PD 1096 Implementing Rules (A3)
PD 1096 Implementing Rules (A3)
April 8, 2005
Stairs residential
Less than 50More than 50-
0.75
0.90
1.10
3.60
Handrails
0.80- 0.90
Winding
Circular
0.30 run
2.50 widths
Courtyard
Corner lotInside lot-
2.0min dist w/
passageway 1.20
90% buildable area
80% buildable area
CEILING HEIGHTS
ARTIFICIAL VENTILATION
grnd flr
2.70
2nd flr
2.40
3rd flr
2.10
artificial ventnatural ventMEZZANINEMin height
min for natural vent
185 sqm
2.40 min
2.70 min
AIR CONDITIONING
68-74 F
2.13m height
ARCHITECTURAL DOCUMENTS
a) VICINITY MAP
PAPER
METRIC
ENGLISH
A0
841
1189
33
47
A1
594
841
23
33
A2
420
594
16.50
23
A3
297
420
11.50
16.50
NUMBER OF EXITS
More than10
2 exits
500-99
3 exits
1000 or more4 exits
mezz greater than 185 sqm
if there are only 2 exits
dead end
ELEVATORS
hoistway pit clearance
in one hoistway
hoisting rope
2 exits
1/5 apart
6.00 min
0.60
4 elevators max
3 for traction elevators
2 for drum type
30mm
ARCADES
clear height
curb line to outermost
part of arcade
DRIVEWAY
Ramp
Sidewalk to ramp
ESCALATORS
angle of inclination
30
width
5.58 min
1.20 max
Speed s
38 mpm / or 90fpm & 120fpm
3.00
0.50
1/3 to slope
1/8 slope
ENTRANCE TO BUILDING
Ramp
1/10
Stairs- tread
0.30
Riser
0.10
Steps
2 min
FIRE EXTINGUISHING SYSTEM
200 sqm or more
in every storey, basement or cellar used for
habitation recreation, dining, study
or work & w/c has occupant load of morethan 20
morethan 30.00m from exit
next door of room , all dressing room, factories,
rehersal w/ occupant load of morethan 10
or group H & Iw/ 500 occupant load
4 or more storeys
dry stand pipe
Dumbwaiter
1 elevator
MINIMUM SPACE
Human habitation
m
Kitchen
m
Toilet
m
AIR SPACE
Classroom
Offices
Habitable space
6.00 sqm
3.00 sqm
1.20 sqm
BOILERS
If bldg not made of fire resistive materials 3.00 distance
SEATS
Width
from back to back
- 0.45
- 0.48
PENTHOUSE/ TOWERS
if housed by elevators & tanks
limit if not 1/3 of roof
- 8.40
- 3.6
- 50
- 9.15
- 3.35
- 50
- 18.30
- 3.00
- 50 & 9.15
- 12.20
- 3.00
TYPE I
TYPE II
15 year
15 days
1 year
120 days
15 days
OCCUPANCY PERMIT
1. as built plans
2. Certificate of completion
3. Logbook
BUILDING CODES
A
B
C
D
E
F
G
H
I
J
Residential Dwellings
Residential Dwellings, Hotels & Apartments
Educational & Recreation
Institution
Business & Mercantile
Industrial
Storage and Hazardous
Assembly less than 1000
Assembly more than 1000
Accessory
wood construction
wood construction w/ fire
resistive materials
TYPE III
TYPE IV
ROAD NETWORK
a. 60m
30m or less
b. 15- 20m
c. 10m
d. 10m
TYPES OF CONSTRUCTION
TYPE V
OCCUPANT LOAD
Unit per occupant
2 exits over
a. dwellings
28.0sq
10
18.6sq
10
c. classroom
Conference, exhibit,
Gym, School shop, lab
d. hospitals
Nursing & childrens home
Home for the aged
-22 sqm for sleeping
-11 sqm for treatment
Nurseries
e. retail stores
2.8 sqm for basements
5.6 sqm for upper floors
offices
dining area
kitchen, parking
aircraft hangars
f. warehouses
mechanical equip.
g. garages
1.80sq
1.40sq
4.60sq
8.40sq
7.40sq
3.25sq
9.30sq
1.40sq
18.6sq
46.5sq
28.0sq
28.0sq
50
5
5
50
10
30
30
50, 30
10
30
30
9.30sq
10
h. auditorium
0.65sq
Theaters, churches, dance floor
Reviewing stands, stadia
50
PARKING SPACES
Low income single detached housing Individual not more than 100sqm
Multi family living units
up to 50 sqm/ unit
50 sqm-100 sqm/ unit
100 sqm & up
1 slot/ 10 units
1 slot per
8 units
4 units
1 unit
2.50 x 5.00
2.15 x 6.00
3.60 x 12.00
3.00 x 9.00
hotels
10 rm
5 units
motel
1 unit
shopping center
100 sqm
markets
150 sqm
30 sqm
night clubs
20 sqm
office buildings
125 sqm
20 beds
125 sqm
50 sqm
50 sqm
10 clasrm
5 clsrm
hospitals
25 beds
recreational facilities
bowling
amusement center
clubhouses, beach house
4 alleys
50 sqm
100 sqm
1000 sqm
2 slots/ hotel
PARKING COMPUTATION
Hotels
others
20%
15%
5%
5%
YARDS
YARD
R1
FRONT
4.50
SIDE
2.00
R2-R3
3.00 8.00
2.00
REAR
2.00
2.00
R4
R5
4.50
6.00
2.00
3.00
2.00
3.00
FRONT
SIDE
REAR
20 24
10 19
Below 10
DANGEROUS BUILDINGS
1. structural hazard
2. fire hazard
3. hazardous wiring
4. hazardous mechanical inst
5. inadequate sanitation and health facilities
6. improper occupancy and architectural eyesore
7. improper location
8. illegal construction
PRE CONSTRUCTION
1. upon receipt of application for building permit, official
shall refer to chief or local fire service for evaluation &
shall submit certificate after 5 days
2. after 5 days the official shall within 15 days issue
building permit
3. after payment of fees the building official shall within 15
days issue building permit
CONSTRUCTION
1. upon issuance of permit, the official shall endorse copy
to chief of local fire service to inspect building
construction
2. upon submission of certificate of completion, the clfs
shall inspect within 5 days for final inspection
POST CONSTRUCTION
1. building official shall conduct annual inspection
NHC
National Housing Corporation
Mass producing building materials
HUDCC
Housing & Urban Development Coordinating Council
I-1
I-2
I-3
SUPPORT AGENCIES
DOF DPWH
DBM
NEDA
PMS
DBP
STOREYS
HEIGHT
(M)
R1
R2
R3
R4
R5
3
5
12
3
18
10
15
36
10
54
C1
C2
C3
5
6
60
15
18
180
RESIDENTIAL
COMMERCIAL
15
21
21
INSTITUTIONA
L
15
CULTURAL
30
Utility,
transportation,
RROW,
Services,
Parks, Open
Recreational
and
Entertainment
Space,
Agricultural,
Agro
Industrial,
Tourism
EASEMENT ALONG A BODY OF WATER
LOCATION
Urban
Agricultural
Forest
GSIS
Government Insurance System
Shall be the primary provider of funds for low- term
housing mortgages for low and middle income
government employees
INDUSTRIAL
15
BASEMENT
3.00m per side of waterways
20.00m per side of waterways
40.00m per side of waterways