Method Statement For Interlock Works
Method Statement For Interlock Works
There are projects that sometimes can proceed for interlock or paving block
works while progressing the main project. This is sometime a technique of the
management to avoid workers to be idle if they have extra people while the
project is at starting stage.
So here are the method statement for interlock work that you might want to learn how it will be
done.
1. Title
Method Statement for Interlock Works
2. Purpose and scope
The purpose of this method statement is to describe the measures and ways
of proper installation of interlock or paving block within our project. The
workwill be as per the project specification and approved drawing.
3. Work procedure
1.
Preparation
o
In the areas where there are kerb stone, the blinding shall be
constructed first serve as the base but make sure it shall be as per
drawing.
shop drawing.
Land surveying shall be made to mark the required levels,
or paving blocks.
Once compacted, cleaning shall be followed to remove all excess
approval.
4. Safety
1.
All works shall comply with safety procedure or instruction set out in
project safety plan andMunicipality rules and regulations.
2.
3.
All operatives involve in this work shall be inducted before entering the
site.
4.
Interlock cutter
2.
Plate compactor
3.
Wheel borrow
4.
Meter
1.
2.
Approved Drawing
3.
Specification