Oracle Projects
Oracle Projects
Project Accounting
Implementation Options
Projects, Vision Operations->Setup->System->Implementation Options
Creating a Project
Normally when we are a creating a new project,we will get following error
Cannot copy a budget to a period which is out of the range of system defined periods (e.g.
PA period or GL period)"
Solution
While copying the template we need to take the Project Start Date as it is in the Template
Transaction Start Date then only it work
If you got any work plan related issue
Go to
Structures ->Click Details
Partial Shared Structures: This scenario allows users to share the top level of the WBS with
the financial structure while allowing Project managers to build out additional granularity for
their work plan activities below the levels of the shared activities. This scenario typically
works very well when the top level of the WBS can be easily shared by scheduled work and
financial needs.
Non-Shared, Mapped Structures: This model applies when you have a scenario wherein the
workplan is structured very differently from how the financials of the project are managed,
but it is possible to map work plan activities (at any level of the Work plan WBS) to activities
in the financial WBS. This model enables the project manager (PM) and the financial
analyst to have independent control over their areas of responsibility but still maintains the
association between them. This allows for improved interactivity between the two in terms of
generating budgets and forecasts based on work plans and also pulling work plan progress
percent complete into the financial structure in order to process revenue and billing
based on physical percent complete.
Shared Structures: This scenario allows users to share the complete WBS with the financial
structure
Part 2
.
Project Structures
There are two types of project structures, Workplan Structures and Financial Structures.
Workplan
Structures
A project uses a workplan structure to define, plan and track on a project.
Financial
Structure
Financial structures are used by persons with financial interest in projects to track
billing, costs, budgets, and other financial information for projects.
Financial
Structure
Task
Attributes
There are attributes related to the financial structure. They include, but are not
limited
to:
Work
Type
Service
Type
Customer
Work
Site
ETC
Source
Chargeable
Billable
Receive
Inter-Project
Invoices
Project
Attributes
Various attributes are stored against a project to facilitate processing and reporting.
Some of these will be defaulted from the template, whilst others will be
entered/updated
during
the
course
of
the
projects
lifecycle.
The
following
attributes
will
be
captured
against
all
projects:
Project
Number
Project
Name
Project
Owning
Organization
Project
Start/End
Dates
Project
Classifications
Team/Key
Members
Customer/funder information
Pic 1:
Budgets (optional)
Quick Entry fields which specify fields to enter for the new project when
creating it from a template
Project Option controls which list the project options to display for new
projects created from a template
N: Setup Projects Templates
Setups
Oracle Projects Setup
Organization Hierarchy
Project/Task owning org hierarchy
Exp/Event org hierarchy
Project Setup