthe
theNew
New
Perspective
USPQuality
QualityRequirements
Requirements
USP
By Tod E. Ransdell
Sanofi Pasteur
O
Editors Note: Figure 1 has been
included to define specific terms
appearing in this article.
117
Figure 2
requirement; NCCLS Type II Water is of lesser quality, but is generally good quality DIW; NCCLS Type
III Water is deionized water that is primarily required
for glassware rinsing functions.3 (See Figure 2).
119
121
Management Considerations
in Water Purification
Systems Validation
By Shahid T. Dara
Schwarz Pharma Inc.
Figure 1
Cleaning Agent:
Universal rinsing agent for equipment, solvent
for detergents/sanitizers.
Solvent:
Base for all aqueous liquids, injectables,
suspensions, ointments.
Granulating Agent:
For wet granulation preparation.
Diluent:
For lyophilized powders, reconstitution of
suspensions.
Shahid T. Dara
Figure 2
Potable Drinking Water: Meets EPA specifications
for drinking water (40 CFR 141).
USP Purified Water: USP 23, 1995, pp 1637.
USP Water-for-Injection: USP 23, 1995, pp 1635-1636,
USP Bacteriostatic Water-for-Injection: USP 23,
1995. pp 1636.
USP Sterile Water-for-Injection: USP 23, 1995, pp
1636-1637.
USP Sterile Water for Inhalation: USP 23, 1995,
pp 1636.
USP Sterile Water for Irrigation: USP 23, 1995, pp
1636.
turers involved citations for water system deficiencies. It is therefore prudent, both for regulatory
compliance and business profitability, to have a
team of experts to manage and conduct this validation.
Validation Team
Who should be part of the Water System Validation Team?
Considering the technical aspects of the project,
the following disciplines should be represented
along with their primary areas of responsibility:
Engineering:
Concept and design of water system
Water system drawings per design
Installation, operation, and performance qualification of the system
Instrument calibration
Preventive maintenance schedules and
procedures
Water system drawings as built
Manufacturing:
End user of the product
System capabilities and limitations vs. plant
manufacturing needs
Operation of the system and usage criteria, i.e.,
flushing before use, etc.
Sampling of water
Quality Assurance:
Define SOP requirements for each phase of
validation
Change control procedures
Water sampling procedures
Employee training requirements
Quality Control Laboratories:
Chemical and microbiological testing
Test methods
Alert and action limits
Validation:
Project supervision
Prepare the protocols
Coordinate all validation activities
Collect all documents
Manage validation change control
Compile final reports
Coordinate review and approval of protocols
and final reports
Commissioning of the water system
Once the water system validation team is assembled, the project should be defined in detail, with
timelines established for completion and review/approval of all critical phases. Also, it should
be established who will be responsible for final
review and approval of the water system validation
before the system is commissioned for use.
Special Edition: Utilities Qualification
123
Shahid T. Dara
Concept
System design
Vendor/s selection
Water system drawings
Sampling plan
Installation qualification (IQ)
Operation qualification (OQ)
Performance qualification (PQ)
Final reports, reviews, and approvals
Ongoing monitoring
Revalidation
Concept:
The quality of water produced and the manufacturing needs of the plant determine the purification
technology to be used. While defining the desired
water quality and the manufacturing needs, one must
authority to ensure the source water meets the compendial requirements for drinking water. During
the design phase, the team should consider the initial cost of the system components as well as their
long-term maintenance costs. The design team
should consider the following when defining the
design specifications:
Pretreatment of Feed Water:
This is especially true for reverse osmosis membrane systems and is also needed to account for seasonal variation in source water quality. Pretreatment
is intended to minimize maintenance of the actual
purification system and could include the use of
dechlorination, depth filters, carbon filters, and
water softeners. Each step of pretreatment should be
duly documented along with operating procedures
for cleaning and sanitization to comply with validation requirements.
Purification of Water:
Source water can be purified by deionization,
reverse osmosis, or distillation. Each purification
technique has its merits and demerits. However, the
selection should be based on
eventual use of the purified
A team approach is the most effective
water and the compliance
benefit/risk analysis, as there
way to accomplish this very
could be a substantial cost
difference in switching from
complicated undertaking.
one purification technology
to another. Generally, USP
Purified Water is water obtained by deionization,
consider current requirements, as well as any future
reverse osmosis, or distillation, while USP Waterexpansion possibilities, thereby building flexibility
for-Injection is water purified by distillation or by
in the system to expand if needed. Validation should
reverse osmosis.
have a thorough understanding of the purification
technology, as it will help in preparing effective valDeionization:
idation protocols.
Deionizers remove solids that are ionic in nature
from source water. Cation exchangers replace posWater Purification System Design
itively charged ions, like calcium and magnesium,
with hydrogen ions. Anion exchangers replace negIn designing a water purification system, the
atively charged ions, such as phosphate and sulfate,
quality of the source water must be considered.
with hydroxide ions. When used in series, a cation
Local water authorities can provide some vital
exchanger and an anion exchanger combine to
information as to the historical data on source
deliver nearly pure water. Use of mixed bed deionwater quality as well as any seasonal variations in
izers, containing both cation and anion resins, genthe water quality. Also, periodic water test reports
erally generate the best quality water. In deionizashould be obtained routinely from the local water
124
Shahid T. Dara
water, meeting the USP Water-for-Injection monograph. However, reverse osmosis has its own limitations:
High pressure of feed water can damage the
filter membrane.
Reverse osmosis filter membranes are not
absolute and can let microbes pass through.
Fine contaminants, like silica, can pass
through these membranes.
Most reverse osmosis filter membranes are not
resistant to chlorine. Therefore, the feed water
has to be dechlorinated, leading to a high
bioload for the membrane to handle. This
could cause microbial contamination of the filter membrane and would require periodic sanitization.
Scale formation at the filter membrane surface
is another problem which could limit the effective filtration area.
Distillation:
Distillation is the most popular method of water
purification and can produce both USP Purified
Water as well as USP Water-for-Injection. Feed
water is boiled to make steam, leaving behind the
contaminants in a liquid state. The steam is removed
from the boiler and condensed into water, either
using a cooling heat exchanger or compression.
Distillation can purify up to 95% of feed water and
the efficiency can be increased by using multiple
stills. The liquid concentrate of the contaminants is
removed from the still by a process referred to as
Blowdown. Distillation does reduce the endotoxins
level of feed water: however, the feed water must be
reasonably free of microbes and endotoxins to produce Water-for-Injection.
Initial cost of a distillation unit and attendant controls along with ongoing maintenance is a major
investment and can run into hundreds of thousands
of dollars. Inappropriate design or operation of a distillation unit can be very costly. If the system is idle
for any reason (routine maintenance) for a period of
time, the feed sections of stills become dead legs and
could harbor microbes. The still must be cleaned and
sanitized before restarting, otherwise a mixture of
water and microbes can enter the still and contaminate the whole system.
Special Edition: Utilities Qualification
125
Shahid T. Dara
Heat Exchangers:
If purified water is to be stored after production
and has to be recirculated, then there will be a
need for heat exchangers to maintain the water
temperature above 80C 85C during storage.
Also, there will be a need for heat exchangers
(with adequate chill water flow), to cool the hot
water to ambient temperatures before it is used.
For a facility working eight to ten hours a day, the
system should be designed to operate in a thermal
cycling mode. At the beginning of a work day, the
heat exchanger with adequate flow of chill water
will decrease the temperature of stored and recirculating water to 25C. The inlet temperature for
the chill water should be about 12 13C and the
outlet temperature would be about 18C. The flow
rate of the chill water is determined by the volume
of water to be cooled. At the end of a work day, the
recirculating loop operating at 25C is heated to 80
85C, using facility maintenance steam which
also maintains the temperature of water in the storage tank. All heating and cooling operations are
performed and controlled by a dedicated heat
transfer and control system associated with the
jacketed and insulated water storage tank.
For continuous-use operations, the water in the
storage tank and the recirculation loop is maintained at 80-85C, and it is at the point of use drops
where the water is cooled down to 25C using
chiller water.
Storage Tank:
The purified water storage tanks material of construction should be such that it does not compromise
the integrity of the purified water stored inside.
Preferably, it should be constructed from stainless
steel and should be equipped with vent filter attachments which allow for easy replacement of the filter.
Distribution Piping:
Purified water is distributed over varying distances in a manufacturing facility. The piping
could be made of stainless steel or PVDF. Both
materials are inert and easy to sanitize. One
should be aware of the dead legs in the piping system and should keep these to a minimum. System
sanitization could be a routine activity based on
the data gathered during validation and daily
126
Vendor Selection
Selecting vendors of a water system components
should be based on a vendors reputation in the pharmaceutical industry, and consideration should be
given to the following:
Prior experience in pharmaceutical industry
water system design, installation, and operation
Knowledge of pertinent regulatory requirements
Ability to provide documentation when required
Training capabilities
On-site technical support
The design team should develop a standardized
questionnaire for prospective vendors. Also, it
should ensure that each vendor has the ability to
document the work performed per validation protocols. Suppliers/vendors should be paid only when
Shahid T. Dara
validation certifies that all necessary services, documents, etc., have been provided and meet the validation requirements.
Sampling Plan
Sampling plans should be critically evaluated
before adoption in validating a water purification
system. The FDA Guide to Inspection of High
Purity Water Systems details the Agencys
expectations. The initial sampling plans during
OQ are meant to assess the systems ability to perform as a unit and produce water of desired quality. The samples should be taken daily (seven days
a week) and analyzed for both microbial and
chemical contents. If the system is equipped with
heat exchangers/water chillers, the water temperature profile should also be determined at this
point.
During PQ, sampling and testing can be divided
into two phases. Initially, the samples should be
taken seven days in a row. During this time, multiple samples might be pulled from each site each
day. If the results are satisfactory, the sampling
could be reduced to five days a week for the next
four weeks. This will mimic the routine operational
activities, when there is no activity over the weekend and holidays. The samples are again tested for
chemical and microbial contents. The water temperature profile is also established during this
period, measuring the water temperature distribution within the storage tank, distribution loop, and
at the points of use drops.
Installation Qualification
As the design is finalized, validation personnel
should start developing the qualification protocols.
This will enable the engineering personnel to
obtain all necessary documents from the different
vendors as the components are being purchased.
Also, this will help technicians to verify that the
water system components are being installed per
design and each component meets its specifications. If the vendor is involved in the installation
of the equipment, a copy of the IQ protocol should
be provided to their technical staff. This ensures
that the vendors engineers and technicians understand the validation requirements and are familiar
with the documentation.
The IQ protocol should detail the following:
System description
Scope of qualification
Responsibilities
Incoming components specifications and inspection
Installation verification
Utilities installation
Critical instrumentation calibration
Software qualification, if needed
Preventive maintenance procedures
Documentation
System drawings as installed
SOPs
Summary report and conclusions
Operational Qualification
Following successful installation of all the components, the water system should be commissioned
for operation after testing each component ( and the
water system as a whole), assuring that it operates
per manufacturers instructions and specifications.
All the controls should be operating within limits,
and critical instruments should be within their calibration period. The IQ must be completed before
starting the OQ.
The OQ protocol should detail the following:
System description
Scope of qualification
Special Edition: Utilities Qualification
127
Shahid T. Dara
Responsibilities
Critical instrumentation calibration
System cleaning/sanitization procedures and
frequency
Sampling plan
Daily for two weeks
Sampling points
Source water
After each critical step in the purification
process
Storage tank (temperature profile and
water quality)
Circulation loop (temperature profile only)
At each point of use (temperature profile
and water quality)
Sampling procedures
Testing requirements
Testing methodologies
Acceptance criteria
Documentation
SOPs
Summary report and conclusions
Performance Qualification
Once the IQ and OQ are completed, the water
system should be qualified to prove that it is capable of producing water of desired quality consistently over a period of time under varying seasonal
conditions.
The OQ protocol should detail the following:
System description
Scope of qualification
Responsibilities
Critical instrumentation calibration
Sampling plan
Initially one week
Daily for four weeks
Sampling points
Source water, initially and every week
thereafter
After each critical step in the purification
process
Storage tank (temperature profile and
water quality)
Recirculation loop (temperature profile
only)
128
Ongoing Monitoring:
In order to complete the validation cycle, the
sampling and testing of water should continue after
the water system has been qualified and commissioned to produce water of known quality. This is
necessary to account for any seasonal variation in
the quality of feed water.
Sampling plan
Routine sampling frequency
Sampling points
Source water once a month
For Water-for-Injection, one point of use
daily and all points of use once a week
Revalidation
Water systems are periodically revalidated.
However, revalidation might be called for if there is
a critical change in equipment or there are persistent water quality issues. In such cases, depending
on the cause, the revalidation effort might be a
repeat of the PQ alone or could involve IQ/OQ
also. Each case should be duly investigated and
system requalification be performed per company
policies.
Shahid T. Dara
Elms, B., and Green, C., Water Systems: The Basics Part 1,
Design as a Prelude to Validation, Vol. 1, No. 2, February
1995.
2. Elms, B., and Green, C., Water Systems: The Basics Part 2,
Validation and Maintenance, Vol. 1, No.3, May 1995.
3. Collentro, W. V., Proper Validation of a Water Purification
System; An Inherently Flawed Process? Vol. 1, No.3, May
1995.
4. Fessenden B., A Guide to Water for the Pharmaceutical
Industry: Part 1 Basic Chemical, Physical & Dynamic
Concepts, Vol. 1, No. 4, August 1995.
Suggested Reading
1. The FDA Guide to Inspections of High Purity Water Systems
Inspections, July, 1993.
NEW
Introduction
to Validation
From
A
to
Z
Ultimate Beginners Guide
The
Articles including:
Validation Without Tears: Getting Started
The Validation Professionals Survival Kit: Tools and Techniques
Eight Rules to Live By For Successful Validation
The Psychology of Validation
Validation: A Fundamental Tool for Quality Assurance
A Systems Approach to Validation
Five Simple Rules for Effective Validation Project Management
Streamlining the Validation Process Using Project Management
Techniques
Master Planning: How to Get Started
Eliminating Validation Management by Crisis: Planning for Validation
Using a Living Validation Master Plan
Reflections on Writing IQ, OQ, and PQ Protocols
Cleaning Validation Programs: How To Get Started
An Introduction to Computer System Validation
Back to the Basics
Revalidation Strategy: Keeping Facilities in Compliance
The Proposed Drug GXP Revisions
The Quality System Regulation.
Also included:
The Validation Dictionary. A lexicon of over 750 terms and acronyms.
Introduction to Validation Videotape.
An annual membership to the Institute of Validation Technology.
PO Box 6004
Duluth, MN 55806
Tel. 218-740-7028 U.S. Only 888-524-9922
Fax: 218-740-6308
E-Mail: [email protected]
Web Site: www.ivthome.com
Special Edition: Utilities Qualification
129
TheStudy
Studyofofthe
theDesign
Design
The
ProductionSystems
Systems
ofofProduction
Purified Water for
ofofPurified
thePharmaceutical
Pharmaceutical
Industry
the
Industry
By I. Lerin Riera,
R. Salazar Macian,
J.M. Su Negre,
and J.R. Tic Grau
University of Barcelona
O
Part I
General Considerations
1. Study of the design: A description of the functioning of the system. To examine the
design of each production system of Purified Water,
the study has been divided into two phases:
Production and storage of purified water
Distribution of purified water to points of use
2. Report on design: Contains recommendations
for each point of improvement* (both critical and
noncritical) detected by the study in the design.
Pharmaceutical Plant A
In Figure 1, the fundamental stages to carry out a
systematic follow up on the flow of the water have
been numbered, from the moment it enters the system as feed water to the moment the purified water
enters the distribution loop where the different
points of use are found.
Figure 1
1.
2.
3.
4.
5.
6.
7.
8.
Glossary
Chlorination
9. Ionic exchange
storage tank
resins
Sand filter
10. UV lamp
Decalcification
11. 2 micrometer
equipment
and 0,22
Intermediate
micrometer filters
storage tank
12. Purified storage
(adding of soditank
um hipochloride) 13. UV lamp
Carbon filter
14. 0,22 micrometer
Intermediate
filters
storage tank
15. Heat exchanger
Reverse
16. Distribution ring
Osmosis
to points of use
Osmotic water
storage tanks
R1
10
11
12
13 14 15
R2
R3
16
R1:
R2:
R3:
Recirculation 1
Recirculation 2
Recirculation 3 (Distribution loop)
131
Pharmaceutical Plant B
The study carried out is similar to that for Plant
A. See Figure 2.
Figure 2
10
11
12
R1
R2
Glossary
1. Chlorination storage
7. Reverse Osmosis
tank
8. Osmotic water
2. Adding of flocculant
storage tanks
3. Dechlorination by
9. Ionic exchange resins
means of sodium
10. 1 and 0.22 micrometer
bisulfate
filters
4. 10 micrometer filter
11. Heat exchanger
5. Adding of chelating
12. Purified storage tank
agent
13. Distribution loop to
6. 5 micrometer filter
points of use
13
R1
R1:
R2:
Recirculation 1
Recirculation 2 (Distribution loops)
133
As the flow of water is thermostatically controlled at 80C through the loop, no stoppages in the
recirculation of the distribution loop are forecasted
for its sanitization as supported by the microbiological data of this plant. In practice, the distribution
loop is sterilized by means of clean steam at 121C
for an hour after holiday periods.
Figure 3
11.a 10
11.b
12
14.a
7
R1
7
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Glossary
Adding of flocculant
11.a.Reverse Osmosis
Adding of chloride
11.b.Double reverse osmosis
Silex anthracite filter
12. Purified water storage
Carbon filters
tank
5 micrometer filter
13. UV lamps
Decalcification equipment
14.a.Distribution loop 1:
Ozonation
Production
5 and 1 micrometer filters
14.b.Distribution loop 2:
UV lamp
Laboratory
UV lamp
13
R1
14.b
R1:
135
137
Figure 5
3 SilexAnthracite
Filter
3
6
Chloride
Detector
1
Chlorination
Tank
Feed
Water
2 Adding of
Flocculant
Return from the
Distribution Loop
7
5 m
Filter
4
8
Decalcified
Water
Storage
Tank
5 Dechlorination
Through
4 Decalcification Bisulfite
Equipment
Clean
Steam
TOC
Clean
Steam
10
14 UV
Sterile Vent
FIlter HEPA
R1: Recirculation 1
12
Distribution
Loop
15
Purified
Water
Storage
Tank
11
9
13 UV
7
11 UV
12
CDI: Electrodeionization
Equipment
138
6
10
Reverse
Osmosis
9 UV
C:
Conductivity meter on-line
TOC: (Total Organic Carbon)
TOC measurer on-line
Figure 6
17
19 UV
R2: Recirculation 2
Points of Use
Clean
Steam
15
Purified
Water
Storage
Tank
18 Distribution Loop
15
14
TOC
13
12
HEPA Sterile
Vent Filter
11
From
Production
Plant
17 UV
16
Heat
Exchanger
tank, it flows through a 5 m filter to retain particles which might break away from the decalcification equipment.
The water enters the decalcified water storage
tank, which is sterilized by clean steam.
After the water leaves the decalcified water tank
and prior to it flowing into the reverse osmosis, the
water flows through an ultraviolet lamp to ensure its
microbiological quality before entering the reverse
osmosis modules.
Water is driven by two autonomous high-pressure
sanitary pumps (15/20 atmospheres) into the
polyamide membranes of the reverse osmosis modules to carry out the first stage of deionization, eliminating 95 97% of the salts in the water, thus
allowing the desired quality to be attained in an economical way.
139
biological quality before it enters the electrodeionization equipment (CDI) This eliminates salts which
may remain in the water after going through the
reverse osmosis modules. It should be noted that
there is a conductivity meter installed on-line at the
exit of the CDI equipment which stops the production of purified water should the specified values of
conductivity be surpassed as specified by the USP
23 (1 3 s/cm at T=25C).
Once it has left the electrodeionization equipment, the water flows through an ultraviolet lamp to
ensure its microbiological quality before it enters the
purified water tank.
In the return of the distribution loop to the purified water tank and before it enters the tank, the
water is again treated by a UV unit to ensure its
microbiological quality before arriving at the storage tank. Before the water enters the purified water
tank, there is an on-line TOC (Total Organic
Carbon) measurer that allows control of the level of
organic substances present in the purified water.
Another possibility to ensure the microbiological
quality of the purified water to points of use consists
of changing the ultraviolet treatment units by water
heating to 80C by means of a heat exchanger.
Keep in mind that, in this sense, the FDA
(Guideline 1993) considers that although the use of
heat could turn out to be more expensive than other
systems, it does lower control and maintenance costs
and reduces potential problems in the production
system for purified water.
Recirculation
This design in Figure 8 shows the recirculations
which ensure the quality of the water in case of stoppage in the production of purified water.
R1 recirculation: R1 recirculation starts after the
ultraviolet lamp and before the purified water storage tank (and creates a closed circuit.)
Figure 7
Clean
Steam
TOC
HEPA Sterile
Vent Filter
RS
Purified
Water
Storage
Tank
Points of Use
Heat
Exchanger
From
Production
Plant
RS:
140
Figure 8
Recirculation 1
Water Coming
from the
Decalcification
Equipment
8
Decalcified
Water
Storage
Tank
14 UV
Distribution
Loop
10
Reverse
Osmosis
9 UV
11 UV
R1 Recirculation
12 CDI
Vent
Filter
HEPA
15
Purified
Water
Storage
Tank
Conductivity
Meter
13 UV
141
142
143
Figure 12
Situation
Figure 13
Total
Points
Monday
Tuesday
Wednesday
Thursday
Friday
Total Points
Sampled
A. Pre-Treatment
11
11
B. Points in Loop:
B.1 Control Points
B.2 Points of Use
In such a way that:
6
40
1
8
1
8
1
8
1
8
2
8
6
40
Every week all the pre-treatment points and all points in the distribution ring are sampled.
At the end of the 4 weeks validation period, four samples from each point will have been taken
144
Introduction
The FDA, in its 1993 Guideline, recommends
that the validation of the system (PQ) is carried out
in three phases. In the first and second, samples are
obtained every day, for two/four weeks at each pretreatment point and at the distribution loop. The
third phase consists of compiling the data attained
from the routinary control plan over one year.
Because of the great number of points of use and
pretreatment points (before the distribution loop)
found in pharmaceutical plants, it is very difficult to
comply with this FDA recommendation. Therefore,
develop a sampling plan which does not totally correspond with this recommendation but which is
considered to be enough to prove that the system
operates in accordance with the established standard operating procedures (SOPs).
Sampling Points
The sampling points in the system are divided
into two groups:
145
146
147
148
The Ultimate
Resource
Glossary of Computerized
System and Software
Development Terminology
F HEALTH
TO
&
H
EN
SA
DEPA
RT
M
Suggested Reading
Only $29. 95
Order Today
3% On-Line Discou
nt
PO BOX 6004
Duluth, MN 55806
Tel. 218-740-7028
U.S. Only 888-524-9922
Fax: 218-740-6308
E-Mail: [email protected]
Web Site: www.ivthome.com
149
150
151
Defining the
Industry
\di-fin-ing\th \in-d s-tre
e
n exclusive lexicon of
more than 750 terms,
symbols, references and
acronyms commonly used
in drug and diagnostic
industries.
Free with
Membership
Only
$ 00
79.
PO Box 6004
Duluth, MN 55806
Phone: 218.740.7028 or
888.524.9922 US Only Fax: 218.740.6308
E-mail: [email protected]
Web Site: www.ivthome.com
152
Qualification of Purified
Water Systems
David W. Vincent
Validation Technologies, Inc.
United
States Pharmacopeia
basic steps in
product contact surface, enables them
(USP) Purified
validating
to truly be considered a product ingre USP
Water-For-Injection
dient. Purified water can be produced
(WFI)
various water
many different ways and with various
different designs and equipment. The
The following table lists the four
systems, and
usage of pharmaceutical grade water
basic water types and classification.1
once they are
is very important in the production of
Type I
Well water
pharmaceutical drug products. Therevalidated,
Type II Potable water
fore, the validation and routine monType III Purified water used for crititoring of these systems are critical in
establishing
ical batch applications
maintaining the quality of the final
a routine
Type IV Food and Drug Adminiproduct. This article discusses the
stration (FDA) water for
basic steps in validating various water
monitoring
final rinse and formulation
systems, and once they are validated,
WFI
establishing a routine monitoring proprogram to
gram to maintain them. In addition
various types of water and their appli- maintain them. Type I Water
Type I is untreated water used for
cations, design, validation requireutilities (fire protection, lawn sprinklers, etc.), and may
ments, steps for validating purified water systems, roube from a well or surface source.
tine monitoring program, Preventative Maintenance
Type II Water
(PM) and revalidation program.
Type II is drinking water (potable) that must meet the
Water is classified into many different groups, deEnvironmental Protection Agency (EPA) requirements
pending on its source, quality, treatment, or use. It is also
necessary to define each classification by the minimum for quality. Its source is from a private or city supply that
quality requirements, especially with regards to chemi- has a variable degree of hardness and added chlorine for
microbial control.
cal and microbiological purity. The following is an
Type III Water
example of the different types of water and their usage.
Type III is purified water, which is the most diffiWater Usage in Pharmaceutical Production
Special Edition: Utilities Qualification
153
David W. Vincent
cult to control from a microbial standpoint, and usually used for bulk batch application where there is no
reasonable alternative and for non-parenteral product formulation. It is sometimes used as the initial
cleaning agent for some processes.
Type IV Water
Type IV water is the most critical quality level. It
is commonly used in final formulation for parenteral
applicants and as final rinse water for critical product
contact surfaces. This water must satisfy the specifications for WFI as defined by USP compendia
154
David W. Vincent
< 5 microsiemens/cm
< 25 EU/ml
< 200 CFU/ml
5.5 to 7.0
< 5 mg/l
Non-detected
155
David W. Vincent
USP 24 Specification
No Specifications
100 cfu/ml
5.0 7.0
500 ppb
ture of the WFI within the storage system is maintained by a plant steam jacket on the WFI storage vessel. The temperature of the vessel contents is maintained above 80C.
The hot WFI distribution loop returns to the WFI
storage vessel through a spray ball. The spray ball constantly rinses the dome and sidewalls of the storage
vessel with hot WFI to maintain cleanliness within the
storage tank.
A 0.2-micron hydrophobic vent filter is usually
employed on the WFI storage vessel to filter any incoming air into the storage vessel during WFI system draw
down. The filter is provided with a low-pressure plant
steam jacket to prevent filter plugging. Valves and ports
are provided on the vent filter for clean steam sanitization of the vent filter after cartridge replacement. A rupture disk on the storage vessel protects it from over pressurizing. A burst monitor indicates rupture disk over
pressure and activates an alarm. The WFI storage tank
temperature is continuously monitored.
WFI Distribution Loops
The generated WFI distributed throughout the
facility can be in three different loops; hot distribution,
ambient distribution, and cold distribution. In distribution systems where the water circulates at high temperature, dead legs and low flow should be avoided,
and valve tie-in points should have length to diameter
ratios of six or less. Components and distribution lines
should be sloped and fitted with drain points.
Water-For-Injection (WFI) Specifications
Conductivity
Endotoxins
Bacteria
pH
TOC
USP 24 specification
0.25 EU/ml
10 cfu/100ml
5.0 7.0
500 ppb
David W. Vincent
After all the equipment and piping has been verified as installed correctly and working as specified,
the initial phase of the water system validation can
begin.
During the initial phase, the operational parameters and cleaning/sanitation procedures and frequencies will be developed. Sampling should be daily after
each step in the purification process, and at each point
of use for two to four weeks.
The sampling procedures for point of use should
reflect how they are taken, e.g., use of hose, and time
for flushing. At the end of two (2) or four (4) weeks,
the firm should have developed its Standard Operating Procedures (SOPs) for operation and maintenance
of the water system.
Phase 2
The second phase of the water system validation
is to demonstrating that the system will consistently
produce the desired water quality when operated in
conformance with SOPs. The sampling is performed as
in the initial phase and for the same period. At the end
of this phase, the data should demonstrate that the system consistently produces the desired quality of water.
Phase 3
The third phase of validation is designed to
demonstrate that when the water system is operated, in
accordance with the SOPs, over a long period of time,
it will consistently produce water of desired quality.
Any variations in the quality of the feed water that
could affect the operation, and ultimately the water quality, will be noticed during this phase of the validation.
Sampling is performed according to routine procedures and frequencies. For WFI systems, samples
should be taken daily from a minimum of one point of
use, with all points of use tested weekly.
The validation of the water system is completed
when the firm has collected data for a full year.
The FDA states that: while the above validation scheme is not the only way a system can be validated, it contains the necessary elements for validation of a water system.
First, there must be data to support the SOPs.
Second, there must be data demonstrating that
the SOPs are valid, and that the system is capaSpecial Edition: Utilities Qualification
157
David W. Vincent
Microbiological/Chemical Limits
Figure 2
Changes
Install Equipment
Piping and Control
Systems
Identify Critical
Process Parameters
and Establish
Operating Ranges
Changes
Tests
Potable
Water
pH
N/A
TOC
N/A
Conductivity N/A
Bacteria
Endotoxins
Purified
Water
5.0 - 7.0
500 ppb
4.7 to 5.8
S/cm
Water-for
injection
5.0 - 7.0
500 ppb
USP 24
Specification/
Method
500 cfu/mL 100 cfu/mL
10 cfu/100mL
N/A
Not Specified 0.25 EU/mL
A validation program qualifies the design, installation, operation, and performance of the system. It begins when the system design moves through different
phases: Construction Qualification (CQ), Installation
Qualification (IQ), Operational Qualification (OQ),
Performance Qualification (PQ) and routine monitoring program. The USP-NF fifth supplement <1231>,
Water for Pharmaceutical Purposes, defines a typical
water system validation lifecycle which is shown in
the graphical representation of Figure 2.
Installation
Qualification
(IQ)
Changes
Operational
Qualification
(OQ)
Establish
Corrective Action
Response
Performance
Qualification
(PQ)
Prospective
Phase-Confirm
Appropriateness of
Critical Process
Parameters
Operating Ranges
Concurrent/Retrospective Phase
Establish reproducibility and reliability of system
Evaluate effects of seasonal changes
Confirm appropriateness of alert an
action levels and corrective action
program
Validation
Maintenance
Change Control
Periodic Review
David W. Vincent
gram. Certain test procedures, such as hydrostatic testing, should be witnessed and documented. Verification
that piping is sloped to drain according to specifications and code should be completed.
Installation Qualification (IQ)
An IQ phase consists of field verifying that instruments, valves, heat exchangers, and major components are installed as per design specifications. The
system should be inspected to verify that the drawings
accurately depict the as-built configuration of the
water system. The system should be checked to verify
that there are no dead legs. A dead leg is a length of
piping that should be less than six inches of the pipe
diameters length. The data and reports for the cleaning and passivation activities should be reviewed, and
the test results included in the final report. Passivation
of the stainless steel piping and tank is important in
removing various metal contaminates, which can
cause oxidization of the surface areas. After the passivation process is complete, it is important to assure that
there are no residues remaining in the system. Finally,
check that distribution system and points of use valves
are labeled and tagged. The water system should be
fully commissioned before the OQ phase can start.2
Operational Qualification (OQ)
During the OQ phase, it is important to test and
verify the following functions:
Flow and pressure rates
Temperature and conductivity
Sanitization and/or Steam-In-Place (SIP) procedures
Computer control functions
Alarms
Pumps
Major components function as per design specifications
Filter integrity
It is important to verify that all instrument and devices have been calibrated before starting the OQ.
After all functions are verified, it is important to perform preliminary testing on the systems. This involves
sampling the system for two weeks for microbial and
chemical quality. It is also important to verify the efficiency of each major component to insure they per-
159
David W. Vincent
David W. Vincent
161
David W. Vincent
EDR form
The facilities and/or production manager will sign
the EDR form, and return it to QA for review and
approval of corrective action.
Perform the corrective action immediately, if
possible. If the action requires planning, materials, or time to implement, perform it as soon as
possible.
QA will review the proposed corrective action and
any subsequent QC retesting data. If the investigation or the data shows that the system is in control,
QA will sign the form, distribute copies, and file
the QA copy of the form.
Distribute copies to QA, facility manager, production, and the system and/or product file.
Manufacturing Alert Notice For Action Limit Failures
A manufacturing alert notice applies to any situation that is considered an immediate threat to a critical
system or process equipment, and which may have a
direct impact on the quality of the product. A manufacturing alert notice is issued to the manufacturing
department notifying them that a system may or may
not be used (depending on the circumstance and severity of the problem) until corrective action has been
taken to bring it back into compliance. A manufacturing alert notice form must be filled out under the following or similar circumstances:
When two or more retest samples exceed the action
limits
When you observe a questionable condition (sanitation, potential contamination)
When you observe a possible minor or major malfunction in the utility system, which could possibly
compromise the integrity of the production area
When a QC test sample exceeds the action limits
If a system is still not in compliance after the first
environmental corrective action or investigation
was taken
Corrective Action Program
An EDR form is initiated immediately when action
levels are exceeded. A number is assigned to the deviation for traceability. The number consists of four
groups of digits; the first group represents the system,
the second group represents the year, and the third
group a sequential number (i.e., Water-For-Injection;
162
David W. Vincent
References
1.
2.
3.
4.
5.
Center for Drugs and Biologics, Center for Devices and Radiographic Health. Guidelines on General Principles of Process Validation. FDA Rockville, Maryland. 1987.
cGMP Compliance in Architecture and Construction of Biopharmaceutical Manufacturing Facilities. BioPharm. Prepared
January-February. 1993.
FDA. Guide to Inspections of High Purity Water Systems. (1993).
Standard Methods for the Examination of Water and Wastewater, 18th Edition. American Public Health Association.
Washington, DC 20005.
PDA Environmental Task Force. Fundamentals of a Microbiological Environmental Monitoring Program. Vol. 44. Supplement 1990.
163
David W. Vincent
164