PM Report: Basic Details
PM Report: Basic Details
Date
Site Name:
Site ID
Zone
Basic Details
Sl.No
Description
Entry to Site
Security availability
DG Reading(HRS)
EB Reading(KWH)
OK/NO/NA
Infra Utilities
Sl.No
Description
Signage Verification
LA Pole verticality
AC functioning
10
11
Rain protection
12
13
OK/NO/NA
Description
Cooling effect
Room Temperature
PMU functioning
10
11
12
13
14
Current reading
15
Voltage reading
OK/NO/NA
16
17
18
19
20
21
BTS
Sl.No
Description
BTS Configuration
Visual inspection
Cleanliness of DDF
10
11
12
13
14
Hardware discrepancy
OK/NO/NA
Microwave Radios
Sl.No
Description
TX Protection(1+0/1+1/ring)
Hop on NMS
Performance Monitor
10
11
12
Cleanliness of DDF
13
14
15
16
Labelling done(pole/cable)
17
18
19
Designed - Tx Power
OK/NO/NA
Rx level
Achieved Rx Level
VSWR MEASUREMENT
Sl Nos
Cable
Tx/Rx A
Rx A
Tx/Rx B
Rx B
Tx/Rx C
Rx C
VSWR
Alarm
EB Power Fail
DG Running
Rectifier fail
Battery Discharged
Aircon 1 Failure
Aircon 2 Failure
10
Dg fails to start
11
Door open
12
High temp
Status
PUNCH POINTS:
Tech Name :
Signature
FLE Name :
Signature
Remarks / Values
Remarks / Values
Remarks / Values
Remarks / Values
FREQUENCY(mhz)
Loop