0% found this document useful (1 vote)
1K views

API 594 Wafer Check

The document announces the publication of the 7th edition of API Std 594, which establishes requirements for check valves. Facilities are advised to review the new edition, incorporate any revisions into their quality management systems, train personnel on new requirements, and evaluate training effectiveness before the March 1, 2011 effective date and their next audit. Technical questions should be directed to [email protected] and inquiries about API monogram licenses or requirements should go to [email protected].
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
1K views

API 594 Wafer Check

The document announces the publication of the 7th edition of API Std 594, which establishes requirements for check valves. Facilities are advised to review the new edition, incorporate any revisions into their quality management systems, train personnel on new requirements, and evaluate training effectiveness before the March 1, 2011 effective date and their next audit. Technical questions should be directed to [email protected] and inquiries about API monogram licenses or requirements should go to [email protected].
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TO:

FROM:

DATE:

RE:

APIStd594MonogramLicensees
APIStd594MonogramApplicants
APIAuditorsofAPIStd594
DonWhittaker,ManagerMonogramProgram/APIQR
December17,2010
APIStd594
StandardforCheckValves:Flanged,Lug,Wafer,andButtwelding,Seventh
Edition

DearColleague,

ItisourpleasuretoannouncethatAPIStd594,7thEditionhasbeenpublished.
Please note that this document will require your review and attention. Your facility should
ensure that all revisions are incorporated into your quality management system and that
affected personnel are trained in the new requirements. Additionally, please evaluate the
effectiveness of all training provided and ensure all personnel are competent to perform the
requiredactivities.Thisshouldbecompletedpriortothespecificationseffectivedateandyour
nextscheduledaudit.
ThepublicationdateforthisdocumentwasSeptember2010withaneffectiveimplementation
dateofMarch1,2011.
Ifyoushouldhavetechnicalquestionsregardingthecontentsofthisspecification,pleasesend
[email protected].

For inquiries about your API Monogram License(s) or API Monogram requirements, please
[email protected].

API is an equal opportunity employer.

You might also like