PP Emergency Guide
PP Emergency Guide
Philip Payne
Test Requirements
Self Contained Luminiares
Daily
Visual Check
Monthly
Annual
Energise lamp from battery Energise lamp from battery
Full 3hr Battery Discharge
(short duration)
Daily
Not Applicable
Monthly
Annual
Energise lamp from battery Energise lamp from battery
(short duration)
Full 3hr Battery Discharge
Risk Assesment
The Regulatory Refrom Order requires that design parties, building owners and occupants should consult
at early stages to develop and manage the risk assesment process.
Risk assesements need to be conducted and measures identified to safeguard building occupants.
Emergency Light must be included and maintained including a test regime with recorded results.
1
LUX
Escape
0.5Routes (Up
15to 2 metre)
LUX
LUX
1
LUX
0.5
LUX
Open
15Area (Anti Panic)
LUX
1
LUX
0.5
LUX
15
LUX
Reception
Areas
15LUX
3hrs
First Aid
Rooms
Treatment
Rooms
Kitchens
15LUX 30mins
50LUX 30mins
15LUX 30mins
Stairs
Ensure each tread recieves light.
Junctions
and Intersections
Ensure changes in level and
in direction recive
adequate light.
Final Exit
Ensure light is
provided outside
the final door.
Refuges
Plant Rooms
Fire Control
Equipment
Security
Devices
Push bar
to open
5LUX
3hrs
15LUX
3hrs
15LUX
3hrs
5LUX
3hrs
Have a green background (Safety Colour) and White Pictograms (Contrast Colour)
Have a minimum illuminance of 2cd/m on the safety colour
Have a contrast between safety Colour and Contrast Colour of >5:1 but <15:1
Have ratio of the max-min luminance within Contrast or Safety Colours of <10:1
Have graphics to one of the following formats:-BS EN 62034:2012
BS5499
BS EN ISO7010
Any of the above meet legislative requirements but may not be mixed on any single installation.
200 x h
h
100 x h
h
Philip Payne
Philip Payne Ltd
A S U B S I D I A RY O F F. W. T H O R P E P L C
Thornhill Road
Lode Lane
Solihull
B91 2HB
England.
Tel: 0121 705 2384
Fax: 0121 711 2469
e-mail: [email protected]
www.philippayne.co.uk
Philip Payne Ltd registered in England No. 1361523
We reserve the right to alter specifications without prior notice.