Pre-Commissioning Check List

This document is a pre-commissioning check list for a project that includes checks of the electrical system and instrumentation, mechanical/HVAC/safety equipment and drilling system, and piping system. It lists items to check for each system, and allows sign-off indicating if each item was completed successfully (OK), not applicable (NA), or if punch items were cleared (PL(A) Cleared). The overall purpose is to verify that installation, testing, and certification of equipment and systems was performed correctly before commissioning.

Uploaded by

Arturo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (9 votes)
7K views

Pre-Commissioning Check List

This document is a pre-commissioning check list for a project that includes checks of the electrical system and instrumentation, mechanical/HVAC/safety equipment and drilling system, and piping system. It lists items to check for each system, and allows sign-off indicating if each item was completed successfully (OK), not applicable (NA), or if punch items were cleared (PL(A) Cleared). The overall purpose is to verify that installation, testing, and certification of equipment and systems was performed correctly before commissioning.

Uploaded by

Arturo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project No.

Pre-Commisioning Check List

Test Memo No.

Test Memo Description:


Electrical System & Instrumentation
Item Description
1
2
3
4
5
6
7
8
9
10

OK

NA

PL(A)
Cleare
d

Equipments Installation completed


Cable Termination completed
Meggering completed / Connection Torque/Ductor test
Loop Check completed
Earthing Check completed
Calibration, Trips & Alarms Check verfied
Visual Damage (Internal / External)
Cleanlines (Switchboards, Transformers)
Mechanical Stage Completed
Certification Valid and Active
Mechanical / HVAC / Safety Equipments & Drilling System
Item Description

1
2
3
4
5
6
7

Sheet 1 of 1

Signature

Date:
Sign:
Date:
Sign:

OK

NA

PL(A)
Cleare
d

Equipments Installation completed


Mechanical Completion (Electrical)
Mechanical Completion ( Piping)
Visual Damage (Internal / External)
Cleanlines
Certification Valid and Active
Non Destructive Test completed

Signature

Date:
Signature:
Date:
Sign:

Piping System
Item Description
1
2
3
4
5
6

OK

NA

PL(A)
Cleare
d

Piping Test Completed


Non Destructive Test completed
Cleaning / Flushing Completed
Reinstatement Stage Completed
Visual Damage
Certification Valid and Active

Signature

Date:
Signature:
Date:
Sign:

OK Done successfully
NA Non Applicable
PL (A) Cleared All punch A are clear

Remarks

Successffully
X No Successffully