1.0 SCOPE
2.0 WORK PROCEDURE
2.1 Input to the Design
2.2 Output from Design
2.3 Work Steps
3.0 SYSTEM DESCRIPTION
4.0 SYSTEM DESIGN
4.1 Mooring Facility
4.2 Loading/ Unloading Facility
4.3 Interconnecting Piping and Auxiliary Facility
4.4 Marine Loading Pump
5.0 LOADING ARM OPERATION PROCEDURES
5.1 Crude Oil and White and Black Oils
5.2 High Pressure LPG Loading
5.3 High Pressure LPG Unloading
5.4 Low Pressure LPG Loading/ Unloading
6.0 BERTHS AND SPOTS ARRANGEMENT
6.1 General
6.2 Basic Requirement of Design
6.3 Design Procedures
6.4Related Figures and Tables
7.0 DEFINITIONS OF TERMS
8.0 REFERENCES
8.1 Related COMPANY
8.2 Related Standards
2
2
2
3
3
5
6
6
8
12
17
18
18
20
21
22
24
24
24
25
41
45
49
49
49
KLM Technology
Group
Project Engineering Standard
Page 2 of 51
Rev: 01
Sept 2012
1.0 SCOPE
This manual covers basic design procedures for marine loading/unloading
facilities for flammable liquid except for LNG, Ethylene, liquid sulphur and etc.
and should be used for the Front End Engineering or verification stage of the
project.
Basic design of marine loading/unloading facilities is closely related to Civil and
HSE engineering.
2.0 WORK PROCEDURE
2.1 Inputs to the Design
2.1.1 Data to be provided by The Client
1. Annual Shipment
Products handled and annual quantity
2. Lot Size of Loading/Unloading
Tanker size and/or lot size per product
3. Maximum berth occupancy time per shipment, if available
(Berthing/de-berthing time + Loading or unloading time)
4. Annual Berth Operation Time
Annual operation days
Daily operation hours
5. Ballast water disposal quantity
6. Required Utilities for tankers
7. Seasonal variations for each product, if available.
2.1.2 Process Conditions
1. Source of the data
The design data shall be obtained from, but is not limited to, the following
documents:
Refinery Scheme including material balances for all operation cases.
The design philosophy of the process units (hereinafter called as onsite), product blenders, and marine loading/unloading facilities
Process Flow Diagram (PFD): Refer to Note 1
Basic Engineering Design Data (BEDD)
Piping & Instrument Diagram (P&ID): Refer to Note below.
Note: This manual includes a definitive study to determine berth spot
arrangement. At this stage, Flow Schemes are not available.
KLM Technology
Group
Project Engineering Standard
Page 3 of 51
Rev: 01
Sept 2012
2. Design basis
Maximum, normal and minimum flow rate and corresponding physical
properties should be used for designing loading pumps and
Loading/unloading facilities.
2.2 Output from Design
The process data to be prepared based on this manual should be as follows:
1.
2.
Name of Facilities
Berth
Loading/unloading facilities
3.
Interconnecting piping
4.
5.
Loading Pump
Measuring facilities
6.
7.
8.
ESD Systems
Oily Sewer Systems
Process Data
Tanker size and number of berths
Number, types and size of loading/unloading
spots, and process conditions for loading
arms.
Number and size of piping and process
conditions
Pump data sheet
Number and type of facilities, and process
conditions
Type and quality of utility and conditions of tiein with tankers and miscellaneous uses on
platform
ESV, Emergency Release Coupler, etc
Oily water drainage system
KLM Technology
Group
Project Engineering Standard
Page 4 of 51
Rev: 01
Sept 2012
Annual Shipment
By Process
By Process & Other Discipline
By Client Discipline
Tanker Type & Size (To be discussed with The Client)
Tanker Type Distribution (To be confirmed with The Client)
Average Tanker Capacity
Annual Berth Occupancy Time for Average Tanker Capacity
Average Number of
Queuing Tanker &
Average Queuing Time
Annual Berth
Operation Time
Estimation of
Number of Berths
No
Number of Berths
Detailed Study including Spot Arrangement
Decision of Number of Berth & Spot Arrangement
Berth Type & Location
Loading Equipment Specification (Arm/ Hose)
Pre-determination of Loading Arm Layout
Hydraulic Calculation of Interconnection Piping
Vendor Quotation
KLM Technology
Group
Project Engineering Standard
Page 5 of 51
Rev: 01
Sept 2012
KLM Technology
Group
Project Engineering Standard
Page 6 of 51
Rev: 01
Sept 2012