Initial Sizing of Structural Members PDF
Initial Sizing of Structural Members PDF
Deflection:
Continuous UDL
WL
10
Cantilever UDL
W factored
Note:
W in kN
L in m.
WL
2
Bending (Plastic theory):
Continuous UDL
WL
16
W factored
Slenderness:
Classification:
Axial load:
LE
r
D
39 ,
t
Do not use UBs where axial loads predominate.
Fc
mm 2
0.6p c
W factored
Note:
W in kN
L in m.
Plate Girders
Used for spans >18m. where UBs are uneconomic or have insufficient capacity.
Post-buckled web strength may be used to resist bending and shear.
Typically
Span/depth = 10 to 12
Web takes all shear and may be slender, d/t = 150 say:
ie. class 2
Aw =
Fv
mm 2
q cr
Check Ixx required from UB formulae and compare with Ixx provided by initial
proportions.
Reinforced Concrete
Beams
b
Simply supported
Continuous
Cantilever
Span/d = 20
Span/d = 26
Span/d = 7
1000V
2d
- limiting shear stress to 2.0 N/mm2 and assuming fcu > 30 N/mm2
Columns
Use stocky sections where:
Effective height
15
smaller lateral dim ension (b or h)
A more refined estimate of the column capacity N, may include the reinforcement
area :
N = 0.35fcu A c + 0.67fy A sc
(0.67fy 0.35fcu )
N = A g 0.35fcu +
100
Note: Ag = Asc + Ac
and
A sc
.100
Ag
Column Size
h mm b mm
300
300
300
350
350
350
400
350
400
400
400
450
450
450
450
500
500
500
600
600
fy
460
fcu
fy
40
460
Column Size
h mm b mm
300
300
300
350
350
350
400
350
400
400
400
450
450
450
450
500
500
500
600
600
Any cross sectional shape that provides the minimum cross sectional area, may be
used instead of the rectangular examples shown in the table.
Slabs
Solid Slabs:
1000V
0.6d
Walls
Treated as columns:
Use stocky sections where:
Effective height
15
thickness
Minimum practical thickness 200mm. although
you will see less! Never < 150mm.
Shear walls will need to be designed as vertical
cantilevers to resist horizontal forces, in addition to
carrying vertical loads.
Piled Foundations
Bored Cast in Place Piles in clay:
d
1
= 0.45c ave . d . L
or
L
d 2
End bearing Q b = 9c b .
4
Ult. capacity Qult = Qb + Q s
Working capacity =
Qb Q s
+
3 1.5
or =
Qb + Q s
2.5
Pile Caps
Retaining Walls
t=
H
12
M=
2
H
3
k a . . H3
6